Typical Full AC-WC Ruas Kutambaru Punti - Batumamak

STA 0+630 s/d 0+800


STA 0+960 s/d 0+995
STA 1+050 s/d 1+125
STA 1+375 s/d 3+125
STA 4+025 s/d 4+350
1 5,5 1

Marka Jalan AC-WC = 5 CM


Pas. Batu Mortar
CL AGG. KELAS A = 30 CM
TIMB. PILIHAN = 20 CM

-3.00% -3.00%

Existing

Typical AC-WC Bahu Kelas S Ruas Kutambaru Punti - Batumamak


STA 1+525 s/d 2+050
STA 2+550 s/d 2+850

1 5,5 1

Marka Jalan AC-WC = 5 CM


Pas. Batu Mortar
CL AGG. KELAS A = 30 CM
TIMB. PILIHAN = 20 CM
Agregat Kelas S = 15 cm
-3.00% -3.00% Timbunan Pilihan = 25 cm

Existing

PENYEDIA JASA KONSULTAN SUPERVISI PENGGUNA JASA


Pekerjaan : Paket No. :- PT. RUMAH BERNEH PT. VIRAMA KARYA KSO PPK 2.4 PROV. SUMATERA UTARA Nama Gambar : Lembar No :
REPUBLIK INDONESIA PT. BERLIAN JAYA MANDIRI KONSULTAN
V = 1:100
KEMENTERIAN PEKERJAAN UMUM No. Ruas :- Skala
D A N P E R U M A H A N R A K Y A T Penignkatan Struktur Jalan Desa Pola Tebu - TYPICAL AC-WC H = 1:100
DIREKTORAT JENDERAL BINA MARGA cerumbu - Kutakendit Nama Ruas : Desa Pola Tebu - cerumbu -
SATUAN KERJA PERENCANAAN DAN PENGAWASAN Kutakendit
Tanggal : 2023
JALAN NASIONAL (P2JN) PROV. SUMATERA UTARA ANTA SILANGIT Ir. BERTON SIAHAAN YAKUB SITEPU, ST
Provinsi : Sumatera Utara Manager Pelaksana Proyek Team Leader NIP :19731252008011001