Anda di halaman 1dari 1

CATATAN

LAMPU KHUSUS
BATU ANDESIT KOLAM RENANG
uk. 400X400x40 MANHOLE 600X600 satuan dalam meter
SPARING LAMPU : BORDER:
P : 300 x L : 300 x D : 80 BATU ANDESIT
PENUTUP SALURAN
UK. 200X80x20
BATU ANDESIT
uk. 400X400x40 TOP:BATU ANDESIT
UK. 400X400x40

SALURAN AIR HUJAN


FIN:PLASTER
SALURAN KOLAM RENANG
FIN:KERAMIK 200X200 -0.85
BALANCING TANK PEKERJAAN
-1.20 Ø12-15

BETON K225 Ø12-15 -1.50 -1.50 BETON K225


Pekerjaan Pembuatan Kolam Renang

FIN: KERAMIK
UK. 85X85
FIN:KERAMIK 200X200 2
-

LOKASI
POTONGA -1
SKALA 1:75 Kota Bukittinggi

PENUTUP SALURAN
BATU ANDESIT
uk. 400X400x40
BATU ANDESIT
uk. 400X400x40
SPARING LAMPU : BORDER:
P : 300 x L : 300 x D : 80 BATU ANDESIT FIN: KERAMIK Architect, Civil Engineer, Surveyor,
PAS BATA 1:4 UK. 200X80x20 UK. 85X85
Construction Management
TOP:BATU ANDESIT LAMPU KHUSUS
+ 0.00 + 0.00 + 0.00 UK. 400X400x40 + 0.00 KOLAM RENANG + 0.00
- 0.05 - 0.05
DIBUAT OLEH

SALURAN AIR HUJAN


FIN:PLASTER Di Buat Oleh
SALURAN KOLAM RENANG PERENCANA
-0.85 -0.85 -0.85 FIN:KERAMIK 200X200

Ø12-15 Ø12-15

-1.20 -1.20

-1.50 -1.50 BETON K225 Ø12-15 MUHAMMAD RAFI ALFIKRI, ST

1
-
PENANGGUNG JAWAB

ARSITEKTUR

KONSTRUKTOR

DIGAMBAR Team cad

Judul Gambar Skala


POTONGA -2
SKALA 1:75

Tanggal Kode Gbr No. Lembar

2023 --------- -

Anda mungkin juga menyukai