KEBUTUHAN LISTRIK

NO TYPE UNIT PINTU GENSET 500 KVA GENSET 250 KVA GENSET 150 KVA
Watt KW KVA PINTU Watt KW KVA PINTU Watt KW KVA
A BANGUNAN PERUMAHAN 13 jam kerja 11 jam kerja 11 jam kerja
1 G6 18 108 900 97 121 60 700 42 53 48 700 34 43
2 G4 6 24 900 22 27 24 700 17 21
3 G2 32 64 2,500 160 200 42 1,500 63 79 22 2,000 44 55
4 G1 3 3 3,500 11 14 3 3,500 11 14
SUB TOTAL 199 7800 290 362 105 5,700 116 146 94 3400 95 119
B BANGUNAN UMUM
1 GUESS HOUSE 2 14 1,100 15 19 14 1,100 15 19
2 RND 1 1 30,000 30 38
3 KANTOR RO KPP 1 1 25,000 25 31 1 5,000 5 6
4 MUSHOLA 1 1 5,000 5 6 1 2,000 2 3
5 KOPERASI 1 1 5,000 5 6 1 3,000 3 4
6 KANTIN DAN PANTRY 1 1 3500 3 4 1 1000 1 1
7 KANTOR TRAKSI CENTRAL
8 DOOR SMEER TRAKSI
9 LAPANGAN TENIS 1 1 1,500 2 2 1,500 2 2
10 KLINIK 1 1 6,000 6 8 6,000 6 8
11 BANGUNAN SEKOLAH 1 1 4,000 4 5 4,000 4 5
12 LAMPU PENERANGAN JALAN 1 1 6,000 6 8 6,000 6 8
SUB TOTAL 23 87,100 101 127 18 29,600 44 56
TOTAL 94,900 391 489 123 35,300 160 202 94 3,400 95 119
LOOSIS 1,013 1 1 695 1 1 53 0 0
GRANDTOTAL 392 490 35,995 161 203 94 3,453 95 119