Anda di halaman 1dari 20

DAFTAR GAMBAR

NO KODE NAMA GAMBAR SKALA NO KODE NAMA GAMBAR SKALA


ARSITEKTUR ELEKTRIKAL

.23 EL-01 DENAH INSTALASI LISTRIK LANTAI 1 1 : 100


.00 AR-00 DAFTAR GAMBAR NTS .24 EL-02 DENAH INSTALASI LISTRIK LANTAI 2 1 : 100
STRUKTUR
.00 SP-01 LANSEKAP 1 : 100
.25 SR-01 DENAH PONDASI 1 : 100
.01 AR-01 DENAH LANTAI 1 & LANTAI 2 1 : 100 .26 SR-02 DETAIL PONDASI 1 1 : 20
.02 AR-02 DENAH ATAP 1 : 100 .27 SR-03 DETAIL PONDASI 2 1 : 20
.03 AR-03 TAMPAK DEPAN & TAMPAK BELAKANG 1 : 100 .28 SR-04 DENAH PEMBALOKAN LANTAI 2 1 : 100
.04 AR-04 TAMPAK SAMPING KANAN & TAMPAK SAMPING KIRI 1 : 100 .29 SR-05 DAFTAR BALOK 1 : 10
.05 AR-05 POTONGAN A-A & B-B 1 : 100 .30 SR-06 DENAH RENCANA ATAP 1 : 100
.06 AR-06 POTONGAN C-C & D-D 1 : 100 .31 SR-07 POTONGAN ATAP 1 : 50
.07 AR-07 DENAH KUSEN LANTAI 1 & LANTAI 2 1 : 100
MEKANIKAL
.08 AR-08 TIPE KUSEN 1 1 : 50
.09 AR-09 TIPE KUSEN 2 1 : 50 .32 PL-01 DENAH INSTALASI AIR BERSIH LT. 1 & LT. 2 1 : 100
.10 AR-10 TIPE KUSEN 3 & DETAIL DAUN PINTU 1 : 50 .33 PL-02 DENAH INSTALASI AIR BERSIH ATAP
.11 AR-11 DETAIL DAUN PINTU 1 : 20 .34 PL-03 DENAH INSTALASI AIR HUJAN LT. 1 & ATAP 1 : 100
.12 AR-12 DENAH POLA LANTAI LT. 1 & LT. 2 1 : 100 .35 PL-04 DENAH INSTALASI AIR KOTOR LT. 1 & LT.2 1 : 100
.13 AR-13 DETAIL POLA LANTAI 1 : 20 .36 PL-05 DENAH SEPTICTANK 1 : 20
.14 AR-14 DENAH POLA PLAFOND LT. 1 & LT. 2 1 : 100
.15 AR-15 DETAIL POLA PLAFOND 1 : 20
.16 AR-16 DETAIL TANGGA & DETAIL PAGAR RAILLING 1 : 50 & 1 : 20
.17 AR-17 DETAIL KM/WC 1 LANTAI 1 1 : 20
.18 AR-18 DETAIL KM/WC 1 LANTAI 1 1 : 20
.19 AR-19 DETAIL KM/WC 2 LANTAI 1 1 : 20
.20 AR-20 DETAIL KM/WC 2 LANTAI 1 1 : 20
.21 AR-21 DETAIL KM/WC 3 LANTAI 2 1 : 20
.22 AR-22 DETAIL KM/WC 3 LANTAI 2 1 : 20

PERENCANA PEKERJAAN GAMBAR DISETUJUI DIPERIKSA DIGAMBAR KODE HALAMAN


ARSITEK STRUKTUR
PROJECT OF VILLA DAFTAR GAMBAR AR
COLLAPSIBLE METAL FRAME
BALI INDONESIA
SCALA NTS
TANGGAL

11-02-23
NO. GAMBAR

00
00
Bpk. .... -
U
PLAZA

SWIMMING POOL

POOLDECK

TEMPAT BILAS
GUEST TOILET
-0.05

KITCHEN
P ±0,00
3.50

3.50
-0.30
LIVING ROOM
P ±0,00

TAMAN DEPAN
P ±0,00
HALL
1.50

TERACE
10.00

10.00
3.00
1.50

UP
TAMAN BELAKANG

10
11

4
3
7
6
5
12

9
13

2
1
8

BED ROOM 1
BATH ROOM 1

P ±0,00

-0.30
3.50

3.50
-0.05

CARPORT

JALAN
3.00 2.74 2.74 1.52

10.00 TAMAN SAMPING

LANDSEKAP
SKALA 1 : 100

PERENCANA PEKERJAAN GAMBAR DISETUJUI DIPERIKSA DIGAMBAR KODE HALAMAN


ARSITEK STRUKTUR
PROJECT OF VILLA LANDSEKAP SP
COLLAPSIBLE METAL FRAME
BALI INDONESIA
SCALA 1 : 100
TANGGAL

11-02-23
NO. GAMBAR

01
01
Bpk. .... -
10.00 10.00
3.50 1.50 1.50 3.50 3.50 1.50 1.50 3.50

DW
BATH ROOM 2 14 15 16 17 18 BATH ROOM 3
13 P +3,28 13 P +3,28
3.00

3.00

3.00

3.00
BATH ROOM 1 12
HALL GUEST TOILET 12

-0.05 11
P ±0,00 -0.05 11
10 10
9 9
8 8
7 7
6
5
4
WARDROBE 2 HALL WARDROBE 3
3
2
P +3,30 P +3,30
KITCHEN
2.74

2.74

2.74

2.74
1
P ±0,00
UP
10.00

10.00

10.00

10.00
BED ROOM 1
P ±0,00
2.74

2.74

2.74

2.74
BED ROOM 2 BED ROOM 3
P +3,30 P +3,30

LIVING ROOM
BALCONIES
1.52

1.52

1.52

1.52
P ±0,00
P +3,28

TERACE
-0.30 -0.05 -0.30

3.50 3.00 3.50 3.50 3.00 3.50

10.00 10.00

1st FLOOR PLAN 2nd FLOOR PLAN


SCALA 1 : 100 SCALA 1 : 100

PERENCANA PEKERJAAN GAMBAR DISETUJUI DIPERIKSA DIGAMBAR KODE HALAMAN


ARSITEK STRUKTUR
PROJECT OF VILLA 1st FLOOR PLAN & 2nd FLOOR PLAN AR
COLLAPSIBLE METAL FRAME
BALI INDONESIA
SCALA 1 : 100
TANGGAL NO. GAMBAR

01
02
Bpk. .... Ir. Arief Aksa -
10.00

3.50 1.50 1.50 3.50

3.00

3.00
2.74

2.74
ROOF TOP ONDOLIN

10.00

10.00
2.74

2.74
1.52

1.52
3.50 3.00

10.00 3.50

ROOF PLAN
SCALA 1 : 100

PERENCANA PEKERJAAN GAMBAR DISETUJUI DIPERIKSA DIGAMBAR KODE HALAMAN


ARSITEK STRUKTUR
PROJECT OF VILLA ROOF PLAN AR
COLLAPSIBLE METAL FRAME
BALI INDONESIA
SCALA 1 : 100
TANGGAL

11-02-23
NO. GAMBAR

02
03
Bpk. .... -
1.27

1.27
3.30

3.30
7.87

7.87
3.30

3.30
3.50 3.00 3.50 1.52 2.74 2.74 3.00
10.00
10.00

FACADE 1 - 5 FACADE A - E
SCALA 1 : 100 SCALA 1 : 100

PERENCANA PEKERJAAN GAMBAR DISETUJUI DIPERIKSA DIGAMBAR KODE HALAMAN


ARSITEK STRUKTUR
PROJECT OF VILLA FACADE 1-5 & FACADE A-E AR
COLLAPSIBLE METAL FRAME
BALI INDONESIA
SCALA 1 : 100
TANGGAL

11-02-23
NO. GAMBAR

03
04
Bpk. .... -
1.27

1.27
3.30

3.30
7.87

7.87
BALKON WARDROBE 2 WARDROBE 3
P +3,28 P +3,30 P +3,30

3.30

3.30
BED ROOM 1 LIVING ROOM BED ROOM 1 KITCHEN
P ±0,00 P ±0,00 P ±0,00 P ±0,00

3.50 3.00 3.50 3.50 3.00 3.50

10.00 10.00

SECTION A-A SECTION B-B


SKALA 1 : 100 SCALA 1 : 100

PERENCANA PEKERJAAN GAMBAR DISETUJUI DIPERIKSA DIGAMBAR KODE HALAMAN


ARSITEK STRUKTUR
PROJECT OF VILLA SECTION A-A & POTONGAN B-B AR
COLLAPSIBLE METAL FRAME
BALI INDONESIA
SCALA 1 : 100
TANGGAL

11-02-23
NO. GAMBAR

05
06
Bpk. .... -
1.27

1.27
3.30

3.30
7.87

7.87
BALCONIES BED ROOM 3 WARDROBE 3 BATH ROOM 3 BED ROOM 3
P +3,28 P +3,30 P +3,30 P +3,25 P +3,28 P +3,30

3.30

3.30
LIVING ROOM KITCHEN GUEST TOILET LIVING ROOM
P ±0,00 P ±0,00 -0.05 P ±0,00

1.52 2.74 2.74 3.00 1.52 2.74 2.74 3.00


10.00 10.00

SECTION C-C SECTION D-D


SCALA 1 : 100 SCALA 1 : 100

PERENCANA PEKERJAAN GAMBAR DISETUJUI DIPERIKSA DIGAMBAR KODE HALAMAN


ARSITEK STRUKTUR
PROJECT OF VILLA SECTION C-C & POTONGAN D-D AR
COLLAPSIBLE METAL FRAME
BALI INDONESIA
SCALA 1 : 100
TANGGAL

11-02-23
NO. GAMBAR

06
07
Bpk. .... -
10.00 10.00
3.50 1.50 1.50 3.50 3.50 1.50 1.50 3.50

DW
BATH ROOM 2 14 15 16 17 18 BATH ROOM 3
13 P +3,28 13 P +3,28
3.00

3.00

3.00

3.00
BATH ROOM 1 12
HALL GUEST TOILET 12

-0.05 11
P ±0,00 -0.05 11
10 10
9 9
8 8
7 7
6
5
4
WARDROBE 2 HALL WARDROBE 3
3
2
P +3,30 P +3,30
KITCHEN
2.74

2.74

2.74

2.74
1
P ±0,00
UP
10.00

10.00

10.00

10.00
BED ROOM 1
P ±0,00
2.74

2.74

2.74

2.74
BED ROOM 2 BED ROOM 3
P +3,30 P +3,30

LIVING ROOM
BALCONIES
1.52

1.52

1.52

1.52
P ±0,00
P +3,28

TERACE
-0.30 -0.05 -0.30

3.50 3.00 3.50 3.50 3.00 3.50

10.00 10.00

1st FLOOR PLAN 2nd FLOOR PLAN


SCALA 1 : 100 SCALA 1 : 100

PERENCANA PEKERJAAN GAMBAR DISETUJUI DIPERIKSA DIGAMBAR KODE HALAMAN


ARSITEK STRUKTUR
PROJECT OF VILLA DENAH PENEMPATAN KUSEN LT. 1 & LT. 2 AR
COLLAPSIBLE METAL FRAME
BALI INDONESIA
SCALA 1 : 100
TANGGAL

11-02-23
NO. GAMBAR

07
08
Bpk. .... -
P1 P2 P3 P4

POT POT POT POT


skala 1:50 skala 1:50 skala 1:50 skala 1:50

JUMLAH 1 Buah JUMLAH 3 Buah JUMLAH 4 Buah JUMLAH 1 Buah


KUSEN ALLUMUNIUM SETARA YKK KUSEN ALLUMUNIUM SETARA YKK KUSEN ALLUMUNIUM SETARA YKK KUSEN ALLUMUNIUM SETARA YKK

DAUN PINTU / JENDELA RANGKA ALLUMUNIUM + KACA DAUN PINTU / JENDELA ALLUMUNIUM DAUN PINTU / JENDELA ALLUMUNIUM DAUN PINTU / JENDELA RANGKA ALLUMUNIUM + KACA

KACA - KACA - KACA - KACA -

FINISH POWDER COATING FINISH POWDER COATING FINISH POWDER COATING FINISH POWDER COATING

LOKASI RUANG BERSAMA LT. 1 LOKASI RUANG TIDUR LT. 1 & LT. 2 LOKASI KM/WC R TIDUR LT. 1 & LT. 2 LOKASI RUANG BERSAMA LT. 2

PERENCANA PEKERJAAN GAMBAR DISETUJUI DIPERIKSA DIGAMBAR KODE HALAMAN


ARSITEK STRUKTUR
PROJECT OF VILLA TIPE KUSEN 1 AR
COLLAPSIBLE METAL FRAME
BALI INDONESIA
SCALA 1 : 50
TANGGAL

11-02-23
NO. GAMBAR

08
09
Bpk. .... -
J1 J2 J3

POT POT POT


skala 1:50 skala 1:50 skala 1:50

JUMLAH 9 Buah JUMLAH 2 Buah JUMLAH 4 Buah


KUSEN ALLUMUNIUM SETARA YKK KUSEN ALLUMUNIUM SETARA YKK KUSEN ALLUMUNIUM SETARA YKK

DAUN PINTU / JENDELA RANGKA ALLUMUNIUM + KACA DAUN PINTU / JENDELA RANGKA ALLUMUNIUM + KACA DAUN PINTU / JENDELA RANGKA ALLUMUNIUM + KACA

KACA - KACA - KACA -

FINISH POWDER COATING FINISH POWDER COATING FINISH POWDER COATING

LOKASI RUANG BERSAMA LT. 1 & LT. 2 LOKASI RUANG BERSAMA LT. 1 LOKASI RUANG BERSAMA LT. 1 & LT. 2

PERENCANA PEKERJAAN GAMBAR DISETUJUI DIPERIKSA DIGAMBAR KODE HALAMAN


ARSITEK STRUKTUR
PROJECT OF VILLA TIPE KUSEN 2 AR
COLLAPSIBLE METAL FRAME
BALI INDONESIA
SCALA 1 : 50
TANGGAL

11-02-23
NO. GAMBAR

09
10
Bpk. .... -
.71 .51 .82
.10 .51 .10 .10 .31 .10 .67 .15

.10

.10
.10

.10
G1

.63
.60
2.45

2.45
2.15

2.15
2.45

2.25

2.45

2.25

2.45

2.45
.60
POT

.63
skala 1:50
.10

.10
.20

.20
.71 .51 .82

JUMLAH 8 Buah
KUSEN -
.10 ~ .10 .10 ~ .10 .67 .15
DAUN PINTU / JENDELA - 0.71 0.51

KACA -

FINISH -

LOKASI KM/WC, AREA TANGGA LT. 1 & LT. 2 Detail daun Pintu Detail daun Pintu Detail daun Pintu
Tipe P1 1 bh Tipe P1 1 bh Tipe P2 4 bh
scala 1:20 scala 1:20 scala 1:20

PERENCANA PEKERJAAN GAMBAR DISETUJUI DIPERIKSA DIGAMBAR KODE HALAMAN


ARSITEK STRUKTUR
PROJECT OF VILLA TIPE KUSEN 3 & DETAIL DAUN PINTU AR
COLLAPSIBLE METAL FRAME
BALI INDONESIA
SCALA 1 : 50 & 1 : 20
TANGGAL

11-02-23
NO. GAMBAR

10
11
Bpk. .... -
.74
.10 .54 .10

.10

.10
.77
.62 .15

.50

2.45
.55

2.15
2.45

2.25
2.10

2.10
.55
.50

.10

.20
.77 .74

.62 .15 .10 ~ .10


0.74

Detail daun Pintu Detail daun Pintu


Tipe P3 4 bh Tipe P4 4 bh
scala 1:20 scala 1:20

PERENCANA PEKERJAAN GAMBAR DISETUJUI DIPERIKSA DIGAMBAR KODE HALAMAN


ARSITEK STRUKTUR
PROJECT OF VILLA DETAIL DAUN PINTU AR
COLLAPSIBLE METAL FRAME
BALI INDONESIA
SCALA 1 : 20
TANGGAL

11-02-23
NO. GAMBAR

11
12
Bpk. .... -
1.27

1.27
3.30

3.30
7.87

7.87
3.30

3.30
3.50 3.00 3.50 3.00 2.74 2.74 1.52
10.00
10.00

FACADE 5 - 1 FACADE E - A
SCALA 1 : 100 SCALA 1 : 100

PERENCANA PEKERJAAN GAMBAR DISETUJUI DIPERIKSA DIGAMBAR KODE HALAMAN


ARSITEK STRUKTUR
PROJECT OF VILLA FACADE 5-1 & E-A AR
COLLAPSIBLE METAL FRAME
BALI INDONESIA
SCALA 1 : 100
TANGGAL

11-02-23
NO. GAMBAR

04
05
Bpk. .... -
10.00 10.00
3.50 1.50 1.50 3.50 3.50 1.50 1.50 3.50

DW
14 15 16 17 18
P +3,28 P +3,28
13 13
3.00

3.00

3.00

3.00
-0.05 12 12
11 11
10
P ±0,00 -0.05 10
9 9
8 8
7 7
6
5
4
HALL
3
P +3,30 P +3,30
2
2.74

2.74

2.74

2.74
1
P ±0,00
UP
10.00

10.00

10.00

10.00
P ±0,00 P ±0,00
2.74

2.74

2.74

2.74
P +3,30
P +3,30
1.52

1.52

1.52

1.52
P +3,28

TERACE
-0.30 -0.05 -0.30

3.50 3.00 3.50 3.50 3.00 3.50

10.00 10.00

1st FLOOR PLAN 2nd FLOOR PLAN


SCALA 1 : 100 SCALA 1 : 100

PERENCANA PEKERJAAN GAMBAR DISETUJUI DIPERIKSA DIGAMBAR KODE HALAMAN


ARSITEK STRUKTUR
PROJECT OF VILLA DENAH POLA LANTAI LT. 1 & LT. 2 AR
COLLAPSIBLE METAL FRAME
BALI INDONESIA
SCALA 1 : 100
TANGGAL

11-02-23
NO. GAMBAR

12
13
Bpk. .... -
.05 TERAS ±0.00 KM/WC ±0.00
-0.05 -0.05

.18 .07
-0.30

DETAIL 1 DETAIL 2
SCALA 1 : 20 SCALA 1 : 20

BALKON LANTAI 2 KM/WC LANTAI 2


+3.28 +3.30 +3.28 +3.30

DETAIL 3 DETAIL 4
SCALA 1 : 20 SCALA 1 : 20

PERENCANA PEKERJAAN GAMBAR DISETUJUI DIPERIKSA DIGAMBAR KODE HALAMAN


ARSITEK STRUKTUR
PROJECT OF VILLA FLOOR DETAIL AR
COLLAPSIBLE METAL FRAME
BALI INDONESIA
SCALA 1 : 20
TANGGAL

11-02-23
NO. GAMBAR

13
14
Bpk. .... -
10.00

10.00 3.50 1.50 1.50 3.50

3.50 1.50 1.50 3.50

3.00

3.00

3.00

3.00
2.74

2.74

2.74

2.74
10.00

10.00

10.00

10.00
2.74

2.74

2.74

2.74
1.52

1.52

1.52

1.52
3.50 3.00 3.50 3.50 3.00 3.50

10.00 10.00

1st FLOOR CEILING PLAN 2nd FLOOR CEILING PLAN


SCALA 1 : 100 SCALA 1 : 100

PERENCANA PEKERJAAN GAMBAR DISETUJUI DIPERIKSA DIGAMBAR KODE HALAMAN


ARSITEK STRUKTUR
PROJECT OF VILLA CEILING PLAN AR
COLLAPSIBLE METAL FRAME
BALI INDONESIA
SCALA 1 : 100
TANGGAL

11-02-23
NO. GAMBAR

14
15
Bpk. .... -
BALKON LANTAI 2 LANTAI 2

DETAIL 1 DETAIL 2 DETAIL 3


SCALA 1 : 20 SCALA 1 : 20 SCALA 1 : 20

DETAIL 4 DETAIL 5 DETAIL 6


SCALA 1 : 20 SCALA 1 : 20 SCALA 1 : 20

PERENCANA PEKERJAAN GAMBAR DISETUJUI DIPERIKSA DIGAMBAR KODE HALAMAN


ARSITEK STRUKTUR
PROJECT OF VILLA PLAFOND DETAIL AR
COLLAPSIBLE METAL FRAME
BALI INDONESIA
SCALA 1 : 20
TANGGAL

11-02-23
NO. GAMBAR

15
16
Bpk. .... -
DW
18 18 P +3,30 P +3,30
14 15 16 17 18 17
13 13 16
15 2
12 12 14
11 11 13
10 10 12
11
9 9 10
8 8 9
8
7 7
DETAIL 1 7
6 6
5 5
4
4 HALL 3
3 2
1
2 P ±0,00
P ±0,00 P ±0,00
1
UP

1st FLOOR STAIRS 2nd FLOOR STAIRS SECTION A-A SECTION B-B
SCKALA 1 : 100 SCALA 1 : 100 SCALA 1 : 100 SCALA 1 : 100

.30
.05 .25

.90
.06 .12
.18

DETAIL 1 DETAIL RAILLING


SKALA 1 : 20 SKALA 1 : 20

PERENCANA PEKERJAAN GAMBAR DISETUJUI DIPERIKSA DIGAMBAR KODE HALAMAN


ARSITEK STRUKTUR
PROJECT OF VILLA STAIRS DETAIL AR
COLLAPSIBLE METAL FRAME
BALI INDONESIA
SCALA 1 : 50 & 1 : 20
TANGGAL

11-02-23
NO. GAMBAR

16
17
Bpk. .... -
.10
.10
10.00

.30
.20
3.50 1.50 1.50 3.50
P.1 P.1 P.1 P.1 P.1
K.1 Sloof 20/30 Sloof 20/30
K.1 K.1 K.1 Sloof 20/30 K.1 .30

.30

.30

.60
Sloof 20/30

Sloof 20/30

Sloof 20/30

Sloof 15/20

Sloof 20/30
8
3.00

3.00

.85
7

1.30
6 1
5
4

1.00
P.1 3 P.1 P.1 P.1

.15
K.1 Sloof 20/30 Sloof 20/30 K.1 Sloof 20/30
2
1
K.1 K.1
NK
Sloof 20/30

Sloof 20/30

Sloof 20/30

Sloof 20/30

.10
.10 .60 .10
2.74

2.74
.80

.25
10.00

10.00
P.1 P.1 P.1 P.1

.05
K.1 Sloof 20/30 Sloof 20/30
K.1 K.1 Sloof 20/30 K.1
POTONGAN 1

.15
SKALA 1 : 20
Sloof 20/30

Sloof 20/30

Sloof 20/30

Sloof 20/30

.10
2.74

2.74
P.1 P.1 P.1 P.1
K.1 Sloof 20/30 Sloof 20/30
K.1 K.1 Sloof 20/30 K.1
Sloof 20/30

Sloof 20/30

Sloof 20/30

Sloof 20/30
1.52

1.52
P.1 P.1 P.1 P.1 P.1
K.1 Sloof 20/30 Sloof 20/30
K.1 K.1 K.1 Sloof 20/30 K.1

.45
.90

.20
.30
3.50 3.00 3.50

10.00

.45

.05
.05 .15 .05

.10
.05 .20 .05
.45 .45

.90

POUNDATION PLAN
SKALA 1 : 100 DETAIL P1/K1
SKALA 1 : 20

PERENCANA PEKERJAAN GAMBAR DISETUJUI DIPERIKSA DIGAMBAR KODE HALAMAN


ARSITEK STRUKTUR
PROJECT OF VILLA POUNDATION PLAN & DETAIL SR
COLLAPSIBLE METAL FRAME
BALI INDONESIA
SCALA 1 : 100 & 1 : 20
TANGGAL

11-02-23
NO. GAMBAR

01
18
Bpk. .... -
10.00
3.50 1.50 1.50 3.50
4
K.1 K.1 K.1 K.1 K.1

8 9 10 11
12
3.00

3.00
7 13
6 14
5 15

TR

K.1 K.1 K.1 K.1


2.74

2.74
T PLAT =12cm
DETAIL 1 DETAIL 2
10.00

10.00
FFL +3,30
FSL +3,25

K.1 K.1 K.1 K.1 K.1 SKALA 1 : 20 SKALA 1 : 20

3 4
2.74

2.74
K.1 K.1 K.1 K.1 K.1

2
1.52

1.52
K.1 K.1 K.1 K.1

3.50 3.00 3.50

10.00

2nd FLOOR PLAN


SCALA 1 : 100

DETAIL 3 DETAIL 4
SKALA 1 : 20 SKALA 1 : 20

PERENCANA PEKERJAAN GAMBAR DISETUJUI DIPERIKSA DIGAMBAR KODE HALAMAN


ARSITEK STRUKTUR
PROJECT OF VILLA 2nd FLOOR PLAN & DETAIL SR
COLLAPSIBLE METAL FRAME
BALI INDONESIA
SCALA 1 : 100 & 1 : 20
TANGGAL

11-02-23
NO. GAMBAR

02
19
Bpk. .... -