DAFTAR GAMBAR ARSITEKTUR DAFTAR GAMBAR ARSITEKTUR

A-101A DENAH LT. 1 A-503A TANGGA #3 DENAH


A-101B DENAH LT. 2 A-503B TANGGA #3 POTONGAN (1)
A-101C DENAH LT. ROOF GARDEN A-503C TANGGA #3 POTONGAN (2)
A-101D DENAH LT. TOP ROOF GAMBAR KERJA
A-102A TAMPAK DEPAN A-601A DENAH POLA LANTAI LT. 1
A-102B
A-103A
TAMPAK SAMPING
POTONGAN A
A-601B
A-601C
DENAH POLA LANTAI LT. 2
DENAH POLA LANTAI LT. ROOF GARDEN
RUMAH KOS
A-103B
A-103C
POTONGAN B
POTONGAN C
A-601D SCHEDULE POLA LANTAI @ DEWANDARU
A-103D POTONGAN D A-701A DENAH PLAFOND LT. 1
A-103E POTONGAN E A-701B DENAH PLAFOND LT. 2
A-103F POTONGAN F A-701C DENAH PLAFOND LT. ROOF GARDEN
A-103G POTONGAN G
A-103H POTONGAN H A-801 DETAIL ( 01 )
A-802 DETAIL ( 02 )
A-201 DENAH FURNITURE LT. 1
A-202 DENAH FURNITURE LT. 2
A-203 DENAH FURNITURE LT. ROOF GARDEN
A-204 SCHEDULE FURNITURE

A-301A TOILET#1 DENAH & PLAFOND


A-301B TOILET#1 POTONGAN A & B
A-301C TOILET #1 POTONGAN C & D
A-302A TOILET#2 DENAH & PLAFOND
A-302B TOILET#2 POTONGAN A & B
A-302C TOILET #2 POTONGAN C & D
A-303A TOILET#3 DENAH & PLAFOND
A-303B TOILET#3 POTONGAN A & B
A-303C TOILET #3 POTONGAN C & D
A-304A TOILET#4 DENAH & PLAFOND
A-304B TOILET#4 POTONGAN A & B
A-304C TOILET #4 POTONGAN C & D
A-305A TOILET#5 DENAH & PLAFOND
A-305B TOILET#5 POTONGAN A & B
A-305C TOILET #5 POTONGAN C & D
A-306 DAPUR

A-401A KEYPLAN PINTU JENDELA LT. 1


A-401B KEYPLAN PINTU JENDELA LT. 2
A-401C KEYPLAN PINTU JENDELA LT. ROOF GARDEN
A-402A SCHEDULE PINTU JENDELA (1)
A-402B SCHEDULE PINTU JENDELA (2)
A-402C SCHEDULE PINTU JENDELA (3)

A-501A TANGGA #1 DENAH Scan this with App

A-501B TANGGA #1 POTONGAN (1)


A-501C TANGGA #1 POTONGAN (2)
A-502A TANGGA #2 DENAH
A-502B TANGGA #2 POTONGAN (1)
A-502C TANGGA #2 POTONGAN (2)

ARS
LT. 2 - KORIDOR LT. 1 - KORIDOR

LT. 1 - R. BERSAMA LT. 1 - FACADE


LT. ROOF GARDEN - KORIDOR LT. ROOF GARDEN - PERGOLA

LT. ROOF GARDEN - KORIDOR OUTDOOR LT. 1 - ENTERANCE


3075 1475 1350 3000 3000 1350 1475 3075
612 EQ EQ 613 1350 1350 612 EQ EQ 613

TOILET #2 TOILET #2m TOILET #2 TOILET #2m

5202
UNIT 9 UNIT 8 UNIT 7 UNIT 6

5703
-
FFL. ± 0.000 FFL. ± 0.000 FFL. ± 0.000 FFL. ± 0.000
G

2#AGGNAT
-

KN
212 212

0051
UNIT 10 UNIT 5
FFL. ± 0.000 FFL. ± 0.000

0051
UNIT 11 UNIT 4
FFL. ± 0.000 FFL. ± 0.000

TOILET #1 TOILET #1m


H

0051
NAMAT
NAMAT

050.0 - .LE
050.0 - .LE

TOILET #1 TOILET #1m -

TOILET #1m TOILET #1

0051
TOILET #1m TOILET #1
UNIT 12 UNIT 3
FFL. ± 0.000 FFL. ± 0.000

50 50

0051
UNIT 13 UNIT 2
FFL. ± 0.000 FFL. ± 0.000

0051
PENGELOLA UNIT 1
FFL. ± 0.000 FFL. ± 0.000

0051
05

F
TOILET #1 TOILET #1m -
FFL. ± 0.000

0051
-

R. BERSAMA
FFL. ± 0.000
NAMAT
050.0 - .LE

4#TELIOT

1#AGGNAT

NK

0051
50
02

DAPUR
FFL. ± 0.000

WARUNG

0051
GARASI
FFL. - 0.050
5701

E
-

R. TAMU K. TAMU
FFL. ± 0.000 FFL. ± 0.000
0003

TOILET #2m
0591

0001

CARPORT KIRI CARPORT KANAN


FFL. - 0.050 FFL. ~
5563

A B C D
- - - -

PROYEK GAMBAR NOMOR GAMBAR NOMOR REVISI NOMOR PROYEK


-

Project Drawing DENAH Drawing Number Revision Number Project Number

RUMAH KOS DEWANDARU A-101A R0 -


LANTAI 1
3075 1475 1350 3000 3000 1350 1475 3075
612 EQ EQ 1350 1350 612 EQ EQ 613

TOILET #2 TOILET #2m TOILET #2 TOILET #2m

5202
UNIT 24 UNIT 23 UNIT 22 UNIT 21

5703
-
-
FFL. + 3.400 FFL. + 3.400 FFL. + 3.400 FFL. + 3.400
G

2#AGGNAT
3#AGGNAT
-

RT
KN
212 212

0051
UNIT 25 UNIT 20
FFL. + 3.400 FFL. + 3.400

0051
UNIT 26 UNIT 19
FFL. + 3.400 FFL. + 3.400

TOILET #1 TOILET #1m


H

0051
TOILET #1 TOILET #1m -

TOILET #1m TOILET #1

0051
TOILET #1m TOILET #1
UNIT 27 UNIT 18
FFL. + 3.400 FFL. + 3.400

0051
UNIT 28 UNIT 17
FFL. + 3.400 FFL. + 3.400

0051
UNIT 29 UNIT 16
FFL. + 3.400 FFL. + 3.400

0051
F
TOILET #1 TOILET #1m -

0051
TOILET #1 TOILET #1m
UNIT 15
-

FFL. + 3.400
1#AGGNAT

0051
UNIT 30 UNIT 14
RT

FFL. + 3.400 FFL. + 3.400

0051
TOILET #2m TOILET #2 E
-

UNIT 31 UNIT 32 UNIT 33 UNIT 34


FFL. + 3.400 FFL. + 3.400 FFL. + 3.400 FFL. + 3.400
0003
0501

TOILET #3 TOILET #3m


005

0001

750 900 900 525 375 1800 900 750

325 325
5563

A B C D
- - - -

PROYEK GAMBAR NOMOR GAMBAR NOMOR REVISI NOMOR PROYEK


-

Project Drawing DENAH Drawing Number Revision Number Project Number

RUMAH KOS DEWANDARU A-101B R0 -


LANTAI 2
3075 1475 1350 3000 3000 1350 1475 3075
1575 1500 1350 1350 1500 1575

TOILET#5

5751
02
JEMUR LAUNDRY
FFL. + 6800 FFL. + 6.800 GUDANG

5703
-
FFL. + 6.800
G

2#AGGNAT
-

200 200

002

RT
002
200 200 200 200
FFL. + 6.800

0051
ROOF GARDEN
FFL. + 7.650

0051
H

0051
-

GAZEBO
FFL. + 6800

0051
ROOF GARDEN ROOF GARDEN
FFL. + 7.650 FFL. + 7.650

0051
0051
002
002

0051
F
-

0051
RAILING
EL +7.900

0051
OUTDOOR
FFL. + 6800

0051 DAK TALANG DAK TALANG


FFL. + 6800 FFL. + 6800
E
-
0003
005

ROOF GARDEN
FFL. + 7.650
0001

FFL. + 7.150

UNIT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
5563

PRM1 PRM2 PRM2 PRM1


TIPE STD1A STD1A STD1A STD1A STD1A STD3A STD2 STD2 STD3B STD1B STD1A STD1B STD1A STD1A STD1A STD1A STD1A STD1A STD1A STD1A STD3A STD2 STD2 STD3C STD1C STD1A STD1C STD1A STD1C STD1C
A A B B

LUAS 11.25 11.25 11.25 11.25 11.25 12.21 10.22 10.22 12.21 11.25 11.25 11.25 11.25 11.25 11.25 11.25 11.25 11.25 11.25 11.25 12.21 10.22 10.22 12.21 11.25 11.25 11.25 11.25 11.25 11.25 19.59 14.63 14.63 19.59
M2

A B C D
- - - -

PROYEK GAMBAR NOMOR GAMBAR NOMOR REVISI NOMOR PROYEK


-

Project Drawing DENAH Drawing Number Revision Number Project Number

RUMAH KOS DEWANDARU A-101C R0 -


LANTAI ROOF GARDEN
3075 1475 1350 3000 3000 1350 1475 3075
TOW TOW
EL +9.200 EL +10.500

TOP ROOF
TOW TOW
FFL. + 10.250
EL +9.200 EL +10.500

5703
G
-

TOW TOW
EL +9.200 EL +10.500

0051
TOW
EL +10.500

TOW TOW
EL +7.750 EL +7.750 TOW
TOW TOW EL +7.750

0051
EL +7.750 EL +7.750

TOW
EL +7.550 SKY LIGHT SKY LIGHT TOW
FFL. ~ FFL. ~ H

0051
EL +7.550
-

TOW
EL +9.200
PERGOLA
FFL. ~

0051
TOW TOW TOW TOW
EL +7.750 EL +7.750 EL +7.750 EL +7.750

0051
TOW TOW
EL +7.750 EL +7.750

0051
TOW TOW
EL +8.450 EL +8.450 TOW

0051
EL +9.200

TOW TOW F
-
EL +7.750 EL +7.750

0051
TOW TOW
SKY LIGHT EL +8.250 EL +8.250 SKY LIGHT
FFL. ~ FFL. ~

0051
0051
E
-
TOW TOW
TOW
EL +8.450 EL +8.450
EL +7.750
0003

TOW TOW TOW


TOW
TOW EL +7.750 EL +8.450 EL +7.750
EL +7.550
EL +7.750
0001

TOW TOW
EL +7.750 EL +8.400
TOW
TOW
EL +7.250
EL +7.750
5563

A B C D
- - - -

PROYEK GAMBAR NOMOR GAMBAR NOMOR REVISI NOMOR PROYEK


-

Project Drawing DENAH Drawing Number Revision Number Project Number

RUMAH KOS DEWANDARU A-101D R0 -


LANTAI TOP ROOF
Project Number
NOMOR PROYEK

-
Revision Number
NOMOR REVISI

R0
A-102A
Drawing Number
NOMOR GAMBAR
LT T ROOF
FFL. +10.250
3450

EL. +8.400
TERALIS RAMBAT
KANAN
650

EL. +7.750 EL. +7.750


500

LOGO + LAMPU EL. +7.250


C3
950

(AKAN DI TENTUKAN)
150 500
LT R GARD 2825 10200 2100 2675
FFL. +6.800
1200 900 900 150
C3 EL. +6.600
900

900 1175 1200 450

150 900

150
HW612
600

650 EL. +5.700


5150
3400

900 900 1800 1800


2100

C1
200

TERALIS RAMBAT HOLLOW 50x100 + KAWAT HARMONIKA GALVANIS

LT 2 PENUTUP ATAP UPVC + LISPLANK


FFL. +3.400 TIANG HOLLOW 100X100
350

TERALIS RAMBAT
50
800

C1
HOLLOW 50x100 + KAWAT HARMONIKA GALVANIS
EL. +3.000

1000
EL. +2.600
600
3400

TALI AIR 15X10


800

C2

TERALIS RAMBAT

TAMPAK DEPAN
700

42 ROOSTER 56 ROOSTER
LT 1
200x200 200x200 KIRI
FFL. ±0.000
200

5675 75 1800 175 1600 275 900 75 900 450


3075 1475 1350 3000 3000 1350 1475 3075 150
150 150
17800

GAMBAR
Drawing
1 2 3 4 5 6 7 8 9 C1 CAT UMUM (PUTIH)

RUMAH KOS DEWANDARU


C2 CAT AKSEN (MOTIF SEMEN)

C3 CAT AKSEN (DARK GREY)

HW612 HOMOGENEUS TILE 600X1200MM

PROYEK
Project
HW612 = EX ROMAN 'RINJANI CHARCOAL -
Project Number
NOMOR PROYEK

-
Revision Number
NOMOR REVISI

R0
Drawing Number

A-102B
NOMOR GAMBAR
LT T ROOF
FFL. +10.250

3150 RAILING PEFORATED METAL HW612


.

+ HANDRAIL STAINLESS STELL HAIRLINE FIN


850

C2
3450

14850 4150
EL. +7.750
1400

800
750

LT R GARD
FFL. +6.800 56 ROOSTER
150

200x200 TALI AIR 15X10


EQ 1600 EQ C2 C2 C1

5150
3400

300
2100

150
TALI AIR 15X10 PAGAR PEFORATED METAL
C2 C2 C2
200

+ HOLLOW 50 X 20 + HOLLOW 100X50

LT 2 PENUTUP ATAP UPVC + LISPLANK


FFL. +3.400 TIANG HOLLOW 100X100
600 2100 2250 600 600 600 2325 2325 600 1650 600 2250 675 1800 1675
300

450 450 600 450 600

320
EL. +2.600

600
3400

600 2100 2250 600 600 600 2325 2325 600 600 825 2400 900 1800 375 1000

480
1050
2000

450 450 600 450 300

TAMPAK SAMPING
36 ROOSTER 27 ROOSTER
C2 C2 C2 200x200 C2 200x200
LT 1
FFL. ±0.000

600
1150

3075 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 3000 1000 3655
25730

GAMBAR
Drawing
Q P N M L K J H G F E D C B A

RUMAH KOS DEWANDARU


C1 CAT UMUM (PUTIH)

C2 CAT AKSEN (MOTIF SEMEN)

HW612 HOMOGENEUS TILE 600X1200MM

PROYEK
Project
-
Project Number
NOMOR PROYEK

-
Revision Number
NOMOR REVISI

R0
A-103A
Drawing Number
NOMOR GAMBAR
LT T ROOF
FFL. +10.250

TOW
FFL. +9.200

CH. +2.400
3450

ROOF GARDEN
EL. +7.750
FFL. +7.650

LT R GARD
FFL. +6.800

CH. +2.700 CH. +2.700 CH. +2.700 CH. +2.700 CH. +2.700

CH. +2.300 CH. +2.300


3400

LT 2
FFL. +3.400

CH. +2.700 CH. +2.700 CH. +2.700 CH. +2.700

CH. +2.300 CH. +2.300 CH. +2.300 CH. +2.350


3400

GARASI

POTONGAN A
T SAMPAH
FFL. -0.050
LT 1 FFL. ~
FFL. ±0.000

3075 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 3000 1000 3655
25730

GAMBAR
Drawing
Q P N M L K J H G F E D C B A

RUMAH KOS DEWANDARU


PROYEK
Project
-
Project Number
NOMOR PROYEK

-
Revision Number
NOMOR REVISI

R0
Drawing Number

A-103B
NOMOR GAMBAR
EL. +10.500

LT T ROOF
FFL. +10.250

EL. +9.500 CH. +2.700


CH. +2.400
3450

EL. +8.400

ROOF GARDEN
EL. +7.750 EL. +7.750 EL. +7.700
FFL. +7.650

LT R GARD
FFL. +6.800

CH. +2.700 CH. +2.700 CH. +2.700 CH. +2.700 CH. +2.700

EL. +5.700 CH. +2.300


EL. +5.100
3400

LT 2
FFL. +3.400

CH. +2.700 CH. +2.700 CH. +2.700 CH. +2.700 CH. +2.700
EL. +2.600
CH. +2.350 EL. +2.300 CH. +2.300 CH. +2.300
3400

EL. +1.900

POTONGAN B
FFL. -0.020
LT 1 FFL. -0.120
FFL. ±0.000

3655 1000 3000 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 3075
25730

GAMBAR
Drawing
A B C D E F G H J K L M N P Q

RUMAH KOS DEWANDARU


PROYEK
Project
-
Project Number
NOMOR PROYEK

-
Revision Number
NOMOR REVISI

R0
A-103C
Drawing Number
NOMOR GAMBAR
EL. +10.500

LT T ROOF
FFL. +10.250

CH. +2.700

EL. +8.100
3450

EL. +8.450 FFL. +8.400

EL. +8.250
ROOF GARDEN
EL. +7.750 EL. +7.750
EL. +8.150 FFL. +7.650

EL. +7.000 EL. +6.950


LT R GARD
FFL. +6.800

CH. +2.700 CH. +2.700 CH. +2.700 CH. +2.700

EL. +5.700 CH. +2.300 CH. +2.300


3400

EL. +3.600
LT 2
FFL. +3.400

EL. +3.000
CH. +2.700 CH. +2.700 CH. +2.700 CH. +2.700 CH. +2.700
EL. +2.600
EL. +2.300
3400

TAMAN TAMAN EL. +0.200

POTONGAN C
FFL. -0.050 FFL. -0.050
LT 1
FFL. ±0.000

3075 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 3000 1000 3655
25730

GAMBAR
Drawing
Q P N M L K J H G F E D C B A

RUMAH KOS DEWANDARU


PROYEK
Project
-
Project Number
NOMOR PROYEK

-
Revision Number
NOMOR REVISI

R0
A-103D
Drawing Number
NOMOR GAMBAR
EL. +10.500

LT T ROOF
FFL. +10.250

CH. +2.400
3450

ROOF GARDEN ROOF GARDEN


EL. +7.750 EL. +7.750 EL. +7.750
FFL. +7.650 FFL. +7.650

LT R GARD
FFL. +6.800

CH. +2.700 CH. +2.700 CH. +2.700

EL. +5.700 CH. +2.300


3400

EL. +3.600
LT 2
FFL. +3.400 EL. +3.120

EL. +3.000
CH. +2.700 CH. +2.700
EL. +2.600
CH. +1.900 CH. +2.300
3400

POTONGAN D
LT 1
FFL. ±0.000

3655 1000 3000 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 3075
25730

GAMBAR
Drawing
A B C D E F G H J K L M N P Q

RUMAH KOS DEWANDARU


PROYEK
Project
-
Project Number
NOMOR PROYEK

-
Revision Number
NOMOR REVISI

R0
Drawing Number

A-103E
NOMOR GAMBAR
LT T ROOF
FFL. +10.250
3450

EL. +8.450

EL. +7.750
EL. +7.550

LT R GARD
FFL. +6.800

CH. +2.700 CH. +2.700 CH. +2.700 CH. +2.700

CH. +2.300 CH. +2.300 EL. +5.700


3400

EL. +3.600
LT 2
FFL. +3.400

CH. +2.700 CH. +2.700

CH. +2.300 CH. +2.700 EL. +2.300


EL. +1.700
3400

GARASI

POTONGAN E
LT 1 FFL. -0.050
FFL. ±0.000

3075 1475 1350 3000 3000 1350 1475 3075

17800

GAMBAR
Drawing
9 8 7 6 5 4 3 2 1

RUMAH KOS DEWANDARU


PROYEK
Project
-
Project Number
NOMOR PROYEK

-
Revision Number
NOMOR REVISI

R0
Drawing Number
NOMOR GAMBAR

A-103F
EL. +10.250

LT T ROOF
FFL. +10.250

EL. +9.200
3450

EL. +8.450
EL. +8.250

EL. +7.700

LT R GARD
FFL. +6.800

CH. +2.700 CH. +2.700 CH. +2.700 CH. +2.700 CH. +2.700 CH. +2.700
3400

LT 2
FFL. +3.400

CH. +2.700 CH. +2.700 CH. +2.700

CH. +2.400
3400

POTONGAN F
LT 1
FFL. ±0.000

3075 1475 1350 3000 3000 1350 1475 3075

17800

GAMBAR
Drawing
1 2 3 4 5 6 7 8 9

RUMAH KOS DEWANDARU


PROYEK
Project
-
Project Number
NOMOR PROYEK

-
Revision Number
NOMOR REVISI

R0
A-103G
Drawing Number
NOMOR GAMBAR
EL. +10.250

LT T ROOF
FFL. +10.250

EL. +9.200
CH. +2.700 CH. +2.700 CH. +2.700
3450

EL. +7.700

LT R GARD
FFL. +6.800

CH. +2.700 CH. +2.700 CH. +2.700 CH. +2.700 CH. +2.700 CH. +2.700
3400

LT 2
FFL. +3.400

CH. +2.700 CH. +2.700 CH. +2.700 CH. +2.700 CH. +2.700 CH. +2.700
3400

POTONGAN G
LT 1
FFL. ±0.000

3075 1475 1350 3000 3000 1350 1475 3075

17800

GAMBAR
Drawing
1 2 3 4 5 6 7 8 9

RUMAH KOS DEWANDARU


PROYEK
Project
-
Project Number
NOMOR PROYEK

-
Revision Number
NOMOR REVISI

R0
A-103H
Drawing Number
NOMOR GAMBAR
LT T ROOF
FFL. +10.250
3450

ROOF GARDEN ROOF GARDEN


EL. +7.750 EL. +7.750 EL. +7.700
FFL. +7.650 FFL. +7.650
EL. +7.550 EL. +7.550 EL. +7.550

EL. +6.950 EL. +7.350 EL. +7.350 EL. +6.950


LT R GARD
FFL. +6.800

CH. +2.700 CH. +2.700 CH. +2.700 CH. +2.700

CH. +2.300 CH. +2.300 CH. +2.300 CH. +2.300


3400

PLANTER BOX PLANTER BOX

LT 2
FFL. +3.400

CH. +2.700 CH. +2.700 CH. +2.700 CH. +2.700

CH. +2.300 CH. +2.300 CH. +2.300 CH. +2.300


3400

TAMAN TAMAN

POTONGAN H
FFL. -0.050 FFL. -0.050
LT 1
FFL. ±0.000

3075 1475 1350 3000 3000 1350 1475 3075

17800

GAMBAR
Drawing
9 8 7 6 5 4 3 2 1

RUMAH KOS DEWANDARU


PROYEK
Project
-
3075 1475 1350 3000 3000 1350 1475 3075
612 EQ EQ 613 1350 1350 612 EQ EQ 613

1A 1A 1A 1A

5202
UNIT 9 UNIT 8 UNIT 7 UNIT 6

5703
-
FFL. ± 0.000 FFL. ± 0.000 FFL. ± 0.000 FFL. ± 0.000
G

2#AGGNAT
3 3 3 3
-

4 4 4 4

KN
3 3

4 4 1A

0051
1A
UNIT 10 UNIT 5
FFL. ± 0.000 FFL. ± 0.000

0051
UNIT 11 UNIT 4
FFL. ± 0.000 FFL. ± 0.000

4 4
1A 1A
H

0051
3 3
-

NAMAT
NAMAT

050.0 - .LE
050.0 - .LE

0051
4 4

UNIT 12 UNIT 3
FFL. ± 0.000 FFL. ± 0.000

1A 50 50 1A

0051
4 1A 1A 4
3 3
UNIT 13 UNIT 2
FFL. ± 0.000 FFL. ± 0.000
3

0051
1B 4 1A
3 3
PENGELOLA UNIT 1
FFL. ± 0.000 FFL. ± 0.000

0051
05

F
-

6 5

0051
4 3
-

R. BERSAMA
FFL. ± 0.000
NAMAT

020.0 - .LE
050.0 - .LE

12
1#AGGNAT
MUMU TELIOT

NK

0051
50
02

DAPUR
FFL. ± 0.000
10
13
WARUNG

0051
2

GARASI
FFL. - 0.050

9
1B E
-

3
R. TAMU K. TAMU
FFL. ± 0.000 FFL. ± 0.000
0003
0591

7 8 7
0001

CARPORT KIRI
FFL. - 0.050
5563

A B C D
- - - -

PROYEK GAMBAR NOMOR GAMBAR NOMOR REVISI NOMOR PROYEK


-

Project Drawing DENAH FURNITUR Drawing Number Revision Number Project Number

RUMAH KOS DEWANDARU A-201 R0 -


LANTAI 1
3075 1475 1350 3000 3000 1350 1475 3075
612 EQ EQ 1350 1350 612 EQ EQ 613

1A 1A 1A 1A

5202
UNIT 24 UNIT 23 UNIT 22 UNIT 21

5703
-
-
FFL. + 3.400 FFL. + 3.400 FFL. + 3.400 FFL. + 3.400
G

2#AGGNAT
3#AGGNAT
3 3 3 3
-

4 4 4 4

RT
KN
3 3

4 4 1A

0051
1A
UNIT 25 UNIT 20
FFL. + 3.400 FFL. + 3.400

0051
UNIT 26 UNIT 19
FFL. + 3.400 FFL. + 3.400

4 4
1A 1A
H

0051
3 3
-

0051
4 4

UNIT 27 UNIT 18
FFL. + 3.400 FFL. + 3.400

1A 1A

0051
4 1A 1A 4
3 3
UNIT 28 UNIT 17
FFL. + 3.400 FFL. + 3.400
3 3

0051
1A 4 4 1A
3 3
UNIT 29 UNIT 16
FFL. + 3.400 FFL. + 3.400

0051
3 F
-

0051
1A
4
UNIT 15
-

FFL. + 3.400
1#AGGNAT

0051
4 4

UNIT 30 UNIT 14
RT

FFL. + 3.400 FFL. + 3.400

1A 1A

0051
2
3 3

1B 2 4 4 2 1B E
-

UNIT 31 3
UNIT 32 UNIT 33 3
UNIT 34
FFL. + 3.400 FFL. + 3.400 FFL. + 3.400 FFL. + 3.400
0003

2
0501

1B 1B

3 2 2
005

3
0001

4 4

750 850 850 750

325 325
5563

A B C D
- - - -

PROYEK GAMBAR NOMOR GAMBAR NOMOR REVISI NOMOR PROYEK


-

Project Drawing DENAH FURNITUR Drawing Number Revision Number Project Number

RUMAH KOS DEWANDARU A-202 R0 -


LANTAI 2
3075 1475 1350 3000 3000 1350 1475 3075
1575 1500 1350 1350 1500 1575

TOILET UMUM
FFL. + 6.780 11 11

5751
02
JEMUR LAUNDRY
FFL. + 6800 FFL. + 6.800 GUDANG

5703
-
FFL. + 6.800
G

2#AGGNAT
-

200 200

002

RT
002
200 200 200 200
FFL. + 6.800

0051
ROOF GARDEN
FFL. + 7.650

0051
10 10 10 10

0051
-

GAZEBO
FFL. + 6800

0051
ROOF GARDEN ROOF GARDEN
FFL. + 7.650 FFL. + 7.650

0051
0051
002
002

0051
F
-

0051
RAILING
EL +7.900

0051
OUTDOOR
FFL. + 6800

0051 DAK TALANG DAK TALANG


FFL. + 6800 FFL. + 6800
E
-
0003
005

ROOF GARDEN
FFL. + 7.650
0001

FFL. + 7.150
5563

A B C D
- - - -

PROYEK GAMBAR NOMOR GAMBAR NOMOR REVISI NOMOR PROYEK


-

Project Drawing DENAH FURNITUR Drawing Number Revision Number Project Number

RUMAH KOS DEWANDARU A-203 R0 -


LANTAI ROOF GARDEN
1a. SINGLE BED SET (30 pcs) 1b. DOUBLE BED SET (6pcs) 2. NAKAS (8pcs)
ex, IKEA - MALM ex, IKEA - MALM ex, IKEA - MALM

3. LEMARI BAJU (36 pcs) 4. MEJA BELAJAR SET (35 pcs) 5. SOFA 3 SEAT (1 pcs), uk 255 x 98 x83
ex, IKEA - TRYSIL ex, IKEA - MICKE + SIBBEN/VALFRED ex, IKEA - VIMLE

6. MEJA TV (1 pcs), uk 180x35x36 7. SOFA 2 SEAT (2 pcs) 8. COFEE TABLE (1 pcs)


ex, IKEA - LACK ex, IKEA - GLOSTAD ex, IKEA - LACK

9. MEJA KERJA + FOTOKOPI (1 pcs) 10. ETALASE (1 pcs) 10. ETALASE (4 pcs)
ex, IKEA - MALM+ SIBBEN/VALFRED ex, LOKAL ex, IKEA - APPLARO

11. MESIN CUCI (2 pcs) 12. KULKAS (1 pcs) 13. DISPENSER (1 pcs)
ex, ~ ex, ~ ex, ~

PROYEK GAMBAR NOMOR GAMBAR NOMOR REVISI NOMOR PROYEK


-

Project Drawing SCHEDULE FURNITURE Drawing Number Revision Number Project Number

RUMAH KOS DEWANDARU A-204 R0 -


Project Number
NOMOR PROYEK
- WATERPROFING COATING AREA SHOWER
KETERANGAN : H=1600 DARI SSL

-
- WATERPROFING COATING AREA KERING
SANITAIR FINISHING CAT / LANTAI & DINDING / PLAFOND SIMBOL KETERANGAN H=200 DARI SSL
- JARAK NAT KERAMIK 3MM
KLOSET + DOWNLOIGHT

Revision Number
1. EX. AMSTAD / WASSER CLOSED COUPLED CF3M KERAMIK LANTAI 300x300MM (MATTE) - LEVEL FD TURUN 3MM

NOMOR REVISI
WASHER DI BAWAH LEVEL KERAMIK TERENDAH

R0
- ANGLE FILLER 30X30MM
2. SHOWER EX. AMSTAD / WASSER MIXER SET CW36G KERAMIK DINDING 300x600MM (GLOSS) - SETIAP SPESIFIKASI SANITARY WAJIB
MELIHAT UPDATE TERBARU
- KODE KERAMIK HANYA MENUNJUKAN

A-301A
Drawing Number
NOMOR GAMBAR
3. FLOOR DRAIN EX. AMSTAD / WASSER KOTAK CW36GA KERAMIK DINDING AKSEN 300x600MM (GLOSS) DINGIN PANAS UKURAN BUKAN TIPE
PANAS DINGIN
- LGS = LIHAT GAMBAR STANDAR
4. WASHTAFEL -
FINISHING PLAFOND FFL = FINISH FLOOR LEVEL
EL = ELEVASI
5. CERMIN - C2 PLAFOND GYPSUM WR 9mm FIN. CAT FD = FLOOR DRAIN
OP = OPENING
WR = WATER RESISTANT
C3 BETON EXPOSED FIN. CAT WASHER WASHER WP = WATERPROF
CL = CENTER LINE
L0 SHADOW LINE 10x10mm FIN = FINISH

PRINSIP MIRROR
NTS -

TOILET # 1 (UNIT 1, 2, 3, 4, 5, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 25, 26, 27, 28, 29, 30 & PENGELOLA)
D C D C
A-301C A-301C A-301C A-301C

FFL. ± 0.000

AS AS
20
150
75

75
FFL -0.025
EQ EQ
FFL -0.020 FFL -0.020
EQ

EQ
JENDELA HANYA DI TOILET FD -0.030 JENDELA HANYA DI TOILET
SISI SUNGAI 4X300=1200 150 SISI SUNGAI C2
CW36GA = EX ROMAN DMINUET W63766R

1200
1200

CF3M
1500

1500
4X300=1200

CH. + 2.300
FFL -0.025
EQ EQ B B
A-301B A-301B
EQ

EQ
SESUAI SPEK

A A
A-301B A-301B

375
300
150

150
AS AS
FFL -0.020

DENAH & PLAFOND


75
75

300 250 75 300 450 75

200
600 825 600 825

75 1500 75 1500
AS AS CW36G = EX ROMAN DMINUET W63366R
1575 1575
AS AS AS AS

GAMBAR
Drawing

RUMAH KOS DEWANDARU


TOILET #1 TOILET #1
DENAH LANTAI DENAH PLAFOND
SKALA 1 : 20 - SKALA 1 : 20 -

CW3M = EX ROMAN DMINUET 33366RP

PROYEK
Project
-
Project Number
NOMOR PROYEK
- WATERPROFING COATING AREA SHOWER
H=1600 DARI SSL

-
- WATERPROFING COATING AREA KERING
H=200 DARI SSL
- JARAK NAT KERAMIK 3MM

Revision Number
- LEVEL FD TURUN 3MM

NOMOR REVISI
DI BAWAH LEVEL KERAMIK TERENDAH

R0
- ANGLE FILLER 30X30MM
- SETIAP SPESIFIKASI SANITARY WAJIB
MELIHAT UPDATE TERBARU
- KODE KERAMIK HANYA MENUNJUKAN

Drawing Number

A-301B
NOMOR GAMBAR
UKURAN BUKAN TIPE
- LGS = LIHAT GAMBAR STANDAR

FFL = FINISH FLOOR LEVEL


EL = ELEVASI
FD = FLOOR DRAIN
OP = OPENING
JENDELA HANYA DI TOILET JENDELA HANYA DI TOILET WR = WATER RESISTANT
SISI SUNGAI SISI SUNGAI WP = WATERPROF
CL = CENTER LINE
CH +2.300 CH +2.300 FIN = FINISH
300

300
100
4X300=1200 150 4X300=1200 150

TOILET # 1 (UNIT 1, 2, 3, 4, 5, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 25, 26, 27, 28, 29, 30 & PENGELOLA)
900

CW36G CW36GA CW36GA

4X600=2400
4X600=2400
2300

2300

1900
FFL -0.020
150
1100

FD -0.060
350

FFL -0.020
50
LANTAI LANTAI
FFL. ±0.000 FFL. ±0.000

POTONGAN A & POTONGAN B


250 200 300 300 300 75 650 700 75

75 1500 75 1500

1575 AS AS 1575
AS AS AS AS

TOILET #1 TOILET #1
POTONGAN - A POTONGAN - B
SKALA 1 : 20 - SKALA 1 : 20 -

GAMBAR
Drawing

RUMAH KOS DEWANDARU


PROYEK
Project
-
Project Number
NOMOR PROYEK
- WATERPROFING COATING AREA SHOWER
H=1600 DARI SSL

-
- WATERPROFING COATING AREA KERING
H=200 DARI SSL
- JARAK NAT KERAMIK 3MM

Revision Number
- LEVEL FD TURUN 3MM

NOMOR REVISI
DI BAWAH LEVEL KERAMIK TERENDAH

R0
- ANGLE FILLER 30X30MM
- SETIAP SPESIFIKASI SANITARY WAJIB
MELIHAT UPDATE TERBARU
- KODE KERAMIK HANYA MENUNJUKAN

A-301C
Drawing Number
NOMOR GAMBAR
UKURAN BUKAN TIPE
- LGS = LIHAT GAMBAR STANDAR

FFL = FINISH FLOOR LEVEL


EL = ELEVASI
FD = FLOOR DRAIN
OP = OPENING
JENDELA HANYA DI TOILET WR = WATER RESISTANT
SISI SUNGAI WP = WATERPROF
CL = CENTER LINE
CH +2.300 CH +2.300 FIN = FINISH
300

300
4X300=1200 150 150 4X300=1200

TOILET # 1 (UNIT 1, 2, 3, 4, 5, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 25, 26, 27, 28, 29, 30 & PENGELOLA)
900

900
CW36GA CW36G CW36G

4X600=2400
4X600=2400
2300

2300
SESUAI SPESIFIKASI
1100

1100
FFL -0.020
FFL -0.020 FD -0.030
LANTAI LANTAI
FFL. ±0.000 FFL. ±0.000

POTONGAN C & POTONGAN D


150 1200 75 1200 225

75 1500 75 1500
AS AS AS AS

TOILET #1 TOILET #1
POTONGAN - C POTONGAN - D
SKALA 1 : 20 - SKALA 1 : 20 -

1 : 20

GAMBAR
Drawing

RUMAH KOS DEWANDARU


PROYEK
Project
-
Project Number
NOMOR PROYEK
- WATERPROFING COATING AREA SHOWER
KETERANGAN : H=1600 DARI SSL

-
- WATERPROFING COATING AREA KERING
SANITAIR FINISHING CAT / LANTAI & DINDING / PLAFOND SIMBOL KETERANGAN H=200 DARI SSL
- JARAK NAT KERAMIK 3MM
KLOSET + DOWNLOIGHT

Revision Number
1. EX. AMSTAD / WASSER CLOSED COUPLED CF3M KERAMIK LANTAI 300x300MM (MATTE) - LEVEL FD TURUN 3MM

NOMOR REVISI
WASHER DI BAWAH LEVEL KERAMIK TERENDAH

R0
PANAS PANAS - ANGLE FILLER 30X30MM
2. SHOWER EX. AMSTAD / WASSER MIXER SET CW36G KERAMIK DINDING 300x600MM (GLOSS) - SETIAP SPESIFIKASI SANITARY WAJIB
MELIHAT UPDATE TERBARU
DINGIN DINGIN - KODE KERAMIK HANYA MENUNJUKAN

A-302A
Drawing Number
NOMOR GAMBAR
3. FLOOR DRAIN EX. AMSTAD / WASSER KOTAK CW36GA KERAMIK DINDING AKSEN 300x600MM (GLOSS) UKURAN BUKAN TIPE
WASHER - LGS = LIHAT GAMBAR STANDAR
4. WASHTAFEL -
FINISHING PLAFOND FFL = FINISH FLOOR LEVEL
WASHER EL = ELEVASI
5. CERMIN - C2 PLAFOND GYPSUM WR 9mm FIN. CAT FD = FLOOR DRAIN
OP = OPENING
WR = WATER RESISTANT
C3 BETON EXPOSED FIN. CAT WP = WATERPROF
CL = CENTER LINE
L0 SHADOW LINE 10x10mm FIN = FINISH

PRINSIP MIRROR
NTS -

C D C D
A-302C A-302C A-302C A-302C
75

75
AS AS
AS AS

FFL -0.020
EQ

A A

600
600

A-302B A-302B
EQ EQ
FD -0.030

EQ
EQ

FFL -0.025 4X300=1200


6X300=1800
450
2025

2025
1950

1950
CW36GA = EX ROMAN DMINUET W63766R
200

TOILET # 2 (UNIT 6, 7, 8, 9, 21, 22, 23, 24, 32, 33 & K TAMU)


50

CF3M C2
B B
SESUAI SPEK A-302B 375 A-302B

EQ
750

750
20
700

FFL. ± 0.000 CH +2.300


FFL -0.020

AS AS

DENAH & PLAFOND


75

75

1050 150 75 1050 150 75

75 1350 75 1350
AS AS AS AS
CW36G = EX ROMAN DMINUET W63366R

GAMBAR
Drawing

RUMAH KOS DEWANDARU


TOILET #2 TOILET #2
DENAH LANTAI DENAH PLAFOND
SKALA 1 : 20 - SKALA 1 : 20 -

CW3M = EX ROMAN DMINUET 33366RP

PROYEK
Project
-
Project Number
NOMOR PROYEK
- WATERPROFING COATING AREA SHOWER
H=1600 DARI SSL

-
- WATERPROFING COATING AREA KERING
H=200 DARI SSL
- JARAK NAT KERAMIK 3MM

Revision Number
- LEVEL FD TURUN 3MM

NOMOR REVISI
DI BAWAH LEVEL KERAMIK TERENDAH

R0
- ANGLE FILLER 30X30MM
- SETIAP SPESIFIKASI SANITARY WAJIB
MELIHAT UPDATE TERBARU
- KODE KERAMIK HANYA MENUNJUKAN

Drawing Number

A-302B
NOMOR GAMBAR
UKURAN BUKAN TIPE
- LGS = LIHAT GAMBAR STANDAR

FFL = FINISH FLOOR LEVEL


EL = ELEVASI
FD = FLOOR DRAIN
OP = OPENING
WR = WATER RESISTANT
WP = WATERPROF
CL = CENTER LINE
CH +2.300 CH +2.300 FIN = FINISH
300

300
100
4X300=1200 4X300=1200
900

800
CW36G CW36G CW36GA

4X600=2400
4X600=2400
2300

2300
SESUAI SPEK

FFL -0.020
FFL -0.020
1100

1100
FD -0.030

TOILET # 2 (UNIT 6, 7, 8, 9, 21, 22, 23, 24, 32, 33 & K TAMU)


FD -0.030

LANTAI LANTAI
FFL. ±0.000 FFL. ±0.000

POTONGAN A & POTONGAN B


225 1050 75 75 1050 150 75

1350 1350
AS AS AS AS

TOILET #2 TOILET #2
POTONGAN - A POTONGAN - B
SKALA 1 : 20 - SKALA 1 : 20 -

GAMBAR
Drawing

RUMAH KOS DEWANDARU


PROYEK
Project
-
Project Number
NOMOR PROYEK
- WATERPROFING COATING AREA SHOWER
H=1600 DARI SSL

-
- WATERPROFING COATING AREA KERING
H=200 DARI SSL
- JARAK NAT KERAMIK 3MM

Revision Number
- LEVEL FD TURUN 3MM

NOMOR REVISI
DI BAWAH LEVEL KERAMIK TERENDAH

R0
- ANGLE FILLER 30X30MM
- SETIAP SPESIFIKASI SANITARY WAJIB
MELIHAT UPDATE TERBARU
- KODE KERAMIK HANYA MENUNJUKAN

A-302C
Drawing Number
NOMOR GAMBAR
UKURAN BUKAN TIPE
- LGS = LIHAT GAMBAR STANDAR

FFL = FINISH FLOOR LEVEL


EL = ELEVASI
FD = FLOOR DRAIN
OP = OPENING
WR = WATER RESISTANT
WP = WATERPROF
CL = CENTER LINE
CH +2.300 CH +2.300 FIN = FINISH

300
400

6X300=1800 6X300=1800

900
CW36G CW36GA CW36G

4X600=2400
4X600=2400
2300

2300
1900

150
1100

TOILET # 2 (UNIT 6, 7, 8, 9, 21, 22, 23, 24, 32, 33 & K TAMU)


350
FFL -0.020 FD -0.030 50
FD -0.030 FFL -0.020
LANTAI LANTAI
FFL. ±0.000 FFL. ±0.000

POTONGAN C & POTONGAN D


EQ EQ 250 200 750
75 700 1100 75
75 600 1200 75
1950 1950
AS AS
2025 2025
AS AS AS AS

TOILET #2 TOILET #2
POTONGAN - C POTONGAN - D
SKALA 1 : 20 - SKALA 1 : 20 -

1 : 20

GAMBAR
Drawing

RUMAH KOS DEWANDARU


PROYEK
Project
-
Project Number
NOMOR PROYEK
- WATERPROFING COATING AREA SHOWER
KETERANGAN : H=1600 DARI SSL

-
- WATERPROFING COATING AREA KERING
SANITAIR FINISHING CAT / LANTAI & DINDING / PLAFOND SIMBOL KETERANGAN H=200 DARI SSL
- JARAK NAT KERAMIK 3MM
KLOSET + DOWNLOIGHT

Revision Number
1. EX. AMSTAD / WASSER CLOSED COUPLED CF3M KERAMIK LANTAI 300x300MM (MATTE) - LEVEL FD TURUN 3MM

NOMOR REVISI
WASHER DI BAWAH LEVEL KERAMIK TERENDAH

R0
WASHER KERAN
- ANGLE FILLER 30X30MM
2. SHOWER EX. AMSTAD / WASSER MIXER SET CW36G KERAMIK DINDING 300x600MM (GLOSS) - SETIAP SPESIFIKASI SANITARY WAJIB
MELIHAT UPDATE TERBARU
KERAN
WASHER - KODE KERAMIK HANYA MENUNJUKAN

A-303A
Drawing Number
NOMOR GAMBAR
3. FLOOR DRAIN EX. AMSTAD / WASSER KOTAK CW36GA KERAMIK DINDING AKSEN 300x600MM (GLOSS)
DINGIN UKURAN BUKAN TIPE
DINGIN - LGS = LIHAT GAMBAR STANDAR
4. WASHTAFEL EX. AMSTAD / WASSER WALLHUNG SET PANAS PANAS
FINISHING PLAFOND FFL = FINISH FLOOR LEVEL
EL = ELEVASI
5. CERMIN EX LOKAL C2 PLAFOND GYPSUM WR 9mm FIN. CAT FD = FLOOR DRAIN
OP = OPENING
WR = WATER RESISTANT
C3 BETON EXPOSED FIN. CAT WP = WATERPROF
CL = CENTER LINE
L0 SHADOW LINE 10x10mm FIN = FINISH

PRINSIP MIRROR
NTS -

D C D C
A-303C A-303C A-303C A-303C

200
FFL -0.020
349

FFL -0.025

400
FFL -0.020
A A
700

700
A-303B A-303B

EQ
20
FFL. ± 0.000 CH. +2.300
CF3M C2
1400

1400
SESUAI SPEK 375

CW36GA = EX ROMAN DMINUET W63766R


5X300=1500

6X300=1800 EQ EQ
B B
700

700
A-303B A-303B
150

FD -0.030

FFL -0.025

EQ
500

500
575

575

TOILET # 3 (UNIT 31 & 34)


200

FFL -0.020

DENAH & PLAFOND


AS AS
75

75

CW36G = EX ROMAN DMINUET W63366R

400 700 EQ EQ

GAMBAR
Drawing
150 1100 700 75 1100 700 75

AS AS

RUMAH KOS DEWANDARU


TOILET #3 TOILET #3
DENAH LANTAI DENAH PLAFOND
SKALA 1 : 20 - SKALA 1 : 20 -

CW3M = EX ROMAN DMINUET 33366RP

PROYEK
Project
-
Project Number
NOMOR PROYEK
- WATERPROFING COATING AREA SHOWER
H=1600 DARI SSL

-
- WATERPROFING COATING AREA KERING
H=200 DARI SSL
- JARAK NAT KERAMIK 3MM

Revision Number
- LEVEL FD TURUN 3MM

NOMOR REVISI
DI BAWAH LEVEL KERAMIK TERENDAH

R0
- ANGLE FILLER 30X30MM
- SETIAP SPESIFIKASI SANITARY WAJIB
MELIHAT UPDATE TERBARU
- KODE KERAMIK HANYA MENUNJUKAN

Drawing Number

A-303B
NOMOR GAMBAR
UKURAN BUKAN TIPE
- LGS = LIHAT GAMBAR STANDAR

FFL = FINISH FLOOR LEVEL


EL = ELEVASI
FD = FLOOR DRAIN
OP = OPENING
WR = WATER RESISTANT
WP = WATERPROF
CL = CENTER LINE
CH +2.300 CH +2.300 FIN = FINISH
300

150 5X300=1800 6X300=1799 150


900

800
CW36GA CW36G CW36G

4X600=2400
4X600=2400
2300

2300
150
SESUAI SPEK
1100

FFL -0.020
SESUAI SPEK

950
FFL -0.020

FD -0.030

LANTAI LANTAI
FFL. ±0.000 FFL. ±0.000

POTONGAN A & POTONGAN B


EQ EQ 700 400

TOILET # 3 (UNIT 31 & 34)


75 700 1100 150 1250 700 75

AS AS

TOILET #3 TOILET #3
POTONGAN - A POTONGAN - B
SKALA 1 : 20 - SKALA 1 : 20 -

GAMBAR
Drawing

RUMAH KOS DEWANDARU


PROYEK
Project
-
Project Number
NOMOR PROYEK
- WATERPROFING COATING AREA SHOWER
H=1600 DARI SSL

-
- WATERPROFING COATING AREA KERING
H=200 DARI SSL
- JARAK NAT KERAMIK 3MM

Revision Number
- LEVEL FD TURUN 3MM

NOMOR REVISI
DI BAWAH LEVEL KERAMIK TERENDAH

R0
- ANGLE FILLER 30X30MM
- SETIAP SPESIFIKASI SANITARY WAJIB
MELIHAT UPDATE TERBARU
- KODE KERAMIK HANYA MENUNJUKAN

A-303C
Drawing Number
NOMOR GAMBAR
UKURAN BUKAN TIPE
- LGS = LIHAT GAMBAR STANDAR

FFL = FINISH FLOOR LEVEL


EL = ELEVASI
FD = FLOOR DRAIN
OP = OPENING
WR = WATER RESISTANT
WP = WATERPROF
CL = CENTER LINE
CH +2.300 CH +2.300 FIN = FINISH
300

400
200 5X300=1500 200 200 5X300=1500 200

1350
900

CW36G CW36G

4X600=2400
4X600=2400
2300

2300
150

1900

150
750

950

350
50 FFL -0.020
FFL -0.020
200

FD -0.030
LANTAI LANTAI
FFL. ±0.000 FFL. ±0.000

POTONGAN C & POTONGAN D


200

351

TOILET # 3 (UNIT 31 & 34)


75 500 700 700 700 700 500 75
575 1400 1400 575
AS AS

TOILET #3 TOILET #3
POTONGAN - C POTONGAN - D
SKALA 1 : 20 - SKALA 1 : 20 -

1 : 20

GAMBAR
Drawing

RUMAH KOS DEWANDARU


PROYEK
Project
-
Project Number
NOMOR PROYEK
- WATERPROFING COATING AREA SHOWER
H=1600 DARI SSL

-
- WATERPROFING COATING AREA KERING
H=200 DARI SSL
- JARAK NAT KERAMIK 3MM

Revision Number
- LEVEL FD TURUN 3MM

NOMOR REVISI
DI BAWAH LEVEL KERAMIK TERENDAH

R0
- ANGLE FILLER 30X30MM
- SETIAP SPESIFIKASI SANITARY WAJIB
MELIHAT UPDATE TERBARU
- KODE KERAMIK HANYA MENUNJUKAN

A-304A
Drawing Number
NOMOR GAMBAR
CW3M = EX ROMAN VINSON BIANCO 33203RP UKURAN BUKAN TIPE
- LGS = LIHAT GAMBAR STANDAR

FFL = FINISH FLOOR LEVEL


EL = ELEVASI
C D C D FD = FLOOR DRAIN
A-304C A-304C A-304C A-304C
OP = OPENING
WR = WATER RESISTANT
200 450 WP = WATERPROF
CL = CENTER LINE
FIN = FINISH
75

75
CW36G = EX ROMAN VINSON BIANCO W63106R
AS AS

150
SESUAI SPEK

KETERANGAN :
SANITAIR
KLOSET +
1. EX. AMSTAD / WASSER CLOSED COUPLED
WASHER
C3

~1445
2. SHOWER EX. AMSTAD / WASSER 2 ARAH SET
FD -0.030
A A
1650

A-304B A-304B
3. FLOOR DRAIN EX. AMSTAD / WASSER KOTAK

4. WASHTAFEL -

5. CERMIN -
3000

3000
7X300=2700

EQ EQ
~505

FINISHING CAT / LANTAI & DINDING / PLAFOND

EQ
C2 CF3M KERAMIK LANTAI 300x300MM (MATTE)
4X300=1200

B B CW36G KERAMIK DINDING 300x600MM (GLOSS)


A-304B A-304B
CF3M
1200

TOILET # 4 (LT. 1 BAWAH TANGGA)


600

FINISHING PLAFOND
EQ

FFL -0.020 C2 PLAFOND GYPSUM WR 9mm FIN. CAT

DENAH & PLAFOND


150

C3 BETON EXPOSED FIN. CAT


300

L0 SHADOW LINE 10x10mm


20

AS FFL. ± 0.000 AS
75
75

500 700 75 500 700 75 SIMBOL KETERANGAN


75 1350 75 1350

GAMBAR
Drawing
DOWNLOIGHT
AS AS AS AS

RUMAH KOS DEWANDARU


TOILET #4 TOILET #4
DENAH LANTAI DENAH PLAFOND
SKALA 1 : 20 - SKALA 1 : 20 -

PROYEK
Project
-
Project Number
NOMOR PROYEK
- WATERPROFING COATING AREA SHOWER
H=1600 DARI SSL

-
- WATERPROFING COATING AREA KERING
H=200 DARI SSL
- JARAK NAT KERAMIK 3MM

Revision Number
- LEVEL FD TURUN 3MM

NOMOR REVISI
DI BAWAH LEVEL KERAMIK TERENDAH

R0
- ANGLE FILLER 30X30MM
- SETIAP SPESIFIKASI SANITARY WAJIB
MELIHAT UPDATE TERBARU
- KODE KERAMIK HANYA MENUNJUKAN

Drawing Number

A-304B
NOMOR GAMBAR
UKURAN BUKAN TIPE
- LGS = LIHAT GAMBAR STANDAR

FFL = FINISH FLOOR LEVEL


EL = ELEVASI
FD = FLOOR DRAIN
OP = OPENING
WR = WATER RESISTANT
WP = WATERPROF
CL = CENTER LINE
CH +2.300 FIN = FINISH
300

300
CH ~+1.800 4X300=1200

900
900

CW36G CW36G

4X600=2400
4X600=2400
2300

2300
SESUAI SPEK

150
1100

1100
4X300=1200

350
FFL -0.020 FFL -0.020

LANTAI LANTAI
FFL. ±0.000 FFL. ±0.000

TOILET # 4 (LT. 1 BAWAH TANGGA)


POTONGAN A & POTONGAN B
75 700 500 75 75 500 50 200 450 75

1350 1350
AS AS AS AS

TOILET #4 TOILET #4
POTONGAN - A POTONGAN - B
SKALA 1 : 20 - SKALA 1 : 20 -

GAMBAR
Drawing

RUMAH KOS DEWANDARU


PROYEK
Project
-
Project Number
NOMOR PROYEK
- WATERPROFING COATING AREA SHOWER
H=1600 DARI SSL

-
- WATERPROFING COATING AREA KERING
H=200 DARI SSL
- JARAK NAT KERAMIK 3MM

Revision Number
- LEVEL FD TURUN 3MM

NOMOR REVISI
DI BAWAH LEVEL KERAMIK TERENDAH

R0
- ANGLE FILLER 30X30MM
- SETIAP SPESIFIKASI SANITARY WAJIB
MELIHAT UPDATE TERBARU
- KODE KERAMIK HANYA MENUNJUKAN

A-304C
Drawing Number
NOMOR GAMBAR
UKURAN BUKAN TIPE
- LGS = LIHAT GAMBAR STANDAR

FFL = FINISH FLOOR LEVEL


EL = ELEVASI
FD = FLOOR DRAIN
OP = OPENING
WR = WATER RESISTANT
WP = WATERPROF
CL = CENTER LINE
FIN = FINISH

CH +2.300 CH +2.300
300
400

~505
100

9X300=2700 150 150 9X300=2700


800
~695

CW36G CW36G

4X600=2400

4X600=2400
2300
2300

1900

~1795
SESUAI SPEK SESUAI SPEK
1100

TOILET # 4 (LT. 1 BAWAH TANGGA)


POTONGAN C & POTONGAN D
FFL -0.020 FFL -0.020
FD -0.030 FD -0.030
LANTAI LANTAI
FFL. ±0.000 FFL. ±0.000

75 150 150 600 300 ~246 ~1404 75 75 ~1404 ~246 1050 150 75

1 : 20
3000 3000

GAMBAR
Drawing
AS AS AS AS

RUMAH KOS DEWANDARU


TOILET #4 TOILET #4
POTONGAN - C POTONGAN - D
SKALA 1 : 20 - SKALA 1 : 20 -

PROYEK
Project
-
Project Number
NOMOR PROYEK
- WATERPROFING COATING AREA SHOWER
KETERANGAN : H=1600 DARI SSL

-
- WATERPROFING COATING AREA KERING
SANITAIR FINISHING CAT / LANTAI & DINDING / PLAFOND SIMBOL KETERANGAN H=200 DARI SSL
- JARAK NAT KERAMIK 3MM
KLOSET + DOWNLOIGHT

Revision Number
1. EX. AMSTAD / WASSER CLOSED COUPLED CF3M KERAMIK LANTAI 300x300MM (MATTE) - LEVEL FD TURUN 3MM

NOMOR REVISI
WASHER DI BAWAH LEVEL KERAMIK TERENDAH

R0
- ANGLE FILLER 30X30MM
2. SHOWER -
CW36G KERAMIK DINDING 300x600MM (GLOSS) - SETIAP SPESIFIKASI SANITARY WAJIB
MELIHAT UPDATE TERBARU
- KODE KERAMIK HANYA MENUNJUKAN

A-305A
Drawing Number
NOMOR GAMBAR
3. FLOOR DRAIN EX. AMSTAD / WASSER KOTAK UKURAN BUKAN TIPE
- LGS = LIHAT GAMBAR STANDAR
4. WASHTAFEL EX. AMSTAD/WASSER WALLHUNG SET FINISHING PLAFOND FFL = FINISH FLOOR LEVEL
EL = ELEVASI
5. CERMIN - C2 PLAFOND GYPSUM WR 9mm FIN. CAT FD = FLOOR DRAIN
OP = OPENING
WR = WATER RESISTANT
C3 BETON EXPOSED FIN. CAT WP = WATERPROF
CL = CENTER LINE
L0 SHADOW LINE 10x10mm FIN = FINISH

D C D C
A-305C A-305C A-305C A-305C

FD -0.030
150

150
AS AS

EQ EQ
5X300=1500

EQ
745

745
C2
4X300=1200
1575

1575
A A
A-305B A-305B

B B
A-305B A-305B

EQ
605

605
CF3M
FFL -0.020
CH. + 2.750
75

75
CW36G = EX ROMAN VINSON BIANCO W63106R
150

20

AS AS
FFL. ± 0.000
75

TOILET # 5 (LT. ROOF GARDEN)


750

DENAH & PLAFOND


CW3M = EX ROMAN VINSON BIANCO 33203RP

GAMBAR
Drawing
SESUAI SPEK
75 700 800 75 75 700 800 75

RUMAH KOS DEWANDARU


1650 1650
AS AS AS AS

TOILET #5 TOILET #5
DENAH LANTAI DENAH PLAFOND
SKALA 1 : 20 -
SKALA 1 : 20

PROYEK
Project
-

-
Project Number
NOMOR PROYEK
- WATERPROFING COATING AREA SHOWER
H=1600 DARI SSL

-
- WATERPROFING COATING AREA KERING
H=200 DARI SSL
- JARAK NAT KERAMIK 3MM

Revision Number
- LEVEL FD TURUN 3MM

NOMOR REVISI
DI BAWAH LEVEL KERAMIK TERENDAH

R0
- ANGLE FILLER 30X30MM
- SETIAP SPESIFIKASI SANITARY WAJIB
MELIHAT UPDATE TERBARU
- KODE KERAMIK HANYA MENUNJUKAN

Drawing Number

A-305B
NOMOR GAMBAR
UKURAN BUKAN TIPE
- LGS = LIHAT GAMBAR STANDAR

FFL = FINISH FLOOR LEVEL


EL = ELEVASI
FD = FLOOR DRAIN
OP = OPENING
WR = WATER RESISTANT
WP = WATERPROF
CL = CENTER LINE
FIN = FINISH

CH +2.500 CH +2.500

600
600

2X300=600 2X300=200
5X300=1500
300

300
140
140

CW36G CW36G
2500

2500
3X600=1800

3X600=1800
FFL -0.020
1600

1600
FFL -0.020

FD -0.030 FD -0.030

POTONGAN A & POTONGAN B


TOILET # 5 (LT. ROOF GARDEN)
LANTAI LANTAI
FFL. ±0.000 FFL. ±0.000

SESUAI SPEK 700 700 SESUAI SPEK


75 1500 75 75 1500 75

1650 1650
AS AS SA SA

TOILET #5 TOILET #5

GAMBAR
Drawing
POTONGAN - A POTONGAN - B

RUMAH KOS DEWANDARU


SKALA 1 : 20 - SKALA 1 : 20 -

PROYEK
Project
-
Project Number
NOMOR PROYEK
- WATERPROFING COATING AREA SHOWER
H=1600 DARI SSL

-
- WATERPROFING COATING AREA KERING
H=200 DARI SSL
- JARAK NAT KERAMIK 3MM

Revision Number
- LEVEL FD TURUN 3MM

NOMOR REVISI
DI BAWAH LEVEL KERAMIK TERENDAH

R0
- ANGLE FILLER 30X30MM
- SETIAP SPESIFIKASI SANITARY WAJIB
MELIHAT UPDATE TERBARU
- KODE KERAMIK HANYA MENUNJUKAN

A-305C
Drawing Number
NOMOR GAMBAR
UKURAN BUKAN TIPE
- LGS = LIHAT GAMBAR STANDAR

FFL = FINISH FLOOR LEVEL


EL = ELEVASI
FD = FLOOR DRAIN
OP = OPENING
WR = WATER RESISTANT
WP = WATERPROF
CL = CENTER LINE
FIN = FINISH

CH +2.500 CH +2.500

600
600

150 3X300=1200 3X300=1200 150


300

300
140
140

CW36G CW36G
2500

2500

3X600=1800
3X600=1800

FD -0.030
1600

1600

POTONGAN C & POTONGAN D


TOILET # 5 (LT. ROOF GARDEN)
900
FFL -0.020 EQ EQ
FFL -0.020
LANTAI LANTAI FD -0.030
FFL. ±0.000 FFL. ±0.000

75 375 600 375 150 75 1350 75 75 75

1575 1575 1500


AS AS AS AS AS

GAMBAR
Drawing

RUMAH KOS DEWANDARU


TOILET #5 TOILET #5
POTONGAN - C POTONGAN - D
SKALA 1 : 20 - SKALA 1 : 20 -

PROYEK
Project
-
KETERANGAN :

Project Number
NOMOR PROYEK
600X3=1800 SANITAIR FINISHING LANTAI & DINDING

-
- SETIAP SPESIFIKASI SANITARY WAJIB
300X4=1200 300X2=600 MELIHAT UPDATE TERBARU
1. KITCHEN SINK EX. ROYAL TANAM KERAMIK LANTAI 300x300MM (GLOSS)
CF3G

Revision Number
- KODE KERAMIK HANYA MENUNJUKAN

NOMOR REVISI
UKURAN BUKAN TYPE

R0
2. KRAN SINK EX. AMSTAD/WASSER CW36G KERAMIK DINDING 300x600MM (GLOSS)
- ZINK TURUN 3 MM DARI FINISH MEJA

600
- LGS = LIHAT GAMBAR STANDAR

Drawing Number
NOMOR GAMBAR
STK KULKAS

A-306
CW36G
300X4=1200

800

CF3G
CW36G = EX ROMAN DTUBE WHITE W63801R CF3G = EX ROMAN DTANABATA GREY 33404RP
200

LANTAI
FFL. ±0.000 600X4=2400

300X2=600 300X6=1800
300 1200 600

75
AS STK DAPUR
POTONGAN A

600
SKALA 1 : 25 -

CW36G

300X4=1200
75
AS
120 330

800
CF3G CF3G

EL +0.900
STK DISPENSER

1050

200
LANTAI
FFL. ±0.000
300X8=2400 C
A-306 150 600 1800 450
KP
TOC +0.900 3075 75

AS AS
SESUAI SPEK

POTONGAN C
EQ

3000

SKALA 1 : 25 -
SESUAI SPEK

600X4=2400
1200

300X2=600 300X6=1800
300X6=1800

STK DAPUR
EQ

FFL. ± 0.000 B BALOK MEJA


A-306
SESUAI SPEK TOC +0.900

600

DENAH & POTONGAN


SAKLAR EXHAUST / KITCHEN HOOD CW36G
300X4=1200
SESUAI SPEK

KP CF3G
TOC +0.900
600

KOMPOR TANAM
120 330

DAPUR
FFL. + 0.800
800

CF3G
75

AS

GAMBAR
EQ EQ

Drawing
STK DISPENSER
200

A
A-306 600 1200 LANTAI
FFL. ±0.000

RUMAH KOS DEWANDARU


450 1800 600
150 600 1800 450
75 150
3075 3075 75
AS AS AS AS

DENAH DAPUR POTONGAN B

PROYEK
Project
SKALA 1 : 25 -
SKALA 1 : 25 - -
J2A

P2m P2 P2m P2

PJ2m PJ3m PJ3 PJ2

J2 J2
P1 P1m

J2 J2

J2A P1 P1m
P2 P2m

J2A

P2m P2

P2 P2m
J2A

P2m P2

PJ1 PJ1m

J1
PJ1m
P1m P1

J1 J1

P1m
J2A
P2 P2m

J2A

P1A

P2m

JS

P1m

P1

J1

P2
PU J1 J1

NO TIPE JUMLAH
1 PU 1
2 P1 / P1m 9
3 P1A 1
4 PJ1 / PJ1m 3
5 PJ2 / PJ2m 2
6 PJ3 / PJ3m 2
7 P2 16
8 J1 6
9 J2 4
10 J2A 6

PROYEK GAMBAR NOMOR GAMBAR NOMOR REVISI NOMOR PROYEK


-

Project Drawing KEYPLAN PINTU JENDELA Drawing Number Revision Number Project Number

RUMAH KOS DEWANDARU A-401A R0 -


LANTAI 1
J2

P2m P2 P2m P2

PJ2m PJ3m PJ3 PJ2

J2 J2
P1 P1m

J2 J2

J2 P1 P1m
P2 P2m

J2A

P2m P2

P2 P2m
J2

P2m P2

PJ1 PJ1m

J1 J1
P1m P1

J1 J1

P1m
J2 P1
P2 P2m

P2m J2
J2A

P2
J2

P1
PJ1
PJ1m

P1 PJ1m PJ1 P1m

J3
P2 P2m

P2
P2m

J1 J4 J4 J1

J1 J1
J5 J6
NO TIPE JUMLAH
1 P1 / P1m 11
2 PJ1 / PJ1m 6
3 PJ2 / PJ2m 2
4 PJ3 / PJ3m 2
5 P2 20
6 J1 8
7 J2 10
8 J2A 2
9 J3 1
10 J4 2
11 J5 1
12 J6 1

PROYEK GAMBAR NOMOR GAMBAR NOMOR REVISI NOMOR PROYEK


-

Project Drawing KEYPLAN PINTU JENDELA Drawing Number Revision Number Project Number

RUMAH KOS DEWANDARU A-401B R0 -


LANTAI 2
P2

P3 P3m J1 P3m P3m

P1

P3 P3m

J1

NO TIPE JUMLAH
1 P1 / P1m 1
2 P2 1
3 P3 / P3m 6
4 J1 1
5 J7 1

PROYEK GAMBAR NOMOR GAMBAR NOMOR REVISI NOMOR PROYEK


-

Project Drawing KEYPLAN PINTU JENDELA Drawing Number Revision Number Project Number

RUMAH KOS DEWANDARU A-401C R0 -


LANTAI ROOF GARDEN
Project Number
DALAM DALAM LUAR DALAM LUAR

NOMOR PROYEK
LUAR

-
Revision Number
NOMOR REVISI

R0
OP=2300

OP=2300

OP=2300

OP=2300

OP=2300

A-402A
Drawing Number
NOMOR GAMBAR
1000

1000
1000

FFL FFL FFL FFL FFL FFL

900 900

DALAM DALAM DALAM


20

LUAR LUAR LUAR

OP = 900 OP = 900

OP=1800

PU P1 / P1m P1A
TIPE PINTU DOUBLE SWING TIPE PINTU SWING TIPE PINTU SWING

KUSEN ALUMUNIUM FIN. POWDER COATING - WARNA KAYU KUSEN ALUMUNIUM FIN. POWDER COATING - WARNA KAYU KUSEN ALUMUNIUM FIN. POWDER COATING - WARNA KAYU

PINTU ALUMUNIUM FIN. POWDER COATING - WARNA KAYU PINTU ALUMUNIUM FIN. POWDER COATING - WARNA KAYU PINTU ALUMUNIUM FIN. POWDER COATING - WARNA KAYU
DAUN DAUN DAUN
JENDELA - JENDELA - JENDELA -

HANDLE LEVER HANDLE (1 SET DENGAN LOCK) + LEVER HANDLE HANDLE LEVER HANDLE HANDLE LEVER HANDLE
HINGE BUTT HINGE HINGE BUTT HINGE HINGE BUTT HINGE
AKSESORIS AKSESORIS AKSESORIS
LOCK SMART DOORLOCK, EX BARDI + FLUSH BOLT LOCK HANDLE SET LOCK SMART DOORLOCK, EX BARDI + FLUSH BOLT
ACCESORIES DOOR CLOSER ACCESORIES - ACCESORIES DOOR CLOSER

DALAM LUAR DALAM LUAR DALAM LUAR DALAM LUAR DALAM LUAR DALAM LUAR
1400

1400

1400
OP=2100

OP=2100

OP=2100
OP=2300

OP=2300

OP=2300
1000

1000

1000
700

700

700
FFL FFL FFL FFL FFL FFL FFL FFL FFL
200

200

200

SCHEDULE PINTU JENDELA


OP=900 900 OP=900 638 638 OP=900

DALAM DALAM DALAM

OP=1800 LUAR OP=1537 LUAR OP=1537 LUAR

(1)
PJ1 / PJ1m PJ2 / PJ2m PJ3 / PJ3m

GAMBAR
Drawing
TIPE PINTU SWING JENDELA JUNGKIT + KACA MATI TIPE PINTU SWING JENDELA JUNGKIT + KACA MATI TIPE PINTU SWING JENDELA JUNGKIT + KACA MATI

RUMAH KOS DEWANDARU


KUSEN ALUMUNIUM FIN. POWDER COATING - WARNA KAYU KUSEN ALUMUNIUM FIN. POWDER COATING - WARNA KAYU KUSEN ALUMUNIUM FIN. POWDER COATING - WARNA KAYU

PINTU ALUMUNIUM FIN. POWDER COATING - WARNA KAYU PINTU ALUMUNIUM FIN. POWDER COATING - WARNA KAYU PINTU ALUMUNIUM FIN. POWDER COATING - WARNA KAYU
DAUN DAUN DAUN
JENDELA ALUMUNIUM FIN. POWDER COATING - WARNA KAYU & KACA 6mm JENDELA ALUMUNIUM FIN. POWDER COATING - WARNA KAYU & KACA 6mm JENDELA ALUMUNIUM FIN. POWDER COATING - WARNA KAYU & KACA 6mm
HANDLE LEVER HANDLE & RAMBUNCIS HANDLE LEVER HANDLE & RAMBUNCIS HANDLE LEVER HANDLE & RAMBUNCIS
HINGE BUTT HINGE & CASEMENT SET HINGE BUTT HINGE & CASEMENT SET HINGE BUTT HINGE & CASEMENT SET
AKSESORIS AKSESORIS AKSESORIS
LOCK HANDLE SET LOCK HANDLE SET LOCK HANDLE SET

PROYEK
Project
ACCESORIES - ACCESORIES - ACCESORIES - -
Project Number
NOMOR PROYEK
DALAM LUAR DALAM LUAR

-
DALAM LUAR

Revision Number
NOMOR REVISI
1400

R0
OP=2100
OP=2300
OP=1900

Drawing Number

A-402B
NOMOR GAMBAR
NABOK

1000
1000

700
FFL FFL FFL FFL FFL FFL

200
DALAM

DALAM DALAM
OP=900 LUAR

OP=700 LUAR OP=900 LUAR

P2 / P2m P3 / P3m J1
TIPE PINTU SWING TIPE PINTU SWING TIPE JENDELA JUNGKIT + KACA MATI

KUSEN PVC KUSEN ALUMUNIUM FIN. POWDER COATING - WARNA KAYU KUSEN ALUMUNIUM FIN. POWDER COATING - WARNA KAYU

PINTU PVC PINTU ALUMUNIUM FIN. POWDER COATING - WARNA KAYU PINTU -
DAUN DAUN DAUN
JENDELA - JENDELA - JENDELA ALUMUNIUM FIN. POWDER COATING - WARNA KAYU & KACA 6mm
HANDLE KNOB HANDLE HANDLE LEVER HANDLE HANDLE RAMBUNCIS
HINGE BUTT HINGE HINGE BUTT HINGE HINGE CASEMENT SET
AKSESORIS AKSESORIS AKSESORIS
LOCK HANDLE SET LOCK HANDLE SET LOCK -

ACCESORIES - ACCESORIES - ACCESORIES -

DALAM LUAR DALAM LUAR DALAM LUAR

OP=300
1400

1400
OP=2100

OP=2100
700

700
FFL FFL FFL FFL FFL FFL
200

200

SCHEDULE PINTU JENDELA


900 900

DALAM DALAM DALAM

OP=600 LUAR OP=600 LUAR OP=1800 LUAR

(2)
J2 J2A J3

GAMBAR
Drawing
TIPE JENDELA JUNGKIT + KACA MATI TIPE JENDELA JUNGKIT TIPE JENDELA JUNGKIT + KACA MATI

RUMAH KOS DEWANDARU


KUSEN ALUMUNIUM FIN. POWDER COATING - WARNA KAYU KUSEN ALUMUNIUM FIN. POWDER COATING - WARNA KAYU KUSEN ALUMUNIUM FIN. POWDER COATING - WARNA KAYU

PINTU - PINTU - PINTU -


DAUN DAUN DAUN
JENDELA ALUMUNIUM FIN. POWDER COATING - WARNA KAYU & KACA 6mm JENDELA ALUMUNIUM FIN. POWDER COATING - WARNA KAYU & KACA 6mm JENDELA ALUMUNIUM FIN. POWDER COATING - WARNA KAYU & KACA 6mm
HANDLE RAMBUNCIS HANDLE RAMBUNCIS HANDLE RAMBUNCIS
HINGE CASEMENT SET HINGE CASEMENT SET HINGE CASEMENT SET
AKSESORIS AKSESORIS AKSESORIS
LOCK - LOCK - LOCK -

PROYEK
Project
ACCESORIES - ACCESORIES - ACCESORIES - -
Project Number
NOMOR PROYEK
DALAM LUAR DALAM LUAR DALAM LUAR

-
OP=600

OP=600

Revision Number
NOMOR REVISI
1400

R0
OP=2100

A-402C
Drawing Number
NOMOR GAMBAR
700
FFL FFL FFL FFL FFL FFL
200

DALAM DALAM DALAM

OP=350 LUAR OP=900 LUAR OP=1800 LUAR

J4 J5 J6
TIPE KACA MATI TIPE JENDELA JUNGKIT TIPE JENDELA JUNGKIT

KUSEN ALUMUNIUM FIN. POWDER COATING - WARNA KAYU KUSEN ALUMUNIUM FIN. POWDER COATING - WARNA KAYU KUSEN ALUMUNIUM FIN. POWDER COATING - WARNA KAYU

PINTU - PINTU - PINTU -


DAUN DAUN DAUN
JENDELA KACA 6mm JENDELA ALUMUNIUM FIN. POWDER COATING - WARNA KAYU & KACA 6mm JENDELA ALUMUNIUM FIN. POWDER COATING - WARNA KAYU & KACA 6mm
HANDLE - HANDLE RAMBUNCIS HANDLE RAMBUNCIS
HINGE - HINGE CASEMENT SET HINGE CASEMENT SET
AKSESORIS AKSESORIS AKSESORIS
LOCK - LOCK - LOCK -

ACCESORIES - ACCESORIES - ACCESORIES -

DALAM LUAR DALAM LUAR


OP=1000

OP=1800
EQ EQ EQ EQ
FFL FFL

SCHEDULE PINTU JENDELA


FFL FFL

DALAM

DALAM

OP=3850 LUAR

OP=1350 LUAR

(3)
JS J7

GAMBAR
Drawing
TIPE JENDELA SLIDINGIT TIPE KACA MATI

RUMAH KOS DEWANDARU


KUSEN ALUMUNIUM FIN. POWDER COATING - WARNA KAYU KUSEN FRAMELESS

PINTU - PINTU -
DAUN DAUN
JENDELA ALUMUNIUM FIN. POWDER COATING - WARNA KAYU & KACA 6mm JENDELA -

HANDLE FLUSH + LOCK HANDLE -

HINGE REL HINGE -


AKSESORIS AKSESORIS
LOCK - LOCK -

PROYEK
Project
ACCESORIES - ACCESORIES - -
Project Number
NOMOR PROYEK
KETERANGAN :

-
1. LANTAI ANAK TANGGA - VINYL
2. LANTAI BORDES TANGGA - VINYL

Revision Number
NOMOR REVISI
- HAND RAILING, STAINLESS STEEL 40x40 FIN. HAIRLINE

R0
3. RAILING - RAILING PENGISI, PEFORATED METAL

A-501A
Drawing Number
NOMOR GAMBAR
1200 300 1200

75
75

G G
8 8 9 10 11
225

300
BORDES
FFL. + 2.000

7 7

1200

1200
1200

12

EQ EQ EQ
BORDES BORDES
EQ

EQ
EQ

FFL. + 1.200 FFL. + 1.200

EQ
EQ

EQ
6 6
13

300
300

3000
3000

5 5
14
EQ

EQ
EQ EQ

300x4=1200
EQ EQ
15
1350

1350
16
NK 4 4

TR 17
LT. 1 BORDES BORDES LT. 2

TANGGA #1
450
FFL. ± 0.000 FFL. + 0.400 FFL. + 0.400 FFL. + 3.400

DENAH
1 2 3 1 2 3
75
75

E E

GAMBAR
Drawing
1200 1200
FFL = anak tangga #9

RUMAH KOS DEWANDARU


75 225 75 225
3000 3000
4 5 4 5

DENAH LANTAI 1 DENAH LANTAI 2


SKALA 1 : 25 - SKALA 1 : 25 -

PROYEK
Project
-
Project Number
NOMOR PROYEK

-
HANDRAILING 50X50 HANDRAILING 50X50
ALUMUNIUM HAIRLINE FINISH ALUMUNIUM HAIRLINE FINISH

Revision Number
NOMOR REVISI

R0
RAILING PERFORATED METAL RAILING PERFORATED METAL

Drawing Number

A-501B
NOMOR GAMBAR
750

750
900

900
150

150
LANTAI 2 17 LANTAI 2
FFL. +3.400 FFL. +3.400
16

15

14

13

12

800
11

10
200X17=3400

200X17=3400
9 9

8 8
PAS. BATA
7 7

1900
4

1 1

LANTAI 1 LANTAI 1

POTONGAN (1)
FFL. ±0.000 FFL. ±0.000

TANGGA #1
PAS. BATA

GAMBAR
1200 300 1200 1200 300 1200

Drawing
75 225 75 75 225 75

RUMAH KOS DEWANDARU


3000 3000
5 4 4 5
POTONGAN - A POTONGAN - B
SKALA 1 : 25
SKALA 1 : 25 -
-

PROYEK
Project
-
Project Number
NOMOR PROYEK

-
HANDRAILING 50X50 HANDRAILING 50X50

Revision Number
ALUMUNIUM HAIRLINE FINISH ALUMUNIUM HAIRLINE FINISH

NOMOR REVISI

R0
RAILING PERFORATED METAL RAILING PERFORATED METAL
928 928

A-501C
Drawing Number
NOMOR GAMBAR
750

750
900

900
132

132
150

150
LANTAI 2 LANTAI 2 17
FFL. +3.400 FFL. +3.400
16

15

14

13

12 12

11 11

10
200X17=3400

200X17=3400
9

PAS. BATA
6

4
PAS. BATA
3

LANTAI 1 LANTAI 1

POTONGAN (2)
FFL. ±0.000 FFL. ±0.000

TANGGA #1
POTONGAN - C POTONGAN - D
SKALA 1 : 25 - SKALA 1 : 25 -

GAMBAR
1200 300 1350 450 300x4=1200 1200

Drawing
75 75 75 75

RUMAH KOS DEWANDARU


3000 3000
G E E G
POTONGAN - C POTONGAN - D
SKALA 1 : 25
SKALA 1 : 25 -
-

PROYEK
Project
-
Project Number
NOMOR PROYEK
KETERANGAN :

-
1. LANTAI ANAK TANGGA - VINYL
2. LANTAI BORDES TANGGA - VINYL

Revision Number
NOMOR REVISI
- HAND RAILING, STAINLESS STEEL 40x40 FIN. HAIRLINE

R0
3. RAILING - RAILING PENGISI, PEFORATED METAL

A-502A
Drawing Number
NOMOR GAMBAR
150
150

Q G

9 11 10

BORDES
FFL. + 2.000

8
1200

1200
12

EQ EQ
EQ
EQ

BORDES
FFL. + 1.400
EQ

EQ
7

13
3075

3075
6

14

300x4=1200
5
300x5=1500

15

16

3
450

17 TR
150

TANGGA #2
NK/TR LT. 2 NK/TR
2 FFL. + 3.400

DENAH
75

75

P 1
E 1

NK LT. 1
75

75

GAMBAR
Drawing
FFL. ± 0.000

1200 1200 1200 1200

RUMAH KOS DEWANDARU


75 75 75 75
5 5

DENAH LANTAI 1 DENAH LANTAI 2


SKALA 1 : 25 - SKALA 1 : 25 -

PROYEK
Project
-
Project Number
NOMOR PROYEK

-
Revision Number
NOMOR REVISI

R0
A-502C
Drawing Number
NOMOR GAMBAR
LANTAI 2 17 LANTAI 2 17
FFL. +3.400 FFL. +3.400
16

15

14

13

12
PAS. BATA

11

10

200X17=3400
200X17=3400

9 9

8 8

PAS. BATA
4

LANTAI 1 LANTAI 1

POTONGAN (1)
FFL. ±0.000 FFL. ±0.000

TANGGA #2
GAMBAR
Drawing
1200 1200 1200 1200

RUMAH KOS DEWANDARU


75 75 75 75
5 5

POTONGAN - A POTONGAN - B
SKALA 1 : 25
SKALA 1 : 25 -
-

PROYEK
Project
-
Project Number
NOMOR PROYEK

-
Revision Number
NOMOR REVISI

R0
A-502D
Drawing Number
NOMOR GAMBAR
LANTAI 2 17 LANTAI 2
FFL. +3.400 FFL. +3.400

900 16

15

14
200
13

12 12

11 11

10
200X17=3400

200X17=3400
9

8
PAS. BATA
7

PAS. BATA
4

900
3

LANTAI 1 LANTAI 1

POTONGAN (2)
FFL. ±0.000 FFL. ±0.000

TANGGA #2
GAMBAR
Drawing
1200 300x4=1200 525 225 300x5=1500 1200 150

RUMAH KOS DEWANDARU


150 3075 75 75 3075
Q P P Q

POTONGAN - C POTONGAN - D
SKALA 1 : 25 -
SKALA 1 : 25 -

PROYEK
Project
-
Project Number
NOMOR PROYEK
KETERANGAN :

-
1. LANTAI ANAK TANGGA - VINYL
2. LANTAI BORDES TANGGA - VINYL

Revision Number
NOMOR REVISI
- HAND RAILING, STAINLESS STEEL 40x40 FIN. HAIRLINE

R0
3. RAILING - RAILING PENGISI, PEFORATED METAL

A-503A
Drawing Number
NOMOR GAMBAR
150
150

Q G

9 11 10

BORDES
FFL. + 5.400

8
1200

1200
12

EQ EQ
EQ
EQ

BORDES
FFL. + 4.800
EQ

EQ
7

13
3075

3075
6

14

300x4=1200
5
300x5=1500

15

16

3
450

17 TR
150

TANGGA #3
NK/TR LT. 3 NK/TR
2 FFL. + 7.200

DENAH
75

75

P 1
E 1

NK LT. 2
75

75

GAMBAR
Drawing
FFL. +3.400

1200 1200 1200 1200

RUMAH KOS DEWANDARU


75 75 75 75
5 5

DENAH LANTAI 2 DENAH LANTAI 3


SKALA 1 : 25 - SKALA 1 : 25 -

PROYEK
Project
-
Project Number
NOMOR PROYEK

-
Revision Number
NOMOR REVISI

R0
Drawing Number

A-503B
NOMOR GAMBAR
LANTAI 3 17 LANTAI 3 17
FFL. +7.200 FFL. +7.200
16

15

14

13

12
PAS. BATA

11

10

200X17=3400
200X17=3400

9 9

8 8

PAS. BATA
4

LANTAI 2 LANTAI 2

POTONGAN (1)
FFL. +3.400 FFL. +3.400

TANGGA #3
GAMBAR
Drawing
1200 1200 1200 1200

RUMAH KOS DEWANDARU


75 75 75 75
5 5

POTONGAN - A POTONGAN - B
SKALA 1 : 25
SKALA 1 : 25 -
-

PROYEK
Project
-
Project Number
NOMOR PROYEK

-
Revision Number
NOMOR REVISI
600

R0
600

A-503C
Drawing Number
NOMOR GAMBAR
900

900
LANTAI 3 17 LANTAI 3
FFL. +7.200 FFL. +7.200

900 16

15

14
200
13

12 12

11 11

10
200X17=3400

200X17=3400
9
RUMAH KOS DEWANDARU
8
PAS. BATA
7

PAS. BATA
4

900
3

LANTAI 2 LANTAI 2

POTONGAN (2)
FFL. +3.400 FFL. +3.400

TANGGA #3
GAMBAR
Drawing
1200 300x4=1200 525 225 300x5=1500 1200 150

RUMAH KOS DEWANDARU


150 3075 75 75 3075
Q P P Q

POTONGAN - C POTONGAN - D
SKALA 1 : 25 -
SKALA 1 : 25 -

PROYEK
Project
-
3075 1475 1350 3000 3000 1350 1475 3075
612 EQ EQ 613 1350 1350 612 EQ EQ 613

asis
asis
asis
asis

054
054

054
054
HF6 HF6 HF6 HF6
UNIT 7

5202
FFL. ± 0.000
UNIT 6
UNIT 9 HFB HFB UNIT 8 HFB HFB FFL. ± 0.000

5703
-

0042=4x006
0042=4x006
0042=4x006

0042=4x006
sisa FFL. ± 0.000 FFL. ± 0.000 sisa sisa sisa
G

2#AGGNAT
450 600x4=2400 600x4=2400 450 450 600x4=2400 600x4=2133 717
-

HFB HFB HFB HFB


SP SP SP SP

KN

asis
asis

054
054

HF6 HF6
asis
522

0051
UNIT 10 HFB HFB UNIT 5
FFL. ± 0.000 FFL. ± 0.000

sisa sisa

0042=4x006
0042=4x006

sisa SP SP sisa
450 600x4=2400 600x4=2400 450
450 600x4=2400 600x4=2400 450

0051
HFB HFB
SP SP
UNIT 11 UNIT 4
QE

FFL. ± 0.000 FFL. ± 0.000

0042=4x006
0042=4x006
HF6 HF6
SP H

0051
-

asis
asis

054
054

asis
asis
054

054
NAMAT
NAMAT

050.0 - .LE
050.0 - .LE

HF6 HF6

0051
UNIT 12 UNIT 3
HW612 HW612
FFL. ± 0.000 FFL. ± 0.000
QE
0042=4x006

0042=4x006
sisa sisa

asis
asis

054
054

450 600x4=2400 50 50 600x4=2400 450


HF6 HF6

0051
HFB UNIT 13 UNIT 2 HFB
SP FFL. ± 0.000 SP
FFL. ± 0.000

0042=4x006
0042=4x006

sisa sisa
asis
054

SP
HFB 600x4=2400 450 450 600x4=2400
HF6 HF6
00441=63x004

0051
PENGELOLA HFB HFB UNIT 1
SP SP
FFL. ± 0.000 FFL. ± 0.000

0004=01x006
0042=4x006

sisa sisa
HFB
450 EQ EQ 450
600x4=2400 sisa SP CF4 sisa 600x4=2400
350 350

0051
sisa 400x27=10800
275 SP
05

SP F
600x2=1200 HW612 HFB -

0051
asis
053
-

R. BERSAMA
FFL. ± 0.000
NAMAT

020.0 - .LE
050.0 - .LE

1#AGGNAT
MUMU TELIOT

sisa
SP
0024=4x006

HFW 450
NK 600x4=2400

0051
50
02

HF6
asis
051

sisa SP sisa DAPUR


600x12=5400 FFL. ± 0.000
125 150 HFB
WARUNG

0051
asis
522

HFB
asis
051

GARASI
FFL. - 0.050 sisa sisa
SP
asis
054

150 HFB 575


600x12=7200 600x6=3600

HF3 E
-

R. TAMU
K. TAMU
0024=7x006

FFL. ± 0.000
0003

FFL. ± 0.000
0042=4x006

HF6
0591

HF6
0042=4x006

HFB HFB
asis
054

SP
00201=4x006

300x9=36
0001

HF3 SP
0021=4x003

TALI AIR 20x10

CARPORT KIRI
FFL. - 0.050 BE
0344=4x5,7011

PV
5563

1050x7=7350
asis
032

A B C D
- - - -

PROYEK GAMBAR NOMOR GAMBAR NOMOR REVISI NOMOR PROYEK


-

Project Drawing DENAH POLA LANTAI Drawing Number Revision Number Project Number

RUMAH KOS DEWANDARU A-601A R0 -


LANTAI 1
3075 1475 1350 3000 3000 1350 1475 3075
612 EQ EQ 1350 1350 612 EQ EQ 613

asis
asis
asis
asis

054
054

054
054
HF6 HF6 HF6 HF6

5202
UNIT 24 UNIT 23 UNIT 22 UNIT 21
FFL. + 3.400 HFB HFB FFL. + 3.400 FFL. + 3.400 HFB HFB FFL. + 3.400

5703
-
-

0042=4x006
0042=4x006
0042=4x006

0042=4x006
sisa sisa sisa sisa
G

2#AGGNAT
3#AGGNAT
450 600x4=2400 600x4=2400 450 450 600x4=2400 600x4=2400 450
-

HFB HFB HFB HFB


SP SP SP SP

RT
KN

asis
asis

054
054

HF6 HF6
asis
522

0051
HFB HFB
UNIT 25 UNIT 20
FFL. + 3.400 sisa sisa FFL. + 3.400

0042=4x006
0042=4x006

sisa SP SP sisa
450 600x4=2400 600x4=2400 450
450 600x4=2400 600x4=2400 450

0051
HFB HFB
SP SP
UNIT 26 UNIT 19
QE

FFL. + 3.400 FFL. + 3.400

0042=4x006
0042=4x006
HF6 HF6
SP H

0051
-

asis
asis

054
054

asis
asis
054

054
HF6 HF6

0051
HW612 HW612
UNIT 27 UNIT 18
QE

FFL. + 3.400 FFL. + 3.400


0042=4x006

0042=4x006
sisa sisa

asis
asis

054
054

450 600x4=2400 600x4=2400 450


HF6 HF6

0051
HFB HFB
SP SP
UNIT 28 UNIT 17
FFL. + 3.400 FFL. + 3.400
0042=4x006
0042=4x006

sisa sisa

asis
asis
054

054
600x4=2400 450 450 600x4=2400
HF6 HF6
00441=63x004

0051
HFB HFB
SP SP
UNIT 29 UNIT 16
FFL. + 3.400 FFL. + 3.400
0042=4x006

0042=4x006
sisa sisa
HFB
450 600x4=2400 600x4=2400 450

0051
HFB
SP SP
asis
054

F
-
HF6

0051
UNIT 15
-

FFL. + 3.400
0042=4x006

sisa

asis
asis

054
054

1#AGGNAT

600x4=2400 450
HF6 HF6

0051
SP HFB
UNIT 30 UNIT 14
RT

FFL. + 3.400 FFL. + 3.400


0042=4x006
0042=4x006

sisa HFB sisa


HFB
450 EQ EQ 450
600x4=2400 sisa SP sisa 600x4=2400
asis
522

CF4
350 350

0051
400x27=10800
SP SP

sisa sisa sisa sisa


HFB SP SP HFB
275 600x6=3600 450 HFB HFB 450 600x6=3600 275

sisa sisa E
450 450 -
600x4=2400 600x4=2400
UNIT 31 UNIT 34
FFL. + 3.400
UNIT 32 UNIT 33 FFL. + 3.400
SP SP
0003

HFB FFL. + 3.400 FFL. + 3.400 HFB

HF6 HF6 HF6 HF6


HFB HFB
0501

0063=6x006
0063=6x006
0063=6x006
0063=6x006
005

0001
asis
asis
asis
asis

052
052
052

052

750 850 850 750

325 325
5224

A B C D
- - - -

PROYEK GAMBAR NOMOR GAMBAR NOMOR REVISI NOMOR PROYEK


-

Project Drawing DENAH POLA LANTAI Drawing Number Revision Number Project Number

RUMAH KOS DEWANDARU A-601B R0 -


LANTAI 2
3075 1475 1350 3000 3000 1350 1475 3075
1575 1500 1350 1350 1500 1575

TOILET UMUM

asis
003
FFL. + 6.780

5751
02
JEMUR LAUNDRY
FFL. + 6800 FFL. + 6.800 GUDANG

5703
-
FFL. + 6.800
SC+ G

2#AGGNAT
SC -

200 200

002

0504=4x006

RT
200 200 SP 200 200

002
sisa FFL. + 6.800
450 HF6
600x9=5400

0051
ROOF GARDEN
FFL. + 7.650

0051
H

0051
-

GAZEBO
FFL. + 6800

0051
CF4 HFW CF4

ROOF GARDEN ROOF GARDEN


FFL. + 7.650 FFL. + 7.650

0051
0051
002
002

0051
F
-

0051
RAILING
EL +7.900

0051
OUTDOOR
FFL. + 6800

0051
SC+

DAK TALANG DAK TALANG


FFL. + 6800 FFL. + 6800
E
-
SC+ SC+
0003
005

ROOF GARDEN
FFL. + 7.650
0001

FFL. + 7.150
5563

A B C D
- - - -

PROYEK GAMBAR NOMOR GAMBAR NOMOR REVISI NOMOR PROYEK


-

Project Drawing DENAH POLA LANTAI Drawing Number Revision Number Project Number

RUMAH KOS DEWANDARU A-601C R0 -


LANTAI ROOF GARDEN
HF6 = HOMOGENEUS TILE 600x600 GLOSS ( FIN LANTAI + PLINT T = 100 ) HFB = HOMOGENEUS TILE 600x600 MATT ( FIN LANTAI + PLINT T = 100 ) HFW = HOMOGENEUS TILE 150x600 STRUCT ( FIN LANTAI + PLINT T = 100 )
ex, NIRO GRANITE - GEB01 CELIA ex, NIRO GRANITE - GTZ02 TERAZZO BRUNNEIS ex, ROMAN GRANITE - DPENINSULA ALMOND

HW612 = HOMOGENEUS TILE 600x1200 ( FIN DINDING ) HF3 = HOMOGENEUS TILE 300x300 ( FIN LANTAI + PLINT T = 100 ) CF4 = CERAMIC TILE 400x400 ( FIN LANTAI )
ex, ROMAN GRANITE - DRINJANI CHARCOAL ex, ROMAN GRANITE - DBASALT CHARCOAL ex, MILAN - MODULA DARK

BE = Beton Expose

SC = SCREED

SC+ = SCREED + WATERPROOFING


PV = PAVING, KOMBINASI ( FIN LANTAI )
ex, LOKAL

PROYEK GAMBAR NOMOR GAMBAR NOMOR REVISI NOMOR PROYEK


-

Project Drawing SCHEDULE POLA LANTAI Drawing Number Revision Number Project Number

RUMAH KOS DEWANDARU A-601D R0 -


3075 1475 1350 3000 3000 1350 1475 3075
612 EQ EQ 613 CENTER 1350 1350 612 EQ EQ 613
BOTTOM BORDES
EQ EQ

QE
C1 C1 C1 C1

QE
QE
QE

QE

5202
QE
EQ EQ EQ EQ C3 EQ EQ EQ EQ

EQ EQ EQ EQ

5703
UNIT 8 UNIT 6
UNIT 9 UNIT 7 G
CH. +2.700 CH. +2.700

QE

QE
QE
QE
QE

QE
CH. +2.700 CH. +2.700 -

QE

QE
C1 EQ EQ JANGGUTAN CH+2.700 EQ EQ C1

QE
QE

QE
C1

0051
UNIT 5

QE
UNIT 10
CH. +2.700
CH. +2.700

EQ EQ EQ EQ
C1 C1
QE

QE
QE
QE
UNIT 11 UNIT 4

0051
CH. +2.700 CH. +2.700
EQ EQ EQ EQ

EQ EQ EQ EQ

QE
QE

0051
-

C1 C1

QE
QE

UNIT 3

0051
UNIT 12 CH. +2.700
CH. +2.700

EQ EQ EQ EQ
C1 C1

QE
QE

QE
QE

UNIT 13 UNIT 2

0051
CH. +2.700 CH. +2.700

EQ EQ EQ EQ
C1 JANGGUTAN JANGGUTAN C1
QE
QE

CH+2700 CH+2700

QE
QE

0051
PENGELOLA UNIT 1
CH. +2.700
CH. +2.700 EQ EQ

EQ EQ EQ EQ
QE

QE
QE

0051
QE

C1 JANGGUTAN
QE
QE

CH+2700 CH. +2.400 F


-
QE

CH. +2.700

0051
R. BERSAMA
EQ EQ EQ
QE

EQ CH. +2.700
QE

EQ EQ
C1
QE
QE

QE

C1

0051
C1 JANGGUTAN
CH+2700

AMBANG ATAS EQ EQ
EQ EQ CH+2700
QE
QE

DAPUR
QE

0051
QE

CH. +2.700
WARUNG

GARASI C1 C1
CH. +2.700
QE
QE
QE

E
R. TAMU -

CH. +2.700
0003

EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ
62

QE
QE
QE

K. TAMU
CH. +2.700

CH. +2.750
QE

C2
EQ EQ X 2 EQ X 2 EQ
0001
QE

QE

EQ EQ EQ EQ
FINISHING PLAFOND SIMBOL KETERANGAN

C1 PLAFOND GYPSUM 9MM FIN. CAT DOWNLIGHT 12W

C2 PLAFOND GYPSUM WR 9MM FIN. CAT DOWNLIGHT 6W


CH. +2.430
5563

C3 BETON EXPOSE FIN. CAT DOWNLIGHT OUTBOW 12W


QE

C2 C2 CORNICE SHADOW LINE LAMPU DINDING 6W

CCTV OUTDOOR

CCTV INDOOR

SENSOR GERAK

A B C D
- - - -

PROYEK GAMBAR NOMOR GAMBAR NOMOR REVISI NOMOR PROYEK


-

Project Drawing DENAH PLAFOND Drawing Number Revision Number Project Number

RUMAH KOS DEWANDARU A-701A R0 -


LANTAI 1
3075 1475 1350 3000 3000 1350 1475 3075
612 EQ EQ 613 CENTER 1350 1350 612 EQ EQ 613
BOTTOM BORDES
EQ EQ

QE
C1 C1 C1 C1

QE
QE
QE

QE

5202
QE
EQ EQ EQ EQ C3 EQ EQ EQ EQ

EQ EQ EQ EQ

5703
UNIT 23 UNIT 21
UNIT 24 UNIT 22 G
CH. +2.700 CH. +2.700

QE

QE
QE
QE
QE

QE
CH. +2.700 CH. +2.700 -

QE

QE
C1 EQ EQ JANGGUTAN CH+2.700 EQ EQ C1

QE
QE

QE
C1

0051
UNIT 20

QE
UNIT 25
CH. +2.700
CH. +2.700

EQ EQ EQ EQ
C1 C1
QE

QE
QE
QE
UNIT 26 UNIT 19

0051
CH. +2.700 CH. +2.700
EQ EQ EQ EQ

EQ EQ EQ EQ

QE
QE

0051
-

C1 C1

QE
QE

UNIT 18

0051
UNIT 27 CH. +2.700
CH. +2.700

EQ EQ EQ EQ
C1 C1
QE

QE
QE
QE

UNIT 28 UNIT 17

0051
CH. +2.700 CH. +2.700

EQ EQ EQ EQ
C1 JANGGUTAN JANGGUTAN C1
QE
QE

CH+2700 CH+2700
QE

QE

0051
UNIT 29 UNIT 16
CH. +2.700
CH. +2.700

EQ EQ EQ EQ

QE
QE

0051
EQ EQ
F
-
QE

QE

0051
UNIT #15
CH. +2.700

EQ EQ
C1 C1
QE

QE

QE
QE

C1

0051
UNIT 30
CH. +2.700

EQ EQ EQ EQ
QE

QE
QE

UNIT 14

0051
CH. +2.700
QE

WARUNG

UNIT 31 C1 C1
C1 C1
CH. +2.700 E
-
QE
QE
QE

QE

EQ EQ EQ EQ

EQ EQ EQ EQ
0003
62

UNIT 34
UNIT 32 UNIT 33 CH. +2.700
CH. +2.700 CH. +2.700
QE
QE

QE
QE

EQ EQ
0001

EQ EQ

FINISHING PLAFOND SIMBOL KETERANGAN

C1 PLAFOND GYPSUM 9MM FIN. CAT DOWNLIGHT 12W

C2 PLAFOND GYPSUM WR 9MM FIN. CAT DOWNLIGHT 6W


5563

C3 BETON EXPOSE FIN. CAT DOWNLIGHT OUTBOW 12W

CORNICE SHADOW LINE LAMPU DINDING 6W

CCTV OUTDOOR

CCTV INDOOR

A B C D
- - - -

PROYEK GAMBAR NOMOR GAMBAR NOMOR REVISI NOMOR PROYEK


-

Project Drawing DENAH PLAFOND Drawing Number Revision Number Project Number

RUMAH KOS DEWANDARU A-701B R0 -


LANTAI 2
3075 1475 1350 3000 3000 1350 1475 3075
612 EQ EQ 613 1350 1350 612 EQ EQ 613

EQ EQ EQ EQ EQ EQ

QE

5202
EQ EQ X 2 EQ

5703
UNIT 23 UNIT 21
UNIT 22 G

QE
CH. +2.700 CH. +2.700
CH. +2.700
C1 C3 -

QE
CH. +2.700

QE
CH. +2.700

QE

0051
C1

QE

0051
H

0051
QE
-

0051
QE

0051
0051
0051
F
-

0051
0051
QE

0051
E
2 X QE

-
0003
62

QE

0001

FINISHING PLAFOND SIMBOL KETERANGAN

C1 PLAFOND GYPSUM 9MM FIN. CAT DOWNLIGHT 12W

C2 PLAFOND GYPSUM WR 9MM FIN. CAT DOWNLIGHT 6W


5563

C3 BETON EXPOSE FIN. CAT DOWNLIGHT OUTBOW 12W

CORNICE SHADOW LINE LAMPU DINDING 6W

CCTV OUTDOOR

CCTV INDOOR

A B C D
- - - -

PROYEK GAMBAR NOMOR GAMBAR NOMOR REVISI NOMOR PROYEK


-

Project Drawing DENAH PLAFOND Drawing Number Revision Number Project Number

RUMAH KOS DEWANDARU A-701C R0 -


LANTAI 2
Project Number
NOMOR PROYEK
C

-
PAGAR PEFORATED METAL+ HOLLOW 50 X 20 + HOLLOW 100 X 50
TIANG PAGAR HOLLOW 100 X 100

Revision Number
NOMOR REVISI

R0
PENUTUP ATAP UPVC + LISPLANK

LUBANG POHON

Drawing Number
NOMOR GAMBAR

A-801
RADIUS DISESUAIKAN DENGAN POHON SKY LIGHT

800
PENUTUP ATAP UPVC + LISPLANK

2410

1050

150
600
LANTAI 1
FFL. ±0.000

1010

VAR
A 60 1150 400
400

1220 980 75 3430


C A
9850 AREA CARPORT + PAGAR
1 2 3 4 5 TAMPAK SAMPING -

AREA CARPORT + PAGAR SKALA 1 : 50 -

LT. 2 -

SKALA 1 : 50 -

GARASI
FFL. - 0.050

20

1000
TERAS 200 CARPORT KANAN

1200
CARPORT KIRI

1330
FFL. - 0.020 FFL. VAR
FFL. VAR
200

200
VAR

EQ

1108 X 4 = 4430
PAGAR PEFORATED METAL+ HOLLOW 50 X 20 + HOLLOW 100 X 50 TIANG KANOPI
TIANG PAGAR HOLLOW 100 X 100 BK AH TALI AIR 15 X 10
~2330

2000
EQ

TEMPAT SAMPAH KELUAR


450 600

DENAH
LANTAI 1
TEMPAT SAMPAH MASUK HOLLOW 50 X 20
EQ

1100
METERAN PAM PATH
1150

1050

150
FFL. VAR
EQ

1250 1350 1350 1350 1350 710

GAMBAR
Drawing
A
300 225
1625 525 225

RUMAH KOS DEWANDARU


342 225
0081
2150 575 1000 2175 342 342 150 225 1050 X 7 = 7350 225
150
1 2 3 4 5 6 7 8 9

PINTU SWING PINTU DOUBLE SWING PINTU LIPAT


AREA CARPORT + PAGAR PEFORATED METAL+ HOLLOW 50 X 20 + HOLLOW 100 X 50 PEFORATED METAL+ HOLLOW 50 X 20 + HOLLOW 100 X 50 PEFORATED METAL+ HOLLOW 50 X 20 + HOLLOW 100 X 50
LT. 1 -

PROYEK
Project
SKALA 1 : 50 - -
Project Number
NOMOR PROYEK

-
450

Revision Number
NOMOR REVISI

R0
Drawing Number
NOMOR GAMBAR

A-802
450
2300
PENEBALAN DINDING
KWH METER

1400
150

200
100
50

052

054
PINTU AKRILIK NOMOR UNIT
MENGHADAP PINTU KAMAR UNIT

DETAIL RUMAH KWH


-

SKALA NTS -

PAGAR PEFORATED METAL+ HOLLOW 50 X 20 + HOLLOW 100 X 50


TIANG PAGAR HOLLOW 100 X 100
PINTU SWING
PEFORATED METAL+ HOLLOW 50 X 20 + HOLLOW 100 X 50
PAGAR PEFORATED METAL+ HOLLOW 50 X 20 + HOLLOW 100 X 50
TIANG PAGAR HOLLOW 100 X 100
PINTU DOUBLE SWING
PEFORATED METAL+ HOLLOW 50 X 20 + HOLLOW 100 X 50
5279
TIANG KANOPI

HOLLOW 50 X 20
800

PINTU LIPAT
PEFORATED METAL+ HOLLOW 50 X 20 + HOLLOW 100 X 50
450

JARAK HOLLOW PEMBAGI KELIPATAN 150, RANDOM


200
600

LANTAI 1
DENAH
600
150

LANTAI 1

GAMBAR
Drawing
FFL. ±0.000
VAR

RUMAH KOS DEWANDARU


5261 525 243 051 522
0512 575 0001 5712 003 243 243 522 0081 522 522 0537 = 7 X 0501 522
051
1 9
AREA CARPORT + PAGAR
TAMPAK DEPAN -

PROYEK
Project
SKALA 1 : 50 - -

Anda mungkin juga menyukai