TIME SCHEDULE VIDEOGRAHPY COMPETITION

SMK MUHAMMADIYAH 1 PURWOKERTO

September
Tahapan
1 2 3 4
Sabtu Minggu Sabtu Minggu Sabtu Minggu Sabtu
Ide
Time Schedule
Pra Production

Sinopsis
Script Writing
Storyboard
Survey lokasi
Setting Alat
Perencanaan
Visual
Production

Perencanaan
Audio
Perencanaan
Editing
Production

Rendering
Post

Distribusi
4
Minggu
DAFTAR CREW MUTU PRODUCTION
SMK MUHAMMADIYAH 1 PURWOKERTO

No Nama Jabatan Crew


1 Nova Annuristian, S.Kom Guru Pembina
2 Rio Puji Rahmawan, S.Pd Guru Pembina
3 Ika Prasetya XI BC SCRIPT WRITER
4 Eka S. XI BC Cameraman
5 Sigit W. XI BC Cameraman
6 Umi XI BC Storyboard
7 Khaerunisa XII MM Editor
8 Tasya XII MM Art
9 Tia Fadila XII MM Talent
10 Mutia X BC 2 Talent
11 Muhammad Isnan X BC 1 Talent
12 Muhammad Agdan X BC 1 Talent
RENCANA ANGGARAN BIAYA PRODUKSI VIDEOGRAHPY
SMK MUHAMMADIYAH 1 PURWOKERTO

No Uraian Vol Sat Harga Satuan Jumlah Harga


1 2 3 4 5 6
I Pra Production
pendaftaran 1 team Rp 45,000.00 Rp 45,000.00
Konsumsi ( 2x Pertemuan ) 12 org Rp 10,000.00 Rp 240,000.00
Air Mineral ( 2x Pertemuan ) 1 dus Rp 38,000.00 Rp 76,000.00

II Production
Komsumsi ( 4x Pertemuan ) 12 org Rp 10,000.00 Rp 480,000.00
Air Mineral ( 4x Pertemuan ) 2 dus Rp 38,000.00 Rp 76,000.00
Artistik 1 pkt Rp 250,000.00 Rp 250,000.00
Wardobe 1 pkt Rp 150,000.00 Rp 150,000.00
Memori Card Camera 32 GB 2 bh Rp 70,000.00 Rp 140,000.00

III Post Production


Konsumsi ( 2x Pertemuan ) 12 org Rp 10,000.00 Rp 240,000.00
Air Mineral ( 2x Pertemuan ) 1 dus Rp 38,000.00 Rp 38,000.00

IV Lain - Lain
Transport Pembina ( 8x Pertemuan ) 2 org Rp 50,000.00 Rp 800,000.00

Total Rp 2,535,000.00