I PEK. PERSIAPAN
1 Pengukuran & pasang bowplang m1 132.90 18,760
Kayu 4/6 lokal m3 0.26 2,000,000 526,284
Kayu 4/6 lokal m3 0.35 2,000,000 701,712
Paku kg 2.66 17,500 46,515
Ongkos bowplang m1 132.90 9,170 1,218,693
2,493,204
JUMLAH I 2,493,204
II PEK. TANAH
1 Galian pondasi m3 217.60 52,125
Ongkos gali m3 217.60 52,125 11,342,400
11,342,400
JUMLAH II 41,817,331
CSP
RENCANA ANGGARAN PELAKSANAAN
PEMBANGUNAN RUMAH TINGGAL
CLASSIC PREMIUM 2 LANTAI; SINGOSARI
KABUPATEN MALANG
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT. VOL.
SATUAN
1 2 3 4 5 6
24,381,279
2 Aanstampang Batu Kali 20 cm m3 33.44 398,765
Batu belah 15/20 m3 35.11 237,500 8,339,100
Pasir pasang m3 16.45 240,000 3,948,595
Ongkos aanstampang m3 33.44 31,310 1,047,006
13,334,702
3 Pondasi Batu Kali 1Pc : 3Ds: 8Psr m3 83.60 530,644
Batu belah 15/20 m3 87.78 237,500 20,847,750
Pasir pasang m3 41.13 240,000 9,871,488
Dolosit sak 239.04 11,500 2,749,003
Pc sak 95.62 55,000 5,258,963
Ongkos pondasi m3 83.60 67,400 5,634,640
44,361,844
4 Sloof 20/40 m3 18.42 2,328,267
Pasir cor m3 14.17 312,500 4,429,434
Koral m3 17.63 375,000 6,610,478
Pc sak 119.50 55,000 6,572,486
Besi dia 13 Ulir) (tul. utama 0 bh) ljr - 115,000 -
Besi dia 12 SKS (A) (tul. utama 4 bh) ljr 28.00 82,000 2,296,000
Besi dia 10 SKS (A) (tul. utama 2 bh) ljr 47.00 50,000 2,350,000
Besi dia 8 SKS (A) (tul. utama 0 bh) ljr - 43,000 -
Besi dia 6 (jarak 150) ljr 139.00 21,000 2,919,000
Kawat bendrat kg 13.05 17,500 228,438
Paku kg 7.00 17,500 122,573
Papan Randu 20x250x2cm ljr 406.00 8,000 3,248,000
Kayu 4/6 lokal m3 0.61 2,000,000 1,218,888
Ongkos pembesian m1 230.25 16,293 3,751,540
Ongkos begisting m1 230.25 13,558 3,121,614
Ongkos cor m1 230.25 26,138 6,018,223
42,886,675
5 Kolom beton bertulang 40/40 lantai 1 m3 6.40 3,336,820
Pasir cor m3 4.92 312,500 1,539,000
Koral m3 6.12 375,000 2,296,800
Pc sak 41.52 55,000 2,283,600
Besi dia 13 Ulir) (tul. utama 0 bh) ljr - 115,000 -
Besi dia 12 SKS (A) (tul. utama 4 bh) ljr 32.00 82,000 2,624,000
Besi dia 10 SKS (A) (tul. utama 4 bh) ljr 16.00 50,000 800,000
Besi dia 8 SKS (A) (tul. utama 0 bh) ljr - 43,000 -
Besi dia 6 (jarak 150) ljr 35.00 21,000 735,000
Kawat bendrat kg 7.03 17,500 122,960
Paku kg 1.00 17,500 17,500
Pas. Begisting beton Jadi m1 40.00 175,000 7,000,000
Kayu 4/6 lokal m3 - 2,000,000 -
Ongkos pembesian m1 40.00 32,587 1,303,467
Ongkos begisting m1 40.00 13,558 542,300
Ongkos cor m1 40.00 52,276 2,091,022
21,355,649
6 Kolom beton bertulang 15/40 lantai 1 m3 19.32 3,209,999
Pasir cor m3 14.87 312,500 4,645,856
Koral m3 18.49 375,000 6,933,465
Pc sak 125.34 55,000 6,893,618
Besi dia 13 Ulir) (tul. utama 0 bh) ljr - 115,000 -
Besi dia 12 SKS (A) (tul. utama 4 bh) ljr 194.00 82,000 15,908,000
Besi dia 10 SKS (A) (tul. utama 4 bh) ljr 129.00 50,000 6,450,000
Besi dia 8 SKS (A) (tul. utama 0 bh) ljr - 43,000 -
Besi dia 6 (jarak 150) ljr 194.00 21,000 4,074,000
Kawat bendrat kg 45.19 17,500 790,792
CSP
RENCANA ANGGARAN PELAKSANAAN
PEMBANGUNAN RUMAH TINGGAL
CLASSIC PREMIUM 2 LANTAI; SINGOSARI
KABUPATEN MALANG
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT. VOL.
SATUAN
1 2 3 4 5 6
Paku kg 3.04 17,500 53,278
Papan Randu 20x250x2cm (sebagian pakai bekas 50 %) ljr 65.00 8,000 520,000
Kayu 4/6 lokal m3 0.57 2,000,000 1,135,552
Ongkos pembesian m1 322.00 12,220 3,934,840
Ongkos begisting m1 322.00 13,558 4,365,515
Ongkos cor m1 322.00 19,603 6,312,273
62,017,189
7 Kolom beton bertulang 15/20 lantai 1 m3 0.96 3,330,424
Pasir cor m3 0.74 312,500 230,850
Koral m3 0.92 375,000 344,520
Pc sak 6.23 55,000 342,540
Besi dia 13 Ulir) (tul. utama 0 bh) ljr - 115,000 -
Besi dia 12 SKS (A) (tul. utama 4 bh) ljr 13.00 82,000 1,066,000
Besi dia 10 SKS (A) (tul. utama 4 bh) ljr - 50,000 -
Besi dia 8 SKS (A) (tul. utama 0 bh) ljr - 43,000 -
Besi dia 6 (jarak 150) ljr 13.00 21,000 273,000
Kawat bendrat kg 2.16 17,500 37,879
Paku kg 0.32 17,500 5,573
Papan Randu 20x250x2cm (sebagian pakai bekas 50 %) ljr 7.00 8,000 56,000
Kayu 4/6 lokal m3 0.06 2,000,000 114,752
Ongkos pembesian m1 32.00 6,110 195,520
Ongkos begisting m1 32.00 6,779 216,920
Ongkos cor m1 32.00 9,802 313,653
3,197,207
8 Kolom beton bertulang 15/15 lantai 1 m3 2.25 3,510,727
Pasir cor m3 1.73 312,500 541,055
Koral m3 2.15 375,000 807,469
Pc sak 14.60 55,000 802,828
Besi dia 13 Ulir) (tul. utama 0 bh) ljr - 115,000 -
Besi dia 12 SKS (A) (tul. utama 0 bh) ljr - 82,000 -
Besi dia 10 SKS (A) (tul. utama 4 bh) ljr 40.00 50,000 2,000,000
Besi dia 8 SKS (A) (tul. utama 0 bh) ljr - 43,000 -
Besi dia 6 (jarak 150) ljr 34.00 21,000 714,000
Kawat bendrat kg 5.13 17,500 89,744
Paku kg 2.00 17,500 35,000
Papan Randu 20x250x2cm (sebagian pakai bekas 50 %) ljr 80.00 8,000 640,000
Kayu 4/6 lokal m3 - 2,000,000 -
Ongkos pembesian m1 100.00 6,110 611,000
Ongkos begisting m1 100.00 6,779 677,875
Ongkos cor m1 100.00 9,802 980,167
7,899,137
9 Balok 15/50 lantai 1 m3 0.90 3,540,193
Pasir cor m3 0.69 312,500 216,422
Koral m3 0.86 375,000 322,988
Pc sak 5.84 55,000 321,131
Besi dia 13 Ulir) (tul. utama 6 bh) ljr 8.00 115,000 920,000
Besi dia 12 SKS (A) (tul. utama 0 bh) ljr - 82,000 -
Besi dia 10 SKS (A) (tul. utama 2 bh) ljr 5.00 50,000 250,000
Besi dia 8 SKS (A) (tul. utama 0 bh) ljr - 43,000 -
Besi dia 6 (jarak 150) ljr 10.00 21,000 210,000
Kawat bendrat kg 2.03 17,500 35,548
Paku kg 1.12 17,500 19,628
Papan Randu 20x250x2cm ljr 27.00 8,000 216,000
Kayu 4/6 lokal m3 0.02 2,000,000 33,264
Ongkos pembesian m1 11.25 15,275 171,844
Ongkos begisting m1 11.25 13,558 152,522
CSP
RENCANA ANGGARAN PELAKSANAAN
PEMBANGUNAN RUMAH TINGGAL
CLASSIC PREMIUM 2 LANTAI; SINGOSARI
KABUPATEN MALANG
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT. VOL.
SATUAN
1 2 3 4 5 6
Ongkos cor m1 11.25 28,163 316,828
3,186,174
10 Balok 15/40 lantai 1 m3 13.11 3,300,868
Pasir cor m3 10.09 312,500 3,152,545
Koral m3 12.55 375,000 4,704,851
Pc sak 85.05 55,000 4,677,812
Besi dia 13 Ulir) (tul. utama 6 bh) ljr 88.00 115,000 10,120,000
Besi dia 12 SKS (A) (tul. utama 0 bh) ljr - 82,000 -
Besi dia 10 SKS (A) (tul. utama 2 bh) ljr 88.00 50,000 4,400,000
Besi dia 8 SKS (A) (tul. utama 0 bh) ljr - 43,000 -
Besi dia 6 (jarak 150) ljr 146.00 21,000 3,066,000
Kawat bendrat kg 26.84 17,500 469,697
Paku kg 19.92 17,500 348,653
Papan Randu 20x250x2cm ljr 480.00 8,000 3,840,000
Kayu 4/6 lokal m3 0.29 2,000,000 578,424
Ongkos pembesian m1 163.88 12,220 2,002,553
Ongkos begisting m1 163.88 13,558 2,221,735
Ongkos cor m1 163.88 22,530 3,692,104
43,274,374
11 Balok 15/25 lantai 1 m3 1.44 3,368,967
Pasir cor m3 1.11 312,500 347,177
Koral m3 1.38 375,000 518,126
Pc sak 9.37 55,000 515,148
Besi dia 13 Ulir) (tul. utama 0 bh) ljr - 115,000 -
Besi dia 12 SKS (A) (tul. utama 4 bh) ljr 16.00 82,000 1,312,000
Besi dia 10 SKS (A) (tul. utama 2 bh) ljr - 50,000 -
Besi dia 8 SKS (A) (tul. utama 0 bh) ljr - 43,000 -
Besi dia 6 (jarak 150) ljr 21.00 21,000 441,000
Kawat bendrat kg 2.83 17,500 49,534
Paku kg 2.17 17,500 37,958
Papan Randu 20x250x2cm ljr 51.00 8,000 408,000
Kayu 4/6 lokal m3 0.05 2,000,000 103,224
Ongkos pembesian m1 32.08 7,638 245,036
Ongkos begisting m1 32.08 13,558 434,970
Ongkos cor m1 32.08 14,081 451,773
4,863,946
12 Plisir 10/70 lantai 1 m3 3.85 3,457,257
Pasir cor m3 2.96 312,500 925,805
Koral m3 3.68 375,000 1,381,669
Pc sak 24.98 55,000 1,373,728
Besi dia 13 Ulir) (tul. utama 0 bh) ljr - 115,000 -
Besi dia 12 SKS (A) (tul. utama 4 bh) ljr - 82,000 -
Besi dia 10 SKS (A) (tul. utama 2 bh) ljr - 50,000 -
Besi dia 8 SKS (A) (tul. utama 0 bh) ljr 70.00 43,000 3,010,000
Besi dia 6 (jarak 150) ljr - 21,000 -
Kawat bendrat kg 4.66 17,500 81,585
Paku kg 6.21 17,500 108,622
Papan Randu 20x250x2cm ljr 146.00 8,000 1,168,000
Kayu 4/6 lokal m3 0.15 2,000,000 293,568
Ongkos pembesian m1 55.00 27,115 1,491,325
Ongkos begisting m1 55.00 40,673 2,236,988
Ongkos cor m1 55.00 22,530 1,239,150
13,310,439
13 Balok latai / level 15/20 lantai 1 m3 1.69 3,238,306
Pasir cor m3 1.30 312,500 405,791
Koral m3 1.61 375,000 605,602
Pc sak 10.95 55,000 602,121
CSP
RENCANA ANGGARAN PELAKSANAAN
PEMBANGUNAN RUMAH TINGGAL
CLASSIC PREMIUM 2 LANTAI; SINGOSARI
KABUPATEN MALANG
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT. VOL.
SATUAN
1 2 3 4 5 6
Besi dia 13 Ulir) (tul. utama 0 bh) ljr - 115,000 -
Besi dia 12 SKS (A) (tul. utama 4 bh) ljr - 82,000 -
Besi dia 10 SKS (A) (tul. utama 0 bh) ljr 23.00 50,000 1,150,000
Besi dia 8 SKS (A) (tul. utama 0 bh) ljr - 43,000 -
Besi dia 6 (jarak 150) ljr 23.00 21,000 483,000
Kawat bendrat kg 3.06 17,500 53,613
Paku kg 3.19 17,500 55,783
Papan Randu 20x250x2cm ljr 75.00 8,000 600,000
Kayu 4/6 lokal m3 0.08 2,000,000 150,084
Ongkos pembesian m1 56.25 6,110 343,688
Ongkos begisting m1 56.25 6,779 381,305
Ongkos cor m1 56.25 11,265 633,656
5,464,642
14 Plat lantai beton bertulang 12 cm (lantai 1) m3 33.18 3,335,313
Pasir cor m3 28.09 312,500 8,776,628
Koral m3 34.93 375,000 13,098,220
Pc sak 236.78 55,000 13,022,943
Besi dia 13 Ulir) (tul. utama 0 bh) ljr - 115,000 -
Besi dia 12 SKS (A) (tul. utama 0 bh) ljr - 82,000 -
Besi dia 10 SKS (A) (tul. utama 0 bh) ljr - 50,000 -
Besi dia 8 SKS (A) (tul. utama) ljr 490.00 43,000 21,070,000
Besi dia 6 (jarak 150) ljr - 21,000 -
Kawat bendrat kg 32.63 17,500 571,095
Paku kg 31.13 17,500 544,782
Papan Randu 20x300x2cm ljr 609.00 8,000 4,872,000
Kayu 4/6 lokal m3 2.71 2,000,000 5,416,320
Perancah bambu (3.5 m) ljr 1,056.00 15,000 15,840,000
Ongkos pembesian m2 276.50 27,115 7,497,298
Ongkos begisting m2 276.50 27,115 7,497,298
Ongkos cor m2 276.50 45,060 12,459,090
110,665,673
15 Plat tangga beton bertulang 12 cm (lantai 1) m3 4.98 3,251,614
Pasir cor m3 4.22 312,500 1,317,685
Koral m3 5.24 375,000 1,966,509
Pc sak 35.55 55,000 1,955,208
Besi dia 13 Ulir) (tul. utama 0 bh) ljr - 115,000 -
Besi dia 12 SKS (A) (tul. utama ) ljr 21.00 82,000 1,722,000
Besi dia 10 SKS (A) (tul. utama 0 bh) ljr - 50,000 -
Besi dia 8 SKS (A) (tul. pembagi) ljr 28.00 43,000 1,204,000
Besi dia 6 (jarak 150) ljr - 21,000 -
Kawat bendrat kg 4.66 17,500 81,585
Paku kg 4.98 17,500 87,150
Papan Randu 20x300x2cm ljr 93.00 8,000 744,000
Kayu 4/6 lokal m3 0.50 2,000,000 1,008,000
Asbes datar lbr 22.00 70,000 1,540,000
Perancah bambu (3.5 m) ljr 30.00 15,000 450,000
Ongkos pembesian m2 41.51 27,115 1,125,611
Ongkos begisting m2 41.51 27,115 1,125,611
Ongkos cor m2 41.51 45,060 1,870,553
16,197,913
16 Plat level beton bertulang 10 cm (lantai 1) m3 0.48 4,003,181
Pasir cor m3 0.41 312,500 126,968
Koral m3 0.51 375,000 189,486
Pc sak 3.43 55,000 188,397
Besi dia 13 Ulir) (tul. utama 0 bh) ljr - 115,000 -
Besi dia 12 SKS (A) (tul. utama 0 bh) ljr - 82,000 -
Besi dia 10 SKS (A) (tul. utama 0 bh) ljr - 50,000 -
CSP
RENCANA ANGGARAN PELAKSANAAN
PEMBANGUNAN RUMAH TINGGAL
CLASSIC PREMIUM 2 LANTAI; SINGOSARI
KABUPATEN MALANG
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT. VOL.
SATUAN
1 2 3 4 5 6
Besi dia 8 (A) (tul. utama) ljr 10.00 43,000 430,000
Besi dia 6 (jarak 150) ljr - 21,000 -
Kawat bendrat kg 0.67 17,500 11,655
Paku kg 0.60 17,500 10,541
Papan Randu 20x300x2cm ljr 11.00 8,000 88,000
Kayu 4/6 lokal m3 0.06 2,000,000 129,888
Asbes datar lbr 3.00 70,000 210,000
Perancah bambu (3.5 m) ljr 4.00 15,000 60,000
Ongkos pembesian m2 4.80 27,115 130,152
Ongkos begisting m2 4.80 27,115 130,152
Ongkos cor m2 4.80 45,060 216,288
1,921,527
17 Kolom beton bertulang 15/40 lantai 2 m3 15.12 3,371,368
Pasir cor m3 11.63 312,500 3,635,888
Koral m3 14.47 375,000 5,426,190
Pc sak 98.09 55,000 5,395,005
Besi dia 13 Ulir) (tul. utama 0 bh) ljr - 115,000 -
Besi dia 12 SKS (A) (tul. utama 4 bh) ljr 152.00 82,000 12,464,000
Besi dia 10 SKS (A) (tul. utama 4 bh) ljr 101.00 50,000 5,050,000
Besi dia 8 SKS (A) (tul. utama 0 bh) ljr - 43,000 -
Besi dia 6 (jarak 150) ljr 152.00 21,000 3,192,000
Kawat bendrat kg 35.40 17,500 619,463
Paku kg 6.16 17,500 107,825
Papan Randu 20x250x2cm (sebagian pakai bekas 50 %) ljr 202.00 8,000 1,616,000
Kayu 4/6 lokal m3 0.44 2,000,000 889,152
Ongkos pembesian m1 252.00 13,442 3,387,384
Ongkos begisting m1 252.00 14,913 3,758,139
Ongkos cor m1 252.00 21,564 5,434,044
50,975,090
18 Kolom beton bertulang 15/15 lantai 2 m3 2.98 3,512,981
Pasir cor m3 2.29 312,500 716,356
Koral m3 2.85 375,000 1,069,089
Pc sak 19.33 55,000 1,062,944
Besi dia 13 Ulir) (tul. utama 0 bh) ljr - 115,000 -
Besi dia 12 SKS (A) (tul. utama 0 bh) ljr - 82,000 -
Besi dia 10 SKS (A) (tul. utama 4 bh) ljr 53.00 50,000 2,650,000
Besi dia 8 SKS (A) (tul. utama 0 bh) ljr - 43,000 -
Besi dia 6 (jarak 150) ljr 52.00 21,000 1,092,000
Kawat bendrat kg 7.03 17,500 122,960
Paku kg 1.33 17,500 23,188
Papan Randu 20x250x2cm (sebagian pakai bekas 50 %) ljr 53.00 8,000 424,000
Kayu 4/6 lokal m3 - 2,000,000 -
Ongkos pembesian m1 132.40 6,721 889,860
Ongkos begisting m1 132.40 7,457 987,257
Ongkos cor m1 132.40 10,782 1,427,515
10,465,170
19 Balok induk 15/40 atap lantai 2 m3 9.54 3,674,234
Pasir cor m3 7.34 312,500 2,294,072
Koral m3 9.13 375,000 3,423,668
Pc sak 61.89 55,000 3,403,991
Besi dia 13 Ulir) (tul. utama 6 bh) ljr 96.00 115,000 11,040,000
Besi dia 12 SKS (A) (tul. utama 0 bh) ljr - 82,000 -
Besi dia 10 SKS (A) (tul. utama 2 bh) ljr 32.00 50,000 1,600,000
Besi dia 8 SKS (A) (tul. utama 0 bh) ljr - 43,000 -
Besi dia 6 (jarak 150) ljr 107.00 21,000 2,247,000
Kawat bendrat kg 21.15 17,500 370,046
Paku kg 15.58 17,500 272,651
CSP
RENCANA ANGGARAN PELAKSANAAN
PEMBANGUNAN RUMAH TINGGAL
CLASSIC PREMIUM 2 LANTAI; SINGOSARI
KABUPATEN MALANG
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT. VOL.
SATUAN
1 2 3 4 5 6
Papan Randu 20x250x2cm ljr 350.00 8,000 2,800,000
Kayu 4/6 lokal m3 0.63 2,000,000 1,264,032
Ongkos pembesian m1 119.25 13,442 1,602,959
Ongkos begisting m1 119.25 14,913 1,778,405
Ongkos cor m1 119.25 24,783 2,955,373
35,052,196
20 Plisir 10/70 atap lantai 2 m3 3.60 3,826,345
Pasir cor m3 2.77 312,500 865,207
Koral m3 3.44 375,000 1,291,232
Pc sak 23.34 55,000 1,283,811
Besi dia 13 Ulir) (tul. utama 6 bh) ljr - 115,000 -
Besi dia 12 SKS (A) (tul. utama 0 bh) ljr - 82,000 -
Besi dia 10 SKS (A) (tul. utama 2 bh) ljr - 50,000 -
Besi dia 8 SKS (A) (tul. utama 0 bh) ljr 66.00 43,000 2,838,000
Besi dia 6 (jarak 150) ljr - 21,000 -
Kawat bendrat kg 4.40 17,500 76,923
Paku kg 6.81 17,500 119,224
Papan Randu 20x250x2cm ljr 136.00 8,000 1,088,000
Kayu 4/6 lokal m3 0.55 2,000,000 1,098,240
Ongkos pembesian m1 51.40 29,827 1,533,082
Ongkos begisting m1 51.40 44,740 2,299,623
Ongkos cor m1 51.40 24,783 1,273,846
13,767,189
21 Balok latai / level 15/20 lantai 2 m3 1.69 3,318,819
Pasir cor m3 1.30 312,500 405,791
Koral m3 1.61 375,000 605,602
Pc sak 10.95 55,000 602,121
Besi dia 13 Ulir) (tul. utama 0 bh) ljr - 115,000 -
Besi dia 12 SKS (A) (tul. utama 4 bh) ljr - 82,000 -
Besi dia 10 SKS (A) (tul. utama 0 bh) ljr 23.00 50,000 1,150,000
Besi dia 8 SKS (A) (tul. utama 0 bh) ljr - 43,000 -
Besi dia 6 (jarak 150) ljr 23.00 21,000 483,000
Kawat bendrat kg 3.06 17,500 53,613
Paku kg 3.19 17,500 55,783
Papan Randu 20x250x2cm ljr 75.00 8,000 600,000
Kayu 4/6 lokal m3 0.08 2,000,000 150,084
Ongkos pembesian m1 56.25 6,721 378,056
Ongkos begisting m1 56.25 7,457 419,435
Ongkos cor m1 56.25 12,392 697,022
5,600,507
22 Plat atap beton bertulang 10 cm m3 14.64 3,832,550
Pasir cor m3 12.39 312,500 3,872,509
Koral m3 15.41 375,000 5,779,323
Pc sak 104.47 55,000 5,746,109
Besi dia 13 Ulir) (tul. utama 0 bh) ljr - 115,000 -
Besi dia 12 SKS (A) (tul. utama 0 bh) ljr - 82,000 -
Besi dia 10 SKS (A) (tul. utama 0 bh) ljr - 50,000 -
Besi dia 8 SKS (A) (tul. utama) ljr 277.00 43,000 11,911,000
Besi dia 6 (jarak 150) ljr - 21,000 -
Kawat bendrat kg 18.45 17,500 322,844
Paku kg 18.82 17,500 329,280
Papan Randu 20x300x2cm ljr 375.00 8,000 3,000,000
Kayu 4/6 lokal m3 1.53 2,000,000 3,052,800
Perancah bambu (3.5 m) ljr 407.00 15,000 6,105,000
Ongkos pembesian m2 146.40 29,827 4,366,600
Ongkos begisting m2 146.40 29,827 4,366,600
CSP
RENCANA ANGGARAN PELAKSANAAN
PEMBANGUNAN RUMAH TINGGAL
CLASSIC PREMIUM 2 LANTAI; SINGOSARI
KABUPATEN MALANG
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT. VOL.
SATUAN
1 2 3 4 5 6
Ongkos cor m2 146.40 49,566 7,256,462
56,108,525
23 Plat atap/tandon beton bertulang 12 cm m3 5.76 3,303,286
Pasir cor m3 4.88 312,500 1,523,610
Koral m3 6.06 375,000 2,273,832
Pc sak 41.10 55,000 2,260,764
Besi dia 13 Ulir) (tul. utama 0 bh) ljr - 115,000 -
Besi dia 12 SKS (A) (tul. utama 0 bh) ljr - 82,000 -
Besi dia 10 SKS (A) (tul. utama 0 bh) ljr - 50,000 -
Besi dia 8 SKS (A) (tul. utama) ljr 89.00 43,000 3,827,000
Besi dia 6 (jarak 150) ljr - 21,000 -
Kawat bendrat kg 5.93 17,500 103,730
Paku kg 5.30 17,500 92,680
Papan Randu 20x300x2cm ljr 106.00 8,000 848,000
Kayu 4/6 lokal m3 0.42 2,000,000 844,800
Perancah bambu (3.5 m) ljr 134.00 15,000 2,010,000
Ongkos pembesian m2 48.00 29,827 1,431,672
Ongkos begisting m2 48.00 29,827 1,431,672
Ongkos cor m2 48.00 49,566 2,379,168
19,026,928
24 Plat level beton bertulang 10 cm (lantai 2) m3 1.20 4,090,109
Pasir cor m3 1.02 312,500 317,419
Koral m3 1.26 375,000 473,715
Pc sak 8.56 55,000 470,993
Besi dia 13 Ulir) (tul. utama 0 bh) ljr - 115,000 -
Besi dia 12 SKS (A) (tul. utama 0 bh) ljr - 82,000 -
Besi dia 10 SKS (A) (tul. utama 0 bh) ljr - 50,000 -
Besi dia 8 (A) (tul. utama) ljr 24.00 43,000 1,032,000
Besi dia 6 (jarak 150) ljr - 21,000 -
Kawat bendrat kg 1.60 17,500 27,972
Paku kg 1.30 17,500 22,764
Papan Randu 20x300x2cm ljr 27.00 8,000 216,000
Kayu 4/6 lokal m3 0.09 2,000,000 176,640
Kalsiboard lbr 5.00 70,000 350,000
Perancah bambu (3.5 m) ljr 34.00 15,000 510,000
Ongkos pembesian m2 12.00 29,827 357,918
Ongkos begisting m2 12.00 29,827 357,918
Ongkos cor m2 12.00 49,566 594,792
4,908,130
25 Ring balok 15/20 m3 5.83 2,951,993
Pasir cor m3 4.48 312,500 1,400,971
Koral m3 5.58 375,000 2,090,806
Pc sak 37.80 55,000 2,078,790
Besi dia 13 Ulir) (tul. utama 0 bh) ljr - 115,000 -
Besi dia 12 SKS (A) (tul. utama 0 bh) ljr - 82,000 -
Besi dia 10 SKS (A) (tul. utama 4 bh) ljr 78.00 50,000 3,900,000
Besi dia 8 SKS (A) (tul. utama 0 bh) ljr - 43,000 -
Besi dia 6 (jarak 150) ljr 78.00 21,000 1,638,000
Kawat bendrat kg 10.39 17,500 181,818
Paku kg 3.44 17,500 60,200
Papan Randu 20x250x2cm ljr 86.00 8,000 688,000
Kayu 4/6 lokal m3 - 2,000,000 -
Ongkos pembesian m1 194.20 6,721 1,305,218
Ongkos begisting m1 194.20 7,457 1,448,077
Ongkos cor m1 194.20 12,392 2,406,429
17,198,308
CSP
RENCANA ANGGARAN PELAKSANAAN
PEMBANGUNAN RUMAH TINGGAL
CLASSIC PREMIUM 2 LANTAI; SINGOSARI
KABUPATEN MALANG
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT. VOL.
SATUAN
1 2 3 4 5 6
IV PEKERJAAN DINDING
1 Pas. Bata ringan lantai 1 m2 782.33 124,139
Pasir pasang m3 3.91 240,000 938,790
Bata ringan (HB) bh 7,040.93 9,500 66,888,788
PC Mortar sak 88.01 80,000 7,040,925
Ongkos pasang m2 782.33 28,439 22,248,443
97,116,945
2 Pas. Bata ringan lantai 2 m2 786.60 126,983
Pasir pasang m3 3.93 240,000 943,920
Bata ringan (HB) bh 7,079.40 9,500 67,254,300
PC Mortar sak 88.49 80,000 7,079,400
Ongkos pasang m2 786.60 31,283 24,607,021
99,884,641
3 Pas. Bata ringan atas atap beton m2 193.50 130,111
Pasir pasang m3 0.97 240,000 232,200
Bata ringan (HB) bh 1,741.50 9,500 16,544,250
PC Mortar sak 21.77 80,000 1,741,500
Ongkos pasang m2 193.50 34,411 6,658,536
25,176,486
3 Plesteran Dinding Lantai 1 m2 1,564.65 23,961
Pasir pasang m3 39.12 240,000 9,387,900
Dolosit sak 89.97 11,500 1,034,625
PC sak 35.99 55,000 1,979,282
Ongkos plester m2 1,564.65 16,035 25,089,163
37,490,970
4 Plesteran Dinding Lantai 2 m2 1,960.20 27,168
Pasir pasang m3 49.01 240,000 11,761,200
Dolosit sak 112.71 11,500 1,296,182
PC sak 45.08 55,000 2,479,653
Ongkos plester m2 1,960.20 19,242 37,718,168
53,255,204
5 Acian Dinding / Beton lantai 1 m2 1,564.65 10,548
PC sak 71.97 55,000 3,958,565
Ongkos acian m2 1,564.65 8,018 12,544,581
16,503,146
6 Acian Dinding / Beton lantai 2 m2 1,960.20 12,151
PC sak 90.17 55,000 4,959,306
Ongkos acian m2 1,960.20 9,621 18,859,084
23,818,390
7 Benangan Dinding / Beton lantai 1 m1 1,830.00 13,180
PC sak 42.09 55,000 2,314,950
Ongkos benangan m1 1,830.00 11,915 21,803,535
24,118,485
8 Benangan Dinding / Beton lantai 2 m1 2,252.80 15,562
PC sak 51.81 55,000 2,849,792
Ongkos benangan m1 2,252.80 14,297 32,209,183
35,058,975
JUMLAH IV 412,423,242
CSP
RENCANA ANGGARAN PELAKSANAAN
PEMBANGUNAN RUMAH TINGGAL
CLASSIC PREMIUM 2 LANTAI; SINGOSARI
KABUPATEN MALANG
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT. VOL.
SATUAN
1 2 3 4 5 6
Ongkos urug m3 38.00 18,135 689,130
10,721,130
2 Rabat plester bawah lantai m2 380.00 53,746
Pasir pasang m3 41.80 240,000 10,032,000
Dolosit sak 54.63 11,500 628,188
PC sak 21.85 55,000 1,201,750
Ongkos rabat m2 380.00 22,530 8,561,400
20,423,338
3 Lantai Granit 60x60 Ruangan lantai 1 m2 208.80 434,751
Granit lantai m2 261.00 275,000 71,775,000
Pasir pasang m3 8.77 240,000 2,104,704
PC sak 29.70 55,000 1,633,599
Dolosid sak 74.25 11,500 853,927
Semen Nat kg 31.32 7,500 234,900
Ongkos Granit lantai m2 208.80 67,883 14,173,866
90,775,996
4 Lantai Marmer Pola R.Tamu & Keluarga lantai 1 m2 116.00 542,077
Marmer lantai m2 145.00 350,000 50,750,000
Pasir pasang m3 4.87 240,000 1,169,280
PC sak 16.50 55,000 907,555
Dolosid sak 41.25 11,500 474,404
Semen Nat kg 17.40 7,500 130,500
Ongkos marmer lantai m2 116.00 81,459 9,449,244
62,880,983
5 Lantai Marmer Pola Teras lantai 1 m2 38.00 542,077
Marmer lantai m2 47.50 350,000 16,625,000
Pasir pasang m3 1.60 240,000 383,040
PC sak 5.41 55,000 297,303
Dolosid sak 13.51 11,500 155,408
Semen Nat kg 5.70 7,500 42,750
Ongkos marmer lantai m2 38.00 81,459 3,095,442
20,598,943
6 Lantai Keramik KM/WC lantai 1 m2 11.20 184,751
Keramik lantai m2 14.00 75,000 1,050,000
Pasir pasang m3 0.47 240,000 112,896
PC sak 1.59 55,000 87,626
Dolosid sak 3.98 11,500 45,805
Semen Nat kg 1.68 7,500 12,600
Ongkos keramik lantai m2 11.20 67,883 760,284
2,069,211
7 Lantai Granit 60x60 Ruangan lantai 2 m2 228.00 441,539
Granit lantai m2 285.00 275,000 78,375,000
Pasir pasang m3 9.58 240,000 2,298,240
PC sak 32.43 55,000 1,783,815
Dolosid sak 81.08 11,500 932,449
Semen Nat kg 34.20 7,500 256,500
Ongkos Granit lantai m2 228.00 74,671 17,024,931
100,670,935
8 Lantai Granit 60x60 Teras lantai 2 m2 36.00 441,539
Granit lantai m2 45.00 275,000 12,375,000
Pasir pasang m3 1.51 240,000 362,880
PC sak 5.12 55,000 281,655
Dolosid sak 12.80 11,500 147,229
Semen Nat kg 5.40 7,500 40,500
Ongkos Granit lantai m2 36.00 74,671 2,688,147
15,895,411
CSP
RENCANA ANGGARAN PELAKSANAAN
PEMBANGUNAN RUMAH TINGGAL
CLASSIC PREMIUM 2 LANTAI; SINGOSARI
KABUPATEN MALANG
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT. VOL.
SATUAN
1 2 3 4 5 6
9 Lantai Keramik KM/WC lantai 2 m2 8.50 191,539
Keramik lantai m2 10.63 75,000 796,875
Pasir pasang m3 0.36 240,000 85,680
PC sak 1.21 55,000 66,502
Dolosid sak 3.02 11,500 34,762
Semen Nat kg 1.28 7,500 9,563
Ongkos keramik lantai m2 8.50 74,671 634,701
1,628,083
10 Lantai Granit tangga m2 62.27 468,692
Granit lantai m2 77.84 275,000 21,404,883
Pasir pasang m3 2.62 240,000 627,669
PC sak 8.86 55,000 487,175
Dolosid sak 22.14 11,500 254,660
Semen Nat kg 9.34 7,500 70,052
Ongkos Granit tangga m2 62.27 101,824 6,340,438
29,184,877
11 Dinding Granit KM/WC Utama lantai 1 m2 133.00 410,690
Granit dinding m2 146.30 275,000 40,232,500
Pasir pasang m3 5.59 240,000 1,340,640
PC sak 37.84 55,000 2,081,118
Semen Nat kg 19.95 7,500 149,625
Ongkos Granit dinding m2 133.00 81,338 10,817,888
54,621,770
12 Dinding Granit KM/WC Luar lantai 1 m2 42.00 410,690
Granit dinding m2 46.20 275,000 12,705,000
Pasir pasang m3 1.76 240,000 423,360
PC sak 11.95 55,000 657,195
Semen Nat kg 6.30 7,500 47,250
Ongkos Granit dinding m2 42.00 81,338 3,416,175
17,248,980
13 Keramik dinding KM/WC Cuci lantai 1 m2 17.82 410,690
Keramik dinding m2 19.60 275,000 5,390,550
Pasir pasang m3 0.75 240,000 179,626
PC sak 5.07 55,000 278,838
Semen Nat kg 2.67 7,500 20,048
Ongkos keramik dinding m2 17.82 81,338 1,449,434
7,318,496
14 Plint lantai (lantai 1) & tangga m1 249.35 81,938
Plint Lantai m2 41.14 275,000 11,314,256
Pasir pasang m3 1.57 240,000 377,017
PC sak 10.64 55,000 585,256
Semen Nat kg 5.61 7,500 42,078
Ongkos plint m1 249.35 32,535 8,112,602
20,431,209
15 Plint lantai (lantai 2) m1 265.20 85,191
Plint Lantai m2 43.76 275,000 12,033,450
Pasir pasang m3 1.67 240,000 400,982
PC sak 11.32 55,000 622,458
Semen Nat kg 5.97 7,500 44,753
Ongkos plint m1 265.20 35,789 9,491,110
22,592,753
16 Batu alam dinding m2 80.00 296,039
Batu alam m2 88.00 175,000 15,400,000
Pasir pasang m3 3.00 240,000 720,000
Dolosit sak 6.90 11,500 79,350
PC sak 2.76 55,000 151,800
CSP
RENCANA ANGGARAN PELAKSANAAN
PEMBANGUNAN RUMAH TINGGAL
CLASSIC PREMIUM 2 LANTAI; SINGOSARI
KABUPATEN MALANG
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT. VOL.
SATUAN
1 2 3 4 5 6
Ongkos pasang m2 80.00 91,650 7,332,000
23,683,150
JUMLAH V 500,745,262
VI PEK. CAT
1 Cat tembok eksterior lantai 1 m2 625.86 24,403
Lem Rajawali kg 62.59 12,500 782,325
Semen putih sak 3.13 80,000 250,344
Kalsium sak 4.69 35,000 164,288
Cat tembok eksterior 3 x kg 112.65 37,000 4,168,228
Kertas gosok lbr 31.29 3,500 109,526
Ongkos Cat m2 625.86 15,655 9,797,838
15,272,549
2 Cat Tembok Interior lantai 1 m2 938.79 22,243
Lem Rajawali kg 93.88 12,500 1,173,488
Semen putih sak 4.69 80,000 375,516
Kalsium sak 7.04 35,000 246,432
Cat tembok interior 3 x kg 168.98 25,000 4,224,555
Kertas gosok lbr 46.94 3,500 164,288
Ongkos Cat m2 938.79 15,655 14,696,757
20,881,037
3 Cat tembok eksterior lantai 2 m2 784.08 25,968
Lem Rajawali kg 78.41 12,500 980,100
Semen putih sak 3.92 80,000 313,632
Kalsium sak 5.88 35,000 205,821
Cat tembok eksterior 3 x kg 141.13 37,000 5,221,973
Kertas gosok lbr 39.20 3,500 137,214
Ongkos Cat m2 784.08 17,221 13,502,250
20,360,989
4 Cat Tembok Interior lantai 2 m2 1,176.12 23,808
Lem Rajawali kg 117.61 12,500 1,470,150
Semen putih sak 5.88 80,000 470,448
Kalsium sak 8.82 35,000 308,732
Cat tembok interior 3 x kg 211.70 25,000 5,292,540
Kertas gosok lbr 58.81 3,500 205,821
Ongkos Cat m2 1,176.12 17,221 20,253,374
28,001,065
5 Cat plafond lantai 1 m2 380.00 22,993
Lem Rajawali kg 38.00 12,500 475,000
Semen putih sak 1.90 80,000 152,000
Kalsium sak 2.85 35,000 99,750
Perban rol 19.00 15,000 285,000
Cat tembok kg 68.40 25,000 1,710,000
Kertas gosok lbr 19.00 3,500 66,500
Ongkos Cat m2 380.00 15,655 5,948,900
8,737,150
6 Cat plafond lantai 2 m2 431.60 24,558
Lem Rajawali kg 43.16 12,500 539,500
Semen putih sak 2.16 80,000 172,640
Kalsium sak 3.24 35,000 113,295
Perban rol 21.58 15,000 323,700
Cat tembok kg 77.69 25,000 1,942,200
Kertas gosok lbr 21.58 3,500 75,530
Ongkos Cat m2 431.60 17,221 7,432,368
10,599,233
CSP
RENCANA ANGGARAN PELAKSANAAN
PEMBANGUNAN RUMAH TINGGAL
CLASSIC PREMIUM 2 LANTAI; SINGOSARI
KABUPATEN MALANG
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT. VOL.
SATUAN
1 2 3 4 5 6
JUMLAH VI 103,852,022
CSP
RENCANA ANGGARAN PELAKSANAAN
PEMBANGUNAN RUMAH TINGGAL
CLASSIC PREMIUM 2 LANTAI; SINGOSARI
KABUPATEN MALANG
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT. VOL.
SATUAN
1 2 3 4 5 6
23 Kaca Mati Es m2 5.40 150,000 810,000
24 Kaca Mati Sunblass sticker m2 24.00 275,000 6,600,000
25 Pengecatan Pintu & Jendela m2 116.28 100,000 11,628,000
IX PEK. SANITARY
1 Closed duduk + perlengkapan unit 8.000 2,775,000 22,200,000
2 Closed jongkok + perlengkapan unit 1.000 475,000 475,000
3 Wastafel + kran + perlengkapan unit 6.000 1,870,000 11,220,000
4 Meja dapur Granit + Rak atas bawah m1 12.000 2,250,000 27,000,000
5 Zink dapur + kran dapur unt 2.000 962,500 1,925,000
6 Meja toilet Granit + Rak m1 14.800 2,250,000 33,300,000
7 Avoer Lantai KM/WC bh 17.000 75,000 1,275,000
8 Kran Panas Dingin+Shower unt 8.000 750,000 6,000,000
9 Kran KM/WC + teras unit 18.000 125,000 2,250,000
JUMLAH IX 105,645,000
X PEK. ATAP
1 Kuda kuda / Gording / Jurai & Nok Kayu 8/12 m2 362.10 147,608
Kuda kuda 8/12 m3 4.06 5,500,000 22,302,720
Jurai & Nok 8/12 m2 1.61 5,500,000 8,828,160
Gording 8/12 m2 2.87 5,500,000 15,797,760
Paku, sekrup dll kg 42.66 17,500 746,592
Ongkos Rangka Atap m3 8.53 676,680 5,773,759
53,448,991
2 Pasang Usuk & Reng m2 362.10 95,555
Kayu Usuk & Reng m3 4.53 5,500,000 24,894,375
Paku kg 54.32 11,964 649,849
Ongkos pasang m2 362.10 25,010 9,056,121
34,600,345
3 Penutup Atap genteng m2 362.10 182,052
Genteng Keramik bh 4,346.00 14,500 63,017,000
Ongkos pasang m2 362.10 8,020 2,904,042
65,921,042
4 Bunbungan genteng (tengah / samping) m1 76.80 128,375
Genteng bumbung bh 307.20 17,400 5,345,280
Pc 40 kg sak 15.36 55,000 844,800
Pasir pasang m3 2.46 240,000 589,824
Ongkos pasang m1 76.80 40,095 3,079,296
9,859,200
5 Lisplang (depan, belakan & samping) m1 91.96 60,815
Kalsiplang m1 101.16 22,000 2,225,432
Paku kg 2.76 17,500 48,279
Ongkos pasang m1 91.96 36,090 3,318,836
5,592,547
6 Cat lisplang m1 91.96 16,353
Thiner B kg 13.56 12,500 169,551
Cat meni kg 3.68 15,000 55,176
Plamir kg 3.45 25,000 86,213
Cat dasar kg 3.91 45,000 175,874
CSP
RENCANA ANGGARAN PELAKSANAAN
PEMBANGUNAN RUMAH TINGGAL
CLASSIC PREMIUM 2 LANTAI; SINGOSARI
KABUPATEN MALANG
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT. VOL.
SATUAN
1 2 3 4 5 6
Cat penutup kg 5.98 45,000 268,983
Ongkos cat m1 91.96 8,135 748,049
1,503,845
JUMLAH X 170,925,970
CSP
RENCANA ANGGARAN PELAKSANAAN
PEMBANGUNAN RUMAH TINGGAL
CLASSIC PREMIUM 2 LANTAI; SINGOSARI
KABUPATEN MALANG
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT. VOL.
SATUAN
1 2 3 4 5 6
CSP
RENCANA ANGGARAN BIAYA
PEMBANGUNAN RUMAH TINGGAL
CLASSIC PREMIUM 2 LANTAI; SINGOSARI
KABUPATEN MALANG
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT. VOL.
SATUAN
1 2 3 4 5 6
A PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi m2 608.00 6,000 3,648,000
2 Pagar proyek sementara m1 68.40 168,000 11,491,200
JUMLAH I 2,991,845
II PEK. TANAH
1 Galian pondasi m3 217.60 62,550 13,610,880
2 Urugan tanah kembali m3 108.80 31,275 3,402,720
3 Urugan pasir bawah foot piate / pondasi (pasir pasang) m3 22.62 338,562 7,658,272
4 Urugan tanah peninggian lantai m3 247.00 103,275 25,508,925
JUMLAH II 50,180,797
IV PEKERJAAN DINDING
1 Pas. Bata ringan lantai 1 m2 782.33 148,967 116,540,334
2 Pas. Bata ringan lantai 2 m2 786.60 152,379 119,861,569
3 Pas. Bata ringan atas atap beton m2 193.50 156,133 30,211,783
3 Plesteran Dinding Lantai 1 m2 1,564.65 28,754 44,989,164
4 Plesteran Dinding Lantai 2 m2 1,960.20 32,602 63,906,244
5 Acian Dinding / Beton lantai 1 m2 1,564.65 12,657 19,803,775
6 Acian Dinding / Beton lantai 2 m2 1,960.20 14,581 28,582,068
7 Benangan Dinding / Beton lantai 1 m1 1,830.00 15,815 28,942,182
CSP
RENCANA ANGGARAN BIAYA
PEMBANGUNAN RUMAH TINGGAL
CLASSIC PREMIUM 2 LANTAI; SINGOSARI
KABUPATEN MALANG
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT. VOL.
SATUAN
1 2 3 4 5 6
8 Benangan Dinding / Beton lantai 2 m1 2,252.80 18,675 42,070,770
JUMLAH IV 494,907,890
VI PEK. CAT
1 Cat tembok eksterior lantai 1 m2 625.86 29,283 18,327,058
2 Cat Tembok Interior lantai 1 m2 938.79 26,691 25,057,244
3 Cat tembok eksterior lantai 2 m2 784.08 31,162 24,433,187
4 Cat Tembok Interior lantai 2 m2 1,176.12 28,570 33,601,278
5 Cat plafond lantai 1 m2 380.00 27,591 10,484,580
6 Cat plafond lantai 2 m2 431.60 29,470 12,719,079
JUMLAH VI 124,622,427
CSP
RENCANA ANGGARAN BIAYA
PEMBANGUNAN RUMAH TINGGAL
CLASSIC PREMIUM 2 LANTAI; SINGOSARI
KABUPATEN MALANG
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT. VOL.
SATUAN
1 2 3 4 5 6
12 Kusen Kayu (dari owner / pemilik) m1 -
13 Engsel pintu set 90.00 60,000 5,400,000
14 Engsel jendela set 58.00 36,000 2,088,000
15 Kunci pintu doubel (belum handel) set 9.00 270,000 2,430,000
16 Kunci pintu engkel (lengkap) set 21.00 360,000 7,560,000
17 Grendel pintu tanam set 9.00 210,000 1,890,000
18 Grendel jendela set 58.00 30,000 1,740,000
19 Hak angin jendela set 58.00 42,000 2,436,000
20 Handel pintu doubel set 18.00 360,000 6,480,000
21 Raill + Engsel + Handel + Kunci Pintu Garasi (PG) set 1.00 30,000,000 30,000,000
22 Kaca Mati Polos m2 39.24 150,000 5,886,000
23 Kaca Mati Es m2 5.40 180,000 972,000
24 Kaca Mati Sunblass sticker m2 24.00 330,000 7,920,000
25 Pengecatan Pintu & Jendela m2 116.28 120,000 13,953,600
IX PEK. SANITARY
1 Closed duduk + perlengkapan unit 8.000 3,330,000 26,640,000
2 Closed jongkok + perlengkapan unit 1.000 570,000 570,000
3 Wastafel + kran + perlengkapan unit 6.000 2,244,000 13,464,000
4 Meja dapur Granit + Rak atas bawah m1 12.000 2,700,000 32,400,000
5 Zink dapur + kran dapur unt 2.000 1,155,000 2,310,000
6 Meja toilet Granit + Rak m1 14.800 2,700,000 39,960,000
7 Avoer Lantai KM/WC bh 17.000 90,000 1,530,000
8 Kran Panas Dingin+Shower unt 8.000 900,000 7,200,000
9 Kran KM/WC + teras unit 18.000 150,000 2,700,000
JUMLAH IX 126,774,000
X PEK. ATAP
1 Kuda kuda / Gording / Jurai & Nok Kayu 8/12 m2 362.10 177,130 64,138,789
2 Pasang Usuk & Reng m2 362.10 114,666 41,520,414
3 Penutup Atap genteng m2 362.10 218,462 79,105,250
4 Bunbungan genteng (tengah / samping) m1 76.80 154,050 11,831,040
5 Lisplang (depan, belakan & samping) m1 91.96 72,978 6,711,057
6 Cat lisplang m1 91.96 19,624 1,804,614
JUMLAH X 205,111,164
CSP
RENCANA ANGGARAN BIAYA
PEMBANGUNAN RUMAH TINGGAL
CLASSIC PREMIUM 2 LANTAI; SINGOSARI
KABUPATEN MALANG
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT. VOL.
SATUAN
1 2 3 4 5 6
CSP
REKAPITULASI ANGGARAN BIAYA
PEMBANGUNAN RUMAH TINGGAL
CLASSIC PREMIUM 2 LANTAI; SINGOSARI
KABUPATEN MALANG
JUMLAH
NO URAIAN PEKERJAAN
1 2 6
A PEKERJAAN PENDAHULUAN 15,139,200
PEMBULATAN 3,449,870,000
TERBILANG :
TIGA MILYAR EMPAT RATUS EMPAT PULUH SEMBILAN JUTA DELAPAN RATUS TUJUH PULUH
RIBU RUPIAH
CSP
DAFTAR HARGA SATUAN UPAH KERJA CSP 2015