22KT03R752-0030 22KT03R7522KT03R752-0033
MATERIAL 4903806726 4903806732 4903806742 4903898122
AC-OF-SM-12D 4400 4000
AN-TIANG-4 8 8 50
BDG-38 76 76
BREKET-A 38 38 100
DC-OF-SM-24D 30
KLEM-COOCKER 14 14 90
KLEM-RING-5-LUBANG 7 7
ODC-C-144 1
ODP-SOLID-8-L 7 7 45
PC-SC-SC-15 2 2
PS-1-4-ODC-288 2 2
PU-S7.0-140 4 4 12
PU-S9.0-140
SC-OF-SM-24 1 4
SLACK-S
SPW-38 38 38 100
SS-TIANG-FO 10 10 271
STAINLESS-BELT 56 56
TC-SM-12
Total Result 255 7 262 4444 4660
22KT03R752-0033 Result Total Result
4903996796 4904115009 4904250272 4904261601 4904350987
1160 9560 9560
15 65 73
12 12 88
12 112 150
30 30
90 104
45 45 52
1 1
45 52
2
12 12 14
49 27 59 147 151
8 8 8
5 5
2 2 2
6 106 144
18 289 299
45 45 101
1 1 1
1268 49 14 73 67 10575 10837
Total Result
REKAPAN PENGAMBILAN MATERIAL INVENTORY
PEKERJAAN: PENGADAAN DAN PEMASANGAN PROJECT STTF2A 2 LOP 2022 WITEL SULSEL
AREA : MAKASSAR
PERIODE : 2022
ID PROJEC : 22KT03R752-0030. 22KT03R752-0033
LOP : R7 MKS SUD PT3 PERUM BUMI INDAH; R7 MKS SUD PT3 KARIANGO
NAMA MATERIAL
KLEM-RING-5-LUBANG
NO NO RFC Tanggal
PS-1-4-ODC-288
DC-OF-SM-24D
AC-OF-SM-12D
ODP-SOLID-8-L
SC-OF-SM-24
PU-S7.0-140
PU-S9.0-140
PC-SC-SC-15
ODC-C-144
TC-SM-12
SLACK-S
1 4903806726 25 Aug 2022 4 2 14 7 2
2 4903806732 25 Aug 2022 7
3 4903806742 25 Aug 2022 4400 12 30 1 1
4 4903898122 12-Sep-22 4000 90 45 4
5 4903996796 30-Sep-22 1160
6 4904115009 24 Oct 2022 49
7 4904250272 19-Nov-22 12 2
8 4904261601 22-Nov-22 27 1 45
9 4904350987 08 Dec 2022 59 8
L
STAINLESS-BELT
SS-TIANG-FO
AN-TIANG-4
BREKET-A
SPW-38
BDG-38
8 38 76 38 10 56
November 2021
1 2
- 3,560 - -
- 4,960 - -
- 35,090 - 4
- 60,350 21 157
- 1,530 26 156
- 3,110 2 12
- 5,796,340 - -
1,575,000 679,000 - -
- 169,720 7 45
- 34,920 2 12
- 7,624,030 - -
- 246,740 4 135
- 41,500 57 278
883,000 419,210 1 3
2,661,000 485,990 - -
240,400 62,630 1 5
- 36,340 3 -
4,764,000 2,122,800 - -
- 701,990 - -
- 16,030 - -
- 15,880 - -
- 762,400 - -
- 249,450 - 8
22
2
1 5 5 -
1 1 1 -
1 1 - 1 MATERIAL MITRA
- 52 52 -
- 14 14 -
1 1 - 1 PEKERJAAN JASA
- 4 - 4 MATERIAL MITRA
1 1 - 1 MATERIAL MITRA
1 7 - 7 MATERIAL MITRA
- 3 - 3 PEKERJAAN JASA
- - - - MATERIAL MITRA
1 1 - 1 MATERIAL MITRA
2 2 2 -
6 6 - 6 PEKERJAAN JASA
1 1 1 -
- 8 8 - 8 BTG DIKEMBALIKAN KE
WH
REKAPAN PENGEMBALIAN MATERIAL INVENTORY
PEKERJAAN PENGADAAN DAN PEMASANGAN PEKERJAAN OSP STTF2A 2 LOP 2022 WITEL SULSEL
AREA : MAKASSAR
PERIODE : 2022
ID PROJECT : 22KT03R752-0030. 22KT03R752-0033
LOP : R7 MKS SUD PT3 PERUM BUMI INDAH; R7 MKS SUD PT3 KARIANGO
NAMA MATERIAL
AC-OF-SM-12D
SS-TIANG-FO
PU-S9.0-140
PU-S7.0-140
NO NO RFR Tanggal
1 4904356753 12/9/2022 8
2 4903815056 3/27/2023 4400
3 4905301896 5/19/2023 3
4 4905301895 5/19/2023 110
5 4905301894 5/19/2023 23
6
TOTAL 4510 8 3 23