Anda di halaman 1dari 11
REKAPITULASI BILL OF QUANTITY NAMA PEKERJAAN _: PEMBANGUNAN PAGAR KELILING KAMPUS BUKIT INDAH LOKASIPEKERIAAN —: KAMPUS BUKIT INDAH KECAMATAN MUARA SATU KOTA LHOKSEUMAWE TAHUN ANGGARAN — : 2022 JUMLAH BIAYA NO. URAIAN PEKERIAAN (RP,) [PANIANG PAGAR 756 M" i._|PEKERJAAN PERSIAPAN ae : _[BIAva SISTEM N MEN KESELAMATAN KONSTRUKSI (SMKK) : PEKERIAAN TANAH DAN PASIR PEKERJAAN STRUKTUR : ._ |PEKERIAAN PASANGAN & PLESTERAN Vi._[PEKERJAAN LAIN - LAIN : JUMLAH} : PPN 11%| - JUMILAH SETELAH PPN} = rsuLaTian|— ; Terbilang : Penyedia BILL OF QUANTITY NAMA PEKERIAAN _: PEMBANGUNAN PAGAR KELILING KAMPUS BUKIT INDAH LoKas! KAMPUS BUKIT INDAH KECAMATAN MUARA SATU KOTA LHOKSEUMAWE TAHUN ANGGARAN. : 2022 No. URAIAN PEKERIAAN ‘VOLUME ANALISA MARGASATUAN | JUMLAH HANSA (ne) (ro) z z 3 a 5 IPANJANG PAGAR 756 M IPEKERIAAN PERSIAPAN [IAVA SISTEM MANAJEMEN WESELAMATAN KONSTAN (Sm Penviapan KK —_— spend ava fries 2 alt Peindung Oi CAPO) Pelindung (Sofety Helmet) . Pelindng Mata Goss, specace) 13,00" Bush 10,90. Bush «,_Tameng Muka (Face shield) an Ml (asker) :Sarung Tangan (Safety Gloves) “1. Sepatu Keselamatan (Safety Shoes) “&.Penunang Seluruh Tubuh (Full Body Harness) fh. Rompl Keselamatan (Safety Vest) iL Celemek Apron/Coveralls) 6|eralatan PB (Rotak 3K and, Tabung Okie, Oba Lu, Perba, i 1 ang P3 Terpat Tid Pain Stetoshop,Tinbangan Be a 411]tampu Darurat (Emergency Lamp ) 12|Tempatcueltangan injk portable UMAR Tale Ls 2s FERERIAAN TANAN DAN PASTE [Gain Tanah PondssTapak _ - ~| 8030 aia | : 2 ]Urugan Kembali Beas Gain — 77 MB 5 3 [Pas Urog Dibawah Ponds — [10 va | aad - Tama TV PERERIAAN STRORTOR — 2 [Tapak Pondasi Beton Bertulang Uk. 60x80 ime seer | EE =e ~ ese we | aaaas - 2 -Pembeslan ~ sna —e | a26ibi = 2 |stoof Uk 25:30 = ~ : Beton Mutu R175 aa a Kolom Pedestal Uk. 30¢m x30em |- Beton Mutu 175 ae 219 NB | ~ ; embesian Binet = | Beksing ~ “3ei8 me = 7 Pom Ue — = - = ~ : aan We ee ~ [aware] sib eee Aaii20 : 5 fine lk i 25 25cm a Beton Mutu Ka75 Aaiis 5 Pembesian 226Lb.) — “Fretisting wana — TV. PERERIAAN PASANGAN & PLESTERAN : 2 fotu Bata 14 7028 Wi [2 estern — = Caress we [3 3 aa7.18 ME Pembersihen Akhir 10 Fake Takei PERATURAN MENTERI PEKERJAAN UMUM DAN PERUMAHAN RAKYAT REPUBLIK INDONESIA NOMOR 1 TAHUN 2022 PEDOMAN PENYUSUNAN PERKIRAAN BIAYA PEKERJAAN KONSTRUKSI BIDANG PEKERJAAN UMUM DAN PERUMAHAN RAKYAT 1.7 HARGA SATUAN PEKERJAAN TANAH Pokerjaan Ponggalian Tanah (C) Penggalian 1 m3 Tanah Biasa Sedalam s.d 1 m Untuk Volume s.d 200 m3 Dalam Satu Lokesi Wo. Uraian Kode | Satuan | Kooofision | Harga Satuan (Rp) | Jumiah Harga (Rp) j___A__|TENAGA KERJA ee Pekeria 7 Lot OH 0750 5 Mandor Los | on 0,025 : “JUMLAH HARGA TENAGA KERJA| 5 8 [BAAN | _ ‘JUMLAH HARGA BAHAN| c [PERALATAN - a = _ JUMLAH HARGA ALAT| [Jumian (A+B =C) 5 Biaya Umum dan Keuntungan (15%) 15% xD. : [Harga Satuan Pekerjaan (0+E) 5 172 ‘1 m2 Pembersihan dan Pengupasan Permukaan Tanah (striping) s.d Tanaman @ 2m 1728 (C) Pengurugan Kembali 1 m3 Galian Te No. Uraian Kode | Satuan | Koeefision | HargaSatuan(Rp) | Jumlah Harga (Rp) A FTENAGA KERJA - - _ Pekeria tor | on | 0500 _ : _ Mandor Los | oH 0,060 : : ‘JUMLAH HARGA TENAGA KERJA] 5 8 [BAHAN aaa JUMLAH HARGA BAHAN} _|PERALATAN _ _ - _ aan JUMLAH HARGA ALAT| [Jumtah (A +B +) 7 Biaya Umum dan Keuntungan (18%) 15% xD. - [Harga Satuan Pekeriaan (D+) 1724 ()Pengugan mi dengan Pasir Ug No. Urait Kode | Satuan | Koeefisien | Harga Satuan (Rp) Jumiah Harga (Rp) 7A [TENAGAKERIA : tan on | oa : : Mandor OH 0010 7 a UMAR HARGA TENAGA KER : Pa z i ee mm | 1200 Oe MAT ARCA BATA © PERACATAN TMATTARGA RT D [amnana8=0) : E |Biaya Umum dan Keuntungan (15%) 15% xD Fae Suan Plann O°) : 2 STRUKTUR 22 Pekerjaan Beton (22648) Penulangan beton 22614a) Penulangan 100 kg baja tulangan dengan tulangan polos atau sirip 226..b(a) _ Panulangan 100 kg dengan Basi Polos atau Besi Sirip We. Uae Kode | Seuan | Kovatsion | Marge satan (Rp) | Junin Haga [Tewcaveran |Pekerja Lot OH - 7 arg uz | on yt Wea Targus | on : [Mandor_ Lod OH - | UMAR HARGA TENRGA HEPA [3 Jaman |Besi Beton (polos/ulir) IM60.d kg 105,000 = kavaliahseon mz [1 | 10 of : MATTTARGA Aa : en a : TDMATTARGA AAT 0 [ume 870) : E [Baya Un dan organ (3%) exo F | Harga Satuan Pekerjaan Per - 100 kg (D+E) ~ [Harga Satuan Pekerjaan Per -1 kg (O+EV100 22 HARGA SATUAN PEKERJAAN PLESTERAN 322(e)__Pemasangan 1 m2 Plestaan 1 SP: PP Tebal 15mm No. Uraian Kode | Satuan | Koeefision | Harga Satuan (Rp) | Jumiah Harga (Rp) ‘A__|TENAGAKERIA lees rs a — Z FTukeng bat oz [oH oto | : ep Tsarg Los [on | ars : —_ Manor to [on | aots : : WUMLATTHARGA TENAGA KERUA : ana | semen Portand a 6200 _| Pasi Pasang m3 04 E : TUMLANTHARGA BAHN = [PERALATAN : JUMLAH HARGA ALA Duman (A+B =0) : [ataya Unum dan Keuntungan (15%) 15% x0. : F___ |Harga Satuan Pakerjaan (0-2) - 3.2.24e) Pemasangan 1 m2 Acian Ne Ulan ‘ode [Seton [ Kowsin | Hare steno) [ donih age Ro) A feRAGA KER see cor [oa : ___[Tukang batu ~ toe | on D IKepata Tukang ‘03 OH | |Mandor_ 7 _ Low OH ~ 3 wan [Semen Portland ft ko lL 3,250 : - TOR AARGA BATA PERALATAN TaMATARA A 0 [omnia : flys Un dan Keren 6%) exo F__[Harga Satuan Pekerjaan (+E) : ‘AA1.1 HARGA SATUAN PEKERJAAN BETON Cetatan Bobotispasi:1400 gins , Buking factor pasir: 20% Bobot is ker: 1350 kgm ALAA Pambuatan 13 Beton Mutu Fe=74 Mpa (100) No, Uraian Kode | Satuan | Koeefision | Harga Satuan (Rp) Jumiah Harga (Rp) 7 eNAGA ERA __ i tor | um | on tos | ow : : toe [on | c0ss : UMA HARGA TENA KER [8 ewan ae semen Poon 2 : a Pas eon 68 — — eri (Maks 30 mn) a | se aa : tue [28 : : a _— TAT ARCA D [ona asB +0) E |Biaya Umum dan Keuntungan (15%) 15% xD - Fae Stan Peon (OE) : AAMAS Pembuatan 1 m3 Beton Mutu fc = 14,5 Mpa (K175) Ne, ran Kode | satuan | Kowatoon ]Harga Sotan Rp) | Junih Hara) i enon — Peles tor | ow : ——_[fstangtay toe | E opal Tung “[tes [on Mando tos | out 8 [aaa a __ seen Portas 7 7 | Pas Balen | : : Kerk cks 3000) po : le : : OMA HAGA Baa : PERALATAN ; | : TMANFARGA RAT D [oomenavo0) : Eis Un dan Kerang 5%) exo - |Harge Satuan Pekerjaan (D+E) = AAMAS. Pernasangan 1 m2 Bekisting untuk Pondas! Telapak Beton Bangunan Gedung No. Uraian Kode | Satuan | Kocefision | Harga Satuan (Rp) | Jumiah Harga (Rp) A [TeNAGA REA Pokera “tot | on 0520 - fTukang kay | toe | on 0260 - : : esl Takano tes | on | 0008 |Mandor to | on 006 | raat = JUMATHARGA TENAGA HERO : Cs — [ _ Papen Key Kot i = 0 PakuS- 10cm a a [Minyak Bekesting liter 0,400 : TOMA HARA ANAND BAGIOX PEMA : cma aa MAT RARGA AAT © [onan 8-0) : E Biya Umum dan Keuntungan (15%) 15% xD : F |Harga Satuan Pekerjaan (D-+E) a A149 _Pamneangan {2 Bkisting nt Soof Baton Bengunen Gedung Wo. Uraian Kode | Satuan | Kosefisien | Harga Satuan (Rp) | Jumiah Harga (Rp) 7 [FeRAGA NERA _ __[Pekera or | on | 052 oo : Yarnton” eee | on | cam | : epaaTkarg wos | on | 0008 : : aa toe [on | 0008 | : : UMLATTHARGA TENAGA REP : 3 [ewan Frere ye Mast [fom foo] 5 | Frau t0em 6 | : rf |Minyak bekisting Liter 0,100 : [MLA FARGA BAAN OBAGI PEAK "PR T_._ L TOMAR HARGA NAT D Pomas8-) : E |Biaya Umum dan Keuntungan (15%) 15% xD : Harga Satuan Pekeraan (OE) ‘AAIA.20 _ Pemasangan 1 m2 Bekisting untuk Kolom Beton Bangunan Gedung No Unian Kode | Satuan | Koooitan | Harge Satuan Rp) | Jura Hang (Rp) 7A__|TENAGAKERIA Pekera Lot | _ Tukang kay Loz ~__|kepata Tukang ~ | tos. OH 0,033 - |Mandor _ Los OH 0,033 ce _ : a TJUMLAR WARGA TENAGA KERR : [BA Papen Kapa Rs “| ome | —___[PekvSem-t00m wo | = Minyok Behoting ier 5 - Balok Kayu Kelas mm | - | | Phyweod bal 9mm |e 5 : Pstertanes- 10cm say | 2000 : © [PERALATAN TOMCAH HARGAALAT| [union (+86) ; [Biaya Umum dan Keuntungan (15%) 15% xD . Harp Satan Peteiaan (OE) 7 AA1421 __ Pamasangan 1 m2 Bekitng untuk Balok Bangunan Gedung No. Uraian Kode | Satuan Koeefisien | Harga Satuan (Rp) Jumlah Harga (Rp) 7 [TENAGAKERIA _ Peter Lo 0580 —_Frukang kaye Loz 0330 “| Kepaa Tkang 08 033 Mandor Lot 0,033 - _ [JUMLA WARGA TENAGA KERR 7 3 [BAAN Kaya Klas ih : m3 | - —__ [PakuSom- 120m ig e eae - cya Betting To ; __[Balok Kayu Kash james) Estes = | ae _ [bets 9 mm _ tbr E 7 loken kay © 8-10 emt bao : TMA HARGA BAAN Dv BAGH EX PEMARAIAN © [PERALATAN _ TOMCAHHARGAALAT| [umioh r=) 7 Biaya Umum dan Keuntungan (15%) 15% xD . Harga Satuan Pekeriaan (D+) : ‘AAA. HARGA SATUAN PEKERJAAN PASANGAN DINDING Adaag —_Pémasangan {m2 Dinding Bata Mer (5x11x 22} cm taba 1/2 Batu dengan Morar tpe W, Fe’ §2 Mpa (Setar ‘Gampuran 1SP :4PP No, Uraian Kode | Setuen | Kovefison | Herge Satuan (Rp) | Jumlah Harge (Rp) 0300 | 0,100 010 E ots : SUMLAH HARGA TENAGA KERJA] : us I [Semen Portand - = Past Pasang : __[PERALATAN a SUMLAH HARGA ALAT| Duman (A+B +0) [Biya Umum dan Keuntungan (15%) 15% xD F___ [Harga Satuan Pekerjaan (D+E) : DAFTAR UPAH DAN BAHAN URAIAN ‘SATUAN HARGASATUAN Ker. 3) 2 3 4 5 ari = Hari Si ~ Hari e a - _ Hari E e 8 |pAHAN _ _ 7 7 1 lair titer _ 2 [Bata Merah Buah = 3 [atu Kall (Sungai/ Gunung) we ee 4 [atu Pecah 2-3 em wt S 4 5 me = - 6 Me = "7 [Batok kayu Klas ih vm 2 8 |alok Kayu Klas 1V - c we : ‘9 |besi Beton Polos Kg [20 |Besi Beton Ulir a a _*e - of 11 [Dokken Kayu@8-10P).¢m | Batang | ia : 12 |kawat Beton — S — 33 |rayu Kast Ele 14 |kayu Kas = —4 15 _[ayu Kas wh a 16 _Kayu Klas iV S 117 [Kerik Beton (Gravel) 18 |erikil Beton (Gravel) 20__|Minyak bekisting — 21_[Plamic Kays 22_ [lami Tembok 23 [Pengencer / Minyak Cat 24 JPaku Kays =| 25 Jas Pasang Pai Baton Me ae 26 _|Pasir Pasang /Pasir Beton Ks 7 27 Joos Urug ma 2 28 _[Perlengkapan & é 29, [semen @ 40kg _ a A 30 _ Ke 7 31 _ Ke } 7 a a — Ms s 33 [Tanah imbun = [ws | 34 |Tripleks 4 mm __tembs — 35 [Tpke 6mm Lembar - — 36 [Tepes 9 mm ember mm 37__|Vertical Blind Mz 7 Penyedia

Anda mungkin juga menyukai