Anda di halaman 1dari 1

Typical Full AC-WC Ruas Kutambaru Punti - Batumamak

STA 0+000 s/d 0+199


STA 0+600 s/d 0+630
Lereng 1 5,5 1

Paret Gendong Marka Jalan


℄ AC-WC = 5 CM
AGG. KELAS A = 30 CM
TIMB. PILIHAN = 20 CM
TOPING

-3.00% -3.00%

Lembah

Existing

Typical Full AC-WC Ruas Kutambaru Punti - Batumamak


STA 0+800 s/d 0+960
STA 0+995 s/d 1+050
STA 1+125 s/d 1+375
STA 3+125 s/d 3+525

1 5,5 1

Marka Jalan AC-WC = 5 CM


Pas. Batu Mortar
CL AGG. KELAS A = 30 CM
TIMB. PILIHAN = 20 CM
TOPING

-3.00% -3.00%

Existing

PENYEDIA JASA KONSULTAN SUPERVISI PENGGUNA JASA


Pekerjaan : Paket No. :- PT. RUMAH BERNEH PT. VIRAMA KARYA KSO PPK 2.4 PROV. SUMATERA UTARA Nama Gambar : Lembar No :
REPUBLIK INDONESIA PT. BERLIAN JAYA MANDIRI KONSULTAN
V = 1:100
KEMENTERIAN PEKERJAAN UMUM No. Ruas :- Skala
D A N P E R U M A H A N R A K Y A T Penignkatan Struktur Jalan Desa Pola Tebu - TYPICAL AC-WC H = 1:100
DIREKTORAT JENDERAL BINA MARGA cerumbu - Kutakendit Nama Ruas : Desa Pola Tebu - cerumbu -
SATUAN KERJA PERENCANAAN DAN PENGAWASAN Kutakendit
Tanggal : 2023
JALAN NASIONAL (P2JN) PROV. SUMATERA UTARA ANTA SILANGIT Ir. BERTON SIAHAAN YAKUB SITEPU, ST
Provinsi : Sumatera Utara Manager Pelaksana Proyek Team Leader NIP :19731252008011001