A. PEKERJAAN PERSIAPAN 1 2 3 4 5 6 7 8
100.00
1 Pembersihan Lahan 24.00 m2 16,775 402,600 0.162523934 0.0203154917 0.0203154917 0.0203154917 0.0203154917 0.0203154917 0.0203154917 0.0203154917 0.0203154917 0.0203154917
2 Pagar Kawasan Pagar Sementara dari Seng Gelombang Tinggi 2 m 28.00 m' 646,694 18,107,432 7.309714558 0.91371432 0.91371432 0.91371432 0.91371432 0.91371432 0.91371432 0.91371432 0.91371432 0.91371432
3 Bowplank 20.00 m' 157,794 3,155,880 1.273984184 0.636992092 0.6369920920 0.6369920920
4 Gudang Gudang Bahan dan Peralatan 6.00 m2 1,476,062 8,856,372 3.575192293 0.446899037 0.446899037 0.446899037 0.446899037 0.446899037 0.446899037 0.446899037 0.446899037 0.446899037
5 Air Kerja 12.00 bln 300,000 3,600,000 1.453269155 0.1816586444 0.1816586444 0.1816586444 0.1816586444 0.1816586444 0.1816586444 0.1816586444 0.1816586444 0.1816586444
6 Listrik kerja 12.00 bln 300,000 3,600,000 1.453269155 0.1816586444 0.1816586444 0.1816586444 0.1816586444 0.1816586444 0.1816586444 0.1816586444 0.1816586444 0.1816586444
sub total 37,722,284
B. BANGUNAN INDUK 0 DURASI
I PEKERJAAN GALIAN 0 1 minggu
1 Galian Pondasi Menerus Menggali Tanah Biasa Sedalam 1 m 13.54 m3 75,762 1,025,817 0.414108029 0.414108029 0.414108029
2 Urugan Tanah Kembali 7.58 m3 18,425 139,662 0.056379375 0.056379375 0.056379375
sub total 1,165,479
II PEKERJAAN PONDASI 0 2 minggu
1 Aanstamping 1.42 m3 646,156 917,542 0.370398553 0.185199276 0.185199276 0.185199276
2 Lantai Kerja Beton Mutu f'c=24,0 Mpa (K275) 0.47 m3 1,229,996 578,098 0.233370046 0.116685023 0.116685023 0.116685023
3 Pondasi Batu Kali Pondasi Batu Belah 1SP : 5 PP 4.06 m3 1,073,374 4,357,898 1.759222051 0.879611026 0.879611026 0.879611026
sub total 5,853,538
III PEKERJAAN STRUKTUR 0 3 minggu
80.00
1 Sloof Sloof beton ukuran 15x30 cm (ukuran finish), besi 0.90 m' 5,250,000 4,725,000 1.907415766 0.635805255 0.635805255 0.635805255 0.635805255
6 dia 12mm SNI, begel dia 6mm SNI -150mm
Kolom Praktis Lantai Dasar kolom 15 x 15 cm, besi 4 x dia 8 mm SNI, begel dia 1.58 m' 125,000 197,500 0.079727961 0.026575987 0.026575987 0.026575987 0.026575987
6mm SNI -150mm
2 Balok Induk Balok beton ukuran 15x30 cm (ukuran finish), 1.08 m3 5,250,000 5,670,000 2.28889892 0.762966307 0.762966307 0.762966307 0.762966307
besi 8 dia 12mm SNI, begel dia 6mm SNI -150mm
3 Balok Lateui balok 15 x 15cm, besi 4 x 10mm SNI, begel dia 0.72 m3 4,000,000 2,880,000 1.162615324 0.387538441 0.387538441 0.387538441 0.387538441
3.5 Ring Balok atas 6mm
BalokSNI -150mm
beton ukuran 15x20 cm (ukuran finish), 1.26 m3 4,000,000 5,040,000 2.034576818 0.678192273 0.678192273 0.678192273 0.678192273
4.1 Topi-topi beton, sirip beton, dan Dak Atap besi 4 dia 10cm,
Dak beton 12mmpembesian
SNI, begel dia 6mmdiaSNI8 mm
1 lapis -150mm
SNI 5.12 m3 4,000,000 20,480,000 8.267486751 2.755828917 2.755828917 2.755828917 2.755828917
(dak beton 10 cm) + talang beton jarak 20cm sub total 38,992,500
IV PEKERJAAN DINDING 0 2 minggu
1 Dinding Bata Ringan Bata Ringan Citicon 60x10x20 cm 216.00 m2 69,720 15,059,520 6.079315531 3.039657765 3.039657765 3.039657765
sub total 15,059,520
V PEKERJAAN ATAP & PLAFOND 0 1 minggu
1 Rangka Plafond Hollo Galvanis 4x4 cm 141.00 m2 45,000 6,345,000 2.561386886 2.561386886 2.561386886
2 Plafond Gypsumboard 9 mm Knauff 141.00 m2 45,000 6,345,000 2.561386886 2.561386886 2.561386886
3 List Plafond Tali Air 28.00 m' 20,000 560,000 0.226064091 60.000.226064091 0.226064091
sub total 13,250,000
VI PEKERJAAN PASANGAN & KERAMIK 0 2 minggu
1 Plesteran 769.12 m2 45,000 34,610,400 13.97172966 6.98586483 6.98586483 6.98586483
2 Acian 764.56 m2 26,500 20,260,840 8.179014954 4.089507477 4.089507477 4.089507477
3 Finishing sudut 43.00 m' 20,000 860,000 0.347169854 0.173584927 0.173584927 0.173584927
4 Pasangan Keramik Lantai Platinum Sicillia 60x60 cm Grey Unpolished 138.50 m2 82,000 11,357,000 4.584660499 2.29233025 2.29233025 2.29233025
5 List Keramik Utama Sesuai Keramik Utama 7x60 cm 26.00 m' 30,000 780,000 0.314874984 0.157437492 0.157437492 0.157437492
6 Pasangan Keramik Lantai Toilet Platinum Sicillia 60x60 cm Grey Unpolished 2.50 m2 82,000 205,000 0.082755605 0.041377802 0.041377802 0.041377802
7 Pasangan Keramik Dinding Toilet Keramik Mozaik 25x60 cm Light Grey 3.32 m2 30,000 99,600 0.040207113 0.020103557 0.020103557 0.020103557
sub total 68,172,840
VII PEKERJAAN PINTU & JENDELA 0 2 minggu
1 Kusen Alumunium Alumunium Dacon 17.88 m' 100,000 1,788,000 0.721790347 0.360895174 0.360895174 0.360895174
2 Pintu Depan Utama Alumunium Alcomexindo 3.00 m' 90,000 270,000 0.108995187 0.054497593 0.054497593 0.054497593
3 Kaca Mati Kaca bening 5 mm 0.84 bh 150,000 126,000 0.05086442 0.02543221 0.02543221 0.02543221
4 Handle + Slot Tunggal Solid 6.00 bh 150,000 900,000 0.363317289 0.181658644 0.181658644 0.181658644
5 Kunci Tunggal Solid 6.00 bh 250,000 1,500,000 0.605528815 0.302764407 0.302764407 0.302764407
6 Engsel Pintu Solid 12.00 bh 50,000 600,000 0.242211526 0.121105763 0.121105763 0.121105763
sub total 5,184,000
VII PEKERJAAN ELEKTRIKAL 0 40.00 1 minggu
1 Instalasi Titik Lampu Prima / Eterna 5.00 ttk 125,000 625,000 0.252303673 0.252303673 0.252303673
2 Instalasi Stop Kontak Prima / Eterna 4.00 ttk 125,000 500,000 0.201842938 0.201842938 0.201842938
3 Instalasi Saklar Prima / Eterna 4.00 ttk 125,000 500,000 0.201842938 0.201842938 0.201842938
4 Lampu Down Light Phillip 3.00 ttk 85,000 255,000 0.102939899 0.102939899 0.102939899
5 Lampu Outbow Phillip 2.00 ttk 200,000 400,000 0.161474351 0.161474351 0.161474351