Rab Type 45
Rab Type 45
Volume Nomer
No. URAIAN PEKERJAAN
m' m2 m3 Analis
1 2 3 4
I PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan Bouwplank 1.00 Ls
2 Pembersihan Lapangan 1.00 Ls
Jumlah I
II PEKERJAAN TANAH
1 Pek Galian tanah untuk pondasi 27.10 m3 A.2.3.1.1
2 Pek Urugan tanah kembali 9.03 m3 A.2.3.1.9
3 Pek Urugan pasir bawah lantai dan pondasi 4.00 m3 A.2.3.1.11
Jumlah II
V PEKERJAAN BETON mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66
1 Pek Sloof 15/20 1.09 m3 A.4.1.1.5
2 Pek Kolom Praktis 15/15 0.99 m3 A.4.1.1.5
3 Pek Kolom Teras 20/20 0.32 m3 A.4.1.1.5
4 Pek Ring Balk 12/20 ( termasuk gunungan) 1.93 m3 A.4.1.1.5
5 Pek Balk Latiu 15/20 0.38 m3 A.4.1.1.5
6 Pek. Plat beton sunsiding t-6 cm 0.05 m3 A.4.1.1.5
7 Pek begisting 11.41 m2 HITUNG
Jumlah V
VI PEKERJAAN PEMBESIAN
1 Pek Sloof 15/20 109.32 kg HITUNG
2 Pek Kolom Praktis 15/15 99.00 kg HITUNG
3 Pek Kolom Teras 20/20 32.00 kg HITUNG
4 Pek Ring Balk 12/20 ( termasuk gunungan) 192.96 kg HITUNG
5 Pek Balk Latiu 15/20 37.50 kg HITUNG
6 Pek. Plat beton sunsiding t-6 cm 4.68 kg HITUNG
Jumlah VI
XI PEKERJAAN CAT
1 Pek cat dinding baru Ex Catylac 154.263 m2 A.4.7.1.10
2 Pek cat plafon baru Ex Catylac 43.589 m2 A.4.7.1.10
3 Pek cat kayu baru Ex Decoluc 10.465 m2 A.4.7.1.4
Jumlah XI
NO URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH
III PEKERJAAN PASANGAN
IV PEKERJAAN LANTAI DAN KERAMIK
V PEKERJAAN BETON mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66
VI PEKERJAAN PEMBESIAN
VII PEKERJAAN ATAP DAN PLAFOND
VIII PEKERJAAN PINTU JENDELA
IX PEKERJAAN SANITAIR
X PEKERJAAN INSTALASI AIR
XI PEKERJAAN CAT
XII PEKERJAAN LISTRIK
JUMLAH
DIBULATKAN
TERBILANG : Seratus tujuh puluh tiga juta dua ratus tujuh puluh empat ribu rupiah
Harga Jumlah
tukang
Satuan Harga Mandor pekerja batu
Rp Rp
5 6
750,000.00 750,000.00
500,000.00 500,000.00
1,250,000.00
813,717.00 9,155,007.91
234,680.60 28,283,236.55
44,115.79 8,506,795.23
25,048.50 3,864,057.76
49,809,097.45
893,655.00 1,863,270.68
146,204.40 5,610,593.85
186,955.20 490,757.40
186,955.20 150,498.94
205,422.40 1,744,036.18
51,551.10 1,629,014.76
95,000.00 855,000.00
12,343,171.80
1,017,028.56 1,111,815.62
1,017,028.56 1,006,858.27
1,017,028.56 325,449.14
1,017,028.56 1,962,458.30
1,017,028.56 381,385.71
1,017,028.56 47,596.94
115,505.00 1,318,032.18
6,153,596.15
120,000.00 8,230,344.00
40,000.00 3,632,000.00
76,457.50 5,243,929.39 0.5487 10.2879
98,966.00 1,425,110.40 16.910 0.0288 5.7600
159,783.80 958,702.80 0.0600 1.2000
99,007.70 5,394,533.54
37,185.00 1,267,636.65 0.0341 1.7045
26,152,256.78
2,500.00 7,500.00
2,500.00 5,000.00
3,500.00 3,500.00
3,000.00 105,000.00
3,500.00 14,000.00
4,500.00 4,500.00
200,000.00 200,000.00
10,000.00 30,000.00
7,500.00 15,000.00
20,000.00 20,000.00
35,000.00 525,000.00
15,000.00 45,000.00
200,000.00 200,000.00
1,500,000.00 1,500,000.00
2,674,500.00
JUMLAH
1,250,000.00
2,020,563.52 544,500.00 1,476,063.5201
49,809,097.45 18,698,317.82 31,110,779.6309
12,343,171.80
6,153,596.15 1,957,765.08 4,195,831.0625
6,433,663.22 3,004,060.79 3,429,602.4290
26,152,256.78 7,519,780.01 18,632,476.7683
20,773,036.88 2,706,576.22 18,066,460.6595
697,944.50
2,674,500.00
4,163,979.69 2,632,902.91 1,531,076.7821
4,798,835.00 928,196.00 3,870,639.0000
137,270,644.98
137,270,000.00
-
tukang tukang tukang tukang pasir
besi kayu cat listrik ka tukang pasir urug pasang Kapur batu belah batu-bata semen kg
4.8056
0.7652 0.0765
0.6930 0.0693
0.2240 0.0224
1.3507 0.1351
0.2625 0.0263
0.0328 0.0033
5.1440 0.5144
2.8800 0.2880 0.4608 115.2000
2.4000 0.1500
3.4090 0.3409
9.4271 0.9427
26.4000 2.6400
4.9963 0.4996
0.7189 0.0719
2.0000 0.0400
1.3500 0.1350
0.9000 0.0900
0.7500 0.0750
1.3500 0.1350
1.3500 0.1350
1.3500 0.1350
9.7186 0.9719
2.7461 0.2746
0.0942 0.0628
1.8000
1.0000
0.0900
0.0300
0.0300
0.0400
3.3282 64.4253 12.5589 2.9900 7.8446 4.8056 0.4608 0.0000 0.0000 0.0000 115.2000
pasir keramik keramik semen papan minyak
beton split m3 30/30 m2 20/25 m2 warna besi bendrat begesting begesting air paku
m3
114.7860 1.6398
103.9500 1.4850
33.6000 0.4800
202.6080 2.8944
39.3750 0.5625
4.9140 0.0702
0.1140 0.0900
0.6547
0.0000 0.0000 0.0000 0.0000 0.0000 499.2330 7.1319 0.1140 0.0000 0.0000 0.7447
ky Kruing talang plat lis plafond
balok besi strip usuk 5/7 reng 2/3 genteng krepus usuk 4/6 seng asbes profil lis 1/4 m'
###
72.0000
6.3000
0.0000 0.0000 0.0000 0.0000 ### 72.0000 0.0000 6.3000 0.0000 0.0000 0.0000
lisplang balok ky kamper kaca t 5 engsel engsel grendel grendel
grc m' sekrup kamper papan lem kayu mm slot pintu pintu jendela pintu jendela
35.7945 136.3600
0.6285 0.5237
0.3520 0.4400
0.0500 0.6245
5.2718
4.0000
9.0000
9.0000
5.0000
9.0000
35.7945 136.3600 0.6285 0.4020 1.5883 5.2718 4.0000 9.0000 9.0000 5.0000 9.0000
handle cat Pipa
hak angin jendela plamir meni kuas minyak cat amplas cat kayu tembok kabel Clipsal
9.0000
9.0000
15.4263 #REF!
4.3589 #REF!
1.5698 2.0931 0.1047 0.3140 2.0931 4.5001
2.7000 81.0000
1.5000 45.0000
9.0000 9.0000 21.3550 2.0931 0.1047 0.3140 2.0931 4.5001 #REF! 4.2000 126.0000
Sock (1
Sock per 3 saklar saklar PINTU
Tee Doos m) Klem lampu SL viting ganda tunggal stop kontak PVC
18.0000 18.0000 108.0000
10.0000 10.0000 60.0000
9.0000 9.0000
3.0000
3.0000
4.0000
28.0000 28.0000 168.0000 9.0000 9.0000 3.0000 3.0000 4.0000 0.0000