Anda di halaman 1dari 75

SKPA : DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

NAMA PEKERJAAN : DED KAWASAN WISATA TAPAK GAJAH GAMPOENG IE


NO. KONTRAK :
TANGGAL KONTRAK :
NO. KONTRAK ADD.I :
TANGGAL KONTRAK ADD.I :
NILAI KONTRAK :
KONTRAKTOR PELAKSANA :
KONSULTAN PENGAWAS :
LOKASI : KOTA SABANG
SUMBER DANA : APBK
TAHUN ANGGARAN : 2023

PEMASUKAN DOKUMEN : Kota Sabang, Maret 2023


Konsultan Perencana
CV. DIMENSI CONSULTANT

PENANGGUNG JAWAB : ABDI MURSALIN


JABATAN : Wakil Direktur

Mengetahui :
Pejabat Pelaksana Teknis Kegiatan (PPTK) Pengguna Anggaran (PA)

KOTA SABANG

NAMA
NIP.
Pengawas Direksi
0
KOTA SABANG

NAMA
NIP.

Terjemahan kedalam kalimat

TOTAL HARGA #N/A

terb#N/A

BASsatu dua tiga empat lima enam tujuh delapa


ribu juta milyar triliyun
#N/A
@ @
bas#N/A
p #N/A
ang#N/A
@ #N/A
@ #N/A
@ #N/A
@ #N/A
@
@
@ #N/A
@ #N/A
@ #N/A
@ #N/A
@ #N/A
@ #N/A
@ #N/A
@
@
@ #N/A
@ #N/A
@ #N/A
@ #N/A
@ #N/A
@ #N/A
@ #N/A
@
@
@ #N/A
@ #N/A
@ #N/A
@ #N/A
@ #N/A
@ #N/A
@ #N/A
@
@ #N/A
@ #N/A
@ #N/A
@ #N/A

@ #N/A
@ #N/A
@ #N/A
@
@
@ #N/A
@ #N/A
@ #N/A
@ #N/A

Terjemahan kedalam kalimat


DUKUNGAN BANK #REF!

terb#REF!

BASsatu dua tiga empat lima enam tujuh delapa


ribu juta milyar triliyun
#REF!
@ @
bas#REF!
p #REF!
ang#REF!
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@
@
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@
@
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@
@
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@
@ #REF!
@ #REF!
@ #REF!
@ #REF!

@ #REF!
@ #REF!
@ #REF!
@
@
@ #REF!
@ #REF!
@ #REF!
@ #REF!

Terjemahan kedalam kalimat

JAMINAN PENAWARAN #REF!

terb#REF!

BASsatu dua tiga empat lima enam tujuh delapa


ribu juta milyar triliyun
#REF!
@ @
bas#REF!
p #REF!
ang#REF!
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@
@
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@
@
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@
@
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@ #REF!
@
@ #REF!
@ #REF!
@ #REF!
@ #REF!

@ #REF!
@ #REF!
@ #REF!
@
@
@ #REF!
@ #REF!
@ #REF!
@ #REF!
UMUM DAN PERUMAHAN RAKYAT
ATA TAPAK GAJAH GAMPOENG IE MEULEE

Menyetujui :
Pengguna Anggaran (PA)

KOTA SABANG

NAMA
NIP.
Diperiksa Oleh:
Konsultan Pengawas
0

NAMA
Jabatan

1 <=== Bahasa <1> Indonesia, <2> Inggris

empat lima enam tujuh delapan sembilan sepuluh @


ar triliyun @
@
@ @ @ @
1 @
#N/A @
#N/A @
#N/A @
#N/A @
#N/A @
@
@
@
2 @
#N/A @
#N/A @
#N/A @
#N/A @
#N/A @
@
@
@
3 @
#N/A @
#N/A @
#N/A @
#N/A @
#N/A @
@
@
@
4 @
#N/A @
#N/A @
#N/A @
#N/A @
#N/A @
@
@
1 @
#N/A @
#N/A @
#N/A @

#N/A @
#N/A @
@
***

#N/A #N/A
#N/A
1 <=== Bahasa <1> Indonesia, <2> Inggris

empat lima enam tujuh delapan sembilan sepuluh @


ar triliyun @
@
@ @ @ @
1 @
#REF! @
#REF! @
#REF! @
#REF! @
#REF! @
@
@
@
2 @
#REF! @
#REF! @
#REF! @
#REF! @
#REF! @
@
@
@
3 @
#REF! @
#REF! @
#REF! @
#REF! @
#REF! @
@
@
@
4 @
#REF! @
#REF! @
#REF! @
#REF! @
#REF! @
@
@
1 @
#REF! @
#REF! @
#REF! @

#REF! @
#REF! @
@
***

#REF! #REF!
#REF!

1 <=== Bahasa <1> Indonesia, <2> Inggris

empat lima enam tujuh delapan sembilan sepuluh @


ar triliyun @
@
@ @ @ @
1 @
#REF! @
#REF! @
#REF! @
#REF! @
#REF! @
@
@
@
2 @
#REF! @
#REF! @
#REF! @
#REF! @
#REF! @
@
@
@
3 @
#REF! @
#REF! @
#REF! @
#REF! @
#REF! @
@
@
@
4 @
#REF! @
#REF! @
#REF! @
#REF! @
#REF! @
@
@
1 @
#REF! @
#REF! @
#REF! @

#REF! @
#REF! @
@
***

#REF! #REF!
#REF!
REKAPITULASI

SKPA : DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT


NAMA PEKERJAAN :
LOKASI : KOTA SABANG
SUMBER DANA : APBK
TAHUN ANGGARAN : 15-Jul-05

JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.)

A. PEKERJAAN PERSIAPAN Rp 1,300,000.00


B. PEKERJAAN RK3 KONSTRUKSI Rp 9,613,006.30
C. PEKERJAAN TANAH Rp -
D. PEKERJAAN PONDASI Rp -
E. PEKERJAAN BETON BERTULANG Rp -
F. PEKERJAAN PASANGAN DAN PLASTERAN Rp -
G. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING Rp -
H. PEKERJAAN PINTU, JENDELA DAN VENTILASI Rp -
I. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL Rp 11,122,345.00
J. PEKERJAAN SANITASI Rp 10,930,000.00
K. PEKERJAAN ATAP Rp #N/A
L. PEKERJAAN LANGIT - LANGIT (PLAFOND) Rp 23,814,440.00
M. PEKERJAAN PENGECATAN Rp -
N. PEKERJAAN LAIN - LAIN Rp 500,000.00
JUMLAH HARGA PEKERJAAN #N/A
SP3D 10% #N/A
JUMLAH TOTAL HARGA PEKERJAAN #N/A
DIBULATKAN #N/A
TERBILANG : #N/A

Kota Sabang, Maret 2023


Konsultan Perencana
ABDI MURSALIN
Wakil Direktur
ENGINEERING ESTIMATE (EE)

SKPA : DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT


NAMA PEKERJAAN : DED KAWASAN WISATA TAPAK GAJAH GAMPOENG IE MEULEE
LOKASI : KOTA SABANG
SUMBER DANA : APBK
TAHUN ANGGARAN : 2023

HARGA JUMLAH
NO URAIAN PEKERJAAN VOL. SAT. ANALISA SATUAN HARGA
(Rp) (Rp)
(1) (2) (3) (4) (5) (6) (7)
A. PEKERJAAN PERSIAPAN
1 Pembersihan dan Perataan Lahan 1.00 Ls Taksir 500,000.00 500,000.00
2 Pengukuran dan Pemasangan Bouwplank 1.00 Ls Taksir 500,000.00 500,000.00
3 Papan Nama Proyek 1.00 Ls Taksir 300,000.00 300,000.00
Jumlah 1,300,000.00
B. PEKERJAAN RK3 KONSTRUKSI
1 Sistem Manajemen Kesehatan dan Keselamatan Kerja 1.00 Paket Anl. K3 9,613,006.30 9,613,006.30
Jumlah 9,613,006.30
C. PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus 44.10 M3 - -
2 Urugan Kembali Bekas Galian Tanah 14.70 M3 - -
3 Urugan Pasir Bawah Pondasi Menerus dan Dibawah Lantai 5.16 M3 - -
4 Urugan Tanah (Timbunan) 2.66 M3 - -
Jumlah -
D. PEKERJAAN PONDASI
1 Pemasangan Batu Kosong (Aanstamping) 2.59 M3 - -
2 Pemasangan Batu Gunung/ Kali Campuran 1 PC : 4 PP 14.70 M3 - -
Jumlah -
E. PEKERJAAN BETON BERTULANG
1 Membuat 1 m3 beton untuk lantai kerja (bedding) Beton fc' = 7,4 Mpa (K-10 6.36 M3 - -
1 Pekerjaan Beton Sloof Uk. 15/18 cm
- Membuat 1 m3 Beton Mutu f'c = 14,5 MPa (K-175) 1.98 M3 - -
- Pembesian Dengan Besi Polos Ø 10 mm 182.64 Kg - -
- Sengkang Besi Polos Ø 6 mm 53.16 Kg - -
- Pemasangan 1 m2 Bekisting Untuk Sloof 5.29 M2 - -
2 Pekerjaan Beton Kolom KP Uk. 13/13 cm
- Membuat 1 m3 Beton Mutu f'c = 14,5 MPa (K-175) 1.62 M3 - -
- Pembesian Dengan Besi Polos Ø 10 mm 239.96 Kg - -
- Sengkang Besi Polos Ø 6 mm 55.16 Kg - -
- Pemasangan 1 m2 Bekisting Untuk Kolom 4.98 M2 - -
3 Pekerjaan Beton Kolom Uk. 13/50 cm
- Membuat 1 m3 Beton Mutu f'c = 14,5 MPa (K-175) 0.77 M3 - -
- Pembesian Dengan Besi Polos Ø 10 mm 44.24 Kg - -
- Sengkang Besi Polos Ø 6 mm 19.89 Kg - -
- Pemasangan 1 m2 Bekisting Untuk Kolom 3.72 M2 - -
4 Pekerjaan Beton Balok Latai Uk. 13/20 cm
- Membuat 1 m3 Beton Mutu f'c = 14,5 MPa (K-175) 0.31 M3 - -
- Pembesian Dengan Besi Polos Ø 10 mm 30.51 Kg - -
- Sengkang Besi Polos Ø 6 mm 9.46 Kg - -
- Pemasangan 1 m2 Bekisting Untuk Balok 1.61 M2 - -
5 Pekerjaan Beton Balok Latai Uk. 13/13 cm
- Membuat 1 m3 Beton Mutu f'c = 14,5 MPa (K-175) 0.47 M3 - -
- Pembesian Dengan Besi Polos Ø 10 mm 70.85 Kg - -
- Sengkang Besi Polos Ø 6 mm 16.45 Kg - -
- Pemasangan 1 m2 Bekisting Untuk Balok 2.43 M2 - -
6 Pekerjaan Beton Ring Balk Uk. 13/ 15 cm
- Membuat 1 m3 Beton Mutu f'c = 14,5 MPa (K-175) 1.26 M3 - -
- Pembesian Dengan Besi Polos Ø 10 mm 162.99 Kg - -
- Sengkang Besi Polos Ø 6 mm 41.48 Kg - -
- Pemasangan 1 m2 Bekisting Untuk Balok 3.88 M2 - -
7 Pekerjaan Beton Balok Top Gavel Uk. 13/ 13 cm
- Membuat 1 m3 Beton Mutu f'c = 14,5 MPa (K-175) 0.44 M3 - -
- Pembesian Dengan Besi Polos Ø 10 mm 56.10 Kg - -
- Sengkang Besi Polos Ø 6 mm 14.26 Kg - -
- Pemasangan 1 m2 Bekisting Untuk Balok 2.26 M2 - -
8 Pekerjaan Beton Plat Tebal 10 cm
- Membuat 1 m3 Beton Mutu f'c = 14,5 MPa (K-175) 0.72 M3 - -
- Pembesian Dengan Besi Polos Ø 10 mm 97.17 Kg - -
- Pemasangan 1 m2 Bekisting Untuk Plat 7.18 M2 - -
Jumlah -
F. PEKERJAAN PASANGAN DAN PLASTERAN
1 Pemasangan Dinding Bata Trasram Campuran 1 PC : 2 PP 17.22 M2 - -
2 Pemasangan Dinding Batu 1/2 Bata Campuran 1 PC : 4 PP 200.45 M2 - -
3 Plasteran Dinding Trasram Campuran 1 PC : 2 PP 17.22 M2 - -
4 Plasteran Dinding Campuran 1 PC : 4 PP 383.83 M2 - -
Jumlah -
G. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
1 Pemasangan Keramik Lantai Uk. 40x40 cm Polish 65.65 M2 - - -
2 Pemasangan Keramik Lantai Uk. 40x40 cm Unpolish 4.44 M2
3 Pemasangan Keramik Dinding 25x40 cm Motif 17.22 M2
4 Pemasangan Batu Alam Sisi Depan Rumah 10.24 M2 - - -
Jumlah -
H. PEKERJAAN PINTU, JENDELA DAN VENTILASI
1 Pemasangan Pintu P1 (2 unit)
- Kusen Kayu Kelas II 0.08 M3
- Pintu Panel Kayu Kelas II 1.64 M2
- Kaca Rayben tebal 5 mm 0.20 M2
- Engsel Pintu 6.00 Buah
- Handle + Kunci 2.00 Buah
2 Pemasangan Pintu P2 (2 unit)
- Kusen Kayu Kelas II 0.08 M3
- Pintu Panel Kayu Kelas II 3.16 M2
- Engsel Pintu 6.00 Buah
- Handle + Kunci 2.00 Buah
3 Pemasangan Pintu P3 (Pintu Aluminium White) 2 Unit 2.00 Unit
4 Pemasangan Pintu P4 ( 4 unit)
- Kusen Kayu Kelas II 0.16 M3
- Pintu Panel Kayu Kelas II 6.56 M2
- Engsel Pintu 6.00 Buah
- Handle + Kunci 4.00 Buah
5 Pemasangan Jendela J1 (2 unit) - - -
- Kusen Kayu Kelas II 0.11 M3
- Daun Jendelan Kayu Kelas II 3.79 M2
- Engsel Jendela 8.00 Buah
- Tarikan Jendela 4.00 Buah
- Pacok Jendela 4.00 Buah
- Hak Angin 8.00 Buah
6 Pemasangan Jendela J2 (2 unit)
- Kusen Kayu Kelas II 0.09 M3
- Daun Jendelan Kayu Kelas II 1.48 M2
Kaca Polos tebal 5mm 0.72 M2
- Engsel Jendela 4.00 Buah
- Tarikan Jendela 2.00 Buah
- Pacok Jendela 2.00 Buah
- Hak Angin 4.00 Buah - -
7 Pemasangan Ventilasi Kamar Mandi
- Kusen Kayu Kelas II 0.03 M3
- Kaca Polos tebal 5 mm 0.33 M2
8 Lobang Angin Pintu dan Jendela
- Kusen Kayu Kelas II 0.09 M3 - -
Jumlah -
I. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
1 Pemasukan Arus Baru 6 Ampere 2.00 Ls Taksir 3,500,000.00 7,000,000.00
2 Zekering Kast Lokal 1 Group + Box Panel Elektrikal 2.00 Unit Taksir 150,000.00 300,000.00
3 Armatur
- Lampu Downlight Hemat Energi 17 Watt 10.00 Buah Taksir 195,000.00 1,950,000.00
- Lampu Downlight Hemat Energi 16 Watt 2.00 Buah Taksir 165,000.00 330,000.00
4 Saklar lampu Merk Panasonik
- Saklar 1 Seri + Instalasi Terpasang 4.00 Buah Taksir 65,000.00 260,000.00
- Saklar 2 Seri + Instalasi Terpasang 4.00 Buah Taksir 95,000.00 380,000.00
5 Instalasi Stop Kontak, Instalasi termasuk Kabel NYA 2,5 mm Dalam Pipa 6.00 Titik Taksir -
PVC Kelengkapan Instalasi (terpasang)
6 Instalasi Titik Penerangan, Instalasi termasuk Kabel NYA 2,5 mm Dalam 5.00 TItik Taksir 180,469.00 902,345.00
Pipa PVC Fitting Lampu dan Kelengkapan Instalasi (terpasang)
Jumlah 11,122,345.00
J. PEKERJAAN SANITASI
1 Pemasangan Meteran dan Sambunnga PDAM + Accessories Lengkap Dipas 2.00 Ls Taksir 2,100,000.00 4,200,000.00
1 Pipa PVC Ø 4" + Accesorries Kelengkapannya 50.00 M - - -
2 Pipa PVC Ø 3" + Accesorries Kelengkapannya 50.00 M - - -
3 Pipa PVC Ø 3/4" + Accesorries Kelengkapannya 50.00 M - - -
4 Floor drain Stainles Steel 2.00 Buah - - -
5 Kran Air 3/4" (Jenis Sesuai Kebutuhan) 2.00 Buah - - -
6 Pemasangan Tempat Sabun 2.00 Buah Taksir 145,000.00 290,000.00
7 Pemasangan Pegangan Kamar Mandi 2.00 Unit Taksir 320,000.00 640,000.00
8 Bak Air Fiberglass Tebal 2.00 Unit - - -
9 Klosed Jongkok Toto 2.00 Unit - - -
10 Pemasangan Septitank + Accessories Lengkap Funsional 1.00 Unit Taksir 10,000,000.00 10,000,000.00
Jumlah 10,930,000.00
K. PEKERJAAN ATAP
1 Pemasangan Atap + Rangka Atap Baja Ringan C.75 Tebal 100 mm , Reng 107.96 M2 Taksir 265,000.00 28,610,566.00
R 32 Tebal = 0,45 mm
2 Rabung Spandek Tebal 0.35 mm 10.96 M A.4.5.2.41. #N/A #N/A
3 Pemasangan Lisplank 3/30 cm Kayu Kelas II 32.16 M A.4.6.1.21. #N/A #N/A
Jumlah #N/A
L. PEKERJAAN LANGIT - LANGIT (PLAFOND)
1 Pemasangan Plafond PVC tebal 8 mm + Rangka Furing dan List Profil 91.594 M2 Taksir 260,000.00 23,814,440.00
Jumlah 23,814,440.00
M. PEKERJAAN PENGECATAN
1 Pengecatan Dinding Dulux Pentalite 398.70 M2 - -
2 Pengecatan Kusen, Pintu dan Jendela 62.46 M2 - -
3 Pengecatan Papan Kayu Lisplank 19.30 M2 - -
Jumlah -
N. PEKERJAAN LAIN - LAIN
1 Perapian dan Pembersihan Sisa Pekerjaan 1.00 Ls Taksir 500,000.00 500,000.00
Jumlah 500,000.00

TOTAL HARGA #N/A


JUMLAH HARGA
NO. URAIAN PEKERJAAN ANALISA KETERANGAN
(Rp)
1 0 0 -
2 0 0 -
3 0 No. -
4 0 0 219,375.00
5 0 0 49,896.00
6 0 0 200,120.74
7 0 1 12,180.50
8 0 3 -
9 0 2 12,180.50
10 0 1 3,988.01
11 Pasir Pasang 2 263,203.49
12 0 1 12,180.50
13 0 1 3,815.58
14 0 1 3,815.58
15 0 1 4,842.85
16 0 1 45,605.67
17 0 0 -
18 0 0 -
19 0 3 -
20 0 0 21,703.00
21 Pembesian Kolom, Balok, Ringbalk dan Sloof untuk Besi Beton Ø ≤12 mm 2.2.6.1.d.(a) 25,168.71
22 0 0 3,282.88
23 0 0 -
24 0 F -
25 0 E -
26 0 D -
27 0 0 -
28 0 D 11,735.44
29 0 0 -
30 0 A.4.4.3. HARG -
31 0 0 -
32 0 1 (Rp)
33 0 2 -
34 0 3 88,679.50
35 0 4 48,369.65
36 0 B 189,219.24
37 0 2 189,219.24
38 0 2 189,219.24
39 0 2 273,316.68
40 0 2 5,136.36
41 0 1 2,902,179.00
42 0 1 44,025.90
43 0 1 7,337.65
44 0 1 20,729.85
45 0 B 1,174.02
46 0 1 -
47 0 0 440.26
48 0 B (Rp)
49 0 0 -
50 0 No. -
51 Pemasangan 1 buah closet duduk/ monoblock A.5.1.1.1. 3,506,656.00
52 0 No. -
53 0 0 -
54 0 A Jumlah Harga
55 0 1 (Rp)
56 0 2 -
57 0 3 6,840.99
58 0 4 24,875.82
59 0 0 3,275.87
60 0 B 52,500.39
61 0 2 -
62 0 0 8,316.00
63 0 0 4,042.50
64 0 C -
65 0 0 23,388.75
66 0 D -
67 0 E -
68 0 0 107,867.88
69 0 0 2,491,744.58
70 0 0 -
71 0 No. -
72 0 0 -
73 0 0 -
74 0 0 -
75 0 0 -
76 0 0 -
77 0 0 -
78 0 0 -
79 0 0 -
80 0 0 -
81 0 0 -
82 0 0 -
83 0 0 -
84 0 0 -
85 0 0 -
86 0 0 -
87 0 0 -
88 0 0 -
89 0 0 -
90 0 0 -
91 0 0 -
92 0 0 -
93 0 0 -
94 0 0 -
95 0 0 -
96 0 0 -
97 0 0 -
98 0 0 -
99 0 0 -
100 0 0 -
101 0 0 -
102 0 0 -
103 0 0 -
104 0 0 -
105 0 0 -
106 0 0 -
107 0 0 -
108 0 0 -
109 0 0 -
110 0 0 -
111 0 0 -
112 0 0 -
113 0 0 -
114 0 0 -
115 0 0 -
116 0 0 -
117 0 0 -
118 0 0 -
119 0 0 -
120 0 0 -
121 0 0 -
122 0 0 -
123 0 0 -
124 0 0 -
125 0 0 -
126 0 0 -
127 0 0 -
128 0 0 -
129 0 0 -
RENCANA ANGGARAN BIAYA (RAB) RK3
SKPA : DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
NAMA PEKERJAAN : DED KAWASAN WISATA TAPAK GAJAH GAMPOENG IE MEULEE
LOKASI : KOTA SABANG
SUMBER DANA : APBK
TAHUN ANGGARAN : 2023

HARGA JUMLAH HARGA


NO. URAIAN PEKERJAAN VOL. SATUAN
SATUAN (Rp.) (Rp.)
(1) (2) (3) (4) (6) (7)
1 Penyiapan RKK terdiri atas
a Pembuatan Prosedur dan Instruksi Kerja 7.00 Org 15,000.00 105,000.00
Sub Total 105,000.00
2 Sosialisasi Promosi dan Pelatihan terdiri dari
a. Induksi K3 (Safety Induction);
b. Pengarahan K3 (Safety Briefing): Pertemuan
Keselamatan (Safety Talk dan/ atau Tool Box
Meeting);
c. Pelatihan K3;
1 Bekerja di Ketinggian
2 Penggunaan Bahan Kimia (MSDS)
d. Simulasi K3;
e. Spanduk (banner); 1.00 Lembar 150,000.00 150,000.00
f. Poster;
g. Papan Informasi K3;
Sub Total 150,000.00
3 Alat Pelindung Kerja dan Alat Pelindung Diri
a. Alat Pelindung Kerja (APK) antara lain :
### 1 Jaring Pengaman (Safety Net);
### 2 Tali Keselamatan (Life Line);
### 3 Pagar Pengaman (Guard Railling);
### 4 Pembatas Area (RestrictedArea).
b. Alat Pelindung Diri (APD) antara lain :
1 Topi Pelindung (Safety Helmet); 7.00 Buah 90,000.00 630,000.00
2 Pelindung Mata (Goggles,Spectacles);
3 Tameng Muka (Face Shield);
4 Pelindung Pernafasan dan Mulut (Masker) 7.00 Buah 11,500.00 80,500.00
5 Sarung Tangan (Safety Gloves); 7.00 Pasang 85,000.00 595,000.00
6 Sepatu Keselamatan (Safety Shoes) ; 7.00 Pasang 150,000.00 1,050,000.00
7 Penunjang Seluruh Tubuh (FullBody Harness); 2.00 Set 450,000.00 900,000.00
8 Rompi Keselamatan (SafetyVest); 7.00 Buah 95,000.00 665,000.00
9 Celemek (Apron/Coveralls);
10 Pelindung Jatuh (FallArrester);
Sub Total 3,920,500.00
4 Asuransi Dan Perijinan terdiri atas
a. Asuransi 1.00 837,506.30 837,506.30
Sub Total 837,506.30
5 Personil K3 terdiri atas
a. Ahli K3 Konstruksi
b. Petugas K3 Konstruksi 4.00 OB 1,000,000.00 4,000,000.00
Sub Total 4,000,000.00
6 Fasilitas Sarana dan Prasarana Kesehatan
a. Peralatan P3K( Kotak P3K, Tandu, Tabung 1.00 Ls 300,000.00 300,000.00
Oksigen, Obat Luka, Perban, dll)
b. Peralatan Pengasapan (Fogging);
Sub Total 300,000.00
7 Rambu-Rambu terdiri atas:
a. Rambu Petunjuk;
b. Rambu Larangan
c. Rambu Peringatan; 1.00 Buah 150,000.00 150,000.00
d. Rambu Kewajiban;
e. Rambu Informasi;
f. Jalur Evakuasi (Escope Route)
Sub Total 150,000.00
8 Konsultasi dengan Ahli terkait Keselamatan Konstruksi
a. Ahli K3 Konstruksi
Sub Total -
9 Lain- Lain Terkait Pengendalian Risiko K3
a. Alat Pemadam Api Ringan (APAR)
b. Bendera K3 1.00 Lembar 150,000.00 150,000.00
c. Program Inspeksi
d. Pelaporan dan Penyelidikan Insiden.
e. Pembuatan Kartu Identitas Pekerja (KIP)
Sub Total 150,000.00
TOTAL MATA PEMBAYARAN PENYELENGGARAAN SMKK 9,613,006.30

Kota Sabang, Maret 2023


Konsultan Perencana
CV. DIMENSI CONSULTANT

ABDI MURSALIN
Wakil Direktur
DAFTAR ANALISA HARGA SATUAN

HARGA SATUAN PEKERJAAN TANAH

1.7.1.a.(c) Penggalian 1 m3 Tanah Biasa Sedalam s/d 1 m Untuk Volume s/d 200 m3 Dalam Satu Lokasi

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.750 126,685.00 95,013.75
2 Mandor L.04 OH 0.035 146,753.00 5,136.36

JUMLAH TENAGA KERJA 100,150.11


B BAHAN

JUMLAH BAHAN -
C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 100,150.11
E Overhead & Profit 15.00% x D 15,022.52
F Harga Satuan Pekerjaan (D+E) 115,172.62
G Dibulatkan 115,172.00

1.7.2.a.(c) Pengurugan Kembali 1 m3 Galian Tanah

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.500 126,685.00 63,342.50
2 Mandor L.04 OH 0.050 146,753.00 7,337.65

JUMLAH TENAGA KERJA 70,680.15


B BAHAN

JUMLAH BAHAN -
C PERALATAN
JUMLAH PERALATAN -
D Jumlah (A+B+C) 70,680.15
E Overhead & Profit 15.00% x D 10,602.02
F Harga Satuan Pekerjaan (D+E) 81,282.17
G Dibulatkan 81,282.00

1.7.2.d.(c) Pengurugan 1 m3 dengan pasir Urug

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.300 126,685.00 38,005.50
2 Mandor L.04 OH 0.010 146,753.00 1,467.53

JUMLAH TENAGA KERJA 39,473.03


B BAHAN
1 Tanah Timbun M3 1.200 150,000.00 180,000.00

JUMLAH BAHAN 180,000.00


C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 219,473.03
E Overhead & Profit 15.00% x D 32,920.95
F Harga Satuan Pekerjaan (D+E) 252,393.98
G Dibulatkan 252,393.00

1.7.14.a.(a) 1 m3 Timbunan atau Urugan Kembali Tanah Biasa/ Liat Berpasir

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.100 126,685.00 12,668.50
2 Mandor L.04 OH 0.010 146,753.00 1,467.53

JUMLAH TENAGA KERJA 14,136.03


B BAHAN
1 Tanah Timbun M3 1.400 150,000.00 210,000.00
JUMLAH BAHAN 210,000.00
C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 224,136.03
E Overhead & Profit 15.00% x D 33,620.40
F Harga Satuan Pekerjaan (D+E) 257,756.43
G Dibulatkan 257,756.00

HARGA SATUAN PEKERJAAN PONDASI

2.1.1.d.(a) Pemasangan 1 m3 Pondasi Batu Belah

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 1.500 126,685.00 190,027.50
2 Tukang Batu L.02 OH 0.750 138,199.00 103,649.25
3 Kepala Tukang L.03 OH 0.075 142,429.00 10,682.18
4 Mandor L.04 OH 0.075 146,753.00 11,006.48
JUMLAH TENAGA KERJA 315,365.40
B BAHAN
1 Batu Gunung / Batu Belah M3 1.200 185,000.00 222,000.00
2 Semen Portland Kg 117.000 1,875.00 219,375.00
3 Pasir Pasang Lokal M3 0.561 144,300.00 80,952.30

JUMLAH BAHAN 522,327.30


C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 837,692.70
E Overhead & Profit 15.00% x D 125,653.91
F Harga Satuan Pekerjaan (D+E) 963,346.61
G Dibulatkan 963,346.00

1.5.1.1.b.(a) Pemasangan 1 m3 Batu Kosong (Aanstamping)

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.780 126,685.00 98,814.30
2 Tukang Batu L.02 OH 0.390 138,199.00 53,897.61
3 Kepala Tukang L.03 OH 0.039 142,429.00 5,554.73
4 Mandor L.04 OH 0.039 146,753.00 5,723.37
JUMLAH TENAGA KERJA 163,990.01
B BAHAN
1 Batu Gunung / Batu Belah M3 1.200 185,000.00 222,000.00
2 Pasir Urug M3 0.432 115,500.00 49,896.00

JUMLAH BAHAN 271,896.00


C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 435,886.01
E Overhead & Profit 15.00% x D 65,382.90
F Harga Satuan Pekerjaan (D+E) 501,268.91

2.2. HARGA SATUAN PEKERJAAN BETON

2.2.1.1.a.(a) 1 m3 beton untuk lantai kerja (bedding) Beton fc' = 7,4 s.d. 9,8 Mpa (K-100 s.d. K-125)

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 1.200 126,685.00 152,022.00
2 Tukang Batu L.02 OH 0.200 138,199.00 27,639.80
3 Kepala Tukang L.03 OH 0.020 142,429.00 2,848.58
4 Mandor L.04 OH 0.120 146,753.00 17,610.36
JUMLAH TENAGA KERJA 200,120.74
B BAHAN
1 Semen Portland Kg 227.000 1,875.00 425,625.00
2 Pasir Pasang Kg 869.000 103.07 89,569.07
3 Batu Pecah / Kerikil lokal Kg 1000.000 375.56 375,555.56
4 Air Liter 215.000 100.00 21,500.00
JUMLAH BAHAN 912,249.63
C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 1,112,370.37
E Overhead & Profit 15.00% x D 166,855.56
F Harga Satuan Pekerjaan (D+E) 1,279,225.92
G Dibulatkan 1,279,225.00

2.2.1.1.b.(c) Membuat 1 M3 Beton Mutu f’c = 7,4 MPa (K100)


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 1.650 126,685.00 209,030.25
2 Tukang Batu L.02 OH 0.275 138,199.00 38,004.73
3 Kepala Tukang L.03 OH 0.028 142,429.00 3,988.01
4 Mandor L.04 OH 0.083 146,753.00 12,180.50
JUMLAH TENAGA KERJA 263,203.49
B BAHAN
1 Semen Portland Kg 247.000 1,875.00 463,125.00
2 Pasir Pasang Kg 869.000 103.07 89,569.07
3 Batu Pecah / Kerikil lokal Kg 999.000 375.56 375,180.00
4 Air Liter 215.000 100.00 21,500.00
JUMLAH BAHAN 949,374.07
C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 1,212,577.56
E Overhead & Profit 15.00% x D 181,886.63
F Harga Satuan Pekerjaan (D+E) 1,394,464.19
G Dibulatkan 1,394,464.00

2.2.1.1.c.(c) Membuat 1 M3 Beton Mutu f’c = 9,8 MPa (K125)

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 1.650 126,685.00 209,030.25
2 Tukang Batu L.02 OH 0.275 138,199.00 38,004.73
3 Kepala Tukang L.03 OH 0.028 142,429.00 3,988.01
4 Mandor L.04 OH 0.083 146,753.00 12,180.50
JUMLAH TENAGA KERJA 263,203.49
B BAHAN
1 Semen Portland Kg 276.000 1,875.00 517,500.00
2 Pasir Pasang Kg 828.000 103.07 85,343.14
3 Batu Pecah / Kerikil lokal Kg 1012.000 375.56 380,062.22
4 Air Liter 215.000 100.00 21,500.00
JUMLAH BAHAN 1,004,405.37
C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 1,267,608.85
E Overhead & Profit 15.00% x D 190,141.33
F Harga Satuan Pekerjaan (D+E) 1,457,750.18
G Dibulatkan 1,457,750.00
2.2.2.1.e.(a) Membuat 1 M3 Beton Mutu Fc=12.2 Mpa (K 150)

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 1.650 126,685.00 209,030.25
2 Tukang Batu L.02 OH 0.275 138,199.00 38,004.73
3 Kepala Tukang L.03 OH 0.028 142,429.00 3,988.01
4 Mandor L.04 OH 0.083 146,753.00 12,180.50
JUMLAH TENAGA KERJA 263,203.49
B BAHAN
1 Semen Portland Kg 299.000 1,875.00 560,625.00
2 Pasir Pasang Kg 799.000 103.07 82,354.07
3 Batu Pecah / Kerikil lokal Kg 1017.000 375.56 381,940.00
4 Air Liter 215.000 100.00 21,500.00
JUMLAH BAHAN 1,046,419.07
C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 1,309,622.56
E Overhead & Profit 15.00% x D 196,443.38
F Harga Satuan Pekerjaan (D+E) 1,506,065.94
G Dibulatkan 1,506,065.00

2.2.2.1.g.(a) Membuat 1 M3 Beton Mutu f’= 14,5 MPa (K 175)

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 1.650 126,685.00 209,030.25
2 Tukang Batu L.02 OH 0.275 138,199.00 38,004.73
3 Kepala Tukang L.03 OH 0.028 142,429.00 3,988.01
4 Mandor L.04 OH 0.083 146,753.00 12,180.50
JUMLAH TENAGA KERJA 263,203.49
B BAHAN
1 Semen Portland Kg 326.000 1,875.00 611,250.00
2 Pasir Pasang Kg 760.000 103.07 78,334.29
3 Batu Pecah / Kerikil lokal Kg 1029.000 375.56 386,446.67
4 Air Liter 215.000 100.00 21,500.00
JUMLAH BAHAN 1,097,530.95
C PERALATAN
JUMLAH PERALATAN -
D Jumlah (A+B+C) 1,360,734.44
E Overhead & Profit 15.00% x D 204,110.17
F Harga Satuan Pekerjaan (D+E) 1,564,844.60
G Dibulatkan 1,564,844.00

2.2.2.1.i.(a) Membuat 1 M3 Beton Mutu f'c=16,9 Mpa (K 200)

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 1.650 126,685.00 209,030.25
2 Tukang Batu L.02 OH 0.275 138,199.00 38,004.73
3 Kepala Tukang L.03 OH 0.028 142,429.00 3,988.01
4 Mandor L.04 OH 0.083 146,753.00 12,180.50
JUMLAH TENAGA KERJA 263,203.49
B BAHAN
1 Semen Portland Kg 352.000 1,875.00 660,000.00
2 Pasir Batu (Sirtu) (daratan). Kg 731.000 342.22 250,164.44
3 Batu Pecah / Kerikil lokal Kg 1031.000 375.56 387,197.78
4 Air Liter 215.000 100.00 21,500.00
JUMLAH BAHAN 1,318,862.22
C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 1,582,065.71
E Overhead & Profit 15.00% x D 237,309.86
F Harga Satuan Pekerjaan (D+E) 1,819,375.56
G Dibulatkan 1,819,375.00

2.2.2.1.i.(c) Membuat 1 M3 Beton Mutu f’= 19,3 MPa (K 225)

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 1.650 126,685.00 209,030.25
2 Tukang Batu L.02 OH 0.275 138,199.00 38,004.73
3 Kepala Tukang L.03 OH 0.028 142,429.00 3,988.01
4 Mandor L.04 OH 0.083 146,753.00 12,180.50
JUMLAH TENAGA KERJA 263,203.49
B BAHAN
1 Semen Portland Kg 371.000 1,875.00 695,625.00
2 Pasir Beton Kg 698.000 385.00 268,730.00
3 Kerikil (Max. 30 mm) Kg 1047.000 598.89 627,036.67
4 Air Liter 215.000 100.00 21,500.00
JUMLAH BAHAN 1,612,891.67
C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 1,876,095.15
E Overhead & Profit 15.00% x D 281,414.27
F Harga Satuan Pekerjaan (D+E) 2,157,509.43
G Dibulatkan 2,157,509.00

A.4.1.1.18. Pemasangan 1 m2 bekisting untuk pondasi Tapak Beton Bangunan Gedung

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.520 126,685.00 65,876.20
2 Tukang Kayu L.02 OH 0.260 138,199.00 35,931.74
3 Kepala Tukang L.03 OH 0.026 142,429.00 3,703.15
4 Mandor L.04 OH 0.026 146,753.00 3,815.58
JUMLAH TENAGA KERJA 109,326.67
B BAHAN
1 Kayu Klas III (Borneo / sejenisnya) M3 0.040 5,500,000.00 220,000.00
2 Paku Kayu Kg 0.300 17,325.00 5,197.50
3 Minyak Bekisting Ltr 0.100 30,000.00 3,000.00

JUMLAH BAHAN 228,197.50


C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 337,524.17
E Overhead & Profit 15.00% x D 50,628.63
F Harga Satuan Pekerjaan (D+E) 388,152.80
G Dibulatkan 388,152.00

A.4.1.1.19. Pemasangan 1 m2 bekisting untuk Sloof Beton Bangunan Gedung

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.520 126,685.00 65,876.20
2 Tukang Kayu L.02 OH 0.260 138,199.00 35,931.74
3 Kepala Tukang L.03 OH 0.026 142,429.00 3,703.15
4 Mandor L.04 OH 0.026 146,753.00 3,815.58
JUMLAH TENAGA KERJA 109,326.67
B BAHAN
1 Kayu Klas III (Borneo / sejenisnya) M3 0.045 5,500,000.00 247,500.00
2 Paku Kayu Kg 0.300 17,325.00 5,197.50
3 Minyak Bekisting Ltr 0.100 30,000.00 3,000.00

JUMLAH BAHAN 255,697.50


C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 365,024.17
E Overhead & Profit 15.00% x D 54,753.63
F Harga Satuan Pekerjaan (D+E) 419,777.80
G Dibulatkan 419,777.00

A.4.1.1.20. Pemasangan 1 m2 bekisting untuk Kolom Beton Bangunan Gedung

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.660 126,685.00 83,612.10
2 Tukang Kayu L.02 OH 0.330 138,199.00 45,605.67
3 Kepala Tukang L.03 OH 0.033 142,429.00 4,700.16
4 Mandor L.04 OH 0.033 146,753.00 4,842.85
JUMLAH TENAGA KERJA 138,760.78
B BAHAN
1 Kayu Klas III (Borneo / sejenisnya) M3 0.040 5,500,000.00 220,000.00
2 Paku Kayu Kg 0.400 17,325.00 6,930.00
3 Minyak Bekisting Ltr 0.200 30,000.00 6,000.00
4 Kayu Klas II (Kamper / Kruing / sejenisnya M3 0.015 6,500,000.00
5 Multipleks 9 mm Lembar 0.350 150,000.00 52,500.00
6 Dolken Kayu Ø 8 - 10 cm/ 400 Btg 2.000 25,000.00 50,000.00
JUMLAH BAHAN 335,430.00
C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 474,190.78
E Overhead & Profit 15.00% x D 71,128.62
F Harga Satuan Pekerjaan (D+E) 545,319.39
G Dibulatkan 545,319.00

A.4.1.1.21. Pemasangan 1 m2 bekisting untuk Balok Beton Bangunan Gedung


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.660 126,685.00 83,612.10
2 Tukang Kayu L.02 OH 0.330 138,199.00 45,605.67
3 Kepala Tukang L.03 OH 0.033 142,429.00 4,700.16
4 Mandor L.04 OH 0.033 146,753.00 4,842.85
JUMLAH TENAGA KERJA 138,760.78
B BAHAN
1 Kayu Klas III (Borneo / sejenisnya) M3 0.040 5,500,000.00 220,000.00
2 Paku Kayu Kg 0.400 17,325.00 6,930.00
3 Minyak Bekisting Ltr 0.200 30,000.00 6,000.00
4 Kayu Klas II (Kamper / Kruing / sejenisnya M3 0.018 6,500,000.00
5 Multipleks 9 mm Lembar 0.350 150,000.00 52,500.00
6 Dolken Kayu Ø 8 - 10 cm/ 400 Btg 2.000 25,000.00 50,000.00
JUMLAH BAHAN 335,430.00
C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 474,190.78
E Overhead & Profit 15.00% x D 71,128.62
F Harga Satuan Pekerjaan (D+E) 545,319.39
G Dibulatkan 545,319.00

A.4.1.1.22. Pemasangan 1 m2 bekisting untuk Plat Beton Bangunan Gedung

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.660 126,685.00 83,612.10
2 Tukang Kayu L.02 OH 0.330 138,199.00 45,605.67
3 Kepala Tukang L.03 OH 0.033 142,429.00 4,700.16
4 Mandor L.04 OH 0.033 146,753.00 4,842.85
JUMLAH TENAGA KERJA 138,760.78
B BAHAN
1 Kayu Klas III (Borneo / sejenisnya) M3 0.040 -
2 Paku Kayu Kg 0.400 17,325.00 6,930.00
3 Minyak Bekisting Ltr 0.200 30,000.00 6,000.00
4 Kayu Klas II (Kamper / Kruing / sejenisnya M3 0.015 6,500,000.00 97,500.00
5 Multipleks 9 mm Lembar 0.350 150,000.00 52,500.00
6 Dolken Kayu Ø 8 - 10 cm/ 400 Btg 6.000 25,000.00 150,000.00
JUMLAH BAHAN 312,930.00
C PERALATAN
JUMLAH PERALATAN -
D Jumlah (A+B+C) 451,690.78
E Overhead & Profit 15.00% x D 67,753.62
F Harga Satuan Pekerjaan (D+E) 519,444.39
G Dibulatkan 519,444.00

A.4.1.1.23. Pemasangan 1 m2 bekisting untuk Dinding Sheerwall

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.660 126,685.00 83,612.10
2 Tukang Kayu L.02 OH 0.330 138,199.00 45,605.67
3 Kepala Tukang L.03 OH 0.033 142,429.00 4,700.16
4 Mandor L.04 OH 0.033 146,753.00 4,842.85
JUMLAH TENAGA KERJA 138,760.78
B BAHAN
1 Kayu Klas III (Borneo / sejenisnya) M3 0.030 5,500,000.00
2 Paku Kayu Kg 0.400 17,325.00 6,930.00
3 Minyak Bekisting Ltr 0.200 30,000.00 6,000.00
4 Kayu Klas II (Kamper / Kruing / sejenisnya M3 0.020 6,500,000.00 130,000.00
5 Multipleks 9 mm Lembar 0.350 150,000.00 52,500.00
6 Dolken Kayu Ø 8 - 10 cm/ 400 Btg 3.000 25,000.00 75,000.00
6 Penjaga Jarak/ Spancer Bh 4.000 15,000.00
JUMLAH BAHAN 270,430.00
C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 409,190.78
E Overhead & Profit 15.00% x D 61,378.62
F Harga Satuan Pekerjaan (D+E) 470,569.39
G Dibulatkan 470,569.00

2.2.6.(a) Penulangan Beton


2.2.6.1.(a) Penulangan 100 Kg Baja Tulangan Dengan Tulang Polos Atau Sirip
2.2.6.1.a.(a) Penulangan Pelat untuk Besi Beton Ø ≥12 mm, cara Manual

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.700 126,685.00 88,679.50
2 Tukang Besi L.02 OH 0.700 138,199.00 96,739.30
3 Kepala Tukang L.03 OH 0.070 142,429.00 9,970.03
4 Mandor L.04 OH 0.070 146,753.00 10,272.71
JUMLAH TENAGA KERJA 205,661.54
B BAHAN
1 Besi Beton Polos Kg 105.000 15,700.00 1,648,500.00
2 Kawat Beton Kg 1.500 25,000.00 37,500.00

JUMLAH BAHAN 1,686,000.00


C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 1,891,661.54
E Jumlah Besi Per 1 Kg 18,916.62
F Overhead & Profit 15.00% x D 2,837.49
G Harga Satuan Pekerjaan (D+E) 21,754.11
H Dibulatkan 21,754.00

2.2.6.1.b.(c) Penulangan 100 Kg dengan besi Polos atau Besi Sirip

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.700 126,685.00 88,679.50
2 Tukang Besi L.02 OH 0.700 138,199.00 96,739.30
3 Kepala Tukang L.03 OH 0.070 142,429.00 9,970.03
4 Mandor L.04 OH 0.040 146,753.00 5,870.12
JUMLAH TENAGA KERJA 201,258.95
B BAHAN
1 Besi Beton Polos Kg 105.000 15,700.00 1,648,500.00
2 Kawat Beton Kg 1.500 25,000.00 37,500.00

JUMLAH BAHAN 1,686,000.00


C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 1,887,258.95
E Jumlah Besi Per 1 Kg 18,872.59
F Overhead & Profit 15.00% x D 2,830.89
G Harga Satuan Pekerjaan (D+E) 21,703.48
H Dibulatkan 21,703.00

2.2.6.1.d.(a) Pembesian Kolom, Balok, Ringbalk dan Sloof untuk Besi Beton Ø ≤12 mm

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 1.600 126,685.00 202,696.00
2 Tukang Besi L.02 OH 1.600 138,199.00 221,118.40
3 Kepala Tukang L.03 OH 0.160 142,429.00 22,788.64
4 Mandor L.04 OH 0.160 146,753.00 23,480.48
JUMLAH TENAGA KERJA 470,083.52
B BAHAN
1 Besi Beton Polos Kg 105.000 15,700.00 1,648,500.00
2 Kawat Beton Kg 2.800 25,000.00 70,000.00

JUMLAH BAHAN 1,718,500.00


C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 2,188,583.52
E Jumlah Besi Per 1 Kg 21,885.84
F Overhead & Profit 15.00% x D 3,282.88
G Harga Satuan Pekerjaan (D+E) 25,168.71
H Dibulatkan 25,168.00

2.2.6.1.e.(a) Pembesian Kolom, Balok, Ringbalk dan Sloof untuk Besi Beton Ø >12 mm

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 1.600 126,685.00 202,696.00
2 Tukang Besi L.02 OH 1.600 138,199.00 221,118.40
3 Kepala Tukang L.03 OH 0.160 142,429.00 22,788.64
4 Mandor L.04 OH 0.160 146,753.00 23,480.48
JUMLAH TENAGA KERJA 470,083.52
B BAHAN
1 Besi Beton (polos/ ulir) Kg 105.000 15,700.00 1,648,500.00
2 Kawat Tali Beton Kg 2.800 25,000.00 70,000.00

JUMLAH BAHAN 1,718,500.00


C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 2,188,583.52
E Jumlah Besi Per 1 Kg 21,885.84
F Overhead & Profit 15.00% x D 3,282.88
G Harga Satuan Pekerjaan (D+E) 25,168.71
H Dibulatkan 25,168.00
A.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING

A.4.4.1.1. Pemasangan 1 m2 dinding bata merah (5 x 11 x 22) cm tebal 1 bata campuran 1 SP : 2 PP

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.6000 126,685.00 76,011.00
2 Tukang Batu L.02 OH 0.2000 138,199.00 27,639.80
3 Kepala Tukang L.03 OH 0.0200 142,429.00 2,848.58
4 Mandor L.04 OH 0.0300 146,753.00 4,402.59
JUMLAH TENAGA KERJA 110,901.97
B BAHAN
1 Batu Bata Buah 140.000 1,300.00 182,000.00
2 Semen Portland Kg 43.500 1,875.00 81,562.50
3 Pasir Pasang lokal M3 0.080 144,300.00 11,544.00

JUMLAH BAHAN 275,106.50


C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 386,008.47
E Overhead & Profit 15.00% x D 57,901.27
F Harga Satuan Pekerjaan (D+E) 443,909.74
G Dibulatkan 443,909.00

A.4.4.1.3. Pemasangan 1 m2 dinding bata merah (5 x 11 x 22) cm tebal 1 bata campuran 1 SP : 4 PP

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.6000 126,685.00 76,011.00
2 Tukang Batu L.02 OH 0.2000 138,199.00 27,639.80
3 Kepala Tukang L.03 OH 0.0200 142,429.00 2,848.58
4 Mandor L.04 OH 0.0300 146,753.00 4,402.59
JUMLAH TENAGA KERJA 110,901.97
B BAHAN
1 Batu Bata Buah 140.000 1,300.00 182,000.00
2 Semen Portland Kg 26.550 1,875.00 49,781.25
3 Pasir Pasang lokal M3 0.093 144,300.00 13,419.90

JUMLAH BAHAN 245,201.15


C PERALATAN
JUMLAH PERALATAN -
D Jumlah (A+B+C) 356,103.12
E Overhead & Profit 15.00% x D 53,415.47
F Harga Satuan Pekerjaan (D+E) 409,518.59
G Dibulatkan 409,518.00

A.4.4.1.7. Pemasangan 1 m2 Dinding Bata Merah (5x11x22) cm tebal 1/2 Batu dengan Mortar type M, fc' 17,7
Mpa (Setara Campuran 1PC : 2PP)

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.3000 126,685.00 38,005.50
2 Tukang Batu L.02 OH 0.1000 138,199.00 13,819.90
3 Kepala Tukang L.03 OH 0.0100 142,429.00 1,424.29
4 Mandor L.04 OH 0.0150 146,753.00 2,201.30
JUMLAH TENAGA KERJA 55,450.99
B BAHAN
1 Batu Bata Buah 70.000 1,300.00 91,000.00
2 Semen Portland Kg 18.950 1,875.00 35,531.25
3 Pasir Pasang lokal M3 0.038 144,300.00 5,483.40

JUMLAH BAHAN 132,014.65


C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 187,465.64
E Overhead & Profit 15.00% x D 28,119.85
F Harga Satuan Pekerjaan (D+E) 215,585.48
G Dibulatkan 215,585.00

A.4.4.1.9. Pemasangan 1 m2 Dinding Bata Merah (5x11x22) cm tebal 1/2 Batu dengan Mortar type N, fc' 5,2
Mpa (Setara Campuran 1PC : 4PP)

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.3000 126,685.00 38,005.50
2 Tukang Batu L.02 OH 0.1000 138,199.00 13,819.90
3 Kepala Tukang L.03 OH 0.0100 142,429.00 1,424.29
4 Mandor L.04 OH 0.0150 146,753.00 2,201.30
JUMLAH TENAGA KERJA 55,450.99
B BAHAN
1 Batu Bata Buah 70.000 1,300.00 91,000.00
2 Semen Portland Kg 11.500 1,875.00 21,562.50
3 Pasir Pasang lokal M3 0.043 144,300.00 6,204.90

JUMLAH BAHAN 118,767.40


C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 174,218.39
E Overhead & Profit 15.00% x D 26,132.76
F Harga Satuan Pekerjaan (D+E) 200,351.14
G Dibulatkan 200,351.00

3.2. HARGA SATUAN PEKERJAAN PLASTERAN

3.2.2.(c) Pemasangan 1 m2 plasteran 1 SP : 2 PP tebal 15 mm

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.3000 126,685.00 38,005.50
2 Tukang Batu L.02 OH 0.1500 138,199.00 20,729.85
3 Kepala Tukang L.03 OH 0.0150 142,429.00 2,136.44
4 Mandor L.04 OH 0.0150 146,753.00 2,201.30
JUMLAH TENAGA KERJA 63,073.08
B BAHAN
1 Semen Portland Kg 10.224 1,875.00 19,170.00
2 Pasir Pasang lokal M3 0.020 144,300.00 2,886.00

JUMLAH BAHAN 22,056.00


C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 85,129.08
E Overhead & Profit 15.00% x D 12,769.36
F Harga Satuan Pekerjaan (D+E) 97,898.44
G Dibulatkan 97,898.00

3.2.2.(c) Pemasangan 1 m2 plasteran 1 SP : 4 PP tebal 15 mm

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.3000 126,685.00 38,005.50
2 Tukang Batu L.02 OH 0.1500 138,199.00 20,729.85
3 Kepala Tukang L.03 OH 0.0150 142,429.00 2,136.44
4 Mandor L.04 OH 0.0150 146,753.00 2,201.30
JUMLAH TENAGA KERJA 63,073.08
B BAHAN
1 Semen Portland Kg 6.240 1,875.00 11,700.00
2 Pasir Pasang lokal M3 0.024 144,300.00 3,463.20

JUMLAH BAHAN 15,163.20


C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 78,236.28
E Overhead & Profit 15.00% x D 11,735.44
F Harga Satuan Pekerjaan (D+E) 89,971.72
G Dibulatkan 89,971.00

3.2.2.2.36.(c) Pemasangan 1 m2 Acian

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.2000 126,685.00 25,337.00
2 Tukang Batu L.02 OH 0.1000 138,199.00 13,819.90
3 Kepala Tukang L.03 OH 0.0100 142,429.00 1,424.29
4 Mandor L.04 OH 0.0100 146,753.00 1,467.53
JUMLAH TENAGA KERJA 42,048.72
B BAHAN
1 Semen Portland Kg 6.240 1,875.00 11,700.00

JUMLAH BAHAN 11,700.00


C PERALATAN

JUMLAH PERALATAN -
D Jumlah (A+B+C) 53,748.72
E Overhead & Profit 15.00% x D 8,062.31
F Harga Satuan Pekerjaan (D+E) 61,811.03
G Dibulatkan 61,811.00

A.4.4.3. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


A.4.4.3.1. Pemasangan 1 m2 lantai ubin PC abu - abu Uk. 40 x 40 cm

Harga Sastuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.2500 126,685.00 31,671.25
2 Tukang Batu L.02 OH 0.1250 138,199.00 17,274.88
3 Kepala Tukang L.03 OH 0.0130 142,429.00 1,851.58
4 Mandor L.04 OH 0.0130 146,753.00 1,907.79
JUMLAH TENAGA KERJA 52,705.49
B BAHAN
1 Keramik Uk. 40 x 40 cm Buah 6.630 15,082.96 100,000.00
2 Semen Portland Kg 9.800 1,875.00 18,375.00
3 Pasir Pasang lokal M3 0.045 144,300.00 6,493.50

JUMLAH BAHAN 124,868.50


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 177,573.99
E Overhead & Profit 15.00% x D 26,636.10
F Harga Satuan Pekerjaan (D+E) 204,210.09
G Dibulatkan 204,210.00

A.4.4.3.2. Pemasangan 1 m2 lantai ubin PC abu - abu Uk. 30 x 30 cm

Harga Sastuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.2500 126,685.00 31,671.25
2 Tukang Batu L.02 OH 0.1250 138,199.00 17,274.88
3 Kepala Tukang L.03 OH 0.0130 142,429.00 1,851.58
4 Mandor L.04 OH 0.0130 146,753.00 1,907.79
JUMLAH TENAGA KERJA 52,705.49
B BAHAN
1 Keramik Uk. 30 x 30 cm Polish Buah 11.870 8,256.11 98,000.00
2 Semen Portland Kg 10.000 1,875.00 18,750.00
3 Pasir Pasang lokal M3 0.045 144,300.00 6,493.50

JUMLAH BAHAN 123,243.50


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 175,948.99
E Overhead & Profit 15.00% x D 26,392.35
F Harga Satuan Pekerjaan (D+E) 202,341.34
G Dibulatkan 202,341.00

A.4.4.3.3. Pemasangan 1 m2 lantai ubin PC abu - abu Uk. 20 x 20 cm

Harga Sastuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.2700 126,685.00 34,204.95
2 Tukang Batu L.02 OH 0.1350 138,199.00 18,656.87
3 Kepala Tukang L.03 OH 0.0140 142,429.00 1,994.01
4 Mandor L.04 OH 0.0140 146,753.00 2,054.54
JUMLAH TENAGA KERJA 56,910.36
B BAHAN
1 Keramik Uk. 20 x 20 cm Buah 26.500 3,207.55 85,000.00
2 Semen Portland Kg 10.400 1,875.00 19,500.00
3 Pasir Pasang lokal M3 0.045 144,300.00 6,493.50

JUMLAH BAHAN 110,993.50


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 167,903.86
E Overhead & Profit 15.00% x D 25,185.58
F Harga Satuan Pekerjaan (D+E) 193,089.44
G Dibulatkan 193,089.00

A.4.4.3.13. Pemasangan 1 m2 lantai ubin Teralux Marmer Uk. 60 x 60 cm

Harga Sastuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.2400 126,685.00 30,404.40
2 Tukang Batu L.02 OH 0.1200 138,199.00 16,583.88
3 Kepala Tukang L.03 OH 0.0120 142,429.00 1,709.15
4 Mandor L.04 OH 0.0120 146,753.00 1,761.04
JUMLAH TENAGA KERJA 50,458.46
B BAHAN
1 Granit tile Uk. 60 x 60 cm Buah 3.100 80,645.16 250,000.00
2 Semen Portland Kg 9.600 1,875.00 18,000.00
3 semen warna Kg 1.500 4,280.00 6,420.00
4 Pasir Pasang lokal M3 0.045 144,300.00 6,493.50
JUMLAH BAHAN 280,913.50
C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 331,371.96
E Overhead & Profit 15.00% x D 49,705.79
F Harga Satuan Pekerjaan (D+E) 381,077.76
G Dibulatkan 381,077.00

A.4.4.3.42. Pemasangan 1 m2 lantai marmer 100 x 100 cm

Harga Sastuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.7000 126,685.00 88,679.50
2 Tukang Batu L.02 OH 0.3500 138,199.00 48,369.65
3 Kepala Tukang L.03 OH 0.0350 142,429.00 4,985.02
4 Mandor L.04 OH 0.0350 146,753.00 5,136.36
JUMLAH TENAGA KERJA 147,170.52
B BAHAN
1 Marmer Uk. 100 x 100 cm Buah 1.060 750,000.00 795,000.00
2 Semen Portland Kg 8.190 1,875.00 15,356.25
3 Pasir Pasang lokal M3 0.045 144,300.00 6,493.50
4 Semen Warna Kg 0.134 4,280.00 573.52
JUMLAH BAHAN 817,423.27
C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 964,593.79
E Overhead & Profit 15.00% x D 144,689.07
F Harga Satuan Pekerjaan (D+E) 1,109,282.86
G Dibulatkan 1,109,282.00

A.4.4.3.42.a Pemasangan 1 m2 lantai Granit 100 x 100 cm Polish

Harga Sastuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.7000 126,685.00 88,679.50
2 Tukang Batu L.02 OH 0.3500 138,199.00 48,369.65
3 Kepala Tukang L.03 OH 0.0350 142,429.00 4,985.02
4 Mandor L.04 OH 0.0350 146,753.00 5,136.36
JUMLAH TENAGA KERJA 147,170.52
B BAHAN
1 Granite Uk. 100 x 100 cm Buah 1.060 275,000.00 291,500.00
2 Semen Portland Kg 8.190 1,875.00 15,356.25
3 Pasir Pasang lokal M3 0.045 144,300.00 6,493.50
4 Semen Warna Kg 0.134 4,280.00 573.52
JUMLAH BAHAN 313,923.27
C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 461,093.79
E Overhead & Profit 15.00% x D 69,164.07
F Harga Satuan Pekerjaan (D+E) 530,257.86
G Dibulatkan 530,257.00

A.4.4.3.42.b Pemasangan 1 m2 lantai Granit 100 x 100 cm Unpolish

Harga Sastuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.7000 126,685.00 88,679.50
2 Tukang Batu L.02 OH 0.3500 138,199.00 48,369.65
3 Kepala Tukang L.03 OH 0.0350 142,429.00 4,985.02
4 Mandor L.04 OH 0.0350 146,753.00 5,136.36
JUMLAH TENAGA KERJA 147,170.52
B BAHAN
1 Granite k. 100 x 100 cm Buah 1.060 287,500.00 304,750.00
2 Semen Portland Kg 8.190 1,875.00 15,356.25
3 Pasir Pasang lokal M3 0.045 144,300.00 6,493.50
4 Semen Warna Kg 0.134 4,280.00 573.52
JUMLAH BAHAN 327,173.27
C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 474,343.79
E Overhead & Profit 15.00% x D 71,151.57
F Harga Satuan Pekerjaan (D+E) 545,495.36
G Dibulatkan 545,495.00

A.4.4.3.53. Pemasangan 1 m2 dinding keramik Uk. 20 x 20 cm

Harga Sastuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.9000 126,685.00 114,016.50
2 Tukang Batu L.02 OH 0.4500 138,199.00 62,189.55
3 Kepala Tukang L.03 OH 0.0450 142,429.00 6,409.31
4 Mandor L.04 OH 0.0450 146,753.00 6,603.89
JUMLAH TENAGA KERJA 189,219.24
B BAHAN
1 Keramik Dinding Uk. 20 x 20 cm Motive Buah 26.000 3,653.85 95,000.00
2 Semen Portland Kg 9.300 1,875.00 17,437.50
3 Pasir Pasang lokal M3 0.018 144,300.00 2,597.40
4 Semen Warna Kg 1.940 4,280.00 8,303.20
JUMLAH BAHAN 123,338.10
C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 312,557.34
E Overhead & Profit 15.00% x D 46,883.60
F Harga Satuan Pekerjaan (D+E) 359,440.94
G Dibulatkan 359,440.00

A.4.4.3.53.a. Pemasangan 1 m2 dinding keramik Uk. 25 x 40 cm

Harga Sastuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.9000 126,685.00 114,016.50
2 Tukang Batu L.02 OH 0.4500 138,199.00 62,189.55
3 Kepala Tukang L.03 OH 0.0450 142,429.00 6,409.31
4 Mandor L.04 OH 0.0450 146,753.00 6,603.89
JUMLAH TENAGA KERJA 189,219.24
B BAHAN
1 Keramik Dinding UK. 25 x 40 cm Buah 10.000 12,500.00 125,000.00
2 Semen Portland Kg 9.300 1,875.00 17,437.50
3 Pasir Pasang lokal M3 0.018 144,300.00 2,597.40
4 Semen Warna Kg 1.940 4,280.00 8,303.20
JUMLAH BAHAN 153,338.10
C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 342,557.34
E Overhead & Profit 15.00% x D 51,383.60
F Harga Satuan Pekerjaan (D+E) 393,940.94
G Dibulatkan 393,940.00

A.4.4.3.53.b. Pemasangan 1 m2 dinding keramik Uk. 30 x 60 cm


Harga Sastuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.9000 126,685.00 114,016.50
2 Tukang Batu L.02 OH 0.4500 138,199.00 62,189.55
3 Kepala Tukang L.03 OH 0.0450 142,429.00 6,409.31
4 Mandor L.04 OH 0.0450 146,753.00 6,603.89
JUMLAH TENAGA KERJA 189,219.24
B BAHAN
1 Keramik Dinding Uk. 30 x 60 cm Buah 6.000 27,500.00 165,000.00
2 Semen Portland Kg 9.300 1,875.00 17,437.50
3 Pasir Pasang lokal M3 0.018 144,300.00 2,597.40
4 Semen Warna Kg 1.940 4,280.00 8,303.20
JUMLAH BAHAN 193,338.10
C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 382,557.34
E Overhead & Profit 15.00% x D 57,383.60
F Harga Satuan Pekerjaan (D+E) 439,940.94
G Dibulatkan 439,940.00

A.4.4.3.54. Pemasangan 1 m2 dinding marmer 100 x 100 cm

Harga Sastuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 1.3000 126,685.00 164,690.50
2 Tukang Batu L.02 OH 0.6500 138,199.00 89,829.35
3 Kepala Tukang L.03 OH 0.0650 142,429.00 9,257.89
4 Mandor L.04 OH 0.0650 146,753.00 9,538.95
JUMLAH TENAGA KERJA 273,316.68
B BAHAN
1 Marmer Uk. 100 x 100 cm Buah 1.060 750,000.00 795,000.00
2 Semen Portland Kg 12.440 1,875.00 23,325.00
3 Pasir Pasang lokal M3 0.025 144,300.00 3,607.50
4 Semen Warna Kg 0.650 4,280.00 2,782.00
5 Paku Kayu Kg 3.030 17,325.00 52,494.75
JUMLAH BAHAN 877,209.25
C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 1,150,525.93
E Overhead & Profit 15.00% x D 172,578.89
F Harga Satuan Pekerjaan (D+E) 1,323,104.82
G Dibulatkan 1,323,104.00

A.4.4.3.57. Pemasangan 1 m2 dinding batu tempel hitam

Harga Sastuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.7000 126,685.00 88,679.50
2 Tukang Batu L.02 OH 0.3500 138,199.00 48,369.65
3 Kepala Tukang L.03 OH 0.0350 142,429.00 4,985.02
4 Mandor L.04 OH 0.0350 146,753.00 5,136.36
JUMLAH TENAGA KERJA 147,170.52
B BAHAN
1 Batu Tempel M2 1.100 150,000.00 165,000.00
2 Semen Portland Kg 11.750 1,875.00 22,031.25
3 Pasir Pasang lokal M3 0.035 144,300.00 5,050.50

JUMLAH BAHAN 192,081.75


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 339,252.27
E Overhead & Profit 15.00% x D 50,887.84
F Harga Satuan Pekerjaan (D+E) 390,140.11
G Dibulatkan 390,140.00

A.4.6.1. HARGA SATUAN PEKERJAAN KAYU

A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan jendela, kayu kelas I

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 7.0000 126,685.00 886,795.00
2 Tukang Kayu L.02 OH 21.0000 138,199.00 2,902,179.00
3 Kepala Tukang L.03 OH 2.1000 142,429.00 299,100.90
4 Mandor L.04 OH 0.3500 146,753.00 51,363.55
JUMLAH TENAGA KERJA 4,139,438.45
B BAHAN
1 Kayu Klas I (Semantok/Ulin/Damar/sejeni M3 1.100 7,500,000.00 8,250,000.00
2 Paku Kayu Kg 1.250 17,325.00 21,656.25
3 Lem Kayu Kg 1.000 28,500.00 28,500.00

JUMLAH BAHAN 8,300,156.25


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 12,439,594.70
E Overhead & Profit 15.00% x D 1,865,939.21
F Harga Satuan Pekerjaan (D+E) 14,305,533.91
G Dibulatkan 14,305,533.00

A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan jendela, kayu kelas II atau kelas III

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 6.0000 126,685.00 760,110.00
2 Tukang Kayu L.02 OH 18.0000 138,199.00 2,487,582.00
3 Kepala Tukang L.03 OH 1.8000 142,429.00 256,372.20
4 Mandor L.04 OH 0.3000 146,753.00 44,025.90
JUMLAH TENAGA KERJA 3,548,090.10
B BAHAN
1 Kayu Klas II (Kamper / Kruing / sejenisnya M3 1.200 6,500,000.00 7,800,000.00
2 Paku Kayu Kg 1.250 17,325.00 21,656.25
3 Lem Kayu Kg 1.000 28,500.00 28,500.00

JUMLAH BAHAN 7,850,156.25


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 11,398,246.35
E Overhead & Profit 15.00% x D 1,709,736.95
F Harga Satuan Pekerjaan (D+E) 13,107,983.30
G Dibulatkan 13,107,983.00

A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau kelas II

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 1.0000 126,685.00 126,685.00
2 Tukang Kayu L.02 OH 3.0000 138,199.00 414,597.00
3 Kepala Tukang L.03 OH 0.3000 142,429.00 42,728.70
4 Mandor L.04 OH 0.0500 146,753.00 7,337.65
JUMLAH TENAGA KERJA 591,348.35
B BAHAN
1 Kayu Klas I (Semantok/Ulin/Damar/sejeni M3 0.040 7,500,000.00 300,000.00
2 Lem Kayu Kg 0.500 28,500.00 14,250.00

JUMLAH BAHAN 314,250.00


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 905,598.35
E Overhead & Profit 15.00% x D 135,839.75
F Harga Satuan Pekerjaan (D+E) 1,041,438.10
G Dibulatkan 1,041,438.00

A.4.6.2. HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A.4.6.2.16. Pemasangan 1 m2 kaca polos tebal 3mm

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.0150 126,685.00 1,900.28
2 Tukang Kayu L.02 OH 0.1500 138,199.00 20,729.85
3 Kepala Tukang L.03 OH 0.0150 142,429.00 2,136.44
4 Mandor L.04 OH 0.0008 146,753.00 117.40
JUMLAH TENAGA KERJA 24,883.96
B BAHAN
1 Kaca Polos 3 mm M2 1.100 249,400.00 274,340.00
2 ### #NAME? 0.050 #NAME? #NAME?

JUMLAH BAHAN #NAME?


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) #NAME?
E Overhead & Profit 15.00% x D #NAME?
F Harga Satuan Pekerjaan (D+E) #NAME?
G Dibulatkan #NAME?

A.4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5mm

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.0150 126,685.00 1,900.28
2 Tukang Kayu L.02 OH 0.1500 138,199.00 20,729.85
3 Kepala Tukang L.03 OH 0.0150 142,429.00 2,136.44
4 Mandor L.04 OH 0.0080 146,753.00 1,174.02
JUMLAH TENAGA KERJA 25,940.58
B BAHAN
1 Kaca Cermin tebal 5 mm M2 1.100 265,000.00 291,500.00

JUMLAH BAHAN 291,500.00


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 317,440.58
E Overhead & Profit 15.00% x D 47,616.09
F Harga Satuan Pekerjaan (D+E) 365,056.67
G Dibulatkan 365,056.00

3.3. HARGA SATUAN PEKERJAAN PENGEATAN

3.3.1.(c) 1 m2 Pengikisan/ Pengerokan Permukaan Cat Lama

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.1500 126,685.00 19,002.75
2 Mandor L.04 OH 0.0030 146,753.00 440.26

JUMLAH TENAGA KERJA 19,443.01


B BAHAN
1 Soda Api/ Paint Remover Kg 0.050 29,355.00 1,467.75

JUMLAH BAHAN 1,467.75


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 20,910.76
E Overhead & Profit 15.00% x D 3,136.61
F Harga Satuan Pekerjaan (D+E) 24,047.37
G Dibulatkan 24,047.00
3.3.5.(c) 1 m2 Pengecatan Bidang Kayu Baru (1 Lapis Plamuur, 1 Lapis Cat Dasar, 3 Lapis Cat Penutup)

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.0700 126,685.00 8,867.95
2 Tukang Cat L.02 OH 0.1050 138,199.00 14,510.90
3 Kepala Tukang L.03 OH 0.0040 142,429.00 569.72
4 Mandor L.04 OH 0.0030 146,753.00 440.26
JUMLAH TENAGA KERJA 24,388.82
B BAHAN
1 Cat Menie Besi Kg 0.200 75,000.00 15,000.00
2 Dempul Kayu Kg 0.150 55,000.00 8,250.00
3 Cat Kayu Dasar Kg 0.170 48,510.00 8,246.70
4 Cat Kayu Mengkilap Kg 0.350 75,000.00 26,250.00
5 Kuas Bh 0.010 31,375.00 313.75
6 Pengencer/tinner Kg 0.030 50,000.00 1,500.00
7 Kertas Amplas Lembar 2.000 10,000.00 20,000.00
JUMLAH BAHAN 79,560.45
C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 103,949.27
E Overhead & Profit 15.00% x D 15,592.39
F Harga Satuan Pekerjaan (D+E) 119,541.66
G Dibulatkan 119,541.00

3.3.10.(c) Pengecatan 1 m2 Tembok Baru (1 Lapis Plamuur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.0200 126,685.00 2,533.70
2 Tukang Cat L.02 OH 0.0630 138,199.00 8,706.54
3 Kepala Tukang L.03 OH 0.0063 142,429.00 897.30
4 Mandor L.04 OH 0.0030 146,753.00 440.26
JUMLAH TENAGA KERJA 12,577.80
B BAHAN
1 Plamur Tembok (dempul) Kg 0.100 40,000.00 4,000.00
2 Cat Tembok Dasar Kg 0.100 30,000.00 3,000.00
3 Cat Tembok (Pentalite) Kg 0.260 115,000.00 29,900.00

JUMLAH BAHAN 36,900.00


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 49,477.80
E Overhead & Profit 15.00% x D 7,421.67
F Harga Satuan Pekerjaan (D+E) 56,899.47
G Dibulatkan 56,899.00

3.3.10.(c).a Pengecatan 1 m2 Tembok Baru (1 Lapis Plamuur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) Weathershield

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.0200 126,685.00 2,533.70
2 Tukang Cat L.02 OH 0.0630 138,199.00 8,706.54
3 Kepala Tukang L.03 OH 0.0063 142,429.00 897.30
4 Mandor L.04 OH 0.0030 146,753.00 440.26
JUMLAH TENAGA KERJA 12,577.80
B BAHAN
1 Plamur Tembok (dempul) Kg 0.100 40,000.00 4,000.00
2 Cat Tembok Dasar Kg 0.100 161,700.00 16,170.00
3 Cat Tembok Weathershield Kg 0.260 161,700.00 42,042.00

JUMLAH BAHAN 62,212.00


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 74,789.80
E Overhead & Profit 15.00% x D 11,218.47
F Harga Satuan Pekerjaan (D+E) 86,008.27
G Dibulatkan 86,008.00

3.3.11.(c). Pengecatan 1 m2 Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup)

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.0280 126,685.00 3,547.18
2 Tukang Cat L.02 OH 0.0420 138,199.00 5,804.36
3 Kepala Tukang L.03 OH 0.0042 142,429.00 598.20
4 Mandor L.04 OH 0.0030 146,753.00 440.26
JUMLAH TENAGA KERJA 10,390.00
B BAHAN
1 Cat Tembok Dasar Kg 0.120 30,000.00 3,600.00
2 Cat Tembok (Pentalite) Kg 0.180 115,000.00 20,700.00
JUMLAH BAHAN 24,300.00
C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 34,690.00
E Overhead & Profit 15.00% x D 5,203.50
F Harga Satuan Pekerjaan (D+E) 39,893.50
G Dibulatkan 39,893.00

A.5.1.1. HARGA SATUAN PEKERJAAN SANITASI DAN PERPIPAAN DALAM GEDUNG

A.5.1.1.1. Pemasangan 1 buah closet duduk/ monoblock

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.5000 126,685.00 63,342.50
2 Tukang Batu L.02 OH 1.1000 138,199.00 152,018.90
3 Kepala Tukang L.03 OH 0.0100 142,429.00 1,424.29
4 Mandor L.04 OH 0.1600 146,753.00 23,480.48
JUMLAH TENAGA KERJA 240,266.17
B BAHAN
1 Kloset Duduk Toto Type Cw868j Unit 1.000 2,650,000.00 2,650,000.00
2 Perlengkapan Ls 6% 2,650,000.00 159,000.00

JUMLAH BAHAN 2,809,000.00


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 3,049,266.17
E Overhead & Profit 15.00% x D 457,389.93
F Harga Satuan Pekerjaan (D+E) 3,506,656.10
G Dibulatkan 3,506,656.00

A.5.1.1.2. Pemasangan 1 buah closet jongkok porselen

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 1.0000 126,685.00 126,685.00
2 Tukang Batu L.02 OH 1.5000 138,199.00 207,298.50
3 Kepala Tukang L.03 OH 0.1500 142,429.00 21,364.35
4 Mandor L.04 OH 0.1600 146,753.00 23,480.48
JUMLAH TENAGA KERJA 378,828.33
B BAHAN
1 Kloset Duduk Toto Biasa Unit 1.000 850,000.00 850,000.00
2 Pasangan Bata 1PC : 3 PS M2 0.036 215,585.00 7,761.06

JUMLAH BAHAN 857,761.06


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 1,236,589.39
E Overhead & Profit 15.00% x D 185,488.41
F Harga Satuan Pekerjaan (D+E) 1,422,077.80
G Dibulatkan 1,422,077.00

A.5.1.1.4. Pemasangan 1 buah urinoir

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 1.0000 126,685.00 126,685.00
2 Tukang Batu L.02 OH 1.0000 138,199.00 138,199.00
3 Kepala Tukang L.03 OH 0.1000 142,429.00 14,242.90
4 Mandor L.04 OH 0.0500 146,753.00 7,337.65
JUMLAH TENAGA KERJA 286,464.55
B BAHAN
1 Urinoir Toto Unit 1.000 3,200,000.00 3,200,000.00
2 Semen Portland Kg 6.000 1,875.00 11,250.00
3 Pasir Pasang lokal M3 0.010 144,300.00 1,443.00
JUMLAH BAHAN 3,212,693.00
C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 3,499,157.55
E Overhead & Profit 15.00% x D 524,873.63
F Harga Satuan Pekerjaan (D+E) 4,024,031.18
G Dibulatkan 4,024,031.00

A.5.1.1.5. Pemasangan 1 buah wastafel

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 1.2000 126,685.00 152,022.00
2 Tukang Batu L.02 OH 1.4500 138,199.00 200,388.55
3 Kepala Tukang L.03 OH 0.1500 142,429.00 21,364.35
4 Mandor L.04 OH 0.0600 146,753.00 8,805.18
JUMLAH TENAGA KERJA 382,580.08
B BAHAN
1 Bak Cuci Tangan / Wastafel Keramik Toto Unit 1.200 1,700,000.00 2,040,000.00
2 Semen Portland Kg 6.000 1,875.00 11,250.00
3 Pasir Pasang lokal M3 0.010 144,300.00 1,443.00
JUMLAH BAHAN 2,052,693.00
C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 2,435,273.08
E Overhead & Profit 15.00% x D 365,290.96
F Harga Satuan Pekerjaan (D+E) 2,800,564.04
G Dibulatkan 2,800,564.00

A.5.1.1.11. Pemasangan 1 Buah Bak Fiberglass Volume 1 m3

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.3000 126,685.00 38,005.50
2 Tukang Batu L.02 OH 0.4500 138,199.00 62,189.55
3 Kepala Tukang L.03 OH 0.0450 142,429.00 6,409.31
4 Mandor L.04 OH 0.0150 146,753.00 2,201.30
JUMLAH TENAGA KERJA 108,805.65
B BAHAN
1 Bak Mandi Fibre Glass Unit 1.000 450,000.00 450,000.00
2 Perlengkapan % 12.000 450,000.00 54,000.00

JUMLAH BAHAN 504,000.00


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 612,805.65
E Overhead & Profit 15.00% x D 91,920.85
F Harga Satuan Pekerjaan (D+E) 704,726.50
G Dibulatkan 704,726.00

A.5.1.1.19. Pemasangan 1 m Pipa Galvanis Diameter 1/2 "

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.0540 126,685.00 6,840.99
2 Tukang Batu L.02 OH 0.0900 138,199.00 12,437.91
3 Kepala Tukang L.03 OH 0.0090 142,429.00 1,281.86
4 Mandor L.04 OH 0.0270 146,753.00 3,962.33
JUMLAH TENAGA KERJA 24,523.09
B BAHAN
1 Pipa Galvanis Ø ½" Tebal 2,8 mm M 1.200 36,666.67 44,000.00
2 Perlengkapan Ls 35% 44,000.00 15,400.00

JUMLAH BAHAN 59,400.00


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 83,923.09
E Overhead & Profit 15.00% x D 12,588.46
F Harga Satuan Pekerjaan (D+E) 96,511.56
G Dibulatkan 96,511.00

A.5.1.1.20. Pemasangan 1 m Pipa Galvanis Diameter 3/4 "

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.0540 126,685.00 6,840.99
2 Tukang Batu L.02 OH 0.0900 138,199.00 12,437.91
3 Kepala Tukang L.03 OH 0.0090 142,429.00 1,281.86
4 Mandor L.04 OH 0.0270 146,753.00 3,962.33
JUMLAH TENAGA KERJA 24,523.09
B BAHAN
1 Pipa Galvanis Ø ¾" Tebal 2,8 mm M 1.200 48,333.33 58,000.00
2 Perlengkapan Ls 35% 58,000.00 20,300.00

JUMLAH BAHAN 78,300.00


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 102,823.09
E Overhead & Profit 15.00% x D 15,423.46
F Harga Satuan Pekerjaan (D+E) 118,246.56
G Dibulatkan 118,246.00
A.5.1.1.21. Pemasangan 1 m Pipa Galvanis Diameter 1 "

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.0540 126,685.00 6,840.99
2 Tukang Batu L.02 OH 0.0900 138,199.00 12,437.91
3 Kepala Tukang L.03 OH 0.0090 142,429.00 1,281.86
4 Mandor L.04 OH 0.0270 146,753.00 3,962.33
JUMLAH TENAGA KERJA 24,523.09
B BAHAN
1 Pipa Galvanis Ø 1" Tebal 2,8 mm M 1.200 56,666.67 68,000.00
2 Perlengkapan Ls 35% 68,000.00 23,800.00

JUMLAH BAHAN 91,800.00


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 116,323.09
E Overhead & Profit 15.00% x D 17,448.46
F Harga Satuan Pekerjaan (D+E) 133,771.56
G Dibulatkan 133,771.00

A.5.1.1.22. Pemasangan 1 m Pipa Galvanis Diameter 1 1/2 "

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.1080 126,685.00 13,681.98
2 Tukang Batu L.02 OH 0.1800 138,199.00 24,875.82
3 Kepala Tukang L.03 OH 0.0180 142,429.00 2,563.72
4 Mandor L.04 OH 0.0050 146,753.00 733.77
JUMLAH TENAGA KERJA 41,855.29
B BAHAN
1 Pipa Galvanis Ø 1 ½" Tebal 2,8 mm M 1.200 73,333.33 88,000.00
2 Perlengkapan Ls 35% 88,000.00 30,800.00

JUMLAH BAHAN 118,800.00


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 160,655.29
E Overhead & Profit 15.00% x D 24,098.29
F Harga Satuan Pekerjaan (D+E) 184,753.58
G Dibulatkan 184,753.00

A.5.1.1.23. Pemasangan 1 m Pipa Galvanis Diameter 3 "

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.1350 126,685.00 17,102.48
2 Tukang Batu L.02 OH 0.2250 138,199.00 31,094.78
3 Kepala Tukang L.03 OH 0.0230 142,429.00 3,275.87
4 Mandor L.04 OH 0.0070 146,753.00 1,027.27
JUMLAH TENAGA KERJA 52,500.39
B BAHAN
1 Pipa Galvanis Ø 3" Tebal 2,8 mm M 1.200 150,000.00 180,000.00
2 Perlengkapan Ls 35% 180,000.00 63,000.00

JUMLAH BAHAN 243,000.00


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 295,500.39
E Overhead & Profit 15.00% x D 44,325.06
F Harga Satuan Pekerjaan (D+E) 339,825.45
G Dibulatkan 339,825.00

A.5.1.1.24. Pemasangan 1 m Pipa Galvanis Diameter 4 "

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.1350 126,685.00 17,102.48
2 Tukang Batu L.02 OH 0.2250 138,199.00 31,094.78
3 Kepala Tukang L.03 OH 0.0230 142,429.00 3,275.87
4 Mandor L.04 OH 0.0070 146,753.00 1,027.27
JUMLAH TENAGA KERJA 52,500.39
B BAHAN
1 Pipa Galvanis Ø 4" Tebal 3,2 mm M 1.200 216,666.67 260,000.00
2 Perlengkapan Ls 35% 260,000.00 91,000.00

JUMLAH BAHAN 351,000.00


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 403,500.39
E Overhead & Profit 15.00% x D 60,525.06
F Harga Satuan Pekerjaan (D+E) 464,025.45
G Dibulatkan 464,025.00

A.5.1.1.25. Pemasangan 1 m Pipa PVC tipe AW Diameter 1/2"

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.0360 126,685.00 4,560.66
2 Tukang Batu L.02 OH 0.0600 138,199.00 8,291.94
3 Kepala Tukang L.03 OH 0.0060 142,429.00 854.57
4 Mandor L.04 OH 0.0020 146,753.00 293.51
JUMLAH TENAGA KERJA 14,000.68
B BAHAN
1 Pipa PVC Ø 1/2" Kualitas AWE (United) M 1.200 5,775.00 6,930.00
2 Perlengkapan Ls 35% 6,930.00 2,425.50

JUMLAH BAHAN 9,355.50


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 23,356.18
E Overhead & Profit 15.00% x D 3,503.43
F Harga Satuan Pekerjaan (D+E) 26,859.61
G Dibulatkan 26,859.00

A.5.1.1.26. Pemasangan 1 m Pipa PVC tipe AW Diameter 3/4"

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.0360 126,685.00 4,560.66
2 Tukang Batu L.02 OH 0.0600 138,199.00 8,291.94
3 Kepala Tukang L.03 OH 0.0060 142,429.00 854.57
4 Mandor L.04 OH 0.0020 146,753.00 293.51
JUMLAH TENAGA KERJA 14,000.68
B BAHAN
1 Pipa PVC Ø 3/4" M 1.200 6,930.00 8,316.00
2 Perlengkapan Ls 35% 8,316.00 2,910.60

JUMLAH BAHAN 11,226.60


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 25,227.28
E Overhead & Profit 15.00% x D 3,784.09
F Harga Satuan Pekerjaan (D+E) 29,011.37
G Dibulatkan 29,011.00

A.5.1.1.27. Pemasangan 1 m Pipa PVC tipe AW Diameter 1"

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.0360 126,685.00 4,560.66
2 Tukang Batu L.02 OH 0.0600 138,199.00 8,291.94
3 Kepala Tukang L.03 OH 0.0060 142,429.00 854.57
4 Mandor L.04 OH 0.0020 146,753.00 293.51
JUMLAH TENAGA KERJA 14,000.68
B BAHAN
1 Pipa PVC Ø 1" AW M 1.200 9,625.00 11,550.00
2 Perlengkapan Ls 35% 11,550.00 4,042.50

JUMLAH BAHAN 15,592.50


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 29,593.18
E Overhead & Profit 15.00% x D 4,438.98
F Harga Satuan Pekerjaan (D+E) 34,032.16
G Dibulatkan 34,032.00

A.5.1.1.28. Pemasangan 1 m Pipa PVC tipe AW Diameter 1 1/2"

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.0540 126,685.00 6,840.99
2 Tukang Batu L.02 OH 0.0900 138,199.00 12,437.91
3 Kepala Tukang L.03 OH 0.0090 142,429.00 1,281.86
4 Mandor L.04 OH 0.0030 146,753.00 440.26
JUMLAH TENAGA KERJA 21,001.02
B BAHAN
1 Pipa PVC Ø 1 1/2" D M 1.200 12,512.50 15,015.00
2 Perlengkapan Ls 35% 15,015.00 5,255.25
JUMLAH BAHAN 20,270.25
C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 41,271.27
E Overhead & Profit 15.00% x D 6,190.69
F Harga Satuan Pekerjaan (D+E) 47,461.96
G Dibulatkan 47,461.00

A.5.1.1.29. Pemasangan 1 m Pipa PVC tipe AW Diameter 2"

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.0540 126,685.00 6,840.99
2 Tukang Batu L.02 OH 0.0900 138,199.00 12,437.91
3 Kepala Tukang L.03 OH 0.0090 142,429.00 1,281.86
4 Mandor L.04 OH 0.0030 146,753.00 440.26
JUMLAH TENAGA KERJA 21,001.02
B BAHAN
1 Pipa PVC Ø 2" M 1.200 14,437.50 17,325.00
2 Perlengkapan Ls 35% 17,325.00 6,063.75

JUMLAH BAHAN 23,388.75


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 44,389.77
E Overhead & Profit 15.00% x D 6,658.47
F Harga Satuan Pekerjaan (D+E) 51,048.24
G Dibulatkan 51,048.00

A.5.1.1.30. Pemasangan 1 m Pipa PVC tipe AW Diameter 2 1/2"

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.0810 126,685.00 10,261.49
2 Tukang Batu L.02 OH 0.1350 138,199.00 18,656.87
3 Kepala Tukang L.03 OH 0.0135 142,429.00 1,922.79
4 Mandor L.04 OH 0.0040 146,753.00 587.01
JUMLAH TENAGA KERJA 31,428.15
B BAHAN
1 Pipa PVC Ø 2 1/2" M 1.200 20,833.33 25,000.00
2 Perlengkapan Ls 35% 25,000.00 8,750.00

JUMLAH BAHAN 33,750.00


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 65,178.15
E Overhead & Profit 15.00% x D 9,776.72
F Harga Satuan Pekerjaan (D+E) 74,954.88
G Dibulatkan 74,954.00

A.5.1.1.31. Pemasangan 1 m Pipa PVC tipe AW Diameter 3"

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.0810 126,685.00 10,261.49
2 Tukang Batu L.02 OH 0.1350 138,199.00 18,656.87
3 Kepala Tukang L.03 OH 0.0135 142,429.00 1,922.79
4 Mandor L.04 OH 0.0040 146,753.00 587.01
JUMLAH TENAGA KERJA 31,428.15
B BAHAN
1 Pipa PVC Ø 3" M 1.200 25,000.00 30,000.00
2 Perlengkapan Ls 35% 30,000.00 10,500.00

JUMLAH BAHAN 40,500.00


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 71,928.15
E Overhead & Profit 15.00% x D 10,789.22
F Harga Satuan Pekerjaan (D+E) 82,717.38
G Dibulatkan 82,717.00

A.5.1.1.32. Pemasangan 1 m Pipa PVC tipe AW Diameter 4"

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.0810 126,685.00 10,261.49
2 Tukang Batu L.02 OH 0.1350 138,199.00 18,656.87
3 Kepala Tukang L.03 OH 0.0135 142,429.00 1,922.79
4 Mandor L.04 OH 0.0040 146,753.00 587.01
JUMLAH TENAGA KERJA 31,428.15
B BAHAN
1 Pipa PVC Ø 4" M 1.200 38,500.00 46,200.00
2 Perlengkapan Ls 35% 46,200.00 16,170.00

JUMLAH BAHAN 62,370.00


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 93,798.15
E Overhead & Profit 15.00% x D 14,069.72
F Harga Satuan Pekerjaan (D+E) 107,867.88
G Dibulatkan 107,867.00

A.5.1.1.33. Pemasangan 1 Buah Wastafel

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.0300 126,685.00 3,800.55
2 Tukang Batu L.02 OH 0.3000 138,199.00 41,459.70
3 Kepala Tukang L.03 OH 0.0300 142,429.00 4,272.87
4 Mandor L.04 OH 0.0150 146,753.00 2,201.30
JUMLAH TENAGA KERJA 51,734.42
B BAHAN
1 Bak Cuci Tangan / Wastafel Keramik Toto Unit 1.200 1,700,000.00 2,040,000.00
2 Waterdrain Buah 1.000 75,000.00 75,000.00

JUMLAH BAHAN 2,115,000.00


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 2,166,734.42
E Overhead & Profit 15.00% x D 325,010.16
F Harga Satuan Pekerjaan (D+E) 2,491,744.58
G Dibulatkan 2,491,744.00

A.5.1.1.35. Pemasangan 1 buah Kran Diameter 1/2" atau 3/4"

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.0100 126,685.00 1,266.85
2 Tukang Batu L.02 OH 0.4000 138,199.00 55,279.60
3 Kepala Tukang L.03 OH 0.0400 142,429.00 5,697.16
4 Mandor L.04 OH 0.0050 146,753.00 733.77
JUMLAH TENAGA KERJA 62,977.38
B BAHAN
1 Kran Air Toto Unit 1.000 95,000.00 95,000.00
2 Sealtape Buah 0.025 25,000.00 625.00

JUMLAH BAHAN 95,625.00


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 158,602.38
E Overhead & Profit 15.00% x D 23,790.36
F Harga Satuan Pekerjaan (D+E) 182,392.73
G Dibulatkan 182,392.00

A.5.1.1.36. Pemasangan 1 buah Floor Drain

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.0100 126,685.00 1,266.85
2 Tukang Batu L.02 OH 0.1000 138,199.00 13,819.90
3 Kepala Tukang L.03 OH 0.0100 142,429.00 1,424.29
4 Mandor L.04 OH 0.0050 146,753.00 733.77
JUMLAH TENAGA KERJA 17,244.81
B BAHAN
1 Floor Drain/Saringan Pembuang buah 1.000 50,000.00 50,000.00

JUMLAH BAHAN 50,000.00


C PERALATAN
-
-
JUMLAH PERALATAN -
D Jumlah (A+B+C) 67,244.81
E Overhead & Profit 15.00% x D 10,086.72
F Harga Satuan Pekerjaan (D+E) 77,331.53
G Dibulatkan 77,331.00
DAFTAR SURVEI HARGA PASAR BAHAN KONTRUKSI

NO. URAIAN KODE SATUAN HARGA SATUAN KETERANGAN


1 Pekerja L.01 OH Rp. 126,685.00 2023
2 Tukang L.02 OH Rp. 138,199.00 2023
3 Tukang Gali L.02 OH Rp. 138,199.00 2023
4 Tukang Batu L.02 OH Rp. 138,199.00 2023
5 Tukang Kayu L.02 OH Rp. 138,199.00 2023
6 Tukang Besi L.02 OH Rp. 138,199.00 2023
7 Tukang Cat L.02 OH Rp. 138,199.00 2023
8 Kepala Tukang L.03 OH Rp. 142,429.00 2023
9 Mandor L.04 OH Rp. 146,753.00 2023

NO. URAIAN SATUAN HARGA SATUAN KETERANGAN


1 Air Liter Rp. 100.00
2 Asbes Gelombang Kecil Lembar Rp. 60,000.00
3 Atap Genteng Metal Meter Rp. 86,650.00
4 Atap Spandek tebal 0,35 mm Lembar Rp. 86,600.00
5 Atap Genteng Ondulen Lembar Rp. 193,000.00
6 Bak Cuci Tangan / Wastafel Keramik Toto Unit Rp. 1,700,000.00
7 Bak Mandi Fibre Glass Unit Rp. 450,000.00 Survey
8 Bak Mandi Plastik Unit Rp. 300,000.00
9 Bataco Buah Rp. 7,500.00 Survey
10 Batu Bata Buah Rp. 1,300.00
11 Batu Gunung / Batu Belah M3 Rp. 185,000.00
12 Batu pakhlaag 5-7 cm M3 Rp. 219,450.00
13 Koral Beton M3 Rp. 219,450.00
14 Batu Pecah / Kerikil (lokal) M3 Rp. 507,000.00
15 Batu Pecah / Kerikil lokal Kg Rp. 375.56
16 Batu Pecah / Kerikil (daratan) M3 Rp. 808,500.00
17 Kerikil (max. 30 mm) Kg Rp. 598.89
18 Baja Ringan Canal C.75 Batang Rp. 135,000.00
19 Batu Tempel M2 Rp. 150,000.00
20 Baut Kap Ø 1/2 - 8 Buah Rp. 8,000.00
21 Besi Beton Polos Kg Rp. 15,700.00
22 Besi Beton Ulir Kg Rp. 21,500.00
23 Besi bout (Kuda-kuda) 5/8 - 10" Buah Rp. 55,000.00
24 Besi Profil Rata - rata Kg Rp. 25,000.00
25 Besi Profil Baja IWF Kg Rp. 27,550.00
26 Besi Stip Kg Rp. 40,000.00
27 Cat Kayu Dasar Kg Rp. 48,510.00
28 Cat Kayu Mengkilap Kg Rp. 75,000.00
29 Cat Menie Besi Kg Rp. 75,000.00
30 Cat Tembok Dasar Kg Rp. 30,000.00
31 Cat Tembok Kg Rp. 161,700.00
32 Cat Tembok (Pentalite) Kg Rp. 115,000.00
33 Cat Tembok Weathershield Kg Rp. 161,700.00
34 Dempul Kayu Kg Rp. 55,000.00
35 Filler Kg Rp. 34,000.00
36 Floor Drain/Saringan Pembuang buah Rp. 50,000.00
37 Granit tile Uk. 40 x 40 cm Polish M2 Rp. 138,000.00
38 Granite tile Uk. 40 x 40 cm Unpolish M2 Rp. 158,700.00
38 Granit tile Uk. 60 x 60 cm Polish M2 Rp. 250,000.00
39 Granit tile Uk. 60 x 60 cm Buah Rp. 80,645.16
39 Granit tile Uk. 100 x 100 cm M2 Rp. 275,000.00
39 Granaite tile Uk. 100 x 100 cm Unpolish M2 Rp. 287,500.00
40 Kaca Polos 3 mm M2 Rp. 249,400.00
41 Kaca Polos 5 mm M2 Rp. 251,000.00
42 Kaca Polos 8 mm M2 Rp. 288,650.00
43 Kaca Polos 10 mm M2 Rp. 331,947.50
44 Kaca Polos 12 mm M2 Rp. 381,739.63
45 Kaca Cermin tebal 5 mm M2 Rp. 265,000.00
46 Kawat Beton Kg Rp. 25,000.00
47 Kayu Klas I (Semantok/Ulin/Damar/sejenisnya) M3 Rp. 7,500,000.00
48 Kayu Klas II (Kamper / Kruing / sejenisnya) M3 Rp. 6,500,000.00
49 Kayu Klas III (Borneo / sejenisnya) M3 Rp. 5,500,000.00
50 Kayu Klas IV (Sengon / sejenisnya) M3 Rp. 5,000,000.00
51 Keramik Sisik Kulit Jeruk Uk. 25 x 25 cm M2 Rp. 90,000.00
52 Keramik Uk. 20 x 20 cm Polish M2 Rp. 85,000.00
53 Keramik Uk. 20 x 20 cm Buah Rp. 3,207.55
54 Keramik Uk. 30 x 30 cm M2 Rp. 98,000.00
55 Keramik Uk. 30 x 30 cm Polish Buah Rp. 8,256.11
56 Keramik Uk. 40 x 40 cm Polish M2 Rp. 100,000.00
57 Keramik Uk. 40 x 40 cm Buah Rp. 15,082.96
58 Keramikt Uk. 40 x 40 cm Unpolish M2 Rp. 115,000.00
59 Keramik Dinding Uk. 20 x 20 cm M2 Rp. 95,000.00
60 Keramik Dinding Uk. 20 x 20 cm Motive Buah Rp. 3,653.85
61 Keramik Dinding Uk. 25 x 40 M2 Rp. 125,000.00
62 Keramik Dinding UK. 25 x 40 cm Buah Rp. 12,500.00
63 Keramik Dinding Uk. 30 x 60 M2 Rp. 165,000.00
64 Keramik Dinding Uk. 30 x 60 cm Buah Rp. 27,500.00
65 Kertas Amplas Lembar Rp. 10,000.00
66 Kloset Duduk Toto Type Cw868j Unit Rp. 2,650,000.00
67 Kloset Duduk Toto Biasa Unit Rp. 850,000.00
68 Kloset Duduk Toto Type Cw868j Unit Rp. 1,878,500.00
69 Kran Steinless Steel Unit Rp. 275,850.00
70 Kran Air Toto Unit Rp. 95,000.00
71 Kunci Pintu Buah Rp. 313,750.00
72 Lem Aibon Buah Rp. 220,000.00
73 Lem Kayu Kg Rp. 28,500.00
74 Marmer Uk. 100 x 100 cm Buah Rp. 750,000.00
75 Minyak Cat Liter Rp. 35,000.00
76 Multipleks 3 mm Lembar Rp. 80,000.00
77 Multipleks 4 mm Lembar Rp. 90,000.00
78 Multipleks 6 mm Lembar Rp. 115,000.00
79 Multipleks 9 mm Lembar Rp. 150,000.00
80 Multipleks 12 mm Lembar Rp. 195,000.00
81 Multipleks 18 mm Lembar Rp. 235,000.00
82 Nok / Rabung Seng 0,35 Cat Pabrik Lembar Rp. 85,000.00
83 Nok / Rabung Seng 0,35 tidak dicat Lembar Rp. 45,000.00
84 Nok/ Rabung Ondulen Lembar Rp. 35,000.00
85 Nok Spandek tebal 0,35 mm M Rp. 20,625.00
86 Paku Beton 8cm Kg Rp. 75,000.00
87 Paku Kayu Kg Rp. 17,325.00
88 Paku Reng Kg Rp. 20,000.00
89 Paku Seng Kotak Rp. 23,100.00
90 Paku Skrup GRC Kg Rp. 100,000.00
91 Paku Ulir Primadek Kg Rp. 40,000.00
92 Pasir Batu (Sirtu) (daratan) M3 Rp. 462,000.00
93 Pasir Batu (Sirtu) (daratan). Kg Rp. 342.22
94 Pasir Beton/ Kerikil (daratan) M3 Rp. 519,750.00
95 Pasir Beton Kg Rp. 385.00
96 Pasir Pasang lokal M3 Rp. 144,300.00
97 Pasir Pasang Kg Rp. 103.07
98 Pasir Urug M3 Rp. 115,500.00
99 Pipa Galvanis Ø ½" Tebal 2,8 mm M Rp. 36,666.67
100 Pipa Galvanis Ø ¾" Tebal 2,8 mm M Rp. 48,333.33
101 Pipa Galvanis Ø 1" Tebal 2,8 mm M Rp. 56,666.67
102 Pipa Galvanis Ø 1 ½" Tebal 2,8 mm M Rp. 73,333.33
103 Pipa Galvanis Ø 2" Tebal 2,8 mm M Rp. 96,666.67
104 Pipa Galvanis Ø 2 ½" Tebal 2,8 mm M Rp. 108,333.33
105 Pipa Galvanis Ø 3" Tebal 2,8 mm M Rp. 150,000.00
106 Pipa Galvanis Ø 4" Tebal 3,2 mm M Rp. 216,666.67
107 Pipa Galvanis Ø 6" Tebal 3,6 mm M Rp. 230,000.00
108 Pipa PVC Ø 1/2" Kualitas AWE (United) M Rp. 5,775.00
109 Pipa PVC Ø 3/4" M Rp. 6,930.00
110 Pipa PVC Ø 1" AW M Rp. 9,625.00
111 Pipa PVC Ø 1 1/2" D M Rp. 12,512.50
112 Pipa PVC Ø 2" M Rp. 14,437.50
113 Pipa PVC Ø 2 1/2" M Rp. 20,833.33
114 Pipa PVC Ø 3" M Rp. 25,000.00
115 Pipa PVC Ø 4" M Rp. 38,500.00
116 Plamur Tembok (dempul) Kg Rp. 40,000.00
117 Profil Alumanium M Rp. 33,500.00
118 PVC Board polos 6 mm M2 Rp. 55,000.00
119 PVC Board Warna 6 mm M2 Rp. 55,000.00
120 PVC Profil M1 Rp. 55,000.00
121 PVC Siku Profil M1 Rp. 50,000.00
122 Semen Portland @ 40 Kg Zak Rp. 75,000.00 2023
123 Semen Portland Kg Rp. 1,875.00
124 Semen Putih @ 50 Kg Zak Rp. 214,000.00
125 Semen Warna Kg Rp. 4,280.00
126 Seng Gelombang BJLS 0,20 - 8' Lembar Rp. 100,000.00
127 Seng Gelombang BJLS 0,20 - 8' Cat Pabrik Lembar Rp. 120,000.00
128 Seng Gelombang BJLS 0,30 - 8' Lembar Rp. 130,000.00
129 Seng Gelombang BJLS 0,30 - 8' Cat Pabrik Lembar Rp. 135,000.00
130 Seng Plat BJLS 20 Lembar Rp. 110,000.00
131 Seng Plat BJLS 30 Lembar Rp. 150,000.00
132 Secrub Fixer Buah Rp. 6,500.00
133 Soda Api/ Paint Remover Kg Rp. 29,355.00
134 Stop Kontak Titik Rp. 13,000.00
135 Sun Screen Aluminium M2 Rp. 650,000.00
136 Tanah Timbun M3 Rp. 150,000.00
137 Titik Lampu + Instalasi Titik Rp. 120,000.00
138 Ubin PC Uk. 40 x 40 cm M2 Rp. 185,000.00
139 Urinoir Toto Unit Rp. 3,200,000.00
140 Dolken Kayu Ø 8 - 10 cm/ 400 Btg Rp. 25,000.00
141 Dolken Kayu Ø 8 - 10 cm/ 400 cm M Rp. 4,166.67
142 Minyak Bekisting Ltr Rp. 30,000.00
143 Paku Triplek Kg Rp. 25,000.00
144 Kuas Bh Rp. 31,375.00
145 Pengencer/tinner Kg Rp. 50,000.00
146 Pasir Beton Lokal M3 Rp. 400,000.00
147 Seng Spandek M Rp. 78,500.00
148 Tangki air kapisitas 500 liter Bh Rp. 800,000.00
149 Tangki air kapasitas 1000 liter Bh Rp. 1,500,000.00
150 Tangki air kapasitas 2000 liter Bh Rp. 3,000,000.00

Note : Harga di hitung dari pusat kota, untuk daerah yang jaraknya >10 km harga barang dikali dengan 2%;
Jarak > 20 km harga barang dikali dengan 4%.
Kota Sabang, Maret 2023
Konsultan Perencana
CV. DIMENSI CONSULTANT

ABDI MURSALIN
Wakil Direktur
SUMBER : https://www.beritakonstruksi.com/2021/06/analisa-pekerjaan-bongkaran-sni.html

Taksir 1. 1 m2 Pekerjaan Pembongkaran Keramik


Tenaga Kerja :
- Mandor org/hr 0.01 100.00
- Pekerja org/hr 0.05 126,685.00

Taksir 2. 1 bh Pekerjaan Pembongkaran Kloset


Tenaga Kerja :
- Mandor org/hr 0.02 100.00
- Pekerja org/hr 0.20 126,685.00

Taksir 3. 1 m3 Pembongkaran Pasangan Dinding Bata


Tenaga Kerja :
- Mandor org/hr 0.09 100.00
- Pekerja org/hr 2.00 126,685.00

Taksir 4. 1 m3 Pekerjaan Pembongkaran Kusen Pintu dan Jendela


Tenaga Kerja :
- Mandor org/hr 0.4 100.00
- Tukang Kayu org/hr 0.11 138,199.00
- Pekerja org/hr 0.64 126,685.00

Taksir 5. 1 m2 Pembongkaran Rangka Atap/ Reng/ Kaso (Bongkaran Tidak Dipakai Kembali)
Tenaga Kerja :
- Mandor org/hr 0.015 100.00
- Kepala Tukang Kayu org/hr 0.0075 -
- Tukang Kayu org/hr 0.075 138,199.00
- Pekerja org/hr 0.150 126,685.00

Taksir 6. 1 m2 Pekerjaan Bongkar Genteng (Bongkaran Tidak Dipakai Kembali)


Tenaga Kerja :
- Mandor org/hr 0.01 100.00
- Pekerja org/hr 0.10 126,685.00

Taksir 7. 1 m2 Pekerjaan Pembongkaran Plafond dan Rangka (Bongkaran Tidak digunakan Kembali)
Tenaga Kerja :
- Mandor org/hr 0.01 100.00
- Pekerja org/hr 0.07 126,685.00

Taksir 8. 1 titik Pekerjaan Pembongkaran Instalasi Listrik & Armartur


Tenaga Kerja :
- Mandor org/hr 0.005 100.00
- Pekerja org/hr 0.100 126,685.00

Taksir 9. 1 m2 Upah Pemasangan Atap Genteng


Tenaga Kerja :
- Mandor org/hr 0.001 100.00
- Kepala Tukang Kayu org/hr 0.010 -
- Tukang Kayu org/hr 0.100 138,199.00
- Pekerja org/hr 0.200 126,685.00

Taksir 10. 1 m2 Pekerjaan Bongkar pintu tralis besi pagar existing


Tenaga Kerja :
- Mandor org/hr 0.008 100.00
- Pekerja org/hr 0.020 126,685.00

Taksir 11. 1 m Pekerjaan Pemasangan Besi Hollow dibawah tinggi 1 meter


Tenaga Kerja :
- Mandor org/hr 0.018 100.00
- Pekerja org/hr 0.350 126,685.00
- Kepala Tukang org/hr 0.035 -
- Tukang org/hr 0.350 138,199.00
- Besi Hollow M 4.000 12,500.00
- Accesories % 100.000 50,000.00

Taksir 12 1 m2 Pemasangan ACP tebal 5 mm

ACP Seven PVDF 1.0 300,000.00


Rangka Hollow 1.0 45,000.00
Sealant/ Lem Aluminium 1.0 25,000.00
Accessories, Scrup, Backup 1.0 10,000.00
Besi Siku - Bracket 1.0 15,000.00
Upah Tenaga Kerja 1.0 140,000.00
Pasang Scafolding 1.0 20,000.00

OH + Profit 10%

Margin 30%
rjaan-bongkaran-sni.html

1.00
6,334.25
6,335.25

2.00
25,337.00
25,339.00

9.00
253,370.00
253,379.00

40.00
15,201.89
81,078.40
96,320.29

Tidak Dipakai Kembali)

1.50
-
10,364.93
19,002.75
29,369.18
mbali)

1.00
12,668.50
12,669.50

Tidak digunakan Kembali)


1.00
8,867.95
8,868.95

0.50
12,668.50
12,669.00

0.10
-
13,819.90
25,337.00
39,157.00

0.80
2,533.70
2,534.50

1.80
44,339.75
-
48,369.65
50,000.00
50,000.00
192,711.20

300,000.00
45,000.00
25,000.00
10,000.00
15,000.00
140,000.00
20,000.00
555,000.00
55,500.00
610,500.00
183,150.00
793,650.00