Anda di halaman 1dari 3

KEYPLAN

THIS DRAWING

NAMA PROYEK

6445
2795 1650 2000
EL13

EL13
EL10

EL10
LOKASI KARAWANG, JAWA BARAT
TAHUN ANGGARAN
2023
WP-01 BANK INDONESIA
SS-01 SATKER : Unit Khusus Pembangunan SPU, DC dan BRS (UKPS)
Jalan M.H. Thamrin No. 2, Jakarta Pusat

DIPERIKSA/DISETUJUI
KONSULTAN PMCM EGIS-YODYA

+0.300
VY-02
PENANGGUNG JAWAB
+0.150
VY-02
+0.300 WP-01
SOC +0.150 ±0.000 SS-01
±0.000
VY-02
Yusran
TEAM LEADER

PENANGGUNG JAWAB
WP-01
SS-01
495 495

BI.C BI.C
EL14

EL14
4
1 2 Jon Robi
3 PENGAWAS SENIOR
18795

2143 KONTRAKTOR

WP-01
SS-01
EL14

EL14
PENANGGUNG JAWAB

±0.000
VY-02
IT OC WP-01
±0.000 SS-01
EL14

EL14
+0.150 +0.150
VY-02 Bagus Prima Anugrah
+0.300 PROJECT MANAGER

+0.300
VY-02
SHOP DRAWING
JUDUL GAMBAR

DENAH FINISH DINDING & LANTAI


BI.D BI.D
RUANG IT OC & SOC - R1

TANGGAL REVISI KETERANGAN

WP-01 SS-01
SS-01 WP-01
82

R2
°

00 05/03/2023 0
0
DI GAMBAR : HAI
BI.6 BI.6 NO. GAMBAR : AK-SD-BIIRS-A03-IN-2141
DENAH R. IT OC & SOC DENAH FINISH DINDING & LANTAI
SKALA 1 : 100 SKALA 1 : 100 SKALA KODE GAMBAR NO. LEMBAR

NTS IN 01
KEYPLAN
U
CEILING LEGEND
GB-01 = GYPSUM BOARD 12MM
FINISHING CAT KHUSUS GYPSUM
GB-01A = GYPSUM BOARD 12MM FIN.DULUX PENTALITE
WHITE SUPERMAT WATER RESISTANT
GB-02 = GYPTILE 60CM X 60CM
FINISHING CAT KHUSUS GYPSUM THIS DRAWING

GB-03 = GYPTILE 60CM X 60CM


FINISHING CAT KHUSUS GYPSUM
CO: BIRU

GB-04 = GYPTILE 60CM X 60CM


FINISHING HPL, EX: TACO
WHITE CHERRY, TH 111 AA
NAMA PROYEK
GB-05 = MEMBRANE LIGHT
CO : PUTIH
WITH 20mm BORDER FINISH MELAMIC

EL13

EL13
EL10

EL10
AL-01 = ALUMINIUM PLAT 8 CM X 125CM
LOKASI KARAWANG, JAWA BARAT
HEIGHT ABOVE FLOOR FINISHED TAHUN ANGGARAN
2023

1145
HEIGHT ABOVE FLOOR FINISHED BANK INDONESIA
SATKER : Unit Khusus Pembangunan SPU, DC dan BRS (UKPS)

CEILING FINISH TYPE REFERENCE Jalan M.H. Thamrin No. 2, Jakarta Pusat

DIPERIKSA/DISETUJUI
KONSULTAN PMCM EGIS-YODYA
LIGHTING LEGEND
1800

FMK 04A
= DOWNLIGHT LED

PENANGGUNG JAWAB
= LED ROUND PANEL LIGHT RECESSED
1800

FMK 04B

EQ 1800 1800 EQ FMK 04A


= LED STRIP

= TL LED LIGHT
FKK 02
GB 3000 = LED PANEL
1800

Yusran
CL 2 TEAM LEADER

= HALO SPOTLIGHT PENANGGUNG JAWAB


495 495

BI.C BI.C
1800
EL14

EL14
Jon Robi
1800

PENGAWAS SENIOR

KONTRAKTOR
EL14

EL14
1800

PENANGGUNG JAWAB

FMK 04B
CH 3000
1800

GB 2
EL14

EL14
FMK 04

FMK 04 Bagus Prima Anugrah


PROJECT MANAGER

SHOP DRAWING
1800

JUDUL GAMBAR

DENAH FINISH DINDING & LANTAI


BI.D BI.D
RUANG IT OC & SOC - R1
1800

TANGGAL REVISI KETERANGAN

985 1800 180000 1800 860


82

82
°

05/03/2023 0
DI GAMBAR : HAI
BI.6 NO. GAMBAR : AK-SD-BIIRS-A03-IN-2141
DENAH PLAFOND DENAH FURNITURE
SKALA 1 : 100 SKALA 1 : 100 BI.6 SKALA KODE GAMBAR NO. LEMBAR

NTS IN 02
KEYPLAN
U

FINISH DINDING
WP-01 = WALLPAPER TYPE : WIDEWALL VICTORY
WVA 4762
WP-01 WP-01
FINISH PLINT
THIS DRAWING
SS-01 = STAINLESS STEEL
HAIRLINE FINISH
55''

CH=3000
55''

NAMA PROYEK

1395 6225 1125 150 900 100 2585 3710 820 1500 200
65 LOKASI KARAWANG, JAWA BARAT
18795 TAHUN ANGGARAN
2023
SS-01 BANK INDONESIA
TAMPAK SATKER : Unit Khusus Pembangunan SPU, DC dan BRS (UKPS)

1 SKALA 1 : 100 WP-01 WP-01


Jalan M.H. Thamrin No. 2, Jakarta Pusat

DIPERIKSA/DISETUJUI
KONSULTAN PMCM EGIS-YODYA

PENANGGUNG JAWAB

CH=3000
Yusran
8805 100 9890 TEAM LEADER

18795 PENANGGUNG JAWAB

TAMPAK SS-01
2 SKALA 1 : 100

Jon Robi
PENGAWAS SENIOR

KONTRAKTOR
CH=3000

CH=3000
PENANGGUNG JAWAB
+0.300
+0.150

805 115 6325


6325 930
7240
7250
A
BI.6 TAMPAK TAMPAK BI.6
3 SKALA 1 : 100 4 SKALA 1 : 100
-
Bagus Prima Anugrah
PROJECT MANAGER
VYNIL FLOOR FINISH VYNIL FLOOR FINISH
ACIAN MULTIPLEK 12MM SHOP DRAWING
SCREEDING JUDUL GAMBAR
MULTIPLEK 18MM
PEDESTAL
±0.00 RAISED FLOOR @600MM DENAH FINISH DINDING & LANTAI
5

RUANG IT OC & SOC - R1


40 5

+0.300

35
50

150

TANGGAL REVISI KETERANGAN


+0.150
300

350
315
150

SLAB BY OTHER ±0.00 SLAB BY OTHER

05/03/2023 0
DI GAMBAR : HAI
NO. GAMBAR : AK-SD-BIIRS-A03-IN-2141
DETAIL LANTAI DETAIL
SKALA 1 : 5 A SKALA 1 : 20 SKALA KODE GAMBAR NO. LEMBAR

NTS IN 03

Anda mungkin juga menyukai