Typical Full AC-WC Ruas Kutambaru Punti - Batumamak
STA 0+630 s/d 0+800
STA 0+960 s/d 0+995 STA 1+050 s/d 1+125 STA 1+375 s/d 3+125 STA 4+025 s/d 4+350 1 5,5 1
Marka Jalan AC-WC = 5 CM
Pas. Batu Mortar CL AGG. KELAS A = 30 CM TIMB. PILIHAN = 20 CM
-3.00% -3.00%
Existing
Typical AC-WC Bahu Kelas S Ruas Kutambaru Punti - Batumamak
STA 1+525 s/d 2+050 STA 2+550 s/d 2+850
1 5,5 1
Marka Jalan AC-WC = 5 CM
Pas. Batu Mortar CL AGG. KELAS A = 30 CM TIMB. PILIHAN = 20 CM Agregat Kelas S = 15 cm -3.00% -3.00% Timbunan Pilihan = 25 cm
Existing
PENYEDIA JASA KONSULTAN SUPERVISI PENGGUNA JASA
Pekerjaan : Paket No. :- PT. RUMAH BERNEH PT. VIRAMA KARYA KSO PPK 2.4 PROV. SUMATERA UTARA Nama Gambar : Lembar No : REPUBLIK INDONESIA PT. BERLIAN JAYA MANDIRI KONSULTAN V = 1:100 KEMENTERIAN PEKERJAAN UMUM No. Ruas :- Skala D A N P E R U M A H A N R A K Y A T Penignkatan Struktur Jalan Desa Pola Tebu - TYPICAL AC-WC H = 1:100 DIREKTORAT JENDERAL BINA MARGA cerumbu - Kutakendit Nama Ruas : Desa Pola Tebu - cerumbu - SATUAN KERJA PERENCANAAN DAN PENGAWASAN Kutakendit Tanggal : 2023 JALAN NASIONAL (P2JN) PROV. SUMATERA UTARA ANTA SILANGIT Ir. BERTON SIAHAAN YAKUB SITEPU, ST Provinsi : Sumatera Utara Manager Pelaksana Proyek Team Leader NIP :19731252008011001