9B
9B
TUGAS 1 ,( 27 JULI) TUGAS 2, 3 AGUSTUS TUGAS 3,( 10 AGUSTUS TUGAS 4, 24 AGUSTUS TUGAS 5, 2 SEP
HLMNN 10. 1B,2C,3D TABEL HLMN 12-16 HLM 20.1B,3A,3C,4D5C HAL 30, 1(A,F,G) 2D HAL 45, 1A,2(CDE), 3A,
RANGKUM HAL 4-9 CTT HAL 18-19. CTT HAL 28 CTT HAL 42-43
MATERI ESENSI 1.2. MATERI ESENSI 1.3
TUGAS 6, 8 SEP TUGAS 7, MID TUGAS 8, 27 SEP TUGAS 9, 13 OKTOBER TUGAS 10, 15 OKTB
HAL 55, 3A,3B,4(CDE) HAL 81, 1(A,B,C) & 2 HAL 81, 4C,4E,5 HAL 92, 1A,1B,3A
CTT 53-54 CTT HAL 78 CONTOH 1 CTT MATERI ESENSI 2.1
CONTOH 2, CONTOH 3 HAL 77-78
TUGAS 11, 8 NOV TUGAS 12, 9 NOV TUGAS 13, 17 NOV
HAL 102, 1B,2B CTT HAL 109-113 HAL 149 NO 1
CTT HAL 99-100 CONTOH 1-4 CTT 136- 137