Anda di halaman 1dari 1

E D C B A

1 2 3 4
POTONGAN -01 POTONGAN -02
SKALA 1 : 100 SKALA 1 : 100

NOTASI MATERIAL :
LANTAI

KERAMIK 300X300MM
KERAMIK 200X200MM
FLOOR HARDENER
DAK BETON LAPIS WATERPROOFING
BATU ALAM CORAL SIKAT
PAVING BLOCK
ASPAL

DINDING

BT BATA PLESTER ACI DI CAT WHEATERSHIELD


BT BATA PLESTER ACI DI CAT EMULSION
BT BATA FINISH BATU ALAM
BT BATA PLESTER NAT 2CM DI CAT
BT BATA FINISHING KERAMIK 200X200MM
BETON 150MM FINISH CAT
KALSIPLANK MOTIF JATI

PLAFOND

1 GYPSUM BOARD TANPA NAT FINISH CAT


2 EXPOSE

DIPERIKSA OLEH DIPERIKSA OLEH KETERANGAN GAMBAR GBR No. CATATAN GAMBAR NO TGL REVISI DIPERIKSA DISETUJUI DIGAMBAR JUDUL PROYEK PEMILIK
- - JASA KONSULTAN
DED FASILITAS DERMAGA DAN DOK KAPAL TIPE SLIPWAY
TERMINAL SUPLLY BASE PT ELNUSA DI PENDINGIN,
KALIMANTAN TIMUR KONSULTAN
- -
DISETUJUI OLEH DISETUJUI OLEH NAMA GAMBAR

MESS V.I.P DIGAMBAR TANGGAL : - SKALA :


DIPERIKSA NO. GAMBAR REV.
- - DISETUJUI

Anda mungkin juga menyukai