U BOLT CLEM

BCC 50mm2

GROUNDING LANTAI 2

GROUND LEVEL

KOLOM

ADJUSTING
NUT TRAY

POTONGAN A 8

POTONGAN B 15
CONCRETE

CLEM

MAX 2 OHM RESISTANCE


POTONGAN A 11
POTONGAN B 3
BCC 50mm2
TO TRAY

KOLOM
U BOLT

NUT GROUNDING

GROUND LEVEL
DETAIL CLEM PEREMPATAN 7
DETAIL KONEKSI GROUNDING TERHADAP TRAY 14

DETAIL GROUNDING DI PILE CAP 10

CLEAM

BOLT
CLEM BOLT

GROUND LEVEL
CONCRETE

NUT

CLEM
MAX 2 OHM RESISTANCE
POTONGAN A 5 POTONGAN B 6

POTONGAN A 2
POTONGAN B 13
CLEM

BOLT GROUND LEVEL


ELEVASI STRUKTUR

BCC 50mm2
CLEM

ELEVASI STRUKTUR

DETAIL GROUNDING PIT 1 DETAIL CLEM PERTIGAAN 4 DETAIL BCC DI DALAM TANAH 9 DETAIL KONEKSI GROUNDING TERHADAP BEAM 12

NO. TANGGAL REVISI PARAF MENYETUJUI MENYETUJUI KONSULTAN PEKERJAAN NAMA BANGUNAN DIGAMBAR JOB CAPTAIN DIPERIKSA
Kuasa Pengguna Anggaran Direktur Utama
RSUD dr. Zainoel Abidin

LABORATORY, RADIOLOGY
& C.O.T
Fakhruddin, S.IP, M.Si dr. Fahrul Jamal, Sp.An,KIC
Pembina Tk. I Pembina Utama Muda
Nip. 19620829 198503 1 004 Nip. 19610510 198812 1 001

MENGETAHUI PEMBERI TUGAS JUDUL GAMBAR TIDAK SKALA

DETAIL - DETAIL SISTEM


PENTANAHAN (GROUNDING)
EL-05