Anda di halaman 1dari 7

PEMBANGUNAN RUANG INFORMASI

UNIVERSITAS SINGAPERBANGSA (UNSIKA)


KARAWANG
2022
RENOVASI GEDUNG TEKNIK
FAKULTAS TEKNIK
UNIVERSITAS SINGAPERBANGSA
(UNSIKA)

Karawang, Jawa Barat


PETA KONTUR

1883

198 197 340 393 340 415


CATATAN

E LEGENDA

KM LANTAI:
119

2 2 1. KERAMIK TILES 600X600 mm


KM FFL -0.04
2 m² 2. LANTAI EPOXY
4 m² 3. KERAMIK 300X300 mm
FFL -0.04

382
KM
119

2
DINDING:
FFL -0.04
2 m² 1. PAS. DINDING KACA ALUMINIUM
2. PAS. DINDING BATA + PLESTER+ACI
3. PAS. BATA+KERAMIK TILES 200/250
4. PAS. DINDING PARTISI

PLAFOND:

200
D
1. RANGKA HOLLOW 40/40+GYPSUMBOARD 9mm
Fin. Cat Tembok Ex. Vinylex Interior
2. RANGKA HOLLOW 40/40+KALSIBOARD
3. EXPOSED BETON Fin. CAT
R. HIMPUNAN
436

15 m²
1007

1007
ATAP:
FFL +0.00 60 1. RANGKA ATAP BAJA RINGAN (BY SUPPLIER)

315
PENUTUP ATAP Genteng Beton Ex. Cisangkan

2
1 LAB. MESIN Lisplank GRC
2. DAK/ KANOPI BETON + WATERPROOFING
141 m²
2

FFL +0.00
2
C
R. CNC
310

310
11 m²
FFL +0.00 PEMILIK

2
2 Owner
UP
PROYEK

B BANGUNAN LABORATORIUM
NO. PROYEK
Project Number

NAMA GAMBAR
R. INFORMASI
32 m²
DENAH R. LAB. MESIN
Lembar ke
SKALA KODE NO.GAMBAR

1 : 100 AR001 Jumlah lbr

A Digambar/Diperiksa Tanggal Paraf

TERAS Drafter

Author
395 340 393 340 415
Job Capt/Asisten

1883

1 DENAH R. LAB. MESIN Diperikasa & disetujui Tanggal Paraf

AR001
1 : 100 1 2 3 4 5 6 Checker
PEMBANGUNAN RAUNG INFORMASI
FAKULTAS TEKNIK
UNIVERSITAS SINGAPERBANGSA
(UNSIKA)

Karawang, Jawa Barat


PETA KONTUR

CATATAN

LEGENDA

LANTAI:
1. KERAMIK TILES 600X600 mm
2. LANTAI EPOXY
3. KERAMIK 300X300 mm

DINDING:
1. PAS. DINDING KACA ALUMINIUM
2. PAS. DINDING BATA + PLESTER+ACI
3. PAS. BATA+KERAMIK TILES 200/250
4. PAS. DINDING PARTISI

LAB. MESIN PLAFOND:


141 m² 1. RANGKA HOLLOW 40/40+GYPSUMBOARD 9mm
Fin. Cat Tembok Ex. Vinylex Interior
2. RANGKA HOLLOW 40/40+KALSIBOARD
3. EXPOSED BETON Fin. CAT

ATAP:
1. RANGKA ATAP BAJA RINGAN (BY SUPPLIER)
PENUTUP ATAP Genteng Beton Ex. Cisangkan
Lisplank GRC
733 2. DAK/ KANOPI BETON + WATERPROOFING

393 340

UP

B PEMILIK
Owner

1
PROYEK

1
-
R. INFORMASI BANGUNAN LABORATORIUM

462
460
32 m²
--- FFL +0.00 NO. PROYEK
560

560
Project Number
1

1
NAMA GAMBAR

1
DENAH R. INFORMASI
A TERAS Lembar ke
100

100
SKALA KODE NO.GAMBAR
FFL -0.04
1 1 : 100 AR002 Jumlah lbr

CARPORT Digambar/Diperiksa Tanggal Paraf

501 448 Drafter

Author
948
Job Capt/Asisten

3 1
4 5
AR004 Diperikasa & disetujui Tanggal Paraf

Checker

1 DENAH R. INFORMASI
AR002
1 : 100
PEMBANGUNAN RAUNG INFORMASI
FAKULTAS TEKNIK
UNIVERSITAS SINGAPERBANGSA
(UNSIKA)

Karawang, Jawa Barat


PETA KONTUR

CATATAN

LEGENDA

LANTAI:
1. KERAMIK TILES 600X600 mm
2. LANTAI EPOXY
3. KERAMIK 300X300 mm

DINDING:
1. PAS. DINDING KACA ALUMINIUM
2. PAS. DINDING BATA + PLESTER+ACI
3. PAS. BATA+KERAMIK TILES 200/250
4. PAS. DINDING PARTISI

PLAFOND:
1. RANGKA HOLLOW 40/40+GYPSUMBOARD 9mm
Fin. Cat Tembok Ex. Vinylex Interior
2. RANGKA HOLLOW 40/40+KALSIBOARD
3. EXPOSED BETON Fin. CAT

ATAP:

TAMPAK DEPAN BANGUNAN


1. RANGKA ATAP BAJA RINGAN (BY SUPPLIER)
PENUTUP ATAP Genteng Beton Ex. Cisangkan
Lisplank GRC
2. DAK/ KANOPI BETON + WATERPROOFING

PEMILIK
Owner
PROYEK

BANGUNAN LABORATORIUM
NO. PROYEK
Project Number

NAMA GAMBAR

TAMPAK BANGUNAN
Lembar ke
SKALA KODE NO.GAMBAR

AR003 Jumlah lbr

Digambar/Diperiksa Tanggal Paraf

Drafter

Author
Job Capt/Asisten

TAMPAK KIRI TAMPAK KANAN


Diperikasa & disetujui Tanggal Paraf

Checker
BATANG BAJA RINGAN C75
PEMBANGUNAN RAUNG INFORMASI
FAKULTAS TEKNIK
UNIVERSITAS SINGAPERBANGSA
RENG R45 (UNSIKA)

PENUTUP ATAP SPANDEK


-
B ---
A Karawang, Jawa Barat
PETA KONTUR
RANGKA PLAFOND HOLLOW 4/3

PENUTUP PLAFOND GYPSUM 9mm

TALANG AIR
120
CATATAN

LEGENDA
35

LANTAI:

4.65°
RING BALOK 1. KERAMIK TILES 600X600 mm
2. LANTAI EPOXY
3. KERAMIK 300X300 mm

80
38
305 HURUF TIMBUL
DINDING:
1. PAS. DINDING KACA ALUMINIUM
2. PAS. DINDING BATA + PLESTER+ACI
CH +2.85
ACP (Fin. MERAH UNSIKA) 3. PAS. BATA+KERAMIK TILES 200/250
4. PAS. DINDING PARTISI

PLAFOND:
1. RANGKA HOLLOW 40/40+GYPSUMBOARD 9mm
Fin. Cat Tembok Ex. Vinylex Interior
RING BALOK 15X30 cm 2. RANGKA HOLLOW 40/40+KALSIBOARD
K175 (7Ø12mm, Ø8-15 cm) 3. EXPOSED BETON Fin. CAT

ATAP:
1. RANGKA ATAP BAJA RINGAN (BY SUPPLIER)
PENUTUP ATAP Genteng Beton Ex. Cisangkan
KUSEN ALUMUNIUM
132

Lisplank GRC
2. DAK/ KANOPI BETON + WATERPROOFING

HANDLE PINTU ENTRANCE


DINDING KACA ALUMUNIUM
285

PINTU ENTRANCE

264
FRAMELESS 155X200 cm
PEMILIK
Owner

208
SLOOF 15X20
K -175 (4Ø10mm, Ø8-15 cm) PROYEK

BANGUNAN LABORATORIUM
PINTU BESI DOUBLE
129

R. INFORMASI TERAS LANTAI TERAS KERAMIK 40X40 cm


NO. PROYEK
Project Number
FFL +0.00
FFL -0.04 NAMA GAMBAR

DPT TERAS BATA ROLLAG POTONGAN AA


200 200 108
LANTAI 1
Lembar ke
SKALA KODE NO.GAMBAR
0 TANAH URUG
1 : 25 AR004 Jumlah lbr

PEDESTAL 30X30 cm Digambar/Diperiksa Tanggal Paraf

Drafter

Author
POND. TALAPAK 25X50X50 cm Job Capt/Asisten
25

50 Diperikasa & disetujui Tanggal Paraf


LAP. TANAH EXISTING
223 245
Checker
468 100

1 POTONGAN AA
AR004
1 : 25
PEMBANGUNAN RUANG LAB. BARU
UNIVERSITAS SINGAPERBANGSA (UNSIKA)
KARAWANG
2022
PEMBANGUNAN RUANG LAB. BARU
FAKULTAS TEKNIK
1883 UNIVERSITAS SINGAPERBANGSA
(UNSIKA)

395 733 755


Karawang, Jawa Barat
PETA KONTUR

E
2 2 2 2

R. DOSEN R. MEETING R. MEETING

382
2
FFL +3.20 FFL +3.24 FFL +3.24

4
4
2
520 1 3 3 CATATAN

2
LEGENDA
1 1 1 1
LANTAI:
D 1. KERAMIK TILES 600X600 mm
2. LANTAI EPOXY
3. LANTAI VYNIL MOTIF KAYU
FFL +3.24
R. TAMU

1007
230
984

DINDING:

2
FFL +3.24 1. PAS. DINDING KACA ALUMINIUM
1 3 2. PAS. DINDING BATA + PLESTER+ACI
3. PAS. BATA+KERAMIK TILES 200/250
4. PAS. DINDING PARTISI

PLAFOND:
1
TURUN 1. RANGKA HOLLOW 40/40+GYPSUMBOARD 9mm

C R. DOSEN R. KEPALA
Fin. Cat Tembok Ex. Vinylex Interior
2. RANGKA HOLLOW 40/40+KALSIBOARD
3. EXPOSED BETON Fin. CAT
464

FFL +3.20 FFL +3.24 ATAP:

395
1. RANGKA ATAP BAJA RINGAN (BY SUPPLIER)

2
3
1
VOID PENUTUP ATAP Genteng Beton Ex. Cisangkan
2

Lisplank GRC
2. DAK/ KANOPI BETON + WATERPROOFING

2 2

395 340 393 340 415 PEMILIK


Owner
1883 PROYEK

BANGUNAN LABORATORIUM
NO. PROYEK
Project Number

A NAMA GAMBAR

DENAH LAB. BARU


Lembar ke
SKALA KODE NO.GAMBAR

1 : 100 AR006 Jumlah lbr

Digambar/Diperiksa Tanggal Paraf

Drafter

1 2 3 4 5 6
Author
Job Capt/Asisten

Diperikasa & disetujui Tanggal Paraf

1 DENAH LAB. ATAS Checker


AR006
1 : 100

Anda mungkin juga menyukai