Anda di halaman 1dari 20

E

F
1500

300
100
G

F
1500

Work Lood 200daN


A 89.1
Diameter of
Pole Section B 114.3
C
(mm) C 139.8
4000

Pipe A 3.2
Thickness B 3.5
(mm) 4.5
C
600

Diffraction at work
96
load (mm)
1160

Cartridge
5
Thickness (mm)

Cartridge Length
600
(mm)

E Welded part
F Stock-pen
G Holding plate

19 OKTOBER 2022
PROYEK KELISTRIKAN RE II
Dig : MUSTIKA AYU
A4 01
POLITEKNIK NEGERI UJUNG PANDANG Dip : Ir. H. HAMMA, M.T. 3A D4 LISTRIK / 42120003
a

70
100
100
1501
30
200
300

300

200
300

200

9.0 m 11.0 m
a Ø 157 Ø 190
b Ø 257 Ø 337

GL GL
300

24 OKTOBER 2022
PROYEK KELISTRIKAN RE II
Dig : MUSTIKA AYU
A4 02
POLITEKNIK NEGERI UJUNG PANDANG Dip : Ir. H. HAMMA, M.T. 3A D4 LISTRIK / 42120003
150

70
100
100
150
50
200
300

300

200

300

200

300

300

500

200

GL GL
300

343

24 OKTOBER 2022
PROYEK KELISTRIKAN RE II
Dig : MUSTIKA AYU
A4 03
POLITEKNIK NEGERI UJUNG PANDANG Dip : Ir. H. HAMMA, M.T. 3A D4 LISTRIK / 42120003
5
4 INSULATED NETRAL
1
MASSENGER CONDUCTOR
3 INSULATED TWISTED
7 CONDUCTOR

25 OKTOBER 2022
PROYEK KELISTRIKAN RE II
Dig : MUSTIKA AYU
A4 04
POLITEKNIK NEGERI UJUNG PANDANG Dip : Ir. H. HAMMA, M.T. 3A D4 LISTRIK / 42120003
25 OKTOBER 2022
PROYEK KELISTRIKAN RE II
Dig : MUSTIKA AYU
A4 05
POLITEKNIK NEGERI UJUNG PANDANG Dip : Ir. H. HAMMA, M.T. 3A D4 LISTRIK / 42120003
Insulated Neutral
Massenger Conductor

1 3 2 4

8 Insulation Bundled
Conductor

Concrete or Steel Pole

Renc For Pemasangan Deadend Assembly

No. Product Materials


1. Pole Bracket Alluminium Alloy
2. Strain Clamp Alluminium Allay
3. Removable Ring Alluminium Alloy
4. Wedge Plastic
5. Strap Stainless Steel
6. Stopping Buckle Stainless Steel
7. Strap Plastic

25 OKTOBER 2022
PROYEK KELISTRIKAN RE II
Dig : MUSTIKA AYU
A4 06
POLITEKNIK NEGERI UJUNG PANDANG Dip : Ir. H. HAMMA, M.T. 3A D4 LISTRIK / 42120003
TAMPAK SAMPING TAMPAK DEPAN

DETAIL A

TAMPAK ATAS

29 OKTOBER 2022
PROYEK KELISTRIKAN RE II
Dig : MUSTIKA AYU
A4 07
POLITEKNIK NEGERI UJUNG PANDANG Dip : Ir. H. HAMMA, M.T. 3A D4 LISTRIK / 42120003
19 OKTOBER 2022
PROYEK KELISTRIKAN RE II
Dig : MUSTIKA AYU
A4 01
POLITEKNIK NEGERI UJUNG PANDANG Dip : Ir. H. HAMMA, M.T. 3A D4 LISTRIK / 42120005
29 OKTOBER 2022
PROYEK KELISTRIKAN RE II
Dig : MUSTIKA AYU
A4 09
POLITEKNIK NEGERI UJUNG PANDANG Dip : Ir. H. HAMMA, M.T. 3A D4 LISTRIK / 42120003
29 OKTOBER 2022
PROYEK KELISTRIKAN RE II
Dig : MUSTIKA AYU
A4 10
POLITEKNIK NEGERI UJUNG PANDANG Dip : Ir. H. HAMMA, M.T. 3A D4 LISTRIK / 42120003
29 OKTOBER 2022
PROYEK KELISTRIKAN RE II
Dig : MUSTIKA AYU
A4 11
POLITEKNIK NEGERI UJUNG PANDANG Dip : Ir. H. HAMMA, M.T. 3A D4 LISTRIK / 42120003
29 OKTOBER 2022
PROYEK KELISTRIKAN RE II
Dig : MUSTIKA AYU
A4 12
POLITEKNIK NEGERI UJUNG PANDANG Dip : Ir. H. HAMMA, M.T. 3A D4 LISTRIK / 42120003
29 OKTOBER 2022
PROYEK KELISTRIKAN RE II
Dig : MUSTIKA AYU
A4 13
POLITEKNIK NEGERI UJUNG PANDANG Dip : Ir. H. HAMMA, M.T. 3A D4 LISTRIK / 42120003
1
2
250

30º
4 Optional Pole Connection
Minimum
1. Guy wire pole binder
2. Turnbuckle
3. Preformed Termination (4)
Minimum 4. Oval guy insulator (MV)
1000 5. Guy wire (As specified)
6. Stay rod (As specified)
7. Guy wire foundation plate (As specified)
8. Concrete pad
5
Minimun 2500

30º 3
Minimum
6

150mm
Maximum

8 7

29 OKTOBER 2022
PROYEK KELISTRIKAN RE II
Dig : MUSTIKA AYU
A4 14
POLITEKNIK NEGERI UJUNG PANDANG Dip : Ir. H. HAMMA, M.T. 3A D4 LISTRIK / 42120003
1
2
250

30º
4 Optional Pole Connection
Minimum
1. Guy wire pole binder
2. Turnbuckle
3. Preformed Termination (4)
Minimum 4. Oval guy insulator (MV)
1000 5. Guy wire (As specified)
6. Stay rod (As specified)
7. Guy wire foundation plate (As specified)
8. Concrete pad
5
Minimun 2500

30º 3
Minimum
6

150mm
Maximum

8 7

29 OKTOBER 2022
PROYEK KELISTRIKAN RE II
Dig : ANNISA
A4 14
POLITEKNIK NEGERI UJUNG PANDANG Dip : Ir. H. HAMMA, M.T. 3A D4 LISTRIK / 42120017
1
2
250

30º
4 Optional Pole Connection
Minimum
1. Guy wire pole binder
2. Turnbuckle
3. Preformed Termination (4)
Minimum 4. Oval guy insulator (MV)
1000 5. Guy wire (As specified)
6. Stay rod (As specified)
7. Guy wire foundation plate (As specified)
8. Concrete pad
5
Minimun 2500

30º 3
Minimum
6

150mm
Maximum

8 7

29 OKTOBER 2022
PROYEK KELISTRIKAN RE II
Dig : JIHAN HAMIDA W
A4 14
POLITEKNIK NEGERI UJUNG PANDANG Dip : Ir. H. HAMMA, M.T. 3A D4 LISTRIK / 42120004
1
2
250

30º
4 Optional Pole Connection
Minimum
1. Guy wire pole binder
2. Turnbuckle
3. Preformed Termination (4)
Minimum 4. Oval guy insulator (MV)
1000 5. Guy wire (As specified)
6. Stay rod (As specified)
7. Guy wire foundation plate (As specified)
8. Concrete pad
5
Minimun 2500

30º 3
Minimum
6

150mm
Maximum

8 7

29 OKTOBER 2022
PROYEK KELISTRIKAN RE II
Dig : RESKI ANWAR
A4 14
POLITEKNIK NEGERI UJUNG PANDANG Dip : Ir. H. HAMMA, M.T. 3A D4 LISTRIK / 42120006
TAMPAK SAMPING TAMPAK DEPAN

DETAIL A

TAMPAK ATAS

29 OKTOBER 2022
PROYEK KELISTRIKAN RE II
Dig : ANNISA
A4 07
POLITEKNIK NEGERI UJUNG PANDANG Dip : Ir. H. HAMMA, M.T. 3A D4 LISTRIK / 42120017
TAMPAK SAMPING TAMPAK DEPAN

DETAIL A

TAMPAK ATAS

29 OKTOBER 2022
PROYEK KELISTRIKAN RE II
Dig : RESKI ANWAR
A4 07
POLITEKNIK NEGERI UJUNG PANDANG Dip : Ir. H. HAMMA, M.T. 3A D4 LISTRIK / 42120006
TAMPAK SAMPING TAMPAK DEPAN

DETAIL A

TAMPAK ATAS

29 OKTOBER 2022
PROYEK KELISTRIKAN RE II
Dig : JIHAN HAMIDA W
A4 07
POLITEKNIK NEGERI UJUNG PANDANG Dip : Ir. H. HAMMA, M.T. 3A D4 LISTRIK / 42120005

Anda mungkin juga menyukai