Harga Satuan Pajak Jumlah Total

No. Uraian Pekerjaan Volume


(Rp) (%) (Rp) (Rp)
               
I PEKERJAAAN PENDAHULUAN            
1 PEKERJAAN PEMBERSIHAN LOKASI 1.00 Ls 300,000.0 11% 333,0
 
0 00.00
            Jumlah - I - 333,000.00
                 
II PEKERJAAN PLAFOND            
1 PEKERJAAN PEMBONGKARAN PLAFOND 30 m2 20,000.0 11% 666,0
 
GYPSUM 0 00.00
2 PEKERJAAN PEMASANGAN RANGKA 30 m2 160,000.0 11% 5,328,0
 
PLAFOND GYPSUM 0 00.00
3 PEKERJAAN PEMASANGAN PLAFOND 20 m2 63,500.0 11% 1,409,7
 
GYPSUM 0 00.00
4 PEKERJAAN PEMASANGAN LIST PLAFOND 10 m' 80,000.0 11% 888,0
 
GYPSUM 0 00.00
            8,291,700.0
Jumlah - II -
0
III PEKERJAAN ATAP/DAK LANTAI            
1 REHAP ATAP/DAK LANTAI 1.00 kgt 12,000,000.0 11% 13,320,
 
0 000.00
            13,320,000.0
Jumlah - III -
0
                 
IV PEKERJAAN KELISTRIKAN            
1 PEMASANGAN KABEL NYM 2 x 2,5 mm 50.00 m' 34,000.0 11% 1,887,0
 
0 00.00
2 PEMASANGAN KABEL NYM 2 x 4 mm 80.00 m' 70,000.0 11% 6,216,0
0 00.00  
3 PEMASANGAN KABEL NYA 30.00 m' 30,000.0 11% 999,0
0 00.00  
4   50.00 m' 70,000.0 11% 3,885,0
PEMASANGAN KABEL NYY 4 x 4 mm 0 00.00  
5 PEMASANGAN KABEL SR 2 x 10 mm 40.00 m' 85,000.0 11% 3,774,0
0 00.00  
6 PEMASANGAN KABEL SR 2 x 16 mm 40.00 m' 100,000.0 11% 4,440,0
0 00.00  
7 PEMASANGAN SAKLAR TUNGGAL   2.00 buah 55,000.0 11% 122,1
0 00.00  
8 PEMASANGAN SAKLAR GANDA   1.00 buah 70,000.0 11% 77,7
0 00.00  
9 PEMASANGAN FITTING LAMPU   4.00 buah 40,000.0 11% 177,6
0 00.00  
10 PEMASANGAN BOLAM LAMPU LED 30 WATT 5.00 buah 150,000.0 11% 832,5
0 00.00  
            22,410,900.0
Jumlah - IV -
0
                 
                 
V PEKERJAAN PENGECETAN            
1 PENGECETAN 400.00 m2 55,000.0 11% 24,420,
 
0 000.00
            24,420,000.0
Jumlah - V -
0
JUMLAH TOTAL Rp 68,775,600.00
JUMLAH PEMBULATAN Rp 68,800,000.00