No Nama Pinjaman Kerja Per Hari

1 Muhai Rp 3,500,000.00 7 Hari Rp. 150 Rb


2 Agok Rp 1,500,000.00 9 Hari Rp. 150 Rb
3 Agus Rp 1,000,000.00 10 Hari Rp. 150 Rb
4 Bayu Rp 1,000,000.00 9 Hari Rp. 80 Rb

Keterangan :
1. Kerja Mulai Tgl 26 Maret 2023
2.
3. Agok
Tgl 30tgl 29 Maret
Maret 20232023 Ijindkk
Muhai, bgawe sehari
minjam krn
duit sakit
100rb

4. Tgl 2 April 2023 (Muhai Libur Tgl 2,3,4 April 2023)


5. Tgl 2 April Bayu Libur Sakit
6. Tgl 2 April 2023 Agok Bon Rp. 50 Rb
7. Tgl 3 April (Muhai dan Agok Cashbon Rp. 1 jt)

No Nama Pinjaman Kerja Masuk Kerja


1 Muhai Rp 2,500,000.00 7 Hari 9-Apr-23
2 Agus Rp 1,000,000.00 10 Hari 5-Apr-23
3 Bayu Rp 580,000.00 9 Hari 5-Apr-23

Keterangan :
1. Kerja Mulai Tgl 5 April 2023, Agus, Bayu
2.
3. Libur
Tgl 9 Bayu
April 6, 7 April
2023, Muhai2023Mulai
sedangkan Agus Tgl 6 April 2023
Begawe

4. Tgl 12 April 2023, Agus minjam duit 1 Jt


5. Tgl 12 April 2023, Bayu minjam duit 300 Rb
6. Tgl 12 April 2023 Muhai Bon Rp. 50 Rb

Total Kerja 11 hari terhitung dari Tgl 26 Maret 2023 Sampai Dengan 15 April 2023
1. Muhai 14 Hari Sisa Hutang -1,450,000
2. Agus 20 Hari Sisa Hutang Lunas
3. Bayu 18 Hari Sisa Hutang -140,000

Total Kerja 3 hari terhitung dari Tgl 15 April 2023 Sampai Dengan 18 April 2023
1. Muhai 17 Hari Sisa Hutang 2,500,000
2. Agus 23 Hari Sisa Hutang 1,500,000
3. Bayu 21 Hari Sisa Hutang 400,000

Hutang Per 17 April 2023


1. Muhai Pinjam 1,500,000
2. Agus Pinjam 1,500,000
3. Bayu Pinjam 500,000
No Nama Sisa Pinjaman Per Tgl 15 April 2023 Pinjaman Tgl 17 April 2023
1 Muhai -Rp 1,450,000.00 1,500,000
2 Agus Rp - 1,500,000
3 Bayu -Rp 140,000.00 500,000
Keterangan (hari x Upah Per Hari) Total Hutang
Rp 1,050,000.00 Rp 2,450,000.00
Rp 1,350,000.00 Rp 150,000.00
Rp 1,500,000.00 s
Rp 7,200,000.00 -Rp 6,200,000.00

Tidak Masuk Kerja Keterangan (Hari x Upah Per Hari)


0 Rp 1,050,000.00
1 Rp 1,500,000.00
2 Rp 720,000.00
Total Kerja 16,17, 18 April 2023 Total Sisa Pinjaman Per Tgl 18 April 2023
3 hari x 150 Rb = Rp. 450,000 -Rp 2,500,000.00
3 hari x 150 Rb = Rp. 450,000 Rp 1,050,000.00
3 hari x 80 Rb = Rp. 240,000 -Rp 400,000.00
Keterangan
Masih Terhutang
Masih Terhutang
Lunas
Masih Terhutang

Total Hutang Keterangan


-Rp 1,450,000.00 Masih Terhutang
Rp 500,000.00 Lunas
Rp 140,000.00 Masih Terhutang
Total Kerja Per Tgl 16 Maret Sampai 18 April 2023
17 Hari
23 Hari
21 Hari