Gambar Jalan Dan Drainase Urai Aspar
Gambar Jalan Dan Drainase Urai Aspar
NATUNA
DISETUJUI
STA + 46.40
SURATMOJO, S.T
Nip. 1973 0205 200502
1002
STRUCTURE
Rencana Plat 6 m -
DRAFTER (CAD)
-
CATATAN
LOKASI KOORDINAT
3°56'01" N - 108°22'18"E
NATUNA
KEGIATAN
PEKERJAAN
0.35
0.65
Rencana Galian
SURATMOJO, S.T
0.65 Nip. 1973 0205 200502
Rencana Galian 1002
KONSULTAN PERENCANA
0.90
TEAM LEADER
-
Rencana Galian STA +6.20 - 42,4 m
STRUCTURE
-
DRAFTER (CAD)
-
CATATAN
RENCANA GALIAN
SKALA 1 : 20
10 LBR
PENGGUNA JASA KEGIATAN
NATUNA
KEGIATAN
PEKERJAAN
Jalan Existing
Jalan Existing
DISETUJUI
0.65
Rencana Galian 0.65
Rencana Galian
SURATMOJO, S.T
Nip. 1973 0205 200502
1002
KONSULTAN PERENCANA
0.90
0.90
TEAM LEADER
-
STRUCTURE
-
DRAFTER (CAD)
-
CATATAN
RENCANA GALIAN
SKALA 1 : 20
10 LBR
PENGGUNA JASA KEGIATAN
NATUNA
0.78
KEGIATAN
0.58
URUSAN PENYELENGGARAAN PSU
PERUMAHAN
PEKERJAAN
0.90 2.50
SURATMOJO, S.T
Nip. 1973 0205 200502
1002
KONSULTAN PERENCANA
0.65
Rencana Galian
TEAM LEADER
-
0.90
STRUCTURE
-
CATATAN
RENCANA GALIAN
JUDUL GAMBAR SKALA
SKALA 1 : 20
10 LBR
PENGGUNA JASA KEGIATAN
NATUNA
0.90
0.90 3.00
DISETUJUI
SKALA 1 : 20
SURATMOJO, S.T
Nip. 1973 0205 200502
1002
KONSULTAN PERENCANA
0.90
DRAFTER (CAD)
-
Pipa PVC 1.5 " - 2 m 0.60
CATATAN
Lantai Saluran Camp 1:2:3 T = 5 Cm
0.30
0.90 3.00
JUDUL GAMBAR SKALA
10 LBR
PENGGUNA JASA KEGIATAN
NATUNA
0.90
JL. BATU SISIR BUKIT ARAI GEDUNG LANTAI I
PULAU SEKATUNG
0.20 0.50 0.20
PENINGKATAN PRASARANA SARANA
DAN UTILITAS
Plasteran + Acian Top Wall Jalan Existing
TAHUN ANGGARAN 2021
0.10 KEGIATAN
Pasangan Batu Camp 1:3
DISETUJUI
Rencana Drainase STA +46,4 - 56 m PEJABAT PELAKSANA KEGIATAN
SKALA 1 : 20 TEKNIS (PPTK)
SURATMOJO, S.T
Nip. 1973 0205 200502
1002
KONSULTAN PERENCANA
0.90
DRAFTER (CAD)
-
Pipa PVC 1.5 " - 2 m 0.60
CATATAN
0.30
0.90 3.00
JUDUL GAMBAR SKALA
10 LBR
PENGGUNA JASA KEGIATAN
0.30 PEKERJAAN
0.90 3.00
LANJUTAN SEMENISASI DAN DRAINASE
Rencana Drainase dan Jalan STA +92 - 109,2 m GG. URAI ASPAR 1 BUKIT CEMAKA KEL.
RANAI
SKALA 1 : 20
DISETUJUI
0.90
SURATMOJO, S.T
0.20 0.50 0.20 Nip. 1973 0205 200502
1002
Plasteran + Acian Top Wall KONSULTAN PERENCANA
CATATAN
0.60
10 LBR
PENGGUNA JASA KEGIATAN
NATUNA
0.90 KEGIATAN
Ø10 - 150mm
LANJUTAN SEMENISASI DAN DRAINASE
GG. URAI ASPAR 1 BUKIT CEMAKA KEL.
RANAI
4.00 DISETUJUI
Ø10 - 150mm
Beton Campuran 1pc : 2kr : 3pp SURATMOJO, S.T
Ø10 - 150mm Nip. 1973 0205 200502
1002
KONSULTAN PERENCANA
TEAM LEADER
-
0.90
STRUCTURE
-
DRAFTER (CAD)
-
CATATAN
4.00
10 LBR
PENGGUNA JASA KEGIATAN
NATUNA
0.90 KEGIATAN
PEKERJAAN
DISETUJUI
STRUCTURE
-
DRAFTER (CAD)
-
CATATAN
6.00
SKALA 1 : 20
10 LBR
PENGGUNA JASA KEGIATAN
NATUNA
KEGIATAN
PEKERJAAN
DISETUJUI
NATUNA
0.50
1002
URUSAN PENYELENGGARAAN PSU PERUMAHAN KONSULTAN PERENCANA
MT
Pekerjaan :
LANJUTAN SEMENISASI DAN DRAINASE GG. URAI ASPAR 1 BUKIT CEMAKA KEL. RANAI 0.40
NO KONTRAK :
0.20
TTD
3°56'03" N NAMA
STRUCTURE
108°18'22"E NIP. .............
-
DRAFTER (CAD)
-
CATATAN
0.80
0.60
DETAIL PRASASTI
Skala 1 : 5
JUDUL GAMBAR SKALA
10 LBR