JASA PEKERJAAN KNL

NO URAIAN PER KILO BERAT KREDIT DEBET KURANG BAYAR


1 JASA KONTRUKSI PEMB I 6.250 31.865 199.156.250 199.156.250
2 Jasa dibayarkan 73.090.500 126.065.750
3 Beli mobil 105.000.000 21.065.750
4 Biaya Bawa mbl ke malang 3.000.000 18.065.750
5 Cabut berkas 2.000.000 16.065.750
7 JASA KONTRUKSI PEMB II 6.250 25.248 157.800.000 173.865.750
8 Jasa dibayarkan 80.375.500 93.490.250
9 Total Kasbon MARDIAN 29.000.000 64.490.250
10 JASA KONTRUKSI PEMB III 6.250 - - 64.490.250
356.956.250

PEKERJAAN PERTAMA
NO URAIAN BERAT QUAINTITY TOTAL
1 Plat 19 mm 443 6 2.658
2 Plat 9 mm 210 7 1.470
3 WF150 168 2 336
4 WF200 256 12 3.072
5 WF250 355 37 13.135
6 CMP 125x50x20x2,3 6m 27 190 5.130
7 SIKU 7 X 7 TEBAL 7 44 20 880
8 BLUESCOPE 36 144 5.184

31.865

PEKERJAAN KEDUA
NO URAIAN BERAT QUAINTITY TOTAL
1 Plat 19 mm 443 3 1.329
2 Plat 9mm 210 5 1.050
3 WF150 168 0 -
4 WF200 256 16 4.096
5 WF250 --> KOLOM DAN ATAP 355 33 11.715
6 CMP 125x50x20x2,3 6m 27 118 3.186
7 SIKU 7 X 7 TENAL 7 44 16 704
8 BLUESCOPE 36 88 3.168

25.248

KAS BON SUMARDI

1 19-Apr 1.000.000 trx knt


2 25-Apr 5.000.000 trx knt
3 26-Apr 5.000.000 trx knt
4 28-May 1.000.000 cash aji
5 22-Jun 5.000.000
6 16-Jul 2.000.000 trx ke istrinya
knt trx ke BCA 2jt, 1jt unt
7 28-Jul 1.000.000
mardian, 1jt unt biaya makan
8 04-Aug 1.000.000 trx dari BCA
9 13-Aug 1.000.000 trx dari BCA
10 15-Sep 5.000.000 trx dr kantor 5jt
11 15-Oct 2.000.000 trx dari BCA
12 05-Nov -

29.000.000