XI TKJIJ 2
RENCANA ANGGARAN BIAYA (RAB)
RAB)
13.714
0.348 0.348
2.164 2.164
0.901 0.901
SMK NEGERI
IAYA (RAB)
13900.00 535150.00
138440.50 3876334.00
4411484.00
29500.00 147500.00
152900.00 611600.00
759100.00
282900.00 381915.00
706300.00 5367880.00
706300.00 1165395.00
6915190.00
29500.00 1475000.00
1475000.00
2950000.00
20000.00 572000.00
572000.00
15607774.00
TABEL -
RINGKASAN ANALISA HARGA SATUAN POKOK KEGIATAN (AHSPK)
BENDUNGAN LOGUNG KABUPATEN KUDUS
A PEKERJAAN PERSIAPAN
A.00 Mobilisasi dan Demobilisasi LS 383,700,000.00
A.01 Barak Kerja (70 m2) LS 94,145,000.00
A.02 Kantor Lapangan (200 m2) LS 443,450,100.00
A.03 Penyediaan Air Bersih dan Sanitasi LS 106,205,000.00
A.04 Penyediaan Sarana Penerangan Kantor LS 404,800,000.00
A.05 Penyediaan Sarana Telekomunikasi LS 87,312,500.00
A.06 Penyediaan Sarana & Prasarana Laboratorium LS 408,479,500.00
A.07 Penyediaan Sarana Kesehatan LS 227,700,000.00
A.08 Jalan masuk ke lokasi ( Pemeliharaan,perbaikan , dll.) LS 5,889,015,000.00
A.09 Dokumentasi Foto dan film Kemajuan Pekerjaan LS 308,343,200.00
A.10 Pencegahan HIV AID LS 537,900,000.00
A.11 Pemantauan Lingkungan LS 419,760,000.00
C PEKERJAAN TANAH
C.01 Pembersihan lapangan m2 13,900.00
Pembersihan / Penebangan pohon m2 27,600.00
C.02 Pengupasan (minimum 0,15 m / tebal top soil) m2 21,200.00
C.03 Galian Tanah biasa m3 29,500.00
C.04 Penggalian Batu Lapuk (dengan alat berat) m3 63,900.00
C.05 Penggalian Batu Keras (dengan alat berat) m3 109,500.00
C.07 Timbunan inti (material kedap) m3 125,600.00
C.08 Timbunan Filter Halus (material pasir) m3 296,800.00
C.09 Timbunan Filter Kasar (material kerikil) m3 330,100.00
C.10 Timbunan Batu (dari stock pile) m3 293,800.00
C.11 Timbunan Riprap (material batu) m3 295,500.00
C.12 Timbunan tanah dipadatkan m3 20,200.00
C.13 Lapisan Kerikil m3 164,800.00
C.14 Urugan Pasir m3 152,900.00
C.15 Timbunan Random Tanah dari stockpile m3 48,600.00
C.16 Gebalan Rumput m2 14,000.00
C.17 Timbunan Sirtu m3 182,500.00
C.18 Timbunan Random (pengangkutan dari borrow area m3 79,100.00
ke stockpile, stockpile ke lokasi timbunan)
D PEKERJAAN BETON
D.01a Beton K-350 m3 1,228,400.00
D.01 Beton K-300 m3 1,162,100.00
D.02 Beton K-250 m3 1,117,400.00
D.03 Beton K-225 m3 1,090,900.00
D.04 Beton K-175 m3 1,033,000.00
D.05a Beton K-125 m3 958,100.00
D.05b Beton K100 / Lantai kerja m3 893,100.00
D.06 Tulangan Beton (pemotongan, pembengkokan dan pemasangan) Kg 15,378.00
D.07 Bekisting tipe non expose F1 (termasuk perancah dan pembongkaran) m2 155,300.00
D.08 Bekisting tipe expose F2 (termasuk perancah dan pembongkaran) m2 186,400.00
D.09 Bekisting tipe expose F4 (termasuk perancah dan pembongkaran) m2 192,600.00
TABEL -
RINGKASAN ANALISA HARGA SATUAN POKOK KEGIATAN (AHSPK)
BENDUNGAN LOGUNG KABUPATEN KUDUS
K PEKERJAAN LAIN-LAIN
K.01 PVC Water Stop, l=300 mm m' 169,800.00
K.02 Dowel Bar dia. 25, L=1 m bh 67,600.00
K.03 Anchor Bar D25 L=2,00 m m' 141,600.00
Anchor Bar D50 m' 233,500.00
K.04 Handrail, Galvanis Pipe dia. 3" (termasuk cat) m' 182,300.00
K.05 Pipa PVC Perforated dia. 6" m' 181,000.00
TABEL -
RINGKASAN ANALISA HARGA SATUAN POKOK KEGIATAN (AHSPK)
BENDUNGAN LOGUNG KABUPATEN KUDUS
HARGA BIAYA
NO URAIAN SATUAN VOLUME SATUAN PEKERJAAN
(Rp.) (Rp.)
A. PEKERJAAN PERSIAPAN
a Mobilisasi dan Demobilisasi Ls 1.00 383,700,000.00 383,700,000.00
b Jalan masuk ke lokasi ( Pemeliharaan,perbaikan , dll.) Ls 1.00 5,889,015,000.00 5,889,015,000.00
c Kantor Direksi, Konsultan ( 200 m2 ) unit 1.00 443,450,100.00 443,450,100.00
Kantor Kontraktor ( 200 m2 ) unit 1.00 443,450,100.00 443,450,100.00
d Gudang Lapangan & Mushola ( 140 m2 ) unit 1.00 91,004,900.00 91,004,900.00
e Barak Kerja ( 70 m2 ) unit 1.00 94,145,000.00 94,145,000.00
f Gedung Poliklinik ( 31,75 m2 ) unit 1.00 62,823,000.00 62,823,000.00
g Bengkel Peralatan (120 m2 ) unit 1.00 220,919,000.00 220,919,000.00
h Penyedia Sarana & Prasarana Laboratorium unit 1.00 408,479,500.00 408,479,500.00
i Penyediaan Air Bersih dan Sanitasi Ls 1.00 106,205,000.00 106,205,000.00
j Penyediaan Sarana Penerangan Kantor Ls 1.00 404,800,000.00 404,800,000.00
k Penyediaan Sarana Telekomunikasi Ls 1.00 87,312,500.00 87,312,500.00
l Penyediaan Sarana Kesehatan Ls 1.00 227,700,000.00 227,700,000.00
m Dokumentasi Foto dan film Kemajuan Pekerjaan LS 1.00 308,343,200.00 308,343,200.00
n Program Pencegahan HIV AID LS 1.00 537,900,000.00 537,900,000.00
o Pemantauan Lingkungan LS 1.00 419,760,000.00 419,760,000.00
p Penyelenggaraan K3 Konstruksi LS 1.00 480,000,000.00 480,000,000.00
q Pembuatan laporan pelaksanaan pekerjaan LS 1.00 423,500,000.00 423,500,000.00
r Survey pengukuran, working drawing dan as build drawing LS 1.00 663,400,000.00 663,400,000.00
s Mebeler dan peralatan Kantor LS 1.00 300,000,000.00 300,000,000.00
11,995,907,300.00
B. PEKERJAAN JALAN
3 Pekerjaan Pendukung
a Marka Jalan m2 177.00 158,200.00 28,001,400.00
b Rambu jalan bh 10.00 322,100.00 3,221,000.00
c Patok pengarah bh 120.00 94,708.00 11,364,960.00
d Patok kilometer bh 2.00 373,309.00 746,618.00
9,912,130,488.00
C PENGELAK SUNGAI
I Dewatering thn 4.00 319,995,500.00 1,279,982,000.00
HARGA BIAYA
NO URAIAN SATUAN VOLUME SATUAN PEKERJAAN
(Rp.) (Rp.)
c Filter / Saringan kasar. m3 1,523.00 330,100.00 502,740,741.93
d Timbunan batu m3 4,705.00 293,800.00 1,382,327,531.00
e Riprap m3 5,624.00 295,500.00 1,661,891,704.50
f Timbunan Random ( Pengangkutan dr Borrow area ke - m3 176,179.00 79,100.00 13,935,759,164.19
stock pile - lokasi timbunan 24,021,292,586.44
V Saluran Pengelak
1 Inlet
a Galian tanah biasa. m3 12,248.00 29,500.00 361,316,000.00
b Penggalian Batu Lapuk (dengan alat berat) m3 12,861.00 63,900.00 821,818,151.73
C Penggalian Batu Keras (dengan alat berat) m3 11,023.00 109,500.00 1,207,018,087.61
d Beton K-225 m3 407.00 1,090,900.00 443,996,913.63
e Besi beton kg 8,469.00 15,378.00 130,236,300.99
f Bekisting expose type F2 m2 496.00 186,400.00 92,454,750.43
g Pasangan Batu Kali (1Pc : 4Ps) m3 41.00 670,200.00 27,474,849.00
h Siaran (1PC : 2 Ps) m2 80.00 37,000.00 2,960,000.00
2 Outlet
a Galian tanah biasa. m3 7,168.00 29,500.00 211,455,985.98
b Penggalian Batu Lapuk (dengan alat berat) m3 5,256.00 63,900.00 335,858,122.14
c Penggalian Batu Keras (dengan alat berat) m3 2,150.00 109,500.00 235,425,203.39
d Timbunan tanah dipadatkan ( random dari stockpile) m3 3,444.00 48,600.00 167,378,449.78
e Beton K-225 m3 1,202.00 1,090,900.00 1,311,261,800.00
f Besi beton kg 189,437.00 15,378.00 2,913,162,240.48
g Bekisting expose type F2 m2 8,198.00 186,400.00 1,528,107,131.03
3 Diversion Conduit .
a. Galian tanah biasa, m3 22,941.00 29,500.00 676,759,619.01
b. Penggalian Batu Lapuk (dengan alat berat) m3 16,059.00 63,900.00 1,026,170,344.36
c. Penggalian Batu Keras (dengan alat berat) m3 5,735.00 109,500.00 627,982,500.00
d Concrete Conduit ( K350 ) m3 6,889.00 1,228,400.00 8,462,447,600.00
e Besi beton kg 757,891.00 15,378.00 11,654,847,798.00
f Bekisting expose type F2 m2 17,756.00 186,400.00 3,309,718,400.00
g Filling Grouting ton 9,044.00 1,763,600.00 15,949,998,400.00
h Backfill Grouting m3 11.00 1,304,900.00 14,353,685.79
i Beton Plugging ( K225 ) m3 156.00 1,090,900.00 170,180,400.00
j Bekisting expose type F4 m2 47.00 192,600.00 9,052,200.00
51,691,434,933.35
VI Rumah kontrol / Control Room
a Galian tanah biasa m3 900.00 29,500.00 26,550,103.25
b Timbunan tanah dipadatkan ( random dari stockpile) m3 555.00 48,600.00 26,972,829.90
c Beton lantai dasar Besement EL. 91.00 ( K225 ) m3 1,837.00 1,090,900.00 2,003,980,027.30
d Beton lantai 1 EL. 94.20 ( K225 ) m3 1,870.00 1,090,900.00 2,039,983,000.00
e Besi beton kg 398,169.00 15,378.00 6,123,042,882.00
f Bekisting expose type F2 m2 1,646.00 186,400.00 306,814,400.00
10,527,343,242.45
D SPILLWAY / BANGUNAN PELIMPAH
I Pekerjaan Tanah
a Pembersihan Lapangan areal spillway. m2 24,845.00 13,900.00 345,345,500.00
b Galian tanah biasa. m3 215,392.00 29,500.00 6,354,063,941.04
c Penggalian Batu Lapuk (dengan alat berat) m3 117,486.00 63,900.00 7,507,355,388.43
d Penggalian Batu Keras (dengan alat berat) m3 78,323.00 109,500.00 8,576,368,500.00
e Timbunan tanah dipadatkan ( random dari stockpile) m3 44,868.00 48,600.00 2,180,584,814.77
24,963,718,144.25
II Ambang Pelimpah.
a Beton K-225 m3 38,918.00 1,090,900.00 42,455,640,955.41
b Bekisting expose type F4 m3 27,297.00 195,900.00 5,347,483,275.58
c Besi beton kg 1,660,744.00 15,378.00 25,538,921,268.14
d Beton plat lantai plunge pool ( K225 ) m3 2,403.00 1,090,900.00 2,621,427,649.13
e Beton / Lantai kerja(1Pc : 3Ps : 5Kr) m3 1,729.00 916,500.00 1,584,624,834.00
77,548,097,982.26
III Jembatan (2 unit)
a Beton Lantai Kerja (1pc : 3ps 5:kr) m3 12.00 916,500.00 10,998,000.00
b Beton K-225 m3 125.00 1,090,900.00 136,362,500.00
c Besi Tulangan Ulir kg 25174.00 15,378.00 387,125,772.00
d Lapisan penetrasi/laston m2 218.00 147,780.00 32,216,040.00
e Bekisting expose type F2 m2 249.00 189,500.00 47,185,026.25
f Elastomeric bearing pad bh 8.00 550,000.00 4,400,000.00
g Pipa sandaran 3" galvanis termasuk cat m' 194.00 182,300.00 35,366,200.00
RENCANA ANGGARAN BIAYA ( R A B )
KEGIATAN : PEMBANGUNAN BENDUNGAN LOGUNG KABUPATEN KUDUS
TAHUN ANGGARAN : 2014
HARGA BIAYA
NO URAIAN SATUAN VOLUME SATUAN PEKERJAAN
(Rp.) (Rp.)
653,653,538.25
RENCANA ANGGARAN BIAYA ( R A B )
KEGIATAN : PEMBANGUNAN BENDUNGAN LOGUNG KABUPATEN KUDUS
TAHUN ANGGARAN : 2014
HARGA BIAYA
NO URAIAN SATUAN VOLUME SATUAN PEKERJAAN
(Rp.) (Rp.)
IV Lain-lain
a Water stop m' 22,745.00 169,800.00 3,862,101,000.00
b Pipa PVC dia. 6" ( drainase spillway ) m' 1,265.00 181,000.00 228,965,000.00
c Gebalan rumput m2 12,032.00 14,000.00 168,448,000.00
d Angkur dia 25 - 200 panjang 2.50 m kg 15,419.00 141,600.00 2,183,330,400.00
e Shotcrete tebal 6 cm m2 27,604.00 397,200.00 10,964,307,462.76
f Dowel Bar dia. 25, L=1 m bh 4,548.00 67,600.00 307,444,800.00
g Joint Filler t=1 cm m' 34,117.00 153,400.00 5,233,547,800.00
22,948,144,462.76
E MAIN DAM
I Large Scale Sample 2.00 150,000,000.00 300,000,000.00
II Galian tanah
a Galian tanah biasa, m3 48,571.00 29,500.00 1,432,844,389.38
b Penggalian Batu Lapuk (dengan alat berat) m3 34,000.00 63,900.00 2,172,600,215.66
c Penggalian Batu Keras (dengan alat berat) m3 14,571.00 109,500.00 1,595,524,814.81
5,200,969,419.85
III Timbunan
a Core / Inti. Kedap air m3 189,827.00 125,600.00 23,842,271,514.00
b Filter / Saringan halus. m3 69,564.00 296,800.00 20,646,596,007.30
c Filter / Saringan kasar. m3 21,852.00 330,100.00 7,213,345,596.12
d Timbunan batu m3 13,611.00 293,800.00 3,998,911,033.69
e Riprap m3 41,258.00 295,500.00 12,191,739,000.00
f Timbunan Random ( Pengangkutan dari Borrow area ke - m3 1,122,605.00 79,100.00 88,798,055,500.00
stock pile, stockpile - kelokasi timbunan
g Pemboran Lubang Curtain Grouting m' 94,560.00 496,700.00 46,967,952,000.00
h Pemboran Lubang Blanket Grouting m' 9,456.00 496,700.00 4,696,795,200.00
i Pemboran Inti untuk Pilot & Check Hole m' 6,304.00 422,800.00 2,665,331,200.00
j Material Grouting ( Semen ) ton 15,602.00 1,763,600.00 27,515,687,200.00
k Water Pressure Test untuk Pilot & Check Hole test 1,260.00 272,200.00 342,972,000.00
l Backfill Grouting m3 1,300.00 1,304,900.00 1,696,370,000.00
m Gebalan rumput m2 29,100.00 14,000.00 407,400,000.00
240,983,426,251.11
IV Perkerasan puncak bendungan
a Lapis penetrasi Makadam 5 cm m2 2,992.00 82,968.00 248,240,256.00
b Lapis penetrasi batu belah 10/15 m2 2,992.00 181,924.50 544,318,104.00
c Urugan Pasir m3 299.00 330,100.00 98,699,900.00
d Kanstin buah 2,152.00 18,777.00 40,408,104.00
e Patok pengaman buah 220.00 195,400.00 42,988,000.00
974,654,364.00
V Jalan inspeksi di lereng hilir Bendungan
a Timbunan tanah dipadatkan ( random dari stockpile) m3 13,200.00 48,600.00 641,520,000.00
b Lapis penetrasi Makadam 50 mm m2 1,200.00 82,968.00 99,561,600.00
c Lapis penetrasi batu belah 10/15 m2 1,200.00 181,924.50 218,309,400.00
d Urugan Pasir m3 120.00 330,100.00 39,612,000.00
e Pasangan Batu Kali (1Pc : 4Ps) m3 206.80 670,200.00 138,597,360.00
f Siaran (1PC : 2 Ps) m2 1,800.00 37,000.00 66,600,000.00
g Lubang pengering PVC 50 mm ( 2" ) m 300.00 50,500.00 15,150,000.00
1,219,350,360.00
VI Drainase Kaki Bendungan
1 Drainase Rembesan
a Galian tanah biasa, m3 586.00 29,500.00 17,287,000.00
b Beton K225 m3 189.00 1,090,900.00 206,180,100.00
c Besi beton kg 8,316.00 15,378.00 127,883,448.00
d Pipa PVC dia 50 mm ( 2 " ) m' 20.00 50,500.00 1,010,000.00
e Pipa beton U R = 25 cm bh 150.00 58,344.00 8,751,600.00
f Begisting non Expose F1 m2 702.00 155,300.00 109,020,600.00
2 Drainase air hujan
a Galian tanah biasa, m3 2,624.00 29,500.00 77,407,893.18
b Timbunan tanah dipadatkan ( random dari stockpile) m3 186.00 48,600.00 9,039,794.40
c Beton K225 m3 216.00 1,090,900.00 235,634,400.00
d Besi beton kg 9,073.00 15,378.00 139,524,594.00
e Pipa beton U R = 25 CM bh 243.00 58,344.00 14,177,592.00
f Begisting non Expose F1 m2 1,386.00 155,300.00 215,245,644.70
g Pipa PVC dia 50 mm ( 2 " ) m 33.00 50,500.00 1,666,500.00
h Timbunan batu m3 43,638.00 293,800.00 12,820,844,400.00
RENCANA ANGGARAN BIAYA ( R A B )
KEGIATAN : PEMBANGUNAN BENDUNGAN LOGUNG KABUPATEN KUDUS
TAHUN ANGGARAN : 2014
HARGA BIAYA
NO URAIAN SATUAN VOLUME SATUAN PEKERJAAN
(Rp.) (Rp.)
13,983,673,566.28
RENCANA ANGGARAN BIAYA ( R A B )
KEGIATAN : PEMBANGUNAN BENDUNGAN LOGUNG KABUPATEN KUDUS
TAHUN ANGGARAN : 2014
HARGA BIAYA
NO URAIAN SATUAN VOLUME SATUAN PEKERJAAN
(Rp.) (Rp.)
F BANGUNAN PENGAMBILAN / INTAKE
I Inlet Work
a Pembersihan Lapangan area Intake m2 1,322.00 13,900.00 18,375,800.00
b Galian tanah biasa m3 1,286.00 29,500.00 37,937,041.30
c Penggalian Batu Lapuk (dengan alat berat) m3 898.00 63,900.00 57,382,404.48
d Penggalian Batu Keras (dengan alat berat) m3 299.00 109,500.00 32,740,981.80
e Beton apron K225 ( Pot. E - E dan F - F ) m3 194.00 1,090,900.00 211,631,327.30
f Buis beton dia 0.70 m bh 12.00 236,500.00 2,838,000.00
g Angkur dia 25 mm m 24.00 141,600.00 3,398,400.00
h Pipa udara dia 0.50 m tebal 10 mm m 53.00 18,941,100.00 1,003,878,300.00
i Beton K225 ( Pot. A - A dan Pot B - B ) m3 1,018.00 1,090,900.00 1,110,536,200.00
j Besi beton kg 137,417.00 15,378.00 2,113,198,626.00
4,591,917,080.88
II Pipa Intake dia 1.00 m
a Galian tanah biasa m3 76.00 29,500.00 2,242,000.00
b Penggalian Batu Lapuk (dengan alat berat) m3 53.00 63,900.00 3,386,789.46
c Penggalian Batu Keras (dengan alat berat) m3 17.00 109,500.00 1,861,186.10
d Beton pembungkus pipa dia 1.00 m ( K225 ) m3 107.00 1,090,900.00 116,726,300.00
e Besi beton kg 6,619.00 15,378.00 101,786,982.00
f Pipa baja dia 1.00 m tebal 10 mm m 25.00 23,302,700.00 582,567,500.00
g Bekisting expose type F2 m2 124.00 186,400.00 23,113,600.00
h Grouting ( filling Grouting ) ton 640.00 1,763,600.00 1,128,698,356.48
i Backfill Grouting m3 8.00 1,304,900.00 10,434,155.78
1,970,816,869.82
III Valve House.
1 Struktur Bawah
a Galian tanah biasa m3 2,580.00 29,500.00 76,110,000.00
b. Timbunan tanah dipadatkan ( random dari stockpile) m3 244.00 48,600.00 11,858,400.00
c. Beton K-225 m3 1,582.00 1,090,900.00 1,725,805,436.35
d. Besi beton kg 174,038.00 15,378.00 2,676,356,287.11
2 Struktur Atas
a Beton K 225 kolom , plat atap , lisplank dll m3 151.00 1,090,900.00 164,720,445.50
b. Besi beton kg 15,895.00 15,378.00 244,433,310.00
4,899,283,878.96
IV Jembatan Penghubung
1 Struktur Bawah
Abutment
a Beton K225 m3 688.00 1,090,900.00 750,539,200.00
b Beton Plat injak K225 m3 8.00 1,090,900.00 8,727,200.00
c Besi beton. kg 1,480.00 15,378.00 22,759,440.00
d Beton / Lantai kerja(1Pc : 3Ps : 5Kr) m3 6.00 893,100.00 5,358,600.00
2 Struktur Atas
a Beton plat lantai K225 m3 31.00 1,090,900.00 33,817,900.00
b Trotoar K225 m3 18.00 1,090,900.00 19,636,200.00
c Besi beton. kg 5,405.00 15,378.00 83,118,090.00
d Bekisting expose type F2 m2 125.00 186,400.00 23,300,000.00
e Elastomeric bearing Pad. 65x400x16 Buah 8.00 550,000.00 4,400,000.00
f Anchor rod , D = 50 mm, L = 75 Cm. Buah 16.00 233,500.00 3,736,000.00
g Handrail, Galvanis Pipe dia. 3" (termasuk cat) m 104.00 182,300.00 18,959,200.00
h Expantion Joint. m 2.00 607,753.00 1,215,506.00
i Steel Drain pipe 75 mm. m 20.00 129,861.00 2,597,220.00
j Besi L 75 X 75 x 7 kg 333.00 40,300.00 13,419,900.00
k Besi U 120 x55x7 kg 563.00 40,300.00 22,688,900.00
l Pengaspalan Jembatan (ATB) m2 156.00 177,336.00 27,664,416.00
m Shear connector canal ( 125 x 65 x 6 x 8) kg 657.00 40,300.00 26,477,100.00
3 Intermediate Stiffener
Plat bawah
a Plat PL. 16 x 400 kg 1,397.00 15,814.80 22,093,275.60
b Plat PL. 25 x 400 kg 2,669.00 15,814.80 42,209,701.20
c Plat PL. 30 x 400 kg 3,846.00 15,814.80 60,823,720.80
Plat atas
a Plat PL. 16 x 300 kg 2,276.00 15,814.80 35,994,484.80
b Plat PL. 20 x 300 kg 1,954.00 15,814.80 30,902,119.20
c Plat PL. 10 x 1700 kg 13,659.00 15,814.80 216,014,353.20
RENCANA ANGGARAN BIAYA ( R A B )
KEGIATAN : PEMBANGUNAN BENDUNGAN LOGUNG KABUPATEN KUDUS
TAHUN ANGGARAN : 2014
HARGA BIAYA
NO URAIAN SATUAN VOLUME SATUAN PEKERJAAN
(Rp.) (Rp.)
Stiffener diafragma
a Plat PL. 140 x 8 x 1650 kg 4,003.00 15,814.80 63,306,644.40
b Plat PL. 120 x 8 x 1650 kg 3,611.00 15,814.80 57,107,242.80
4 Batang diagonal L. 70 X 70 X 7 kg 697.00 16,722.30 11,655,446.24
5 Batang horisontal L. 70 X 70 X 7 kg 573.00 16,722.30 9,581,880.48
6 Plat strip kg 20.00 15,814.80 316,296.00
1,618,420,036.72
VII Pembersihan Lapangan area genangan termasuk tebang pohon m2 160,840.00 27,600.00 4,439,184,000.00
4,439,184,000.00
VIII Penataan Greenbelt Ha 32.00 15,000,000.00 480,000,000.00
HARGA BIAYA
NO URAIAN SATUAN VOLUME SATUAN PEKERJAAN
(Rp.) (Rp.)
i Jendela Aluminium set 12.00 825,000.00 9,900,000.00
1,542,896,050.00
RENCANA ANGGARAN BIAYA ( R A B )
KEGIATAN : PEMBANGUNAN BENDUNGAN LOGUNG KABUPATEN KUDUS
TAHUN ANGGARAN : 2014
HARGA BIAYA
NO URAIAN SATUAN VOLUME SATUAN PEKERJAAN
(Rp.) (Rp.)
J PEMBANGUNAN FASILITAS
a Gudang Lapangan ( 140 m2 ) unit 1.00 91,004,900.00 91,004,900.00
b Tandon Air unit 1.00 27,175,077.49 27,175,077.49
c Tangki Bahan Bakar unit 1.00 21,089,090.00 21,089,090.00
d Kantor Utama Bendungan (420 m2) unit 1.00 827,476,100.00 827,476,100.00
e Rumah Dinas Type 1 (60 m2) (1 Unit) unit 1.00 117,692,000.00 117,692,000.00
f Rumah Dinas Type 2 (45 m2) (1 Unit) unit 1.00 92,882,000.00 92,882,000.00
g Gardu Pandang (40 m2) unit 1.00 84,461,000.00 84,461,000.00
h Pos Jaga (9 m2) 2 unit unit 1.00 15,719,000.00 15,719,000.00
i Mushola (60 m3) unit 1.00 117,411,000.00 117,411,000.00
j Rumah Genset (16 m2) unit 1.00 31,169,000.00 31,169,000.00
k Bengkel Peralatan (120 m2) unit 1.00 220,919,000.00 220,919,000.00
l Rumah Instrumen (31.76 m2) unit 1.00 62,823,000.00 62,823,000.00
m Instalasi Jaringan Tegangan Menengah 20 KV/220 V Ls 1.00 246,477,700.00 246,477,700.00
n Instalasi Penerangan Jalan dan Puncak Bendung Titik 70.00 5,550,000.00 388,500,000.00
o Patok Batas aset Tanah Bendungan ( beton K 175 ) bh 30.00 959,000.00 28,770,000.00
p Landscape m2 50,000.00 12,500.00 625,000,000.00
2,998,568,867.49
K PEMBANGUNAN JALAN
a Lapis pondasi agregat klas C m3 1,458.00 301,900.00 440,170,200.00
b Lapis pondasi agregat klas A m3 3,280.00 274,800.00 901,344,000.00
c Lapis pondasi agregat klas B m3 6,560.00 272,800.00 1,789,568,000.00
d Lapis resap pengikat ltr 26,921.00 11,313.00 304,557,273.00
e Asphalt Treated ( ATB ) m3 1,094.00 2,955,600.00 3,233,426,400.00
6,669,065,873.00
Catatan:
1. Data of April 2012 8. Susut = Harga Susut / Usia Guna
2. Susut = 3% x Harga Beli 9. Harga BBM (Solar) = Rp 11,950 /liter
3. Spare Part = 6% x (Harga Beli - Nilai Susut) / Lama Operasi 10. Harga Pelumas = Rp 34,000 /liter
4. Biaya Perbaikan = 4% x (Harga Beli - Nilai Susut) / Lama Operasi 11. Operator = Rp 75,000 /org-hari 100,000
5. Suku Bunga Bank = 12% 12. Ass. Operator = Rp 42,500 /org-hari 66,667
6. Bahan bakar = 0.12 x HP x Harga bahan bakar (Solar)
7. Bahan bakar = 0.22 x HP x Harga bahan bakar (Premium)
8. Pelumas, dll = 0.003 x HP x Harga Pelumas
9. Kurs Dollar 1US$ = Rp. 11,500
STANDAR HARGA SATUAN DASAR (SHSD)
SEWA ALAT
Harga Sewa
No. Jenis Alat Satuan
(Rp)
II BAHAN
1 Pasir urug m3 100,000
2 Pasir beton / cor ( hitam ) m3 300,000 190,000
3 Pasir pasang m3 147,500
4 Sirtu m3 115,000
5 Tanah urug m3
6 Batu belah ( kali / gunung ) m3 140,000
7 Batu bata merah bh 625
8 Batu pecah 5/7 m3 162,500
9 Batu pecah 3/5 m3 177,500
10 Batu pecah 2/3 m3 200,000
11 Semen portland 40 kg zak 53,000
12 Semen portland 50 kg zak 66,000 63,750
13 Semen warna kg 12,000
14 Keramik 30X30cm M2 50,000
15 Keramik 20X20cm M2 50,000
16 Besi tulangan beton ( polos ) kg 10,500
17 Besi tulangan beton ( ulir ) kg 12,500
18 Besi plat kg 13,000
19 Besi profil kg 13,750
20 Kawat ikat beton kg 16,750
20 Kayu jati balok m3 23,500,000
21 Kayu jati papan m3 28,000,000
22 Kayu kamper balok m3 6,800,000
23 Kayu kamper papan m3 7,450,000
24 Kayu kruing balok m3 6,400,000
25 Kayu kruing papan m3 6,900,000
No Jenis Upah Kerja / Bahan / Peralatan Satuan Daftar Harga KETERANGAN
( Rp )
26 Kayu tahun / balau balok m3 6,600,000
27 Kayu meranti balok m3 4,150,000
28 Kayu meranti papan m3 4,750,000
29 Kayu bekisting m3 2,200,000
No Jenis Upah Kerja / Bahan / Peralatan Satuan Daftar Harga KETERANGAN
( Rp )
30 Triplek 120 x 240 cm tebal 3mm lbr 55,000
31 Triplek 120 x 240 cm tebal 4 mm lbr 68,000
32 Kayu dolken/gelam Ø 10 cm panj. 4 m btg 31,000
33 Paku reng / usuk / triplek / seng kg 18,000
34 Paku asbes gelombang kg 21,000
35 Paku payung kg 21,000
36 Geotextile non Woven t=2mm m 17,500
37 Klosed Jongkok Keramik bh 140,000
38 Klosed Duduk Keramik bh 1,100,000
39 Teer / aspal kg 10,625
40 Buis Beton dia. 100, L=50 cm bh 150,000
41 Buis Beton dia. 50, L=50 cm bh 90,000
42 Pipa PVC Ø 1" m 8,000
43 Pipa PVC Ø 2" m 25,000
44 Pipa PVC Ø 4" m 75,833
45 Pipa PVC Ø 6" m 160,833
46 Cat kayu kg 56,500
47 Cat besi kg 45,000
49 Cat meni kg 16,500
50 Cat tembok kg 19,500
51 Cross bit, dia. 50 mm Pcs 278,300
52 Concrete Additive kg 17,500
53 Aspal Curah kg 10,469
54 Agregat Klas A m3 154,400
55 Agregat Klas B m3 137,900
56 Agregat Kasar m3 247,500
57 Agregat Halus m3 220,000
58 Filler kg 950
59 Dolken Jati lokal dia 15 - 20 cm L = 2 m btg 75,000
60 Rumput m2 5,000
61 Batu pecah mesin 1 - 2 cm ( beton ) m3 200,000
62 Multipleks 1,20x2,40m/12 mm lbr 160,000
63 Minyak Begisting Ltr 10,000
64 Mur baut Kuda -kuda Kg 15,000
65 Asbes gelombang 3,00 m x 1,05 m x 4 mm lbr 69,250
ANALISA HARGA SATUAN POKOK KEGIATAN
(AHSPK)
No. : A.00
Jenis Pekerjaan : MOBILISASI DAN DEMOBILISASI
Harga Satuan : Rp. 383,700,000.0
Satuan : Ls
Jumlah 383,700,000.0
Biaya umum dan keuntungan 10 %
Jumlah (termasuk biaya umum dan keuntungan) sebelum PPN 383,700,000.0
Jumlah dibulatkan 383,700,000.0
No. :
Jenis Pekerjaan : Patok geser
Harga Satuan : Rp. 710,200
Satuan : bh
I TENAGA
1. Tukang Batu org/hr 0.09 57,500 5,031
2. Mandor org/hr 0.04 57,500 2,396
3. Pekerja org/hr 0.10 42,500 4,427
II BAHAN
1 Beton K175 m3 0.375 1,033,000.00 387,375
2 Besi Tulangan Kg 9.900 15,378.00 152,242
3 Bekisting m2 0.480 192,600.00 92,448
4 Cat Kg 0.050 19,500.00 975
Sub Total II 632,065
III PERALATAN
1 Concrete mixer jam 0.020 25,300 506
2 Concrete Vibrator Jam 0.020 24,500 490
3 Alat bantu ls 1.000 750 750
No. :
Jenis Pekerjaan : Patok Batas aset Tanah Bendungan
Harga Satuan : Rp. 959,000
Satuan : bh
I TENAGA
1. Tukang Batu org/hr 0.09 10,500 919
2. Mandor org/hr 0.04 177,500 7,396
3. Pekerja org/hr 0.10 200,000 20,833
II BAHAN
1 Beton K175 m3 0.500 1,033,000.00 516,500
2 Besi Tulangan Kg 13.200 15,378.00 202,990
3 Bekisting m2 0.640 192,600.00 123,264
III PERALATAN
1 Concrete mixer jam 0.020 0 0
2 Concrete Vibrator Jam 0.020 0 0
3 Alat bantu ls 1.000 0 0
No. :
Jenis Pekerjaan : Bench Mark ( BM )
Harga Satuan : Rp. 195,499
Satuan : bh
I TENAGA
1. Tukang Batu org/hr 0.221 57,500 12,728
2. Mandor org/hr 0.055 57,500 3,182
3. Pekerja org/hr 0.63 42,500 26,563
II BAHAN
1 Beton K175 m3 0.012 1,033,000.00 12,783
2 Besi Tulangan Kg 1.238 15,378.00 19,030
3 Bekisting m2 0.060 192,600.00 11,556
4 Mur Kuningan bh 1.00 25,000.00 25,000
Sub Total II 68,370
III PERALATAN
1 Concrete mixer jam 1.328 25,300 33,598
2 Concrete Vibrator Jam 1.328 24,500 32,536
3 Alat bantu ls 1.000 750 750
No. : A.02
Jenis Pekerjaan : Kantor Lapangan (200 m²)
Harga Satuan : Rp. 443,450,100
Satuan : LS
No. : A.01
Jenis Pekerjaan : Barak Kerja (70 m2)
Harga Satuan : Rp. 94,145,000
Satuan : LS
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
No. : A.03
Jenis Pekerjaan : Penyedia Air Bersih dan Sanitasi
Harga Satuan : Rp. 106,205,000
Satuan : LS
IKA
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
No. : A.05
Jenis Pekerjaan : Penyedia Sarana Telekomunikasi
Harga Satuan : Rp. 87,312,500
Satuan : LS
I PERALATAN
II PENYAMBUNGAN
III LAIN-LAIN
No. : A.06
Jenis Pekerjaan : Penyedia Sarana & Prasarana Laboratorium ( Mektan & Concrete )
Harga Satuan : Rp. 408,479,500
Satuan : LS
I KONSTRUKSI
II PERALATAN TEST
Sub Total II 0
III OPERASIONAL
No. : A.04
Jenis Pekerjaan : Penyediaan Sarana Penerangan Kantor
Harga Satuan : Rp. 404,800,000
Satuan : LS
No. : A.07
Jenis Pekerjaan : Penyediaan Sarana Kesehatan
Harga Satuan : Rp. 227,700,000
Satuan : LS
II BAHAN
1. Obat-obatan Ls 1.00 1,500,000.00 1,500,000.00
III PERALATAN
Alat bantu medis ls 1.00 15,000,000.00 15,000,000.00
(AHSPK)
No. : A.08
Jenis Pekerjaan : Jalan masuk ke lokasi ( Pemeliharaan,perbaikan , dll.)
Harga Satuan : Rp. 5,889,015,000
Satuan : LS
I TENAGA
II BAHAN
1. CD - RW Handy Cam buah 2.00 12,000.00 24,000.00
2. Kertas Foto lbr 20.00 6,000.00 120,000.00
3. Album bh 4.00 75,000.00 300,000.00
III PERALATAN
No. : A.10
Jenis Pekerjaan : Pencegahan HIV AID
Harga Satuan : Rp. 537,900,000
Satuan : LS
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
I TENAGA
1 Nara Sumber org-bln 12.000 2,000,000 24,000,000
2 Tenaga Penyuluh Medis org-bln 12.000 1,750,000 21,000,000
3 Operator Komputer org-bln 12.000 1,250,000 15,000,000
4 Evaluator dan Pembuatan Laporan org-bln 12.000 1,500,000 18,000,000
II BAHAN
1 Leaflet Lbr 1,200.000 3,000 3,600,000
2 Sticker Lbr 200.000 2,000 400,000
3 Poster Lbr 75.000 10,000 750,000
4 Banner Spanduk Lbr 20.000 80,000 1,600,000
5 CD Keping 100.000 10,000 1,000,000
6 Snak 100 x 1 x 12bln Dus 1,200.000 10,000 12,000,000
7 Penggandaan Laporan Bulanan Set 180.000 75,000 13,500,000
III PERALATAN
1 Sewa LCD/ End Focus Kali 12.000 200,000 2,400,000
2 Sewa Kendaraan Roda 4 Minibus Kali 12.000 750,000 9,000,000
No. : A.11
Jenis Pekerjaan : Pemantauan Lingkungan
Harga Satuan : Rp. 419,760,000
Satuan : LS
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
I TENAGA
1 Ahli Lingkungan org-bln 4.000 4,500,000 18,000,000
2 Tenaga Pemantau/Pengambilan Uji Sample :
- Kualitas Air org-bln 8.000 1,750,000 14,000,000
- Polusi Udara org-bln 8.000 1,750,000 14,000,000
- Kebisingan org-bln 8.000 1,750,000 14,000,000
- Pengujian Laboraturium sample 40.000 250,000 10,000,000
3 Evaluasi dan Pembuatan Laporan org-bln 4.000 1,500,000 6,000,000
3 Operator Komputer org-bln 4.000 1,250,000 5,000,000
II BAHAN
1 Poster Lbr 40.000 10,000 400,000
2 Baner Lbr 40.000 80,000 3,200,000
3 CD Keping 20.000 10,000 200,000
4 Penggandaan Laporan Bulanan Set 40.000 75,000 3,000,000
III PERALATAN
1 Sewa Peralatan Uji Kali 8.000 200,000 1,600,000
2 Sewa Kendaraan Kali 8.000 750,000 6,000,000
No. : B.01a
Jenis Pekerjaan : Dewatering
Harga Satuan : Rp. 310,961,750
Satuan : pertahun
I TENAGA
1. Mekanik Terampil org/hr 1.00 75,000 75,000
2. Tukang Listrik org/hr 1.00 57,500 57,500
3. Mandor org/hr 1.00 57,500 57,500
4. Pekerja org/hr 5.00 42,500 212,500
II BAHAN
Sub Total II 0
III PERALATAN
1. Pompa, 4" - H=5 m jam 24.00 15,500 372,000
No. : C.05
Jenis Pekerjaan : Galian Batu Keras ( dengan alat berat ) termasuk pembuangan jarak 0,00-3000m
Harga Satuan : Rp. 109,500
Satuan : m³
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
I TENAGA
1. Mandor org/hr 0.0834 57,500 4,796
2. Pekerja org/hr 0.1601 42,500 6,802
II BAHAN
Sub Total II 0
III PERALATAN
1. Air Compressor, 250 CFM jam 0.0667 434,900 29,017
2 Jack Hammer 25Kg jam 0.0334 31,500 1,051
3 Giant breaker jam 0.0695 451,700 31,393
4 Excavator/Backhoe, 1,2 m3 jam 0.0259 537,300 13,934
5 Buldozer, 15 ton jam 0.0043 667,000 2,881
6 Dump Truck, 10 ton jam 0.0306 318,000 9,731
No. : C.02
Jenis Pekerjaan : Pengupasan (minimum 0,15 m tebal top soil)
Harga Satuan : Rp. 21,200
Satuan : m²
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
I TENAGA
1. Mandor org/hr 0.0056 57,500 322
2. Pekerja org/hr 0.0133 42,500 565
II BAHAN
Sub Total II 0
III PERALATAN
1. Buldozer, 15 ton jam 0.0083 667,000 5,558
2. Excavator/Backhoe, 1,2 m3 jam 0.0042 537,300 2,239
3. Dump Truck, 10 ton jam 0.0333 318,000 10,600
No. : C.01
Jenis Pekerjaan : Pembersihan lapangan
Harga Satuan : Rp. 13,900
Satuan : m²
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
I TENAGA
1. Mandor org/hr 0.0500 57,500 2,875
2. Pekerja org/hr 0.1000 42,500 4,250
II BAHAN
Sub Total II 0
III PERALATAN
1. Buldozer, 15 ton jam 0.0083 667,000 5,558
No. : C.01
Jenis Pekerjaan : Pembersihan Lapangan area genangan
( termasuk tebang pohon dan pembuangan )
Harga Satuan : Rp. 27,600
Satuan : m²
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
I TENAGA
1. Mandor org/hr 0.0500 57,500 2,875
2. Pekerja org/hr 0.1000 42,500 4,250
II BAHAN
Sub Total II 0
III PERALATAN
1. Chain saw jam 0.1667 17,500 2,917
2. Excavator/Backhoe, 1,2 m3 jam 0.0083 537,300 4,478
3. Dump Truck, 10 ton jam 0.0333 318,000 10,600
No. : C.03
Jenis Pekerjaan : Galian Tanah biasa termasuk pembuangan jarak 0,00-3,000m
Harga Satuan : Rp. 29,500
Satuan : m³
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
I TENAGA
1. Mandor org/hr 0.0213 57,500 1,225
2. Pekerja org/hr 0.0085 42,500 361
II BAHAN
Sub Total II 0
III PERALATAN
1. Buldozer, 15 ton jam 0.0046 667,000 3,035
2. Excavator/Backhoe, 1,2 m3 jam 0.0216 537,300 11,612
3. Dump Truck, 10 ton jam 0.0333 318,000 10,589
No. : C.04
Jenis Pekerjaan : Galian Batu Lapuk (dengan alat berat) termasuk pembuangan jarak 0,00-3,000m
Harga Satuan : Rp. 63,900
Satuan : m³
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
I TENAGA
1. Mandor org/hr 0.0298 57,500 1,711
2. Pekerja org/hr 0.0858 42,500 3,647
II BAHAN
Sub Total II 0
III PERALATAN
1 Air Compressor, 250 CFM jam 0.0584 434,900 25,389
2 Jack Hammer 25Kg jam 0.0350 31,500 1,103
2 Buldozer, 15 ton jam 0.0022 667,000 1,441
3 Excavator/Backhoe, 1,2 m3 jam 0.0272 537,300 14,631
5 Dump Truck, 10 ton jam 0.0321 318,000 10,217
No. : C.07
Jenis Pekerjaan : Timbunan Inti termasuk Slurr
Harga Satuan : Rp. 125,600
Satuan : m³
I TENAGA
1. Mandor org/hr 0.0600 57,500 3,450
2. Pekerja org/hr 0.6000 42,500 25,500
II BAHAN
Sub Total II 0
III PERALATAN
a Borrow area :
1. Excavator/Backhoe, 1,2 m3 jam 0.0174 537,300 9,349
2. Dump Truck, 10 ton jam 0.0239 318,000 7,584
b Stock Pile :
1 Excavator/Backhoe, 1,2 m3 jam 0.0300 537,300 16,119
2 Dump Truck, 10 ton jam 0.0395 318,000 12,545
c Embankment area :
1 Buldozer, 15 ton jam 0.0113 667,000 7,504
2 Vibrator Roller, 10 ton jam 0.0400 410,000 16,400
3 Motor Grader, 3,1 m jam 0.0048 505,900 2,428
4 Water Tank Truck, 5000 liter jam 0.0375 314,900 11,809
5. Tamping rammer jam 0.0113 140,000 1,575
No. : C.08
Jenis Pekerjaan : Timbunan Filter Halus ( material Pasir )
Harga Satuan : Rp. 296,800
Satuan : m³
I TENAGA
1. Mandor org/hr 0.0147 57,500 845
2. Pekerja org/hr 0.0353 42,500 1,500
II BAHAN
1. Agregat halus m3 1.1000 220,000 242,000
III PERALATAN
a. Stock Pile :
1. Excavator/Backhoe, 1,2 m3 jam 0.0139 537,300 7,468
2. Dump Truck, 10 ton jam 0.0263 318,000 8,363
b. Embankment area :
3. Buldozer, 15 ton jam 0.0043 667,000 2,868
4. Vibrator Roller, 10 ton jam 0.0152 410,000 6,232
5. Tamping rammer 80 kg jam 0.0238 25,800 614
No. : C.09
Jenis Pekerjaan : Timbunan Filter Kasar ( material kerikil )
Harga Satuan : Rp. 330,100
Satuan : m³
I TENAGA
1. Mandor org/hr 0.0147 57,500 845
2. Pekerja org/hr 0.0353 42,500 1,500
II BAHAN
1. Agregat Kasar m3 1.1000 247,500 272,250
III PERALATAN
a Stock Pile :
1. Excavator/Backhoe, 1,2 m3 jam 0.0139 537,300 7,468
2. Dump Truck, 10 ton jam 0.0263 318,000 8,363
b Embankment area :
1 Buldozer, 15 ton jam 0.0043 667,000 2,868
2 Vibrator Roller, 10 ton jam 0.0152 410,000 6,232
3 Tamping rammer 80 kg jam 0.0238 25,800 614
No. : C.12
Jenis Pekerjaan : Urugan Kembali (dipadatkan)
Harga Satuan : Rp. 20,200
Satuan : m³
I TENAGA
1. Mandor org/hr 0.0135 57,500 777
2 Pekerja org/hr 0.0270 42,500 1,149
II BAHAN
Sub Total II 0
III PERALATAN
1. Excavator/Backhoe, 1,2 m3 jam 0.0104 537,300 5,588
2. Dump Truck, 10 ton jam 0.0071 318,000 2,258
3. Tamping rammer 80 kg jam 0.3333 25,800 8,600
No. : C.10
Jenis Pekerjaan : Timbunan Batu (dari stock pile)
Harga Satuan : Rp. 293,800
Satuan : m³
I TENAGA
1. Mandor org/hr 0.0159 57,500 914
2. Pekerja org/hr 0.0381 42,500 1,619
II BAHAN
1 Batu riprap m3 1.100 200,000 220,000
a Stock Pile :
1 Excavator/Backhoe, 1,2 m3 jam 0.0159 537,300 8,543
2 Dump Truck, 10 ton jam 0.0213 318,000 6,773
b Embankment area :
1 Excavator/Backhoe, 1,2 m3 jam 0.0345 537,300 18,537
2 Buldozer, 15 ton jam 0.0056 667,000 3,735
3 Vibrator Roller, 10 ton jam 0.0172 410,000 7,052
No. : C.11
Jenis Pekerjaan : Timbunan riprap ( material batu )
Harga Satuan : Rp. 295,500
Satuan : m³
I TENAGA
1. Mandor org/hr 0.0159 57,500 914
2. Pekerja org/hr 0.0381 42,500 1,619
II BAHAN
1 Batu riprap m3 1.100 200,000 220,000
a Stock Pile :
1 Excavator/Backhoe, 1,2 m3 jam 0.0222 537,300 11,928
2 Dump Truck, 10 ton jam 0.0400 318,000 12,720
b Embankment area :
1 Excavator/Backhoe, 1,2 m3 jam 0.0400 537,300 21,492
No. : C.13
Jenis Pekerjaan : Lapisan Kerikil / Sirtu
Harga Satuan : Rp. 164,800
Satuan : m³
I TENAGA
1. Mandor org/hr 0.0139 57,500 799
2 Pekerja org/hr 0.0278 42,500 1,182
II BAHAN
1. Sirtu m3 1.1000 115,000 126,500
III PERALATAN
a Stock Pile :
1. Excavator/Backhoe, 1,2 m3 jam 0.0139 537,300 7,468
2. Dump Truck, 10 ton jam 0.0222 318,000 7,060
b Embankment area :
1 Vibrator Roller, 10 ton jam 0.0152 410,000 6,232
2 Tamping rammer 80 kg jam 0.0238 25,800 614
No. : C.14
Jenis Pekerjaan : Urugan Pasir
Harga Satuan : Rp. 152,900
Satuan : m²
I TENAGA
1. Mandor org/hr 0.0147 57,500 845
2. Pekerja org/hr 0.0294 42,500 1,250
II BAHAN
1. Pasir Urug m3 1.1000 100,000 110,000
III PERALATAN
a Stock Pile :
1. Excavator/Backhoe, 1,2 m3 jam 0.0147 537,300 7,898
2. Dump Truck, 10 ton jam 0.0250 318,000 7,950
b Embankment area :
1 Buldozer, 15 ton jam 0.0078 667,000 5,203
2 Vibrator Roller, 10 ton jam 0.0144 410,000 5,904
No. : C.15
Jenis Pekerjaan : Timbunan Random dari Stock Pile
Harga Satuan : Rp. 48,600
Satuan : m³
I TENAGA
1. Mandor org/hr 0.0048 57,500 276
2 Pekerja org/hr 0.0600 42,500 2,550
II BAHAN
Sub Total II 0
III PERALATAN
No. : C.16
Jenis Pekerjaan : Gebalan Rumput
Harga Satuan : Rp. 14,000
Satuan : m²
I TENAGA
1. Mandor org/hr 0.0038 57,500 216
2 Pekerja org/hr 0.0375 42,500 1,594
II BAHAN
1. Gebalan Rumput m2 1.1000 10,000 11,000
III PERALATAN
No. : C.18
Jenis Pekerjaan : Timbunan Random (pengangkutan dari borrow area ke stock pile, stock pile ke lokasi
timbunan)
Harga Satuan : Rp. 79,100
Satuan : m³
I TENAGA
II BAHAN
Sub Total II 0
III PERALATAN
a Borrow area
1. Excavator/Backhoe, 1,2 m3 jam 0.0216 537,300 11,612
2. Dump Truck, 10 ton jam 0.0455 318,000 14,469
b Stock Pile :
1 Excavator/Backhoe, 1,2 m3 jam 0.0127 537,300 6,824
2 Dump Truck, 10 ton jam 0.0303 318,000 9,635
c Embankment area :
1 Buldozer, 15 ton jam 0.0090 667,000 6,003
2 Vibrator Roller, 10 ton jam 0.0270 410,000 11,070
3 Motor Grader, 3,1 m jam 0.0032 505,900 1,619
4 Water Tank Truck, 5000 liter jam 0.0250 314,900 7,873
No. : C.17
Jenis Pekerjaan : Timbunan Sirtu
Harga Satuan : Rp. 182,500
Satuan : m³
I TENAGA
II BAHAN
1 Sirtu m3 1.100 115,000 126,500
III PERALATAN
a River Deposit :
1. Excavator/Backhoe, 1,2 m3 jam 0.0132 537,300 7,092
2. Dump Truck, 10 ton jam 0.0213 318,000 6,773
b Stock Pile :
1 Excavator/Backhoe, 1,2 m3 jam 0.0139 537,300 7,468
2 Dump Truck, 10 ton jam 0.0222 318,000 7,060
c Embankment area :
1 Buldozer, 15 ton jam 0.0043 667,000 2,868
2 Vibrator Roller, 10 ton jam 0.0152 410,000 6,232
No. : D.01
Jenis Pekerjaan : Beton K-300
Harga Satuan : Rp. 1,162,100
Satuan : m³
I TENAGA
1. Mandor org/hr 0.0830 57,500 4,773
2. Kepala Tukang org/hr 0.0280 57,500 1,610
3. Tukang Batu org/hr 0.2750 57,500 15,813
4. Pekerja org/hr 1.6500 42,500 70,125
II BAHAN
1. Batu Pecah 1-2 cm m³ 0.8000 200,000 160,000
2. Pasir Beton / Cor m³ 0.4813 300,000 144,390
3. Semen portland 50 kg zak 8.2600 69,300 572,418
4. Concrete Additive kg 0.8000 17,500 14,000
III PERALATAN
No. : D.01a
Jenis Pekerjaan : Beton K-350
Harga Satuan : Rp. 1,228,400
Satuan : m³
I TENAGA
1. Mandor org/hr 0.1050 57,500 6,038
2. Kepala Tukang org/hr 0.0350 57,500 2,013
3. Tukang Batu org/hr 0.3500 57,500 20,125
4. Pekerja org/hr 2.1000 42,500 89,250
II BAHAN
1. Batu Pecah 1-2 cm m³ 0.7407 200,000 148,148
2. Pasir Beton / Cor m³ 0.4764 300,000 142,929
3. Semen portland 50 kg zak 8.9600 69,300 620,928
4. Concrete Additive kg 0.8000 17,500 14,000
III PERALATAN
No. : D.02
Jenis Pekerjaan : Beton K-250
Harga Satuan : Rp. 1,117,400
Satuan : m³
I TENAGA
1. Mandor org/hr 0.0830 57,500 4,773
2. Kepala Tukang org/hr 0.0280 57,500 1,610
3. Tukang Batu org/hr 0.2750 57,500 15,813
4. Pekerja org/hr 1.6500 42,500 70,125
II BAHAN
1. Batu Pecah 1-2 cm m³ 0.8000 200,000 160,000
2. Pasir Beton / Cor m³ 0.4700 300,000 141,000
3. Semen portland 50 kg zak 7.6800 69,300 532,224
4. Concrete Additive kg 0.8000 17,500 14,000
III PERALATAN
No. : D.03
Jenis Pekerjaan : Beton K-225
Harga Satuan : Rp. 1,090,900
Satuan : m³
I TENAGA
II BAHAN
III PERALATAN
1 Car Mix, 5 m3/jam jam 0.0650 297,700 19,351
2 Diesel Generator, 100 kVA jam 0.0650 266,800 17,342
3 Concrete Pump Truck, 30 m3/jam jam 0.0542 266,600 14,452
4 Concrete Vibrator, 45 mm jam 0.1850 24,500 4,532
5 Concrete batching plant 40 m3 jam 0.0325 633,900 20,602
No. : D.04
Jenis Pekerjaan : Beton K-175
Harga Satuan : Rp. 1,033,000
Satuan : m³
I TENAGA
II BAHAN
III PERALATAN
No. : D.05b
Jenis Pekerjaan : Beton K100 / Lantai Kerja
Harga Satuan : Rp. 893,100
Satuan : m³
I TENAGA
II BAHAN
III PERALATAN
No. : D.06
Jenis Pekerjaan : Tulangan Beton (pemotongan, pembengkokan dan pemasangan)
Harga Satuan : Rp. 15,378
Satuan : ton
I TENAGA
II BAHAN
III PERALATAN
No. : D.07
JENIS PEKERJAAN : Bekisting Tipe Non Expose F1 (termasuk perancah dan pembongkarannya)
HARGA SATUAN : Rp. 155,300
SATUAN PEKERJAAN : M2
I TENAGA
1 Mandor org/hr 0.0220 57,500.00 1,265.00
2 Tukang org/hr 0.5200 57,500.00 29,900.00
3 Pekerja org/hr 0.2000 42,500.00 8,500.00
Sub Total I 39,665.00
II BAHAN
1 Paku 2" dan 3" kg 0.4000 18,000.00 7,200.00
2 Papan Kayu Kls.4 m3 0.0300 2,200,000.00 33,000.00
3 Kayu kruing balok 5/7cm m3 0.0180 6,600,000.00 59,400.00
Sub Total II 99,600.00
III PERALATAN
1 Alat bantu ( 5% dari sub Total I ) % 5.0000 39,665.00 1,983.25
Sub Total III 1,983.25
No. ;
JENIS PEKERJAAN ; Bekisting Tipe Expose F2 (termasuk perancah dan pembongkarannya)
HARGA SATUAN ; Rp. 186,400
SATUAN PEKERJAAN ; M2
I TENAGA
1 Mandor org/hr 0.0220 57,500.00 1,265.00
2 Tukang org/hr 0.5200 57,500.00 29,900.00
3 Pekerja org/hr 0.2000 42,500.00 8,500.00
Sub Total I 39,665.00
II BAHAN
1 Paku 2" dan 3" kg 0.4000 18,000.00 7,200.00
2 Papan Kayu Kls.4 lembar 0.3500 160,000.00 28,000.00
3 Kayu kruing balok 5/7cm m3 0.0280 6,600,000.00 92,400.00
set 0.0280 10,000.00 280.00
Sub Total II 127,880.00
III PERALATAN
1 Alat bantu ( 5% dari sub Total I )
% 5.0000 39,665.00 1,983.25
Sub Total III 1,983.25
No. : D.09
JENIS PEKERJAAN : Bekisting Tipe Expose F4 (termasuk perancah dan pembongkarannya)
HARGA SATUAN : Rp. 192,600
SATUAN PEKERJAAN : M2
I TENAGA
1 Mandor org/hr 0.0220 57,500.00 1,265.00
2 Tukang org/hr 0.5200 57,500.00 29,900.00
3 Pekerja org/hr 0.2000 42,500.00 8,500.00
Sub Total I 39,665.00
II BAHAN
1 Paku 2" dan 3" kg 0.4000 18,000.00 7,200.00
2 Multipleks 12 mm dengan lapisan Polyfilm lembar 0.4200 160,000.00 33,600.00
3 Kayu kruing balok 5/7cm m3 0.0280 6,600,000.00 92,400.00
4 Minyak bekisting set 0.0280 10,000.00 280.00
Sub Total II 133,480.00
III PERALATAN
1 Alat bantu ( 5% dari sub Total I ) 5.0000 39,665.00 1,983.25
Sub Total III 1,983.25
No. : F 04
Jenis Pekerjaan : Lapis Pondasi Atas / Base Course, Agregat Class C
Harga Satuan : Rp. 301,900
Satuan : m2
I TENAGA
II BAHAN
III PERALATAN
No. : E.01
Jenis Pekerjaan : Pasangan Batu Kali (1Pc : 3Ps)
Harga Satuan : Rp. 706,300
Satuan : m³
I TENAGA
II BAHAN
III PERALATAN
No. : E.03
Jenis Pekerjaan : Pasangan Batu Bata (1Pc : 4Ps)
Harga Satuan : Rp. 216,000
Satuan : m2
2
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
I TENAGA
II BAHAN
III PERALATAN
No. : E.02
Jenis Pekerjaan : Pasangan Batu Kali (1Pc : 4Ps)
Harga Satuan : Rp. 670,200
Satuan : m³
I TENAGA
II BAHAN
III PERALATAN
No. : E.04
Jenis Pekerjaan : Plesteran t=15 mm (1Pc : 3Ps)
Harga Satuan : Rp. 42,000
Satuan : m²
I TENAGA
II BAHAN
III PERALATAN
No. : E.05
Jenis Pekerjaan : Pasangan Batu Kali Kosong
Harga Satuan : Rp. 282,900
Satuan : m³
I TENAGA
II BAHAN
1 Pasir urug m3 0.4320 100,000 43,200
2 Batu belah ( kali / gunung ) m3 1.1000 140,000 154,000
Sub Total II 197,200
III PERALATAN
No. : E.06
Jenis Pekerjaan : Bronjong
Harga Satuan : Rp. 588,431
Satuan : m³
I TENAGA:
II BAHAN
1. Batu Belah m3 1.100 135,000 148,500
2. Kawat Bronjong Galvanis Ø2,70 mm unit 1.000 300,000.0 300,000
( 2x1x0,50 ) m', Pabrikasi
Sub Total III 448,500
No. : E.07
Jenis Pekerjaan : Siaran (1PC : 2 Ps)
Harga Satuan : Rp. 37,000
Satuan : m2
I TENAGA
II BAHAN
1 Semen portland 50 kg zak 0.1268 69,300 8,787
2 Pasir Pasang m3 0.0120 147,500 1,770
No. : F.01
Jenis Pekerjaan : Lapisan penetrasi batu belah 10/15
Harga Satuan : Rp. 1,455,400
Satuan : m³
I TENAGA
II BAHAN
III PERALATAN
No. : F.02
Jenis Pekerjaan : Lapis Pondasi Atas / Base Course, Agregat Class A
Harga Satuan : Rp. 274,800
Satuan : m³
I TENAGA
II BAHAN
III PERALATAN
No. : F.03
Jenis Pekerjaan : Lapis Pondasi Bawah/Sub-Base Course, Agregat Class B
Harga Satuan : Rp. 272,800
Satuan : m³
I TENAGA
II BAHAN
III PERALATAN
HARGA
NO. MACAM PEKERJAAN SAT. KUANTITAS SATUAN JML.HARGA
(Rp) (Rp)
I TENAGA
1. Mandor jam 0.0021 57,500 122
2. Pekerja jam 0.0145 42,500 616
Sub Total I 738
II BAHAN
1. Agregat Kasar m3 0.0189 247,500.00 4,678
2. Agregat Halus m 3
0.0272 220,000.00 5,984
3. Aspal kg 5.4823 10,468.75 57,393
4. Filler kg 5.2899 950.00 5,025
Sub Total II 73,080
III PERALATAN
1. Wheel Loader, 1.5 m3 jam 0.0019 397,000 744
2. Asphalt Mixing Plant jam 0.0021 3,471,705 7,377
3. Dump Truck, 4 ton jam 0.0233 318,000 7,394
4. Asphalt Finisher jam 0.0026 490,200 1,287
5. Tandem Roller jam 0.0021 342,300 727
6. P. Tyre Roller jam 0.0016 336,240 546
HARGA
NO. MACAM PEKERJAAN SAT. KUANTITAS SATUAN JML.HARGA
(Rp) (Rp)
I TENAGA
1. Mandor jam 0.0686 57,500 3,946
2. Pekerja jam 0.6868 42,500 29,187
Sub Total I 29,187
II BAHAN
1. Agregat Kasar m3 0.8957 247,500.00 221,686
2. Agregat Halus m3 0.7022 220,000.00 154,484
3. Aspal kg 150.8600 10,468.75 1,579,316
4. Filler kg 112.8600 950.00 107,217
Sub Total II 2,062,702
III PERALATAN
1. Wheel Loader, 1.5 m3 jam 0.0605 397,000 24,019
2. Asphalt Mixing Plant jam 0.0686 3,471,705 238,246
3. Dump Truck, 4 ton jam 0.7726 318,000 245,695
4. Asphalt Finisher jam 0.0859 490,200 42,096
5. Tandem Roller jam 0.0753 342,300 25,758
6. P. Tyre Roller jam 0.0574 336,240 19,292
No. : G.01
Jenis Pekerjaan : Pemboran untuk injeksi semen ( Grouting ) Hole dia 56mm
Harga Satuan : Rp. 496,700
Satuan : m
I TENAGA
II BAHAN
III PERALATAN
No. : G.06
Jenis Pekerjaan : Pemboran inti untuk pilot & check hole dia 65 mm
Harga Satuan : Rp. 422,800
Satuan : m
I TENAGA
II BAHAN
III PERALATAN
No. : G.10
Jenis Pekerjaan : Ijeksi semen ( Grouting )
Harga Satuan : Rp. 1,763,600
Satuan : ton
I TENAGA
1. Site Engineer org/bulan 0.0057 4,500,000 25,714
2 Grouting skill org/bulan 0.0067 3,000,000 20,000
3 Pekerja khusus org/bulan 0.0067 1,750,000 11,667
4 Mechanic org/bulan 0.0057 3,000,000 17,143
5. Driver org/bulan 0.0067 1,750,000 11,667
II BAHAN
III PERALATAN
1 Grouting Pump Jam 0.0036 99,000 354
2 Grouting Mixer Jam 0.0036 80,000 286
3 Double injection pipe dia. 33 mmx1,5m Jam 0.0014 1,000,000 1,389
4 Mechanical packer & accessories Jam 0.0014 3,500,000 4,861
5 Packer rubber bh 0.1000 200,000 20,000
6 Pipe wrench set 0.0001 750,000 75
7 Water pipe diameter 1 1/4" x 6 m bh 0.0014 225,000 313
8 Water hose & accessories 1 1/4" m 0.0028 500,000 1,389
9 Rubber piston bh 0.0111 150,000 1,667
10 Diesel spareparts set 0.0019 1,500,000 2,778
11 Bahan bakar peralatan lt 1.5000 11,950 17,925
12 Bahan bakar kendaraan crew lt 1.2500 10,700 13,375
13 Pelumas lt 0.0167 34,000 567
14 Flow meter Jam 0.0007 150,000 104
15 Pressure gauge Jam 0.0005 75,000 35
No. : G.11
Jenis Pekerjaan : Water Pressure Test
Harga Satuan : Rp. 272,200
Satuan : tes
I TENAGA
1. Site Engineer org/bulan 0.0143 4,500,000 64,286
2 Grouting skill org/bulan 0.0133 3,000,000 40,000
3 Pekerja khusus org/bulan 0.0167 1,750,000 29,167
4 Mechanic org/bulan 0.0114 3,000,000 34,286
5 Driver org/bulan 0.0067 1,750,000 11,667
Sub Total II -
III PERALATAN
1 Grouting Pump Jam 0.0036 99,000 354
2 Water supply pump Jam 0.0036 66,000 236
3 Double injection pipe dia. 33 mmx1,5m Jam 0.0007 41,667 29
4 Mechanical packer & accessories Jam 0.0007 145,833 101
5 Packer rubber bh 0.0667 200,000 13,333
6 Pipe wrench set 0.0001 750,000 75
7 Water pipe diameter 1 1/4" x 6 m bh 0.0014 225,000 313
8 Water hose & accessories 1 1/4" m 0.0028 500,000 1,389
9 Rubber piston bh 0.0111 150,000 1,667
10 Diesel spareparts set 0.0014 1,500,000 2,083
11 Bahan bakar peralatan lt 4.0000 11,950 47,800
12 Pelumas lt 0.0167 34,000 567
13 Flow meter Jam 0.0005 150,000 69
14 Pressure gauge Jam 0.0005 75,000 35
No. : G.14
Jenis Pekerjaan : Backfill Grouting
Harga Satuan : Rp. 1,304,900
Satuan : m3
I TENAGA
II BAHAN
III PERALATAN
No. : G.15
Jenis Pekerjaan : Shotcrete with steel wire mesh 100 x 100 x 4mm ( tebal 6 cm )
Harga Satuan : Rp. 397,200
Satuan : m2
I TENAGA
II BAHAN
III PERALATAN
No. : G.16
Jenis Pekerjaan : Rock Bolt D = 22, L = 3 m
Harga Satuan : Rp. 189,800
Satuan : m
I TENAGA
II BAHAN
III PERALATAN
No. : H.01
Jenis Pekerjaan : Hydraulic piezometer
Harga Satuan : Rp. 35,097,500
Satuan : set
I BAHAN
II PEMASANGAN
III PERALATAN
No. : H.01a
Jenis Pekerjaan : Stand Pipe Piezometer
Harga Satuan : Rp. 89,950,000
Satuan : set
I BAHAN
II PEMASANGAN
III PERALATAN
No. : H.02
Jenis Pekerjaan : Seepage Water Measuring Device (V-Notch Weir)
Harga Satuan : Rp. 51,894,200
Satuan : set
I BAHAN
1. V-Notch Weir, semua konstruksi stainless bh 1.0000 42,887,813 42,887,813
steel, tebal 5 mm, dilengkapi dengan plat
baffle, pengatur dan skala pengukuran. Range
0-50 liter/detik
II PEMASANGAN
III PERALATAN
No. : H.03
Jenis Pekerjaan : Multilayer Settlement Gauges
Harga Satuan : Rp. 80,978,000
Satuan : set
I BAHAN
5. Magnet Settlement Probe, with 50 metre long pcs 1.0000 25,800,000 25,800,000
tape graduated in metres, milimetres
II PEMASANGAN
(10% dari Sub Total I) % 10.0000 66,924,000.00 6,692,400
III PERALATAN
No. : H.05
Jenis Pekerjaan : Crest Settlement Survey Point
Harga Satuan : Rp. 2,178,000
Satuan : set
I BAHAN
II PEMASANGAN
III PERALATAN
No. : H.06
Jenis Pekerjaan : Observation Holes
Harga Satuan : Rp. 16,879,500
Satuan : set
I BAHAN
1. Porous Siotted Tube, 38 mm l.d. 48 mm o.d. slot ukuran bh 2.0000 650,000 1,300,000
1.5 mm, flush jointed , 3 meter panjang
2. PVC Tube, 38 mm l.d., 48 mm o.d., flush jointed 3 meter bh 12.0000 275,000 3,300,000
II PEMASANGAN
III PERALATAN
No. : H.07
Jenis Pekerjaan : Autometic Water Level recorder (AWLR)
Harga Satuan : Rp. 58,080,000
Satuan : set
I BAHAN
II PEMASANGAN
III PERALATAN
No. : H.08
Jenis Pekerjaan : Papan Duga Air
Harga Satuan : Rp. 315,700
Satuan : set
I TENAGA
II BAHAN
III PERALATAN
1 Alat Bantu % 6.0000 11,775 707
Sub Total III 707
No. : H.09
Jenis Pekerjaan : Inklinometer
Harga Satuan : Rp. 342,442,375 219472
Satuan : set
No. : I.01
Jenis Pekerjaan : Intake Trashrack (1 x 1 )
Harga Satuan : Rp. 88,204,875
Satuan : set
No. : I.02
Jenis Pekerjaan : Fix Whell Gate (1 x 1 )
Harga Satuan : Rp. 786,555,000
Satuan : set
No. : I.03
Jenis Pekerjaan : Katup Pintas (Sluice Valve) dia. 200 mm
Harga Satuan : Rp. 80,575,000
Satuan : set
No. : I.04
Jenis Pekerjaan : Butterfly valve, dia. 0,10 m
Harga Satuan : Rp. 5,500,000
Satuan : set
No. : I.04
Jenis Pekerjaan : Butterfly Valve, dia 0,10 m
Harga Satuan : Rp. 25,589,666
Satuan : set
No. : I.05
Jenis Pekerjaan : Hollow Jet Valve, dia. 0.80 m
Harga Satuan : Rp. 113,025,000
Satuan : set
No. : I.05
Jenis Pekerjaan : Butterfly Valve, dia 0,30 m
Harga Satuan : Rp. 50,325,000
Satuan : set
No. : I.05
Jenis Pekerjaan : Butterfly Valve, dia 0,30 m
Harga Satuan : Rp. 50,325,000
Satuan : set
No. : I.05b
Jenis Pekerjaan : Butterfly Valve, dia 0,15 m
Harga Satuan : Rp. 12,512,500
Satuan : set
No. : I.05
Jenis Pekerjaan : Butterfly Valve, dia 0,30 m
Harga Satuan : Rp. 50,325,000
Satuan : set
No. : I.06
Jenis Pekerjaan : Butterfly Valve, dia. 0,70 m
Harga Satuan : Rp. 100,925,000
Satuan : set
No. : I.06
Jenis Pekerjaan : Butterfly Valve, dia. 0,70 m
Harga Satuan : Rp. 100,925,000
Satuan : set
No. : I.06
Jenis Pekerjaan : Butterfly Valve, dia. 0,70 m
Harga Satuan : Rp. 100,925,000
Satuan : set
No. : I.07
Jenis Pekerjaan : Pipa Baja Saluran Utama, dia. 1,0 m tebal 10 mm
Harga Satuan : Rp. 23,302,700
Satuan : set
I BAHAN :
1 Pipa baja (Ø 1,0 M) m 1.0000 10,500,000 10,500,000
2 Pekerjaan pengelasan m 0.6283 1,925,000 1,209,478
3 Ring penguat kg 4.9400 55,000 271,700
4 Bellmouth( Ø 1.0m) kg 5.3700 66,000 354,420
5 Sadel beton(1,5mx0,5mx0,5m) m3 0.0600 1,228,400 73,704
6 Expansion joint buah 1.0000 8,250,000 8,250,000
7 Biaya transportasi % 5.0000 10,500,000 525,000
No. : I.08
Jenis Pekerjaan : Pipa Baja Saluran irigasi, dia. 0,8 m tebal 10 mm
Harga Satuan : Rp. 17,481,500
Satuan : set
No. : I.09
Jenis Pekerjaan : Pipa Baja dia. 0,5 m tebal 10 mm
Harga Satuan : Rp. 18,941,100
Satuan : set
I BAHAN :
1 Pipa baja (Ø 0,5 M) m 1.0000 5,950,560.00 5,950,560.00
2 Pekerjaan pengelasan m 1.0500 1,925,000.00 2,021,250.00
3 Ring penguat kg 4.9400 55,000.00 271,700.00
4 Bellmouth( Ø 0,50m) kg 5.3700 66,000.00 354,420.00
5 Sadel beton(1,5mx0,5mx0,5m) m3 0.0600 1,228,400.00 73,704.00
6 Expansion joint buah 1.0000 8,250,000.00 8,250,000.00
7 Biaya transportasi % 5.0000 5,950,560.00 297,528.00
No. : I.11
Jenis Pekerjaan : Pintu (4,00 x 4,00) m
Harga Satuan : Rp. 220,243,000
Satuan : set
1 BAHAN
2 ONGKOS KERJA
No. : J.01
Jenis Pekerjaan : Pemasangan Kuda-kuda Kayu Kruing
Harga Satuan : Rp. 9,301,900
Satuan : m³
I TENAGA
II BAHAN
III PERALATAN
No. : J.02
Jenis Pekerjaan : Pemasangan Reng Kruing / Usuk Kamper
Harga Satuan : Rp. 104,800
Satuan : m2
I TENAGA
II BAHAN
III PERALATAN
No. : J.03
Jenis Pekerjaan : Pemasangan Lisplank Kayu Kamper Tebal 3x30 cm
Harga Satuan : Rp. 110,000
Satuan : m
I TENAGA
II BAHAN
III PERALATAN
No. : J.04
Jenis Pekerjaan : Pemasangan Atap Asbes Gelombang 3,00 m x 1,05 m x 4 m
Harga Satuan : Rp. 41,200
Satuan : m2
I TENAGA
II BAHAN
III PERALATAN
No. : J.05
Jenis Pekerjaan : Pemasangan Bubung Asbes Gelombang
Harga Satuan : Rp. 74,300
Satuan : m
I TENAGA
II BAHAN
III PERALATAN
No. : J.06
Jenis Pekerjaan : Kusen Pintu / Jendela Kayu Kruing
Harga Satuan : Rp. 10,035,500
Satuan : m³
I TENAGA
II BAHAN
III PERALATAN
No. : J.07
Jenis Pekerjaan : Daun Pintu Taekwood 3 mm
Harga Satuan : Rp. 615,200
Satuan : m2
I TENAGA
II BAHAN
III PERALATAN
No. : J.08
Jenis Pekerjaan : Daun Pintu Triplek 4 mm
Harga Satuan : Rp. 577,800
Satuan : m2
I TENAGA
II BAHAN
III PERALATAN
No. : J.09
Jenis Pekerjaan : Pemasangan Kaca Mati tebal 5 mm
Harga Satuan : Rp. 107,900
Satuan : m2
I TENAGA
II BAHAN
III PERALATAN
No. : J.10
Jenis Pekerjaan : Gording/Nock
Harga Satuan : Rp. 9,174,100
Satuan : m3
I TENAGA
II BAHAN
III PERALATAN
No. : J.11
Jenis Pekerjaan : Pemasangan Kaca Mati Rayban tebal 5 mm
Harga Satuan : Rp. 120,000
Satuan : m2
I TENAGA
II BAHAN
III PERALATAN
No. : J.12
Jenis Pekerjaan : Pengecatan Tembok
Harga Satuan : Rp. 52,300
Satuan : m2
I TENAGA
II BAHAN
III PERALATAN
No. : J.13
Jenis Pekerjaan : Pemasangan Tegel Plint Abu-abu 15x20 cm campuran 1PC : 2Ps
Harga Satuan : Rp. 225,200
Satuan : m2
I TENAGA
II BAHAN
III PERALATAN
No. : J.14
Jenis Pekerjaan : Pemasangan Tegel Teraso 30x30 cm
Harga Satuan : Rp. 150,400
Satuan : m2
I TENAGA
II BAHAN
III PERALATAN
I TENAGA I
II BAHAN II
: J.15
Jenis Pekerjaan : Pemasangan Tegel Keramik 30x30 cm
Harga Satuan : Rp. 159,000
Satuan : m2
TENAGA
MATERIAL
PERALATAN
No. : J.15c
Jenis Pekerjaan : Pemasangan List Keramik 5x20 cm
Harga Satuan : Rp. 69,400
Satuan : m2
I TENAGA
II BAHAN
III PERALATAN
No. : J.15d
Jenis Pekerjaan : Pemasangan Air Conditioner 2 PK
Harga Satuan : Rp. 4,580,300
Satuan : m2
I TENAGA
II BAHAN
III PERALATAN
No. : J.15e
Jenis Pekerjaan : Pemasangan Air Conditioner 1 PK
Harga Satuan : Rp. 3,755,300
Satuan : m2
I TENAGA
II BAHAN
III PERALATAN
No. : J.16
Jenis Pekerjaan : Pemasangan Kran Air dia 3/4"
Harga Satuan : Rp. 24,300
Satuan : buah
I TENAGA
II BAHAN
III PERALATAN
No. : J.17
Jenis Pekerjaan : Kloset Jongkok Porselin
Harga Satuan : Rp. 412,600
Satuan : buah
I TENAGA
II BAHAN
III PERALATAN
No. : J.18
Jenis Pekerjaan : Bak Mandi batu bata volume 0,30 m3
Harga Satuan : Rp. 1,088,000
Satuan : buah
I TENAGA
1 Mandor org/hari 0.0300 57,500 1,725
2 Kepala Tukang org/hari 0.3000 57,500 17,250
3 Tukang batu org/hari 3.0000 57,500 172,500
4 Pekerja org/hari 6.0000 42,500 255,000
II BAHAN
III PERALATAN
No. : J.19
Jenis Pekerjaan : Besi Baja Profil WF < 200 mm
Harga Satuan : Rp. 40,300
Satuan : kg
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
I TENAGA
II BAHAN
III PERALATAN
No. : J.20
Jenis Pekerjaan : Rangka Kuda-kuda L, 50/50 x 5
Harga Satuan : Rp. 46,800
Satuan : kg
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
I TENAGA
II BAHAN
III PERALATAN
No. : J.21
Jenis Pekerjaan : Plafon Gypsum
Harga Satuan : Rp. 338,300
Satuan : m2
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
I PEKERJA
II MATERIAL
III PERALATAN
No. : J.21
Jenis Pekerjaan : List Plafon 15x15 cm
Harga Satuan : Rp. 22,100
Satuan : m2
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
I TENAGA
II BAHAN
III PERALATAN
No. : J.21a
Jenis Pekerjaan : Plafon Eternit Rangka Kayu Meranti
Harga Satuan : Rp. 242,000
Satuan : m2
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
I TENAGA
II BAHAN
III PERALATAN
No. : J.22
Jenis Pekerjaan : Pemasanngan Wastafel Gantung bulat
Harga Satuan : Rp. 522,000
Satuan : buah
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
I TENAGA
II MATERIAL
III PERALATAN
No. : J.24
Jenis Pekerjaan : Grendel
Harga Satuan : Rp. 22,600
Satuan : buah
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
I TENAGA
II BAHAN
III PERALATAN
No. : J.25
Jenis Pekerjaan : Engsel Kuningan
Harga Satuan : Rp. 29,200
Satuan : buah
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
I TENAGA
II BAHAN
III PERALATAN
No. : J.26
Jenis Pekerjaan : Kunci Tanam 2x Putar
Harga Satuan : Rp. 198,000
Satuan : buah
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
I TENAGA
II BAHAN
III PERALATAN
No. : J.27
Jenis Pekerjaan : Gudang Lapangan (15 x 8 m2)
Harga Satuan : Rp. 91,004,900
Satuan : LS
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
No. : J.28
Jenis Pekerjaan : Tandon air
Harga Satuan : Rp. 27,175,077
Satuan : LS
I TENAGA
II BAHAN
III PERALATAN
No. : J.29
Jenis Pekerjaan : Tangki Bahan Bakar
Harga Satuan : Rp. 21,089,090
Satuan : LS
I TENAGA
II BAHAN
III PERALATAN
No. : J.30
Jenis Pekerjaan : Atap Baja Ringan + Genteng Penutup
Harga Satuan : Rp. 290,700
Satuan : m2
I TENAGA
II BAHAN
III PERALATAN
No. : J.31
Jenis Pekerjaan : Kusen Aluminium
Harga Satuan : Rp. 97,300
Satuan : m
I TENAGA
II BAHAN
III PERALATAN
No. : J.32
Jenis Pekerjaan : Daun Pintu/Jendela Kaca
Harga Satuan : Rp. 292,900
Satuan : m2
I TENAGA
II BAHAN
III PERALATAN
No. : J.33
Jenis Pekerjaan : Kantor Proyek (420 m2)
Harga Satuan : Rp. 773,204,000
Satuan : Unit
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
No. : J.34
Jenis Pekerjaan : Rumah Dinas Type 1 (60 m2)
Harga Satuan : Rp. 117,692,000
Satuan : Unit
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
No. : J.35
Jenis Pekerjaan : Rumah Dinas Type 2 (45 m2)
Harga Satuan : Rp. 92,882,000
Satuan : Unit
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
No. : J.36
Jenis Pekerjaan : Klinik Umum (45,5 m2)
Harga Satuan : #REF!
Satuan : Unit
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
No. : J.37
Jenis Pekerjaan : Gardu Pandang (40 m2)
Harga Satuan : Rp. 84,461,000
Satuan : Unit
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
No. : J.38
Jenis Pekerjaan : Pos Jaga ( 9 m2 ) 2 Unit
Harga Satuan : Rp. 15,719,000
Satuan : Unit
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
No. : J.39
Jenis Pekerjaan : Mushola (60 m3)
Harga Satuan : Rp. 117,411,000
Satuan : Unit
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
No. : J.40
Jenis Pekerjaan : Rumah Genset (16 m2)
Harga Satuan : Rp. 31,169,000
Satuan : Unit
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
No. : J.41
Jenis Pekerjaan : Bengkel Peralatan (120 m2)
Harga Satuan : Rp. 220,919,000
Satuan : Unit
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
No. : J.41a
Jenis Pekerjaan : Rumah Instrumen (31.76 m2)
Harga Satuan : Rp. 62,823,000
Satuan : Unit
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
No. : J.42
Jenis Pekerjaan : Rumah tangki Bahan Bakar ( 90 m³ )
Harga Satuan : Rp. 167,607,000
Satuan : Unit
BBWS
Harga Satuan Jumlah Harga
No. Item Pekerjaan Satuan Volume
(Rp) (Rp)
No. : K.01
Jenis Pekerjaan : PVC Water Stop, lebar 300 mm
Harga Satuan : Rp. 169,800
Satuan : m´
I TENAGA
II BAHAN
III PERALATAN
No. : K.02
Jenis Pekerjaan : Dowel Bar dia. 25, L=1m
Harga Satuan : Rp. 67,600
Satuan : buah
I TENAGA
II BAHAN
III PERALATAN
No. : K.03
Jenis Pekerjaan : Anchor rod D 25mm L-2,00m
Harga Satuan : Rp. 141,600
Satuan : m'
I TENAGA
II BAHAN
III PERALATAN
No. : K.03
Jenis Pekerjaan : Anchor rod D 50mm
Harga Satuan : Rp. 233,500
Satuan : m'
I TENAGA
II BAHAN
III PERALATAN
No. : K.04
Jenis Pekerjaan : Handrail, Galvanis Pipe dia. 3” (termasuk cat)
Harga Satuan : Rp. 182,300
Satuan : m´
I TENAGA
II BAHAN
III PERALATAN
No. : K.05
Jenis Pekerjaan : Pipa PVC Perforated dia. 6”
Harga Satuan : Rp. 181,000
Satuan : m´
I TENAGA
II BAHAN
III PERALATAN
No. : K.06
Jenis Pekerjaan : Besi Plat
Harga Satuan : Rp. 15,814,800
Satuan : ton
I TENAGA
II BAHAN
III PERALATAN
No. : K.06
Jenis Pekerjaan : Besi Profil
Harga Satuan : Rp. 16,722,300
Satuan : ton
I TENAGA
II BAHAN
III PERALATAN
No. : K.08
Jenis Pekerjaan : Baja WF 150 x 150
Harga Satuan : Rp. 26,100
Satuan : kg
I TENAGA
II BAHAN
III PERALATAN
No. : K.09
Jenis Pekerjaan : Dowel Bar dia. 25, L= 1 m
Harga Satuan : Rp. 52,100
Satuan : buah
I TENAGA
II BAHAN
III PERALATAN
No. : K.10
Jenis Pekerjaan : Buis Beton d 70 cm, pj. 1,00 m
Harga Satuan : Rp. 236,500
Satuan : buah
I TENAGA
II BAHAN
III PERALATAN
No. : K.11
Jenis Pekerjaan : Tangga (Pipa Galvanis) dia. 16 mm
Harga Satuan : Rp. 104,000
Satuan : m'
I TENAGA
II BAHAN
III PERALATAN
No. : K.12
Jenis Pekerjaan : Pintu Plat Besi t = 5 mm (0,8 x 2 m)
Harga Satuan : Rp. 10,463,000
Satuan : buah
I TENAGA
II BAHAN
III PERALATAN
No. : K.13
Jenis Pekerjaan : Buis Beton dia.100 L=1,00 m
Harga Satuan : Rp. 230,200
Satuan : buah
I TENAGA
II BAHAN
III PERALATAN
No. : K.14
Jenis Pekerjaan : Geotextile, t=2 mm
Harga Satuan : Rp 27,800
Satuan : m2
I TENAGA
II BAHAN
III PERALATAN
No. : K.15
Jenis Pekerjaan : Weep Hole Pipa PVC dia. 2"
Harga Satuan : Rp 50,500
Satuan : m
I TENAGA
II BAHAN
III PERALATAN
No. : K.16
Jenis Pekerjaan : Pancang Dolken
Harga Satuan : Rp 114,100
Satuan : m'
I TENAGA
II BAHAN
1 Dolken Kayu Gelam Dia 15-20 Cm/ 400c btg 1.0000 40,000 40,000
Sub Total II 40,000
III PERALATAN
No. : K.19
Jenis Pekerjaan : Pengadaan dan Pemasangan Fasilitas Air Conditioner
Harga Satuan : Rp 4,537,500
Satuan : bh
I TENAGA
Sub Total I 0
II BAHAN
III PERALATAN
No. : K.20
Jenis Pekerjaan : Pengadaan dan Pemasangan Fasilitas Closet Duduk
Harga Satuan : Rp 1,444,000
Satuan : bh
I TENAGA
1 Pekerja org/hr 3.3000 42,500 140,250
2 Tukang batu org/hr 1.1000 57,500 63,250
3 Kepala tukang batu org/hr 0.0010 57,500 58
4 Mandor org/hr 0.1600 57,500 9,200
II BAHAN
III PERALATAN
I TENAGA
II BAHAN
III PERALATAN
0
No. : L.01
Jenis Pekerjaan : Instalasi Jaringan Tegangan Menengah 20 KV/220 V 3 phasa 4 Conductor ;
Transformator 50 KVA 3 Phasa 4 Conductor
Harga Satuan : Rp 246,477,700
Satuan : Ls
I Penarikan Jaringan 20 KV
1 Conductor AAA C 70 mm2 M 330.00 40,500.00 13,365,000
2 GSW 70 mm M 110.00 35,000.00 3,850,000
3 Concrete Pole 11 m/200daN termasuk Insulator dan Accessories Set 3.00 3,540,000 10,620,000
V JUMLAH 246,477,770
No. : L.02
Jenis Pekerjaan : Instalasi Penerangan Gedung
Harga Satuan : Rp 0
Satuan : Ls
Jumlah 0
Biaya umum dan keuntungan 10 % 0
Jumlah (termasuk biaya umum dan keuntungan) sebelum PPN 0
Jumlah Dibulatkan 0
ANALISA HARGA SATUAN POKOK KEGIATAN
(AHSPK)
No. : L.03
Jenis Pekerjaan : Instalasi Penerangan Jalan dan Puncak Bendungan
Harga Satuan : Rp 386,685,800
Satuan : Ls
Jumlah 351,532,600
Biaya umum dan keuntungan 10 % 35,153,260
Jumlah (termasuk biaya umum dan keuntungan) sebelum PPN 386,685,860
Jumlah Dibulatkan 386,685,800
ANALISA HARGA SATUAN POKOK KEGIATAN
(AHSPK)
No. : M.01
Jenis Pekerjaan : Kantor Utama Bendungan (420 m²)
Harga Satuan : Rp. 827,476,100
Satuan : LS
No. : A.02
Jenis Pekerjaan : Kantor Lapangan (200 m²)
Harga Satuan : Rp. 341,209,100
Satuan : LS
5. Pekerjaan Atap :
- Kuda-kuda WF 150.150 (ref.J.19) kg 2,657.210 40,300.00 107,085,563.00
- Gording 8/12 (ref.J.10) m3 1.212 9,174,100.00 11,119,009.20
- Atap Asbes Gelombang Kecil (ref.J.04 ) m2 122.470 41,200.00 5,045,764.00
6 Plafon Eternit (ref.J.21) m2 264.000 138,100.00 36,458,400.00
7 Pekerjaan Pintu dan Jendela :
- Kusen Pintu 1 (ref.J.06) m3 0.555 10,035,500.00 5,569,702.50
- Kusen Pintu 2 (ref.J.06) m3 0.042 10,035,500.00 421,491.00
- Kusen Pintu 3 (ref.J.06) m3 0.116 10,035,500.00 1,164,118.00
- Kusen Jendela 1 (ref.J.06) m3 1.050 10,035,500.00 10,537,275.00
- Kusen Jendela 2 (ref.J.06) m3 0.022 10,035,500.00 220,781.00
- Daun Pintu Teakwood (Pintu 1) (ref.J.07) m2 18.900 615,200.00 11,627,280.00
- Kaca Rayban Polos Tebal 5 mm (ref.J.11) m2 2.520 120,000.00 302,400.00
8 Pekerjaan Lain-lain :
- Wastafel (ref.J.22) buah 2.000 522,000.00 1,044,000.00
- Kloset Jongkok (ref.J17) buah 2.000 412,600.00 825,200.00
- Kran Air (ref.J.16) buah 4.000 24,300.00 97,200.00
- Bak Mandi (0,60 x 0,60 x 0,80) (ref .J18 ) buah 1.000 1,088,000.00 1,088,000.00
- Grendel (ref.J.24) buah 6.000 22,600.00 135,600.00
- Engsel (ref.J.25) stel 21.000 29,200.00 613,200.00
'- Kunci Tanam Besar 2x Putar buah 14.000 198,000.00 2,772,000.00