Anda di halaman 1dari 40

REKAPITULASI

DAFTAR KUANTITAS DAN HARGA


SPESIFIKASI 2018
Owner Estimate (OE)

NAMA KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA


NAMA SUB KEGIATAN : REHABILITASI JALAN
NAMA PEKERJAAN : PERENCANAAN PEMELIHARAAN BERKALA JALAN PRAJA SIAMAN (NO. RUAS 45)
SUMBER DANA : DAU
TAHUN ANGGARAN : TA. 2023
LOKASI : KOTA PROBOLINGGO

JUMLAH HARGA
NO. DIVISI URAIAN PEKERJAAN
(Rupiah)

DIVISI 1 UMUM 8.000.000,00


DIVISI 2 SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK) 14.061.180,00
DIVISI 3 PEKERJAAN DRAINASE 480.444.095,88
DIVISI 4 PEKERJAAN TANAH DAN GEOSINTETIK 19.666.027,46
DIVISI 7 PERKERASAN ASPAL 521.142.786,77
DIVISI 8 STRUKTUR 46.906.906,97
DIVISI 10 PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN 710.708.591,58

(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 1.800.929.588,66
(B) Pajak Pertambahan Nilai ( PPN ) = 11% x (A) 198.102.254,75
(C) Jumlah Total Harga Pekerjaan = (A) + (B) 1.999.031.843,41
(D) Pembulatan 1.999.031.843,00
TERBILANG : SATU MILYAR SEMBILAN RATUS SEMBILAN PULUH SEMBILAN JUTA TIGA PULUH SATU RIBU
DELAPAN RATUS EMPAT PULUH TIGA RUPIAH

Probolinggo, …… …........... 2023


Mengetahu/Menyetujui :
Kepala Dinas Dibuat Oleh :
Pekerjaan Umum, Penataan Ruang Pejabat Pembuat Komitmen
dan Perumahan Kawasan Permukiman (PPK)

SETIORINI SAYEKTI, S.K.M., M.Si. GIGIH ARDITYAWAN PRATAMA, ST., MM.


NIP. 19740527 199703 2 002 NIP. 19870317 201101 1 008
DAFTAR KUANTITAS DAN HARGA
SPESIFIKASI 2018
Owner Estimate (OE)

NAMA KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA


NAMA SUB KEGIATAN : REHABILITASI JALAN
NAMA PEKERJAAN : PERENCANAAN PEMELIHARAAN BERKALA JALAN PRAJA SIAMAN (NO. RUAS 45)
SUMBER DANA : DAU
TAHUN ANGGARAN : TA. 2023
LOKASI : KOTA PROBOLINGGO

NO. MATA PERKIRAAN HARGA JUMLAH


PEMBAYARAN URAIAN SAT KUANTITAS SARUAN HARGA
(Rupiah) (Rupiah)
a b c d e f = (d x e)

DIVISI 1. UMUM
1.2 Mobilisasi LS 1,00 8.000.000,00 8.000.000,00

DIVISI 1 UMUM
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 8.000.000,00

DIVISI 2. SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)


1 Penyiapan dokumen penerapan SMKK:
1.1 Pembuatan dokumen RKK, RMPK, RKPPL, dan RMLLP (1 set 4 buku) Set 1,00 150.000,00 150.000,00
1.2 Pembuatan prosedur dan instruksi kerja (1 set 4 buku) Set 1,00 150.000,00 150.000,00
1.3 Penyusunan pelaporan penerapan SMKK (1 set 4 buku) Set 1,00 150.000,00 150.000,00
2 Sosialisasi dan Promosi Dan Pelatihan:
2.1 Induksi Keselamatan Konstruksi (Safety Induction) Orang 8,00 5.400,00 43.200,00
2.2 Pengarahan Keselamatan Konstruksi (Safety Briefing) Orang 8,00 4.000,00 32.000,00
2.3 Spanduk (Banner) ukuran (3m x 1m) Buah 2,00 50.000,00 100.000,00
2.4 Papan Informasi Keselamatan Konstruksi Lembar 2,00 150.000,00 300.000,00
3 Alat Pelindung Kerja (APK) dan Alat Pelindung Diri (APD)
3.1 Alat Pelindung Kerja (APK) terdiri atas:
a Pembatas area (Restricted Area) Rol 8,00 78.000,00 624.000,00
3.2 Alat Pelindung Diri (APD) terdiri atas:
a Topi pelindung (Safety Helmet) Buah 8,00 65.000,00 520.000,00
b Sepatu keselamatan (Safety Shoes, rubber safety shoes and toe cap) Pasang 8,00 100.000,00 800.000,00
c Rompi keselamatan (Safety Vest) Buah 8,00 25.000,00 200.000,00
4 Asuransi dan perizinan terkait keselamatan konstruksi:
4.1 Asuransi (Construction All Risk/ CAR) LS 1,00 2.862.000,00 2.862.000,00
5 Personel Keselamatan Konstruksi:
5.1 Ahli K3 konstruksi atau ahli keselamatan konstruksi (sebagai pimpinan UKK/personil
OP manajerial) 1,00 2.576.240,00 2.576.240,00
5.2 Petugas Pengatur Lalu Lintas OB 1,00 2.576.240,00 2.576.240,00
6 Fasilitas sarana, prasarana, dan alat kesehatan
6.1 Peralatan P3K Set 1,00 250.000,00 250.000,00
7 Rambu dan Perlengkapan lalu lintas yang diperlukan atau manajemen lalu lintas
7.1 Rambu petunjuk Buah 2,00 75.000,00 150.000,00
7.2 Rambu informasi Buah 2,00 75.000,00 150.000,00
7.3 Kerucut lalu lintas (traffic cone) Buah 2,00 100.000,00 200.000,00
8 Konsultasi dengan Ahli terkait Keselamatan Konstruksi
8.1 Ahli Struktur OJ/OK 1,00 1.000.000,00 1.000.000,00
9 Kegiatan dan peralatan terkait Pengendalian Risiko Keselamatan Konstruksi
9.1 Bendera K3 Buah 1,00 27.500,00 27.500,00
10 Manajemen Mutu
10.1 Laporan Kendali Mutu Bulan 4,00 300.000,00 1.200.000,00

DIVISI 2 SISTEM MANAJEMEN


Jumlah KESELAMATAN
Harga Pekerjaan KONSTRUKSI
DIVISI 2 (masuk (SMKK) Perkiraan Harga Pekerjaan)
pada Rekapitulasi 14.061.180,00

DIVISI 3. DRAINASE
3.3.(43) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 80x80x120 cm (Gandar 20M'ton) 210,00 2.287.829,03 480.444.095,88

DIVISI 3 PEKERJAAN DRAINASE


Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 480.444.095,88
NO. MATA PERKIRAAN HARGA JUMLAH
PEMBAYARAN URAIAN SAT KUANTITAS SARUAN HARGA
(Rupiah) (Rupiah)
a b c d e f = (d x e)

DIVISI 4. PEKERJAAN TANAH DAN GEOSINTETIK


4.1.(1) Galian Biasa M3 44,25 19.059,44 843.380,42
Normalisasi Saluran Sebelah Kiri m3 18,00 19.059,44 343.070,00
4.2.(2a) Timbunan Pilihan dari sumber galian M3 70,50 145.554,08 10.261.562,84
4.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm buah 24,00 342.417,26 8.218.014,21

DIVISI 4 PEKERJAAN TANAH


Jumlah Harga DAN GEOSINTETIK
Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 19.666.027,46

DIVISI 7. PERKERASAN ASPAL


7.1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 992,40 25.788,07 25.592.079,02
7.3(5a) Laston Lapis Aus (AC-WC) Ton 150,18 1.200.265,06 180.255.806,75
7.3(6a) Laston Lapis Antara (AC-BC) Ton 222,35 1.150.000,00 255.702.500,00
7.3.(8) Bahan anti pengelupasan Kg 525,97 113.300,00 59.592.401,00

DIVISI 7 PERKERASAN ASPAL


Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 521.142.786,77

DIVISI 8. STRUKTUR
8.1 (7a) Beton strukur, fc’20 MPa M3 42,62 1.100.584,40 46.906.906,97

DIVISI 8 STRUKTUR
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 46.906.906,97

DIVISI 10. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN


10.2.(1) Marka Jalan Termoplastik M2 93,13 149.208,95 13.895.829,55
A.4.4.3.64. Pemasangan 1 m2 paving block kubus tebal 6 cm M2 942,45 363.316,48 342.407.620,25
A.4.4.3.64.a Pemasangan 1 m Granit Disabilitas 30x30x3 cm M 432,00 202.636,57 87.538.998,10
A.4.1.1.23 Pembuatan dan Pemasangan 1 Unit bak kontrol + Cover unit 71,00 2.353.618,56 167.106.917,96
A.4.1.1.24 Pengadaan dan Penanaman Pohon Bungur Tinggi 4 m dengan diameter 10 cmunit
(Toleransi) 34,00 780.816,05 26.547.745,65
A.4.1.1.25 Pengadaan dan Pemasangan APJ Konvensional LED 120 Watt unit 5,00 11.862.296,01 59.311.480,06
A.4.1.1.25.a Deliniator Patok Lalu Lintas Besi Ø4" APJ unit 10,00 950.000,00 9.500.000,00
A.4.1.1.26 Pengadaan dan Pemasangan Rambu unit 4,00 1.100.000,00 4.400.000,00

DIVISI 10 PEKERJAAN HARIAN


Jumlah Harga & PEKERJAAN
Pekerjaan LAIN-LAIN
DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 710.708.591,58
REKAPITULASI
PERHITUNGAN VOLUME

NAMA KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA


NAMA SUB KEGIATAN : REHABILITASI JALAN
NAMA PEKERJAAN : PERENCANAAN PEMELIHARAAN BERKALA JALAN PRAJA SIAMAN (NO. RUAS 45)
SUMBER DANA : DAU
TAHUN ANGGARAN : TA. 2023
LOKASI : KOTA PROBOLINGGO

3.3.(43) 4.1.(1) 4.2.(2a) 4.4.(3) 7.1 (2a) 7.3(5a) 7.3(6a) 7.3.(8) 8.1 (7a) 10.2.(1) A.4.4.3.64. A.4.4.3.64.a A.4.1.1.23
A.4.1.1.24
Pengadaan
Gorong- dan
gorong Kotak Pembuatan Penanaman
Beton Timbunan Pemotongan Pemasangan Pemasangan dan Pohon
Lapis Perekat Laston Lapis Bahan anti Beton
Bertulang, Pilihan dari Pohon Pilihan Laston Lapis Marka Jalan 1 m2 paving 1 m Granit Pemasangan Bungur
NO. STATIONING Galian Biasa - Aspal Antara (AC- pengelupasa strukur, fc’20
ukuran dalam sumber diameter > 30 Aus (AC-WC) Termoplastik block kubus Disabilitas 1 Unit bak Tinggi 4 m
Cair/Emulsi BC) n MPa
80x80x120 galian – 50 cm tebal 6 cm 30x30x3 cm kontrol + dengan
cm (Gandar Cover diameter 10
20 ton) cm
(Toleransi)
M' M3 M3 buah Liter Ton Ton Kg M3 M2 M2 M unit unit

1 STA 0+000 - 0+025 21,00 5,50 6,25 3,00 132,12 19,99 30,39 70,02 4,50 15,26 77,50 50,00 8,00 4,00
2 STA 0+025 - 0+050 21,00 6,25 6,25 - 133,50 20,20 30,71 70,76 6,25 11,75 93,75 50,00 8,00 4,00
3 STA 0+050 - 0+075 20,00 6,25 6,25 5,00 138,00 20,88 30,68 73,14 6,25 11,33 132,50 50,00 10,00 4,00
4 STA 0+075 - 0+100 21,00 6,25 6,25 - 133,50 20,20 29,68 70,76 6,25 11,33 137,50 50,00 8,00 4,00
5 STA 0+100 - 0+125 21,00 6,25 10,75 5,00 133,50 20,20 29,07 70,76 6,25 11,75 132,50 50,00 8,00 4,00
6 STA 0+125 - 0+150 21,00 6,25 9,25 6,00 141,75 21,45 30,43 75,13 6,25 11,75 127,50 50,00 8,00 4,00
7 STA 0+150 - 0+180 26,00 7,50 11,10 2,00 180,03 27,24 41,41 95,42 6,88 20,00 126,00 60,00 8,00 4,00
8 STA 0+180 - 0+252 59,00 - 14,40 3,00 - - - - - - 115,20 72,00 13,00 6,00

JUMLAH TOTAL 210,00 44,25 70,50 24,00 992,40 150,18 222,35 525,97 42,62 93,13 942,45 432,00 71,00 34,00
PERHITUNGAN VOLUME

NAMA KEGIATAN : PENYELENGGARAAN JALAN KABUPATEN/KOTA


NAMA SUB KEGIATAN : REHABILITASI JALAN
NAMA PEKERJAAN : PERENCANAAN PEMELIHARAAN BERKALA JALAN PRAJA SIAMAN (NO. RUAS 45)
SUMBER DANA : DAU
TAHUN ANGGARAN : TA. 2023
LOKASI : KOTA PROBOLINGGO

PERHITUNGAN
NO. DIVISI ITEM PEKERJAAN STATION SUB VOL VOL SAT KET
Panjang x Lebar x Tinggi x Bj x Qty
STA 0+000 - 0+025
3.3.(43) Gorong-gorong Kotak Beton Bertulang, ukuran dalam
0+000
80x80x120
- 0+025cm (Gandar
21 20 ton) 21,00 21,00 M' BOX CULVERT KANAN
4.1.(1) Galian Biasa 0+002 - 0+004 2 x( 0,5 )x 0,25 x 2 0,25 5,50 M3 BAHU KANAN-KIRI
2
0+004 - 0+025 21 x 0,5 x 0,25 x 2 5,25 BAHU KANAN-KIRI
4.2.(2a) Timbunan Pilihan dari sumber galian 0+000 - 0+025 25 x 1 x 0,2 x 1 5,00 6,25 M3 PEDESTRIAN KANAN
25 x 0,5 x 0,05 x 2 1,25 BAHU KANAN-KIRI
4.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm0+000 - 0+025 3 3,00 3,00 buah POHON KANAN-KIRI
7.1 (2a) Lapis Perekat - Aspal Cair/Emulsi 0+000 - 0+002 2 x( 13+10 )x 0,3 x 2 13,80 132,12 Liter R
2
0+002 - 0+004 2 x( 10+8,2 )x 0,3 x 2 10,92 R
2
0+004 - 0+006 2 x( 8,2+8 )x 0,3 x 2 9,72 R
2
0+006 - 0+008 2 x( 8+8,6 )x 0,3 x 2 9,96 R
2
0+008 - 0+025 17 x 8,6 x 0,3 x 2 87,72 FULL
7.3(5a) Laston Lapis Aus (AC-WC) 0+000 - 0+002 2 x( 13+10 )x 0,04 x 2,27 2,09 19,99 Ton R
2
0+002 - 0+004 2 x( 10+8,2 )x 0,04 x 2,27 1,65 R
2
0+004 - 0+006 2 x( 8,2+8 )x 0,04 x 2,27 1,47 R
2
0+006 - 0+008 2 x( 8+8,6 )x 0,04 x 2,27 1,51 R
2
0+008 - 0+025 17 x 8,6 x 0,04 x 2,27 13,27 FULL
7.3(6a) Laston Lapis Antara (AC-BC) 0+000 - 0+002 2 x( 13+10 )x 0,06 x 2,3 3,17 30,39 Ton R
2
0+002 - 0+004 2 x( 10+8,2 )x 0,06 x 2,3 2,51 R
2
0+004 - 0+006 2 x( 8,2+8 )x 0,06 x 2,3 2,24 R
2
0+006 - 0+008 2 x( 8+8,6 )x 0,06 x 2,3 2,29 R
2
0+008 - 0+025 17 x 8,6 x 0,06 x 2,3 20,18 FULL
7.3.(8) Bahan anti pengelupasan 0+000 - 0+002 2 x( 13+10 )x 0,156 3,59 70,02 Kg HRS-WC
2
0+002 - 0+004 2 x( 10+8,2 )x 0,156 2,84 R
2
0+004 - 0+006 2 x( 8,2+8 )x 0,156 2,53 R
2
0+006 - 0+008 2 x( 8+8,6 )x 0,156 2,59 R
2
0+008 - 0+025 17 x 8,6 0,156 22,81 R
0+000 - 0+002 2 x( 13+10 )x 0,162 3,73 AC-BC
2
0+002 - 0+004 2 x( 10+8,2 )x 0,162 2,95 R
2
0+004 - 0+006 2 x( 8,2+8 )x 0,162 2,62 R
2
0+006 - 0+008 2 x( 8+8,6 )x 0,162 2,69 R
2
0+008 - 0+025 17 x 8,6 0,162 23,68 R
8.1 (7a) Beton strukur, fc’20 MPa 0+006 - 0+008 2 x( 0,5 )x 0,25 x 2 0,25 4,50 M3 BAHU KANAN-KIRI
2
0+008 - 0+025 17 x 0,5 x 0,25 x 2 4,25 BAHU KANAN-KIRI
10.2.(1) Marka Jalan Termoplastik 0+000 - 0+010 10 x 0,12 1,20 15,26 M2 TENGAH LURUS
0+000 6,5 x 0,12 0,78 TENGAH KE KIRI
0+010 - 0+025 15 / 8 x 3 x 0,12 0,68 TENGAH PUTUS-PUTUS
0+000 - 0+025 25 x 0,12 x 2 6,00 LURUS KANAN-KIRI
0+010 - 0+025 5 x 0,12 x 3,5 2,10 PARKIR KIRI
0+002 10 / 0,6 x x 0,3 x 2,5 4,50 ZEBRACROSS
A.4.4.3.64. Pemasangan 1 m2 paving block kubus tebal 6 cm0+000 - 0+025 25 x( 1,6 + 0,9 ) 31,25 77,50 M2 PEDESTRIAN KANAN
2
0+000 - 0+025 25 x( 2,2 + 1,5 ) 46,25 PEDESTRIAN KIRI
2
A.4.4.3.64.a Pemasangan 1 m Granit Disabilitas 30x30x3 cm 0+000 - 0+025 25 x 2 50,00 50,00 M PEDESTRIAN KANAN-KIRI
A.4.1.1.23 Pembuatan dan Pemasangan 1 Unit bak kontrol +0+000
Cover - 0+025 4 x 2 8,00 8,00 unit PEDESTRIAN KANAN-KIRI
A.4.1.1.24 Pengadaan dan Penanaman Pohon Bungur Tinggi0+000
4 m dengan
- 0+025
diameter2 10 cmx (Toleransi) 2 4,00 4,00 unit PEDESTRIAN KANAN-KIRI
PERHITUNGAN
NO. DIVISI ITEM PEKERJAAN STATION SUB VOL VOL SAT KET
Panjang x Lebar x Tinggi x Bj x Qty
STA 0+025 - 0+050
3.3.(43) Gorong-gorong Kotak Beton Bertulang, ukuran dalam
0+025
80x80x120
- 0+050cm (Gandar
21 20 ton) 21,00 21,00 M' BOX CULVERT KANAN
4.1.(1) Galian Biasa 0+025 - 0+050 25 x 0,5 x 0,25 x 2 6,25 6,25 M3 BAHU KANAN-KIRI
4.2.(2a) Timbunan Pilihan dari sumber galian 0+025 - 0+050 25 x 1 x 0,2 x 1 5,00 6,25 M3 PEDESTRIAN KANAN
25 x 0,5 x 0,05 x 2 1,25 BAHU KANAN-KIRI
7.1 (2a) Lapis Perekat - Aspal Cair/Emulsi 0+025 - 0+050 25 x( 8,6+9,2 )x 0,3 x 2 133,50 133,50 Liter FULL
2
7.3(5a) Laston Lapis Aus (AC-WC) 0+025 - 0+050 25 x( 8,6+9,2 )x 0,04 x 2,27 20,20 20,20 Ton FULL
2
7.3(6a) Laston Lapis Antara (AC-BC) 0+025 - 0+050 25 x( 8,6+9,2 )x 0,06 x 2,3 30,71 30,71 Ton FULL
2
7.3.(8) Bahan anti pengelupasan 0+025 - 0+050 25 x( 8,6+9,2 )x 0,156 34,71 70,76 Kg HRS-WC
2
25 x( 8,6+9,2 )x 0,162 36,05 AC-BC
2
8.1 (7a) Beton strukur, fc’20 MPa 0+025 - 0+050 25 x 0,5 x 0,25 x 2 6,25 6,25 M3 BAHU KANAN-KIRI
10.2.(1) Marka Jalan Termoplastik 0+025 - 0+050 25 / 8 x 3 x 0,12 1,13 11,75 M2 TENGAH LURUS
0+025 - 0+050 25 x 0,12 x 2 6,00 LURUS KANAN-KIRI
0+025 - 0+050 11 x 0,12 x 3,5 4,62 PARKIR KIRI
A.4.4.3.64. Pemasangan 1 m2 paving block kubus tebal 6 cm0+025 - 0+050 25 x( 0,9 + 1,8 ) 33,75 93,75 M2 PEDESTRIAN KANAN
2
0+025 - 0+050 25 x( 1,5 + 3,3 ) 60,00 PEDESTRIAN KIRI
2
A.4.4.3.64.a Pemasangan 1 m Granit Disabilitas 30x30x3 cm 0+025 - 0+050 25 x 2 50,00 50,00 M PEDESTRIAN KANAN-KIRI
A.4.1.1.23 Pembuatan dan Pemasangan 1 Unit bak kontrol +0+025
Cover - 0+050 4 x 2 8,00 8,00 unit PEDESTRIAN KANAN-KIRI
A.4.1.1.24 Pengadaan dan Penanaman Pohon Bungur Tinggi0+025
4 m dengan
- 0+050
diameter2 10 cmx (Toleransi) 2 4,00 4,00 unit PEDESTRIAN KANAN-KIRI

STA 0+050 - 0+075


3.3.(43) Gorong-gorong Kotak Beton Bertulang, ukuran dalam
0+050
80x80x120
- 0+075cm (Gandar
20 20 ton) 20,00 20,00 M' BOX CULVERT KANAN
4.1.(1) Galian Biasa 0+050 - 0+075 25 x 0,5 x 0,25 x 2 6,25 6,25 M3 BAHU KANAN-KIRI
4.2.(2a) Timbunan Pilihan dari sumber galian 0+050 - 0+075 25 x 1 x 0,2 x 1 5,00 6,25 M3 PEDESTRIAN KANAN
25 x 0,5 x 0,05 x 2 1,25
4.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm0+050 - 0+075 5 5,00 5,00 buah POHON KANAN-KIRI
7.1 (2a) Lapis Perekat - Aspal Cair/Emulsi 0+050 - 0+075 25 x 9,2 x 0,3 x 2 138,00 138,00 Liter FULL
7.3(5a) Laston Lapis Aus (AC-WC) 0+050 - 0+075 25 x 9,2 x 0,04 x 2,27 20,88 20,88 Ton FULL
7.3(6a) Laston Lapis Antara (AC-BC) 0+050 - 0+075 25 x 9,2 x 0,06 x 2,3 30,68 30,68 Ton FULL
7.3.(8) Bahan anti pengelupasan 0+050 - 0+075 25 x 9,2 x 0,156 35,88 73,14 Kg HRS-WC
25 x 9,2 x 0,162 37,26 AC-BC
8.1 (7a) Beton strukur, fc’20 MPa 0+050 - 0+075 25 x 0,5 x 0,25 x 2 6,25 6,25 M3 BAHU KANAN-KIRI
10.2.(1) Marka Jalan Termoplastik 0+050 - 0+075 25 / 8 x 3 x 0,12 1,13 11,33 M2 TENGAH LURUS
0+050 - 0+075 25 x 0,12 x 2 6,00 LURUS KANAN-KIRI
0+050 - 0+075 10 x 0,12 x 3,5 4,20 PARKIR KIRI
A.4.4.3.64. Pemasangan 1 m2 paving block kubus tebal 6 cm0+050 - 0+075 25 x( 1,8 + 2,2 ) 50,00 132,50 M2 PEDESTRIAN KANAN
2
0+050 - 0+075 25 x 3,3 82,50 PEDESTRIAN KIRI
A.4.4.3.64.a Pemasangan 1 m Granit Disabilitas 30x30x3 cm 0+050 - 0+075 25 x 2 50,00 50,00 M PEDESTRIAN KANAN-KIRI
A.4.1.1.23 Pembuatan dan Pemasangan 1 Unit bak kontrol +0+050
Cover - 0+075 5 x x 2 10,00 10,00 unit PEDESTRIAN KANAN-KIRI
A.4.1.1.24 Pengadaan dan Penanaman Pohon Bungur Tinggi0+050
4 m dengan
- 0+075
diameter2 10 cm (Toleransi) x 2 4,00 4,00 unit PEDESTRIAN KANAN-KIRI

STA 0+075 - 0+100


3.3.(43) Gorong-gorong Kotak Beton Bertulang, ukuran dalam
0+07580x80x120
- 0+100cm (Gandar
21 20 ton) 21,00 21,00 M' BOX CULVERT KANAN
4.1.(1) Galian Biasa 0+075 - 0+100 25 x 0,5 x 0,25 x 2 6,25 6,25 M3 BAHU KANAN-KIRI
4.2.(2a) Timbunan Pilihan dari sumber galian 0+075 - 0+100 25 x 1 x 0,2 x 1 5,00 6,25 M3 PEDESTRIAN KANAN
25 x 0,5 x 0,05 x 2 1,25 BAHU KANAN-KIRI
7.1 (2a) Lapis Perekat - Aspal Cair/Emulsi 0+075 - 0+100 25 x( 8,6+9,2 )x 0,3 x 2 133,50 133,50 Liter FULL
2
7.3(5a) Laston Lapis Aus (AC-WC) 0+075 - 0+100 25 x( 8,6+9,2 )x 0,04 x 2,27 20,20 20,20 Ton FULL
2
7.3(6a) Laston Lapis Antara (AC-BC) 0+075 - 0+100 25 x( 8,6+9,2 )x 0,06 x 2,3 29,68 29,68 Ton FULL
2
7.3.(8) Bahan anti pengelupasan 0+075 - 0+100 25 x( 8,6+9,2 )x 0,156 34,71 70,76 Kg HRS-WC
2
25 x( 8,6+9,2 )x 0,162 36,05 AC-BC
2
8.1 (7a) Beton strukur, fc’20 MPa 0+075 - 0+100 25 x 0,5 x 0,25 x 2 6,25 6,25 M3 BAHU KANAN-KIRI
10.2.(1) Marka Jalan Termoplastik 0+075 - 0+100 25 / 8 x 3 x 0,12 1,13 11,33 M2 TENGAH LURUS
0+075 - 0+100 25 x 0,12 x 2 6,00 LURUS KANAN-KIRI
0+075 - 0+100 10 x 0,12 x 3,5 4,20 PARKIR KIRI
A.4.4.3.64. Pemasangan 1 m2 paving block kubus tebal 6 cm0+075 - 0+100 25 x 2,2 55,00 137,50 M2 PEDESTRIAN KANAN
0+075 - 0+100 25 x 3,3 82,50 PEDESTRIAN KIRI
A.4.4.3.64.a Pemasangan 1 m Granit Disabilitas 30x30x3 cm 0+075 - 0+100 25 x 2 50,00 50,00 M PEDESTRIAN KANAN-KIRI
A.4.1.1.23 Pembuatan dan Pemasangan 1 Unit bak kontrol +0+075
Cover - 0+100 4 x 2 8,00 8,00 unit PEDESTRIAN KANAN-KIRI
A.4.1.1.24 Pengadaan dan Penanaman Pohon Bungur Tinggi0+0754 m dengan
- 0+100
diameter2 10 cmx (Toleransi) 2 4,00 4,00 unit PEDESTRIAN KANAN-KIRI
PERHITUNGAN
NO. DIVISI ITEM PEKERJAAN STATION SUB VOL VOL SAT KET
Panjang x Lebar x Tinggi x Bj x Qty
STA 0+100 - 0+125
3.3.(43) Gorong-gorong Kotak Beton Bertulang, ukuran dalam
0+100
80x80x120
- 0+125cm (Gandar
21 20 ton) 21,00 21,00 M' BOX CULVERT KANAN
4.1.(1) Galian Biasa 0+100 - 0+125 25 x 0,5 x 0,25 x 2 6,25 6,25 M3 BAHU KANAN-KIRI
4.2.(2a) Timbunan Pilihan dari sumber galian 0+100 - 0+125 25 x 1,9 x 0,2 x 1 9,50 10,75 M3 PEDESTRIAN KANAN
25 x 0,5 x 0,05 x 2 1,25 BAHU KANAN-KIRI
4.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm0+100 - 0+125 5 5,00 5,00 buah POHON KANAN-KIRI
7.1 (2a) Lapis Perekat - Aspal Cair/Emulsi 0+100 - 0+125 25 x( 8,5+9,3 )x 0,3 x 2 133,50 133,50 Liter FULL
2
7.3(5a) Laston Lapis Aus (AC-WC) 0+100 - 0+125 25 x( 8,5+9,3 )x 0,04 x 2,27 20,20 20,20 Ton FULL
2
7.3(6a) Laston Lapis Antara (AC-BC) 0+100 - 0+125 25 x( 8,5+9,3 )x 0,06 x 2,3 29,07 29,07 Ton FULL
2
7.3.(8) Bahan anti pengelupasan 0+100 - 0+125 25 x( 8,5+9,3 )x 0,156 34,71 70,76 Kg HRS-WC
2
25 x( 8,5+9,3 )x 0,162 36,05 AC-BC
2
8.1 (7a) Beton strukur, fc’20 MPa 0+100 - 0+125 25 x 0,5 x 0,25 x 2 6,25 6,25 M3 BAHU KANAN-KIRI
10.2.(1) Marka Jalan Termoplastik 0+100 - 0+125 25 / 8 x 3 x 0,12 1,13 11,75 M2 TENGAH LURUS
0+100 - 0+125 25 x 0,12 x 2 6,00 LURUS KANAN-KIRI
0+100 - 0+125 11 x 0,12 x 3,5 4,62 PARKIR KIRI
A.4.4.3.64. Pemasangan 1 m2 paving block kubus tebal 6 cm0+100 - 0+125 25 x( 2,2 + 1,6 ) 47,50 132,50 M2 PEDESTRIAN KANAN
2
0+100 - 0+125 25 x 3,4 85,00 PEDESTRIAN KIRI
A.4.4.3.64.a Pemasangan 1 m Granit Disabilitas 30x30x3 cm 0+100 - 0+125 25 x 2 50,00 50,00 M PEDESTRIAN KANAN-KIRI
A.4.1.1.23 Pembuatan dan Pemasangan 1 Unit bak kontrol +0+100
Cover - 0+125 4 x 2 8,00 8,00 unit PEDESTRIAN KANAN-KIRI
A.4.1.1.24 Pengadaan dan Penanaman Pohon Bungur Tinggi0+100
4 m dengan
- 0+125
diameter2 10 cmx (Toleransi) 2 4,00 4,00 unit PEDESTRIAN KANAN-KIRI

STA 0+125 - 0+150


3.3.(43) Gorong-gorong Kotak Beton Bertulang, ukuran dalam
0+12580x80x120
- 0+150cm (Gandar
21 20 ton) 21,00 21,00 M' BOX CULVERT KANAN
4.1.(1) Galian Biasa 0+125 - 0+150 25 x 0,5 x 0,25 x 2 6,25 6,25 M3 BAHU KANAN-KIRI
4.2.(2a) Timbunan Pilihan dari sumber galian 0+125 - 0+150 25 x 1,6 x 0,2 x 1 8,00 9,25 M3 PEDESTRIAN KANAN
25 x 0,5 x 0,05 x 2 1,25 BAHU KANAN-KIRI
4.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm0+125 - 0+150 6 6,00 6,00 buah POHON KANAN-KIRI
7.1 (2a) Lapis Perekat - Aspal Cair/Emulsi 0+125 - 0+150 25 x( 9,3+9,6 )x 0,3 x 2 141,75 141,75 Liter FULL
2
7.3(5a) Laston Lapis Aus (AC-WC) 0+125 - 0+150 25 x( 9,3+9,6 )x 0,04 x 2,27 21,45 21,45 Ton FULL
2
7.3(5a) Laston Lapis Aus (AC-WC) 0+125 - 0+150 25 x( 9,3+9,6 )x 0,06 x 2,3 30,43 30,43 Ton FULL
2
7.3.(8) Bahan anti pengelupasan 0+125 - 0+150 25 x( 9,3+9,6 )x 0,156 36,86 75,13 Kg HRS-WC
2
0+125 - 0+150 25 x( 9,3+9,6 )x 0,162 38,27 AC-BC
2
8.1 (7a) Beton strukur, fc’20 MPa 0+125 - 0+150 25 x 0,5 x 0,25 x 2 6,25 6,25 M3 BAHU KANAN-KIRI
10.2.(1) Marka Jalan Termoplastik 0+125 - 0+150 25 / 8 x 3 x 0,12 1,13 11,75 M2 TENGAH LURUS
0+125 - 0+150 25 x 0,12 x 2 6,00 LURUS KANAN-KIRI
0+125 - 0+150 11 x 0,12 x 3,5 4,62 PARKIR KIRI
A.4.4.3.64. Pemasangan 1 m2 paving block kubus tebal 6 cm0+125 - 0+150 25 x 1,6 40,00 127,50 M2 PEDESTRIAN KANAN
0+125 - 0+150 25 x 3,5 87,50 PEDESTRIAN KIRI
A.4.4.3.64.a Pemasangan 1 m Granit Disabilitas 30x30x3 cm 0+125 - 0+150 25 x 2 50,00 50,00 M PEDESTRIAN KANAN-KIRI
A.4.1.1.23 Pembuatan dan Pemasangan 1 Unit bak kontrol +0+125
Cover - 0+150 4 x 2 8,00 8,00 unit PEDESTRIAN KANAN-KIRI
A.4.1.1.24 Pengadaan dan Penanaman Pohon Bungur Tinggi0+1254 m dengan
- 0+150
diameter2 10 cmx (Toleransi) 2 4,00 4,00 unit PEDESTRIAN KANAN-KIRI
PERHITUNGAN
NO. DIVISI ITEM PEKERJAAN STATION SUB VOL VOL SAT KET
Panjang x Lebar x Tinggi x Bj x Qty
STA 0+150 - 0+180
3.3.(43) Gorong-gorong Kotak Beton Bertulang, ukuran dalam
0+15080x80x120
- 0+180cm (Gandar
26 20 ton) 26,00 26,00 M' BOX CULVERT KANAN
4.1.(1) Galian Biasa 0+150 - 0+180 30 x 0,5 x 0,25 x 2 7,50 7,50 M3 BAHU KANAN-KIRI
4.2.(2a) Timbunan Pilihan dari sumber galian 0+150 - 0+180 30 x 1,6 x 0,2 x 1 9,60 11,10 M3 PEDESTRIAN KANAN
30 x 0,5 x 0,05 x 2 1,50 BAHU KANAN-KIRI
4.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm0+150 - 0+180 2 2,00 2,00 buah POHON KANAN-KIRI
7.1 (2a) Lapis Perekat - Aspal Cair/Emulsi 0+150 - 0+175 25 x 9,6 x 0,3 x 2 144,00 180,03 Liter FULL
0+175 - 0+176 1 x( 9,6+10,5 )x 0,3 x 2 6,03 R
2
0+176 - 0+178 2 x( 10,5+12,5 )x 0,3 x 2 13,80 R
2
0+178 - 0+180 2 x( 12,5+14,5 )x 0,3 x 2 16,20 R
2
7.3(5a) Laston Lapis Aus (AC-WC) 0+150 - 0+175 25 x 9,6 x 0,04 x 2,27 21,79 27,24 Ton FULL
0+175 - 0+176 1 x( 9,6+10,5 )x 0,04 x 2,27 0,91 R
2
0+176 - 0+178 2 x( 10,5+12,5 )x 0,04 x 2,27 2,09 R
2
0+178 - 0+180 2 x( 12,5+14,5 )x 0,04 x 2,27 2,45 R
2
7.3(6a) Laston Lapis Antara (AC-BC) 0+150 - 0+175 25 x 9,6 x 0,06 x 2,3 33,12 41,41 Ton FULL
0+175 - 0+176 1 x( 9,6+10,5 )x 0,06 x 2,3 1,39 R
2
0+176 - 0+178 2 x( 10,5+12,5 )x 0,06 x 2,3 3,17 R
2
0+178 - 0+180 2 x( 12,5+14,5 )x 0,06 x 2,3 3,73 R
2
7.3.(8) Bahan anti pengelupasan 0+150 - 0+175 25 x 9,6 x 0,156 37,44 95,42 Kg HRS-WC
0+175 - 0+176 1 x( 9,6+10,5 )x 0,156 1,57 R
2
0+176 - 0+178 2 x( 10,5+12,5 )x 0,156 3,59 R
2
0+178 - 0+180 2 x( 12,5+14,5 )x 0,156 4,21 R
2
0+150 - 0+175 25 x 9,6 x 0,162 38,88 AC-BC
0+175 - 0+176 1 x( 9,6+10,5 )x 0,162 1,63 R
2
0+176 - 0+178 2 x( 10,5+12,5 )x 0,162 3,73 R
2
0+178 - 0+180 2 x( 12,5+14,5 )x 0,162 4,37 R
2
8.1 (7a) Beton strukur, fc’20 MPa 0+150 - 0+175 25 x 0,5 x 0,25 x 2 6,25 6,88 M3 BAHU KANAN-KIRI
0+175 - 0+180 5 x( 0,5 )x 0,25 x 2 0,63 BAHU KANAN-KIRI
2
10.2.(1) Marka Jalan Termoplastik 0+150 - 0+170 20 / 8 x 3 x 0,12 0,90 20,00 M2 TENGAH PUTUS-PUTUS
0+170 - 0+180 10 x 0,12 1,20 TENGAH LURUS
0+180 7,25 x 0,12 0,87 TENGAH KE KIRI
0+150 - 0+180 30 x 0,12 x 2 7,20 LURUS KANAN-KIRI
0+150 - 0+178 10 x 0,12 x 3,5 4,20 PARKIR KIRI
0+178 12,5 / 0,6 x x 0,3 x 2,5 5,63 ZEBRACROSS
A.4.4.3.64. Pemasangan 1 m2 paving block kubus tebal 6 cm0+150 - 0+180 30 x 1,6 48,00 126,00 M2 PEDESTRIAN KANAN
0+150 - 0+180 30 x 2,6 78,00 PEDESTRIAN KIRI
A.4.4.3.64.a Pemasangan 1 m Granit Disabilitas 30x30x3 cm 0+150 - 0+180 30 x 2 60,00 60,00 M PEDESTRIAN KANAN-KIRI
A.4.1.1.23 Pembuatan dan Pemasangan 1 Unit bak kontrol +0+150
Cover - 0+180 4 x 2 8,00 8,00 unit PEDESTRIAN KANAN-KIRI
A.4.1.1.24 Pengadaan dan Penanaman Pohon Bungur Tinggi0+1504 m dengan
- 0+180
diameter2 10 cmx (Toleransi) 2 4,00 4,00 unit PEDESTRIAN KANAN-KIRI

MASUK JL. PAHLAWAN


STA 0+180 - 0+252
3.3.(43) Gorong-gorong Kotak Beton Bertulang, ukuran dalam
0+18080x80x120
- 0+252cm (Gandar
59 20 ton) 59,00 59,00 M' BOX CULVERT KANAN
4.2.(2a) Timbunan Pilihan dari sumber galian 0+180 - 0+252 72 x 1 x 0,2 x 1 14,40 14,40 M3 PEDESTRIAN KANAN
4.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm0+180 - 0+252 3 3,00 3,00 buah POHON KANAN-KIRI
A.4.4.3.64. Pemasangan 1 m2 paving block kubus tebal 6 cm0+180 - 0+252 72 x 1,6 115,20 115,20 M2 PEDESTRIAN KANAN
A.4.4.3.64.a Pemasangan 1 m Granit Disabilitas 30x30x3 cm 0+180 - 0+252 72 72,00 72,00 M PEDESTRIAN KANAN
A.4.1.1.23 Pembuatan dan Pemasangan 1 Unit bak kontrol +0+180
Cover - 0+252 13 x 13,00 13,00 unit PEDESTRIAN KANAN
A.4.1.1.24 Pengadaan dan Penanaman Pohon Bungur Tinggi0+1804 m dengan
- 0+252
diameter6 10 cm (Toleransi) 6,00 6,00 unit PEDESTRIAN KANAN
DAFTAR
HARGA DASAR SATUAN BAHAN

HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)

1 Pasir Pasang (Sedang) M01b M3 133.333,33 Base Camp


2 Pasir Beton (Kasar) M01a M3 225.000,00 Base Camp
3 Pasir Halus (untuk HRS) M01c M3 225.000,00 Base Camp
4 Pasir Urug M01d M3 100.000,00 Base Camp
5 Batu Kali M02 M3 225.000,00 Lokasi Pekerjaan
6 Agregat Pecah Kasar M03 M3 225.000,00 Base Camp
7 Agg. Halus LP A M04 M3 229.500,00 Base Camp
8 Agregat Lolos # 1 " M38 M3 234.770,26 Base Camp
9 Lolos screen1 ukuran ( 0 - 5) M89a M3 292.510,00 Base Camp
10 Lolos screen2 ukuran ( 0 - 5) M89b M3 291.590,00 Base Camp
11 Lolos screen2 ukuran ( 5 - 9,5) M89c M3 281.610,00 Base Camp
12 Lolos screen2 ukuran ( 9.5 - 19,0) M89d M3 284.110,00 Base Camp
13 F i l l e r (non semen) (limestone dust, kapur padam, dolomit,
M05 fly ash)
Kg 1.440,00 Proses/Base Camp
14 Batu Belah / Kerakal M06 M3 225.000,00 Lokasi Pekerjaan
15 Gravel M07 M3 530.800,00 Base Camp
16 Bahan Tanah Timbunan M08 M3 194.010,00 Borrow Pit/quarry
17 Bahan Pilihan M09 M3 217.500,00 Quarry
18 Aspal M10 Kg 11.500,00 Base Camp
19 Kerosen / Minyak Tanah M11 LITER 12.000,00 Base Camp
20 Semen / PC (40kg) - Zak 51.000,00
21 Semen / PC (kg) (Dinamix Merah) M12 Kg 1.275,00
22 Besi Beton M13 Kg 10.701,79 Lokasi Pekerjaan
23 Kawat Beton M14 Kg 22.000,00 Lokasi Pekerjaan
24 Kawat Bronjong M15 Kg 22.000,00 Lokasi Pekerjaan
25 Sirtu M16 M3 200.000,00 Lokasi Pekerjaan
26 S i r t u (4 ≤ PI ≤10 ; LL ≤ 35 %) M3 200.000,00
27 S i r t u (4 ≤ PI ≤15 ; LL ≤ 35 %) M3 200.000,00
28 Cat Marka (Non Thermoplas) M17a Kg 63.000,00 Lokasi Pekerjaan
29 Cat Marka (Thermoplastic) M17b Kg 34.600,00 Lokasi Pekerjaan
30 Paku M18 Kg 21.500,00 Lokasi Pekerjaan
31 Kayu Perancah M19 M3 2.500.000,00 Lokasi Pekerjaan
32 Bensin M20 LITER 8.000,00 Pertamina
33 Solar M21 LITER 7.000,00 Pertamina
34 Minyak Pelumas / Oli M22 LITER 51.800,00 Pertamina
35 Plastik Filter M23 M2 18.411,00 Lokasi Pekerjaan
36 Pipa Galvanis Dia. 1.6" M24 Batang 125.000,00 Lokasi Pekerjaan
37 Pipa Porus diameter 4" M25 M' 40.000,00 Lokasi Pekerjaan
39 Agr. Kelas A (analisis) M26 M3 316.511,38 Base Camp
41 Agr. Kelas B (analisis) M27 M3 286.546,46 Base Camp
44 Arg. Kelas S (analisis) M29 M3 177.754,91 Base Camp
45 Lapis Drainase (analisis) M3 316.681,72 Base Camp
46 Geotextile M30 M2 34.388,77 Lokasi Pekerjaan
47 Aspal Emulsi M31 Kg 13.400,00 Base Camp
48 Gebalan Rumput M32 M2 5.514,00 Lokasi Pekerjaan
49 Thinner M33 LITER 48.124,00 Lokasi Pekerjaan
50 Glass Bead M34 Kg 19.400,00 Lokasi Pekerjaan
51 Pelat Rambu (Eng. Grade) M35a BH 176.000,00 Lokasi Pekerjaan
52 Pelat Rambu (High I. Grade) M35b BH 216.500,00 Lokasi Pekerjaan
53 Rel Pengaman M36 M' 1.100.000,00 Lokasi Pekerjaan
54 Beton Struktur Fc' 25 Mpa M37 M3 1.018.843,18 Lokasi Pekerjaan
55 Baja Tulangan (Polos) U24 M39a Kg 8.900,00 Lokasi Pekerjaan
56 Baja Tulangan (Ulir) D32 M39b Kg 13.000,00 Lokasi Pekerjaan
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)
57 Kapur M40 M3 265.000,00 Hasil Proses
58 Chipping M41 M3 353.384,18 Base Camp
59 Chipping (kg) M41 Kg 576,48 Base Camp
60 Cat M42 Kg 27.500,00 Base Camp
61 Pemantul Cahaya (Reflector) M43 Bh. 12.600,00 Base Camp
62 Pasir Urug M44 M3 236.600,00 Base Camp
63 Arbocell M45 Kg. 32.000,00 Base Camp
64 Baja Bergelombang M46 Kg 12.500,00 Lokasi Pekerjaan
65 Beton Fc' 10 MPa M47 M3 994.208,54 Lokasi Pekerjaan
66 Baja Struktur M48 Kg 8.900,00 Pelabuhan terdekat
67 Tiang Pancang Baja M49 M' 25.247,37 Lokasi Pekerjaan
68 Tiang Pancang Beton Pratekan M50 M3 423.957,93 Pelabuhan terdekat
69 Kawat Las M51 Dos 16.000,00 Lokasi Pekerjaan
70 Pipa Baja M52 Kg 15.000,00 Pelabuhan terdekat
71 Minyak Fluks M53 Liter 6.237,00 Base Camp
72 Bunker Oil M54 Liter 3.000,00 Base Camp
73 Asbuton Halus M55 Ton 325.000,00 Base Camp
74 Baja Prategang M56 Kg 529.645,16 Base Camp
75 Baja Tulangan M57a Kg 8.900,00 Lokasi Pekerjaan
76 Baja Tulangan (Ulir) D39 M39c Kg 12.672,00 Lokasi Pekerjaan
77 Baja Tulangan (Ulir) D48 M39d Kg 12.672,00 Lokasi Pekerjaan
78 PCI Girder L=17m M58a Buah 86.000.000,00 Pelabuhan terdekat
79 PCI Girder L=21m M58b Buah 97.000.000,00 Pelabuhan terdekat
80 PCI Girder L=26m M58c Buah 124.000.000,00 Pelabuhan terdekat
81 PCI Girder L=32m M58d Buah 157.000.000,00 Pelabuhan terdekat
82 PCI Girder L=36m M58e Buah 168.000.000,00 Pelabuhan terdekat
83 PCI Girder L=41m M58f Buah 192.000.000,00 Pelabuhan terdekat
84 Beton Struktur Fc' 30 MPa M59 M3 1.376.833,75 Lokasi Pekerjaan
85 Beton Struktur Fc' 15 MPa M60 M3 964.338,00 Lokasi Pekerjaan
86 Cerucuk M61 M 15.000,00
87 Elastomer M62 buah 505.304,00
88 Bahan pengawet: kreosot M63 liter 5.000,00
89 Mata Kucing M64 buah 75.000,00
90 Anchorage M65 buah 31.778.709,75
91 Anti strpping agent M66 Kg 100.000,00
92 Bahan Modifikasi M67 Kg 1.000,00
93 Beton Struktur Fc' 50 MPa M68 M3 1.550.816,32
94 Beton Struktur Fc' 40 MPa M69 M3 1.484.441,34
95 Ducting (Kabel prestress) M70 M' 150.000,00
96 Ducting (Strand prestress) M71 M' 50.000,00
97 Beton Fc' 35 MPa M72 M3 1.428.705,67
98 Multipleks 12 mm M73 Lbr 181.500,00
99 Elastomer jenis 1 M74a buah 385.500,00 Base Camp
100 Elastomer jenis 2 M74b buah 650.000,00 Base Camp
101 Elastomer jenis 3 M74c buah 838.000,00 Base Camp
102 Expansion Tipe Joint Asphaltic Plug M75d M 1.000.000,00 Base Camp
103 Expansion Join Tipe Rubber M75e M 1.200.000,00 Base Camp
104 Expansion Join Baja Siku M75f M 275.000,00 Base Camp
105 Marmer M76 Buah 400.000,00 Base Camp
106 Kerb Type A M77 Buah 45.000,00 Base Camp
107 Paving Block M78 Buah 40.000,00 Lokasi Pekerjaan
108 Mini Timber Pile M79 Buah 27.000,00 Lokasi Pekerjaan
109 Expansion Joint Tipe Torma M80 M1 1.200.000,00 Lokasi Pekerjaan
110 Strip Bearing M81 Buah 229.500,00 Lokasi Pekerjaan
111 Joint Socket Pile 35x35 M82 Set 607.500,00 Lokasi Pekerjaan
112 Joint Socket Pile 16x16x16 M83 Set 67.500,00 Lokasi Pekerjaan
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)
113 Mikro Pile 16x16x16 M84 M1 60.750,00 Lokasi Pekerjaan
114 Matras Concrete M85 Buah 405.000,00 Lokasi Pekerjaan
115 Assetilline M86 Botol 229.500,00 Lokasi Pekerjaan
116 Oxygen M87 Botol 114.750,00 Lokasi Pekerjaan
117 Batu Bara M88 Kg 600,00 Lokasi Pekerjaan
118 Pipa Galvanis Dia 3" M24a M 20.000,00
119 Pipa Galvanis Dia 1,5" M24b M 15.000,00
120 Agregat Pecah Mesin 0-5 mm M91 M3 261.000,00
121 Agregat Pecah Mesin 5-10 & 10-20 mm M92 M3 287.000,00
122 Agregat Pecah Mesin 20-30 mm M93 M3 287.000,00
123 Joint Sealent M94 Kg 34.100,00
124 Cat Anti Karat M95 Kg 35.750,00
125 Expansion Cap M96 Kg 6.050,00
126 Polytene 125 mikron M97 Kg 19.250,00
127 Curing Compound M98 Ltr 38.500,00
128 Kayu Acuan M99 Kg 2.500.000,00
129 Additive M67a Kg 38.500,00
130 Casing M100 M2 9.000,00
131 Pasir Tailing M101 M3 259.000,00 Base Camp
132 Polimer M102 45.000,00 Base Camp
133 Batubara M103 kg 500,00 Base Camp
134 Kerb jenis 1 M104 Buah 45.000,00
135 Kerb jenis 2 M105 Buah 50.000,00
136 Kerb jenis 3 M106 Buah 55.000,00
137 Bahan Modifikasi M107 Kg 75.000,00
138 Aditif anti pengelupasan M108 Liter 100.000,00
139 Bahan Pengisi (Filler) Tambahan M109 Kg 1.275,00
140 Asbuton yang diproses M110 Kg 30.000,00
141 Elastomer Alam M111 Kg 30.000,00
142 Elastomer Sintesis M112 Kg 30.000,00
143 Anchorage M113 Buah 255.750,00
144 - hidup M114 bh 750.000,00
145 - mati M115 bh 400.000,00
146 Kabel Prategang M116 Kg 192.256,00
147 - Selongsong M117 M' 98.400,00
148 - Baja Prategang M118 Kg 582.609,68
149 - Grouting M119 M2 6.759,16
155 Cairan Perekat (Epoxy Resin) M125 Kg 30.000,00
156 Epoxy Bahan Penutup (sealant) M126 Kg 34.100,00
157 Alat Penyuntik Anti Gravitasi M127 Kg 135.000,00 alat penyuntik epoxy
160 Acuan/multipleks M130 M3 170.000,00
162 Pipa Galvanis Dia 8" M132 M 17.500,00
164 Baut Angkur M134 Kg 25.000,00
172 Kayu Kelas 1 M142 Kg 5.000.000,00
174 Timbunan/urugan Porous M144 M3 268.610,73
189 Aspal Emulsi CSS-1 atau SS-1 M31a Liter 13.850,00 Base Camp
190 Aspal Emulsi CRS-1 atau RS-1 M31b Liter 13.400,00 Base Camp
191 Aspal Emulsi Modifikasi Polimer 1h M31c Liter 13.000,00 Base Camp
192 Aspal Emulsi Modifikasi Polimer 2h M31d Liter 13.900,00 Base Camp
193 Serat Selulosa M158 KG 22.500,00 mulai ganti nomor
194 Zeolit M159 KG 6.000,00
195 Wax M160 KG 32.085,00
196 Asbuton B 5/20 M161 KG 950,00
197 CPHMA M162 Ton 900.000,00
198 Asbuton B 50/20 M163 KG 1.000,00
199 Pasir Kasar M164 M3 225.000,00
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)
200 Pipa Porus diameter 5" M25a M' 77.000,00
201 Pipa Porus diameter 6" M25b M' 110.000,00
202 Pipa Porus diameter 8" M25c M' 142.500,00
203 Backer rod 3/8 inci M165 Kg 10.833,33
204 Cairan Perekat (Epoxy Resin) 2 komponen M166 Ltr 350.000,00
205 Semen alumina M167 Kg 13.493,16
206 Semen (OPC) M168 Kg 1.440,00
207 Pasir Kasar M134 M3 200.000,00
208 AK-2 (10/20) M169 M3 235.000,00
209 Air M170 Liter 14,65 2569/kubik
210 Super plastiziser, maks 0,3 % Sm M171 Kg 40.000,00
211 curing compound (pigmen putih) M172 Ltr 38.500,00
212 BjTP 280 M173 Kg 8.889,00
213 Concrete Grouting Non srinkage HWR M174 Kg 6.759,16
214 Plastik membrane polyethylene 125 mikron M175 Kg 63.250,00
215 Mortar semen cepat mengeras (RSC) M176 Kg 4.296,30
216 Mortar pre-packed untuk stiching M177 Kg 7.100,00
217 Termoplastik (sealant tuang panas) M178 Kg 28.985,00
218 Backer rod 1 1/6 inci M179 M1 16.554,86
219 Termoseting (sealant tuang dingin) M180 Kg 65.333,33
220 Bahan grouting tersedia jenis preformed M181 Kg 24.722,50
221 Plastizier' M182 Kg 40.000,00
222 Rapid Setting Material (Beton Semen Fast Track < 24M183
jam) M3 2.623.471,18
223 Thermocouple M184 Buah 25.000,00
224 Beton Struktur fc' 45 MPa M185 M3 1.540.406,70
225 Beton Struktur fc' 20 MPa M186 M3 1.000.531,27
226 Baja Struktur Grade 345 (Kuat Leleh 345 MPa) M187 Kg 17.000,00
227 Baja Struktur Grade 485 (Kuat Leleh 485 MPa) M188 Kg 18.000,00
228 Baja Struktur Grade 690 (Kuat Leleh 690 Mpa untuk Tebal
M189Pelat Kg 22.000,00
229 Baja Struktur Grade 690 (Kuat Leleh 620 Mpa untuk Tebal
M190Pelat > Kg
2,5 - 4,0 inch) 19.000,00
230 Casing, diameter 800 mm M191 Rp/M' 42.464,64
231 Bahan turap kayu tanpa pengawetan M192 M3/M' 1.300.000,00
232 Berat H Beam per m' M193 8.789,14
233 Strand 1/2 inci M194 19.182,87
234 Perancah/ formwoks M195 45.000,00
235 Bahan Turap Kayu dengan pengawetan M196 M3/M' 1.000.000,00
236 Kreosot M197 Kg 10.000,00
237 Bonding Agent M198 Ltr 40.000,00
238 Cat dasar beton M199 Kg 29.387,76
239 Cat akhir protektif beton M200 Kg 16.428,57
240 Cat akhir dekoratif beton M201 Kg 20.000,00
241 Cat dasar baja M202 Kg 65.000,00
250 Baut Mutu Tinggi A490 Tipe 1 diameter M25 M211 Buah 19.500,00
255 Elektroda Las SAW M216 Kg 15.000,00
262 Baut dan Mur M223 Buah 30.000,00
265 Perkerasan beton fast track <8 jam M226 Kg 3.039.037,55
266 Silicon Seal M227 Kg 30.000,00
267 Karet Pengisi Sambungan Strip Seal M228 M' 1.200.000,00
268 Karet Pengisi Sambungan Compression Seal M229 M' 1.200.000,00
269 Sambungan siar muai tipe modular M230 M' 40.000,00
270 Sambungan siar muai tipe finger plate M231 M' 3.500.000,00
273 Landasan logam berongga (Pot Bearing) M234 Buah 3.331.619,28
274 Landasan logam jenis Spherical M235 Buah 4.500.000,00
276 Lem PVC M237 Kg 45.000,00
277 Tiang sandaran baja M238 M' 150.000,00
278 Deck Drain M239 Buah 100.000,00
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)
279 Pipa PVC M240 M' 75.000,00
280 Pipa Baja M241 M' 400.000,00
281 Sambungan Pipa PVC M242 Buah 15.000,00
282 Sambungan Pipa Baja M243 Buah 35.000,00
283 Baja Tulangan (Furnished) M57b Kg 13.676,46
284 Bronjong dengan kawat dilapisi galvanis M15a Kg 10.000,00
285 Bronjong dengan kawat dilapisi PVC M15b Kg 21.000,00
286 Turap Beton M244 Kg 1.428.705,67
287 Tiang Pancang Kayu M245 M3 1.000.000,00
288 Plat sepatu tiang pancang / plat sambung M246 Kg 15.500,00
289 Beton strukutr bervolome besar, fc'30 MPa M247 M3 1.531.576,50
290 Beton struktur bervolume besar, fc’25 Mpa M248 M3 1.482.916,98
291 Beton strukut bervolume besar, fc’20 MPa M249 M3 2.176.613,79
292 Beton strukutr memadat sendiri, fc'30 MPa M250 M3 1.464.101,39
293 Beton struktur memadat sendiri, fc’25 Mpa M251 M3 1.429.840,39
294 Beton strukut memadat sendiri, fc’20 MPa M252 M3 1.220.437,47
295 Beton Fc' 35 MPa M253 M3 1.428.705,67
296 BjTS 280 M254 Kg 12.622,84
297 Asphaltic plug M255 Kg 41.000,00
298 Asphaltic plug Moveable M256 Kg 45.000,00
299 accelerator M256 Kg 17.500,00
300 Insulasi M257 m2 300.000,00
301 Anyaman Kawat Baja Dilas M258 Kg 32.000,00
302 Curing membrane M259 Kg 200.000,00
303 Sambungan siar muai tipe Karet (Preformed T-shape)M260 Kg 40.920,00
304 Bridging Plate PL 125 x 6 M261 Kg 15.500,00
305 Perletakan logam tipe fixed 150 Ton M262 Buah 1.500.000,00
306 Perletakan logam tipe movable 150 Ton M263 Buah 2.000.000,00
307 Elastomer bearing pad; (450x400x45) mm3 M264 Buah 1.071.000,00
308 Beton c 10 MPa M265 M3 903.825,95
309 Marmer M266 M2 200.000,00
310 Baja Tulangan Angkur M267 Kg 13.676,46
311 BjTS 420 M268 Kg 12.622,84
312 Grauting berbahan dasar semen M269 Kg 350.000,00
313 Graut berbahan dasar Cellular Plastic M270 Kg 350.000,00
314 Tanah humus M271 M3 140.000,00
315 Pupuk M272 Kg 30.000,00
316 Gebalan/ Rumput M273 M2 20.000,00
317 Tanah Liat M274 M3 90.000,00
318 Pipa Galvanise Dia 6" M275 M 454.000,00
319 Lampu penerangan Jalan Tipe Merkuri 400 Watt M276 Buah 950.000,00
320 Lampu penerangan Jalan Tipe Merkuri 250 Watt M277 Buah 700.000,00
321 Lampu LED 100 watt M278 Buah 3.500.000,00
322 Mortar M279 Kg 26.125,00
Paku jalan Tidak Memantul M280 Buah 48.000,00
Paku Jalan Memantul Bujur Sangkar M281 Buah 54.000,00
Paku Jalan Memantul Persegi Panjang M282 Buah 66.000,00
333 U-Ditch uk 40 x40 x120 cm M283 pcs 414.030,00
334 U-Ditch uk 80x80x120 cm (Gandar 10 ton) M284 pcs 1.642.500,00
335 U-Ditch uk 100x100x120 cm (Gandar 10 ton) M285 pcs 2.225.250,00
336 Box Culvert 60x60x120 cm (Gandar 20 ton) M286 m' 1.781.541,67
337 Box Culvert 80x80x120 cm (Gandar 20 ton) M287 m' 1.725.958,33
338 Box Culvert 100x100x120 cm (Gandar 20 ton) M287 m' 2.683.333,33
339 Cover U 80 HD (Gandar 10 ton) M288 pcs 805.000,00
340 Cover U 100.12.120 cm (Gandar 10 ton) M289 pcs 934.835,00
341 Granit Disabilitas 30x30x3 cm M290 pcs 46.937,56
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)
342 Kanstin S 40x30x15x8 K300 M291 pcs 47.261,83
343 Kanstin Trotoar 40x20x15 K300 M292 pcs 32.000,00
344 Paving block kubus 10,5x10,5x8 cm M293 pcs 1.962,50
345 Paving block kubus 10,5x10,5x6 cm K400 M294 pcs 1.091,48
346 Paving block kubus 21x21x8 cm M295 pcs 7.850,00
347 Paving block kubus 21x21x6 cm K400 M296 pcs 3.660,30
348 Semen Warna M297 pcs 7.850,00
349 Besi Profil M298 kg 16.600,00
350 Plat Baja tebal 10 mm M299 m2 1.007.793,60
351 Plat Baja tebal 6 mm M300 m2 604.676,16
352 Plat strip 30x30x3 mm M301 m' 16.400,00
353 Paku 5 cm - 12 cm M302 kg 15.800,00
354 Minyak bekisting M303 ltr 15.800,00
355 Balok kayu kelas II M304 m3 6.300.000,00
356 Dolken kayu Ø 8-10 / 400 cm M305 btg 23.100,00
357 Pohon Glodokan Tiang M306 bh 1.035.000,00
358 Pohon Ketapang Kencana Ø8 (Toleransi) M307 bh 275.000,00
359 Pohon Bungur Tinggi 4m Lingkar batang Ø10 cm (Toleransi)
M308 bh 450.000,00
360 Tanah katel M309 m3 188.571,00
361 Tanah humus M310 m3 1.200.000,00
362 Kabel Udara LVTC 2x16mm M311 m' 23.000,00
363 Kabel NYY 3x4mm M312 m' 32.200,00
364 Kabel NYM 3x2,5mm M313 m' 16.100,00
365 MCB 6A M314 m' 143.750,00
366 T Dus M315 bh 6.500,00
367 Pipa PVC 5/8" M316 m' 9.500,00
368 Tiang Oktogonal 9 m M317 unit 5.250.000,00
369 Klem kabel M318 bh 67.500,00
370 Box Panel + Breket M319 bh 562.500,00
371 Luminer 120 watt M320 bh 3.850.000,00
372 Panel KWH meter dan Koordinat System M321 unit 742.500,00
373 Daya Baru 2200 VA M322 unit 2.300.000,00
374 Sertifikat Laik Operasi M323 unit 126.500,00
375 Deliniator Patok Lalu Lintas Besi Ø4" APJ M324 unit 950.000,00
376 Pengadaan dan Pemasangan Rambu M325 unit 1.100.000,00
HARGA DASAR SATUAN UPAH

HARGA HARGA
No. URAIAN KODE SATUAN YG DIGUNAKAN SATUAN KETERANGAN
( Rp.) ( Rp.)

1 Pekerja (L01) Jam 14.721,43 103.050,00


2 Tukang (L02) Jam 14.785,71 103.500,00
3 Mandor (L03) Jam 14.857,14 104.000,00
4 Operator (L04) Jam 27.857,14 195.000,00
5 Pembantu Operator (L05) Jam 14.702,38 102.916,67
6 Sopir / Driver (L06) Jam 23.214,29 162.500,00
7 Pembantu Sopir / Driver (L07) Jam 12.380,95 86.666,67
8 Mekanik (L08) Jam 27.857,14 195.000,00
9 Pembantu Mekanik (L09) Jam 23.214,29 162.500,00
10 Kepala Tukang (L10) Jam 14.857,14 104.000,00
11 Tenaga Ahli Muda S1 (1 Tahun) (L11) Jam 111.781,43 782.470,00 19.561.750,00
12 Tenaga Ahli Muda S1 (5 Tahun) (L12) Jam 146.175,71 1.023.230,00 25.580.750,00
13 CAD / CAM OPERATOR (L16) Jam 70.221,67 491.551,67 12.288.791,67
14 SOFTWARE PROGRAMMER / IMPLEMENTER (L17) Jam 83.979,38 587.855,67 14.696.391,67
15 HARDWARE TECHNICIAN (L18) Jam 70.221,67 491.551,67 12.288.791,67
16 FACILITATOR (L19) Jam 70.221,67 491.551,67 12.288.791,67
17 SENIOR ASSISTANT PROFESSIONAL STAFF (L20) Jam 83.979,38 587.855,67 14.696.391,67
18 ASSISTANT PROFESSIONAL STAFF (L21) Jam 81.113,19 567.792,33 14.194.808,33
19 SPECIAL TECHNICIAN / INSPECTOR (L22) Jam 81.399,81 569.798,67 14.244.966,67
20 TECHNICIAN (L23) Jam 70.221,67 491.551,67 12.288.791,67
21 INSPECTOR (L24) Jam 70.221,67 491.551,67 12.288.791,67
22 SURVEYOR (L25) Jam 66.209,00 463.463,00 11.586.575,00
23
24
25
26
27
DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA

BIAYA
No. URAIAN KO HP KAP. HARGA SEWA KET.
DE ALAT ALAT/JAM
(di luar PPN)

1 ASPHALT MIXING PLANT E01 294,0 60,0 T/Jam 19.582.433.584,10 7.588.991,70


2 ASPHALT FINISHER E02 72,4 10,0 Ton 3.920.444.109,06 1.014.413,96
3 POWER BROOM E03 12,0 4.000,0 M2/Jam 34.452.000,00 64.904,33
4 BULLDOZER 100-150 HP E04 155,0 - - 3.899.731.670,91 817.352,14
5 COMPRESSOR 4000-6500 L\M E05 75,0 5.000,0 CPM/(L/m) 1.055.902.246,70 279.744,39
6 CONCRETE MIXER 0.3-0.6 M3 E06 20,0 500,0 Liter 296.641.100,67 189.269,88
7 CRANE 10-15 TON E07 138,0 15,0 Ton 2.919.137.430,11 640.757,48
8 DUMP TRUCK 3 - 4 M3 E08 100,0 4,0 M3 1.858.504.744,22 433.480,24
9 DUMP TRUCK 6-8 M3 E09 190,0 8,0 M3 2.853.267.448,38 672.976,24
10 EXCAVATOR 80-140 HP E10 133,0 0,9 M3 3.324.726.168,22 703.819,63
11 FLAT BED TRUCK 3-4 TON E11 100,0 4,0 ton 700.000.000,00 241.505,73
12 GENERATOR SET E12 180,0 135,0 KVA 207.000.000,00 226.171,26
13 MOTOR GRADER >100 HP E13 135,0 10.800,0 - 1.145.500.000,00 344.361,53
14 TRACK LOADER 75-100 HP E14 70,0 0,8 M3 685.861.500,00 214.277,86
15 WHEEL LOADER 1.0-1.6 M3 E15 96,0 1,5 M3 1.454.375.000,00 363.194,36
16 THREE WHEEL ROLLER 6-8 T E16 55,0 8,0 Ton 700.000.000,00 204.178,23
17 TANDEM ROLLER 6-8 T. E17 74,3 6,9 Ton 1.328.600.000,00 324.343,88
18 TIRE ROLLER 8-10 T. E18 135,0 10,9 Ton 987.500.000,00 318.179,53
19 VIBRATORY ROLLER 5-8 T. E19 82,0 7,1 Ton 644.300.000,00 217.344,75
20 CONCRETE VIBRATOR E20 5,5 25,0 - 10.123.500,00 52.205,05
21 STONE CRUSHER E21 220,0 60,0 T/Jam 1.771.597.800,00 533.321,37
22 WATER PUMP 70-100 mm E22 6,0 - - 7.467.000,00 49.238,64
23 WATER TANKER 3000-4500 L. E23 135,0 4.000,0 Liter 151.092.100,00 179.579,32
24 PEDESTRIAN ROLLER E24 8,8 835,00 Ton 193.042.790,00 93.863,55
25 TAMPER E25 1,5 121,00 Ton 21.000.000,00 52.447,87
26 JACK HAMMER E26 0,0 1.330,00 - 46.000.000,00 50.182,13
27 FULVI MIXER E27 345,0 2.005,00 - 900.000.000,00 753.039,37
28 CONCRETE PUMP E28 150,0 100,00 M3/jam 1.126.745.241,00 336.360,61
29 TRAILER 20 TON E29 175,0 20,00 Ton 850.000.000,00 315.496,85
30 PILE DRIVER + HAMMER E30 25,0 2,50 Ton 400.000.000,00 129.580,57
31 CRANE ON TRACK 35 TON E31 125,0 35,0 Ton 1.075.613.000,00 307.936,74
32 WELDING SET E32 11,0 250,0 Amp 11.350.000,00 53.564,82
33 BORE PILE MACHINE E33 150,0 2.000,0 Meter 2.250.000.000,00 505.212,00
34 ASPHALT LIQUID MIXER E34 5,0 1.000,0 Liter 150.000.000,00 75.051,30
35 TRONTON 15 TON E35 150,0 15,0 Ton 800.000.000,00 367.277,08
36 COLD MILLING E36 240,0 1.000,0 m 5.300.000.000,00 1.149.301,28
37 ROCK DRILL BREAKER E37 2,7 0,7 M3 12.000.000,00 774.201,59
38 COLD RECYCLER E38 900,0 2,2 M 7.400.000.000,00 2.044.759,90
39 HOT RECYCLER E39 400,0 3,0 M 16.000.000.000,00 3.055.106,15
40 AGGREGAT (CHIP) SPREADER E40 115,0 3,5 M 395.000.000,00 338.772,66
41 ASPHALT DISTRIBUTOR E41 115,0 4.000,0 Liter 395.000.000,00 298.571,29
42 SLIP FORM PAVER E42 174,0 7,0 M 13.769.105.700,00 2.286.114,98
43 CONCRETE PAN MIXER E43 15,4 500,0 Liter 20.988.000,00 91.420,77
44 CONCRETE BREAKER E44 290,0 20,0 m3/jam 900.000.000,00 461.657,27
45 ASPAHLT TANKER E45 190,0 4.000,0 liter 500.000.000,00 303.326,18
46 CEMENT TANKER E46 190,0 4.000,0 liter 500.000.000,00 275.326,18
47 CONDRETE MIXER (350) E47 20,0 350,0 liter 35.000.000,00 69.869,52
48 VIBRATING RAMMER E48 4,2 80,0 KG 8.190.000,00 49.945,82
49 TRUK MIXER (AGITATOR) E49 220,0 5,0 M3 229.750.616,99 263.121,24
50 BORE PILE MACHINE E50 125,0 60,0 CM 1.170.000.000,00 378.069,29
51 CRANE ON TRACK 75-100 TON E51 200,0 75,0 Ton 10.540.000.000,00 1.955.030,98
52 BLENDING EQUIPMENT E52 50,0 30,0 Ton 500.000.000,00 182.448,14
53 ASPHALT LIQUID MIXER E34a 40,0 20.000,0 Liter 150.000.000,00 104.083,80
54 BAR BENDER E53 3,0 0,0 0 82.500.000,00 62.974,80
55 BAR CUTTER E54 3,0 0,0 0 82.500.000,00 62.974,80
56 BREAKER E55 170,0 15,0 m3/jam 1.650.000.000,00 456.994,15
57 GROUTING PUMP E56 100,0 15,0 Ton 24.000.000,00 129.486,54
58 JACK HIDROLIC E57 10,0 - - 12.000.000,00 52.843,03
59 MESIN LAS E58 3,0 0,2 Ton 100,00 45.623,47
60 PILE DRIVER LEADER, 75 kw E59 70,0 75,0 kw 585.000.000,00 120.820,29
61 PILE HAMMER E60 10,0 0,0 0 100,00 52.772,58
62 PILE HAMMER, 2,5 Ton E61 1,0 2,5 Ton 400.000.000,00 59.959,91
63 STRESSING JACK E62 89,0 15,0 Ton 300.000.000,00 171.621,31
64 WELDING MACHINE, 300 A E63 5,0 0,0 0 35.530.000,00 47.884,55
65 ASPHALT MIXING PLANT (WARM E01a
MIX) 294,0 60,0 T/Jam 5.500.000.000,00 5.087.286,29
66 ASPHALT MIXING PLANT (MODIFIKASI,
E01b ASBUTON)
294,0 60,0 T/Jam 5.500.000.000,00 5.087.286,29
67 TANDEM ROLLER 8-10 T. E17a 100,0 10,0 Ton 1.550.000.000,00 382.358,27

68 Trailer Tronton 30 T; 200 HP E35a 386.887,65


69 MINI EXCAVATOR 40-60 HP E10a 50,0 0,2 M3 450.000.000,00 226.451,17
70 BABY VIBRATORY ROLLER 1-2 T.E19a 7,6 1,5 Ton 120.000.000,00 84.770,62
71 WATER JET BLASTING E64 6,5 100,0 Liter 16.000.000,00 56.380,45
72 MESIN POTONG RUMPUT E65 28,8 150,0 M2 3.650.000,00

73 Ponton + Tug Boat; 40 Ton; 80 HP E66 370.361,46


74 Silicon Seal pump E67 134.065,52
75 Pompa (+Mixer) pengisi bahan perekat
E68epoxy, 600 Watt 35.408,27
76 Gerinda tangan GWS 750-100 4"; 1 HP
E69 37.043,02
77 Hand Mixer E70 100.000,00
78 Mesin Bor E71 100.000,00

79 Mesin Amplas kayu E73 20.000,00


80 KUNCI TORSI 200-1000N.M E74 0,0 1,0 buah baut 15.000.000,00 50.219,17
81 POMPA + MIXER EPOXY, 810 WattE75 1,1 0,8 l/mnt 7.000.000,00 46.134,02
82 CONCRETE CUTTER 130 feet/mnt E76 13,0 39,6 m/menit 26.000.000,00 55.836,24
83 SAND BLASTING E77 75,0 10,0 m2/jam 7.500.000,00 46.389,35
84 MOBILE CRANE 1 TON E78 190,0 1,0 Ton 900.000.000,00 191.697,50
85 DRUM MIXER E79 20,0 4,0 Ton/jam 600.000.000,00 348.945,24
86 STAMPER E81 22,0 60,0 m2/jam 30.000.000,00 57.878,81
87 JACK HIDROLIK JEMBATAN E82 22,0 50,0 Ton 75.000.000,00 63.285,63
88 HYDROLIC PUMP E83 22,0 30,0 Mpa 16.000.000,00 46.981,09
89 MANIFOLD E84 0,0 1,0 0,0 5.000.000,00 45.112,74
90 THERMOPLASTIC ROAD MARKINGE85 MACHINE
5,5 1.300,0 m/jam 120.000.000,00 75.721,30
91 COLD PAINT SRAY MACHINE E86 5,5 1.300,0 m/jam 70.000.000,00 61.903,89
92 FLAT BED TRUCK 10 TON E11a 190,0 8,0 M3 900.000.000,00 191.697,50
93 Mesin Las 250 A /hari - 275.000,00
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI

% TERHADAP TOTAL BIAYA PROYEK = 0,4442 %


Lembar 1.2-1
HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

B. PERALATAN
Periksa lembar 1.2-2 4.384.615,38

E. MOBILISASI PERSONIL
E.II. Personi Lainnya Set 1 1.000.000,00 1.000.000,00

F. Manajemen dan Keselamatan lalu lintas LS 1.000.000,00

G. DEMOBILISASI LS 1 1.615.384,62 1.615.384,62

Total Biaya Mobilisasi 8.000.000,00

Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
Lembar 1.2-2
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

B. PERALATAN

1 ASPHALT MIXING PLANT E01 Unit 1 1.484.615,38 1.484.615,38


2 ASPHALT FINISHER E02 Unit 1 500.000,00 500.000,00
9 DUMP TRUCK 6-8 M3 E09 Unit 5 150.000,00 750.000,00
11 FLAT BED TRUCK 3-4 TON E11 Unit 1 150.000,00 150.000,00
15 WHEEL LOADER 1.0-1.6 M3 E15 Unit 1 500.000,00 500.000,00
17 TANDEM ROLLER 6-8 T. E17 Unit 1 500.000,00 500.000,00
18 TIRE ROLLER 8-10 T. E18 Unit 1 500.000,00 500.000,00

Total untuk Item B pada Lembar 1 4.384.615,38


ASURANSI
(Construction All Risk/ CAR)

NILAI KONTRAK SESUAI SPK : 2.000.000.000,00


NILAI KONTRAK SETELAH PPN 11 % : 1.801.801.801,80

NO PERHITUNGAN BPJS Rate JKK Iuran JKK Rate JKM Iuran JKM Keterangan

1 TARIF 1 x 100.000.000,00 0,21% 210.000,00 0,03% 30.000,00 Nilai Kontrak 0 s/d 100 juta
2 TARIF 2 x 400.000.000,00 0,17% 680.000,00 0,02% 80.000,00 Nilai Kontrak > 100 juta s/d 500 juta
3 TARIF 3 x 1.000.000.000,00 0,13% 1.300.000,00 0,02% 200.000,00 Nilai Kontrak > 500 juta s/d 1 Milyar
4 TARIF 4 x 301.801.801,80 0,11% 331.981,98 0,01% 30.180,18 Nilai Kontrak > 1 Milyar s/d 5Milyar
5 TARIF 5 x - 0,09% - 0,01% - Nilai Kontrak > 5 Milyar
1.801.801.801,80 2.521.981,98 340.180,18
TOTAL IURAN JKK + JK 2.862.000,00
AHSP TAMBAHAN

1.3 Pembersihan Badan Jalan dari Sedimentasi


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja (L01) OH 0,0070 14.721,43 103,05
2 Mandor (L03) OH 0,2260 14.857,14 3.357,71

JUMLAH TENAGA KERJA 3.460,76


B BAHAN
1
JUMLAH HARGA BAHAN -
C PERALATAN
1 EXCAVATOR 80-140 HP E10 jam 2,5000 703.819,63 1.759.549,07
2 DUMP TRUCK 6-8 M3 E09 jam 1,7500 672.976,24 1.177.708,42
3 Alat Bantu ls 0,0500 2.937.257,49 146.862,87

JUMLAH HARGA ALAT 3.084.120,36

D Jumlah (A+B+C) 3.087.581,13


E Overhead & Profit - -
F Harga Satuan Pekerjaan (D+E) 3.087.581,13

1.4 Normalisasi Saluran Sebelah Kiri


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja (L01) OH 0,2500 103.050,00 25.762,50
2 Mandor (L03) OH 0,0250 104.000,00 2.600,00

JUMLAH TENAGA KERJA 28.362,50


B BAHAN
1
JUMLAH HARGA BAHAN -
C PERALATAN
1 DUMP TRUCK 6-8 M3 E09 jam 0,1200 672.976,24 80.757,15
2 Alat Bantu ls 0,1000 28.362,50 2.836,25

JUMLAH HARGA ALAT 83.593,40

D Jumlah (A+B+C) 111.955,90


E Overhead & Profit - -
F Harga Satuan Pekerjaan (D+E) 111.955,90
3.3.(43) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 80x80x120 cm (Gandar 20 ton)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja (L01) Jam 2,3333 14.721,43 34.350,00
2 Tukang (L02) Jam 0,9333 14.785,71 13.800,00
3 Mandor (L03) Jam 0,4667 14.857,14 6.933,33

JUMLAH TENAGA KERJA 55.083,33


B BAHAN
1 Box Culvert 80x80x120 cm (Gandar 20 ton) M287 m' 1,0000 1.725.958,33 1.725.958,33
2 Beton, fc’12,5 Mpa (K150) 7.1 (10) M3 0,1000 994.208,54 99.420,85
3 Galian Batu 4.1.(3) M3 2,4000 113.523,11 272.455,46

JUMLAH HARGA BAHAN 2.097.834,65


C PERALATAN
1 CRANE ON TRACK 35 TON E31 jam 0,0530 307.936,74 16.320,65
2 EXCAVATOR 80-140 HP E10 jam 0,1673 703.819,63 117.774,37
3 Alat Bantu ls 0,0500 16.320,65 816,03

JUMLAH HARGA ALAT 134.911,05

D Jumlah (A+B+C) 2.287.829,03


E Overhead & Profit - -
F Harga Satuan Pekerjaan (D+E) 2.287.829,03

A.4.4.3.64. Pemasangan 1 m2 paving block kubus tebal 6 cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja (L01) OH 0,2500 103.050,00 25.762,50
2 Tukang (L02) OH 0,5500 103.500,00 56.925,00
3 Kepala Tukang (L10) OH 0,0500 104.000,00 5.200,00
4 Mandor (L03) OH 0,0013 104.000,00 135,20
JUMLAH TENAGA KERJA 88.022,70
B BAHAN
1 Galian Batu Lunak 4.1.(2) m3 0,3600 46.428,95 16.714,42
2 Paving block kubus 21x21x6 cm K400 M296 pcs 16,0000 3.660,30 58.564,80
3 Paving block kubus 10,5x10,5x6 cm K400 M294 pcs 21,0000 1.091,48 22.920,98
4 Kanstin S 40x30x15x8 K300 M291 pcs 1,8000 47.261,83 85.071,29
5 Kanstin Trotoar 40x20x15 K300 M292 pcs 1,8000 32.000,00 57.600,00
5 Pasir Beton (Kasar) M01a M3 0,0800 225.000,00 18.000,00
6 Pasir Beton (Kasar) M01a M3 0,0050 225.000,00 1.125,00
JUMLAH HARGA BAHAN 259.996,49
C PERALATAN
1 TAMPER E25 jam 0,2917 52.447,87 15.297,30
JUMLAH HARGA ALAT 15.297,30

D Jumlah (A+B+C) 363.316,48


E Overhead & Profit - -
F Harga Satuan Pekerjaan (D+E) 363.316,48
A.4.4.3.64.a Pemasangan 1 m Granit Disabilitas 30x30x3 cm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja (L01) OH 0,2100 103.050,00 21.640,50
2 Tukang (L02) OH 0,1050 103.500,00 10.867,50
3 Kepala Tukang (L10) OH 0,0105 104.000,00 1.092,00
4 Mandor (L03) OH 0,0105 104.000,00 1.092,00
JUMLAH TENAGA KERJA 34.692,00
B BAHAN
1 Granit Disabilitas 30x30x3 cm M290 pcs 3,3333 46.937,56 156.458,54
2 Semen / PC (kg) (Dinamix Merah) M12 Kg 3,1200 1.275,00 3.978,00
3 Pasir Beton (Kasar) M01a M3 0,0135 225.000,00 3.037,50
4 Semen Warna M297 pcs 0,1500 7.850,00 1.177,50
JUMLAH HARGA BAHAN 164.651,54
C PERALATAN
1 Peralatan % 2,0000 164.651,54 3.293,03
JUMLAH HARGA ALAT 3.293,03

D Jumlah (A+B+C) 202.636,57


E Overhead & Profit - -
F Harga Satuan Pekerjaan (D+E) 202.636,57

A.4.2.1.1 Pemasangan 1 kg besi Profil


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja (L01) OH 0,0600 103.050,00 6.183,00
2 Tukang (L02) OH 0,0600 103.500,00 6.210,00
3 Kepala Tukang (L10) OH 0,0060 104.000,00 624,00
4 Mandor (L03) OH 0,0030 104.000,00 312,00
JUMLAH TENAGA KERJA 13.329,00
B BAHAN
1 Besi Profil M298 kg 1,1000 16.600,00 18.260,00
JUMLAH HARGA BAHAN 18.260,00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 31.589,00


E Overhead & Profit - -
F Harga Satuan Pekerjaan (D+E) 31.500,00
A.4.2.1.1.a Pembuatan dan Pemasangan 1 Bh Cover Bak Kontrol Fin. Cat Meni
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja (L01) OH 0,2050 103.050,00 21.125,25
2 Tukang (L02) OH 1,0500 103.500,00 108.675,00
3 Kepala Tukang (L10) OH 0,0250 104.000,00 2.600,00
4 Mandor (L03) OH 0,0025 104.000,00 260,00
JUMLAH TENAGA KERJA 132.660,25
B BAHAN
1 Plat Baja tebal 10 mm M299 m2 1,0260 1.007.793,60 1.033.996,24
2 Engsel bh 2,0000 16.000,00 32.000,00
3 Cat dasar baja M202 Kg 0,5000 65.000,00 32.500,00
4 Aksesories ls 0,0500 1.098.496,24 54.924,81
JUMLAH HARGA BAHAN 1.153.421,05
C PERALATAN
1 Mesin Las 250 A jam 0,2700 275.000,00 74.250,00
2 Alat Bantu ls 0,0500 74.250,00 3.712,50
JUMLAH HARGA ALAT 77.962,50

D Jumlah (A+B+C) 1.364.043,80


E Overhead & Profit - -
F Harga Satuan Pekerjaan (D+E) 1.364.000,00

A.4.2.1.22 Pembuatan dan Pemasangan 1 Unit Cover Bak Kontrol Fin. Cat Meni + Ring Balok
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja (L01) OH - 117.944,44 -
2 Tukang (L02) OH - 119.334,44 -
3 Kepala Tukang (L10) OH - 124.583,33 -
4 Mandor (L03) OH - 130.000,00 -
JUMLAH TENAGA KERJA -
B BAHAN
1 Baja Tulangan Polos-BjTP 280 8.3 (1) kg 17,2346 11.007,59 189.711,28
2 Pemasangan 1 m2 Bekisting untuk Plat lantai Beton
A.4.1.1.22 m2 0,4320 255.556,00 110.400,19
3 Beton strukur, fc’20 MPa 8.1 (7a) m3 0,0612 1.100.584,40 67.355,77
4 Pemasangan 1 kg besi Profil A.4.2.1.1 kg 25,2512 31.500,00 795.414,01
5 Aksesories ls 0,1000 1.162.881,24 116.288,12
JUMLAH HARGA BAHAN 1.279.169,37
C PERALATAN
1 Mesin Las 250 A jam 0,2700 275.000,00 74.250,00
2 Alat Bantu ls 0,0500 74.250,00 3.712,50
JUMLAH HARGA ALAT 77.962,50

D Jumlah (A+B+C) 1.357.131,87


E Overhead & Profit - -
F Harga Satuan Pekerjaan (D+E) 1.357.100,00
A.4.1.1.22 Pemasangan 1 m2 Bekisting untuk Plat lantai Beton
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja (L01) OH 0,6600 103.050,00 68.013,00
2 Tukang (L02) OH 0,3300 103.500,00 34.155,00
3 Kepala Tukang (L10) OH 0,0330 104.000,00 3.432,00
4 Mandor (L03) OH 0,0330 104.000,00 3.432,00
JUMLAH TENAGA KERJA 109.032,00
B BAHAN
1 Kayu Acuan M99 Kg 0,0400 2.500.000,00 100.000,00
2 Paku 5 cm - 12 cm M302 kg 0,4000 15.800,00 6.320,00
3 Minyak bekisting M303 ltr 0,2000 15.800,00 3.160,00
4 Balok kayu kelas II M304 m3 0,0150 6.300.000,00 94.500,00
5 Acuan/multipleks M130 M3 0,3500 170.000,00 59.500,00
6 Dolken kayu Ø 8-10 / 400 cm M305 btg 6,0000 23.100,00 138.600,00
JUMLAH HARGA BAHAN 402.080,00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 255.556,00


E Overhead & Profit - -
F Harga Satuan Pekerjaan (D+E) 255.500,00

A.4.1.1.23 Pembuatan dan Pemasangan 1 Unit bak kontrol + Cover


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja (L01) OH 117.944,44 -
2 Tukang (L02) OH 119.334,44 -
3 Kepala Tukang (L10) OH 124.583,33 -
4 Mandor (L03) OH 130.000,00 -
JUMLAH TENAGA KERJA -
B BAHAN
1 Galian Biasa 4.1.(1) m3 1,150 19.059,44 21.918,36
2 Baja Tulangan Polos-BjTP 280 8.3 (1) kg 65,204 11.007,59 717.739,21
3 Beton strukur, fc’20 MPa 8.1 (7a) m3 0,545 1.100.584,40 599.818,50
4 Pemasangan 1 kg besi Profil A.4.2.1.1 kg 32,195 31.500,00 1.014.142,50
JUMLAH HARGA BAHAN 2.353.618,56
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 2.353.618,56


E Overhead & Profit - -
F Harga Satuan Pekerjaan (D+E) 2.353.600,00
A.4.4.2.6 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja (L01) OH 0,3000 103.050,00 30.915,00
2 Tukang (L02) OH 0,1500 103.500,00 15.525,00
3 Kepala Tukang (L10) OH 0,0150 104.000,00 1.560,00
4 Mandor (L03) OH 0,0150 104.000,00 1.560,00
JUMLAH TENAGA KERJA 49.560,00
B BAHAN
1 Semen / PC (kg) (Dinamix Merah) M12 Kg 7,7760 1.275,00 9.914,40
2 Pasir Pasang (Sedang) M01b M3 0,0230 133.333,33 3.066,67
JUMLAH HARGA BAHAN 12.981,07
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 62.541,07


E Overhead & Profit - -
F Harga Satuan Pekerjaan (D+E) 62.500,00

A.4.4.2.7 Pemasangan 1 m2 acian


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja (L01) OH 0,2000 103.050,00 20.610,00
2 Tukang (L02) OH 0,1000 103.500,00 10.350,00
3 Kepala Tukang (L10) OH 0,0100 104.000,00 1.040,00
4 Mandor (L03) OH 0,0100 104.000,00 1.040,00
JUMLAH TENAGA KERJA 33.040,00
B BAHAN
1 Semen / PC (kg) (Dinamix Merah) M12 Kg 3,2500 1.275,00 4.143,75
JUMLAH HARGA BAHAN 4.143,75
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 37.183,75


E Overhead & Profit - -
F Harga Satuan Pekerjaan (D+E) 37.100,00
A.4.1.1.24 Pengadaan dan Penanaman Pohon Bungur Tinggi 4 m dengan diameter 10 cm (Toleransi)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja (L01) OH 0,1500 103.050,00 15.457,50
2 Tukang (L02) OH 0,2500 103.500,00 25.875,00
JUMLAH TENAGA KERJA 41.332,50
B BAHAN
1 Pohon Bungur Tinggi 4m Lingkar batang Ø10 cm (Toleransi)
M308 bh 1,0000 450.000,00 450.000,00
2 Tanah katel M309 m3 0,1500 188.571,00 28.285,65
3 Tanah humus M310 m3 0,0050 1.200.000,00 6.000,00
4 Kanstin Trotoar 40x20x15 K300 M292 pcs 5,0000 32.000,00 160.000,00
5 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm
A.4.4.2.6 m2 0,4019 62.500,00 25.120,00
6 Pemasangan 1 m2 acian A.4.4.2.7 m2 0,4019 37.100,00 14.911,23
7 Cat dasar baja M202 Kg 0,4000 65.000,00 26.000,00
8 Pasir Pasang (Sedang) M01b M3 0,0500 133.333,33 6.666,67
9 Alat Bantu ls 0,0500 450.000,00 22.500,00
JUMLAH HARGA BAHAN 739.483,55
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 780.816,05


E Overhead & Profit - -
F Harga Satuan Pekerjaan (D+E) 780.816,05

A.4.1.1.25 Pengadaan dan Pemasangan APJ Konvensional LED 120 Watt


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja (L01) OH 0,5500 103.050,00 56.677,50
2 Tukang (L02) OH 0,7500 103.500,00 77.625,00
3 Kepala Tukang (L10) OH 0,0550 104.000,00 5.720,00
4 Mandor (L03) OH 0,0055 104.000,00 572,00
JUMLAH TENAGA KERJA 140.594,50
B BAHAN
1 Galian Batu Lunak 4.1.(2) m3 0,3600 46.428,95 16.714,42
2 Pasir Urug M01d M3 0,0180 100.000,00 1.800,00
3 Baja Tulangan (Polos) U24 M39a Kg 11,7494 8.900,00 104.569,27
4 Baja Tulangan (Ulir) D32 M39b Kg 8,1686 13.000,00 106.192,18
5 Besi Profil M298 kg 0,5642 16.600,00 9.365,10
6 Beton Struktur fc' 20 MPa M186 M3 0,3600 1.000.531,27 360.191,26
7 Cat Anti Karat M95 Kg 0,6359 35.750,00 22.731,64
8 Kabel Udara LVTC 2x16mm M311 m' 40,0000 23.000,00 920.000,00
9 Kabel NYY 3x4mm M312 m' 1,5000 32.200,00 48.300,00
10 Kabel NYM 3x2,5mm M313 m' 9,0000 16.100,00 144.900,00
11 T Dus M315 bh 4,0000 6.500,00 26.000,00
12 Pipa PVC 5/8" M316 m' 9,0000 9.500,00 85.500,00
12 Tiang Oktogonal 9 m M317 unit 1,0000 5.250.000,00 5.250.000,00
13 Klem kabel M318 bh 2,0000 67.500,00 135.000,00
14 Box Panel + Breket M319 bh 1,0000 562.500,00 562.500,00
15 Luminer 120 watt M320 bh 1,0000 3.850.000,00 3.850.000,00
16 Alat Bantu ls 0,0100 7.793.763,87 77.937,64
JUMLAH HARGA BAHAN 11.721.701,51
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 11.862.296,01


E Overhead & Profit - -
F Harga Satuan Pekerjaan (D+E) 11.862.296,01
A.4.1.1.26 Pengadaan dan Pemasangan Daya Baru & Smart System
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja (L01) OH 0,3500 103.050,00 36.067,50
2 Tukang (L02) OH 0,5500 103.500,00 56.925,00
3 Kepala Tukang (L10) OH 0,0550 104.000,00 5.720,00
4 Mandor (L03) OH 0,0055 104.000,00 572,00
JUMLAH TENAGA KERJA 99.284,50
B BAHAN
1 Box Panel + Breket M319 bh 1,0000 562.500,00 562.500,00
2 Kabel NYM 3x2,5mm M313 m' 3,0000 16.100,00 48.300,00
3 Sertifikat Laik Operasi M323 unit 1,0000 126.500,00 126.500,00
4 Daya Baru 2200 VA M322 unit 1,0000 2.300.000,00 2.300.000,00
5 Panel KWH meter dan Koordinat System M321 unit 1,0000 742.500,00 742.500,00
6 MCB 6A M314 m' 2,0000 143.750,00 287.500,00
7 Kabel NYM 3x2,5mm M313 m' 9,0000 16.100,00 144.900,00
8 Klem kabel M318 bh 2,0000 67.500,00 135.000,00
9 T Dus M315 bh 1,0000 6.500,00 6.500,00
10 Alat Bantu ls 0,0100 4.347.200,00 43.472,00
JUMLAH HARGA BAHAN 4.397.172,00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 4.496.456,50


E Overhead & Profit - -
F Harga Satuan Pekerjaan (D+E) 4.496.456,50
Analisa El - 121
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.21.


JENIS PEKERJAAN : Manajemen Mutu
SATUAN PEMBAYARAN : Lump Sum

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Tidak ada pengadaan peralatan pengujian mutu dan
perlengkapan perangkat alat tulis dan kantor
2 Hanya Jasa Pengendalian Mutu Pekerjaan dilapangan
selama masa pelaksanaan pekerjaan
3 Personil melakukan pengendalian mutu berdasarkan spesifikasi
pekerjaan dan membuat laporan mutu pekerjaan
4 Manajemen Mutu sesuai ketentuan Ditjen Bina Marga

B. URUTAN KERJA
1 Penyedia setelah menerima SPMK mengusulkan personil
Tenaga Ahli Mutu Pekerjaan sbg Manajer Kendali Mutu
2 Tenaga Ahli dibantu oleh Asisten Kendali Mutu yang
berpengalaman dibidangnya dan tenaga pendukung
3 Membuat RMK dan laporan mutu yg disetujui PPK
4 Melakukan pengendalian mutu semua pekerjaan dan
membuat laporan secara berkala

C. TENAGA / PERSONIL

4 Laporan Kendali Mutu Bulan 4,00 300.000,00 1.200.000,00

D TOTAL BIAYA PENGENDALIAN MUTU 1.200.000,00

Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
Asuransi Tenaga Kerja dan pengeluaran lainnya.
2. Biaya tersebut sudah termasuk biaya pembuatan laporan yang terkait dengan mutu pekerjaan
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan pembuatan laporan mutu seperti komputer, printer, kertas dan sebagainya.
Analisa EI-411

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROP / KAB / KODYA : Kota Probolinggo


ITEM PEMBAYARAN NO. : 4.1.(1) PERKIRAAN VOL. PEK. : 62,25
JENIS PEKERJAAN : Galian Biasa TOTAL HARGA (Rp.) : 1.186.450,42
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0,07

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja (L01) Jam 0,0077 14.721,43 113,02
2. Mandor (L03) Jam 0,0038 14.857,14 57,03

JUMLAH HARGA TENAGA 170,05

B. BAHAN

JUMLAH HARGA BAHAN -

C. PERALATAN
1. Excavator (E10) Jam 0,0038 703.819,63 2.701,63
2. Dump Truck (E09) Jam 0,0333 433.480,24 14.455,09
3. Alat Bantu Ls 1,0000 - -

JUMLAH HARGA PERALATAN 17.156,72

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 17.326,77


E. OVERHEAD & PROFIT 10,00 x D 1.732,68
F. HARGA SATUAN PEKERJAAN ( D + E ) 19.059,44
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-422a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROP / KAB / KODYA : Kota Probolinggo


ITEM PEMBAYARAN NO. : 4.2.(2a) PERKIRAAN VOL. PEK. : 70,50
JENIS PEKERJAAN : Timbunan Pilihan Dari Sumber GalianTOTAL HARGA (Rp.) : 10.261.562,84
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0,57

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja (L01) Jam 0,0159 14.721,43 233,67
2. Mandor (L03) Jam 0,0040 14.857,14 58,96

JUMLAH HARGA TENAGA 292,63

B. BAHAN
1. Bahan pilihan (M09) (M09) M3 1,2000 100.000,00 120.000,00

JUMLAH HARGA BAHAN 120.000,00

C. PERALATAN
5. Alat Bantu Ls 1,0000 12.029,26 12.029,26

JUMLAH HARGA PERALATAN 12.029,26

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 132.321,89


E. OVERHEAD & PROFIT 10% x D 13.232,19
F. HARGA SATUAN PEKERJAAN ( D + E ) 145.554,08
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-443
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROP / KAB / KODYA : Kota Probolinggo


ITEM PEMBAYARAN NO. : 4.4.(3) PERKIRAAN VOL. PEK. : 24,00
JENIS PEKERJAAN : Pemotongan Pohon Pilihan diameter TOTAL
> 30 – 50
HARGA
cm (Rp.) : 8.218.014,21
SATUAN PEMBAYARAN : buah % THD. BIAYA PROYEK : 0,46

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja Biasa (L01) Jam 0,3015 14.721,43 4.438,24
2. Mandor (L03) Jam 0,0301 14.857,14 447,92

JUMLAH HARGA TENAGA 4.886,16

B. BAHAN

JUMLAH HARGA BAHAN -

C. PERALATAN
1. Track Loader E14 Jam 0,0301 214.277,86 6.460,08
2. Dump Truck E09 Jam 0,4240 672.976,24 285.319,77
3. Chainsaw Jam 0,3182 100,00 31,82
4. Alat Bantu Ls 0,0500 291.811,68 14.590,58

JUMLAH HARGA PERALATAN 306.402,26

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 311.288,42


E. OVERHEAD & PROFIT 10,0 % x D 31.128,84
F. HARGA SATUAN PEKERJAAN ( D + E ) 342.417,26
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-712a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROP / KAB / KODYA : Kota Probolinggo


ITEM PEMBAYARAN NO. : 7.1 (2a) PERKIRAAN VOL. PEK. : 992,40
JENIS PEKERJAAN : Lapis Perekat - Aspal Cair/Emulsi TOTAL HARGA (Rp.) : 25.592.079,02
SATUAN PEMBAYARAN : Liter % THD. BIAYA PROYEK : 1,42

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja (L01) Jam 0,0016 14.721,43 23,89
2. Mandor (L03) Jam 0,0008 14.857,14 12,05

JUMLAH HARGA TENAGA 35,94

B. BAHAN
1. Aspal Emulsi CRS-1 (M31b) Liter 1,7167 13.400,00 23.003,33
atau RS-1

JUMLAH HARGA BAHAN 23.003,33

C. PERALATAN
1. Asp. Distributor E41 Jam 0,0002 298.571,29 59,95
2. Compressor E05 Jam 0,0010 279.744,39 291,81
3. Power Broom E03 Jam 0,0008 64.904,33 52,66

JUMLAH HARGA PERALATAN 404,42

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 23.443,70


E. OVERHEAD & PROFIT 10% x D 2.344,37
F. HARGA SATUAN PEKERJAAN ( D + E ) 25.788,07
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-735a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROP / KAB / KODYA : Kota Probolinggo


ITEM PEMBAYARAN NO. : 7.3(5a) PERKIRAAN VOL. PEK. : 150,18
JENIS PEKERJAAN : Laston Lapis Aus (AC-WC) TOTAL HARGA (Rp.) : 180.255.806,75
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK : 10,01

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja (L01) Jam 0,2008 14.721,43 2.956,11
2. Mandor (L03) Jam 0,0201 14.857,14 298,34

JUMLAH HARGA TENAGA 3.254,45

B. BAHAN
1. Agr Pch Mesin 5-10 & 10-15(M92) M3 0,2808 287.000,00 80.588,30
2. Agr Pch Mesin 0 - 5 (M91) M3 0,4164 261.000,00 108.685,74
3 Semen (M12) Kg 9,6820 1.275,00 12.344,55
4 Aspal (M10) Kg 58,0560 11.500,00 667.644,51

JUMLAH HARGA BAHAN 869.263,10

C. PERALATAN
1. Wheel Loader E15 Jam 0,0054 363.194,36 1.950,02
2. AMP E01 Jam 0,0201 7.588.991,70 152.389,39
3. Genset E12 Jam 0,0201 226.171,26 4.541,59
4. Dump Truck E09 Jam 0,0587 672.976,24 39.491,44
5. Asp. Finisher E02 Jam 0,0125 1.014.413,96 12.707,27
6. Tandem Roller E17a Jam 0,0128 382.358,27 4.877,43
7 P. Tyre Roller E18 Jam 0,0084 318.179,53 2.675,36
8 Alat Bantu Ls 1,0000 - -

JUMLAH HARGA PERALATAN 218.632,51

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1.091.150,05


E. OVERHEAD & PROFIT 10,0 % x D 109.115,01
F. HARGA SATUAN PEKERJAAN ( D + E ) 1.200.265,06
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-738

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROP / KAB / KODYA : Kota Probolinggo


ITEM PEMBAYARAN NO. : 7.3.(8) PERKIRAAN VOL. PEK. : 525,97
JENIS PEKERJAAN : Bahan Anti Pengelupasan TOTAL HARGA (Rp.) : 59.592.401,00
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK : 3,31

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja (L01) Jam 0,0000 24.996,34 -
2. Mandor (L03) Jam 0,0000 30.066,21 -

JUMLAH HARGA TENAGA -

B. BAHAN
1. Bahan anti pengelupasan (M66) Kg 1,0300 100.000,00 103.000,00

JUMLAH HARGA BAHAN 103.000,00

C. PERALATAN

JUMLAH HARGA PERALATAN -

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 103.000,00


E. OVERHEAD & PROFIT 10% x D 10.300,00
F. HARGA SATUAN PEKERJAAN ( D + E ) 113.300,00
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-736a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROP / KAB / KODYA : Kota Probolinggo


ITEM PEMBAYARAN NO. : 7.3(6a) PERKIRAAN VOL. PEK. : 222,35
JENIS PEKERJAAN : Laston Lapis Antara (AC-BC) TOTAL HARGA (Rp.) : 255.702.500,00
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK : 14,20

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja (L01) Jam 0,2008 16.849,21 3.383,37
2. Mandor (L03) Jam 0,0201 18.571,43 372,92

JUMLAH HARGA TENAGA 3.756,30

B. BAHAN
1. Agr Pch Mesin 5-10 & 10-20(M92) M3 0,3720 287.000,00 106.750,95
2. Agr Pch Mesin 0 - 5 (M91) M3 0,3719 261.000,00 97.059,38
3 Semen (M12) Kg 9,6820 1.275,00 12.344,55
4 Aspal (M10) Kg 53,9218 11.500,00 620.100,13

JUMLAH HARGA BAHAN 836.255,01


C. PERALATAN
2. AMP E01 Jam 0,0201 7.588.991,70 152.389,39
3. Genset E12 Jam 0,0201 226.171,26 4.541,59
4. Dump Truck E09 Jam 0,0491 672.976,24 33.055,53
5. Asphalt Finisher E02 Jam 0,0084 1.014.413,96 8.471,52
6. Tandem Roller E17a Jam 0,0085 382.358,27 3.251,62
7 P. Tyre Roller E18 Jam 0,0056 318.179,53 1.783,57
8 Alat Bantu Ls 1,0000 - -

JUMLAH HARGA PERALATAN 205.443,24

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1.045.454,55


E. OVERHEAD & PROFIT 10,0 % x D 104.545,45
F. HARGA SATUAN PEKERJAAN ( D + E ) 1.150.000,00
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa El-817a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROP / KAB / KODYA : Kota Probolinggo


ITEM PEMBAYARAN NO. :8.1 (7a) PERKIRAAN VOL. PEK. : 42,62
JENIS PEKERJAAN :Beton struktur fc’ 20 Mpa TOTAL HARGA (Rp.) : 46.906.906,97
SATUAN PEMBAYARAN :M3 % THD. BIAYA PROYEK : 2,60

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja (L01) jam 3,0522 14.721,43 44.932,87
2. Tukang (L02) jam 4,5783 14.785,71 67.693,63
3. Mandor (L03) jam 0,3815 14.857,14 5.668,39

JUMLAH HARGA TENAGA 118.294,89

B. BAHAN
1 Ready Mixed m3 1,0000 721.000,00 721.000,00

JUMLAH HARGA BAHAN 721.000,00

C. PERALATAN
1. Concrete Mixer (E43) jam 0,3815 91.420,77 34.879,41
2 Concrete Vibrator (E20) jam 2,2892 52.205,05 119.505,55
3 Water Tang Truck (E23) jam 0,0382 179.579,32 6.851,42
4 Alat Bantu Ls 1,0000 - -

JUMLAH HARGA PERALATAN 161.236,38

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1.000.531,27


E. OVERHEAD & PROFIT 10% x D 100.053,13
F. HARGA SATUAN PEKERJAAN ( D + E ) 1.100.584,40
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa El-831
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROP / KAB / KODYA : Kota Probolinggo


ITEM PEMBAYARAN NO. : 8.3 (1) PERKIRAAN VOL. PEK. : 1,00
JENIS PEKERJAAN : Baja Tulangan Polos BjTP 280 TOTAL HARGA (Rp.) : 11.007,59
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK : 0,00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 0,0146 14.721,43 214,93


2. Tukang (L02) jam 0,0104 14.785,71 153,77
3. Mandor (L03) jam 0,0021 14.857,14 31,20

JUMLAH HARGA TENAGA 399,90

B. BAHAN

1. Baja Tulangan Polos BjTP


(M57a)
280 Kg 1,0300 8.900,00 9.167,00
2. Kawat Beton (M14) Kg 0,0200 22.000,00 440,00

JUMLAH HARGA BAHAN 9.607,00

C. PERALATAN

1. Alat Bantu Ls 1,0000 - -

JUMLAH HARGA PERALATAN -

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 10.006,90


E. OVERHEAD & PROFIT 10,0 % x D 1.000,69
F. HARGA SATUAN PEKERJAAN ( D + E ) 11.007,59
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa El-817a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROP / KAB / KODYA : Kota Probolinggo


ITEM PEMBAYARAN NO. :8.1 (10) PERKIRAAN VOL. PEK. : 1,00
JENIS PEKERJAAN :Beton struktur fc’ = 10 Mpa TOTAL HARGA (Rp.) : 994.208,54
SATUAN PEMBAYARAN :M3 % THD. BIAYA PROYEK : 0,04

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja (L01) jam 1,4458 16.849,21 24.360,30
2. Tukang (L02) jam 2,4096 17.047,78 41.078,98
3. Mandor (L03) jam 0,2410 18.571,43 4.475,04

JUMLAH HARGA TENAGA 69.914,32

B. BAHAN
1. Semen (M12) Kg 237,9300 1.275,00 303.360,75
2. Pasir Beton (M01a) M3 0,5960 225.000,00 134.092,24
3. Agregat Kasar (M03) M3 0,9153 225.000,00 205.944,83
4. Kayu Perancah (M19) M3 0,0200 2.500.000,00 50.000,00
5. Paku (M18) Kg 0,2400 21.500,00 5.160,00
6. Air (M170) Ltr 166,8600 14,65 2.444,50
7. Plastizier (M182) Kg 0,7138 40.000,00 28.551,60

JUMLAH HARGA BAHAN 729.553,92

C. PERALATAN
1. Concrete Mixer (E43) jam 0,2410 91.420,77 22.029,10
2 Concrete Vibrator (E20) jam 1,4458 52.205,05 75.477,19
3 Water TankTruck (E23) jam 0,0382 179.579,32 6.851,42
4 Alat Bantu Ls 1,0000 - -

JUMLAH HARGA PERALATAN 104.357,71

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 903.825,95


E. OVERHEAD & PROFIT 10,0 % x D 90.382,59
F. HARGA SATUAN PEKERJAAN ( D + E ) 994.208,54
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-1021

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROP / KAB / KODYA : Kota Probolinggo


ITEM PEMBAYARAN NO. : 10.2.(1) PERKIRAAN VOL. PEK. : 93,13
JENIS PEKERJAAN : Marka Jalan Termoplastik TOTAL HARGA (Rp.) : 13.895.829,55
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0,77

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja Biasa (L01) jam 0,1428 14.721,43 2.102,12
2. Tukang (L02) jam 0,0178 14.785,71 263,91
3. Mandor (L03) jam 0,0178 14.857,14 265,19

JUMLAH HARGA TENAGA 2.631,22

B. BAHAN
1. Cat Marka Thermoplastic (M17b) Kg 3,3218 34.600,00 114.932,55
2. Glass Bead (M34) Kg 0,4635 19.400,00 8.991,90

JUMLAH HARGA BAHAN 123.924,45


C. PERALATAN
1. Dump Truck (E08) Jam 0,0178 433.480,24 7.737,26
2. Thermoplastic Road Marking Machine (E85) Jam 0,0178 75.721,30 1.351,56
3. Alat Bantu Ls 1,0000 - -

JUMLAH HARGA PERALATAN 9.088,83

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 135.644,50


E. OVERHEAD & PROFIT 10% x D 13.564,45
F. HARGA SATUAN PEKERJAAN ( D + E ) 149.208,95
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

Anda mungkin juga menyukai