Anda di halaman 1dari 124

Praktikum Anggaran

Perusahaan
INSTRUKS
NAMA PERUSAHAAN : PT RODA JAYA
ALAMAT : Jalan Pedati No 1X

UNTUK MENGERJAKAN SILAHKAN PILIH

Forecasting Penjualan 1
Budget Penjualan 2
Budget Produksi 3
Budget Bahan Baku 4.
Budget Tenaga Kerja 5
Budget Overhead Pabrik 6.
m Anggaran INSTRUKSI 1
sahaan
INSTRUKSI UMUM
: PT RODA JAYA
: Jalan Pedati No 1X

PT RODA JAYA

NAMA MAHASISW : NI PUTU MADURI SANJI


NIM : 2215664004
KELAS : RPL AKUNTANSI MANAJERIAL
PT RODA JAYA
Ja la n Peda ti No: 1X

INPUT DATA
PT RODA
JAYA

TAHUN PENJUALAN (Unit) X


2008 143,500 -9
2009 144,000 -7
2010 145,300 -5
2011 147,000 -3
2012 165,200 -1
2013 159,000 1
2014 160,500 3
2015 167,000 5
2016 171,500 7
2017 174,000 9
INSTRUKSI 1

PT RODA
JAYA

NEXT
PT RODA JAYA
Ja la n Peda ti No: 1X

PRAKIRAAN PENJUALAN
Tabel 1.1 Forecasting Penjualan Tahun 2018
N Y X XY
2008 143,500 -9 (1,291,500)
2009 144,000 -7 (1,008,000)
2010 145,300 -5 (726,500)
2011 147,000 -3 (441,000)
2012 165,200 -1 (165,200)
2013 159,000 1 159,000
2014 160,500 3 481,500
2015 167,000 5 835,000
2016 171,500 7 1,200,500
2017 174,000 9 1,566,000
10 1,577,000 - 609,800

a = ∑Y = 1,577,000
N 10

b = ∑ XY = 609,800
X2 330

Forecast 2018 a + b (x) = 178,027


INSTRUKSI 1

UALAN PT RODA
JAYA

2018
X2 Ý
81 141,069
49 144,765
25 148,461
9 152,156
LEASE SQUARE METHOD

1 155,852
1 159,548
9 163,244
25 166,939
49 170,635
81 174,331
330 1,577,000

= 157,700

= 1,848

NEXT
PT RODA JAYA
Ja la n Peda ti No: 1X

MASUKAN DATA

Jenis Produk Radial


Daerah Penjualan Badung Tabanan
Presentase (%) 24% 21%
Bulan % Radial
Harga Jual
Januari 5% Biasa
Februari 3%
Maret 11%
April 11%
Mei 11%
Juni 11%
Juli 11%
Agustus 8%
September 8%
Oktober 8%
November 8%
Desember 5%
INSTRUKSI 1

UKAN DATA

Radial Biasa
Bangli Badung Tabanan Bangli
15% 11% 16% 13%
Rp 440,000
Rp 410,000
LEASE SQUARE METHOD

PT RODA
JAYA

NEXT
PT RODA JAYA
Ja la n Peda ti No: 1X

PROPORSI PENJUAL
Tabel 1.2 Proporsi Penjualan
Badung Tabanan
Jenis Produk
% Unit % Unit
Radial 24% 42,726 21% 37,386
Biasa 11% 19,583 16% 28,484
Total 35% 62,309 37% 65,870
-
Tabel 1.3 Budget Penjualan
Tipe Radial Tipe Biasa
Bulan %
Unit Rp Unit
Januari 5% 5,341 Rp 2,349,952,000 3,561
Februari 3% 3,204 Rp 1,409,971,200 2,136
Maret 11% 11,750 Rp 5,169,894,400 7,833
April 11% 11,750 Rp 5,169,894,400 7,833
Mei 11% 11,750 Rp 5,169,894,400 7,833
Juni 11% 11,750 Rp 5,169,894,400 7,833
Juli 11% 11,750 Rp 5,169,894,400 7,833
Agustus 8% 8,545 Rp 3,759,923,200 5,697
September 8% 8,545 Rp 3,759,923,200 5,697
Oktober 8% 8,545 Rp 3,759,923,200 5,697
November 8% 8,545 Rp 3,759,923,200 5,697
Desember 5% 5,341 Rp 2,349,952,000 3,561
Total 100% 106,816 Rp 46,999,040,000 71,211

Tabel 1.4 Budget Penjualan di Badung Tahun 2018


Tipe Radial Tip
Bulan
Unit Harga/Unit Rp Unit
Januari 2,136 Rp 440,000 Rp 939,980,800 979
Februari 1,282 Rp 440,000 Rp 563,988,480 587
Maret 4,700 Rp 440,000 Rp 2,067,957,760 2,154
April 4,700 Rp 440,000 Rp 2,067,957,760 2,154
Mei 4,700 Rp 440,000 Rp 2,067,957,760 2,154
Juni 4,700 Rp 440,000 Rp 2,067,957,760 2,154
Juli 4,700 Rp 440,000 Rp 2,067,957,760 2,154
Agustus 3,418 Rp 440,000 Rp 1,503,969,280 1,567
September 3,418 Rp 440,000 Rp 1,503,969,280 1,567
Oktober 3,418 Rp 440,000 Rp 1,503,969,280 1,567
November 3,418 Rp 440,000 Rp 1,503,969,280 1,567
Desember 2,136 Rp 440,000 Rp 939,980,800 979
Total 42,726 Rp 18,799,616,000 19,583

Tabel 1.5 Budget Penjualan di Tabanan Tahun 2018


Tipe Radial Tip
Bulan
Unit Harga/Unit Rp Unit
Januari 1,869 Rp 440,000 Rp 822,483,200 1,424
Februari 1,122 Rp 440,000 Rp 493,489,920 855
Maret 4,112 Rp 440,000 Rp 1,809,463,040 3,133
April 4,112 Rp 440,000 Rp 1,809,463,040 3,133
Mei 4,112 Rp 440,000 Rp 1,809,463,040 3,133
Juni 4,112 Rp 440,000 Rp 1,809,463,040 3,133
Juli 4,112 Rp 440,000 Rp 1,809,463,040 3,133
Agustus 2,991 Rp 440,000 Rp 1,315,973,120 2,279
September 2,991 Rp 440,000 Rp 1,315,973,120 2,279
Oktober 2,991 Rp 440,000 Rp 1,315,973,120 2,279
November 2,991 Rp 440,000 Rp 1,315,973,120 2,279
Desember 1,869 Rp 440,000 Rp 822,483,200 1,424
Total 37,386 Rp 16,449,664,000 28,484

Tabel 1.6 Budget Penjualan di Bangli


Tipe Radial Tip
Bulan
Unit Harga/Unit Rp Unit
Januari 1,335 Rp 440,000 Rp 587,488,000 1,157
Februari 801 Rp 440,000 Rp 352,492,800 694
Maret 2,937 Rp 440,000 Rp 1,292,473,600 2,546
April 2,937 Rp 440,000 Rp 1,292,473,600 2,546
Mei 2,937 Rp 440,000 Rp 1,292,473,600 2,546
Juni 2,937 Rp 440,000 Rp 1,292,473,600 2,546
Juli 2,937 Rp 440,000 Rp 1,292,473,600 2,546
Agustus 2,136 Rp 440,000 Rp 939,980,800 1,851
September 2,136 Rp 440,000 Rp 939,980,800 1,851
Oktober 2,136 Rp 440,000 Rp 939,980,800 1,851
November 2,136 Rp 440,000 Rp 939,980,800 1,851
Desember 1,335 Rp 440,000 Rp 587,488,000 1,157
Total 26,704 Rp 11,749,760,000 23,143
INSTRUKSI 1

PENJUALAN
PT RODA
JAYA

Bangli Jumlah
% Unit % Unit
15% 26,704 60% 106,816
13% 23,143 40% 71,211
28% 49,847 100% 178,027

LEASE SQUARE METHOD


Tipe Biasa
Jumlah
Rp
Rp 1,459,818,667 Rp 3,809,770,667
Rp 875,891,200 Rp 2,285,862,400
Rp 3,211,601,067 Rp 8,381,495,467
Rp 3,211,601,067 Rp 8,381,495,467
Rp 3,211,601,067 Rp 8,381,495,467
Rp 3,211,601,067 Rp 8,381,495,467
Rp 3,211,601,067 Rp 8,381,495,467
Rp 2,335,709,867 Rp 6,095,633,067
Rp 2,335,709,867 Rp 6,095,633,067
Rp 2,335,709,867 Rp 6,095,633,067
Rp 2,335,709,867 Rp 6,095,633,067
Rp 1,459,818,667 Rp 3,809,770,667
Rp 29,196,373,333 Rp 76,195,413,333

Tipe Biasa
Jumlah
Harga/Unit Rp
Rp 410,000 Rp 401,450,133 Rp 1,341,430,933
Rp 410,000 Rp 240,870,080 Rp 804,858,560
Rp 410,000 Rp 883,190,293 Rp 2,951,148,053
Rp 410,000 Rp 883,190,293 Rp 2,951,148,053
Rp 410,000 Rp 883,190,293 Rp 2,951,148,053
Rp 410,000 Rp 883,190,293 Rp 2,951,148,053
Rp 410,000 Rp 883,190,293 Rp 2,951,148,053
Rp 410,000 Rp 642,320,213 Rp 2,146,289,493
Rp 410,000 Rp 642,320,213 Rp 2,146,289,493
Rp 410,000 Rp 642,320,213 Rp 2,146,289,493
Rp 410,000 Rp 642,320,213 Rp 2,146,289,493
Rp 410,000 Rp 401,450,133 Rp 1,341,430,933
Rp 8,029,002,667 Rp 26,828,618,667

Tipe Biasa
Jumlah
Harga/Unit Rp
Rp 410,000 Rp 583,927,467 Rp 1,406,410,667
Rp 410,000 Rp 350,356,480 Rp 843,846,400
Rp 410,000 Rp 1,284,640,427 Rp 3,094,103,467
Rp 410,000 Rp 1,284,640,427 Rp 3,094,103,467
Rp 410,000 Rp 1,284,640,427 Rp 3,094,103,467
Rp 410,000 Rp 1,284,640,427 Rp 3,094,103,467
Rp 410,000 Rp 1,284,640,427 Rp 3,094,103,467
Rp 410,000 Rp 934,283,947 Rp 2,250,257,067
Rp 410,000 Rp 934,283,947 Rp 2,250,257,067
Rp 410,000 Rp 934,283,947 Rp 2,250,257,067
Rp 410,000 Rp 934,283,947 Rp 2,250,257,067
Rp 410,000 Rp 583,927,467 Rp 1,406,410,667
Rp 11,678,549,333 Rp 28,128,213,333

Tipe Biasa
Jumlah
Harga/Unit Rp
Rp 410,000 Rp 474,441,067 Rp 1,061,929,067
Rp 410,000 Rp 284,664,640 Rp 637,157,440
Rp 410,000 Rp 1,043,770,347 Rp 2,336,243,947
Rp 410,000 Rp 1,043,770,347 Rp 2,336,243,947
Rp 410,000 Rp 1,043,770,347 Rp 2,336,243,947
Rp 410,000 Rp 1,043,770,347 Rp 2,336,243,947
Rp 410,000 Rp 1,043,770,347 Rp 2,336,243,947
Rp 410,000 Rp 759,105,707 Rp 1,699,086,507
Rp 410,000 Rp 759,105,707 Rp 1,699,086,507
Rp 410,000 Rp 759,105,707 Rp 1,699,086,507
Rp 410,000 Rp 759,105,707 Rp 1,699,086,507
Rp 410,000 Rp 474,441,067 Rp 1,061,929,067
Rp 9,488,821,333 Rp 21,238,581,333

NEXT
PT RODA JAYA
Ja la n Peda ti No: 1X

INPUT

Jenis Produksi Penjualan


Tipe Radial 106,816
Tipe Biasa 71,211
Produksi Radial
Normal 1/12 dari produksi 1 tahun
Maksimum + 10% dari normal
Minimum - 10% dari normal
Merosot ± 30% dari normal
Penjualan (Unit)
Bulan
Radial
Januari 5,341
Februari 3,204
Maret 11,750
April 11,750
Mei 11,750
Juni 11,750
Juli 11,750
Agustus 8,545
September 8,545
Oktober 8,545
November 8,545
Desember 5,341
INSTRUKSI 2

NPUT DATA PT RODA


JAYA

Persediaan Akhir Persediaan Awal


40,000 16,000
8,000 20,000
Biasa
1/12 dari produksi 1 tahun
+ 10% dari normal
- 10% dari normal
± 30% dari normal
Penjualan (Unit)
Biasa
3,561
2,136
7,833
7,833
7,833
7,833
7,833
5,697
5,697
5,697
5,697
3,561
PT RODA JAYA
Ja la n Peda ti No: 1X

BUGDET PRODUKSI
Perhitungan Produksi
Jenis Produk Penjualan Persediaan Akhir Persediaan Awal
Tipe Radial 106,816 40,000 16,000
Tipe Biasa 71,211 8,000 20,000
Total 178,027 48,000 36,000

Radial Biasa
Normal 10,901 Normal 4,934
Maksimum 11,991 Maksimum 5,428
Minimum 9,811 Minimum 4,441
Merosot 7,631 Merosot 3,454

Tabel 1.7 Produksi Tipe Radial


Bulan Penjualan Persediaan Akhir Tersedia
Januari 5,341 20,470 25,811
Februari 3,204 24,897 28,101
Maret 11,750 25,139 36,888
April 11,750 25,380 37,130
Mei 11,750 25,622 37,372
Juni 11,750 25,864 37,613
Juli 11,750 26,105 37,855
Agustus 8,545 28,461 37,007
September 8,545 30,817 39,363
Oktober 8,545 33,174 41,719
November 8,545 35,530 44,075
Desember 5,341 40,000 45,341
Total 106,816 448,275

Tabel 1.7 Produksi Tipe Biasa


Bulan Penjualan Persediaan Akhir Tersedia
Januari 3,561 20,880 24,441
Februari 2,136 22,198 24,334
Maret 7,833 19,792 27,626
April 7,833 17,387 25,220
Mei 7,833 14,981 22,814
Juni 7,833 12,576 20,409
Juli 7,833 10,170 18,003
Agustus 5,697 9,408 15,104
September 5,697 8,645 14,342
Oktober 5,697 7,882 13,579
November 5,697 7,120 12,817
Desember 3,561 8,000 11,561
Total 71,211 159,039 230,250
INSTRUKSI 2

ODUKSI PT RODA
JAYA

Jumlah Produksi %
130,816 69%
59,211 31%
190,027 100%

Persediaan Awal Produksi


16,000 9,811
20,470 7,631
24,897 11,991
25,139 11,991
25,380 11,991
25,622 11,991
25,864 11,991 -
26,105 10,901
28,461 10,901
30,817 10,901
33,174 10,901
35,530 9,811
130,816
Persediaan Awal Produksi
20,000 4,441
20,880 3,454
22,198 5,428
19,792 5,428
17,387 5,428
14,981 5,428
12,576 5,428
10,170 4,934
9,408 4,934
8,645 4,934
7,882 4,934
7,120 4,441
59,211
PT RODA JAYA
Ja la n Peda ti No: 1X

INPUT STANDAR USED RA

Radial
Jenis Produk
Karet Alam Benang Sintetis Carbon Block
Bagian Mixing 10 0.5 0.5
Bagian Costing - - -
Bagian Finishing - - -
Satuan kg kg ltr

Produksi
Bulan
Radial Biasa
Januari 9,811 4,441
Februari 7,631 3,454
Maret 11,991 5,428
April 11,991 5,428
Mei 11,991 5,428
Juni 11,991 5,428
Juli 11,991 5,428
Agustus 10,901 4,934
September 10,901 4,934
Oktober 10,901 4,934
November 10,901 4,934
Desember 9,811 4,441
Total 130,816 59,211
INSTRUKSI 3

USED RATE PT RODA JAYA

Biasa
Karet Alam Benang Sintetis Carbon Block
8 0.3 0.5
- - -
- - -
kg kg ltr
PT RODA JAYA
Ja la n Peda ti No: 1X

BUDGET KEBUTUHAN BAH

Jenis Bahan Baku


Keterangan
Karet Alam Benang Sintetis
Januari
Produk Tipe Radial 98,112 4,906
Produk Tipe Biasa 35,526 1,332
Jumlah 133,638 6,238
Bagian Mixing 133,638 6,238
Bagian Costing - -
Bagian Finishing - -
Jumlah 133,638 6,238
Februari
Produk Tipe Radial 76,309 3,815
Produk Tipe Biasa 27,632 1,036
Jumlah 103,941 4,852
Bagian Mixing 103,941 4,852
Bagian Costing - -
Bagian Finishing - -
Jumlah 103,941 4,852
Maret
Produk Tipe Radial 119,915 5,996
Produk Tipe Biasa 43,421 1,628
Jumlah 163,336 7,624
Bagian Mixing 163,336 7,624
Bagian Costing - -
Bagian Finishing - -
Jumlah 163,336 7,624
April
Produk Tipe Radial 119,915 5,996
Produk Tipe Biasa 43,421 1,628
Jumlah 163,336 7,624
Bagian Mixing 163,336 7,624
Bagian Costing - -
Bagian Finishing - -
Jumlah 163,336 7,624
Mei
Produk Tipe Radial 119,915 5,996
Produk Tipe Biasa 43,421 1,628
Jumlah 163,336 7,624
Bagian Mixing 163,336 7,624
Bagian Costing - -
Bagian Finishing - -
Jumlah 163,336 7,624
Juni
Produk Tipe Radial 119,915 5,996
Produk Tipe Biasa 43,421 1,628
Jumlah 163,336 7,624
Bagian Mixing 163,336 7,624
Bagian Costing - -
Bagian Finishing - -
Jumlah 163,336 7,624
INSTRUKSI 3

UTUHAN BAHAN BAKU PT RODA JAYA

ahan Baku Jenis Bahan Baku


Keterangan
Carbon Block Karet Alam Benang Sintetis Carbon Block
Juli
4,906 Produk Tipe Radial 119,915 5,996 5,996
2,220 Produk Tipe Biasa 43,421 1,628 2,714
7,126 Jumlah 163,336 7,624 8,710
7,126 Bagian Mixing 163,336 7,624 8,710
- Bagian Costing - - -
- Bagian Finishing - - -
7,126 Jumlah 163,336 7,624 8,710
Agustus
3,815 Produk Tipe Radial 109,013 5,451 5,451
1,727 Produk Tipe Biasa 39,474 1,480 2,467
5,542 Jumlah 148,487 6,931 7,918
5,542 Bagian Mixing 148,487 6,931 7,918
- Bagian Costing - - -
- Bagian Finishing - - -
5,542 Jumlah 148,487 6,931 7,918
September
5,996 Produk Tipe Radial 109,013 5,451 5,451
2,714 Produk Tipe Biasa 39,474 1,480 2,467
8,710 Jumlah 148,487 6,931 7,918
8,710 Bagian Mixing 148,487 6,931 7,918
- Bagian Costing - - -
- Bagian Finishing - - -
8,710 Jumlah 148,487 6,931 7,918
Oktober
5,996 Produk Tipe Radial 109,013 5,451 5,451
2,714 Produk Tipe Biasa 39,474 1,480 2,467
8,710 Jumlah 148,487 6,931 7,918
8,710 Bagian Mixing 148,487 6,931 7,918
- Bagian Costing - - -
- Bagian Finishing - - -
8,710 Jumlah 148,487 6,931 7,918
November
5,996 Produk Tipe Radial 109,013 5,451 5,451
2,714 Produk Tipe Biasa 39,474 1,480 2,467
8,710 Jumlah 148,487 6,931 7,918
8,710 Bagian Mixing 148,487 6,931 7,918
- Bagian Costing - - -
- Bagian Finishing - - -
8,710 Jumlah 148,487 6,931 7,918
Desember
5,996 Produk Tipe Radial 98,112 4,906 4,906
2,714 Produk Tipe Biasa 35,526 1,332 2,220
8,710 Jumlah 133,638 6,238 7,126
8,710 Bagian Mixing 133,638 6,238 7,126
- Bagian Costing - - -
- Bagian Finishing - - -
8,710 Jumlah 133,638 6,238 7,126
PT RODA JAYA
Ja la n Peda ti No: 1X

INPUT DATA PERSEDIAAN

Keterangan Karet Alam Benang Sintetis


Persediaan akhir 4,000 3,000
Persediaan awal 1,600 600

Radial
Bulan
Karet Alam Benang Sintetis
Januari 98,112 4,906
Februari 76,309 3,815
Maret 119,915 5,996
April 119,915 5,996
Mei 119,915 5,996
Juni 119,915 5,996
Juli 119,915 5,996
Agustus 109,013 5,451
September 109,013 5,451
Oktober 109,013 5,451
November 109,013 5,451
Desember 98,112 4,906

Harga Bahan Karet Alam Benang Sintetis


Januari 20,000 30,000
Februari 20,000 30,000
Maret 20,000 30,000
April 20,000 30,000
Mei 25,000 35,000
Juni 25,000 35,000
Juli 25,000 35,000
Agustus 25,000 35,000
September 30,000 40,000
Oktober 30,000 40,000
November 30,000 40,000
Desember 30,000 40,000
INSTRUKSI 3

PERSEDIAAN PT RODA JAYA

Carbon Block
2,000
800

Radial Biasa
Carbon Block Karet Alam Benang Sintetis Carbon Block
4,906 35,526 1,332 2,220
3,815 27,632 1,036 1,727
5,996 43,421 1,628 2,714
5,996 43,421 1,628 2,714
5,996 43,421 1,628 2,714
5,996 43,421 1,628 2,714
5,996 43,421 1,628 2,714
5,451 39,474 1,480 2,467
5,451 39,474 1,480 2,467
5,451 39,474 1,480 2,467
5,451 39,474 1,480 2,467
4,906 35,526 1,332 2,220

Carbon Block
15,000
15,000
15,000
15,000
20,000
20,000
20,000
20,000
25,000
25,000
25,000
25,000
PT RODA JAYA
Ja la n Peda ti No: 1X

BUDGET PEMBELIAN BAHA


Tabel 1.11 Alokasi Persediaan Bahan Baku
Keterangan Karet Alam Benang Sintetis
Persediaan akhir 4,000 3,000
Persediaan awal 1,600 600
Selisih 2,400 2,400
Alokasi selisih per 200 200

Tabel 1.2 Budget Pembelian Bahan Baku


Jenis Bahan Baku
Keterangan
Karet Alam Benang Sintetis
Januari
Kebutuhan 133,638 6,238
Persediaan Awal 1,600 600
Tersedia 135,438 7,038
Persediaan Akhir 1,800 800
Pembelian 133,838 6,438
Harga Beli 20,000 30,000
N. Pembelian 2,676,768,000 193,135,200
Februari
Kebutuhan 103,941 4,852
Persediaan Awal 1,800 800
Tersedia 105,941 5,852
Persediaan Akhir 2,000 1,000
Pembelian 104,141 5,052
Harga Beli 20,000 30,000
N. Pembelian 2,082,819,556 151,549,600
Maret
Kebutuhan 163,336 7,624
Persediaan Awal 2,000 1,000
Tersedia 165,536 8,824
Persediaan Akhir 2,200 1,200
Pembelian 163,536 7,824
Harga Beli 20,000 30,000
N. Pembelian 3,270,716,444 234,720,800
April
Kebutuhan 163,336 7,624
Persediaan Awal 2,200 1,200
Tersedia 165,736 9,024
Persediaan Akhir 2,400 1,400
Pembelian 163,536 7,824
Harga Beli 20,000 30,000
N. Pembelian 3,270,716,444 234,720,800
Mei
Kebutuhan 163,336 7,624
Persediaan Awal 2,400 1,400
Tersedia 165,936 9,224
Persediaan Akhir 2,600 1,600
Pembelian 163,536 7,824
Harga Beli 25,000 35,000
N. Pembelian 4,088,395,556 273,840,933
Juni
Kebutuhan 163,336 7,624
Persediaan Awal 2,600 1,600
Tersedia 166,136 9,424
Persediaan Akhir 2,800 1,800
Pembelian 163,536 7,824
Harga Beli 25,000 35,000
N. Pembelian 4,088,395,556 273,840,933

Produk Tipe Radial


Keterangan
Kebutuhan Harga/Unit
Januari
Karet Alam 98,112 20,000
Benang Sintesis 4,906 30,000
Carbon Black 4,906 15,000
Jumlah 107,923
Februari
Karet Alam 76,309 20,000
Benang Sintesis 3,815 30,000
Carbon Black 3,815 15,000
Jumlah 83,940
Maret
Karet Alam 119,915 20,000
Benang Sintesis 5,996 30,000
Carbon Black 5,996 15,000
Jumlah 131,906
April
Karet Alam 119,915 20,000
Benang Sintesis 5,996 30,000
Carbon Black 5,996 15,000
Jumlah 131,906
Mei
Karet Alam 119,915 25,000
Benang Sintesis 5,996 35,000
Carbon Black 5,996 20,000
Jumlah 131,906
Juni
Karet Alam 119,915 25,000
Benang Sintesis 5,996 35,000
Carbon Black 5,996 20,000
Jumlah 131,906
Juli
Karet Alam 119,915 25,000
Benang Sintesis 5,996 35,000
Carbon Black 5,996 20,000
Jumlah 131,906
Agustus
Karet Alam 109,013 25,000
Benang Sintesis 5,451 35,000
Carbon Black 5,451 20,000
Jumlah 119,915
September
Karet Alam 109,013 30,000
Benang Sintesis 5,451 40,000
Carbon Black 5,451 25,000
Jumlah 119,915
Oktober
Karet Alam 109,013 30,000
Benang Sintesis 5,451 40,000
Carbon Black 5,451 25,000
Jumlah 119,915
November
Karet Alam 109,013 30,000
Benang Sintesis 5,451 40,000
Carbon Black 5,451 25,000
Jumlah 119,915
Desember
Karet Alam 98,112 30,000
Benang Sintesis 4,906 40,000
Carbon Black 4,906 25,000
Jumlah 107,923
Jumlah Setahun
Karet Alam
Benang Sintesis
Carbon Black
Jumlah
INSTRUKSI 3

MBELIAN BAHAN BAKU


PT RODA JAYA

Carbon Block
2,000
800
1,200
100

Bahan Baku Jenis Bahan Baku


Keterangan
Carbon Block Karet Alam Benang Sintetis Carbon Block
Juli
7,126 Kebutuhan 163,336 7,624 8,710
800 Persediaan Awal 2,800 1,800 1,400
8,026 Tersedia 166,336 9,624 10,210
900 Persediaan Akhir 3,000 2,000 1,500
7,226 Pembelian 163,536 7,824 8,810
15,000 Harga Beli 25,000 35,000 20,000
108,390,000 N. Pembelian 4,088,395,556 273,840,933 176,191,111
Agustus
5,542 Kebutuhan 148,487 6,931 7,918
900 Persediaan Awal 3,000 2,000 1,500
6,542 Tersedia 151,687 9,131 9,518
1,000 Persediaan Akhir 3,200 2,200 1,600
5,642 Pembelian 148,687 7,131 8,018
15,000 Harga Beli 25,000 35,000 20,000
84,636,667 N. Pembelian 3,717,177,778 249,582,667 160,355,556
September
8,710 Kebutuhan 148,487 6,931 7,918
1,000 Persediaan Awal 3,200 2,200 1,600
9,810 Tersedia 151,887 9,331 9,618
1,100 Persediaan Akhir 3,400 2,400 1,700
8,810 Pembelian 148,687 7,131 8,018
15,000 Harga Beli 30,000 40,000 25,000
132,143,333 N. Pembelian 4,460,613,333 285,237,333 200,444,444
Oktober
8,710 Kebutuhan 148,487 6,931 7,918
1,100 Persediaan Awal 3,400 2,400 1,700
9,910 Tersedia 152,087 9,531 9,718
1,200 Persediaan Akhir 3,600 2,600 1,800
8,810 Pembelian 148,687 7,131 8,018
15,000 Harga Beli 30,000 40,000 25,000
132,143,333 N. Pembelian 4,460,613,333 285,237,333 200,444,444
November
8,710 Kebutuhan 148,487 6,931 7,918
1,200 Persediaan Awal 3,600 2,600 1,800
10,010 Tersedia 152,287 9,731 9,818
1,300 Persediaan Akhir 3,800 2,800 1,900
8,810 Pembelian 148,687 7,131 8,018
20,000 Harga Beli 30,000 40,000 25,000
176,191,111 N. Pembelian 4,460,613,333 285,237,333 200,444,444
Desember
8,710 Kebutuhan 133,638 6,238 7,126
1,300 Persediaan Awal 3,800 2,800 1,900
10,110 Tersedia 137,638 9,238 9,126
1,400 Persediaan Akhir 4,000 3,000 2,000
8,810 Pembelian 133,838 6,438 7,226
20,000 Harga Beli 30,000 40,000 25,000
176,191,111 N. Pembelian 4,015,152,000 257,513,600 180,650,000

k Tipe Radial Produk Tipe Biasa


Biaya Kebutuhan Harga/Unit Biaya

1,962,240,000 35,526 20,000 710,528,000


147,168,000 1,332 30,000 39,967,200
73,584,000 2,220 15,000 33,306,000
2,182,992,000 39,079 783,801,200

1,526,186,667 27,632 20,000 552,632,889


114,464,000 1,036 30,000 31,085,600
57,232,000 1,727 15,000 25,904,667
1,697,882,667 30,395 609,623,156

2,398,293,333 43,421 20,000 868,423,111


179,872,000 1,628 30,000 48,848,800
89,936,000 2,714 15,000 40,707,333
2,668,101,333 47,763 957,979,244
2,398,293,333 43,421 20,000 868,423,111
179,872,000 1,628 30,000 48,848,800
89,936,000 2,714 15,000 40,707,333
2,668,101,333 47,763 957,979,244

2,997,866,667 43,421 25,000 1,085,528,889


209,850,667 1,628 35,000 56,990,267
119,914,667 2,714 20,000 54,276,444
3,327,632,000 47,763 1,196,795,600

2,997,866,667 43,421 25,000 1,085,528,889


209,850,667 1,628 35,000 56,990,267
119,914,667 2,714 20,000 54,276,444
3,327,632,000 47,763 1,196,795,600

2,997,866,667 43,421 25,000 1,085,528,889


209,850,667 1,628 35,000 56,990,267
119,914,667 2,714 20,000 54,276,444
3,327,632,000 47,763 1,196,795,600

2,725,333,333 39,474 25,000 986,844,444


190,773,333 1,480 35,000 51,809,333
109,013,333 2,467 20,000 49,342,222
3,025,120,000 43,421 1,087,996,000

3,270,400,000 39,474 30,000 1,184,213,333


218,026,667 1,480 40,000 59,210,667
136,266,667 2,467 25,000 61,677,778
3,624,693,333 43,421 1,305,101,778

3,270,400,000 39,474 30,000 1,184,213,333


218,026,667 1,480 40,000 59,210,667
136,266,667 2,467 25,000 61,677,778
3,624,693,333 43,421 1,305,101,778

3,270,400,000 39,474 30,000 1,184,213,333


218,026,667 1,480 40,000 59,210,667
136,266,667 2,467 25,000 61,677,778
3,624,693,333 43,421 1,305,101,778

2,943,360,000 35,526 30,000 1,065,792,000


196,224,000 1,332 40,000 53,289,600
122,640,000 2,220 25,000 55,510,000
3,262,224,000 39,079 1,174,591,600

32,758,506,667 11,861,870,222
2,292,005,333 622,452,133
1,310,885,333 593,340,222
36,361,397,333 13,077,662,578
PT RODA JAYA
Ja la n Peda ti No: 1X

INPUT STANDAR USED RATE

Operator Operator
Jenis Produk
1 2
Radial 2.08 2.67
Biasa 1.92 2.58

INPUT TARIF JAM KERJA

Operator Operator
Jenis Produk
1 2
Radial Rp 2,500.00 Rp 3,500.00
Biasa Rp 2,500.00 Rp 3,500.00

Produksi
Bulan
Radial Biasa
Januari 9,811 4,441
Februari 7,631 3,454
Maret 11,991 5,428
April 11,991 5,428
Mei 11,991 5,428
Juni 11,991 5,428
Juli 11,991 5,428
Agustus 10,901 4,934
September 10,901 4,934
Oktober 10,901 4,934
November 10,901 4,934
Desember 9,811 4,441
INSTRUKSI 4

AR USED RATE PT RODA JAYA


PT RODA JAYA

Operator
Inspektur
3
2.17 1.83
2.08 1.83

JAM KERJA

Operator
Inspektur
3
Rp 4,000.00 Rp 4,500.00
Rp 4,000.00 Rp 4,500.00
PT RODA JAYA
Ja la n Peda ti No: 1X
BUDGET TENAGA KERJA L

Operator 1
Bulan JKL
Produksi
SUR Total
Januari 9,811 2.083 20,440
Februari 7,631 2.083 15,898
Maret 11,991 2.083 24,982
April 11,991 2.083 24,982
Mei 11,991 2.083 24,982
Juni 11,991 2.083 24,982
Juli 11,991 2.083 24,982
Agustus 10,901 2.083 22,711
September 10,901 2.083 22,711
Oktober 10,901 2.083 22,711
November 10,901 2.083 22,711
Desember 9,811 2.083 20,440
Jumlah 130,816 272,533

BUDGET TENAGA KERJA

Operator 1
Bulan JKL
Produksi
SUR Total
Januari 4,441 1.917 8,512
Februari 3,454 1.917 6,620
Maret 5,428 1.917 10,403
April 5,428 1.917 10,403
Mei 5,428 1.917 10,403
Juni 5,428 1.917 10,403
Juli 5,428 1.917 10,403
Agustus 4,934 1.917 9,457
September 4,934 1.917 9,457
Oktober 4,934 1.917 9,457
November 4,934 1.917 9,457
Desember 4,441 1.917 8,512
Jumlah 59,211 113,487
T TENAGA KERJA LANGSUNG TIPE RADIAL

Operator 2 Operator 3
JKL JKL
Produksi Produksi
SUR Total SUR Total
9,811 2.667 26,163 9,811 2.167 21,258
7,631 2.667 20,349 7,631 2.167 16,534
11,991 2.667 31,977 11,991 2.167 25,982
11,991 2.667 31,977 11,991 2.167 25,982
11,991 2.667 31,977 11,991 2.167 25,982
11,991 2.667 31,977 11,991 2.167 25,982
11,991 2.667 31,977 11,991 2.167 25,982
10,901 2.667 29,070 10,901 2.167 23,620
10,901 2.667 29,070 10,901 2.167 23,620
10,901 2.667 29,070 10,901 2.167 23,620
10,901 2.667 29,070 10,901 2.167 23,620
9,811 2.667 26,163 9,811 2.167 21,258
130,816 348,843 130,816 283,435

ET TENAGA KERJA LANGSUNG TIPE BIASA

Operator 2 Operator 3
JKL JKL
Produksi Produksi
SUR Total SUR Total
4,441 2.583 11,472 4,441 2.083 9,252
3,454 2.583 8,923 3,454 2.083 7,196
5,428 2.583 14,021 5,428 2.083 11,308
5,428 2.583 14,021 5,428 2.083 11,308
5,428 2.583 14,021 5,428 2.083 11,308
5,428 2.583 14,021 5,428 2.083 11,308
5,428 2.583 14,021 5,428 2.083 11,308
4,934 2.583 12,747 4,934 2.083 10,280
4,934 2.583 12,747 4,934 2.083 10,280
4,934 2.583 12,747 4,934 2.083 10,280
4,934 2.583 12,747 4,934 2.083 10,280
4,441 2.583 11,472 4,441 2.083 9,252
59,211 152,961 59,211 123,356
INSTRUKSI 4

PT RODA JAYA

Inspektur
JKL
SUR Total
1.833 17,987
1.833 13,990
1.833 21,984
1.833 21,984
1.833 21,984
1.833 21,984
1.833 21,984
1.833 19,986
1.833 19,986
1.833 19,986
1.833 19,986
1.833 17,987
239,829

PT RODA JAYA

Inspektur
JKL
SUR Total
1.833 8,141
1.833 6,332
1.833 9,951
1.833 9,951
1.833 9,951
1.833 9,951
1.833 9,951
1.833 9,046
1.833 9,046
1.833 9,046
1.833 9,046
1.833 8,141
108,553

NEXT
PT RODA JAYA
Jalan Peda ti No: 1X

Tabel: 1.15 Budget Biaya Tenaga Kerja Langsung Radial


Operator 1
Bulan JKL
Produksi
SUR Total
Januari 9,811 2.08 20,440
Februari 7,631 2.08 15,898
Maret 11,991 2.08 24,982
April 11,991 2.08 24,982
Mei 11,991 2.08 24,982
Juni 11,991 2.08 24,982
Juli 11,991 2.08 24,982
Agustus 10,901 2.08 22,711
September 10,901 2.08 22,711
Oktober 10,901 2.08 22,711
November 10,901 2.08 22,711
Desember 9,811 2.08 20,440
Jumlah 130,816 272,533

Tabel: 1.18 Budget Biaya Tenaga Kerja Langsung Biasa


Operator 1
Bulan JKL
Produksi
SUR Total
Januari 4,441 1.917 8,512
Februari 3,454 1.917 6,620
Maret 5,428 1.917 10,403
April 5,428 1.917 10,403
Mei 5,428 1.917 10,403
Juni 5,428 1.917 10,403
Juli 5,428 1.917 10,403
Agustus 4,934 1.917 9,457
September 4,934 1.917 9,457
Oktober 4,934 1.917 9,457
November 4,934 1.917 9,457
Desember 4,441 1.917 8,512
Jumlah 59,211 113,487

Tabel: 1.21 Budget Biaya Tenaga Kerja Langsung


Bagian Mixing Bagian Casting
Bulan
JKL Rp JKL
Januari 28,952 72,378,833 37,635
Februari 22,518 56,294,648 29,272
Maret 35,385 88,463,019 45,999
April 35,385 88,463,019 45,999
Mei 35,385 88,463,019 45,999
Juni 35,385 88,463,019 45,999
Juli 35,385 88,463,019 45,999
Agustus 32,168 80,420,926 41,817
September 32,168 80,420,926 41,817
Oktober 32,168 80,420,926 41,817
November 32,168 80,420,926 41,817
Desember 28,952 72,378,833 37,635
Jumlah 386,020 965,051,111

Tabel: 1.22 Budget Biaya Tenaga Kerja Langsung


Bagian Mixing Bagian Casting
Bulan
JKL Rp JKL
Tipe Radial 272,533 681,333,333 348,843
Tipe Biasa 113,487 283,717,778 152,961
Jumlah 386,020 965,051,111 501,804
BUDGET BIAYA TENAGA KERJA L

Operator 1 Operator 2
Rp JKL
Produksi
Tarif/Jam Total SUR Total
2,500 51,100,000 9,811 2.667 26,163
2,500 39,744,444 7,631 2.667 20,349
2,500 62,455,556 11,991 2.667 31,977
2,500 62,455,556 11,991 2.667 31,977
2,500 62,455,556 11,991 2.667 31,977
2,500 62,455,556 11,991 2.667 31,977
2,500 62,455,556 11,991 2.667 31,977
2,500 56,777,778 10,901 2.667 29,070
2,500 56,777,778 10,901 2.667 29,070
2,500 56,777,778 10,901 2.667 29,070
2,500 56,777,778 10,901 2.667 29,070
2,500 51,100,000 9,811 2.667 26,163
681,333,333 121,005 348,843

Operator 1 Operator 2
Rp JKL
Produksi
Tarif/Jam Total SUR Total
2,500 21,278,833 4,441 2.583 11,472
2,500 16,550,204 3,454 2.583 8,923
2,500 26,007,463 5,428 2.583 14,021
2,500 26,007,463 5,428 2.583 14,021
2,500 26,007,463 5,428 2.583 14,021
2,500 26,007,463 5,428 2.583 14,021
2,500 26,007,463 5,428 2.583 14,021
2,500 23,643,148 4,934 2.583 12,747
2,500 23,643,148 4,934 2.583 12,747
2,500 23,643,148 4,934 2.583 12,747
2,500 23,643,148 4,934 2.583 12,747
2,500 21,278,833 4,441 2.583 11,472
283,717,778 59,211 152,961

Bagian Casting Bagian Finishing Jumlah


Rp JKL Rp JKL Rp
131,723,433 56,638 239,616,067 123,225 443,718,333
102,451,559 44,052 186,368,052 95,841 345,114,259
160,995,307 69,224 292,864,081 150,608 542,322,407
160,995,307 69,224 292,864,081 150,608 542,322,407
160,995,307 69,224 292,864,081 150,608 542,322,407
160,995,307 69,224 292,864,081 150,608 542,322,407
160,995,307 69,224 292,864,081 150,608 542,322,407
146,359,370 62,931 266,240,074 136,916 493,020,370
146,359,370 62,931 266,240,074 136,916 493,020,370
146,359,370 62,931 266,240,074 136,916 493,020,370
146,359,370 62,931 266,240,074 136,916 493,020,370
131,723,433 56,638 239,616,067 123,225 443,718,333
1,756,312,444 755,172 3,194,880,889 1,642,996 5,916,244,444

Bagian Casting Bagian Finishing Jumlah


Rp JKL Rp JKL Rp
1,220,949,333 523,264 2,212,970,667 1,144,640 4,115,253,333
535,363,111 231,908 981,910,222 498,356 1,800,991,111
1,756,312,444 755,172 3,194,880,889 1,642,996 5,916,244,444
INSTRUKSI 4

A KERJA LANGSUNG

or 2 Operator 3
Rp Rp
Produksi
Tarif/Jam Total SUR Total Tarif/Jam
3,500 91,571,200 9,811 2.167 21,258 4,000
3,500 71,222,044 7,631 2.167 16,534 4,000
3,500 111,920,356 11,991 2.167 25,982 4,000
3,500 111,920,356 11,991 2.167 25,982 4,000
3,500 111,920,356 11,991 2.167 25,982 4,000
3,500 111,920,356 11,991 2.167 25,982 4,000
3,500 111,920,356 11,991 2.167 25,982 4,000
3,500 101,745,778 10,901 2.167 23,620 4,000
3,500 101,745,778 10,901 2.167 23,620 4,000
3,500 101,745,778 10,901 2.167 23,620 4,000
3,500 101,745,778 10,901 2.167 23,620 4,000
3,500 91,571,200 9,811 2.167 21,258 4,000
1,220,949,333 130,816 283,435

or 2 Operator 3
Rp JKL Rp
Produksi
Tarif/Jam Total SUR Total Tarif/Jam
3,500 40,152,233 4,441 2.083 9,252 4,000
3,500 31,229,515 3,454 2.083 7,196 4,000
3,500 49,074,952 5,428 2.083 11,308 4,000
3,500 49,074,952 5,428 2.083 11,308 4,000
3,500 49,074,952 5,428 2.083 11,308 4,000
3,500 49,074,952 5,428 2.083 11,308 4,000
3,500 49,074,952 5,428 2.083 11,308 4,000
3,500 44,613,593 4,934 2.083 10,280 4,000
3,500 44,613,593 4,934 2.083 10,280 4,000
3,500 44,613,593 4,934 2.083 10,280 4,000
3,500 44,613,593 4,934 2.083 10,280 4,000
3,500 40,152,233 4,441 2.083 9,252 4,000
535,363,111 59,211 123,356
PT RODA JAYA

Inspektur
Rp JKL Rp
Total SUR Total Tarif/Jam Total
85,030,400 1.833 17,987 4,500 80,942,400
66,134,756 1.833 13,990 4,500 62,955,200
103,926,044 1.833 21,984 4,500 98,929,600
103,926,044 1.833 21,984 4,500 98,929,600
103,926,044 1.833 21,984 4,500 98,929,600
103,926,044 1.833 21,984 4,500 98,929,600
103,926,044 1.833 21,984 4,500 98,929,600
94,478,222 1.833 19,986 4,500 89,936,000
94,478,222 1.833 19,986 4,500 89,936,000
94,478,222 1.833 19,986 4,500 89,936,000
94,478,222 1.833 19,986 4,500 89,936,000
85,030,400 1.833 17,987 4,500 80,942,400
### 239,829 ###

Inspektur
Rp JKL Rp
Total SUR Total Tarif/Jam Total
37,006,667 1.833 8,141 4,500 36,636,600
28,782,963 1.833 6,332 4,500 28,495,133
45,230,370 1.833 9,951 4,500 44,778,067
45,230,370 1.833 9,951 4,500 44,778,067
45,230,370 1.833 9,951 4,500 44,778,067
45,230,370 1.833 9,951 4,500 44,778,067
45,230,370 1.833 9,951 4,500 44,778,067
41,118,519 1.833 9,046 4,500 40,707,333
41,118,519 1.833 9,046 4,500 40,707,333
41,118,519 1.833 9,046 4,500 40,707,333
41,118,519 1.833 9,046 4,500 40,707,333
37,006,667 1.833 8,141 4,500 36,636,600
493,422,222 108,553 488,488,000
PT RODA JAYA
Ja la n Peda ti No: 1X
INPUT DATA UPAH

Departemen

Produksi:
Bagian Mixing
Bagian Costing
Bagian Finishing
Bagian Pembantu

Pemasaran dan
Administrasi Umum:

Jumlah
YA INSTRUKSI 5
No: 1X
INPUT DATA UPAH DAN GAJI
PT RODA JAYA

Karyawan
Jabatan Jumlah Orang Gaji/Bulan (Rp)

Kepala Bagian 1 Rp 750,000


Kepala Bagian 1 Rp 750,000
Kepala Bagian 1 Rp 750,000
Kepala Bagian 1 Rp 750,000
Tenaga Administrasi Pabrik 1 Rp 550,000
Tenaga Reparasi 1 Rp 500,000
Tenaga Pembangkit Tenaga Listrik 1 Rp 500,000

Direktur 1 Rp 1,500,000.00
Sekretaris 1 Rp 850,000.00
Kepala Departmen 1 Rp 800,000.00
Administrasi Umum 2 Rp 275,000.00
Administrasi Keuangan dan Akuntansi 2 Rp 275,000.00
Tenaga Pemasaran 3 Rp 150,000.00
17 Rp 8,400,000.00
NSTRUKSI 5

PT RODA JAYA
PT RODA JAYA
Ja lan Pedati No: 1X
PERH

Departemen

Produksi:
Bagian Mixing
Bagian Costing
Bagian Finishing
Bagian Pembantu

Pemasaran dan Administrasi Umum:

Jumlah

Tabel: 1.24 Bugdet Alokasi BTKTL

Keterangan

BTKTL sebelum alokasi


Alokasi dari administrasi pabrik dan gudang
Alokasi dari pembangkit tenaga listrik
Alokasi dari repasi
BTKTL Total

Tabel: 1.25 Bugdet BTKTL


Keterangan
BTKTL sebelum alokasi
Alokasi dari administrasi pabrik dan gudang
Alokasi dari pembangkit tenaga listrik
Alokasi dari repasi
BTKTL Total
PERHITUNGAN GAJI DAN UPAH

Karyawan
Jabatan Jumlah Orang Gaji/Bulan (Rp)

Kepala Bagian 1 Rp 750,000


Kepala Bagian 1 Rp 750,000
Kepala Bagian 1 Rp 750,000
Kepala Bagian 1 Rp 750,000
Tenaga Administrasi Pabrik 1 Rp 550,000
Tenaga Reparasi 1 Rp 500,000
Tenaga Pembangkit Tenaga
1 Rp 500,000
Listrik

Direktur 1 Rp 1,500,000.00
Sekretaris 1 Rp 850,000.00
Kepala Departmen 1 Rp 800,000.00
Administrasi Umum 2 Rp 275,000.00
Administrasi Keuangan dan
2 Rp 275,000.00
Akuntansi
Tenaga Pemasaran 3 Rp 150,000.00
17 Rp 8,400,000.00

Bagian Mixing Bagian Costing Bagian Finishing

Rp 9,000,000.00 Rp 9,000,000.00 Rp 9,000,000.00


Rp 7,800,000.00 Rp 3,120,000.00 Rp 4,680,000.00
Rp 3,000,000.00 Rp 1,200,000.00 Rp 1,800,000.00
Rp 3,000,000.00 Rp 1,200,000.00 Rp 1,800,000.00
Rp 22,800,000.00 Rp 14,520,000.00 Rp 17,280,000.00

Bagian Mixing Bagian Costing Bagian Finishing


Rp 9,000,000.00 Rp 9,000,000.00 Rp 9,000,000.00
Rp 7,800,000.00 Rp 3,120,000.00 Rp 4,680,000.00
Rp 3,000,000.00 Rp 1,200,000.00 Rp 1,800,000.00
Rp 3,000,000.00 Rp 1,200,000.00 Rp 1,800,000.00
Rp 22,800,000.00 Rp 14,520,000.00 Rp 17,280,000.00
INSTRUKSI 5

DAN UPAH
PT RODA JAYA

Gaji/Tahun(Rp)

Rp 9,000,000
Rp 9,000,000
Rp 9,000,000
Rp 9,000,000
Rp 6,600,000
Rp 6,000,000
Rp 6,000,000

Rp 18,000,000
Rp 10,200,000
Rp 9,600,000
Rp 6,600,000
Rp 6,600,000
Rp 5,400,000
Rp 111,000,000.00

Adm Pabrik dan Gudang Pembangkit Tenaga Listrik Reparasi

Rp 15,600,000 Rp 6,000,000 Rp 6,000,000


-Rp 15,600,000
-Rp 6,000,000
-Rp 6,000,000
Rp - Rp - Rp -
PT RODA JAYA
Ja la n Peda ti No: 1X

INPUT DATA ALOKASI


ALOKASI BAGIAN JASA KE BAGIAN:
Bagian Presentase
Bagian Produksi:
Bagian Mixing 50%
Bagian Costing 20%
Bagian Finishing 30%
Jumlah 100%

DEPRESIASI BANGUNAN
Keterangan Persentase
Bagian Produksi:
Bagian Mixing
Bagian Casting
Bagian Finishing
60%
Bagian Jasa:
Bagian Adm. Pabrik & Gudang
Bagian Pembangkit Tenaga Listrik
Bagian Reparasi
Dep. Pemasaran dan AU 40%
Jumlah 100%

INPUT AKTIVA TETAP DAN DEPRESIASI AKTIVA TETAP

Keterangan Tahun Perolehan

Bangunan 2007
Mesin dan Peralatan di Bagian Mixing 2010

Mesin dan Peralatan di Bagian Casting 2010

Mesin dan Peralatan di Bagian Finishing 2010


Peralatan di Bagian Adm. Pabrik &
2017
Gudang
Mesin dan Peralatan di Bagian
2017
Pembangkit Tenaga Listrik

Mesin dan Peralatan di Bagian Reparasi 2017

Peralatan di Departemen Pemasaran &


2017
Adm. Umum

INPUT DATA DISTRIBUSI DEP BANGUNAN DEP PRODUKSI


Keterangan Persentase
Bagian Pembantu/Jasa:
Bagian Adm. Pabrik & Gudang 10%
Bagian Pembangkit Tenaga Listrik 5%
Bagian Reparasi 5%
Bagian Produksi:
Bagian Mixing 35%
Bagian Casting 15%
Bagian Finishing 30%
Jumlah 100%
INSTRUKSI 6

A ALOKASI
PT RODA JAYA

BANGUNAN

PRESIASI AKTIVA TETAP


Umur Ekonomis Depresiasi per
(tahun) Tahun (Rp)
20 Rp 50,000,000
10 Rp 25,000,000

10 Rp 23,000,000

10 Rp 20,000,000
4 Rp 15,000,000

5 Rp 17,500,000

4 Rp 12,000,000

4 Rp 14,000,000
PT RODA JAYA
Ja la n Peda ti No: 1X

DISTRIBUSI DAN AL

Tabel: 1.26 Distribusi dan Alokasi Dep Bangunan


Keterangan
Dep Bangunan pabrik sebelum alokasi
Alokasi dari administrasi pabrik dan gudang
Alokasi dari pembangkit tenaga listrik
Alokasi dari repasi
Dep Bangunan pabrik Total

Tabel: 1.27 Budget Depresiasi Bangunan


Keterangan
Dep Bangunan pabrik sebelum alokasi
Alokasi dari administrasi pabrik dan gudang
Alokasi dari pembangkit tenaga listrik
Alokasi dari repasi
Dep Bangunan pabrik Total
TRIBUSI DAN ALOKASI DEPRESIASI BANGUNAN

n
Bagian Mixing Bagian Costing Bagian Finishing Adm Pabrik dan Gudang
Rp 10,500,000.00 Rp 4,500,000.00 Rp 9,000,000.00 Rp 3,000,000.00
Rp 1,500,000.00 Rp 600,000.00 Rp 900,000.00 -Rp 3,000,000
Rp 750,000.00 Rp 300,000.00 Rp 450,000.00
Rp 750,000.00 Rp 300,000.00 Rp 450,000.00
Rp 13,500,000.00 Rp 5,700,000.00 Rp 10,800,000.00 Rp -

Bagian Mixing Bagian Costing Bagian Finishing


Rp 10,500,000.00 Rp 4,500,000.00 Rp 9,000,000.00
Rp 1,500,000.00 Rp 600,000.00 Rp 900,000.00
Rp 750,000.00 Rp 300,000.00 Rp 450,000.00
Rp 750,000.00 Rp 300,000.00 Rp 450,000.00
Rp 13,500,000.00 Rp 5,700,000.00 Rp 10,800,000.00

Alokasi Rp 30,000,000.00
Depresiasi 50000000
selisih Rp 20,000,000.00
INSTRUKSI 6
BANGUNAN
PT RODA JAYA

Pembangkit Tenaga Listrik Reparasi


Rp 1,500,000.00 Rp 1,500,000.00

-Rp 1,500,000
-Rp 1,500,000
Rp - Rp -
PT RODA JAYA
Ja la n Peda ti No: 1X
DISTRIBUSI DAN ALOKAS

Tabel: 1.26 Distribusi dan Alokasi Mesin


Keterangan
Dep mesin dan peralatan sebelum alokasi
Alokasi dari administrasi pabrik dan gudang
Alokasi dari pembangkit tenaga listrik
Alokasi dari repasi
Dep mesin dan peralatan pabrik total

Tabel: 1.25 Bugdet Depresiasi Mesin dan Peralatan


Keterangan
Dep mesin dan peralatan pabrik sebelum alokasi
Alokasi dari administrasi pabrik dan gudang
Alokasi dari pembangkit tenaga listrik
Alokasi dari repasi
Dep mesin dan peralatan pabrik total
USI DAN ALOKASI DEPRESIASI MESIN & PERALATA

Bagian Mixing Bagian Costing Bagian Finishing Adm Pabrik dan Gudang
Rp 25,000,000 Rp 23,000,000 Rp 20,000,000 Rp 15,000,000
Rp 7,500,000.00 Rp 3,000,000.00 Rp 4,500,000.00 -Rp 15,000,000
Rp 8,750,000.00 Rp 3,500,000.00 Rp 5,250,000.00
Rp 6,000,000.00 Rp 2,400,000.00 Rp 3,600,000.00
Rp 47,250,000.00 Rp 31,900,000.00 Rp 33,350,000.00 Rp -

Bagian Mixing Bagian Costing Bagian Finishing


Rp 25,000,000.00 Rp 23,000,000.00 Rp 20,000,000.00
Rp 7,500,000.00 Rp 3,000,000.00 Rp 4,500,000.00
Rp 8,750,000.00 Rp 3,500,000.00 Rp 5,250,000.00
Rp 6,000,000.00 Rp 2,400,000.00 Rp 3,600,000.00
Rp 47,250,000.00 Rp 31,900,000.00 Rp 33,350,000.00

Alokasi Rp 112,500,000.00
Depresiasi 126500000
Selisih Rp 14,000,000.00
INSTRUKSI 7
N & PERALATAN
PT RODA JAYA

Pembangkit Tenaga
Reparasi
Listrik
Rp 17,500,000 Rp 12,000,000

-Rp 17,500,000
-Rp 12,000,000
Rp - Rp -
PT RODA JAYA
Ja lan Peda ti No: 1X

INPUT DATA LISTRIK


Bagian KWH Terpakai Tarif/Kwh
Januari 1,450 550
Februari 1,600 550
Maret 1,600 550
April 1,700 550
Mei 1,700 550
Juni 1,700 550
Juli 1,600 550
Agustus 1,600 550
September 1,600 550
Oktober 1,750 550
November 1,800 550
Desember 1,900 550
20,000

Pemakaian Listik
Keterangan
KWH per Tahun

Bagian Produksi:
Bagian Mixing 8,200
Bagian Casting 5,500
Bagian Finishing 5,450
Bagian Jasa:
Bagian Adm. Pabrik & Gudang 150
Bagian Pembangkit Tenaga Listrik 280
Bagian Reparasi 270
Dep. Pemasaran dan AU 150
Jumlah 20,000
INSTRUKSI 8
STRIK
PT RODA
JAYA

NEXT
PT RODA JAYA
Ja la n Peda ti No: 1X
BIAYA LISTRIK
Tabel 1.30 Biaya Listrik Per Tahun
Bagian
Januari
Februari
Maret
April
Mei
Juni
Juli
Agustus
September
Oktober
November
Desember
Jumlah
Tabel 1.31 Biaya Listrik Departemen Per Tahun
Keterangan
Bagian Produksi:
Bagian Mixing
Bagian Casting
Bagian Finishing
Bagian Jasa:
Bagian Adm. Pabrik & Gudang
Bagian Pembangkit Tenaga Listrik
Bagian Reparasi
Dep. Pemasaran dan AU
Jumlah

Tabel: 1.32 Distribusi dan Alokasi Listrik Departemen Produksi


Keterangan
Biaya Listrik pabrik sebelum alokasi
Alokasi dari administrasi pabrik dan gudang
Alokasi dari pembangkit tenaga listrik
Alokasi dari repasi
Biaya Listrik pabrik total

Tabel: 1.33 Bugdet Biaya Listrik Departemen Produksi


Keterangan
Biaya Listrik pabrik sebelum alokasi
Alokasi dari administrasi pabrik dan gudang
Alokasi dari pembangkit tenaga listrik
Alokasi dari repasi
Biaya Listrik pabrik total
INSTRUKSI
BIAYA LISTRIK
PT RODA JAYA

KWH Terpakai Tarif/Kwh Biaya


1,450 550 Rp 797,500.00
1,600 550 Rp 880,000.00
1,600 550 Rp 880,000.00
1,700 550 Rp 935,000.00
1,700 550 Rp 935,000.00
1,700 550 Rp 935,000.00
1,600 550 Rp 880,000.00
1,600 550 Rp 880,000.00
1,600 550 Rp 880,000.00
1,750 550 Rp 962,500.00
1,800 550 Rp 990,000.00
1,900 550 Rp 1,045,000.00
20,000 Rp 11,000,000.00

KWH Terpakai Tarif/Kwh Biaya

8,200 550 Rp 4,510,000.00


5,500 550 Rp 3,025,000.00
5,450 550 Rp 2,997,500.00

150 550 Rp 82,500.00


280 550 Rp 154,000.00
270 550 Rp 148,500.00
150 550 Rp 82,500.00
Rp 11,000,000.00

emen Produksi
Adm Pabrik dan Pembangkit Tenaga
Bagian Mixing Bagian Costing Bagian Finishing
Gudang Listrik
Rp 4,510,000.00 Rp 3,025,000.00 Rp 2,997,500.00 Rp 82,500 Rp 154,000
Rp 41,250.00 Rp 16,500.00 Rp 24,750.00 -Rp 82,500
Rp 77,000.00 Rp 30,800.00 Rp 46,200.00 -Rp 154,000
Rp 74,250.00 Rp 29,700.00 Rp 44,550.00
Rp 4,702,500.00 Rp 3,102,000.00 Rp 3,113,000.00 Rp - Rp -

roduksi
Bagian Mixing Bagian Costing Bagian Finishing
Rp 4,510,000.00 Rp 3,025,000.00 Rp 2,997,500.00
Rp 41,250.00 Rp 16,500.00 Rp 24,750.00
Rp 77,000.00 Rp 30,800.00 Rp 46,200.00
Rp 74,250.00 Rp 29,700.00 Rp 44,550.00
Rp 4,702,500.00 Rp 3,102,000.00 Rp 3,113,000.00

Budget Rp 10,917,500.00
Biaya 11000000
Selisih Rp 82,500.00
INSTRUKSI 8

Reparasi
Rp 148,500

-Rp 148,500
Rp -
PT RODA JAYA
Jalan Pedati No: 1X
INPUT DATA BOP LAIN
Bagian Administrasi Pabrik & Gudang
Biaya Perjalanan Rp 7,040,000
Biaya Telepon Rp 7,586,000
Biaya Asuransi Rp 240,000
Biaya Alat Tulis Kantor Rp 3,744,000
Bagian Pembangkit Tenaga Listrik
Biaya Perawatan Rp 6,800,000
Bahan Bakar dan Pelumas Rp 24,000,000
Biaya Asuransi Rp 840,000
Bagian Reparasi
Bahan Pembantu Rp 1,360,000
Biaya Asuransi Rp 120,000
INSTRUKSI 9
A BOP LAIN PT RODA JAYA

Rp 18,610,000

Rp 31,640,000

Rp 1,480,000
PT RODA JAYA
Ja la n Peda ti No: 1X

BIAYA OVERHEAD PABRIK


Tabel: 1.33 Bugdet Biaya Listrik Departemen Produksi
Keterangan
Administrasi Pabrik & Gudang
Pembangkit Tenaga Listrik
Reparasi
Jumlah
INSTRUKSI 9
RHEAD PABRIK LAINNYA PT RODA JAYA

roduksi
Bagian Mixing Bagian Costing Bagian Finishing Jumlah
Rp 9,305,000.00 Rp 3,722,000.00 Rp 5,583,000.00 Rp 18,610,000.00
Rp 15,820,000.00 Rp 6,328,000.00 Rp 9,492,000.00 Rp 31,640,000.00
Rp 740,000.00 Rp 296,000.00 Rp 444,000.00 Rp 1,480,000.00
Rp 25,865,000.00 Rp 10,346,000.00 Rp 15,519,000.00 Rp 51,730,000.00
INSTRUKSI 9
PT RODA JAYA
Ja la n Peda ti No: 1X

BIAYA OVERHEAD PABRIK


Tabel: 1.35 BOP Total
Keterangan
BTKL
Depresiasi
Listrik
Administrasi Pabrik dan Guadang
Pembangkit Tenaga Listrik
Reparasi
Jumlah
INSTRUKSI 10
ERHEAD PABRIK TOTAL PT RODA JAYA

Bagian Mixing Bagian Costing Bagian Finishing Jumlah


Rp 22,800,000.00 Rp 14,520,000.00 Rp 17,280,000.00 Rp 54,600,000.00
Rp 60,750,000.00 Rp 37,600,000.00 Rp 44,150,000.00 Rp 142,500,000.00
Rp 4,702,500.00 Rp 3,102,000.00 Rp 3,113,000.00 Rp 10,917,500.00
Rp 9,305,000.00 Rp 3,722,000.00 Rp 5,583,000.00 Rp 18,610,000.00
Rp 15,820,000.00 Rp 6,328,000.00 Rp 9,492,000.00 Rp 31,640,000.00
Rp 740,000.00 Rp 296,000.00 Rp 444,000.00 Rp 1,480,000.00
Rp 114,117,500.00 Rp 65,568,000.00 Rp 80,062,000.00 Rp 259,747,500.00
INSTRUKSI 10
ODA JAYA
PT RODA JAYA
Ja la n Peda ti No: 1X
INPUT BIAYA PEMASARAN

Jenis Biaya
Telepon dan Internet
Korespodensi
Alat Tulis Kantor
Perjalanan
Serba-Serbi
Jumlah

INPUT BIAYA ADM DAN UMUM

Jenis Biaya
Telepon dan Internet
Korespodensi
Alat Tulis Kantor
Perjalanan
Serba-Serbi
Jumlah

INPUT BIAYA KANTOR PUSAT

Jenis Biaya
Telepon dan Internet
Korespodensi
Alat Tulis Kantor
Perjalanan
Serba-Serbi
Jumlah
INSTRUKSI 10
PEMASARAN
PT RODA JAYA

Biaya per Tahun


Rp 3,122,000
Rp 122,000
Rp 222,000
Rp 2,200,000
Rp 111,000
Rp 5,777,000

DM DAN UMUM

Biaya per Tahun


Rp 2,232,000
Rp 232,000
Rp 332,000
Rp 2,100,000
Rp 222,000
Rp 5,118,000

KANTOR PUSAT

Biaya per Tahun


Rp 4,232,000
Rp 232,000
Rp 232,000
Rp 3,200,000
Rp 425,000
Rp 8,321,000
BIAYA PEMASARAN, ADMINISTRASI, DAN UMUM

PT RODA JAYA
Jenis Biaya
Ja la n Peda ti No: 1X Telepon dan Fax
Korespodensi
Alat Tulis Kantor
Perjalanan
Serba-serbi
Direktur
Sekretaris
Kepala Dep
Adm Umum
Keu dan Akt
Pemasaran
Selisih alokasi depresiasi perlatan
Selisih alokasi depresiasi bangunan
Selisih alokasi depresiasi listrik
Jumlah
INSTRUKSI 10
MINISTRASI, DAN UMUM

PT RODA JAYA

Biaya per Tahun


Rp 9,586,000
Rp 586,000
Rp 786,000
Rp 7,500,000
Rp 758,000
Rp 18,000,000
Rp 10,200,000
Rp 9,600,000
Rp 6,600,000
Rp 6,600,000
Rp 5,400,000
Rp 14,000,000
Rp 20,000,000
Rp 82,500
Rp 109,698,500
PT RODA JAYA
Ja la n Peda ti No: 1X
INPUT DATA BIAYA
Radial
Jenis Biaya
Biaya Bahan
Karet Alam Rp 32,758,506,667
Benang Sintesis Rp 2,292,005,333
Carbon Black Rp 1,310,885,333

Radial
Posisi
Biaya TKL
Operator 1 Rp 681,333,333
Operator 2 Rp 1,220,949,333
Operator 3 Rp 1,133,738,667
Inspektur Rp 1,079,232,000

Biaya Overhead Pabrik Total


TKL Rp 54,600,000.00
Depresiasi Rp 142,500,000.00
Listrik Rp 10,917,500.00
Adm Pabrik dan Gudang Rp 18,610,000.00
Pembangkit Tenaga Listrik Rp 31,640,000.00
Reparasi Rp 1,480,000.00
Radial
Proporsi BOP %
70%
INSTRUKSI 10
TA BIAYA PT RODA JAYA

Radial Biasa
Produksi Biaya Bahan Produksi
130,816 Rp 11,861,870,222 59,211
130,816 Rp 622,452,133 59,211
130,816 Rp 593,340,222 59,211

Radial Biasa
Produksi Biaya TKL Produksi
130,816 Rp 283,717,778 59,211
130,816 Rp 535,363,111 59,211
130,816 Rp 493,422,222 59,211
130,816 Rp 488,488,000 59,211

Biasa
30%
NEXT
PT RODA JAYA
Ja la n Peda ti No: 1X

DATA BIAYA
Tabel: 1.37 Biaya Bahan Baku Setiap Produk

Jenis Bahan Satuan

Karet Alam Kg
Benang Sintetis Kg
Carbon Black Liter
Jumlah

Tabel: 1.38 Biaya TKL Setiap Produk


Tipe Radial
Posisi
SUR
Operator 1 125
Operator 2 160
Operator 3 130
Inspektur 110
Jumlah

Tabel: 1.39 Biaya Overhead Pabrik


Tipe Radial
Biaya Overhead Pabrik
SUR
BTKTL 54,600,000
Depresiasi 142,500,000
Listrik 10,917,500
Administrasi Pabrik & Gudang 18,610,000
Pembangkit Tenaga Listrik 31,640,000
Reparasi 1,480,000
Jumlah BOP
INSTRUKSI 10

DATA BIAYA PT RODA


JAYA

Tipe Radial Tipe Biasa


SUR Biaya/Unit SUR Biaya/Unit
10 Rp 250,417 8 Rp 200,333
0.5 Rp 17,521 0.3 Rp 10,513
0.5 Rp 10,021 0.5 Rp 10,021
Rp 277,958 Rp 220,867

Tipe Radial Tipe Biasa


Biaya/Unit SUR Biaya/Unit
Rp 5,208 115 Rp 4,792
Rp 9,333 155 Rp 9,042
Rp 8,667 125 Rp 8,333
Rp 8,250 110 Rp 8,250
Rp 31,458 Rp 30,417

Tipe Radial Tipe Biasa


Biaya/Unit SUR Biaya/Unit
Rp 37,978,964 54,600,000 Rp 16,621,036
Rp 99,120,921 142,500,000 Rp 43,379,079
Rp 7,594,054 10,917,500 Rp 3,323,446
Rp 12,944,845 18,610,000 Rp 5,665,155
Rp 22,008,322 31,640,000 Rp 9,631,678
Rp 1,029,466 1,480,000 Rp 450,534
Rp 180,676,572 Rp 79,070,928

NEXT
PT RODA JAYA
Jalan Pedati No: 1X
BUGDET BEBAN POK
Tabel: 1.40 Beban Pokok Produksi
Tipe Radial
Elemen Biaya
Per Unit
Biaya Bahan Baku
Karet Alam Rp 250,417
Benang Sintesis Rp 17,521
Carbon Black Rp 10,021
Biaya Tenaga Kerja Langsung Rp 31,458
Jumlah Rp 309,417
Biaya Overhead Pabrik (BOP)
BTKTL Rp 290
Depresiasi Rp 758
Listrik Rp 58
Administrasi Pabrik & Gudang Rp 99
Pembangkit Tenaga Listrik Rp 168
Reparasi Rp 8
Jumlah BOP Rp 1,381
Harga Pokok Produksi Rp 310,798

Tabel: 1.41 Laporan Laba Rugi Periode 2018


Keterangan Tipe Radial
Penjualan Rp 46,999,040,000
Beban Pokok Produksi Rp 40,657,327,239
Persediaan awal produk jadi Rp 4,960,000,000
Persediaan akhir produk jadi Rp 12,431,912,683
Beban Pokok Penjualan Rp 33,185,414,556
Laba Kotor Rp 13,813,625,444
Beban Pemasaran & K Pusat Rp 76,304,676
Laba Sebelum Pajak Rp 13,737,320,768
PPh Badan:
0 s.d 50.000.000 = 10%
> 50.000.000 s.d 100.000.000 = 15%
diatas 100.000.000 = 30%
Total PPh Yang Harus Dibayar
Laba Setelah Pajak
INSTRUKSI 11
BEBAN POKOK PRODUKSI
PT RODA JAYA

Tipe Radial Tipe Biasa


Total Per Unit Total

Rp 32,758,506,667 Rp 200,333 Rp 11,861,870,222


Rp 2,292,005,333 Rp 10,513 Rp 622,452,133
Rp 1,310,885,333 Rp 10,021 Rp 593,340,222
Rp 4,115,253,333 Rp 30,417 Rp 1,800,991,111
Rp 40,476,650,667 Rp 251,283 Rp 14,878,653,689

Rp 37,978,964 Rp 281 Rp 16,621,036


Rp 99,120,921 Rp 733 Rp 43,379,079
Rp 7,594,054 Rp 56 Rp 3,323,446
Rp 12,944,845 Rp 96 Rp 5,665,155
Rp 22,008,322 Rp 163 Rp 9,631,678
Rp 1,029,466 Rp 8 Rp 450,534
Rp 180,676,572 Rp 1,335 Rp 79,070,928
Rp 40,657,327,239 Rp 252,619 Rp 14,957,724,617

Tipe Biasa Total


Rp 29,196,373,333 Rp 76,195,413,333
Rp 14,957,724,617 Rp 55,615,051,856
Rp 5,040,000,000 Rp 10,000,000,000
Rp 2,020,950,002 Rp 14,452,862,685
Rp 17,976,774,615 Rp 51,162,189,170
Rp 11,219,598,719 Rp 25,033,224,163
Rp 33,393,824 Rp 109,698,500
Rp 11,186,204,895 Rp 24,923,525,663

Rp 5,000,000
Rp 7,500,000
Rp 7,447,057,699
Rp 7,459,557,699
Rp 17,463,967,964
SI 11

PT RODA JAYA
PT RODA JAYA
Jalan Pedati No: 1X
INPUT PENGELOMPOK
Keterangan
Term of Payment:
% dari transaksi penjualan, dilakukan secara tunai
% dari transaksi penjualan, dilakukan secara kredit dengan pelunasan (Diskon)
% dari transaksi penjualan, dilakukan secara kredit dengan pelunasan (Tanpa Diskon)
% dari transaksi penjualan, dilakukan secara kredit dengan pelunasan satu bulan sesudah tr

MASUKAN
Bulan Penjualan
Januari 3,809,770,667
Februari 2,285,862,400
Maret 8,381,495,467
April 8,381,495,467
Mei 8,381,495,467
Juni 8,381,495,467
Juli 8,381,495,467
Agustus 6,095,633,067
September 6,095,633,067
Oktober 6,095,633,067
November 6,095,633,067
Desember 3,809,770,667
INSTRUKSI 12
NGELOMPOKAN TRANSAKSI
eterangan Nilai

40%
n pelunasan (Diskon) 20%
n pelunasan (Tanpa Diskon) 30%
n pelunasan satu bulan sesudah transaksi 10%

MASUKAN DATA
Penerimaan Dari Tahun Sebelumnya
Bulan Oktober November
Januari 4,325,000 5,820,000
Input Disini Februari 2,300,000
Maret
STRUKSI 12
PT RODA JAYA

nya
Desember

1,300,000
4,150,000

NEXT
PT RODA JAYA
Jalan Pedati No: 1X
INPUT D
Tabel 1.42 Skedul Penerimaan Piutang
Penerimaan Piuta
Bulan
Januari
Oktober Rp 4,325,000
November Rp 5,820,000
Desember
Januari Rp 1,874,407,168
Februari
Maret
April
Jumlah Rp 1,884,552,168

Penerimaan Piuta
Bulan
Mei
April Rp 838,149,547
Mei Rp 4,123,695,770
Juni
Juli
Agustus
Jumlah Rp 4,961,845,316

Penerimaan Piuta
Bulan
September
Agustus Rp 609,563,307
September Rp 2,999,051,469
Oktober
November
Desember
Jumlah Rp 3,608,614,775

Tabel: 1.43 Anggaran Piutang


Keterangan Piutang Awal
Januari Rp 17,895,000
Februari Rp 388,727,067
Maret Rp 232,736,240
April Rp 838,149,547
Mei Rp 838,149,547
Juni Rp 838,149,547
Juli Rp 838,149,547
Agustus Rp 838,149,547
September Rp 609,563,307
Oktober Rp 609,563,307
November Rp 609,563,307
Desember Rp 609,563,307
Jumlah Rp 7,268,359,267
INSTRUKS
INPUT DATA
PT RODA JA

Penerimaan Piutang
Piutang Neto
Februari Maret April
Rp 4,325,000
Rp 2,300,000 Rp 8,120,000
Rp 1,300,000 Rp 4,150,000 Rp 5,450,000
Rp 380,977,067 Rp 2,255,384,235
Rp 1,124,644,301 Rp 228,586,240 Rp 1,353,230,541
Rp 4,123,695,770 Rp 838,149,547 Rp 4,961,845,316
Rp 4,123,695,770 Rp 4,123,695,770
Rp 1,509,221,367 Rp 4,356,432,010 Rp 4,961,845,316 Rp 12,712,050,861

Penerimaan Piutang
Piutang Neto
Juni Juli Agustus
Rp 838,149,547
Rp 838,149,547 Rp 4,961,845,316
Rp 4,123,695,770 Rp 838,149,547 Rp 4,961,845,316
Rp 4,123,695,770 Rp 838,149,547 Rp 4,961,845,316
Rp 2,999,051,469 Rp 2,999,051,469
Rp 4,961,845,316 Rp 4,961,845,316 Rp 3,837,201,015 Rp 18,722,736,964

Penerimaan Piutang
Piutang Neto
Oktober November Desember
Rp 609,563,307
Rp 609,563,307 Rp 3,608,614,775
Rp 2,999,051,469 Rp 609,563,307 Rp 3,608,614,775
Rp 2,999,051,469 Rp 380,977,067 Rp 3,380,028,535
Rp 1,874,407,168 Rp 1,874,407,168
Rp 3,608,614,775 Rp 3,608,614,775 Rp 2,483,970,475 Rp 13,309,814,801

Tambahan Piutang Jumlah Piutang Penerimaan Piutang Piutang Neto


Rp 2,255,384,235 Rp 2,273,279,235 Rp 1,884,552,168 Rp 388,727,067
Rp 1,353,230,541 Rp 1,741,957,607 Rp 1,509,221,367 Rp 232,736,240
Rp 4,961,845,316 Rp 5,194,581,556 Rp 4,356,432,010 Rp 838,149,547
Rp 4,961,845,316 Rp 5,799,994,863 Rp 4,961,845,316 Rp 838,149,547
Rp 4,961,845,316 Rp 5,799,994,863 Rp 4,961,845,316 Rp 838,149,547
Rp 4,961,845,316 Rp 5,799,994,863 Rp 4,961,845,316 Rp 838,149,547
Rp 4,961,845,316 Rp 5,799,994,863 Rp 4,961,845,316 Rp 838,149,547
Rp 3,608,614,775 Rp 4,446,764,322 Rp 3,837,201,015 Rp 609,563,307
Rp 3,608,614,775 Rp 4,218,178,082 Rp 3,608,614,775 Rp 609,563,307
Rp 3,608,614,775 Rp 4,218,178,082 Rp 3,608,614,775 Rp 609,563,307
Rp 3,608,614,775 Rp 4,218,178,082 Rp 3,608,614,775 Rp 609,563,307
Rp 2,255,384,235 Rp 2,864,947,541 Rp 2,483,970,475 Rp 380,977,067
Rp 45,107,684,693 Rp 52,376,043,960 Rp 44,744,602,627 Rp 7,631,441,333
INSTRUKSI 12
PT RODA JAYA
PT RODA JAYA
Ja la n Peda ti No: 1X

INPUT PENGELOMPOK
Keterangan
Term of Payment:
% dari transaksi penjualan, dilakukan secara tunai
% dari transaksi penjualan, dilakukan secara kredit dengan pelunasan (Diskon)
% dari transaksi penjualan, dilakukan secara kredit dengan pelunasan (Tanpa Diskon)
% dari transaksi penjualan, dilakukan secara kredit dengan pelunasan satu bulan sesudah tr

MASUKAN
Bulan Pembelian
Januari 2,978,293,200
Februari 2,319,005,822
Maret 3,637,580,578
April 3,637,580,578
Mei 4,538,427,600
Juni 4,538,427,600
Juli 4,538,427,600
Agustus 4,127,116,000
September 4,946,295,111
Oktober 4,946,295,111
November 4,946,295,111
Desember 4,453,315,600
INSTRUKSI 13
NGELOMPOKAN TRANSAKSI
eterangan Nilai

40%
n pelunasan (Diskon) 20%
n pelunasan (Tanpa Diskon) 30%
n pelunasan satu bulan sesudah transaksi 10%

MASUKAN DATA
Penerimaan Dari Tahun Sebelumnya
Bulan Oktober November
Januari 3,520,000
Input Disini Februari 1,100,000
Maret
INSTRUKSI 13
PT RODA JAYA

nya
Desember

1,250,000

NEXT
PT RODA JAYA
Jalan Pedati No: 1X
INPUT D
Tabel 1.44 Skedul Penerimaan Utang
Penerimaan Uta
Bulan
Januari
Oktober Rp 3,520,000
November
Desember
Januari 1,459,363,668
Februari
Maret
April
Jumlah Rp 1,462,883,668

Penerimaan Uta
Bulan
Mei
April Rp 363,758,058
Mei 2,223,829,524
Juni
Juli
Agustus
Jumlah Rp 2,587,587,582

Penerimaan Uta
Bulan
September
Agustus Rp 412,711,600
September 2,423,684,604
Oktober
November
Desember
Jumlah Rp 2,836,396,204

Tabel: 1.43 Anggaran Utang


Keterangan Utang Awal
Januari Rp 5,870,000
Februari Rp 300,179,320
Maret Rp 233,150,582
April Rp 363,758,058
Mei Rp 363,758,058
Juni Rp 453,842,760
Juli Rp 453,842,760
Agustus Rp 453,842,760
September Rp 412,711,600
Oktober Rp 494,629,511
November Rp 494,629,511
Desember Rp 494,629,511
Jumlah Rp 4,524,844,431
INSTRUKSI 13
INPUT DATA PT RODA JA

Penerimaan Utang
Utang Neto
Februari Maret April
Rp 3,520,000
Rp 1,100,000 Rp 1,100,000
Rp 1,250,000 Rp 1,250,000
Rp 297,829,320 Rp 1,757,192,988
1,136,312,853 Rp 231,900,582 Rp 1,368,213,435
1,782,414,483 Rp 363,758,058 Rp 2,146,172,541
1,782,414,483 Rp 1,782,414,483
Rp 1,435,242,173 Rp 2,015,565,065 Rp 2,146,172,541 Rp 7,059,863,447

Penerimaan Utang
Utang Neto
Juni Juli Agustus
Rp 363,758,058
Rp 453,842,760 Rp 2,677,672,284
2,223,829,524 Rp 453,842,760 Rp 2,677,672,284
2,223,829,524 Rp 453,842,760 Rp 2,677,672,284
2,022,286,840 Rp 2,022,286,840
Rp 2,677,672,284 Rp 2,677,672,284 Rp 2,476,129,600 Rp 10,419,061,750

Penerimaan Utang
Utang Neto
Oktober November Desember
Rp 412,711,600
Rp 494,629,511 Rp 2,918,314,116
2,423,684,604 Rp 494,629,511 Rp 2,918,314,116
2,423,684,604 Rp 494,629,511 Rp 2,918,314,116
2,182,124,644 Rp 2,182,124,644
Rp 2,918,314,116 Rp 2,918,314,116 Rp 2,676,754,155 Rp 11,349,778,591

Tambahan Utang Jumlah Utang Penerimaan Utang Utang Neto


Rp 1,757,192,988 Rp 1,763,062,988 Rp 1,462,883,668 Rp 300,179,320
Rp 1,368,213,435 Rp 1,668,392,755 Rp 1,435,242,173 Rp 233,150,582
Rp 2,146,172,541 Rp 2,379,323,123 Rp 2,015,565,065 Rp 363,758,058
Rp 2,146,172,541 Rp 2,509,930,599 Rp 2,146,172,541 Rp 363,758,058
Rp 2,677,672,284 Rp 3,041,430,342 Rp 2,587,587,582 Rp 453,842,760
Rp 2,677,672,284 Rp 3,131,515,044 Rp 2,677,672,284 Rp 453,842,760
Rp 2,677,672,284 Rp 3,131,515,044 Rp 2,677,672,284 Rp 453,842,760
Rp 2,434,998,440 Rp 2,888,841,200 Rp 2,476,129,600 Rp 412,711,600
Rp 2,918,314,116 Rp 3,331,025,716 Rp 2,836,396,204 Rp 494,629,511
Rp 2,918,314,116 Rp 3,412,943,627 Rp 2,918,314,116 Rp 494,629,511
Rp 2,918,314,116 Rp 3,412,943,627 Rp 2,918,314,116 Rp 494,629,511
Rp 2,627,456,204 Rp 3,122,085,715 Rp 2,676,754,155 Rp 445,331,560
Rp 29,268,165,348 Rp 33,793,009,779 Rp 28,828,703,788 Rp 4,964,305,991
INSTRUKSI 13
PT RODA JAYA
PT RODA JAYA
Jalan Pedati No: 1X

Badung
Bulan
Penjualan PPN Total
Januari Rp 1,341,430,933 Rp 134,143,093 Rp 1,475,574,027
Februari Rp 804,858,560 Rp 80,485,856 Rp 885,344,416
Maret Rp 2,951,148,053 Rp 295,114,805 Rp 3,246,262,859
April Rp 2,951,148,053 Rp 295,114,805 Rp 3,246,262,859
Mei Rp 2,951,148,053 Rp 295,114,805 Rp 3,246,262,859
Juni Rp 2,951,148,053 Rp 295,114,805 Rp 3,246,262,859
Juli Rp 2,951,148,053 Rp 295,114,805 Rp 3,246,262,859
Agustus Rp 2,146,289,493 Rp 214,628,949 Rp 2,360,918,443
September Rp 2,146,289,493 Rp 214,628,949 Rp 2,360,918,443
Oktober Rp 2,146,289,493 Rp 214,628,949 Rp 2,360,918,443
November Rp 2,146,289,493 Rp 214,628,949 Rp 2,360,918,443
Desember Rp 1,341,430,933 Rp 134,143,093 Rp 1,475,574,027
Total Rp 26,828,618,667 Rp 2,682,861,867 Rp 29,511,480,533
BUDGET PENERIMAAN KAS
Tabanan Bangli
Penjualan PPN Total Penjualan
Rp 1,406,410,667 Rp 140,641,067 Rp 1,547,051,733 Rp 1,061,929,067
Rp 843,846,400 Rp 84,384,640 Rp 928,231,040 Rp 637,157,440
Rp 3,094,103,467 Rp 309,410,347 Rp 3,403,513,813 Rp 2,336,243,947
Rp 3,094,103,467 Rp 309,410,347 Rp 3,403,513,813 Rp 2,336,243,947
Rp 3,094,103,467 Rp 309,410,347 Rp 3,403,513,813 Rp 2,336,243,947
Rp 3,094,103,467 Rp 309,410,347 Rp 3,403,513,813 Rp 2,336,243,947
Rp 3,094,103,467 Rp 309,410,347 Rp 3,403,513,813 Rp 2,336,243,947
Rp 2,250,257,067 Rp 225,025,707 Rp 2,475,282,773 Rp 1,699,086,507
Rp 2,250,257,067 Rp 225,025,707 Rp 2,475,282,773 Rp 1,699,086,507
Rp 2,250,257,067 Rp 225,025,707 Rp 2,475,282,773 Rp 1,699,086,507
Rp 2,250,257,067 Rp 225,025,707 Rp 2,475,282,773 Rp 1,699,086,507
Rp 1,406,410,667 Rp 140,641,067 Rp 1,547,051,733 Rp 1,061,929,067
Rp 28,128,213,333 Rp 2,812,821,333 Rp 30,941,034,667 Rp 21,238,581,333
INSTRUKSI 14

AS
Bangli Total
PPN Total Penjualan PPN
Rp 106,192,907 Rp 1,168,121,973 Rp 3,809,770,667 Rp 380,977,067
Rp 63,715,744 Rp 700,873,184 Rp 2,285,862,400 Rp 228,586,240
Rp 233,624,395 Rp 2,569,868,341 Rp 8,381,495,467 Rp 838,149,547
Rp 233,624,395 Rp 2,569,868,341 Rp 8,381,495,467 Rp 838,149,547
Rp 233,624,395 Rp 2,569,868,341 Rp 8,381,495,467 Rp 838,149,547
Rp 233,624,395 Rp 2,569,868,341 Rp 8,381,495,467 Rp 838,149,547
Rp 233,624,395 Rp 2,569,868,341 Rp 8,381,495,467 Rp 838,149,547
Rp 169,908,651 Rp 1,868,995,157 Rp 6,095,633,067 Rp 609,563,307
Rp 169,908,651 Rp 1,868,995,157 Rp 6,095,633,067 Rp 609,563,307
Rp 169,908,651 Rp 1,868,995,157 Rp 6,095,633,067 Rp 609,563,307
Rp 169,908,651 Rp 1,868,995,157 Rp 6,095,633,067 Rp 609,563,307
Rp 106,192,907 Rp 1,168,121,973 Rp 3,809,770,667 Rp 380,977,067
Rp 2,123,858,133 Rp 23,362,439,467 Rp 76,195,413,333 Rp 7,619,541,333
RUKSI 14
PT RODA JAYA

al
Total
Rp 4,190,747,733
Rp 2,514,448,640
Rp 9,219,645,013
Rp 9,219,645,013
Rp 9,219,645,013
Rp 9,219,645,013
Rp 9,219,645,013
Rp 6,705,196,373
Rp 6,705,196,373
Rp 6,705,196,373
Rp 6,705,196,373
Rp 4,190,747,733
Rp 83,814,954,667