LHP 31 Desember 2020
LHP 31 Desember 2020
2 PRODUKSI
CPO KG 48.608,55 3.070.298,79 24.283.963
KERNEL KG 16.040,56 825.920,33 6.371.134
CANGKANG KG 172.000,00 1.490.000,00 9.135.000
ABU JANJANGAN KOSONG KG 4.200,00 50.250,00 417.175
FIBER KG 5.600,00 178.500,00 1.460.900
3 RENDEMEN TARGET OER
CPO % 19,09 19,58 19,40 19,50
KERNEL % 6,30 5,27 5,09 5,50
CANGKANG % 67,54 9,50 7,30
ABU JANJANGAN KOSONG % 1,65 0,32 0,33
FIBER % 2,20 1,14 1,17
4 PENGIRIMAN
CPO KG - 3.380.000 24.897.000
KERNEL KG - 791.610 6.385.820
CANGKANG KG - 1.932.090 9.357.470
ABU JANJANGAN KOSONG KG - 52.500 417.745
FIBER KG - 86.850 1.500.520
JANJANGAN KOSONG KG - 60.360 2.499.110
5 STOCK CPO PRODUKSI VAKUM LEVEL OIL DIKLARIFIKASI
SALDO AWAL (SALDO AKHIR MEI 2020) KG 1.003.152,00 6,18 0,32 0,031 POSISI KETINGGIAN ESTIMASI KG KETERANGAN
KG FFA MOISTURE DIRT CST 0 CM -
STORAGE TANK I KAP 500 TON KG 198.456,67 4,66 1,01 0,075 SLUDGE TANK 0 PLAT -
STORAGE TANK II KAP 2000 TON KG 191.659,06 5,15 0,66 0,086 OIL TANK 0 PLAT -
STORAGE TANK III KAP 2000 TON KG - 0,00 - - RECOVERY 0 CM -
TOTAL KG 390.115,73
6 STOCK KERNEL K.A K.K I.P LEVEL VOLUME DI KERNEL SILO
SALDO AWAL (SALDO AKHIR MEI 2020) KG 148.383,16 6,89 4,81 18,16 POSISI KETINGGIAN ESTIMASI KG
BULKING SILO NO I KG 66.836 TOTAL LOSSES KARNEL Kernel Silo 1 1.890 17.117
BULKING SILO NO II KG 66.861 KARNEL 0,57 Kernel Silo 2 1.640 18.114
KERNEL DI LANTAI KG - 35.230
Total KG 133.697,00 Rabu, 30 Desember 2020
7 STOCK PRODUCT STOCK MEI 2020 OIL LOSS FINAL EFFLUENT OIL LOSS LEVEL VOLUME DI HOPPER NUT ST KARNEL
CANGKANG 432.650 KG 210.180 SHIFT I SHIFT II POSISI KETINGGIAN ESTIMASI KG
ABU JANJANGAN 11.700 KG 11.130 COMPOSIT : 0,91 3,09 HOPPER I 134 CM -
FIBRE 155.410 KG 115.790 HOPPER II 182 CM -
8 KAPASITAS OLAH - HOPPER III 0 CM -
SHIFT I : 07.00-02.30 WIB JAM 6,50 PERSENTASE BREAKDWON Jam Olah %
SHIFT II : JAM - 2,29 6,07 May-20 4,62 NB: ESTIMASI NUT DILANTAI ± 4.000 KG
JAM OLAH JAM 6,50 416,95 3.241,67 2.385,28 5.626,95
KAPASITAS OLAH KG/JAM 39.182 37.616 38.606 Break down mei
BREAKDOWN JAM 1,00 9,53 196,83 63,34 260,17
SHIFT I : * JAM 08.13-09.13 WIB, STOP OLAH REBUSAN. PERBAIKAN THRESER DRUM 01 & 02.
SHIFT II : * NAIKAN NUT LANTAI ± 4 TON
DIBUAT DIVERIFIKASI DISETUJUI
MARTIN SIREGAR BASONO ADI SUCIPTO ANTANIUS PURBA / SUGENG B FERGUSON NAHAMPUN SIHAR E SIMANJUNTAK
ADMIN PRODUKSI ASST QC ASST PROSES I/II ASST MAINTENANCE MILL MANAGER
NB: ADANYA PENAMBAHAN STOCK CANGKANG UNTUK MENYESUAIKAN STOCK CANGKANG DILAPANGAN DAN DI LHP