Anda di halaman 1dari 5

jarak harga 6unit x 25hk

Teso timur range 8


90-100 113,022 252
hasil / hari 6,300
25 hari kerja /bln 712,038,600

KALIBRASI ISUZU

SISA DI TANKI PULL ke


UNIT TRIP ISI BBM hri TOTAL SISA + STLH ISI

HRI 020 1 200 46


2 166 46 212
3 150 196

HRI 021 1 200 46


2 144 39 190
3 180 219
rata" 1 hr bgkr 1unit /bln
6 23
252 966
28,481,544 109,179,252

PEMAKAIAN

154
166
196

154 sesudah bongkar


151 belum bongkar
219
Range 7 Uang Jln BBM upah total
177,518 180 30
5,325,540 400,000 1,656,000 240,000 2,296,000

3,029,540
43

12 unit 1 bln 25 hk 7 unit hasil

30 720 5,040 26,840,721,600


KERINCI KALIMANTAN

NO NO PINTU
1 HRI 001 Andre 1 Dito 1 HRI 010
2 HRI 002 Syarial Darma 2 Darma 2 HRI 011
3 HRI 003 Dedik 3 Parlin 3 HRI 012
4 HRI 004 Riki 4 Dafit 4 HRI 013
5 HRI 005 Dafit 5 Anggun 5 HRI 014
6 HRI 006 Heri 6 Saragi 6 HRI 015
7 HRI 007 Akmal 7 HRI 016
8 HRI 008 Dito 8 HRI 018
9 HRI 009
10 HRI 017
11 HRI 019 Darma wijaya
12 HRI 020 Rahmad
13 HRI 021 Dadang
KALIMANTAN

DRIVER

Asrial

Jonny

Anda mungkin juga menyukai