Anda di halaman 1dari 14

NO BIDDER HASIL HASIL REMARK

ALAMAT SAMPUL I SAMPUL II

1 PT. Citramasjaya LULUS Rp 64.240.000.000,- PEMENANG


Teknikmandiri
Jakarta
2 PT. Ayama Cahaya LULUS Rp 66.109.889.935,- -
Mandiri
Jakarta Timur
3 PT. Hasta Karya Perdana LULUS Rp 70.399.149.411,- -
Surabaya

4 KSO Alhas Jaya Group- LULUS Rp 72.707.972.305,- -


Primordia
Jakarta Selatan

5 PT. Daya Usaha Mandiri TIDAK LULUS TIDAK DIBUKA -


Jakarta Timur
1. 18-12-2018 : Pengumuman Lelang
2. 26-12-2018 : Aanwitzing / Rapat Penjelasan Tender
3. 03-01-2019 : Site Survey
4. 11-01-2019 : Submission Doc Tender
5. 11-01-2019 : Buka Sampul I (Admin Teknis)
6. 22-01-2019 : Klarifikasi Sampul I (AdminTeknis)
7. 24-01-2019 : Pengumuman Sampul I
8. 25-01-2019 : Buka Sampul II (Harga)
9. 28-01-2019 : Klarifikasi dan Negosiasi Harga
10. 30-01-2019 : Pengumuman Pemenang
11. 04-02-2019 : Surat Penunjukan Penyedia Barang/Jasa (SPPBJ)
12. 06-02-2019 : Contract Discussion Agreement (CDA)
13. 08-02-2019 : Sign Contract
14. xx-02-2019 : Kick Of Meeting (KOM)
 NAMA KONTRAK : PEKERJAAN PEMBANGUNAN GI 150 KV GUNUNG MULIA STEEL
 NOMOR KONTRAK : 0127.PJ/DAN.02.02/UIP ISJ/2018
 TANGGAL KONTRAK : 08 FEBRUARI 2019
 SERAH TERIMA LOKASI :-
 EFFEKTIF KONTRAK :-
 JANGKA WAKTU PELAKSANAAN : 365 HARI KALENDER
 SERAH TERIMA PERTAMA :-
 MASA PEMELIHARAAN : 180 HARI KALENDER SEJAK TOC
 SERAH TERIMA KEDUA :-
 SUMBER DANA : APLN 2019
 NILAI KONTRAK AWAL : Rp 64.240.000.000,- (INCLUDE PPN 10%)
 NAMA KONTRAKTOR : PT. CITRAMASJAYA TEKNIKMANDIRI
 NAMA PEMBERI KERJA : PT. PLN UIP INTERKONEKSI SUMATERA JAWA (ISJ)
NO SCOPE OF WORKS CONTRACT VALUE BOBOT
1 Pengadaan Electro Mechanical 30.460.864.586 52.16%
2 Pemasangan Electro Mechanical 2.488.642.712 4.26%
3 Pekerjaan Sipil 25,450.492.702 43.58%

TOTAL 58.400.000.000 100%


PPN 10% 5.840.000.000
TOTAL +PPN 10% 64.240.000.000
1. PEMBAYARAN UANG MUKA : 15%
2. PEMBAYARAN PERALATAN E&M ON SITE (MOS) : 70%
3. PEMBAYARAN PEKERJAAN JASA KONSTRUKSI : 95%
4. PEMBAYARAN PEKERJAAN SIPIL : 95%
5. PEMBAYARAN SELESAI PEKERJAAN (BAST-1) : 95%
6. PEMBAYARAN MASA PEMELIHARAAN : 5%
GI 150 KV GUNUNG MULIA STEEL

1. Alamat Lokasi Beberan, Ciruas, Serang, Banten


2. Akses 1,9 KM dari Jalan Raya Serang – Jakarta
3. Status Lahan Sudah bebas
4. Akses Jalan Tanah disamping saluran irigasi
5. Lahan bekas sawah yang sudah dikeringkan
6. Elevasi tanah asli + 1,5 Mtr dibawah muka jalan akses
GI 150 KV GUNUNG MULIA STEEL

 1 Line Bay 150 KV to GI Serang 1


 1 Line Bay 150 KV to GI Serang 2
 1 Line Bay 150 KV to GI Cikande
 1 Line Bay 150 KV to GI Indah Kiat
 1 Line Bay 150 KV to GI Gunung Mulia Steel Consumer
 1 Traformer Bay
 1 Coupler Bay

TOTAL 7 BAYS
GI 150 KV GUNUNG MULIA STEEL

1. Control Building SAS include Coridor


2. Control Building MV Cell
3. Preparation
4. Site Works
5. Foundation 150 KV Equipment
6. Miscelleneous Works
PENGADAAN MTU TERPUSAT
1. Circuit Breaker (CB)
2. Current Transformer (CT)
3. Capacitive Voltage Transformer (CVT)
4. Disconnecting Switch (DS)
5. Disconnection Switch With Earthing (DSE)
6. Lightning Arrester (LA)
7. Transformer 60 MVA
GI 150 KV GUNUNG MULIA STEEL
 RCP & SAS : NR – CHINA : PT. NR INDONESIA
 TELECOMUNICATION : SIEMENS – INDONESIA : PT. SIEMENS INDONESIA
 MV 20 KV CUBICLE : SIEMENS – INDONESIA : PT. SIEMENS INDONESIA
 FITTING & ACCESORIES : KAK – INDONESIA : PT. KARYA ADI KITA
 DISC INSULATOR : SUZHOU – CHINA : PT. KARYA ADI KITA
 POWER CABLE : VOKSEL - INDONESIA : PT. VOKSEL ELECTRIC
 FIRE PREVENTION : BZE - CHINA : PT. BIRA INDONESIA
 BATTERAY & CHARGER : TECHFILL - TAIWAN : PT. GAE
 PANEL VCD & VAC : GAE - INDONESIA : PT. GAE
 CCTV : DAHUA : PT. MITRA LIMA
 NCT&NGR : HILKAR – TURKI : PT. CELINDO INTI PERKASA
 AUX TRAFO 20KV : TRAFOINDO - INDONESIA : PT. TRAFOINDO
 STEEL STRUCTURE : CTI - INDONESIA : PT. ISFA
 EARTHING : KUMWELD- THAILAND : PT. RAJ PRIMA
NO VENDOR NAME CONTACT PERSON PHONE NO EMAIL ADRESS
1 PT. SIEMENS INDONESIA EVAN SINAGA 08111750415 evan.sinaga@siemens.com

2 PT. NR ELECTRIC KOFI WANG 081218965532 wangxiaobing@nrec.com

3 PT. KARYA ADIKITA GALVANIZ MYCHEL HARYANTO 081285671818 mychell_8@yahoo.com

4 PT. MITRALIMA SINERGI MULYADI 085285729888 m_amran@m5sinergi.co.id

5 PT. RAJ PRIMA CHARLES YULIANTO 08551108821 charlesyulianto@gmail.com

6 PT. TRAFOINDO DIANA MARGARETHA 08158674449 diana.margaretha@trafoindonesia.com


7 PT. VOKSEL ELECTRIC WIDODO 08569902101 widodo@voksel.co.id

8 PT. CELINDO INTI PERKASA RIYANTA 081215770052 riyanta@cellindo.co.id

9 PT. BIRA INDONESIA DANIEL 082244735008 bjmperkasa@gmail.com

10 PT. GAE ENCEP 08129829709 gaejkt@GAE.co.id


1. Master Schedule
2. Disbustment Schedule
3. S-Curve
4. Structure Organisasi Proyek