9.00
9.00 9.00 9.00
9.00 9.00
- Fasos KETERANGAN
DMJ 7 M
9.00
9.00 9.00 MENGETAHUI
9.00 9.00
7.55 9.00
15.00
TOTAL LUAS LAHAN = 8.731 M² KEPALA BIDANG PENYEHATAN
LINGKUNGAN DINAS PERUMAHAN
15.00 15.00
15.00
15.00 RAKYAT DAN KAWASAN
15.00
15.00 PERMUKIMAN
KABUPATEN SINTANG
9.00
9.00 9.00 9.00
9.00 9.00
KETERANGAN :
8.44
15.00 15.00
15.00 15.00
15.00 15.00
15.00
TYPE 36 = 34 UNIT
9.00
9.00 9.00
rian
u ngai Du
ingkar S S
Jalan L BOY RAHADIAN
ARSITEK
MASTER PLAN
SKALA FTP
OBANG RAHMAD
10.00
1.50
GAMBAR PENGAJUAN
3.50
PERSETUJUAN BANGUNAN GEDUNG
(PBG)
PERUMAHAN
3.00
VILLA AMORA
LOKASI BANGUNAN
7.50
1.50
PROVINSI KALIMANTAN BARAT
4.50
MENGETAHUI
KEPALA BIDANG PENYEHATAN
LINGKUNGAN DINAS PERUMAHAN
RAKYAT DAN KAWASAN
3.00
PERMUKIMAN
KABUPATEN SINTANG
1.00
ROMANTIO, S.ST
Penata Tk. I
NIP. 19730302 199703 1 003
JUDUL GAMBAR
SITUASI
6.00
6.00
SKALA
1 : 200
PEMOHON
BOY RAHADIAN
SITUASI 10.00
Skala 1: 200
OBANG RAHMAD
10.00
1.50
GAMBAR PENGAJUAN
3.50
PERSETUJUAN BANGUNAN GEDUNG
(PBG)
PERUMAHAN
3.00
Teras K.Tidur VILLA AMORA
- 0.05 ± 0.00
LOKASI BANGUNAN
7.50
1.50
KM/Wc
- 0.05 PROVINSI KALIMANTAN BARAT
4.50
MENGETAHUI
KEPALA BIDANG PENYEHATAN
LINGKUNGAN DINAS PERUMAHAN
R. Tamu RAKYAT DAN KAWASAN
3.00
± 0.00 PERMUKIMAN
KABUPATEN SINTANG
K.Tidur
± 0.00
1.00
Teras
- 0.05
ROMANTIO, S.ST
Penata Tk. I
NIP. 19730302 199703 1 003
JUDUL GAMBAR
RENCANA TAPAK
6.00
6.00
SKALA
1 : 200
PEMOHON
BOY RAHADIAN
OBANG RAHMAD
DINAS PERUMAHAN RAKYAT
DAN KAWASAN PERMUKIMAN
KABUPATEN SINTANG
Jalan M. Saad Sintang 78611
GAMBAR PENGAJUAN
PERSETUJUAN BANGUNAN GEDUNG
POT POT (PBG)
B C
PERUMAHAN
3.00 3.00 VILLA AMORA
LOKASI BANGUNAN
6
JALAN LINGKAR SUNGAI DURIAN
KELURAHAN RAWA MAMBOK
2.00 KECAMATAN SINTANG
Teras K.Tidur KABUPATEN SINTANG
- 0.05 ± 0.00 3.00
PROVINSI KALIMANTAN BARAT
5
POT POT
A A MENGETAHUI
R.Makan
± 0.00
4 KEPALA BIDANG PENYEHATAN
LINGKUNGAN DINAS PERUMAHAN
RAKYAT DAN KAWASAN
KM/Wc 1.50 7.50 PERMUKIMAN
- 0.05
KABUPATEN SINTANG
4.50
3
R. Tamu
± 0.00
3.00
ROMANTIO, S.ST
K.Tidur
± 0.00 2 Penata Tk. I
NIP. 19730302 199703 1 003
1.00 Teras
- 0.05 JUDUL GAMBAR
1
DENAH
6.00 1 : 100
POT POT
A B B C C PEMOHON
BOY RAHADIAN
ARSITEK
Denah
Skala 1: 100
OBANG RAHMAD
+ 5.60 Perabung 20 x 20 cm
0.25 + 5.35
Kayu Nok 5 x 7 cm
10
10
GAMBAR PENGAJUAN
PERSETUJUAN BANGUNAN GEDUNG
3.20 (PBG)
Lantai Keramik 30 x 30
Lantai Keramik 20 x 20
PERUMAHAN
Dinding Batako Fin. Cat
VILLA AMORA
Cor t=8cm
R. Makan Wc/KM Pasir Urug t = 32cm
± 0.00 ± 0.00 - 0.05
LOKASI BANGUNAN
Sloof 15 x 40
0.40 Sloof 15 x 35
- 0.40
A B C MENGETAHUI
KEPALA BIDANG PENYEHATAN
LINGKUNGAN DINAS PERUMAHAN
Potongan A - A RAKYAT DAN KAWASAN
PERMUKIMAN
Skala 1: 100 KABUPATEN SINTANG
Perabung 20 x 20 cm
+ 5.60
Kayu Nok 5 x 7 cm
0.60 0.60
Kuda - Kuda Kls. II 5 x 7 cm
2.40 Ikatan Angin kayu Kls. II 5 x 7 cm
Reng Kayu Kls. II 4 x 6 cm
10
Plafond Gypsum 9mm
POTONGAN
3.20
SKALA
Lantai Keramik 30 x 30
Cor t=8cm 1 : 100
R. Makan R. Tamu Pasir Urug t = 32cm
± 0.00 Teras ± 0.00 ± 0.00
Teras
- 0.05 - 0.05
0.40 Sloof 15 x 40
- 0.40 PEMOHON
Tanah Asli
0.65 Lantai Kerja t = 5cm
- 1.05 Pasir Urug t = 10cm
4.50 1.00
BOY RAHADIAN
ARSITEK
5 2 1
Potongan B - B
Skala 1: 100 OBANG RAHMAD
DINAS PERUMAHAN RAKYAT
DAN KAWASAN PERMUKIMAN
+ 5.60 KABUPATEN SINTANG
+ 5.35 Jalan M. Saad Sintang 78611
GAMBAR PENGAJUAN
PERSETUJUAN BANGUNAN GEDUNG
(PBG)
+ 3.70
140
PERUMAHAN
+ 3.20 VILLA AMORA
65
+ 2.55
LOKASI BANGUNAN
± 0.00
- 0.40
MENGETAHUI
KEPALA BIDANG PENYEHATAN
A B C LINGKUNGAN DINAS PERUMAHAN
RAKYAT DAN KAWASAN
Tampak Depan PERMUKIMAN
KABUPATEN SINTANG
Skala 1: 100
+ 5.60
+ 5.35
ROMANTIO, S.ST
Penata Tk. I
NIP. 19730302 199703 1 003
JUDUL GAMBAR
+ 3.20 TAMPAK
+ 2.55
SKALA
1 : 100
PEMOHON
± 0.00
- 0.40
BOY RAHADIAN
C B A
ARSITEK
Tampak Belakang
Skala 1: 100
OBANG RAHMAD
+ 5.60
+ 5.35
DINAS PERUMAHAN RAKYAT
DAN KAWASAN PERMUKIMAN
KABUPATEN SINTANG
Jalan M. Saad Sintang 78611
+ 3.70
GAMBAR PENGAJUAN
+ 3.20 PERSETUJUAN BANGUNAN GEDUNG
(PBG)
+ 2.55
PERUMAHAN
VILLA AMORA
LOKASI BANGUNAN
MENGETAHUI
Tampak Kanan KEPALA BIDANG PENYEHATAN
Skala 1: 100 LINGKUNGAN DINAS PERUMAHAN
RAKYAT DAN KAWASAN
PERMUKIMAN
KABUPATEN SINTANG
+ 5.60
+ 5.35
ROMANTIO, S.ST
Penata Tk. I
+ 3.70 NIP. 19730302 199703 1 003
+ 2.55
TAMPAK
SKALA
1 : 100
± 0.00 PEMOHON
- 0.40
6 5 4 3 2 1
BOY RAHADIAN
Tampak Kiri ARSITEK
Skala 1: 100
OBANG RAHMAD
DINAS PERUMAHAN RAKYAT
DAN KAWASAN PERMUKIMAN
KABUPATEN SINTANG
+ 5.60 Jalan M. Saad Sintang 78611
+ 5.35
GAMBAR PENGAJUAN
PERSETUJUAN BANGUNAN GEDUNG
(PBG)
PERUMAHAN
VILLA AMORA
LOKASI BANGUNAN
+ 2.55
MENGETAHUI
10 0.80 30
63 10 KEPALA BIDANG PENYEHATAN
LINGKUNGAN DINAS PERUMAHAN
RAKYAT DAN KAWASAN
PERMUKIMAN
KABUPATEN SINTANG
240 305
230
ROMANTIO, S.ST
Penata Tk. I
± 0.00 15 NIP. 19730302 199703 1 003
25 55
40 JUDUL GAMBAR
- 0.40
DETAIL ARSITEKTUR
A B C SKALA
FTP
PEMOHON
DETAIL ARSITEKTUR
Skala 1: 100 BOY RAHADIAN
ARSITEK
OBANG RAHMAD
DINAS PERUMAHAN RAKYAT
DAN KAWASAN PERMUKIMAN
KABUPATEN SINTANG
Jalan M. Saad Sintang 78611
POT POT
B C
GAMBAR PENGAJUAN
PERSETUJUAN BANGUNAN GEDUNG
3.00 3.00 (PBG)
P1 P1
K1 15 x 40 K1 PERUMAHAN
6 VILLA AMORA
LOKASI BANGUNAN
15 x 40
2.00
15 x 40
3.00 JALAN LINGKAR SUNGAI DURIAN
P1 P1
K1 15 x 40
KELURAHAN RAWA MAMBOK
KP
5 KECAMATAN SINTANG
POT POT KABUPATEN SINTANG
A P1 A PROVINSI KALIMANTAN BARAT
15 x 40 KP 15 x 40 KP
4
MENGETAHUI
15 x 40
15 x 35
15 x 40
1.50 7.50
KEPALA BIDANG PENYEHATAN
15 x 40
P1 LINGKUNGAN DINAS PERUMAHAN
4.50 15 x 40 KP 15 x 40 KP RAKYAT DAN KAWASAN
3 PERMUKIMAN
KABUPATEN SINTANG
15 x 40
15 x 40
3.00
P1 P1
K1
15 x 40 KP
2
15 x 40
15 x 40
1.00
P1 P1 P1 ROMANTIO, S.ST
K1 K1
KP 15 x 40 15 x 40 Penata Tk. I
1 NIP. 19730302 199703 1 003
JUDUL GAMBAR
3.00 3.00
6.00
SKALA
POT POT
A B B C C
PEMOHON
OBANG RAHMAD
DINAS PERUMAHAN RAKYAT
DAN KAWASAN PERMUKIMAN
KABUPATEN SINTANG
Jalan M. Saad Sintang 78611
10
10
10
4D8 Ø 6 - 200 4D8 Ø 6 - 200
GAMBAR PENGAJUAN
PERSETUJUAN BANGUNAN GEDUNG
(PBG)
Plesteran t = 1.5cm Plesteran t = 1.5cm
KP KP
Lantai Fin. Keramik 30 x 30 Lantai Fin. Keramik 30 x 30 PERUMAHAN
Lantai Cor Beton t = 8cm Lantai Cor Beton t = 8cm VILLA AMORA
Pasir Urug t = 32cm Pasir Urug t = 32cm
LOKASI BANGUNAN
± 0.00
8
8
4 D 10 4 D 10
JALAN LINGKAR SUNGAI DURIAN
40
Ø 6 - 200 Ø 6 - 200 KELURAHAN RAWA MAMBOK
32
32
KECAMATAN SINTANG
- 0.40 - 0.40 - 0.40 KABUPATEN SINTANG
PROVINSI KALIMANTAN BARAT
Ø 6 - 200 Ø 6 - 200
105
35
35
4 D 10 4 D 10
50
- 0.75 MENGETAHUI
8 D 10 Tanah Asli 8 D 10 Tanah Asli
15
15
Ø 6 - 200 Ø 6 - 200
KEPALA BIDANG PENYEHATAN
- 0.90
Lantai Kerja t = 5cm Lantai Kerja t = 5cm LINGKUNGAN DINAS PERUMAHAN
5
5
RAKYAT DAN KAWASAN
15
Pasir Urug t = 10cm Pasir Urug t = 10cm
10
10
- 1.05 PERMUKIMAN
KABUPATEN SINTANG
Cerucuk Ø 8 - 10cm Cerucuk Ø 8 - 10cm
10 20 20 10 10 20 20 10
60 60
JUDUL GAMBAR
A A
60
SKALA
B
60
PEMOHON
Detail P1
Skala 1: 20
BOY RAHADIAN
ARSITEK
OBANG RAHMAD
DINAS PERUMAHAN RAKYAT
DAN KAWASAN PERMUKIMAN
KABUPATEN SINTANG
POT POT Jalan M. Saad Sintang 78611
B C
GAMBAR PENGAJUAN
3.00 3.00 PERSETUJUAN BANGUNAN GEDUNG
(PBG)
K1 K1
6
PERUMAHAN
VILLA AMORA
3.00
K1 KP JALAN LINGKAR SUNGAI DURIAN
5 KELURAHAN RAWA MAMBOK
POT POT KECAMATAN SINTANG
A A KABUPATEN SINTANG
KP KP PROVINSI KALIMANTAN BARAT
4
1.50 7.50
MENGETAHUI
4.50 KP KP KEPALA BIDANG PENYEHATAN
3 LINGKUNGAN DINAS PERUMAHAN
RAKYAT DAN KAWASAN
PERMUKIMAN
KABUPATEN SINTANG
3.00
K1
KP 2
1.00
KP K1 K1
1 ROMANTIO, S.ST
Penata Tk. I
NIP. 19730302 199703 1 003
JUDUL GAMBAR
3.00 3.00
6.00
PEMOHON
RENCANA KOLOM
Skala 1: 100 BOY RAHADIAN
ARSITEK
OBANG RAHMAD
DINAS PERUMAHAN RAKYAT
DAN KAWASAN PERMUKIMAN
KABUPATEN SINTANG
Jalan M. Saad Sintang 78611
POT POT
B C
GAMBAR PENGAJUAN
PERSETUJUAN BANGUNAN GEDUNG
3.00 3.00 (PBG)
K1 10 x 15 K1
6 PERUMAHAN
VILLA AMORA
LOKASI BANGUNAN
10 x 15
2.00
10 x 15
3.00
JALAN LINGKAR SUNGAI DURIAN
K1 10 x 15 KP KELURAHAN RAWA MAMBOK
5
KECAMATAN SINTANG
POT POT KABUPATEN SINTANG
10 x 15
A A PROVINSI KALIMANTAN BARAT
10 x 15 KP 10 x 15 KP
4
10 x 15
10 x 15
10 x 15
1.50 7.50 MENGETAHUI
10 x 15
KEPALA BIDANG PENYEHATAN
4.50 10 x 15 KP 10 x 15 KP LINGKUNGAN DINAS PERUMAHAN
3 RAKYAT DAN KAWASAN
PERMUKIMAN
KABUPATEN SINTANG
10 x 15
10 x 15
3.00
K1 10 x 15
KP 2
10 x 15
10 x 15
1.00
KP 10 x 15 K1 10 x 15 K1 ROMANTIO, S.ST
1 Penata Tk. I
NIP. 19730302 199703 1 003
JUDUL GAMBAR
3.00 3.00
6.00
SKALA
POT POT
A B B C C
PEMOHON
OBANG RAHMAD
DINAS PERUMAHAN RAKYAT
DAN KAWASAN PERMUKIMAN
KABUPATEN SINTANG
Jalan M. Saad Sintang 78611
POT POT
B C
GAMBAR PENGAJUAN
PERSETUJUAN BANGUNAN GEDUNG
3.00 3.00 (PBG)
6 PERUMAHAN
VILLA AMORA
Spandek mini Uk. 170 x 80 cm
LOKASI BANGUNAN
2.00
0.50
3.00
0.50 JALAN LINGKAR SUNGAI DURIAN
5 KELURAHAN RAWA MAMBOK
KECAMATAN SINTANG
POT POT KABUPATEN SINTANG
A A
PROVINSI KALIMANTAN BARAT
4
Perabung 20 x 20 cm
1.50 7.50 MENGETAHUI
Kayu Nok 5 x 7 cm
KEPALA BIDANG PENYEHATAN
4.50 LINGKUNGAN DINAS PERUMAHAN
3 RAKYAT DAN KAWASAN
PERMUKIMAN
0.60 Reng Kayu Kls. II 4 x 6 cm KABUPATEN SINTANG
Kuda - Kuda Kls. II 5 x 7 cm
0.60
0.50 1.50 1.50 0.50
3.00
0.60 1.50 1.50 0.50
2
0.60
1.00
0.60 ROMANTIO, S.ST
1 Penata Tk. I
0.50
NIP. 19730302 199703 1 003
0.50 JUDUL GAMBAR
3.00 3.00
6.00
SKALA
POT POT
A B B C C
PEMOHON
OBANG RAHMAD
DINAS PERUMAHAN RAKYAT
DAN KAWASAN PERMUKIMAN
15 KABUPATEN SINTANG
2.5 10 2.5 Jalan M. Saad Sintang 78611
2.5
1.5 1.5
1
GAMBAR PENGAJUAN
1
PERSETUJUAN BANGUNAN GEDUNG
10
(PBG)
2.5 5 2.5
15
2.5 10 2.5
2.5
10
1.5 7 1.5
10 ROMANTIO, S.ST
1.5 1.5 7 1.5 Penata Tk. I
NIP. 19730302 199703 1 003
Plesteran t= 1.5 Cm Ø 6 - 200 1.5
10 7 4D8 4 D 10 JUDUL GAMBAR
Ø 6 - 200 35 30
Plesteran t= 1.5 Cm
10 7 4D8
1.5 Ø 6 - 200
1.5
SKALA
2.5
KP 10 x 10 Sloof 15 x 35 KP 10 x 10
PEMOHON
ARSITEK
OBANG RAHMAD
DINAS PERUMAHAN RAKYAT
DAN KAWASAN PERMUKIMAN
KABUPATEN SINTANG
Jalan M. Saad Sintang 78611
GAMBAR PENGAJUAN
PERSETUJUAN BANGUNAN GEDUNG
(PBG)
PERUMAHAN
Keramik 30 x 30 VILLA AMORA
LOKASI BANGUNAN
Cor Beton t = 8 cm
MENGETAHUI
KEPALA BIDANG PENYEHATAN
Sloof 15 x 40 LINGKUNGAN DINAS PERUMAHAN
40
RAKYAT DAN KAWASAN
PERMUKIMAN
Pasir Urug t = 32 cm Pasir Urug t = 32 cm 32 KABUPATEN SINTANG
ROMANTIO, S.ST
Penata Tk. I
NIP. 19730302 199703 1 003
JUDUL GAMBAR
SKALA
BOY RAHADIAN
ARSITEK
OBANG RAHMAD
DINAS PERUMAHAN RAKYAT
DAN KAWASAN PERMUKIMAN
KABUPATEN SINTANG
Jalan M. Saad Sintang 78611
KETERANGAN :
POT POT
B C
GAMBAR PENGAJUAN
LAMPU PERSETUJUAN BANGUNAN GEDUNG
3.00 3.00 (PBG)
STOP KONTAK
PERUMAHAN
6 VILLA AMORA
SAKLAR SINGLE
LOKASI BANGUNAN
2.00
SAKLAR DOUBLE
3.00 JALAN LINGKAR SUNGAI DURIAN
KELURAHAN RAWA MAMBOK
5 MCB KECAMATAN SINTANG
POT POT KABUPATEN SINTANG
A A PROVINSI KALIMANTAN BARAT
Box Meteran
4
Kabel Listrik MENGETAHUI
1.50 7.50
KEPALA BIDANG PENYEHATAN
4.50 LINGKUNGAN DINAS PERUMAHAN
RAKYAT DAN KAWASAN
3 PERMUKIMAN
KABUPATEN SINTANG
3.00
2
1.00
ROMANTIO, S.ST
1 Penata Tk. I
NIP. 19730302 199703 1 003
JUDUL GAMBAR
6.00
SKALA
POT POT
Distribusi Dari PLN A B B C C 1 : 200
PEMOHON
BOY RAHADIAN
ARSITEK
OBANG RAHMAD
KETERANGAN :
PA = Pompa Air
DF = Drain Floor
DINAS PERUMAHAN RAKYAT
KA = Kran Air DAN KAWASAN PERMUKIMAN
ST = Septictank KABUPATEN SINTANG
Jalan M. Saad Sintang 78611
= Air Bersih Pipa uk. 3/4"
= Air Limbah Pipa uk. 2"
GAMBAR PENGAJUAN
= Air Kotor Pipa uk. 4" PERSETUJUAN BANGUNAN GEDUNG
PA
(PBG)
PERUMAHAN
VILLA AMORA
LOKASI BANGUNAN
MENGETAHUI
KEPALA BIDANG PENYEHATAN
LINGKUNGAN DINAS PERUMAHAN
RAKYAT DAN KAWASAN
PERMUKIMAN
KABUPATEN SINTANG
ROMANTIO, S.ST
Penata Tk. I
NIP. 19730302 199703 1 003
JUDUL GAMBAR
RENCANA SANITASI
SKALA
1 : 200
Sumur
PEMOHON
BOY RAHADIAN
ARSITEK
RENCANA SANITASI
Skala 1: 200
OBANG RAHMAD