Anda di halaman 1dari 6

RAB ANGGARAN PRODUK

PEMAKAIA
NO URAIAN SATUAN JUMLAH
JAM
1 MOBIL UNIT 20
2 SOLAR LTR 231 16
3 MAKAN PENGAWAS org 6
4 PAD RITASE 1
5 ROYALTY DEBU UNIT 2
6 SEWA ALAT BERAT UNIT 2 400
7 ROYALTY PASIR KUBIK 1
8 MOBILISASI ALAT UNIT 2

PEMAKAIA
NO URAIAN SATUAN JUMLAH
JAM
1 INVOICE WIKA PER 45 HARI KUBIK 6.5
2 PENGELUARAN RAB PRODUKSI

GAJI KARYAWAN
NO NAMA JUMLAH
1 WENDRA Rp 7,000,000.00
2 BAYU Rp 5,000,000.00
3 ABO Rp 2,500,000.00
4 ROBIN Rp 2,500,000.00
5 RESKI Rp 1,500,000.00
6
7
SUB TOTAL Rp 18,500,000.00
ANGGARAN PRODUKSI
PEMAKAIAN
HARGA SATUAN HARGA TOTAL
VOLUME HARI
100 45 Rp 195,000.00 Rp 877,500,000.00
45 Rp 2,100,000.00 Rp 94,500,000.00
45 Rp 150,000.00 Rp 6,750,000.00
100 45 Rp 5,000.00 Rp 22,500,000.00
45 Rp 100,000.00 Rp 4,500,000.00
Rp 275,000.00 Rp 110,000,000.00
100 45 Rp 50,000.00 Rp 225,000,000.00
Rp 9,000,000.00 Rp 9,000,000.00
SUB TOTAL Rp 1,349,750,000.00

PEMAKAIAN
HARGA SATUAN HARGA TOTAL
VOLUME HARI
100 45 Rp 529,750.00 Rp 2,383,875,000.00
Rp 1,349,750,000.00
SUBTOTAL Rp 1,034,125,000.00
R
NO TGL/BLN/THN URAIAN SATUAN

1 MOBIL UNIT
2
3
4
5
RAB PRODUKSI MINGGUAN
RITASE/ PEMAKAIAN
JUMLAH HARGA SATUAN
UNIT QTY
3
HARI HARGA/M3
5 20 100 7 81,500.00 Rp 8,150,000.00
HARGA TOTAL

Rp 57,050,000.00

Anda mungkin juga menyukai