PT PLN (PERSERO) PLN INDONESIA POWER No. Dok : UPDKTL-DP-06.

01-07
UNIT PELAKSANA PENGENDALIAN PEMBANGKITAN TELLO Revisi :1
Berlaku Sejak : 14 Agustus 2020
RENCANA ANGGARAN DAN BIAYA Halaman : 1 dari 1

RENCANA ANGGARAN DAN BIAYA (RAB)


PENGADAAN MATERIAL PERBAIKAN MOTOR FUEL FORWARDING UNIT 2 GE 1 & GE 2

HARGA ONLINE
HARGA SATUAN CV. HARGA SATUAN
No URAIAN SATUAN VOLUME HARGA SATUAN TOTAL
TASWING EVALUASI
HARGA ONGKIR ROK TOTAL

1 Besi H Beam batang 2 9.850.000 7.560.200 1.134.030 756.020 9.450.250 9.450.250 18.900.500
Ukuran : 150x150x7 mm
2 Besi UNP batang 2 695.000 707.500 106.125 70.750 884.375 695.000 1.390.000
Ukuran : 100x50x8 mm
3 Dynabolt pcs 16 35.000 27.500 4.125 2.750 34.375 34.375 550.000
Ukuran : 20 mm -
4 Mata Bor Beton pcs 2 280.000 209.900 31.485 20.990 262.375 262.375 524.750
Ukuran : 20 mm -
5 Semen Grounding / SIKA Groud sak 10 220.000 200.000 30.000 20.000 250.000 220.000 2.200.000
6 Mata Gerinda Potong WD 4" dus 6 75.000 89.000 13.350 8.900 111.250 75.000 450.000
7 Mata Gerinda Perata Nippong pcs 10 25.000 16.000 2.400 1.600 20.000 20.000 200.000
8 Meni Zinc Chromate 1 Kg Nippon kg 4 75.000 55.000 8.250 5.500 68.750 68.750 275.000
9 Cat Danagloss Abu-abu Muda (NC kg 10 185.000 139.000 20.850 13.900 173.750 173.750 1.737.500
10 Thinner Super/Cobra 1 btl (1,5 ltr) 13 75.000 60.000 9.000 6.000 75.000 75.000 975.000
11 Kawat Las RD-460 Ø 2.6 mm kg 10 39.000 37.500 5.625 3.750 46.875 39.000 390.000
12 Kawat Las LB 52 Ø 3.2 mm 5 kg 2 275.000 235.000 35.250 23.500 293.750 275.000 550.000
13 Batu Kerikil mobil kijang 1 670.000 - - - 670.000 670.000
14 Pasir m3 6 160.000 - - - 160.000 960.000
15 Semen Tonas sak 10 80.000 74.000 11.100 7.400 92.500 80.000 800.000
Jumlah 30.572.750,00
PPN 11% 3.363.002,50
Jumlah + PPN 11% 33.935.752,50

Makassar, 16 Agustus 2023

Dibuat oleh,
MANAGER BAGIAN OPERASI DAN PEMELIHARAAN

AGUNG WICAKSONO