EDISI I 2018
B BAHAN - -
B BAHAN - -
- - -
3 - Ls Alat Bantu - - - -
2 1.00 Ls Bahan Pengaman Tebing Galian Kayu 380,000.00 400,000.00 380,000.00 400,000.00
3 - Ls Alat Bantu - -
5 E.23 0.0070 Jam Water Tank Truck 150,000.00 160,000.00 1,050.00 1,120.00
6 E212 - Ls Alat Bantu - - - -
2 E.11 0.1177 Jam Flat Bed Truck 370,000.00 390,000.00 43,549.00 45,903.00
3 Ls Alat Bantu
5 E.23 0.0141 Jam Water Tank Truck 150,000.00 160,000.00 2,115.00 2,256.00
6 Ls Alat Bantu
5 E.23 0.0422 Jam Water Tank Truck 150,000.00 160,000.00 6,330.00 6,752.00
6 E.42 0.0037 Jam Concrete Paver (Slipform Paver) 500,000.00 550,000.00 1,850.00 2,035.00
7 Ls Alat Bantu - -
5 E.23 0.0422 Jam Water Tank Truck 150,000.00 160,000.00 6,330.00 6,752.00
6 E.42 0.0074 Jam Concrete Paver (Slipform Paver) 500,000.00 550,000.00 3,700.00 4,070.00
7 Ls Alat Bantu
2 L.01 0.7028 Jam Buruh tak terlatih 7,142.86 7,857.14 5,020.00 5,522.00
3 L.01 0.1506 Jam Buruh semi terlatih 7,142.86 7,857.14 1,075.71 1,183.29
4 M.39a 28.3774 Kg Baja Wire Mesh M.10 10,000.00 10,500.00 283,774.00 297,962.70
5 M.94 16.1694 Kg Baja Tulangan Polos / Dowel D.32 10,000.00 11,250.00 161,694.00 181,905.75
5 E.23 0.0422 Jam Water Tank Truck 150,000.00 160,000.00 6,330.00 6,752.00
6 E.42 0.0074 Jam Concrete Paver (Slipform Paver) 500,000.00 550,000.00 3,700.00 4,070.00
7 Ls Alat Bantu
11 6.1 (1)(a) 1 LTR LAPIS SERAP PENGIKAT - ASPAL CAIR 7,712.12 8,216.22
A TENAGA 26.71 30.29
12
### 6.3 (5a) 1 TON LASTON LAPIS AUS (AC-WC) 866,733.73 977,355.40
8 Alat Bantu
5 Alat Bantu
14 7.1 (5) a 1 M3 BETON MUTU SEDANG fc' = 30 Mpa LANTAI JEMBATAN 2,167,458.31 2,455,844.01
1 E.43 0.0502 Jam Concrete Pan Mixer 500,000.00 510,000.00 25,100.00 25,602.00
5 E.23 0.0382 Jam Water Tank Truck 150,000.00 160,000.00 5,730.00 6,112.00
6 Alat bantu
C PERALATAN
16
### 7.3 (1) 1 KG BAJA TULANGAN U 24 POLOS 14,377.00 16,175.50
C PERALATAN - -
M.12 0.0833 Bh Tiang Pancang Pracetak Uk.350 x 350 mm 1,650,000.00 1,700,000.00 137,445.00 141,610.00
1 0.0833 m' Tiang Pancang Pracetak Uk.350 x 350 mm 1,650,000.00 1,700,000.00 137,445.00 141,610.00
1 0.0335 Jam Crane (di Base camp) 850,000.00 900,000.00 28,475.00 30,150.00
B BAHAN - -
EDISI I 2018
HARGA
EDISI I 2018
HARGA
10 T u k a n g b e s i Hr 95,000 105,000
11 K e p . t k . b e s i Hr 110,000 120,000
12 T u k a n g c a t Hr 95,000 105,000
13 K e p . t k . c a t Hr 110,000 120,000
14 T u k a n g p l i t u r Hr 95,000 105,000
15 T u k a n g j a l a n Hr 75,000 80,000
16 T u k a n g g a l i Hr 75,000 80,000
18 T k . l e i d e n g Hr 95,000 105,000
20 P e m b . M a s i n i s Hr 115,000 125,000
21 P e n j a g a a p i Hr 75,000 80,000
22 P e n j a g a m a l a m Hr 75,000 80,000
DAFTAR SEWA P E R A L A T AN
HARGA
9
29 Mesin Las jam 180,000 200,000
9
HARGA SATUAN PEKERJAAN KONSTRUKSI
10 5.3 (2) PERKERASAN BETON SEMEN DG ANYAMAN TULANGAN TUNGGAL 1 M3 2,143,796.29 2,266,810.30
11 6.1 (1)(a) LAPIS SERAP PENGIKAT - ASPAL CAIR 1 LTR 7,712.12 8,216.22
18 7.6 (16)a PEMANCANGAN TIANG BETON BERTULANG UKURAN 350 X 350 MM 1 M' 362,050.62 377,255.29
HARGA
I BAHAN DASAR
1 BATU KALI Bulat Utuh m3 230,000 250,000
Bulat Belah m3 260,000 335,000
8 PORTLAND CEMENT
Merk I 40 kg zak 41,500 42,500
4 ASBES PLAT
5 SENG PLAT
6 SENG GELOMBANG
III . B A H A N K A Y U
1 JATI Papan m3 22,000,000 23,000,000
20 X 20 cm m2 39,500 45,000
2 UBIN PORSELIN
3 MOZAIK PORSELIN
10 X 20 cm m2 35,000 55,000
15 X 15 cm m2 45,000 55,000
20 X 20 cm m2 52,000 60,000
20 X 25 cm m2 52,000 56,000
20 X 20 cm m2 46,500 56,000
33 x 33 cm m2 52,000 60,000
25 x 25 cm m2 49,000 55,000
15 x 20 cm m2 52,000 57,000
V.BAHAN CETAK
1 BUIS BETON Ø 10 cm - 100 cm bh 29,000 40,000
10 X 20 cm bh 7,500 12,000
20 X 20 cm bh 8,000 16,000
25 X 25 cm bh 11,000 20,000
30 X 30 cm bh 15,000 19,000
15 X 25 cm bh 8,500 13,000
15 X 30 cm bh 8,500 16,000
VI . B A H A N B E S I
1 BESI BETON besi beton polos kg 10,000 11,250
VII . B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
VIII . B A H A N L A N G I T - L A N G I T
1 SOFT BOARD-uk: 4'X 8'
Gypsum tebal 9 mm lbr 60,000 68,000
3 PLY WOOD
Teak wood
4 Tripleks
5 Multipleks
IX . B A H A N F I N I S H I N G
1 KAYU
2 TEMBOK
3 BESI
XI . PAVING BLOCK
1 SQUARE Abu-abu m2 75,000 80,000
XII. L A I N - L A I N
1 KREI 25 MM m2 45,000 50,000
2 Sliding Pintu J4 bh 180,000 235,000
8 ASPAL.
5 mm m2 225,000 275,000
12 LAIN-LAIN
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
1. Pekerja (L01) Jam 0.0024 10,000.00
2. Mandor (L02) Jam 0.0001 13,750.00
B. BAHAN
1 Batu pecah 1/2, t=2 cm kg 66.0000 210.53
2 Lapis aspal (terpasang) Liter 1.0700 8,571.26
JUMLAH HARGA BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0001 280,000.00
2. Dump Truck E08 Jam 0.0091 220,000.00
3. P. Tyre Roller E18 Jam 0.0010 550,000.00
4. Alat Bantu Ls 1.0000 200.00
UMLAH HARGA PERALATAN
JUMLAH PERKIRAAN
HARGA NO. KOMPONEN SATUAN KUANTITAS
(Rp.)
A. TENAGA
24.45 1. Pekerja (L01) Jam 0.0024
1.68 2. Mandor (L02) Jam 0.0001
B. BAHAN
13,894.74 1 Batu pecah 1/2, t = 15 cm kg 285.0000
9,171.25 2 Lapis aspal (terpasang) Liter 1.0700
23,065.99 JUMLAH HARGA BAHAN
C. PERALATAN
34.23 1. Wheel Loader E15 Jam 0.0001
1,991.83 2. Dump Truck E08 Jam 0.0091
532.78 3. P. Tyre Roller E18 Jam 0.0010
200.00 4. Alat Bantu Ls 1.0000
2,758.84 UMLAH HARGA PERALATAN
HARGA JUMLAH
SATUAN HARGA NO. KOMPONEN
(Rp.) (Rp.)
A. TENAGA
10,000.00 24.45 1. Pekerja (L01)
13,750.00 1.68 2. Mandor (L02)
B. BAHAN
210.53 60,000.00 2 Minyak Tanah (M11)
8,571.26 9,171.25
JUMLAH HARGA BAHAN 69,171.25
C. PERALATAN
280,000.00 34.23 1. Asphalt Distributor (E41)
220,000.00 1,991.83 2 Air Compresor (E05)
550,000.00 532.78
200.00 200.00
LAH HARGA PERALATAN 2,758.84
1 m2
0.15 m thicknes
0.15 m3/m2
285 kg/m2
33 kg
0.01736842 m3
33