1 Rp 3,930,300,000.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Terbilang
TIGA MILYAR SEMBILAN RATUS TIGA PULUH JUTA TIGA RATUS RIBU RUPIAH
RUPIAH
RUPIAH
RUPIAH
RUPIAH
RUPIAH
RUPIAH
RUPIAH
RUPIAH
RUPIAH
RUPIAH
RUPIAH
RUPIAH
RUPIAH
RUPIAH
RUPIAH
RUPIAH
RUPIAH
RUPIAH
RUPIAH
RUPIAH
RUPIAH
RUPIAH
RUPIAH
RUPIAH
FORMULIR REKAPITULASI TINGKAT KOMPONEN DALAM NEGERI (TKDN)
PEKERJAAN : PEMBANGUNAN KOMPLEKS RUMAH OPERASIONAL KANTOR OTORITAS PELABUHAN UTAMA MAKASSAR
LOKASI : KECAMATAN PANAKKUKANG, KELURAHAN TAMAMAUNG
SUMBER DANA : APBN
TAHUN ANGGARAN : 2019
NILAI GABUNGAN BARANG/JASA (Rp) TKDN
URAIAN PEKERJAAN TOTAL
DN LN BARANG/JASA GABUNGAN
RIBU (RP) % KDN
(1) (2) (3) (4) (5) (6) (7)
BARANG
I Material Langsung (Barang Baku) 2,200,968,000.00 - 2,200,968,000.00 56.00 81.16
II Peralatan (Barang Jadi) 510,939,000.00 - 510,939,000.00 13.00 18.84
A. Sub Total Barang 2,711,907,000.00 - 2,711,907,000.00 69.00 100.00
JASA
III Manajemen Proyek dan Perekayasaan 117,909,000.00 - 117,909,000.00 3.00 9.68
IV Alat Kerja/Fasilitas Kerja 314,424,000.00 - 314,424,000.00 8.00 25.81
V Konstruksi dan Fabrikasi 471,636,000.00 - 471,636,000.00 12.00 38.71
VI Jasa Umum 314,424,000.00 - 314,424,000.00 8.00 25.81
B. Sub Total Jasa 1,218,393,000.00 - 1,218,393,000.00 31.00 100.00
C. Total Biaya (A+B) 3,930,300,000.00 - 3,930,300,000.00 100.00 100.00
Formulasi Perhitungan :
Nilai Barang Total (3C)-Nilai Barang Luar Negeri (3B)
% TKDN Barang = x 100
Nilai Gabungan Barang dan Jasa (9C)
2,711,907,000.00 - -
= x 100
3,930,300,000.00
= 69.00 %
PEKERJAAN TANAH, JALAN & DRAINASE Rp 621,517,445.71 Rp 642,172,970.45 1.00 Rp 621,517,445.71 Rp 642,172,970 Rp 20,655,525
PEKERJAAN MEKANIKAL ELEKTRIKAL SITE Rp 248,071,904.52 Rp 312,421,904.52 1.00 Rp 248,071,904.52 Rp 312,421,905 Rp 64,350,000
PEKERJAAN PLUMBING & SANITASI SITE Rp 194,905,295.00 Rp 194,905,295.00 1.00 Rp 194,905,295.00 Rp 194,905,295 Rp -
II PEK. RUMAH TIPE B (120) Rp 690,513,701.93 Rp 701,955,907.74 1.00 Rp 690,513,701.93 Rp 701,955,908 Rp 11,442,206
VII PEK. PAGAR DAN KANOPI Rp 297,319,928.18 Rp 277,926,264.24 1.00 Rp 297,319,928.18 277926264.238484 (19,393,663.94)
Direktur
HARGA PENAWARAN BIAYA HASIL NEGOSIASI
SITE DEVELOPMENT
KEGIATAN : PEMBANGUNAN KOMPLEKS RUMAH OPERASIONAL KANTOR OTORITAS PELABUHAN UTAMA MAKAS
LOKASI : KECAMATAN PANAKKUKANG, KELURAHAN TAMAMAUNG
KOTA / KABUPATEN : MAKASSAR
PROVINSI : SULAWESI SELATAN
TAHUN ANGGARAN : 2019
KEGIATAN : PEMBANGUNAN KOMPLEKS RUMAH OPERASIONAL KANTOR OTORITAS PELABUHAN UTAMA MAKASSAR
LOKASI : KECAMATAN PANAKKUKANG, KELURAHAN TAMAMAUNG
KOTA / KABUPATEN : MAKASSAR
PROVINSI : SULAWESI SELATAN
TAHUN ANGGARAN : 2019
KODE
No. URAIAN ANALIS Volume BOQ Volume GBR SAT. HARGA SATUAN JUMLAH
A
I PEKERJAAN PERSIAPAN
1.1 Pek. Pengukuran & Pemasangan Bouwplank AN-001 100.00 100.00 m' Rp 59,653.00 Rp 5,965,300.00
1.2 Pek. Papan Nama Proyek - 1.00 1.00 ls Rp 500,000.00 Rp 500,000.00
1.3 Direksi Keet, Los Kerja, Peralatan K3 & Gudang AN-002 24.00 24.00 m2 Rp 1,014,134.00 Rp 24,339,216.00
TOTAL PEKERJAAN PERSIAPAN Rp 30,804,516.00
II PEKERJAAN TANAH, JALAN & DRAINASE
2.1 Pekerjaan Tanah, Lantai & Drainase
2.1.1 Pek. Pembersihan AN-003 690.34 593.19 m2 Rp 17,050.00 Rp 10,113,889.50
2.1.2 Pek. Timbunan Tanah T:70 cm AN-010 1798.06 1,815.86 m3 Rp 94,622.00 Rp 171,820,304.92
2.1.3 Pek. Pemadatan Tanah Timbunan AN-007 1798.06 1,815.86 m3 Rp 56,900.00 Rp 103,322,434.00
2.1.4 Pek. Urugan Sirtu C t:15 cm AN-009 426.37 389.11 m3 Rp 189,530.00 Rp 73,748,018.30
2.1.5 Pek. Pemasangan Paving Block K.300 AN-044 690.34 593.19 m² Rp 184,725.20 Rp 109,577,141.39
TOTAL Rp 468,581,788.11
2.2 Pekerjaan Saluran Drainase
2.2.1 Galian Tanah AN-004 28.19 29.40 m3 Rp 77,825.00 Rp 2,287,743.70
2.2.2 Pas. U-Ditch AN-029 176.20 180.11 m' Rp 480,810.00 Rp 86,598,689.10
2.2.3 Pas. Cover U-Ditch AN-030 176.20 180.11 m' Rp 342,210.00 Rp 61,635,443.10
2.2.4 Floor Drain AN-071 2.00 2.00 bh Rp 37,125.00 Rp 74,250.00
2.2.5 Pipa Air Kotor PVC dia. 3" AN-078 30.90 30.90 m' Rp 75,713.00 Rp 2,339,531.70
TOTAL Rp 152,935,657.60
TOTAL PEKERJAAN TANAH, JALAN & DRAINASE Rp 621,517,445.71
III PEKERJAAN MEKANIKAL ELEKTRIKAL
3.1 Panel Listrik
3.1.1 Panel MDP/Gardu - 1.00 1.00 bh Rp 19,000,000.00 Rp 19,000,000.00
3.1.2 Instalasi Penyambungan PLN
Pekerjaan Tiang Listrik + Kabel + Mobilisasi - 4.00 4.00 tiang Rp 15,000,000.00 Rp 60,000,000.00
Biaya SLO - 1.00 1.00 lot Rp 5,000,000.00 Rp 5,000,000.00
TOTAL Rp 84,000,000.00
3.2 Pek. Instalasi Penerangan
3.2.1 Instalasi Titik Nyala AN-083 31.00 31.00 ttk Rp 397,716.00 Rp 12,329,196.00
3.2.2 PJU Solar Cell 100 w LED + Armatur - 7.00 4.00 set Rp 21,450,000.00 Rp 85,800,000.00
3.2.3 Lampu Taman + Armatur AN-090 22.00 22.00 bh Rp 1,555,653.00 Rp 34,224,366.00
3.2.4 Lampu Sorot + Armatur AN-089 5.00 5.00 bh Rp 994,653.00 Rp 4,973,265.00
TOTAL Rp 137,326,827.00
3.2 Pek. Jaringan Kabel Tanam NYY 2x2.5 mm AN-091 290.98 290.98 m' Rp 91,913.80 Rp 26,745,077.52
TOTAL Rp 26,745,077.52
TOTAL PEKERJAAN MEKANIKAL ELEKTRIKAL Rp 248,071,904.52
IV PEKERJAAN PLUMBING & SANITASI
4.1 Instalasi Penyediaan Air Bersih
4.1.1 Pekerjaan Sumur Bor & Tangki Air
4.1.1.1 Pembuatan Sumur Bor AN-089 25.00 25.00 m' Rp 250,000.00 Rp 6,250,000.00
4.1.1.2 Pek. Ruang Pompa Sumur Bor 1,2 x 1,2 x 1,2 mtr - 1.00 1.00 ls Rp 2,000,000.00 Rp 2,000,000.00
4.1.1.3 Tangki Air Kap. 1000 Liter - 4.00 4.00 unit Rp 1,100,000.00 Rp 4,400,000.00
4.1.1.4 Fitting & Aksesoris - 1.00 1.00 lot Rp 500,000.00 Rp 500,000.00
TOTAL Rp 13,150,000.00
4.1.2 Instalasi Pompa Air
4.1.2.1 Pompa Air - 3.00 3.00 unit Rp 1,000,000.00 Rp 3,000,000.00
4.1.2.2 Pipa Suplay dari Sumur ke Roof Tank 3/4 AN-076 30.00 30.00 m' Rp 18,733.00 Rp 561,990.00
4.1.2.3 Fitting & Aksesoris - 1.00 1.00 lot Rp 500,000.00 Rp 500,000.00
TOTAL Rp 4,061,990.00
4.2 Pek. Instalasi Penyambngan dari PDAM
4.2.1 Pipa Distribusi 3 inc AN-078 200.00 200.00 m' Rp 75,713.00 Rp 15,142,600.00
4.2.2 Perizinan Penyambungan PDAM + Instalasi Pipa Induk - 1.00 1.00 lot Rp 43,000,000.00 Rp 43,000,000.00
4.2.3 Fitting & Aksesoris - 1.00 1.00 lot Rp 2,500,000.00 Rp 2,500,000.00
TOTAL Rp 60,642,600.00
4.3 Pek. Septictank Bio Komunal
KODE
No. URAIAN ANALIS Volume BOQ Volume GBR SAT. HARGA SATUAN JUMLAH
A
Kapasitas 2 M3/Hr Type BT-16 Cylinder C/W Unit Blower + Aksesoris - 2.00 2.00 set Rp 48,470,500.00 Rp 96,941,000.00
Control Panel, Material Pemasangan,
Kondisi Terpasang dan Beroperasi
Pipa Air Kotor PVC dia. 4" dari Unit rumah AN-079 210.00 210.00 m' Rp 95,760.50 Rp 20,109,705.00
TOTAL Rp 117,050,705.00
TOTAL PEKERJAAN SANITASI Rp 194,905,295.00
V PEKERJAAN AKHIR
6.1 Pembersihan Sisa Pekerjaan - 1.00 1.00 ls Rp 1,500,000.00 Rp 1,500,000.00
6.2 Laporan & Dokumentasi - 1.00 1.00 ls Rp 5,000,000.00 Rp 5,000,000.00
6.3 As Built Drawing - 1.00 1.00 ls Rp 2,500,000.00 Rp 2,500,000.00
TOTAL PEKERJAAN AKHIR Rp 9,000,000.00
HARGA PENAWARAN BIAYA HASIL NEGOSIASI
RUMAH TIPE B (120)
KEGIATAN : PEMBANGUNAN KOMPLEKS RUMAH OPERASIONAL KANTOR OTORITAS PELABUHAN UTAMA MAKASS
LOKASI : KECAMATAN PANAKKUKANG, KELURAHAN TAMAMAUNG
KOTA / KABUPATEN : MAKASSAR
PROVINSI : SULAWESI SELATAN
TAHUN ANGGARAN : 2019
KEGIATAN : PEMBANGUNAN KOMPLEKS RUMAH OPERASIONAL KANTOR OTORITAS PELABUHAN UTAMA MAKASSAR
LOKASI : KECAMATAN PANAKKUKANG, KELURAHAN TAMAMAUNG
KOTA / KABUPATEN : MAKASSAR
PROVINSI : SULAWESI SELATAN
TAHUN ANGGARAN : 2019
KEGIATAN : PEMBANGUNAN KOMPLEKS RUMAH OPERASIONAL KANTOR OTORITAS PELABUHAN UTAMA MAKAS
LOKASI : KECAMATAN PANAKKUKANG, KELURAHAN TAMAMAUNG
KOTA / KABUPATEN : MAKASSAR
PROVINSI : SULAWESI SELATAN
TAHUN ANGGARAN : 2019
KEGIATAN : PEMBANGUNAN KOMPLEKS RUMAH OPERASIONAL KANTOR OTORITAS PELABUHAN UTAMA MAKASSAR
LOKASI : KECAMATAN PANAKKUKANG, KELURAHAN TAMAMAUNG
KOTA / KABUPATEN : MAKASSAR
PROVINSI : SULAWESI SELATAN
TAHUN ANGGARAN : 2019
KEGIATAN : PEMBANGUNAN KOMPLEKS RUMAH OPERASIONAL KANTOR OTORITAS PELABUHAN UTAMA MAKASS
LOKASI : KECAMATAN PANAKKUKANG, KELURAHAN TAMAMAUNG
KOTA / KABUPATEN : MAKASSAR
PROVINSI : SULAWESI SELATAN
TAHUN ANGGARAN : 2019
KEGIATAN : PEMBANGUNAN KOMPLEKS RUMAH OPERASIONAL KANTOR OTORITAS PELABUHAN UTAMA MAKASSAR
LOKASI : KECAMATAN PANAKKUKANG, KELURAHAN TAMAMAUNG
KOTA / KABUPATEN : MAKASSAR
PROVINSI : SULAWESI SELATAN
TAHUN ANGGARAN : 2019
KEGIATAN : PEMBANGUNAN KOMPLEKS RUMAH OPERASIONAL KANTOR OTORITAS PELABUHAN UTAMA MAKAS
LOKASI : KECAMATAN PANAKKUKANG, KELURAHAN TAMAMAUNG
KOTA / KABUPATEN : MAKASSAR
PROVINSI : SULAWESI SELATAN
TAHUN ANGGARAN : 2019
KEGIATAN : PERENCANAAN PEMBANGUNAN KOMPLEKS RUMAH OPERASIONAL KANTOR OTORITAS PELABUHAN UTAMA MAKASSAR
LOKASI : KECAMATAN PANAKKUKANG, KELURAHAN TAMAMAUNG
KOTA / KABUPATEN : MAKASSAR
PROVINSI : SULAWESI SELATAN
TAHUN ANGGARAN : 2019
KEGIATAN : PEMBANGUNAN KOMPLEKS RUMAH OPERASIONAL KANTOR OTORITAS PELABUHAN UTAMA MAKAS
LOKASI : KECAMATAN PANAKKUKANG, KELURAHAN TAMAMAUNG
KOTA / KABUPATEN : MAKASSAR
PROVINSI : SULAWESI SELATAN
TAHUN ANGGARAN : 2019
KEGIATAN : PEMBANGUNAN KOMPLEKS RUMAH OPERASIONAL KANTOR OTORITAS PELABUHAN UTAMA MAKASSAR
LOKASI : KECAMATAN PANAKKUKANG, KELURAHAN TAMAMAUNG
KOTA / KABUPAT : MAKASSAR
PROVINSI : SULAWESI SELATAN
TAHUN ANGGARA: 2019
KEGIATAN : PEMBANGUNAN KOMPLEKS RUMAH OPERASIONAL KANTOR OTORITAS PELABUHAN UTAMA MAKASS
LOKASI : KECAMATAN PANAKKUKANG, KELURAHAN TAMAMAUNG
KOTA / KABUPATEN : MAKASSAR
PROVINSI : SULAWESI SELATAN
TAHUN ANGGARAN : 2019
KODE Volume
No. URAIAN
ANALISA BOQ
I PEKERJAAN PERSIAPAN
1.1 Pekerjaan Pengukuran & Pemasangan Bouwplank AN-001 209.00
TOTAL PEKERJAAN PERSIAPAN
II PEKERJAAN PAGAR KELILING
2.1 Pekerjaan Pondasi Garis
2.1.1 Galian Tanah Pondasi < 1 m AN-004 20.90
2.1.2 Pasangan Pondasi Batu Kali PC. 1:4 AN-011 54.85
Volume
SAT. HARGA SATUAN JUMLAH
GBR
KEGIATAN : PEMBANGUNAN KOMPLEKS RUMAH OPERASIONAL KANTOR OTORITAS PELABUHAN UTAMA MAKASSAR
LOKASI : KECAMATAN PANAKKUKANG, KELURAHAN TAMAMAUNG
KOTA / KABUPATEN : MAKASSAR
PROVINSI : SULAWESI SELATAN
TAHUN ANGGARAN : 2019
B BAHAN
1 Air B-1 LTR Rp 70.00 PDAM/Sumur Bor
2 Ampelas B-2 LBR Rp 3,000.00 -
3 Armatur Downlight B-3 BH Rp 10,300.00 Osram
4 Atap Bitumen B-4 LBR Rp 120,000.00 Onduline
5 Atap Spandek 0.35 B-5 M Rp 57,000.00 Lysaght
6 Baja CT.75 T:0.75 mm B-6 M Rp 15,000.00 SNI BjTP 24
7 Bak Cuci Piring B-7 UNIT Rp 300,000.00 Elegant
8 Balok Kayu Kelas I B-8 M³ Rp 2,600,000.00 Jati
9 Balok Kayu Kelas II B-9 M³ Rp 2,000,000.00 Meranti
10 Bambu Besar B-10 BTG Rp 25,000.00 Barombong
11 Bata Merah B-11 BH Rp 425.00 Lokal
12 Bata Rooster B-12 BH Rp 1,700.00 Lokal
13 Batu Alam B-13 M² Rp 165,400.00 Lokal
14 Batu Alam Motif Sirip 20 x 40 cm B-14 M² Rp 193,400.00 -
15 Batu Belah B-15 M³ Rp 125,000.00 Lokal
16 Baut B-16 BH Rp 500.00 SNI BjTP 24
17 Besi Beton (Polos/Ulir) B-17 KG Rp 9,000.00 SNI BjTP 24
18 Besi Hollow 40x20x1.5 mm B-18 BH Rp 120,700.00 SNI BjTP 24
19 Besi Hollow 40x40x2 mm B-19 BH Rp 200,000.00 SNI BjTP 24
20 Campuran Beton Ready Mix K175 B-20 M³ Rp 750,000.00 K175 slump 12
21 Campuran Beton Ready Mix K225 B-21 M³ Rp 850,000.00 K175 slump 12
22 Cat Dasar B-22 KG Rp 35,000.00 Nippon Paint
23 Cat Penutup B-23 KG Rp 30,000.00 Nippon Paint
24 Cover U Ditch B-24 BH Rp 275,000.00 Wika Beton
25 Dempul B-25 KG Rp 38,000.00 Matex
26 Dolken Kayu Galam, 8-10 cm Panjang 4 m B-26 BTG Rp 22,900.00 Lokal
27 Ducting Jalur Kabel B-27 M Rp 25,300.00 First Duct
28 Engsel B-28 BH Rp 25,000.00 Balezza
29 Floor Deck T 0.75 mm B-29 M² Rp 110,000.00 Sakura
30 Floor Drain B-30 UNIT Rp 20,000.00 Onda
31 Granit 60 x 60 cm B-31 DOZ Rp 135,000.00 Garuda
32 Grendel B-32 BH Rp 36,600.00 Balezza
33 Gypsum Board B-33 LBR Rp 68,000.00 Jayaboard
34 Handle B-34 BH Rp 90,000.00 Balezza
35 Jet Washer B-35 BH Rp 95,000.00 Onda
36 Kabel NYM 3 x 2.5 mm B-36 M Rp 14,600.00 Eterna
37 Kabel NYY 4x2.5 mm B-37 M Rp 20,500.00 Eterna
38 Kaca Tebal 5 mm B-38 M² Rp 125,400.00 Panasap
39 Kait angin Jendela Alumunium Kwalitas 1 B-39 BH Rp 15,700.00 Balezza
40 Kawat Beton B-40 KG Rp 16,750.00 BJ 240 - BJ 32
41 Kawat Las B-41 BH Rp 8,000.00 Esab
42 Kayu balok 5/7 kls III B-42 M³ Rp 1,500,000.00 Durian
43 Kayu Kelas III B-43 M³ Rp 2,000,000.00 Durian
44 Kayu kls II (balok) B-44 M³ Rp 2,000,000.00 Meranti
45 Kayu papan 3/20 B-45 LTR Rp 2,000,000.00 Durian
46 Keramik 20 x 20 cm B-46 DOZ Rp 65,000.00 Roman
47 Keramik 30 x 30 cm B-47 DOZ Rp 70,000.00 Roman
48 Kerikil (Maks. 30 mm) B-48 M³ Rp 250,000.00 Lokal
49 Kloset Duduk B-49 UNIT Rp 1,500,000.00 KIA
50 Kloset Jongkok B-50 UNIT Rp 400,000.00 KIA
51 Koral beton B-51 M³ Rp 375,800.00 Lokal
52 Kran Air 3/4 Inch B-52 BH Rp 50,000.00 Onda
53 Kuas B-53 BH Rp 15,000.00 -
54 Kunci Tanam B-54 BH Rp 120,200.00 Balezza
55 Lampu 18 w B-55 BH Rp 32,400.00 Philips, Panasonic, Osram
NO. URAIAN KODE SATUAN HARGA SATUAN KET. - MEREK/JENIS/KELAS
56 Lampu 23 w B-56 BH Rp 39,700.00 Philips, Panasonic, Osram
57 Lampu LED 7 w B-57 BH Rp 47,000.00 Philips, Panasonic, Osram
58 Lampu Sorot LED 30 w B-58 BH Rp 250,000.00 Philips, Panasonic, Osram
59 Lampu Taman B-59 BH Rp 760,000.00 Philips, Panasonic, Osram
60 Lem Kayu B-60 KG Rp 15,700.00 Fox
61 Les Gypsum B-61 M Rp 16,400.00 Jayaboard
62 Lisplank Woodplank B-62 M² Rp 15,000.00 Jayaboard
63 Menie Besi B-63 KG Rp 30,300.00 Avian
64 Minipile K-500 25x25 B-64 BUAH Rp 3,000,000.00 Ready Mix
65 Minyak Bekisting B-65 LTR Rp 20,000.00 -
66 Moff Kabel B-66 BH Rp 31,000.00 Eterna
67 Nok Atap Bitumen B-67 LBR Rp 35,000.00 Onduline
68 Paku B-68 KG Rp 19,000.00 -
69 Paku 10 cm B-69 KG Rp 19,000.00 -
70 Paku 5 - 10 cm B-70 KG Rp 19,000.00 -
71 Paku 5 - 12 cm B-71 KG Rp 19,000.00 -
72 Paku biasa B-72 KG Rp 19,000.00 -
73 Paku Skrup B-73 KG Rp 75,000.00 -
74 Paku Skrup 3 cm B-74 Kg Rp 75,000.00 -
75 Paku Spandek B-75 BH Rp 450.00 -
76 Panel MDP 0-15 Grup B-76 BH Rp 2,000,000.00 Nokian
77 Papan Kayu Kelas I B-77 M³ Rp 3,500,000.00 Jati
78 Papan Kayu Kelas II B-78 M³ Rp 3,000,000.00 Meranti
79 Pasir Beton B-79 M³ Rp 150,000.00 Lokal
80 Pasir Pasang B-80 M³ Rp 150,000.00 Lokal
81 Pasir Urug B-81 M³ Rp 110,000.00 Lokal
82 Paving Block B-82 M² Rp 88,200.00 Lokal
83 Penggantung B-83 BH Rp 41,500.00 -
84 Pengukur/Injection B-84 BH Rp 950,000.00 -
85 Pintu KM/WC PVC kw.1 (Lengkap Accessorie B-85 BH Rp 240,000.00 -
86 Pipa GIP dia. 1 1/2 Inch B-86 M Rp 9,500.00 Sch 40 ISTW
87 Pipa GIP dia. 200 mm B-87 M Rp 12,500.00 Sch 40 ISTW
88 Pipa Listrik B-88 BH Rp 10,000.00 Supernova
89 Pipa Listrik NYY 3x2.5 mm B-89 BH Rp 16,000.00 Supernova
90 Pipa PVC 1 1/2" B-90 M Rp 9,500.00 Power
91 Pipa PVC 1/2" B-91 M Rp 6,250.00 Power
92 Pipa PVC 3" B-92 M Rp 27,500.00 Power
93 Pipa PVC 3/4" B-93 M Rp 7,500.00 Power
94 Pipa PVC 4" B-94 M Rp 38,750.00 Power
95 Plamur B-95 KG Rp 3,500.00 A-Plus
96 Plint Keramik B-96 BH Rp 45,000.00 Roman
97 Plywood Tebal 9 mm B-97 LBR Rp 125,000.00 -
98 Polycarbonate T:5 B-98 LBR Rp 100,000.00 -
99 Press Kabel B-99 BH Rp 17,000.00 -
100 Rel pintu sorong w.500.80 B-100 SET Rp 15,000.00 -
101 Reng B-101 M Rp 5,500.00 Taco
102 Saklar Ganda B-102 BH Rp 15,700.00 Panasonic
103 Saklar Tunggal B-103 BH Rp 11,500.00 Panasonic
104 Seal Tape B-104 BH Rp 5,300.00 Onda
105 Sealant B-105 KG Rp 70,000.00 -
106 Semen Portland B-106 KG Rp 1,200.00 Tonasa, Holcim, Tiga Roda, Bosowa
107 Semen Warna B-107 KG Rp 20,900.00 -
108 Seng gelombang B-108 M Rp 42,500.00 Gajah
109 Seng plat B-109 M Rp 54,400.00 Gajah
110 Shower B-110 BH Rp 120,000.00 KIA
111 Sirtu Urug B-111 M³ Rp 120,000.00 Lokal
112 Stop Kontak B-112 BH Rp 12,500.00 Panasonic
113 Tanah Timbunan B-113 M³ Rp 48,100.00 Lokal
114 Tegel Keramik 30 x 30 cm B-114 DOS Rp 78,000.00 Roman
115 U Ditch 40x40x100 B-115 BH Rp 378,500.00 Wika Beton
116 Vernis B-116 LTR Rp 62,700.00 Lux
117 Wastafel B-117 UNIT Rp 731,500.00 KIA
118 Waterdrain B-118 BH Rp 50,000.00 KIA
119 Waterprofing B-119 KG Rp 48,350.00 Sika
120 Wiremesh M8 B-120 KG Rp 11,000.00 SNI BjTP 24
C PERALATAN
1 Pompa & Conveyor Beton C-1 SEWA/HARI Rp 135,000.00 -
2 Pemadat Timbunan (Stamper) C-2 SEWA/HARI Rp 50,000.00 -
3 Concrete Mixer C-3 SEWA/HARI Rp 450,000.00 -
RENCANA ANGGARAN BIAYA
PEKERJAAN
LOKASI
TAHUN ANGGARAN
Rp 188,142,141.00
Rp 174,009,736.00
m2 593.19 Rp 15,500.00 Rp 9,194,445.00
m3 1,815.86 Rp 28,300.00 Rp 51,388,838.00
m3 1,815.86 Rp 51,500.00 Rp 93,516,790.00
m3 389.11 Rp 28,300.00 Rp 11,011,813.00
m2 593.19 Rp 15,000.00 Rp 8,897,850.00
Rp 14,132,405.00
m3 29.40 Rp 70,750.00 Rp 2,079,767.00
m' 180.11 Rp 31,300.00 Rp 5,637,443.00
m' 180.11 Rp 31,300.00 Rp 5,637,443.00
bh 2.00 Rp 13,750.00 Rp 27,500.00
m' 30.90 Rp 24,280.00 Rp 750,252.00
Rp 21,035,445.00
bh 1.00
tiang 4.00
lot 1.00
Rp 21,035,445.00
ttk 31.00 Rp 72,600.00 Rp 2,250,600.00
set 4.00 Rp -
bh 22.00 Rp 41,030.00 Rp 902,660.00
bh 5.00 Rp 41,030.00 Rp 205,150.00
m' 290.98 Rp 60,750.00 Rp 17,677,035.00
m' 25.00
ls 1.00
unit 4.00
lot 1.00
unit 3.00
m' 30.00
lot 1.00
m' 200.00
lot 1.00
lot 1.00
set 2.00
m' 210.00
ls 1.00
ls 1.00
ls 1.00
#REF!
Unit 1.00 Rp 104,817,756.115
m3 215.34 Rp 70,750.00 Rp 15,235,305.000
m3 Rp 70,750.00 Rp -
m3 34.45 Rp 122,850.00 Rp 4,232,723.040
m3 86.14 Rp 28,300.00 Rp 2,437,648.800
m3 430.68 Rp 81,900.00 Rp 35,272,692.000
m3 0.00 Rp 569,286.67 Rp -
m3 0.00 Rp 504,498.33 Rp -
IV.1.6 Pasangan Bata Merah Uk. (5x11x22) cm tebal 1/2 Bata, 1 Pc : 5 m2 56.438
9.68 Semen PC kg 0.464
70 Bata Merah bh 3.357
0.045 Pasir Pasang m3 0.002
IV.1.9 Pasang Kusen Pintu dan Jendela Kayu Kelas III m3 1.844
1.1 Kayu Balok Kelas III m3 0.000
1.25 Paku kg 0.000
1 Lem Kayu kg 0.000
IV.1.23 Pekerjaan Pipa Air Kotor PVC Dia. 6 Inch m' 37.846
0.25 Pipa PVC Dia. 6" btg 0.000
0.1 Tutup Pipa Dia. 6" bh 0.000
IV.1.24 Pekerjaan Pipa Air Bersih PVC Dia. 0,5 Inch m' 2.010
0.25 Pipa PVC Dia. 0,5" btg 2.496
0.1 Tutup Pipa Dia. 0,5" bh 0.998
Sub Total
IV.2 Rumah Tipe 45 Uk. (8 x 12) M2 Unit 1.000
IV.2.1 Galian Tanah Biasa m3 76.226
IV.2.2 Pasang Pondasi Bata Merah tebal 1 bata, 1 Pc : 1 Ps m3 76.226
136 Semen PC kg 4914.207
300 Bata Merah bh 48.251
0.544 Pasir Pasang m3 0.087
IV.2.6 Pasangan Bata Merah Uk. (5x11x22) cm tebal 1/2 Bata, 1 Pc : 5 m2 74.051
9.68 Semen PC kg 0.393
70 Bata Merah bh 2.839
0.045 Pasir Pasang m3 0.002
IV.2.9 Pasang Kusen Pintu dan Jendela Kayu Kelas III m3 1.560
1.1 Kayu Balok Kelas III m3 0.000
1.25 Paku kg 0.000
1 Lem Kayu kg 0.000
IV.2.23 Pekerjaan Pipa Air Kotor PVC Dia. 6 Inch m' 58.350
0.25 Pipa PVC Dia. 6" btg 0.000
0.1 Tutup Pipa Dia. 6" bh 0.000
IV.2.24 Pekerjaan Pipa Air Bersih PVC Dia. 0,5 Inch m' 3.027
0.25 Pipa PVC Dia. 0,5" btg 2.380
0.1 Tutup Pipa Dia. 0,5" bh 0.952
Sub Total
IV.3.6 Pasangan Bata Merah Uk. (5x11x22) cm tebal 1/2 Bata, 1 Pc : 5 m2 8.647
9.68 Semen PC kg 0.000
70 Bata Merah bh 0.000
0.045 Pasir Pasang m3 0.000
IV.3.9 Pasang Kusen Pintu dan Jendela Kayu Kelas III m3 0.000
1.2 Kayu Balok Kelas III m3 0.000
1.25 Paku kg 0.000
1 Lem Kayu kg 0.000
IV.3.20 Pekerjaan Pipa Air Kotor PVC Dia. 6 Inch m' 4.166
0.25 Pipa PVC Dia. 6" btg 0.000
0.1 Tutup Pipa Dia. 6" bh 0.000
IV.3.21 Pekerjaan Pipa Air Bersih PVC Dia. 0,5 Inch m' 147.728
0.25 Pipa PVC Dia. 0,5" btg 2.517
0.1 Tutup Pipa Dia. 0,5" bh 1.007
IV.4.6 Pasangan Bata Merah Uk. (5x11x22) cm tebal 1/2 Bata, 1 Pc : 5 m2 0.000
9.68 Semen PC kg 1.319
70 Bata Merah bh 9.541
0.045 Pasir Pasang m3 0.006
IV.4.9 Pasang Kusen Pintu dan Jendela Kayu Kelas III m3 5.243
1.2 Kayu Balok Kelas III m3 0.000
1.25 Paku kg 0.000
1 Lem Kayu kg 0.000
IV.4.20 Pekerjaan Pipa Air Kotor PVC Dia. 6 Inch m' 3.697
0.25 Pipa PVC Dia. 6" btg 0.000
0.1 Tutup Pipa Dia. 6" bh 0.000
IV.4.21 Pekerjaan Pipa Air Bersih PVC Dia. 0,5 Inch m' 118.093
0.25 Pipa PVC Dia. 0,5" btg 2.912
0.1 Tutup Pipa Dia. 0,5" bh 1.165
Rp 19,000.00 Rp 7,285.60
Rp 2,000,000.00 Rp 1,295.00
Rp 1,500,000.00 Rp 1,665.00
Rp 1,800.00 Err:522
Rp 1,000,000.00 Rp 92,500.00
Rp 900,000.00 Err:522
Rp 2,000,000.00 Rp 4,255,000.00
Rp 42,500.00 Err:522
Rp - Err:522
Rp 19,000.00 Err:522
Rp 450.00 Err:522
Rp 750,000.00 Err:522
Rp - Err:522
Rp - Err:522
Rp 500,000.00 Rp 500,000.00
Rp 48,139.00 #VALUE!
Rp 87,417.60 #VALUE!
Rp 7,500.00 #VALUE!
Rp - #VALUE!
Rp - Rp -
Rp - Rp -
Rp 525,000.00 Rp 18,375,000.00
Rp - Rp -
Rp - Rp -
Rp 7,000,000.00 Rp 140,000,000.00
Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 175,000.00 Rp -
Rp 1,899,836.29
Rp -
Rp 900,000.00 Rp -
Rp 900,000.00 Rp -
Rp 5,500.00 Rp -
Rp 1,899,836.29
Rp 1,800.00 Rp 219,295.37
Rp 425.00 Rp 114,216.34
Rp 900,000.00 Rp 438,590.73
Rp 1,800.00 Rp 321,500.90
Rp 900,000.00 Rp 806,232.96
Rp -
Rp 559,529,959.330
Rp 1,800.00 Rp 6,919,700.40
Rp 425.00 Rp 24,243.01
Rp 900,000.00 Rp 93,093.16
Rp 1,800.00 Rp 1,168,516.80
Rp 900,000.00 Rp 171,127.13
Rp 900,000.00 Rp 116,990.28
Rp 9,000.00 Rp 2,265,661.13
Rp 19,000.00 Rp 8,514.90
Rp - Rp -
Rp - Rp -
Rp 7,000.00 Rp 1,045.69
Rp 1,800.00 Rp 981,486.72
Rp 900,000.00 Rp 29,505.94
Rp 900,000.00 Rp 18,951.13
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 3,500,000.00 Rp 149,097.38
Rp - Rp -
Rp - Rp -
Rp 7,000.00 Rp 238.56
Rp 1,800.00 Rp 742,608.00
Rp 900,000.00 Rp 148,831.02
Rp 900,000.00 Rp 95,591.44
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 1,800.00 Rp 835.49
Rp - Rp -
Rp 900,000.00 Rp 1,942.00
Rp 1,800.00 Rp 17,209.07
Rp 900,000.00 Rp 43,155.45
Rp 1,800.00 Rp -
Rp - Rp -
Rp - Rp -
Rp 55,000.00 Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 25,000.00 Rp 2,262,093.75
Rp 1,800.00 Rp 10,800.00
Rp - Rp 8,400.00
Rp 900,000.00 Rp 9,000.00
Rp - Rp 274,285.00
Rp - Rp 351,000.00
Rp 450,000.00 Rp 4,429,440.00
Rp 60,000.00 Rp 4,500.00
Rp - Rp 106,125.00
Rp - Rp 3,972.47
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 1,800.00 Rp 48,127.16
Rp - Rp -
Rp 900,000.00 Rp 16,279,986.74
Rp - Rp -
Rp 1,800.00 Rp 775,237.46
Rp - Rp -
Rp 900,000.00 Rp 3,421,930.05
Rp - Rp -
Rp 1,800.00 Rp 162,949.05
Rp - Rp -
Rp 900,000.00 Rp 25,920.00
Rp - Rp -
Rp - Rp -
Rp - Err:522
Rp 1,100.00 Err:522
Rp - Rp 1,251,000.00
Rp - Rp 457,875.00
Rp 800.00 Err:522
Rp - Err:522
Rp 1,400.00 Err:522
Rp 11,200.00 Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 38,800.00 Rp -
Rp - Rp -
Rp 2,100.00 Rp 2,096.64
Rp 4,500,000.00 Rp -
Rp 250,000.00 Rp 2,250,000.00
Rp - Rp -
Rp - Rp -
Rp 3,500,000.00 Rp -
Rp 4,000,000.00 Rp -
Rp 60,000.00 Rp -
Rp - Rp -
Rp - Rp -
Rp 139,882,489.832
Rp 181,409,254.026
Rp 1,800.00 Rp 8,845,572.60
Rp - Rp -
Rp 900,000.00 Rp 78,744.92
Rp 1,800.00 Rp 988,416.00
Rp 900,000.00 Rp 144,751.70
Rp 900,000.00 Rp 98,958.83
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 7,000.00 Rp 884.52
Rp 1,800.00 Rp 1,102,170.24
Rp 900,000.00 Rp 33,133.99
Rp 900,000.00 Rp 21,281.36
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 3,500,000.00 Rp 167,430.38
Rp - Rp -
Rp - Rp -
Rp 7,000.00 Rp 267.89
Rp 1,800.00 Rp 1,005,073.92
Rp 900,000.00 Rp 201,433.56
Rp 900,000.00 Rp 129,377.09
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 1,800.00 Rp 706.72
Rp - Rp -
Rp 900,000.00 Rp 1,642.68
Rp 1,800.00 Rp 14,556.67
Rp 900,000.00 Rp 36,504.00
Rp 1,800.00 Rp -
Rp - Rp -
Rp - Rp -
Rp 55,000.00 Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 25,000.00 Rp 4,314,712.50
Rp 1,800.00 Rp 10,800.00
Rp - Rp 8,400.00
Rp 900,000.00 Rp 9,000.00
Rp - Rp 274,285.00
Rp - Rp 438,750.00
Rp 450,000.00 Rp 8,622,000.00
Rp 60,000.00 Rp 4,500.00
Rp - Rp 106,125.00
Rp - Rp 5,751.07
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 1,800.00 Rp 44,936.78
Rp - Rp -
Rp 900,000.00 Rp 25,100,241.47
Rp - Rp -
Rp 1,800.00 Rp 1,195,249.59
Rp - Rp -
Rp 900,000.00 Rp 4,256,752.50
Rp - Rp -
Rp 1,800.00 Rp 202,702.50
Rp - Rp -
Rp 900,000.00 Rp 28,800.00
Rp - Rp -
Rp - Rp -
Rp - Err:522
Rp 1,100.00 Err:522
Rp - Rp 1,390,000.00
Rp - Rp 508,750.00
Rp 800.00 Err:522
Rp - Err:522
Rp 1,400.00 Err:522
Rp 11,200.00 Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 38,800.00 Rp -
Rp - Rp -
Rp 2,100.00 Rp 1,999.20
Rp 4,500,000.00 Rp -
Rp 250,000.00 Rp 2,500,000.00
Rp - Rp -
Rp - Rp -
Rp 3,500,000.00 Rp -
Rp 4,000,000.00 Rp -
Rp 60,000.00 Rp -
Rp - Rp -
Rp - Rp -
Rp 181,409,254.026
Rp 307,269,878.867 Rp 307,269,878.867
Rp 1,800.00 Rp 14,259,844.80
Rp - Rp -
Rp 900,000.00 Rp 278,333.02
Rp 1,800.00 Rp 3,493,670.40
Rp 900,000.00 Rp 511,641.58
Rp 900,000.00 Rp 349,781.42
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 7,000.00 Rp 3,126.44
Rp 1,800.00 Rp 3,841,344.00
Rp 900,000.00 Rp 115,480.40
Rp 900,000.00 Rp 74,170.95
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 3,500,000.00 Rp 583,537.50
Rp - Rp -
Rp - Rp -
Rp 7,000.00 Rp 933.66
Rp 1,800.00 Rp 2,858,457.60
Rp 900,000.00 Rp 572,882.54
Rp 900,000.00 Rp 1,839,759.89
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 1,800.00 Rp -
Rp - Rp -
Rp 900,000.00 Rp -
Rp 1,800.00 Rp -
Rp 900,000.00 Rp -
Rp 1,800.00 Rp -
Rp - Rp -
Rp - Rp -
Rp 55,000.00 Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 1,800.00 Rp 6,077,894.40
Rp - Rp -
Rp 900,000.00 Rp 5,064,912.00
Rp - Rp -
Rp - Rp -
Rp 60,000.00 Rp 18,000.00
Rp - Rp 424,500.00
Rp - Rp 16,174.03
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 1,800.00 Rp 85,332.25
Rp - Rp -
Rp 900,000.00 Rp 63,547,138.34
Rp - Rp -
Rp 1,800.00 Rp 3,026,054.21
Rp - Rp -
Rp 900,000.00 Rp 756,000.00
Rp - Rp -
Rp - Rp -
Rp - Err:522
Rp 1,100.00 Err:522
Rp - Rp 2,780,000.00
Rp - Rp 1,017,500.00
Rp 800.00 Err:522
Rp - Err:522
Rp 1,400.00 Err:522
Rp 11,200.00 Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 38,800.00 Rp -
Rp - Rp -
Rp 2,100.00 Rp 2,114.51
Rp 4,500,000.00 Rp 3,150.00
Rp 250,000.00 Rp 5,000,000.00
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 1,800.00 Rp 21,150.00
Rp 900,000.00 Rp 31,500.00
Rp - Rp -
Rp 307,269,878.867
Rp 284,023,223.186 Rp 284,023,223.186
Rp 1,800.00 Rp 13,697,147.52
Rp - Rp -
Rp 900,000.00 Rp 270,761.39
Rp 1,800.00 Rp 3,398,630.40
Rp 900,000.00 Rp 497,723.15
Rp 900,000.00 Rp 340,266.14
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 7,000.00 Rp 3,041.39
Rp 1,800.00 Rp 3,623,616.00
Rp 900,000.00 Err:522
Rp 900,000.00 Err:522
Rp - Err:522
Rp - Err:522
Rp - Err:522
Rp 3,500,000.00 Err:522
Rp - Err:522
Rp - Err:522
Rp 7,000.00 Err:522
Rp 1,800.00 Rp 2,499,724.80
Rp 900,000.00 Err:522
Rp 900,000.00 Err:522
Rp - Err:522
Rp - Err:522
Rp - Err:522
Rp - Err:522
Rp 1,800.00 Rp 2,374.98
Rp - Rp -
Rp 900,000.00 Rp 5,520.35
Rp 1,800.00 Rp 48,918.82
Rp 900,000.00 Rp 122,674.50
Rp 1,800.00 Rp -
Rp - Rp -
Rp - Rp -
Rp 55,000.00 Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 1,800.00 Rp 5,145,841.44
Rp - Rp -
Rp 900,000.00 Rp 4,288,201.20
Rp - Rp -
Rp - Rp -
Rp 60,000.00 Rp 3,000.00
Rp - Rp 70,750.00
Rp - Rp 7,540.60
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 1,800.00 Rp 75,737.54
Rp - Rp -
Rp 900,000.00 Rp 50,799,486.30
Rp - Rp -
Rp 1,800.00 Rp 2,419,023.16
Rp - Rp -
Rp 900,000.00 Rp 945,000.00
Rp - Rp -
Rp - Rp -
Rp - Err:522
Rp 1,100.00 Err:522
Rp - Rp 3,475,000.00
Rp - Rp 1,271,875.00
Rp 800.00 Err:522
Rp - Err:522
Rp 1,400.00 Err:522
Rp 11,200.00 Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 38,800.00 Rp -
Rp - Rp -
Rp 2,100.00 Rp 2,446.07
Rp 4,500,000.00 Rp 3,150.00
Rp 250,000.00 Rp 6,250,000.00
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp 1,800.00 Rp 21,150.00
Rp 900,000.00 Rp 31,500.00
Rp - Rp -
Rp 284,023,223.186