PERINGKAT PENYULANG DENGAN GANGGUAN TERBANYAK

APJ SITUBONDO

BULAN PERINGKAT
NO PENYULANG PANJANG (KMS) BEBAN TOTAL
AGT SEP OKT NOP DES JAN GANGGUAN
1 Arak-arak 89.394 72 4 4 2 1 14 12 37 1
2 Jangkar 47.517 49 - 3 5 4 8 13 33 2
3 Tamanan 56.200 108 3 8 6 2 7 4 30 3
4 Klabang 141.841 150 1 2 6 7 6 5 27 4
5 Olehan 26.387 76 4 2 5 2 3 10 26 5
6 Pasir putih 34.087 96 - 4 2 2 8 9 25 6
7 Pompa 32.669 103 - 6 2 3 6 4 21 7
8 Tlogosari 59.427 65 3 4 5 2 3 4 21 8
9 Ramban 69.222 93 3 1 5 3 4 4 20 9
10 Besuki 144.842 127 - 2 5 2 7 3 19 10
11 Kapongan 31.395 114 1 6 3 1 3 4 18 11
12 Maesan 61.636 70 2 1 5 3 4 3 18 12
13 Asem Bagus 64.189 116 2 2 3 - 7 3 17 13
14 Klampokan 157.274 74 1 4 2 1 4 5 17 14
15 Tal Kandang 25.924 95 - 1 4 2 6 3 16 15
16 Manggaran 36.363 60 2 1 2 1 4 4 14 16
17 Panarukan 48.995 63 - - - 1 6 6 13 17
18 Pejaten 29.838 34 1 2 1 1 5 3 13 18
19 A.Jafar 15.324 70 2 1 - 1 1 3 8 19
20 Prajekan 17.741 56 1 2 1 - 1 - 5 20
21 Tegal Ampel 10.567 49 - - 1 - 2 2 5 21
22 Bonindo 12.104 78 1 - 1 - 2 - 4 22
23 Curah Dami 11.778 84 - - - - 1 1 2 23
TOTAL GANGGUAN 1,224.714 31 56 66 39 112 105 409
PARETOGANGGUANPENYULANGTERBANYAK
APJ SITUBONDO
40

35

30

25
KALI

20 KALI TRIP

15

10

0
Arak - Arak Jangkar Tamanan Klabang Olehan Pasir Putih Pompa Tlogosari Ramban Besuki
KALI TRIP 37 33 30 27 26 25 21 21 20 19
PENYULANG
TOTAL GANGGUAN PER UNIT BULAN
AGUSTUS - JANUARI 2011
JUMLAH GANGGUAN PER BULAN
NO UNIT

AGS SEP OKT NOV DES JAN TOTAL

                 

1 PANARUKAN 9 16 23 10 40 44 142

2 BONDOWOSO 14 19 23 9 37 29 131

3 WONOSARI 5 4 10 10 11 9 49

4 ASEMBAGUS 3 9 3 5 11 16 47

5 BESUKI 0 8 7 5 13 7 40

                 

               

  TOTAL 31 56 66 39 112 105 409

                 
PROSENTASEPENYEBABGANGGUANPENYULANG
DI APJ SITUBONDO

I2 I3 I4
8% 1%1%
I1
E4 5%
E1
E3
2% E2
7% E3
E4
I1
E2
7% I2
E1 I3
69%
I4
• WILAYAH APJ SITUBONDO LEBIH DARI 69 % MERUPAKAN RAWAN
POHON (DAERAH PEGUNUNGAN, HUTAN, DAN POHON PRODUKTIF
MASYARAKAT)
• SEBAGIAN MERUPAKAN DAERAH PANTAI (RAWAN PENGGARAMAN) DAN
RAWAN PETIR
• MASIH BANYAKNYA SUTM YANG MENGGUNAKAN TIANG TM 9M (EKS
LISDES) PADAHAL DAERAH TERSEBUT MERUPAKAN DAERAH RAWAN
POHON
• SERINGNYA CUACA EKSTRIM (HUJAN ANGIN, ANGIN PUTING BELIUNG
DAN LAINLAIN)
• DAERAH YANG MERUPAKAN RAWAN POHON SEBAGIAN MERUPAKAN
POHON PRODUKTIF (MANGGA, SENGON, JATI DAN LAINNYA) SEHINGGA
SULIT UNTUK DILAKUKAN PERABASAN
• TIDAK ADANYA INVESTASI BASKET 1 (KEANDALAN) TAHUN 2010
NO URAIAN SAT JUMLAH KETERANGAN
1 PEMASANGAN GROUND WIRE Kms 5.75 TELAH TERPASANG
PENGGANTIAN JTM TELANJANG MENJADI HANYA MATERIAL YG SUDAH ADA,
2 Kms 26
AAAC-OC 150 MM2 JASA TIDAK ADA
3 PEMASANGAN RECLOSER UNIT 3 TELAH TERPASANG
 4  PEMASANGAN PMCB  UNIT 3  TELAH TERPASANG - BO

• RECLOSER
– TERPASANG 6 UNIT
– 4 UNIT RUSAK/ TIDAK BEKERJA
• PMCB
– TERPASANG 6 UNIT, 3 UNIT BELUM BEROPERASI (PROSES PENGOPERASIAN)
• USULAN
– PENAMBAHAN PEMASANGAN PMCB PENYULANG (DIMASUKKAN DALAM PRK P2)
INVESTASI INVESTASI 2011
 NO BASKET I : KEANDALAN SATUAN 
2010 PRK P0 + P1

1 REKONFIGURASI JARINGAN    - - 
2
PEMBANGUNAN PENYULANG BARU   - -
3
REHABILITASI JARINGAN   - -
 
- PENGGANTIAN JTM TELANJANG MENJADI AAAC-OC 150 MM2 Kms - 54,05
  - JASA PEMASANGAN AAAC-OC (2280 KM)
Km - 204,13

4 PENGADAAN DAN PEMASANGAN BUS COPLER, CUBICLE


PENYULANG DAN TRAFO PS UNTUK GARDU INDUK   - -
5 Set
PENGADAAN & PEMASANGAN RECLOSER 20 KV 400 A - 3,00

6 PENGADAAN & PEMAS. LBS MOTORIZED 20 KV 400 A & RTU KEY


POINT, RADIO & ANTENNA Set - -
7
PENGADAAN & PEMASANGAN LBS 20KV 400A Set - 5,00
• A3C TO A3CS
• TREE BOMB
• SEHARI BERSAMA PENYULANG
• (SOPAN) SOSIALISASI DAN
PENDEKATAN PELANGGAN
• KEGIATAN
– PENGGANTIAN KONDUKTOR SUTM TELANJANG (A3C) MENJADI SUTM
BERISOLASI (A3CS)
• PELAKSANAAN
– 15 FEBRUARI 2011 – 15 MEI 2011 (3 BULAN)
• LOKASI
– SUTM PADA DAERAH RAWAN POHON
• VOLUME
– 79 KM
• RENCANA KEDEPAN
– PENGGANTIAN KONDUKTOR SUTM TELANJANG (A3C) MENJADI SUTM
BERISOLASI (A3CS) UNTUK PROGRAM PRK P10 DAN P1 TAHUN 2011
SEPANJANG 54.05 KMS PADA DAERAH RAWAN POHON
• KEGIATAN
– RABAS-RABAS POHON DENGAN MENGERAHKAN PERSONIL TAMBAHAN 10
ORANG PER PENYULANG SERENTAK UNTUK SEMUA PENYULANG (KEGIATAN
RABAS-RABAS HARIAN OLEH PERSONIL RABAS-RABAS TETAP BERJALAN)
• PELAKSANAAN
– SATU KALI TIAP BULAN ATAU SESUAI KEBUTUHAN (TAHUN 2011 SUDAH
TERLAKSANA 10 JANUARI 2011)
• LOKASI
– SELURUH PENYULANG
• VOLUME
– 23 PENYULANG (230 PERSONIL RABAS-RABAS TAMBAHAN)
• RENCANA KEDEPAN
– PELAKSANAAN TERUS DILAKSANAKAN UNTUK MENJAGA PENYULANG
BERSIH
• KEGIATAN
– KEGIATAN JUMAT SEHAT DENGAN MENGERAHKAN SEMUA PEGAWAI PLN APJ
SITUBONDO UNTUK MELAKUKAN INSPEKSI PENYULANG
• PELAKSANAAN
– SATU BULAN SEKALI ATAU SESUAI KEBUTUHAN (TAHUN 2011 TELAH
TERLAKSANA 7 JANUARI 2011)
• LOKASI
– SELURUH PENYULANG
• VOLUME
– 23 PENYULANG
• RENCANA KEDEPAN
– PELAKSANAAN TERUS DILAKSANAKAN UNTUK MENJAGA PENYULANG
BERSIH
• KEGIATAN
– SOSIALISASI DAN PENDEKATAN KEPADA PELANGGAN YANG POHONNYA
SULIT UNTUK DILAKUKAN PERABASAN.
• PELAKSANAAN
– SESUAI KEBUTUHAN
• LOKASI
– SELURUH PENYULANG
• VOLUME
– 23 PENYULANG
• RENCANA KEDEPAN
– PELAKSANAAN TERUS DILAKSANAKAN UNTUK MENJAGA PENYULANG
BERSIH