SHOP DRAWING (CCO)

Pekerjaan : Peningkatan Kualitas Permukiman Kumuh


DAS Jeneberang Kabupaten Gowa
Lokasi : Kawasan DAS Jeneberang Kabupaten Gowa

POT
B PEKERJAAN RUANG TERBUKA PUBLIK (RTP)

Menyetujui :
PPK Pengembangan Kawasan Permukiman Wilayah I
Provinsi Sulawesi Selatan

693 A. Nirma Yanti, ST, MT


NIP. 19770123 201012 2 011
90 90
Diperiksa :
171 175 175 171 Direksi Lapangan PKP Provinsi Sulawesi Selatan

L 70x70x7

L 70x70x7

L 70x70x7

L 70x70x7

L 70x70x7
25 WF150x75x5x7 WF150x75x5x7 WF150x75x5x7 WF150x75x5x7 25
C

Muh. Azwar Anas, S.T.


NIP. 19910921 201903 1 006

L 70x70x7

L 70x70x7

L 70x70x7

L 70x70x7
150 150 Dinas Perkimtan Kabupaten Gowa

L 70x70x7
WF150x75x5x7 WF150x75x5x7 WF150x75x5x7 WF150x75x5x7
B

400 350 350 400

POT L 70x70x7
POT Dirwan Ruddin
150 150 NIP. 19710228 200604 1 008
A A

L 70x70x7

L 70x70x7

L 70x70x7

L 70x70x7
Diperiksa :
WF150x75x5x7 WF150x75x5x7 WF150x75x5x7 WF150x75x5x7
A

Technical Management Consultant (TMC-6) Gowa


25 25 PT . KOGAS DRIYAP KONSULTAN
L 70x70x7

L 70x70x7

L 70x70x7

L 70x70x7

L 70x70x7
90 Ir.Ulfah Tajuddin, M.SP
90
Civil Engineer / Site Engineer

Dibuat Oleh :
Kontraktor Pelaksana
PT QIRELIS MANDIRI JAYA

1 2 3 4 5

Ir. Muh Iswadi


Kepala Proyek
POT

B JUDUL GAMBAR SKALA

DENAH JEMBATAN
SKALA 1 :50
KETERANGAN GAMBAR

NOMOR LEMBAR JUMLAH GAMBAR


710 120

171 175 175 171

Pipa Baja Karbon dia.2"


(dia.60,5 mm, tebal 2,8 mm)
SHOP DRAWING (CCO)
Pekerjaan : Peningkatan Kualitas Permukiman Kumuh
Shear Connector DAS Jeneberang Kabupaten Gowa
Wiremesh M8 50 100 Lokasi : Kawasan DAS Jeneberang Kabupaten Gowa
Bondek (t = 6 mm) + 18.500 40
+ 18.350 Wingwall + 18.350 PEKERJAAN RUANG TERBUKA PUBLIK (RTP)

25
WF150x75x5x7
Menyetujui :
DET.1
PPK Pengembangan Kawasan Permukiman Wilayah I
Elastomeric Provinsi Sulawesi Selatan
Elastomeric
Bearing Pad Bearing Pad
40x40x5 cm

MAB + 17,025

250 A. Nirma Yanti, ST, MT


300 NIP. 19770123 201012 2 011
Diperiksa :
Direksi Lapangan PKP Provinsi Sulawesi Selatan

Berdasarkan data sondir, Berdasarkan data sondir,


tahanan ujung 30 kg/cm2 dan tahanan ujung 30 kg/cm2 dan
total friction 80,4 kg/cm' total friction 80,4 kg/cm'

40
Muh. Azwar Anas, S.T.
NIP. 19910921 201903 1 006
40
580 Dinas Perkimtan Kabupaten Gowa
100

DET.1

10 70 10 10 70 10
30 90 90 30
Dirwan Ruddin
120 120 NIP. 19710228 200604 1 008

Diperiksa :
Technical Management Consultant (TMC-6) Gowa

1 2 3 4 5 PT . KOGAS DRIYAP KONSULTAN

POTONGAN A-A 400


SKALA 1 :50 150 150
Pipa Baja Karbon dia.2" Ir.Ulfah Tajuddin, M.SP
(dia.60,5 mm, tebal 2,8 mm) Civil Engineer / Site Engineer

Dibuat Oleh :
Shear Connector Shear Connector Kontraktor Pelaksana
Bondek (t = 6 mm) + 18.500 PT QIRELIS MANDIRI JAYA

12

Baja WF150x75x5x7
Wing Wall Wing Wall Ir. Muh Iswadi
Kepala Proyek

JUDUL GAMBAR SKALA


250
300

40 KETERANGAN GAMBAR

25 175 175 25

121 350 121


POTONGAN B-B NOMOR LEMBAR JUMLAH GAMBAR
SKALA 1 :50
C B A
SHOP DRAWING (CCO)
53 120 Pekerjaan : Peningkatan Kualitas Permukiman Kumuh
DAS Jeneberang Kabupaten Gowa
Lokasi : Kawasan DAS Jeneberang Kabupaten Gowa

D19-200 PEKERJAAN RUANG TERBUKA PUBLIK (RTP)


D10-200
90 Menyetujui :
40 10 PPK Pengembangan Kawasan Permukiman Wilayah I
Provinsi Sulawesi Selatan
160 Elastomeric Bearing
Pad 40x40x5 cm
121 5
25 A. Nirma Yanti, ST, MT
NIP. 19770123 201012 2 011
D16-200 Diperiksa :
Expansion Joint
80 Direksi Lapangan PKP Provinsi Sulawesi Selatan

D19-200
D10-200
Tulangan Bawah D25-200 55 40 25
Tulangan Atas D25-200 Muh. Azwar Anas, S.T.
NIP. 19910921 201903 1 006

Tulangan Atas D25-200 Beton K-225 Dinas Perkimtan Kabupaten Gowa


D10-200
D16-200
120
Tulangan Bawah D25-200
D19-200 8 D25
Dirwan Ruddin
D10 - 200
NIP. 19710228 200604 1 008
473 350 350 592 Beton K-225
Gorong - Gorong
40 dia.70 cm Diperiksa :
Technical Management Consultant (TMC-6) Gowa
D19-200 Beton Siklop (K175) PT . KOGAS DRIYAP KONSULTAN
D10-200

D19-190
10 70 10
100
DET.1
DETAIL 1 (BUIS D70) Ir.Ulfah Tajuddin, M.SP
SKALA 1 :25 Civil Engineer / Site Engineer

Dibuat Oleh :
10 70 10 Kontraktor Pelaksana
PT QIRELIS MANDIRI JAYA

30 90
80
DETAIL A (POER & ABUTMEN Ir. Muh Iswadi
SKALA 1 :25 Kepala Proyek
121
160 JUDUL GAMBAR SKALA
45
90 20 25 DETAIL PEMBESIAN (POER & ABUTMEN)
SKALA 1 :50

KETERANGAN GAMBAR

NOMOR LEMBAR JUMLAH GAMBAR


SHOP DRAWING (CCO)
53 120 Pekerjaan : Peningkatan Kualitas Permukiman Kumuh
DAS Jeneberang Kabupaten Gowa
90 Lokasi : Kawasan DAS Jeneberang Kabupaten Gowa

D19-200 PEKERJAAN RUANG TERBUKA PUBLIK (RTP)


D10-200
45 20 25
90 Menyetujui :
PPK Pengembangan Kawasan Permukiman Wilayah I
Provinsi Sulawesi Selatan
160 Beton K-225
D10-200
121 D16-200

A. Nirma Yanti, ST, MT


D19-200 NIP. 19770123 201012 2 011
Diperiksa :
Expansion Joint
80 Beton K-225 Direksi Lapangan PKP Provinsi Sulawesi Selatan
D19-200 40
D10-200
Tulangan Bawah D25-200 D19-200
8D25
Tulangan Atas D25-200
Muh. Azwar Anas, S.T.
100 D10-200 NIP. 19910921 201903 1 006
Tulangan Atas D25-200 DET.1 Dinas Perkimtan Kabupaten Gowa
Beton Siklop
(K175)

Tulangan Bawah D25-200


20 10 50 10
Dirwan Ruddin
473 350 350 592 70 NIP. 19710228 200604 1 008

Diperiksa :

DETAIL A (POER & WINGWALL Technical Management Consultant (TMC-6) Gowa


PT . KOGAS DRIYAP KONSULTAN
D10-200 SKALA 1 :25

D19-190

8 D25
Ir.Ulfah Tajuddin, M.SP
D10 - 200 Civil Engineer / Site Engineer
Gorong - Gorong
Dibuat Oleh :
dia.50 cm
Kontraktor Pelaksana
PT QIRELIS MANDIRI JAYA
Beton Siklop (K175)

80 10 50 10

DETAIL 1 (BUIS D50) Ir. Muh Iswadi


121 Kepala Proyek
SKALA 1 :25

160 JUDUL GAMBAR SKALA


45
90 20 25

DETAIL PEMBESIAN (POER & WINGWALL)


KETERANGAN GAMBAR
SKALA 1 :50

NOMOR LEMBAR JUMLAH GAMBAR


SHOP DRAWING (CCO)
Pekerjaan : Peningkatan Kualitas Permukiman Kumuh
DAS Jeneberang Kabupaten Gowa
Lokasi : Kawasan DAS Jeneberang Kabupaten Gowa

PEKERJAAN RUANG TERBUKA PUBLIK (RTP)


710
Menyetujui :
Pipa Baja Karbon dia.2" PPK Pengembangan Kawasan Permukiman Wilayah I
(dia.60,5 mm, tebal 2,8 mm) Provinsi Sulawesi Selatan

Shear Connector
Wiremesh M8 50 100
Bondek (t = 6 mm) MAB + 18.500 40
A. Nirma Yanti, ST, MT
WF150x75x5x7
25 NIP. 19770123 201012 2 011
DET.1 Diperiksa :
18.000
Elastomeric Elastomeric Direksi Lapangan PKP Provinsi Sulawesi Selatan
Bearing Pad Bearing Pad
40x40x5 cm

250
Muh. Azwar Anas, S.T.
NIP. 19910921 201903 1 006

bidang persamaan 191 181 Dinas Perkimtan Kabupaten Gowa

reference level 40

Dirwan Ruddin
40 NIP. 19710228 200604 1 008
100
Diperiksa :
DET.1
Technical Management Consultant (TMC-6) Gowa
DET.1 PT . KOGAS DRIYAP KONSULTAN
90 90
120 120
189 194

Ir.Ulfah Tajuddin, M.SP


Civil Engineer / Site Engineer
17.290
17.160

16.430

15.330

15.290

15.340

16.050

17.160
17.180

17.320
16.370

Dibuat Oleh :
ELEVASI TANAH ASLI Kontraktor Pelaksana
PT QIRELIS MANDIRI JAYA
ORIGINAL GROUND LEVEL
0.37

0.75

0.89

0.63

0.28
0.52
JARAK (m) 1.82 2.56 1.06
1.84
DISTANCE (m) Ir. Muh Iswadi
Kepala Proyek

JUDUL GAMBAR SKALA

TOPOGRAFI EKS. TANAH


SKALA 1 :50 KETERANGAN GAMBAR

NOMOR LEMBAR JUMLAH GAMBAR