Anda di halaman 1dari 58

PEMERINTAH KABUPATEN FLORES TIMUR

DINAS PEKERJAAN UMUM DAN


PENATAAN RUANG
Jalan Imam Bonjol No. 33 – Kel. Sarotari – Telp. (0383) 21130

BILL OF QUANTITY
(BOQ)

Program
PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM

Kegiatan
PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM)
DI DAERAH KABUPATEN

Pekerjaan
PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/BRONCAPTERING
SUMUR DALAM TERLINDUNGI DESA SUKUTOKAN
Lokasi
KECAMATAN KELUBAGOLIT - KABUPATEN FLORES TIMUR – PROVINSI NTT

Tahun Anggaran
2023
KOP PERUSAHAAN

REKAPITULASI

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM)
DI DAERAH KABUPATEN
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/BRONCAPTERING
SUMUR DALAM TERLINDUNGI DESA SUKUTOKAN
LOKASI : KECAMATAN KELUBAGOLIT - KABUPATEN FLORES TIMUR – PROVINSI NTT
TA. : 2023

JUMLAH
NO URAIAN JENIS KEGIATAN
HARGA (RP.)

A PEKERJAAN PERSIAPAN -
B REHAB JARINGAN TRANSMISI (DARI MATA AIR KE BAK WATODEI) -
C PEKERJAAN IPA - 1 UNIT -
D PEMBANGUNAN BAK RESERVOIR 50 M3 - 1 UNIT -
E PEMBANGUNAN JARINGAN PIPA TRANSMISI -
F PEMBANGUNAN JARINGAN PIPA DISTRIBUSI -
G PEMBANGUNAN SAMBUNGAN RUMAH (SR) 319 UNIT -
H PENGADAAN POMPA BESERTA INSTALASINYA -
I PEKERJAAN TIANG LISTRIK DAN INSTALASI LISTRIK -
J REHAB RUMAH POMPA -
K PERLINTASAN PIPA -

JUMLAH -
PPN 11% -
TOTAL JUMLAH -
DIBULATKAN -
Terbilang : -

Larantuka, ……/ …………………./ 2023


Dibuat Oleh :
CV/ PT. .................................

Nama Jelas
Jabatan
KOP PERUSAHAAN

DAFTAR KUANTITAS DAN HARGA

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM)
DI DAERAH KABUPATEN
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/BRONCAPTERING
SUMUR DALAM TERLINDUNGI DESA SUKUTOKAN
LOKASI : KECAMATAN KELUBAGOLIT - KABUPATEN FLORES TIMUR – PROVINSI NTT
TA. : 2023

NO JUMLAH HARGA (
URAIAN JENIS KEGIATAN SAT. VOLUME HARGA SATUAN (RP)
RP )
A PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi Ls 1,00 - -
2 Pembuatan Papan Nama Proyek Ls 1,00 - -
3 Administrasi dan Dokumentasi dan pelaporan Ls 1,00 - -
4 Biaya Laboratoriun Uji Kuat Tekan Beton Rencana Ls 1,00 - -
5 Alat Pelindung Diri dan Keselamatan Kerja (APD K3)
- Helm Pengaman Kerja Bh 12,00 - -
- Sarung Tangan Psng 12,00 - -
- Sepatu Boots Psng 12,00 - -
- Rompi Kerja Bh 12,00 - -

JUMLAH A -
B REHAB JARINGAN TRANSMISI (DARI MATA AIR KE BAK WATODEI)
I PEMASANGAN KONTRUKSI PIPA DAN ACCESSORIES GIP Ø 2"
DARI MATA AIR WAIANA KE BAK WATODEI (GANTI PIPA)
1 Flanged Joint HDPE Ø 63 mm x 2" Bh 1,00 - -
2 Flange Drat GIP Ø 2" Bh 1,00 - -
3 Packing Karet 2" Bh 1,00 - -
4 Baut Moer + Ring Flange Ø 2" Bh 4,00 - -
5 Straight Coupler HDPE Ø2" Bh 2,00 - -
6 Pemasangan Aksesoris Ls 1,00 - -
JUMLAH B -
C PEKERJAAN IPA - 1 UNIT
I Pekerjaan Persiapan
1 Pembersihan Lokasi Ls 1,00 - -
2 Pasangan Bouplank Ls 1,00 - -
3 Pengangkutan Material ke Lokasi Pekerjaan Ls 1,00 - -
4 Kist Dam Ls 1,00 - -

II Pekerjaan Tanah
1 Galian Tanah Biasa M3 0,29 - -
2 Urugan Tanah Kembali M3 0,29 - -

III Pekerjaan Beton


1 Lantai Dasar Beton Bertulang
- Beton K250 M3 0,17 - -
- Pembesian Kg 13,81 - -
- Bekisting M2 1,68 - -
2 Dinding luar beton bertulang
- Beton K250 M3 0,78 - -
- Pembesian Kg 64,13 - -
- Bekisting M2 15,60 - -
2 Dinding sekat beton bertulang
- Beton K250 M3 0,12 -
- Pembesian Kg 21,32 - -
- Bekisting M2 2,40 - -
NO JUMLAH HARGA (
URAIAN JENIS KEGIATAN SAT. VOLUME HARGA SATUAN (RP)
RP )
4 Plat Beton Bertulang Penutup
- Beton K250 M3 0,13 - -
- Pembesian Kg 13,81 - -
- Bekisting M2 1,68 - -
5 Acian Semen M2 5,82 - -

IV Pekerjaan Pelengkap
1 Inlet Pipa HDPE Ø 2,5" (Pipa Lama) M' 1,40 - -
2 Outlet Pipa HDPE Ø 2,5" (Pipa Lama) M' 1,40 - -
3 Batu Pecah 2/3 M3 0,08 - -
4 Pasir M3 0,08 - -
5 Ijuk Ls 1,00 - -

JUMLAH B -
D PEMBANGUNAN BAK RESERVOIR 50 M3 - 1 UNIT
I Pekerjaan Persiapan
1 Pembersihan Lokasi Ls 1,00 - -
2 Pasangan Bouplank Ls 1,00 - -
3 Penyiapan akses jalan masuk Ls 1,00 - -

II Pekerjaan Tanah
1 Galian Tanah Biasa M3 20,80 - -
2 Urugan Tanah Kembali M3 20,80 - -
3 Urugan Pasir Bawah Pondasi M3 2,08 - -

III Pekerjaan Pasangan, Plesteran dan Beton


1 Pas. Aanstamping M3 4,16 - -
2 Pas. Pondasi batu kali 1PC : 4Ps M3 14,87 - -
3 Lantai Kerja Bawah Plat Lantai Beton Tumbuk K100 M3 3,60 - -
4 Lantai Dasar Beton Bertulang
- Beton K250 M3 6,50 - -
- Pembesian Kg 769,65 - -
- Bekisting M2 3,42 - -
5 Dinding luar beton bertulang
- Beton K250 M3 8,94 - -
- Pembesian Kg 1.059,37 - -
- Bekisting M2 89,44 - -
5 Plat Atap Beton Bertulang dan Beton Penutup
- Beton K250 M3 4,37 - -
- Pembesian Kg 690,77 - -
- Bekisting M2 29,16 - -
7 Kotak Pengaman Gate Valve
- Beton K250 M3 0,30 - -
- Pembesian Kg 15,76 - -
- Bekisting M2 4,73 - -
- Tutupan Kotak Pengaman Gate Valve (Plat Besi) Unit 1,00 - -
8 Acian Semen M2 151,09 - -
9 Pengecatan dengan Cat Waterproof M2 151,09 - -

IV Pekerjaan Pelengkap
1 Inlet Pipa GIP Ø 3" M' 1,00 - -
2 Penguras Pipa GIP outlet Ø 2" M' 1,00 - -
3 Peluap Pipa GIP Ø 2,5" M' 1,00 - -
4 Outlet Pipa GIP Ø 2" M' 8,00 - -
5 Watermour GIP Ø 2" Bh 4,00 - -
6 Double Niple GIP Ø 2" Bh 4,00 - -
7 Gate Valve GIP Ø 2" Bh 4,00 - -
8 Knee GIP Ø 2" Bh 8,00 - -
9 Dop GIP Ø 2" Bh 1,00 - -
10 Tangga Kontrol (Besi Beton 16 mm) Ls 1,00 - -
11 Pipa udara Bh 1,00 - -

JUMLAH D -
NO JUMLAH HARGA (
URAIAN JENIS KEGIATAN SAT. VOLUME HARGA SATUAN (RP)
RP )
E PEMBANGUNAN JARINGAN PIPA TRANSMISI
I PEMASANGAN KONTRUKSI PIPA DAN ACCESSORIES HDPE Ø 2"
DARI BAK WATODEI KE DESA SUKUTOKAN
1 Pengukuran dan Pematokan Ls 1,00 - -
2 Pengangkutan Pipa dari Base Camp Sementara Ke Lokasi Pemasangan Ls 1,00 - -
3 Galian Tanah untuk pembenaman pipa distribusi HDPE Ø 63mm M3 342,40 - -
4 Urugan Tanah Kembali M3 342,40 - -
5 Pengetesan Air M' 4.280,00 - -
6 Pemasangan Pipa HDPE SDR 11 (PN 16) Dia. 2" atau 63mm M' 4.280,00 - -
7 Pemasangan Pipa GIP Dia. 2,5" M' 6,00 - -
8 Watermour GIP Ø 2,5" Bh 1,00 - -
9 Double Niple GIP Ø 2,5" Bh 1,00 - -
10 Gate Valve GIP Ø 2,5" Bh 1,00 - -
11 Knee 90ᴼ GIP Ø 2,5" Bh 2,00 - -
12 Reducer GIP Ø 2,5" - Ø 2" Bh 1,00 - -
13 Male Thread Adaptor HDPE PN 16- Ø 63" Bh 1,00 - -
14 Straight Coupler HDPE Ø2" Bh 42,00 - -
15 Air Release Valve Ø2" Cast Iron Bh 2,00 - -
16 Drain Valve Ø2" Cast Iron Bh 1,00 - -
17 Tee Equal HDPE Ø 63 X 63 X 63 Bh 1,00 - -
18 Flanged Joint HDPE Ø 63 mm x 2" Bh 1,00 - -
19 Packing Karet 2" Bh 2,00 - -
20 Baut Moer + Ring Flange Ø 2" Bh 8,00 - -

III PEMASANGAN KONTRUKSI PIPA DAN ACCESSORIES HDPE Ø 1"


DARI BAK WATODEI KE BAK DUSUN WATODEI
1 Pengukuran dan Pematokan Ls 1,00 - -
2 Galian Tanah untuk pembenaman pipa distribusi HDPE 32mm M3 9,72 - -
3 Urugan Tanah Kembali M3 9,72 - -
4 Pengetesan Air M' 216,00 - -
5 Pemasangan Pipa HDPE SDR 11 (PN 16) Dia. 1" atau 32mm M' 216,00 - -
6 Pemasangan Pipa GIP Dia. 1" M' 6,00 - -
7 Watermour GIP Ø 1" Bh 1,00 - -
8 Double Niple GIP Ø 1" Bh 1,00 - -
9 Gate Valve GIP Ø 1" Bh 1,00 - -
10 Knee GIP Ø 1" Bh 2,00 - -
11 Female Thread Adaptor HDPE PN 16- Ø 32" Bh 1,00 - -
12 Straight Coupler HDPE Ø1" Bh 3,00 - -

JUMLAH E -
F PEMBANGUNAN JARINGAN PIPA DISTRIBUSI
I PEMASANGAN KONTRUKSI PIPA DAN ACCESSORIES HDPE Ø 2"
DUSUN I, II DAN III
1 Pengukuran dan Pematokan Ls 1,00 - -
2 Galian Tanah untuk pembenaman pipa distribusi HDPE 63mm M3 24,00 - -
3 Urugan Tanah Kembali M3 24,00 - -
4 Pengetesan Air M' 300,00 - -
5 Pemasangan Pipa HDPE SDR 11 (PN 16) Dia. 2" atau 63mm M' 300,00 - -
6 Female Thread Adaptor HDPE PN 16- Ø 63" Bh 3,00 - -
7 Reducing Coupler HDPE PN 16 Ø 63 mm x Ø 50 mm Bh 3,00 - -

II PEMASANGAN KONTRUKSI PIPA DAN ACCESSORIES HDPE Ø 1,5"


A DUSUN I
1 Pengukuran dan Pematokan Ls 1,00 - -
2 Galian Tanah untuk pembenaman pipa distribusi HDPE 50mm M3 28,35 - -
3 Urugan Tanah Kembali M3 28,35 - -
4 Pemotongan badan Jalan (5 Titik) Titik 5,00 - -
5 Rabat Beton K 100 (5 Titik) M3 0,23 - -
6 Pengetesan Air M' 630,00 - -
7 Pemasangan Pipa HDPE SDR 11 (PN 16) Dia. 1,5" atau 50mm M' 630,00 - -
8 Straight Coupler HDPE Ø50" Bh 5,00 - -
9 Elbow HDPE Ø 50 mm - 90˚ Bh 3,00 - -
10 Tee Reduced HDPE Ø 50 X 50 X 32 Bh 11,00 - -
11 End Cap HDPE PN-16 - Ø 50" Bh 1,00 - -
NO JUMLAH HARGA (
URAIAN JENIS KEGIATAN SAT. VOLUME HARGA SATUAN (RP)
RP )
B DUSUN II
1 Pengukuran dan Pematokan Ls 1,00 - -
2 Galian Tanah untuk pembenaman pipa distribusi HDPE 50mm M3 48,06 - -
3 Urugan Tanah Kembali M3 48,06 - -
4 Pemotongan badan Jalan (6 Titik) Titik 6,00 - -
5 Rabat Beton K 100 (6 Titik) M3 0,27 - -
6 Pengetesan Air M' 1.068,00 - -
7 Pemasangan Pipa HDPE SDR 11 (PN 16) Dia. 1,5" atau 50mm M' 1.068,00 - -
8 Straight Coupler HDPE Ø50" Bh 10,00 - -
9 Elbow HDPE Ø 50 mm - 90˚ Bh 1,00 - -
10 Tee Equal HDPE Ø 50 X 50 X 50 Bh 1,00 - -
11 Tee Reduced HDPE Ø 50 X 50 X 32 Bh 11,00 - -
12 End Cap HDPE PN-16 - Ø 50" Bh 2,00 - -
C DUSUN III
1 Pengukuran dan Pematokan Ls 1,00 - -
2 Galian Tanah untuk pembenaman pipa distribusi HDPE 50mm M3 27,18 - -
3 Urugan Tanah Kembali M3 27,18 - -
4 Pemotongan badan Jalan (3 Titik) Titik 3,00 - -
5 Rabat Beton K 100 (3 Titik) M3 0,14 - -
6 Pengetesan Air M' 604,00 - -
7 Pemasangan Pipa HDPE SDR 11 (PN 16) Dia. 1,5" atau 50mm M' 604,00 - -
8 Straight Coupler HDPE Ø50" Bh 5,00 - -
9 Elbow HDPE Ø 50 mm - 90˚ Bh 2,00 - -
10 Tee Reduced HDPE Ø 50 X 50 X 32 Bh 11,00 - -
11 End Cap HDPE PN-16 - Ø 50" Bh 1,00 - -

III PEMASANGAN KONTRUKSI PIPA DAN ACCESSORIES HDPE Ø 1"


A DUSUN I
1 Pengukuran dan Pematokan Ls 1,00 - -
2 Galian Tanah untuk pembenaman pipa distribusi HDPE 32mm M3 68,51 - -
3 Urugan Tanah Kembali M3 68,51 - -
4 Pemotongan badan Jalan (6 Titik) Titik 6,00 - -
5 Rabat Beton K 100 (6 Titik) M3 0,27 - -
6 Pengetesan Air M' 1.522,36 - -
7 Pemasangan Pipa HDPE SDR 11 (PN 16) Dia. 1" atau 32mm M' 1.522,36 - -
8 Straight Coupler HDPE Ø32" Bh 9,00 - -
9 Elbow HDPE Ø 32 mm - 90˚ Bh 16,00 - -
10 Tee Equal HDPE Ø 32 X 32 X 32 Bh 4,00 - -
11 End Cap HDPE PN-16 - Ø 50" Bh 15,00 - -
B DUSUN II
1 Pengukuran dan Pematokan Ls 1,00 - -
2 Galian Tanah untuk pembenaman pipa distribusi HDPE 32mm M3 98,31 - -
3 Urugan Tanah Kembali M3 98,31 - -
4 Pemotongan badan Jalan (4 Titik) Titik 4,00 - -
5 Rabat Beton K 100 (4 Titik) M3 0,18 - -
6 Pengetesan Air M' 2.184,73 - -
7 Pemasangan Pipa HDPE SDR 11 (PN 16) Dia. 1" atau 32mm M' 2.184,73 - -
8 Straight Coupler HDPE Ø32" Bh 13,00 - -
9 Elbow HDPE Ø 32 mm - 90˚ Bh 18,00 - -
10 Tee Equal HDPE Ø 32 X 32 X 32 Bh 7,00 - -
11 End Cap HDPE PN-16 - Ø 50" Bh 19,00 - -
C DUSUN III
1 Pengukuran dan Pematokan Ls 1,00 - -
2 Galian Tanah untuk pembenaman pipa distribusi HDPE 32mm M3 78,71 - -
3 Urugan Tanah Kembali M3 78,71 - -
4 Pemotongan badan Jalan (1 Titik) Titik 1,00 - -
5 Rabat Beton K 100 (1 Titik) M3 0,05 - -
6 Pengetesan Air M' 1.749,19 - -
7 Pemasangan Pipa HDPE SDR 11 (PN 16) Dia. 1" atau 32mm M' 1.749,19 - -
8 Straight Coupler HDPE Ø32" Bh 12,00 - -
9 Elbow HDPE Ø 32 mm - 90˚ Bh 17,00 - -
10 Tee Equal HDPE Ø 32 X 32 X 32 Bh 6,00 - -
11 End Cap HDPE PN-16 - Ø 50" Bh 17,00 - -

JUMLAH F -
NO JUMLAH HARGA (
URAIAN JENIS KEGIATAN SAT. VOLUME HARGA SATUAN (RP)
RP )

G PEMBANGUNAN SAMBUNGAN RUMAH (SR) 319 UNIT


I PEMASANGAN PIPA DAN ACCESSORIES SR
1 Clamp Sadle HDPE Ø 32 X 20 mm Bh 1,00 - -
2 Male Thread Joint HDPE Ǿ 20mm Bh 1,00 - -
3 Pemasangan Pipa HDPE SDR 11 (PN 16) Ø 20 mm M' 6,00 - -
4 Pemasangan Pipa GIP Ø 1/2" M' 2,00 - -
5 Female Threaded Elbow HDPE 90⁰ Ø 20 mm Bh 1,00 - -
6 Knee GIP Ø 1/2" Bh 5,00 - -
7 Double nipel GIP Ø 1/2 Bh 3,00 - -
8 Plugh Kran GIP Ø 1/2 " Kuningan Bh 1,00 - -
9 Water Meter Coupler Ø 1/4"-Ø 1/2" SNI Kuningan Bh 2,00 - -
10 Water Meter GIP Ø 1/2" SNI Bh 1,00 - -
11 Katup Searah Ø 1/2" Kuningan Bh 1,00 - -
12 Stop Kran GIP Ø 1/2" Kuningan Bh 1,00 - -
13 Kran Air Kuningan Ø 1/2" Bh 1,00 - -
14 Box Water Meter (Warna Biru) Bh 1,00 - -
15 Baut Moor 10 mm Bh 4,00 - -
II KONSTRUKSI PEMASANGAN PIPA SR
1 Galian Tanah M3 0,22 - -
2 Urugan Tanah Kembali M3 0,22 - -
3 Pengetesan Air M3 8,00 - -
4 Beton Tumbuk K100, M3 0,02 - -
Jumlah -
Unit 319,00 - -
J U M L A H I + II -
III PEKERJAAN CROSING JALAN PIPA SR
1 Pemotongan badan Jalan (3 Titik) Titik 3,00 - -
2 Rabat Beton K 100 (3 Titik) M3 0,14 - -
JUMLAH G -

H PENGADAAN POMPA BESERTA INSTALASINYA


I PENGADAAN DAN PEMASANGAN POMPA
1 Pengadaan dan Pemasangan Pompa Centrifuqal dan Control Panel Ls 1,00 - -
Beserta Instalasinya
- Design : Verlical Inline
- Debit : 2 Liter s/d 3 Liter
- Head : 250 meter s/d 260 meter
2 Pengangkutan Material ke Lokasi Pekerjaan Ls 1,00 - -
3 Tee Y GIP Ø 2" Bh 2,00 - -
4 Water Moor GIP Ø 2" SNI Bh 3,00 - -
5 Flange Drat GIP Ø 2" Bh 8,00 - -
6 Gate Valve GIP Ø 2" All Flange Bh 2,00 - -
7 Packing Karet 2" Bh 8,00 - -
8 Baut Moer + Ring Flange Ø 2" Bh 32,00 - -
9 Y strainer Ø 2" All Flange Cast Iron Bh 1,00 - -
10 Check Valve Cast Iron Flange Ø 2" All Flange Bh 1,00 - -
11 Meter Tekanan Bh 1,00 - -
12 Reducing Tee 90⁰ Ø 2 mm x Ø 1/2 mm Bh 1,00 - -
13 Double Niple GIP Ø 2" Bh 2,00 - -
14 Socket GIP Ø 2" Bh 3,00 - -
15 Knee 45ᴼ GIP Ø 2" Bh 2,00 - -
14 Pemasangan Pipa GIP Dia.2" M' 24,00 - -

JUMLAH H -
NO JUMLAH HARGA (
URAIAN JENIS KEGIATAN SAT. VOLUME HARGA SATUAN (RP)
RP )
I PEKERJAAN TIANG LISTRIK DAN INSTALASI LISTRIK
1. Pemasangan Meteran Listrik PLN Kapasitas 33 KVA Ls 1,00 - -
- Biaya Penyambungan
- Bea Materai
- Stroom Awal
- Box Appl PLN
2 Box Panel Listrik, Panel Tangan On/Of dan Instalasi Panel Bh 1,00 - -
3 Pemasangan Tiang Listrik
- Pengangkutan Material ke Lokasi Pekerjaan Ls 1,00 - -
- Tiang Listrik Pipa GIP Ø1,5 Jarak 60 Meter (Lihat Gambar) Bh 19,00 - -
- Pemasangan Instalasi Listrik Kabel Twist 4 Jalur 4x16 mm M' 1.180,00 - -
4 Galian Tanah M3 1,82 - -
5 Beton Pondasi K100 M3 2,43 - -

JUMLAH I -
J REHAB RUMAH POMPA
I Pekerjaan Persiapan
1 Pengangkutan Material ke Lokasi Pekerjaan Ls 1,00 - -
2 Pembongkaran Bangunan Eksisting dan Pembersihan Lokasi Ls 1,00 - -
3 Pasangan Bouplank Ls 1,00 - -
4 Galian Tanah Biasa M3 3,87 - -
5 Urugan Tanah Kembali M3 3,87 - -
6 Urugan Pasir Bawah Pondasi M3 0,12 - -
II Pekerjaan Pasangan, Plesteran dan Beton
1 Pas. Aanstamping M3 0,23 - -
2 Pas. Pondasi batu kali 1PC : 4Ps M3 0,50 - -
3 Rabat Beton Lantai K100 M3 0,50 - -
4 Beton Pondasi Pompa Air M3 0,13 - -
5 Pas. Angker Pompa Air Bh 4,00 - -
6 Dinding beton bertulang
- Beton K250 M3 1,38 - -
- Pembesian Kg 94,56 - -
- Bekisting M2 23,00 - -
6 Angker Besi 10 mm Kg 4,73 - -
III Pekerjaan Kuda-Kuda dan Penutup Atap
1 Pas. Kuda - Kuda Konvensional; Kayu Kelas II (5/10) M3 0,07 - -
2 Pas. Gording; Kayu Kelas II (5/7) Kg 0,10 - -
3 Pas. Seng Gelombang BJLS 0.30 M2 8,90 - -
4 Pas. Bubungan Seng Pelat L 40 M2 3,45 - -

JUMLAH J -
K PERLINTASAN PIPA
I Pekerjaan Bangunan Perlintasan Pipa (4 Titik)
1 Galian Tanah M3 0,67 - -
2 Beton Pondasi K100 M3 1,15 - -
3 Angker + Baut Ø12 Bh 16,00 - -
4 Plat Angker Tebal 5mm, Lebar 75 mm Bh 8,00 - -

JUMLAH K -
ANALISA HARGA SATUAN PEKERJAAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM)
DI DAERAH KABUPATEN
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/BRONCAPTERING
SUMUR DALAM TERLINDUNGI DESA SUKUTOKAN
LOKASI : KECAMATAN KELUBAGOLIT - KABUPATEN FLORES TIMUR – PROVINSI NTT
TA. : 2023

Jenis Pekerjaan : A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m


Satuan Mata Pembayaran : Rp./M3
3
Kuantitas Pekerjaan M
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,750 - -
2 Mandor OH 0,025 - -

2 Material :
1 -

3 Peralatan :
1 -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -

Jenis Pekerjaan : A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah


Satuan Mata Pembayaran : Rp./M3
3
Kuantitas Pekerjaan M
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,500 - -
2 Mandor OH 0,050 - -

2 Material :
1

3 Peralatan :
1 -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -
Jenis Pekerjaan : A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug
Satuan Mata Pembayaran : Rp./M3
3
Kuantitas Pekerjaan M
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,300 - -
2 Mandor OH 0,010 - -

2 Material :
1 Pasir Urug m
3 1,200 - -

3 Peralatan :
1 -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -

Jenis Pekerjaan : A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP
Satuan Mata Pembayaran : Rp./M3
3
Kuantitas Pekerjaan M
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 1,500 - -
2 Tukang batu OH 0,750 - -
3 Kepala tukang OH 0,075 - -
4 Mandor OH 0,075 - -

2 Material :
3
1 Batu belah m 1,200 - -
2 Semen Portland Kg 163,000 - -
3
3 Pasir pasang m 0,520 - -

3 Peralatan :
1 -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -
Jenis Pekerjaan : A.3.2.1.2. Pemasangan 1 m3 batu kosong (anstamping)
Satuan Mata Pembayaran : Rp./M3
3
Kuantitas Pekerjaan M
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,780 - -
2 Tukang batu OH 0,390 - -
3 Kepala tukang OH 0,039 - -
4 Mandor OH 0,039 - -

2 Material :
3
1 Batu belah m 1,200 - -
3
2 Pasir Urug m 0,432 - -

3 Peralatan :
1 -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -

Jenis Pekerjaan : A.3.2.1.2. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm.


Satuan Mata Pembayaran : Rp./M2
Kuantitas Pekerjaan m2
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,300 - -
2 Tukang batu OH 0,150 - -
3 Kepala tukang OH 0,015 - -
4 Mandor OH 0,015 - -

2 Material :
1 Semen portland Kg 7,776 - -
2 Pasir Pasang m3 0,023 - -
-

3 Peralatan :
1 -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -

Jenis Pekerjaan : A.3.2.1.2. Pemasangan 1 m2 acian.


Satuan Mata Pembayaran : Rp./m2
Kuantitas Pekerjaan m2
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5
1 Tenaga Kerja :
1 Pekerja OH 0,200 - -
2 Tukang batu OH 0,100 - -
3 Kepala tukang OH 0,010 - -
4 Mandor OH 0,010 - -

2 Material :
1 Semen portland Kg 3,250 - -
3 Peralatan :
1 -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -
Jenis Pekerjaan : A.3.2.1.2. Pengecatan 1 m2 tembok baru dengan cat waterproofing
Satuan Mata Pembayaran : Rp./m2
Kuantitas Pekerjaan m2
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,020 - -
2 Tukang batu OH 0,063 - -
3 Kepala tukang OH 0,006 - -
4 Mandor OH 0,003 - -

2 Material :
1 Plamuur Kg 0,100 - -
Cat Penutup Waterproofing Kg 0,260 - -

3 Peralatan :
1 -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -

A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 7,4 MPa, slump (120 ± 20) mm
stara -K100
3
Kuantitas Pekerjaan M
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 1,650 - -
2 Tukang batu OH 0,275 - -
3 Kepala tukang OH 0,028 - -
4 Mandor OH 0,083 - -

2 Material :
1 Semen Portland Kg 247,000 - -
2 Pasir Beton M3 0,621 - -
3 Kerikil M3 0,740 - -
4 Air Liter 215,000 - -

3 Peralatan :
1 -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 21,7 MPa, slump (120 ± 20) mm
stara -K250
3
Kuantitas Pekerjaan M
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 1,650 - -
2 Tukang batu OH 0,275 - -
3 Kepala tukang OH 0,028 - -
4 Mandor OH 0,083 - -

2 Material :
1 Semen Portland Kg 384,000 - -
2 Pasir Beton Kg 0,494 - -
3 Kerikil Kg 0,770 - -
4 Air Liter 215,000 - -

3 Peralatan :
1 -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -

Jenis Pekerjaan : A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
Satuan Mata Pembayaran : Rp./Kg
Kuantitas Pekerjaan Kg
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,070 - -
2 Tukang Besi OH 0,070 - -
3 Kepala tukang OH 0,007 - -
4 Mandor OH 0,004 - -

2 Material :
1 Besi Beton Kg 10,500 - -
2 Kawat Beton Kg 0,150 - -

3 Peralatan :
1 -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -
Harga Satuan Pekerjaan/Kg (F+100) -
Jenis Pekerjaan : A.4.1.1.17 Pemasangan 1m2 bekisting dinding
Satuan Mata Pembayaran : Rp./Kg
Kuantitas Pekerjaan Kg
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,66 - -
2 Tukang Besi OH 0,33 - -
3 Kepala tukang OH 0,03 - -
4 Mandor OH 0,03 - -

2 Material :
Kayu kelas III m3 0,03 - -
Paku 5 - 12 cm kg 0,40 - -
Minyak bekisting Liter 0,20 - -
Balok kayu m3 0,02 - -
Triplex 9 mm Lbr 0,35 - -
Dolken kayu Ø 8-10/400 cm Batang 3,00 - -
Penjaga jarak bekisting / spacer Buah

3 Peralatan :
1 -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -

Jenis Pekerjaan : A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½”


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,054 - -
2 Tukang Pipa OH 0,090 - -
3 Kepala tukang OH 0,009 - -
4 Mandor OH 0,027 - -

2 Material :
1 Pipa Galvanize 1/2" m' 1,200 - -
2 Perlengkapan Ls 35% x Hrg Pipa -

3 Peralatan :
1 - Ls

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -
Jenis Pekerjaan : A.5.1.1 20. Pemasangan 1 m’ pipa galvanis diameter ¾"
Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,054 - -
2 Tukang Pipa OH 0,090 - -
3 Kepala tukang OH 0,009 - -
4 Mandor OH 0,027 - -

2 Material :
1 Pipa Galvanize 3/4" m' 1,200 - -
2 Perlengkapan Ls 35% x Hrg Pipa -

3 Peralatan :
1 -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -

Jenis Pekerjaan : A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1”


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,108 - -
2 Tukang Pipa OH 0,180 - -
3 Kepala tukang OH 0,018 - -
4 Mandor OH 0,005 - -

2 Material :
1 Pipa Galvanize 1" m' 1,200 - -
2 Perlengkapan Ls 35% x Hrg Pipa -

3 Peralatan :
1 -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -
Jenis Pekerjaan : A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1 1/4"
Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,108 - -
2 Tukang Pipa OH 0,180 - -
3 Kepala tukang OH 0,018 - -
4 Mandor OH 0,005 - -

2 Material :
1 Pipa Galvanize 1 1/4" m' 1,200 - -
2 Perlengkapan Ls 35% x Hrg Pipa -

3 Peralatan :
1 -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -

Jenis Pekerjaan : A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 1 ½"


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,108 - -
2 Tukang Pipa OH 0,180 - -
3 Kepala tukang OH 0,018 - -
4 Mandor OH 0,005 - -

2 Material :
1 Pipa Galvanize 1 1/2" m' 1,200 - -
2 Perlengkapan Ls 35% x Hrg Pipa -

3 Peralatan :
1 -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -
Jenis Pekerjaan : A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 2"
Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,108 - -
2 Tukang Pipa OH 0,180 - -
3 Kepala tukang OH 0,018 - -
4 Mandor OH 0,005 - -

2 Material :
1 Pipa Galvanize 2" m' 1,200 - -
2 Perlengkapan Ls 35% x Hrg Pipa -

3 Peralatan :
1 -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -

Jenis Pekerjaan : A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 2 1/2"


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,108 - -
2 Tukang Pipa OH 0,180 - -
3 Kepala tukang OH 0,018 - -
4 Mandor OH 0,005 - -

2 Material :
1 Pipa Galvanize 2 1/2" m' 1,200 - -
2 Perlengkapan Ls 35% x Hrg Pipa -

3 Peralatan :
1 -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -
Jenis Pekerjaan : A.5.1.1 23. Pemasangan 1 m’ pipa galvanis diameter 3"
Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,108 - -
2 Tukang Pipa OH 0,180 - -
3 Kepala tukang OH 0,018 - -
4 Mandor OH 0,005 - -

2 Material :
1 Pipa Galvanize 3" m' 1,200 - -
2 Perlengkapan Ls 35% x Hrg Pipa -

3 Peralatan :
1 -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -

Jenis Pekerjaan : A.5.1.1 24. Pemasangan 1 m’ pipa galvanis diameter 4"


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,108 - -
2 Tukang Pipa OH 0,180 - -
3 Kepala tukang OH 0,018 - -
4 Mandor OH 0,005 - -

2 Material :
1 Pipa Galvanize 4" m' 1,200 - -
2 Perlengkapan Ls 35% x Hrg Pipa -

3 Peralatan :
1 -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -
Jenis Pekerjaan : A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 90 mm
Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,035 - -
2 Tukang Pipa OH 0,017 - -
3 Mandor OH 0,003 - -

2 Material :
1 Pipa HDPE dia 90 mm m' 1,000 - -

3 Peralatan :
1 Sewa Tripot/Tackel & handle crane 2 T Jam 0,0190 - -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -

Jenis Pekerjaan : A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 75 mm


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,035 - -
2 Tukang Pipa OH 0,017 - -
3 Mandor OH 0,003 - -

2 Material :
1 Pipa HDPE dia 75 mm m' 1,000 - -

3 Peralatan :
1 Sewa Tripot/Tackel & handle crane 2 T Jam 0,0190 - -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -
Jenis Pekerjaan : A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 63 mm
Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,035 - -
2 Tukang Pipa OH 0,017 - -
3 Mandor OH 0,003 - -

2 Material :
1 Pipa HDPE dia 63 mm m' 1,000 - -

3 Peralatan :

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -

Jenis Pekerjaan : A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 50 mm


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,035 - -
2 Tukang Pipa OH 0,017 - -
3 Mandor OH 0,003 - -

2 Material :
1 Pipa HDPE dia 50 mm m' 1,000 - -

3 Peralatan :

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -
Jenis Pekerjaan : A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 40 mm
Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,035 - -
2 Tukang Pipa OH 0,017 - -
3 Mandor OH 0,003 - -

2 Material :
1 Pipa HDPE dia 40 mm m' 1,000 - -

3 Peralatan :

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -

Jenis Pekerjaan : A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 32 mm


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,035 - -
2 Tukang Pipa OH 0,017 - -
3 Mandor OH 0,003 - -

2 Material :
1 Pipa HDPE dia 32 mm m' 1,000 - -

3 Peralatan :

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -
Jenis Pekerjaan : A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 25 mm
Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,035 - -
2 Tukang Pipa OH 0,017 - -
3 Mandor OH 0,003 - -

2 Material :
1 Pipa HDPE dia 25 mm m' 1,000 - -

3 Peralatan :

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -

Jenis Pekerjaan : A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 20 mm


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,035 - -
2 Tukang Pipa OH 0,017 - -
3 Mandor OH 0,003 - -

2 Material :
1 Pipa HDPE dia 20 mm m' 1,000 - -

3 Peralatan :

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -
Jenis Pekerjaan : Las HDPE
Satuan Mata Pembayaran : Rp./Ttk
Kuantitas Pekerjaan Titik
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,035 - -
2 Tukang Las OH 0,017 - -
3 Mandor OH 0,003 - -

2 Material :
1 Bensin Ltr 0,005 - -

3 Peralatan :
1 Mesin Las Jam 0,0190 - -
2 Genset Jam 0,0190 - -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -

Jenis Pekerjaan : 1 M' Uji Coba/Pengetesan Pipa Ø 90/75 mm


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,0080 - -
2 Mandor OH 0,0008 - -

2 Material :
1 Air Bersih M3 0,0020 - -
2 Pertalite Ltr 0,0600 - -
3 Pelumas Ltr 0,0020 - -

3 Peralatan :
1 Pompa Test Tekan Hr 0,0008 - -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -
Jenis Pekerjaan : 1 M' Uji Coba/Pengetesan Pipa Ø 50/63 mm
Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,0080 - -
2 Mandor OH 0,0008 - -

2 Material :
1 Air Bersih M3 0,0020 - -
2 Pertalite Ltr 0,0600 - -
3 Pelumas Ltr 0,0020 - -

3 Peralatan :
1 Pompa Test Tekan Hr 0,0005 - -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -

Jenis Pekerjaan : 1 M' Uji Coba/Pengetesan Pipa Ø 40/32 mm


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,0060 - -
2 Mandor OH 0,0006 - -

2 Material :
1 Air Bersih M3 0,0015 - -
2 Pertalite Ltr 0,0400 - -
3 Pelumas Ltr 0,0015 - -

3 Peralatan :
1 Pompa Test Tekan Hr 0,0005 - -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -
Jenis Pekerjaan : 1 M' Uji Coba/Pengetesan Pipa Ø25/20 mm
Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 0,00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,0060 - -
2 Mandor OH 0,0006 - -

2 Material :
1 Air Bersih M3 0,0010 - -
2 Pertalite Ltr 0,0300 - -
3 Pelumas Ltr 0,0010 - -

3 Peralatan :
1 Pompa Test Tekan Hr 0,0003 - -

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -

Jenis Pekerjaan : A.2.2.1.13 Pembongkaran Pipa


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 0,00

HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,035 - -
2 Tukang Pipa OH 0,017 - -
3 Mandor OH 0,003 - -

2 Material :

3 Peralatan :

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -
Jenis Pekerjaan : Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas II
Satuan Mata Pembayaran : Rp./M3
Kuantitas Pekerjaan M3
Harga Satuan : Rp. 0,00

HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 4,000 - -
2 Tukang kayu OH 12,000 - -
3 Kepala tukang OH 1,200 - -
4 Mandor OH 0,200 - -

2 Material :
1 Balok kayu Kelas II m3 1,100 - -
2 Besi strip tebal 5 mm Kg 15,000 - -
3 Paku 12 cm Kg 5,600 - -

3 Peralatan :

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -
Jenis Pekerjaan : Pemasangan 1 m3 konstruksi gordeng, kayu kelas II
Satuan Mata Pembayaran : Rp./M3
Kuantitas Pekerjaan M3
Harga Satuan : Rp. 0,00

HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 2,400 - -
2 Tukang kayu OH 7,200 - -
3 Kepala tukang OH 0,720 - -
4 Mandor OH 0,120 - -

2 Material :
1 Balok kayu Kelas II m3 1,100 - -
2 Besi strip tebal 5 mm Kg 15,000 - -
3 Paku 12 cm Kg 3,000 - -

3 Peralatan :

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -
Jenis Pekerjaan : Pemasangan 1 m1 lisplank Papan GRC ( Woodplank)
Satuan Mata Pembayaran : Rp./M'
Kuantitas Pekerjaan M'
Harga Satuan : Rp. 0,00

HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,100 - -
2 Tukang kayu OH 0,200 - -
3 Kepala tukang OH 0,020 - -
4 Mandor OH 0,005 - -

2 Material :
1 Listplank GRC m 1,000 - -
2 Paku 5 dan 7 cm Kg 0,050 - -

3 Peralatan :

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -
Jenis Pekerjaan : Pemasangan 1 m2 Atap Seng BJLS 0.30 mm
Satuan Mata Pembayaran : Rp./M2
Kuantitas Pekerjaan M2
Harga Satuan : Rp. 0,00

HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,120 - -
2 Tukang kayu OH 0,060 - -
3 Kepala tukang OH 0,006 - -
4 Mandor OH 0,006 - -

2 Material :
1 Seng gelombang Lbr 0,900 - -
2 Paku seng Kg 0,020 - -

3 Peralatan :

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -
Jenis Pekerjaan : Pemasangan 1 m’ Nok/Bubung Atap Seng
Satuan Mata Pembayaran : Rp./M2
Kuantitas Pekerjaan M2
Harga Satuan : Rp. 0,00

HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0,150 - -
2 Tukang kayu OH 0,070 - -
3 Kepala tukang OH 0,007 - -
4 Mandor OH 0,006 - -

2 Material :
1 Seng pelat Lbr 1,100 - -
2 Paku biasa 1/2" - 1" Kg 0,040 - -

3 Peralatan :

Jumlah Harga Satuan -


Keuntungan dan Biaya Overhead 10 % -
Harga Satuan Pekerjaan -
HARGA SATUAN UPAH DAN BAHAN

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM)
DI DAERAH KABUPATEN
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/BRONCAPTERING
SUMUR DALAM TERLINDUNGI DESA SUKUTOKAN
LOKASI : KECAMATAN KELUBAGOLIT - KABUPATEN FLORES TIMUR – PROVINSI NTT
TA. : 2023

HARGA SATUAN
NO. U R A I A N SAT. SK Bupati Tahun Harga Analisa
Harga Survey Harga Dasar Harga Terpakai
2023 Onsite
A UPAH (UMR dibagi dengan 25 Hari Keja Efektif)

1 Pekerja OH
2 Tukang OH
3 Kepala Tukang OH
4 Mandor OH
5 Operator OH
6 Pembantu Operator OH
7 Sopir OH
8 Pembantu Sopir OH

B BAHAN
Price List Harga Harga Sampai Pel. Harga Analisa
B.1 PIPA Harga Bongkar Harga Terpakai
Surabaya 2023 Adonara Onsite

1 Pipa HDPE Ø 90 mm ( 3 inch ) Pn 16 Sdr 11 m'


2 Pipa HDPE Ø 75 mm ( 2 1/2 inch ) Pn 16 Sdr 11 m'
3 Pipa HDPE Ø 63 mm ( 2 inch ) Pn 16 Sdr 11 m'
4 Pipa HDPE Ø 50 mm ( 1 1/2 inch ) Pn 16 Sdr 11 m'
5 Pipa HDPE Ø 40 mm ( 1 1/4 inch ) Pn 16 Sdr 11 m'
6 Pipa HDPE Ø 32 mm ( 1 inch ) Pn 16 Sdr 11 m'
7 Pipa HDPE Ø 25 mm ( 3/4 inch ) Pn 16 Sdr 11 m'
8 Pipa HDPE Ø 20 mm ( 1/2 inch ) Pn 16 Sdr 11 m'
9 Pipa Galvanis 4" Medium A m'
10 Pipa Galvanis 3" Medium A m'
11 Pipa Galvanis 2 1/2" Medium A m'
12 Pipa Galvanis 2" Medium A m'
13 Pipa Galvanis 1 1/2" Medium A m'
14 Pipa Galvanis 1 1/4" Medium A m'
15 Pipa Galvanis 1" Medium A m'
16 Pipa Galvanis 3/4" Medium A m'
17 Pipa Galvanis 1/2" Medium A m'

B.2 AKSESORIS PIPA Harga Survey Fee Overhead Harga Terpakai


1 Coupler Ø 20 mm Bh
2 Coupler Ø 25 mm Bh
3 Coupler Ø 32 mm Bh
4 Coupler Ø 40 mm Bh
5 Coupler Ø 50 mm Bh
6 Coupler Ø 63 mm Bh
7 Male Adaptor Ø 20 mm x 1/2" Bh
8 Male Adaptor Ø 20 mm x 3/4" Bh
9 Male Adaptor Ø 25 mm x 3/4" Bh
10 Male Adaptor Ø 25 mm x 1" Bh
11 Male Adaptor Ø 32 mm x 1" Bh
12 Male Adaptor Ø 40 mm x 1 1/4" Bh
13 Male Adaptor Ø 50 mm x 1 1/2" Bh
14 Male Adaptor Ø 50 mm x 2" Bh
15 Male Thread Joint 1/2 " Bh
16 Male Thread Join 2 " Bh
17 Female Adaptor Ø 20 mm x 1/2" Bh
18 Female Adaptor Ø 25 mm x 3/4" Bh
19 Female Adaptor Ø 32 mm x 1" Bh
20 Female Adaptor Ø 40 mm x 1 1/4" Bh
21 Female Thread Join 1/2" Bh
22 Female Thread Join 3/4" Bh
23 Female Thread Join 1" Bh
24 Female Thread Join 1,5" Bh
25 Female Thread Join 2" Bh
24 Male Threaded Elbow 90⁰ Ø 20 mm x 1/2" Bh
25 Male Threaded Elbow 90⁰ Ø 25 mm x 3/4" Bh
26 Male Threaded Elbow 90⁰ Ø 32 mm x 1" Bh
27 Male Threaded Elbow 90⁰ Ø 50 mm x 1 1/2" Bh
28 Male Threaded Elbow 90⁰ Ø 63 mm x 2" Bh
29 Tee 90⁰ Ø 20 mm Bh
30 Tee 90⁰ Ø 25 mm Bh
31 Tee 90⁰ Ø 32 mm Bh
32 Tee 90⁰ Ø 40 mm Bh
33 Tee 90⁰ Ø 50 mm Bh
34 Tee 90⁰ Ø 63 mm Bh
35 Reducing Tee 90⁰ Ø 25 mm x Ø 20 mm Bh
36 Reducing Tee 90⁰ Ø 32 mm x Ø 25 mm Bh
37 Reducing Tee 90⁰ Ø 63 mm x Ø 32 mm Bh
38 Reducing Tee 90⁰ Ø 63 mm x Ø 50 mm Bh
39 Reducing Tee 90⁰ Ø 90 mm x Ø 32 mm Bh
40 Reducing Tee 90⁰ Ø 90 mm x Ø 63 mm Bh
41 Reducing Coupler Ø 25 mm x Ø 20 mm Bh
42 Reducing Coupler Ø 32 mm x Ø 20 mm Bh
43 Reducing Coupler Ø 32 mm x Ø 25 mm Bh
44 Reducing Coupler Ø 40 mm x Ø 25 mm Bh
45 Reducing Coupler Ø 40 mm x Ø 32 mm Bh
46 Reducing Coupler Ø 50 mm x Ø 32 mm Bh
47 Reducing Coupler Ø 50 mm x Ø 40 mm Bh
48 Reducing Coupler Ø 63 mm x Ø 32 mm Bh
49 Reducing Coupler Ø 63 mm x Ø 50 mm Bh
50 Reducing Coupler Ø 90 mm x Ø 32 mm Bh
51 Reducing Coupler Ø 90 mm x Ø 63 mm Bh
52 Elbow 90⁰ Ø 20 mm Bh
53 Elbow 90⁰ Ø 25 mm Bh
54 Elbow 90⁰ Ø 32 mm Bh
55 Elbow 90⁰ Ø 40 mm Bh
56 Elbow 90⁰ Ø 50 mm Bh
57 Elbow 90⁰ Ø 63 mm Bh
58 Female Threaded Elbow 90⁰ Ø 20 mm x 1/2" Bh
59 Female Threaded Elbow 90⁰ Ø 25 mm x 3/4" Bh
60 Female Threaded Elbow 90⁰ Ø 32 mm x 1" Bh
61 Female Threaded Elbow 90⁰ Ø 50 mm x 1 1/2" Bh
62 Female Threaded Elbow 90⁰ Ø 63 mm x 2" Bh
63 Female Threaded Tee 90⁰ Ø 20 mm x 1/2" Bh
64 Female Threaded Tee 90⁰ Ø 25 mm x 3/4" Bh
65 Female Threaded Tee 90⁰ Ø 32 mm x 1" Bh
66 Female Threaded Tee 90⁰ Ø 50 mm x 1 1/2" Bh
67 Female Threaded Tee 90⁰ Ø 63 mm x 2" Bh
68 End Cap Ø 20 mm Bh
69 End Cap Ø 25 mm Bh
70 End Cap Ø 32 mm Bh
71 End Cap Ø 40 mm Bh
72 End Cap Ø 50 mm Bh
73 End Cap Ø 63 mm Bh
74 Flanged Joint Ø 50 mm x 1 1/2" Bh
75 Flanged Joint Ø 63 mm x 2" Bh
76 Clamp Sadle Ø 25 mm x 1/2" Bh
77 Clamp Sadle Ø 32 mm x 1/2" Bh
78 Clamp Sadle Ø 50 mm x 1/2" Bh
79 Clamp Sadle Ø 63 mm x 1/2" Bh
80 Clamp Sadle Ø 90 mm x 1/2" Bh
81 Clamp Sadle Ø 110 mm x 1/2" Bh
82 Knee 90ᴼ GIP Ø 1/2" Bh
83 Knee 90ᴼ GIP Ø 3/4" Bh
84 Knee 90ᴼ GIP Ø 1" Bh
85 Knee 90ᴼ GIP Ø 1 1/4" Bh
86 Knee 90ᴼ GIP Ø 1 1/2" Bh
87 Knee 90ᴼ GIP Ø 2" Bh
88 Knee 90ᴼ GIP Ø 2 1/2" Bh
89 Knee 90ᴼ GIP Ø 3" Bh
90 Knee 90ᴼ GIP Ø 4" Bh
91 Knee 45ᴼ GIP Ø 1/2" Bh
92 Knee 45ᴼ GIP Ø 3/4" Bh
93 Knee 45ᴼ GIP Ø 1" Bh
94 Knee 45ᴼ GIP Ø 1 1/4" Bh
95 Knee 45ᴼ GIP Ø 1 1/2" Bh
96 Knee 45ᴼ GIP Ø 2" Bh
97 Knee 45ᴼ GIP Ø 2 1/2" Bh
98 Knee 45ᴼ GIP Ø 3" Bh
99 Knee 45ᴼ GIP Ø 4" Bh
100 Tee GIP Ø 1/2" Bh
101 Tee GIP Ø 3/4" Bh
102 Tee GIP Ø 1" Bh
103 Tee GIP Ø 1 1/4" Bh
104 Tee GIP Ø 1 1/2" Bh
105 Tee GIP Ø 2" Bh
106 Tee GIP Ø 2 1/2" Bh
107 Tee GIP Ø 3" Bh
108 Tee GIP Ø 4" Bh
109 Socket GIP Ø 1/2" Bh
110 Socket GIP Ø 3/4" Bh
111 Socket GIP Ø 1" Bh
112 Socket GIP Ø 1 1/4" Bh
113 Socket GIP Ø 1 1/2" Bh
114 Socket GIP Ø 2" Bh
115 Socket GIP Ø 2 1/2" Bh
116 Socket GIP Ø 3" Bh
117 Socket GIP Ø 4" Bh
118 Double Niple GIP Ø 1/2" Bh
119 Double Niple GIP Ø 3/4" Bh
120 Double Niple GIP Ø 1" Bh
121 Double Niple GIP Ø 1 1/4" Bh
122 Double Niple GIP Ø 1 1/2" Bh
123 Double Niple GIP Ø 2" Bh
124 Double Niple GIP Ø 2 1/2" Bh
125 Double Niple GIP Ø 3" Bh
126 Double Niple GIP Ø 4" Bh
127 Watermour GIP Ø 1/2" Bh
128 Watermour GIP Ø 3/4" Bh
129 Watermour GIP Ø 1" Bh
130 Watermour GIP Ø 1 1/4" Bh
131 Watermour GIP Ø 1 1/2" Bh
132 Watermour GIP Ø 2" Bh
133 Watermour GIP Ø 2 1/2" Bh
134 Watermour GIP Ø 3" Bh
135 Watermour GIP Ø 4" Bh
136 Plug GIP Ø 1/2" Bh
137 Plug GIP Ø 3/4" Bh
138 Plug GIP Ø 1" Bh
139 Plug GIP Ø 1 1/4" Bh
140 Plug GIP Ø 1 1/2" Bh
141 Plug GIP Ø 2" Bh
142 Plug GIP Ø 2 1/2" Bh
143 Plug GIP Ø 3" Bh
144 Plug GIP Ø 4" Bh
145 Dop GIP Ø 1/2" Bh
146 Dop GIP Ø 3/4" Bh
147 Dop GIP Ø 1" Bh
148 Dop GIP Ø 1 1/4" Bh
149 Dop GIP Ø 1 1/2" Bh
150 Dop GIP Ø 2" Bh
151 Dop GIP Ø 2 1/2" Bh
152 Dop GIP Ø 3" Bh
153 Dop GIP Ø 4" Bh
154 V. Socket GIP Ø 1/2" Bh
155 V. Socket GIP Ø 3/4" Bh
156 V. Socket GIP Ø 1" Bh
157 V. Socket GIP Ø 1 1/4" Bh
158 V. Socket GIP Ø 1 1/2" Bh
159 V. Socket GIP Ø 2" Bh
160 V. Socket GIP Ø 2 1/2" Bh
161 V. Socket GIP Ø 3" Bh
162 V. Socket GIP Ø 4" Bh
163 V. Tee GIP Ø 1/2" Bh
164 V. Tee GIP Ø 3/4" Bh
165 V. Tee GIP Ø 1" Bh
166 V. Tee GIP Ø 1 1/4" Bh
167 V. Tee GIP Ø 1 1/2" Bh
168 V. Tee GIP Ø 2" Bh
169 V. Tee GIP Ø 2 1/2" Bh
170 V. Tee GIP Ø 3" Bh
171 V. Tee GIP Ø 4" Bh
172 V. Ring GIP Ø 1/2" Bh
173 V. Ring GIP Ø 3/4" Bh
174 V. Ring GIP Ø 1" Bh
175 V. Ring GIP Ø 1 1/4" Bh
176 V. Ring GIP Ø 1 1/2" Bh
177 V. Ring GIP Ø 2" Bh
178 V. Ring GIP Ø 2 1/2" Bh
179 V. Ring GIP Ø 3" Bh
180 V. Ring GIP Ø 4" Bh
181 Flange Drat GIP Ø 1/2" Bh
182 Flange Drat GIP Ø 3/4" Bh
183 Flange Drat GIP Ø 1" Bh
184 Flange Drat GIP Ø 1 1/4" Bh
185 Flange Drat GIP Ø 1 1/2" Bh
186 Flange Drat GIP Ø 2" Bh
187 Flange Drat GIP Ø 2 1/2" Bh
188 Flange Drat GIP Ø 3" Bh
189 Flange Drat GIP Ø 4" Bh
190 V. Knee GIP Ø 3/4" Bh
191 V. Knee GIP Ø 1" Bh
192 V. Knee GIP Ø 1 1/4" Bh
193 Clamp Saddle 2" x 1/2 " Bh
194 Clamp Saddle 1 1/2" x 1/2 " Bh
195 Clamp Saddle 1 " x 1/2 " Bh
196 Clamp Saddle 3/4" x 1/2 " Bh
197 Clamp Saddle Ø 4" - Black Malliable Iron Bh
198 Packing Karet 1,5" Bh
199 Packing Karet 2" Bh
195 Packing Karet 3" Bh
196 Plug Valve 1/2" - Kuningan Bh
197 Check Valve 1/2" - Kuningan Bh
198 Water Meter Ø 15 mm ( 1/2" ) - SNI 2547 : 2008 Bh
199 Kran Air GIP Ø 15 mm ( 1/2" ) Bh
200 Kran Air GIP Ø 20 mm ( 3/4" ) Bh
201 Kran Air GIP Ø 32 mm ( 1" ) Bh
202 Stop Kran GIP Ø 1 1/2" Bh
203 Stop Kran GIP Ø 1" Bh
204 Stop Kran GIP Ø 3/4" Bh
205 Stop Kran GIP Ø 1/2" Bh
206 Box Meter (bahan Plastik) Bh
207 Wall Pipa 1,5 Bh
208 Ball Valve 1/2" - Kuningan Bh
209 Gate Valve 1/2" Bh
210 Gate Valve 3/4" Bh
211 Gate Valve 1" Bh
212 Gate Valve 1 1/2" Bh
213 Gate Valve 2" Bh
214 Gate Valve 2 1/2" Bh
215 Gate Valve 3" Bh
216 Gate Valve 2" All Flange Bh
217 Long bow Gips Bh
218 Air Valve GIP Φ 2" Bh
219 Air Valve GIP Φ 1 1/2" Bh
220 Air Valve GIP Φ 1" Bh
221 Y strainer Ø 2" All Flange Cast Iron Bh
222 Check Valve Cast Iron Flange Ø 2" All Flange Bh
223 Water Meter Induk Dia.2" All Flange Bh
224 Selotip Bh
225 Pelapung tengki - bola stailess 1 dim Bh
217 Plat nama stainles atau kuningan uk. 10x12cm Bh
218 Pasang Daya Baru PLN 23 KVA Bh
219 Pasang Daya Baru PLN 33 KVA Bh
220 Pompa Centrifuqal Bh

B.3 BAHAN LAIN

1 Air ltr
2 Batu Kali / Karang / Gunung m3
3 Batu Bata Merah Bh
4 Batu Pecah m3
5 Pasir Urug m3
6 Pasir Pasang / Cor m3
7 Semen Kg
8 Besi Beton Polos Kg
9 Kawat Ikat Kg
10 Engsel Bh
11 Plat Baja Penutup m2
12 Papan Kayu Begesting m3
13 Pertalite Ltr
13 Balok Kayu Kelas II m3
14 Tripleks Tebal 9 mm lbr
15 Minyak Begesting ltr
16 Cat Waterproofing Kg
17 Plamuur Kg
18 Cat Dasar Kg
19 Plat Nama Stainless / Kuningan Bh
20 Solar Industri ltr
21 Bensin Industri ltr
22 Plat Strip m2
23 Baut Ø 10 Bh
24 Oli ltr
25 Kawat Las btg
26 Kayu Kelas III m3
27 Paku 7- 10 cm kg
28 Besi H Beam Kg
29 Kawat Bronjong Pabrikasi Bh
30 dolken kayu bh
31 Listplank GRC M'
32 Seng pelat M'
33 Seng gelombang BJLS 0,3 mm Lembar
34 Paku seng Kg
C ALAT Harga Terpakai

1 Dump Truck Jam


2 Exavator Jam
3 Mesin Las HDPE Jam
4 Mesin Las Listrik Jam
5 Pompa Tes Tekan Jam
6 Stamper Jam
7 Concrete Mixer Jam
8 Concrete Vibrator Jam
9 Jack Hammer Jam
10 Genset Jam
11 Tripod/ Tackle & Handle Crane 2T Jam
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM)
: DI DAERAH KABUPATEN
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/BRONCAPTERING
: SUMUR DALAM TERLINDUNGI DESA SUKUTOKAN
LOKASI : KECAMATAN KELUBAGOLIT - KABUPATEN FLORES TIMUR – PROVINSI NTT
TA. : 2023

No. URAIAN Sat KET.

1. Pipa HDPE Ø 90 mm ( 3 inch ) Pn 16 Sdr 11

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Adonara O1 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S Km
- Jarak Angkut ( PP = 2 x L ) Km
- Kecepatan Rata-rata dengan muatan v1 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 Km/Jam
- Kecepatan Rata-rata v3 Km/Jam
- Jumlah Pekerja yang dibutuhkan P Orang
- Jam Kerja per Hari Tk Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 Jam
- Jumlah trip perhari (Tk/t2) t3 Trip
- Kapasitas angkut per trip m m'
- Biaya Sewa Truck/Hari A Rupiah
- Produksi per hari t3 x m Kp m'
- Biaya angkut A / Kp O2 Rp/m'
- Upah Pekerja Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L km.
b - Jarak angkut PP = 2xL km.
meter
c - Jam kerja efektif jam
d - Kecepatan berjalan m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d Jam
e2. Waktu lain-lain PP Menit
Jam
f - Jumlah trip perhari (c-e2) / e1 Trip
g - Kapasitas Angkut perorang meter
h - Produksi per hari gxf meter

i - Ongkos angkut = Upah pekerja Rp - O4 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Terong Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ipiebang Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Bama Rp/m
d Biaya Angkut dari Desa Ke Lokasi Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM)
: DI DAERAH KABUPATEN
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/BRONCAPTERING
: SUMUR DALAM TERLINDUNGI DESA SUKUTOKAN
LOKASI : KECAMATAN KELUBAGOLIT - KABUPATEN FLORES TIMUR – PROVINSI NTT
TA. : 2023

No. URAIAN Sat KET.

2. Pipa HDPE Ø 75 mm ( 2 1/2 inch ) Pn 16 Sdr 11

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Adonara O1 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S Km
- Jarak Angkut ( PP = 2 x L ) Km
- Kecepatan Rata-rata dengan muatan v1 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 Km/Jam
- Kecepatan Rata-rata v3 Km/Jam
- Jumlah Pekerja yang dibutuhkan P Orang
- Jam Kerja per Hari Tk Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 Jam
- Jumlah trip perhari (Tk/t2) t3 Trip
- Kapasitas angkut per trip m m'
- Biaya Sewa Truck/Hari A Rupiah
- Produksi per hari t3 x m Kp m'
- Biaya angkut A / Kp O2 Rp/m'
- Upah Pekerja Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L km.
b - Jarak angkut PP = 2xL km.
meter
c - Jam kerja efektif jam
d - Kecepatan berjalan m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d Jam
e2. Waktu lain-lain PP Menit
Jam
f - Jumlah trip perhari (c-e2) / e1 Trip
g - Kapasitas Angkut perorang meter
h - Produksi per hari gxf meter

i - Ongkos angkut = Upah pekerja Rp - O4 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Terong Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ipiebang Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Bama Rp/m
d Biaya Angkut dari Desa Ke Lokasi Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM)
: DI DAERAH KABUPATEN
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/BRONCAPTERING
: SUMUR DALAM TERLINDUNGI DESA SUKUTOKAN
LOKASI : KECAMATAN KELUBAGOLIT - KABUPATEN FLORES TIMUR – PROVINSI NTT
TA. : 2023

No. URAIAN Sat KET.

3. Pipa HDPE Ø 63 mm ( 2 inch ) Pn 16 Sdr 11

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Adonara O1 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S Km
- Jarak Angkut ( PP = 2 x L ) Km
- Kecepatan Rata-rata dengan muatan v1 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 Km/Jam
- Kecepatan Rata-rata v3 Km/Jam
- Jumlah Pekerja yang dibutuhkan P Orang
- Jam Kerja per Hari Tk Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 Jam
- Jumlah trip perhari (Tk/t2) t3 Trip
- Kapasitas angkut per trip m m'
- Biaya Sewa Truck/Hari A Rupiah
- Produksi per hari t3 x m Kp m'
- Biaya angkut A / Kp O2 Rp/m'
- Upah Pekerja Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L km.
b - Jarak angkut PP = 2xL km.
meter
c - Jam kerja efektif jam
d - Kecepatan berjalan m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d Jam
e2. Waktu lain-lain PP Menit
Jam
f - Jumlah trip perhari (c-e2) / e1 Trip
g - Kapasitas Angkut perorang meter
h - Produksi per hari gxf meter

i - Ongkos angkut = Upah pekerja Rp - O4 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Terong Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ipiebang Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Bama Rp/m
d Biaya Angkut dari Desa Ke Lokasi Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM)
: DI DAERAH KABUPATEN
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/BRONCAPTERING
: SUMUR DALAM TERLINDUNGI DESA SUKUTOKAN
LOKASI : KECAMATAN KELUBAGOLIT - KABUPATEN FLORES TIMUR – PROVINSI NTT
TA. : 2023

No. URAIAN Sat KET.

4. Pipa HDPE Ø 50 mm ( 1 1/2 inch ) Pn 16 Sdr 11

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Adonara O1 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S Km
- Jarak Angkut ( PP = 2 x L ) Km
- Kecepatan Rata-rata dengan muatan v1 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 Km/Jam
- Kecepatan Rata-rata v3 Km/Jam
- Jumlah Pekerja yang dibutuhkan P Orang
- Jam Kerja per Hari Tk Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 Jam
- Jumlah trip perhari (Tk/t2) t3 Trip
- Kapasitas angkut per trip m m'
- Biaya Sewa Truck/Hari A Rupiah
- Produksi per hari t3 x m Kp m'
- Biaya angkut A / Kp O2 Rp/m'
- Upah Pekerja Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L km.
b - Jarak angkut PP = 2xL km.
meter
c - Jam kerja efektif jam
d - Kecepatan berjalan m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d Jam
e2. Waktu lain-lain PP Menit
Jam
f - Jumlah trip perhari (c-e2) / e1 Trip
g - Kapasitas Angkut perorang meter
h - Produksi per hari gxf meter

i - Ongkos angkut = Upah pekerja Rp - O4 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Terong Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ipiebang Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Bama Rp/m
d Biaya Angkut dari Desa Ke Lokasi Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM)
: DI DAERAH KABUPATEN
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/BRONCAPTERING
: SUMUR DALAM TERLINDUNGI DESA SUKUTOKAN
LOKASI : KECAMATAN KELUBAGOLIT - KABUPATEN FLORES TIMUR – PROVINSI NTT
TA. : 2023

No. URAIAN Sat KET.

5. Pipa HDPE Ø 40 mm ( 1 1/4 inch ) Pn 16 Sdr 11

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Adonara O1 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S Km
- Jarak Angkut ( PP = 2 x L ) Km
- Kecepatan Rata-rata dengan muatan v1 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 Km/Jam
- Kecepatan Rata-rata v3 Km/Jam
- Jumlah Pekerja yang dibutuhkan P Orang
- Jam Kerja per Hari Tk Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 Jam
- Jumlah trip perhari (Tk/t2) t3 Trip
- Kapasitas angkut per trip m m'
- Biaya Sewa Truck/Hari A Rupiah
- Produksi per hari t3 x m Kp m'
- Biaya angkut A / Kp O2 Rp/m'
- Upah Pekerja Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L km.
b - Jarak angkut PP = 2xL km.
meter
c - Jam kerja efektif jam
d - Kecepatan berjalan m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d Jam
e2. Waktu lain-lain PP Menit
Jam
f - Jumlah trip perhari (c-e2) / e1 Trip
g - Kapasitas Angkut perorang meter
h - Produksi per hari gxf meter

i - Ongkos angkut = Upah pekerja Rp - O4 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Terong Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ipiebang Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Bama Rp/m
d Biaya Angkut dari Desa Ke Lokasi Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM)
: DI DAERAH KABUPATEN
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/BRONCAPTERING
: SUMUR DALAM TERLINDUNGI DESA SUKUTOKAN
LOKASI : KECAMATAN KELUBAGOLIT - KABUPATEN FLORES TIMUR – PROVINSI NTT
TA. : 2023

No. URAIAN Sat KET.

6. Pipa HDPE Ø 32 mm ( 1 inch ) Pn 16 Sdr 11

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Adonara O1 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S Km
- Jarak Angkut ( PP = 2 x L ) Km
- Kecepatan Rata-rata dengan muatan v1 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 Km/Jam
- Kecepatan Rata-rata v3 Km/Jam
- Jumlah Pekerja yang dibutuhkan P Orang
- Jam Kerja per Hari Tk Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 Jam
- Jumlah trip perhari (Tk/t2) t3 Trip
- Kapasitas angkut per trip m m'
- Biaya Sewa Truck/Hari A Rupiah
- Produksi per hari t3 x m Kp m'
- Biaya angkut A / Kp O2 Rp/m'
- Upah Pekerja Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L km.
b - Jarak angkut PP = 2xL km.
meter
c - Jam kerja efektif jam
d - Kecepatan berjalan m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d Jam
e2. Waktu lain-lain PP Menit
Jam
f - Jumlah trip perhari (c-e2) / e1 Trip
g - Kapasitas Angkut perorang meter
h - Produksi per hari gxf meter

i - Ongkos angkut = Upah pekerja Rp - O4 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Terong Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ipiebang Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Bama Rp/m
d Biaya Angkut dari Desa Ke Lokasi Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM)
: DI DAERAH KABUPATEN
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/BRONCAPTERING
: SUMUR DALAM TERLINDUNGI DESA SUKUTOKAN
LOKASI : KECAMATAN KELUBAGOLIT - KABUPATEN FLORES TIMUR – PROVINSI NTT
TA. : 2023

No. URAIAN Sat KET.

7. Pipa HDPE Ø 25 mm ( 3/4 inch ) Pn 16 Sdr 11

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Adonara O1 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S Km
- Jarak Angkut ( PP = 2 x L ) Km
- Kecepatan Rata-rata dengan muatan v1 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 Km/Jam
- Kecepatan Rata-rata v3 Km/Jam
- Jumlah Pekerja yang dibutuhkan P Orang
- Jam Kerja per Hari Tk Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 Jam
- Jumlah trip perhari (Tk/t2) t3 Trip
- Kapasitas angkut per trip m m'
- Biaya Sewa Truck/Hari A Rupiah
- Produksi per hari t3 x m Kp m'
- Biaya angkut A / Kp O2 Rp/m'
- Upah Pekerja Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L km.
b - Jarak angkut PP = 2xL km.
meter
c - Jam kerja efektif jam
d - Kecepatan berjalan m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d Jam
e2. Waktu lain-lain PP Menit
Jam
f - Jumlah trip perhari (c-e2) / e1 Trip
g - Kapasitas Angkut perorang meter
h - Produksi per hari gxf meter

i - Ongkos angkut = Upah pekerja Rp - O4 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Terong Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ipiebang Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Bama Rp/m
d Biaya Angkut dari Desa Ke Lokasi Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM)
: DI DAERAH KABUPATEN
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/BRONCAPTERING
: SUMUR DALAM TERLINDUNGI DESA SUKUTOKAN
LOKASI : KECAMATAN KELUBAGOLIT - KABUPATEN FLORES TIMUR – PROVINSI NTT
TA. : 2023

No. URAIAN Sat KET.

8. Pipa HDPE Ø 20 mm ( 1/2 inch ) Pn 16 Sdr 11

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Adonara O1 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S Km
- Jarak Angkut ( PP = 2 x L ) Km
- Kecepatan Rata-rata dengan muatan v1 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 Km/Jam
- Kecepatan Rata-rata v3 Km/Jam
- Jumlah Pekerja yang dibutuhkan P Orang
- Jam Kerja per Hari Tk Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 Jam
- Jumlah trip perhari (Tk/t2) t3 Trip
- Kapasitas angkut per trip m m'
- Biaya Sewa Truck/Hari A Rupiah
- Produksi per hari t3 x m Kp m'
- Biaya angkut A / Kp O2 Rp/m'
- Upah Pekerja Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L km.
b - Jarak angkut PP = 2xL km.
meter
c - Jam kerja efektif jam
d - Kecepatan berjalan m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d Jam
e2. Waktu lain-lain PP Menit
Jam
f - Jumlah trip perhari (c-e2) / e1 Trip
g - Kapasitas Angkut perorang meter
h - Produksi per hari gxf meter

i - Ongkos angkut = Upah pekerja Rp - O4 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Terong Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ipiebang Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Bama Rp/m
d Biaya Angkut dari Desa Ke Lokasi Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM)
: DI DAERAH KABUPATEN
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/BRONCAPTERING
: SUMUR DALAM TERLINDUNGI DESA SUKUTOKAN
LOKASI : KECAMATAN KELUBAGOLIT - KABUPATEN FLORES TIMUR – PROVINSI NTT
TA. : 2023

No. URAIAN Sat KET.

9. Pipa Galvanis 4" Medium A

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Adonara O1 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S Km
- Jarak Angkut ( PP = 2 x L ) Km
- Kecepatan Rata-rata dengan muatan v1 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 Km/Jam
- Kecepatan Rata-rata v3 Km/Jam
- Jumlah Pekerja yang dibutuhkan P Orang
- Jam Kerja per Hari Tk Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 Jam
- Jumlah trip perhari (Tk/t2) t3 Trip
- Kapasitas angkut per trip m m'
- Biaya Sewa Truck/Hari A Rupiah
- Produksi per hari t3 x m Kp m'
- Biaya angkut A / Kp O2 Rp/m'
- Upah Pekerja Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L km.
b - Jarak angkut PP = 2xL km.
meter
c - Jam kerja efektif jam
d - Kecepatan berjalan m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d Jam
e2. Waktu lain-lain PP Menit
Jam
f - Jumlah trip perhari (c-e2) / e1 Trip
g - Kapasitas Angkut perorang meter
h - Produksi per hari gxf meter

i - Ongkos angkut = Upah pekerja Rp - O4 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Terong Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ipiebang Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Bama Rp/m
d Biaya Angkut dari Desa Ke Lokasi Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM)
: DI DAERAH KABUPATEN
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/BRONCAPTERING
: SUMUR DALAM TERLINDUNGI DESA SUKUTOKAN
LOKASI : KECAMATAN KELUBAGOLIT - KABUPATEN FLORES TIMUR – PROVINSI NTT
TA. : 2023

No. URAIAN Sat KET.

10. Pipa Galvanis 3" Medium A

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Adonara O1 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S Km
- Jarak Angkut ( PP = 2 x L ) Km
- Kecepatan Rata-rata dengan muatan v1 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 Km/Jam
- Kecepatan Rata-rata v3 Km/Jam
- Jumlah Pekerja yang dibutuhkan P Orang
- Jam Kerja per Hari Tk Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 Jam
- Jumlah trip perhari (Tk/t2) t3 Trip
- Kapasitas angkut per trip m m'
- Biaya Sewa Truck/Hari A Rupiah
- Produksi per hari t3 x m Kp m'
- Biaya angkut A / Kp O2 Rp/m'
- Upah Pekerja Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L km.
b - Jarak angkut PP = 2xL km.
meter
c - Jam kerja efektif jam
d - Kecepatan berjalan m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d Jam
e2. Waktu lain-lain PP Menit
Jam
f - Jumlah trip perhari (c-e2) / e1 Trip
g - Kapasitas Angkut perorang meter
h - Produksi per hari gxf meter

i - Ongkos angkut = Upah pekerja Rp - O4 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Terong Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ipiebang Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Bama Rp/m
d Biaya Angkut dari Desa Ke Lokasi Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM)
: DI DAERAH KABUPATEN
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/BRONCAPTERING
: SUMUR DALAM TERLINDUNGI DESA SUKUTOKAN
LOKASI : KECAMATAN KELUBAGOLIT - KABUPATEN FLORES TIMUR – PROVINSI NTT
TA. : 2023

No. URAIAN Sat KET.

11. Pipa Galvanis 2 1/2" Medium A

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Adonara O1 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S Km
- Jarak Angkut ( PP = 2 x L ) Km
- Kecepatan Rata-rata dengan muatan v1 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 Km/Jam
- Kecepatan Rata-rata v3 Km/Jam
- Jumlah Pekerja yang dibutuhkan P Orang
- Jam Kerja per Hari Tk Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 Jam
- Jumlah trip perhari (Tk/t2) t3 Trip
- Kapasitas angkut per trip m m'
- Biaya Sewa Truck/Hari A Rupiah
- Produksi per hari t3 x m Kp m'
- Biaya angkut A / Kp O2 Rp/m'
- Upah Pekerja Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L km.
b - Jarak angkut PP = 2xL km.
meter
c - Jam kerja efektif jam
d - Kecepatan berjalan m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d Jam
e2. Waktu lain-lain PP Menit
Jam
f - Jumlah trip perhari (c-e2) / e1 Trip
g - Kapasitas Angkut perorang meter
h - Produksi per hari gxf meter

i - Ongkos angkut = Upah pekerja Rp - O4 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Terong Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ipiebang Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Bama Rp/m
d Biaya Angkut dari Desa Ke Lokasi Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM)
: DI DAERAH KABUPATEN
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/BRONCAPTERING
: SUMUR DALAM TERLINDUNGI DESA SUKUTOKAN
LOKASI : KECAMATAN KELUBAGOLIT - KABUPATEN FLORES TIMUR – PROVINSI NTT
TA. : 2023

No. URAIAN Sat KET.

12. Pipa Galvanis 2" Medium A

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Adonara O1 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S Km
- Jarak Angkut ( PP = 2 x L ) Km
- Kecepatan Rata-rata dengan muatan v1 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 Km/Jam
- Kecepatan Rata-rata v3 Km/Jam
- Jumlah Pekerja yang dibutuhkan P Orang
- Jam Kerja per Hari Tk Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 Jam
- Jumlah trip perhari (Tk/t2) t3 Trip
- Kapasitas angkut per trip m m'
- Biaya Sewa Truck/Hari A Rupiah
- Produksi per hari t3 x m Kp m'
- Biaya angkut A / Kp O2 Rp/m'
- Upah Pekerja Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L km.
b - Jarak angkut PP = 2xL km.
meter
c - Jam kerja efektif jam
d - Kecepatan berjalan m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d Jam
e2. Waktu lain-lain PP Menit
Jam
f - Jumlah trip perhari (c-e2) / e1 Trip
g - Kapasitas Angkut perorang meter
h - Produksi per hari gxf meter

i - Ongkos angkut = Upah pekerja Rp - O4 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Terong Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ipiebang Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Bama Rp/m
d Biaya Angkut dari Desa Ke Lokasi Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM)
: DI DAERAH KABUPATEN
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/BRONCAPTERING
: SUMUR DALAM TERLINDUNGI DESA SUKUTOKAN
LOKASI : KECAMATAN KELUBAGOLIT - KABUPATEN FLORES TIMUR – PROVINSI NTT
TA. : 2023

No. URAIAN Sat KET.

13. Pipa Galvanis 1 1/2" Medium A

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Adonara O1 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S Km
- Jarak Angkut ( PP = 2 x L ) Km
- Kecepatan Rata-rata dengan muatan v1 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 Km/Jam
- Kecepatan Rata-rata v3 Km/Jam
- Jumlah Pekerja yang dibutuhkan P Orang
- Jam Kerja per Hari Tk Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 Jam
- Jumlah trip perhari (Tk/t2) t3 Trip
- Kapasitas angkut per trip m m'
- Biaya Sewa Truck/Hari A Rupiah
- Produksi per hari t3 x m Kp m'
- Biaya angkut A / Kp O2 Rp/m'
- Upah Pekerja Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L km.
b - Jarak angkut PP = 2xL km.
meter
c - Jam kerja efektif jam
d - Kecepatan berjalan m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d Jam
e2. Waktu lain-lain PP Menit
Jam
f - Jumlah trip perhari (c-e2) / e1 Trip
g - Kapasitas Angkut perorang meter
h - Produksi per hari gxf meter

i - Ongkos angkut = Upah pekerja Rp - O4 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Terong Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ipiebang Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Bama Rp/m
d Biaya Angkut dari Desa Ke Lokasi Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM)
: DI DAERAH KABUPATEN
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/BRONCAPTERING
: SUMUR DALAM TERLINDUNGI DESA SUKUTOKAN
LOKASI : KECAMATAN KELUBAGOLIT - KABUPATEN FLORES TIMUR – PROVINSI NTT
TA. : 2023

No. URAIAN Sat KET.

14. Pipa Galvanis 1 1/4" Medium A

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Adonara O1 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S Km
- Jarak Angkut ( PP = 2 x L ) Km
- Kecepatan Rata-rata dengan muatan v1 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 Km/Jam
- Kecepatan Rata-rata v3 Km/Jam
- Jumlah Pekerja yang dibutuhkan P Orang
- Jam Kerja per Hari Tk Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 Jam
- Jumlah trip perhari (Tk/t2) t3 Trip
- Kapasitas angkut per trip m m'
- Biaya Sewa Truck/Hari A Rupiah
- Produksi per hari t3 x m Kp m'
- Biaya angkut A / Kp O2 Rp/m'
- Upah Pekerja Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L km.
b - Jarak angkut PP = 2xL km.
meter
c - Jam kerja efektif jam
d - Kecepatan berjalan m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d Jam
e2. Waktu lain-lain PP Menit
Jam
f - Jumlah trip perhari (c-e2) / e1 Trip
g - Kapasitas Angkut perorang meter
h - Produksi per hari gxf meter

i - Ongkos angkut = Upah pekerja Rp - O4 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Terong Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ipiebang Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Bama Rp/m
d Biaya Angkut dari Desa Ke Lokasi Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM)
: DI DAERAH KABUPATEN
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/BRONCAPTERING
: SUMUR DALAM TERLINDUNGI DESA SUKUTOKAN
LOKASI : KECAMATAN KELUBAGOLIT - KABUPATEN FLORES TIMUR – PROVINSI NTT
TA. : 2023

No. URAIAN Sat KET.

15. Pipa Galvanis 1" Medium A

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Adonara O1 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S Km
- Jarak Angkut ( PP = 2 x L ) Km
- Kecepatan Rata-rata dengan muatan v1 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 Km/Jam
- Kecepatan Rata-rata v3 Km/Jam
- Jumlah Pekerja yang dibutuhkan P Orang
- Jam Kerja per Hari Tk Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 Jam
- Jumlah trip perhari (Tk/t2) t3 Trip
- Kapasitas angkut per trip m m'
- Biaya Sewa Truck/Hari A Rupiah
- Produksi per hari t3 x m Kp m'
- Biaya angkut A / Kp O2 Rp/m'
- Upah Pekerja Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L km.
b - Jarak angkut PP = 2xL km.
meter
c - Jam kerja efektif jam
d - Kecepatan berjalan m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d Jam
e2. Waktu lain-lain PP Menit
Jam
f - Jumlah trip perhari (c-e2) / e1 Trip
g - Kapasitas Angkut perorang meter
h - Produksi per hari gxf meter

i - Ongkos angkut = Upah pekerja Rp - O4 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Terong Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ipiebang Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Bama Rp/m
d Biaya Angkut dari Desa Ke Lokasi Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM)
: DI DAERAH KABUPATEN
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/BRONCAPTERING
: SUMUR DALAM TERLINDUNGI DESA SUKUTOKAN
LOKASI : KECAMATAN KELUBAGOLIT - KABUPATEN FLORES TIMUR – PROVINSI NTT
TA. : 2023

No. URAIAN Sat KET.

16. Pipa Galvanis 3/4" Medium A

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Adonara O1 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S Km
- Jarak Angkut ( PP = 2 x L ) Km
- Kecepatan Rata-rata dengan muatan v1 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 Km/Jam
- Kecepatan Rata-rata v3 Km/Jam
- Jumlah Pekerja yang dibutuhkan P Orang
- Jam Kerja per Hari Tk Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 Jam
- Jumlah trip perhari (Tk/t2) t3 Trip
- Kapasitas angkut per trip m m'
- Biaya Sewa Truck/Hari A Rupiah
- Produksi per hari t3 x m Kp m'
- Biaya angkut A / Kp O2 Rp/m'
- Upah Pekerja Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L km.
b - Jarak angkut PP = 2xL km.
meter
c - Jam kerja efektif jam
d - Kecepatan berjalan m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d Jam
e2. Waktu lain-lain PP Menit
Jam
f - Jumlah trip perhari (c-e2) / e1 Trip
g - Kapasitas Angkut perorang meter
h - Produksi per hari gxf meter

i - Ongkos angkut = Upah pekerja Rp - O4 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Terong Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ipiebang Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Bama Rp/m
d Biaya Angkut dari Desa Ke Lokasi Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM)
: DI DAERAH KABUPATEN
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/BRONCAPTERING
: SUMUR DALAM TERLINDUNGI DESA SUKUTOKAN
LOKASI : KECAMATAN KELUBAGOLIT - KABUPATEN FLORES TIMUR – PROVINSI NTT
TA. : 2023

No. URAIAN Sat KET.

17. Pipa Galvanis 1/2" Medium A

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Adonara O1 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S Km
- Jarak Angkut ( PP = 2 x L ) Km
- Kecepatan Rata-rata dengan muatan v1 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 Km/Jam
- Kecepatan Rata-rata v3 Km/Jam
- Jumlah Pekerja yang dibutuhkan P Orang
- Jam Kerja per Hari Tk Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 Jam
- Jumlah trip perhari (Tk/t2) t3 Trip
- Kapasitas angkut per trip m m'
- Biaya Sewa Truck/Hari A Rupiah
- Produksi per hari t3 x m Kp m'
- Biaya angkut A / Kp O2 Rp/m'
- Upah Pekerja Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L km.
b - Jarak angkut PP = 2xL km.
meter
c - Jam kerja efektif jam
d - Kecepatan berjalan m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d Jam
e2. Waktu lain-lain PP Menit
Jam
f - Jumlah trip perhari (c-e2) / e1 Trip
g - Kapasitas Angkut perorang meter
h - Produksi per hari gxf meter

i - Ongkos angkut = Upah pekerja Rp - O4 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Terong Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ipiebang Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Bama Rp/m
d Biaya Angkut dari Desa Ke Lokasi Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI Rp/m
ANALISA BIAYA PIPA DILOKASI SEMENTARA

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM)
DI DAERAH KABUPATEN
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/BRONCAPTERING
SUMUR DALAM TERLINDUNGI DESA SUKUTOKAN
LOKASI : KECAMATAN KELUBAGOLIT - KABUPATEN FLORES TIMUR – PROVINSI NTT
TA. : 2023

Price List 2023 Pengiriman Harga Pipa


Harga surabaya Termasuk PPN Door To Door dari Pabrik Asuransi 0,3 % Keuntungan 10 % di Pel. Terong Adonara
No. Jenis dan Ukuran
ke Lokasi di ADONARA
(Rp./M') (Rp./M') (Rp./M') (Rp./M') (Rp./M')

1 Pipa HDPE Ø 90 mm ( 3 inch ) Pn 16 Sdr 11


2 Pipa HDPE Ø 75 mm ( 2 1/2 inch ) Pn 16 Sdr 11
3 Pipa HDPE Ø 63 mm ( 2 inch ) Pn 16 Sdr 11
4 Pipa HDPE Ø 50 mm ( 1 1/2 inch ) Pn 16 Sdr 11
5 Pipa HDPE Ø 40 mm ( 1 1/4 inch ) Pn 16 Sdr 11
6 Pipa HDPE Ø 32 mm ( 1 inch ) Pn 16 Sdr 11
7 Pipa HDPE Ø 25 mm ( 3/4 inch ) Pn 16 Sdr 11
8 Pipa HDPE Ø 20 mm ( 1/2 inch ) Pn 16 Sdr 11
9 Pipa Galvanis 4" Medium A
10 Pipa Galvanis 3" Medium A
11 Pipa Galvanis 2 1/2" Medium A
12 Pipa Galvanis 2" Medium A
13 Pipa Galvanis 1 1/2" Medium A
14 Pipa Galvanis 1 1/4" Medium A
15 Pipa Galvanis 1" Medium A
16 Pipa Galvanis 3/4" Medium A
17 Pipa Galvanis 1/2" Medium A
ANALISA BIAYA ANGKUTAN PIPA

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM)
DI DAERAH KABUPATEN
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/BRONCAPTERING
SUMUR DALAM TERLINDUNGI DESA SUKUTOKAN
LOKASI : KECAMATAN KELUBAGOLIT - KABUPATEN FLORES TIMUR – PROVINSI NTT
TA. : 2023

Volume Panjang Pipa Panjang Total Biaya Kirim Biaya Kirim Total Biaya kirim
Container 20 Ft (Roll / Btg) / Container/Truck dr Pelbh Sby dr Pelbh Sby ke Lokasi
No. Diameter
(Roll / Btg) (M') (M') ke Pelbhan terong ke Pelbh Terong Sementara
(Rp./ Container 20 Ft) (Rp./ M') (Rp.M')
1 2 3 4 5 = (4 x 3) 6 7 = (6/5) 8

1 Pipa HDPE Ø 90 mm ( 3 inch ) Pn 16 Sdr 11 Rol


2 Pipa HDPE Ø 75 mm ( 2 1/2 inch ) Pn 16 Sdr 11 Rol
3 Pipa HDPE Ø 63 mm ( 2 inch ) Pn 16 Sdr 11 Rol
4 Pipa HDPE Ø 50 mm ( 1 1/2 inch ) Pn 16 Sdr 11 Rol
5 Pipa HDPE Ø 40 mm ( 1 1/4 inch ) Pn 16 Sdr 11 Rol
6 Pipa HDPE Ø 32 mm ( 1 inch ) Pn 16 Sdr 11 Rol
7 Pipa HDPE Ø 25 mm ( 3/4 inch ) Pn 16 Sdr 11 Rol
8 Pipa HDPE Ø 20 mm ( 1/2 inch ) Pn 16 Sdr 11 Rol
9 Pipa Galvanis 4" Medium A Btg
10 Pipa Galvanis 3" Medium A Btg
11 Pipa Galvanis 2 1/2" Medium A Btg
12 Pipa Galvanis 2" Medium A Btg
13 Pipa Galvanis 1 1/2" Medium A Btg
14 Pipa Galvanis 1 1/4" Medium A Btg
15 Pipa Galvanis 1" Medium A Btg
16 Pipa Galvanis 3/4" Medium A Btg
17 Pipa Galvanis 1/2" Medium A Btg
DAFTAR ANALISA BIAYA OPERASI PERALATAN

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM)
DI DAERAH KABUPATEN
PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/BRONCAPTERING
SUMUR DALAM TERLINDUNGI DESA SUKUTOKAN
LOKASI : KECAMATAN KELUBAGOLIT - KABUPATEN FLORES TIMUR – PROVINSI NTT
TA. : 2023

ANALISA BIAYA OPERASI PERALATAN


No. URAIAN KODE KOEFISIEN SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan EXCAVATOR
(Merk/Type Alat) KOMATSU
2. Tenaga Pw HP
3. Kapasitas Cp --
4. Alat yang dipakai : a. Umur Ekonomis A Tahun
b. Jam Kerja dalam 1 tahun W Jam
c. Harga Alat B Rupiah

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x c C Rupiah

2. Faktor Angsuran Modal = i x ( 1+ i ) ^ A'


D -
( 1 + i ) ^ A - 1

Biaya Pasti Perjam :


a. Biaya Pengembalian Modal = ( B- C ) x D
E Rupiah
W

b. Asuransi, dan Lain -Lain = - x B


F Rupiah
W

Biaya Pasti Perjam = ( E + F ) G Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = ( 0,125 - 0,175 Ltr/Hp/Jam ) x Pw x Ms H Rupiah

2. Pelumas = ( 0,01 - 0,020 Ltr/Hp/Jam ) x Pw x Mp I Rupiah

3. Perawatan dan Perbaikan = ( 12,5 % - 17,5 % ) x B


K Rupiah
W
4. Operator = ( 1 Orang / Jam ) x U1 L Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M Rupiah

Biaya Operasi Per Jam = ( H+ I + K + L + M ) P Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G +P ) S Rupiah

E. LAIN - LAIN

Tingkat Suku Bunga i % Tahun


Upah Operator / Sopir U1 Rp./jam
Upah Pembantu Operator / Pembantu Sopir U2 Rp./jam
Bahan Bakar Bensin Mb Liter
Bahan Bakar Solar Ms Liter
Minyak Pelumas Mp Liter
ANALISA BIAYA OPERASI PERALATAN
No. URAIAN KODE KOEFISIEN SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK
(Merk/Type Alat)
2. Tenaga Pw HP
3. Kapasitas Cp --
4. Alat yang dipakai : a. Umur Ekonomis A Tahun
b. Jam Kerja dalam 1 tahun W Jam
c. Harga Alat B Rupiah

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x B C Rupiah

2. Faktor Angsuran Modal = i x ( 1+ i ) ^ A'


D -
( 1 + i ) ^ A - 1

Biaya Pasti Perjam :


a. Biaya Pengembalian Modal = ( B- C ) x D
E Rupiah
W

b. Asuransi, dan Lain -Lain = - x B


F Rupiah
W

Biaya Pasti Perjam = ( E + F ) G Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = ( 0,120 - 0,15 Ltr/Hp/Jam ) x Pw x Ms H Rupiah

2. Pelumas = ( 0,025 - 0,030 Ltr/Hp/Jam ) x Pw x Mp I Rupiah

3. Perawatan dan Perbaikan = ( 0,125 % - 0,175 % ) x B


K Rupiah
W
4. Sopir = ( 1 Orang / Jam ) x U1 L Rupiah
5. Pembantu Sopir = ( 1 Orang / Jam ) x U2 M Rupiah

Biaya Operasi Per Jam = ( H+ I + K + L + M ) P

D. TOTAL BIAYA SEWA ALAT / JAM = ( G +P ) S Rupiah

E. LAIN - LAIN

Tingkat Suku Bunga i % Tahun


Upah Operator / Sopir U1 Rp./jam
Upah Pembantu Operator / Pembantu Sopir/Pem.Mekanik U2 Rp./jam
Bahan Bakar Bensin Mb Liter
Bahan Bakar Solar Ms Liter
Minyak Pelumas Mp Liter
ANALISA BIAYA OPERASI PERALATAN
No. URAIAN KODE KOEFISIEN SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE MIXER 350 LTR
(Merk/Type Alat) KUBOTA (MOLEN)
2. Tenaga Pw HP
3. Kapasitas Cp Liter
4. Alat yang dipakai : a. Umur Ekonomis A Tahun
b. Jam Kerja dalam 1 tahun W Jam
c. Harga Alat B Rupiah

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x B C Rupiah

2. Faktor Angsuran Modal = i x ( 1+ i ) ^ A'


D -
( 1 + i ) ^ A - 1

Biaya Pasti Perjam :


a. Biaya Pengembalian Modal = ( B- C ) x D
E Rupiah
W

b. Asuransi, dan Lain -Lain = - x B


F Rupiah
W

Biaya Pasti Perjam = ( E + F ) G Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = ( 0,100 - 0,175 Ltr/Hp/Jam ) x Pw x Ms H Rupiah

2. Pelumas = ( 0,01 - 0,020 Ltr/Hp/Jam ) x Pw x Mp I Rupiah

3. Perawatan dan Perbaikan = ( 12,5 % - 17,5 % ) x B


K Rupiah
W
4. Operator = ( 1 Orang / Jam ) x U1 L Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M Rupiah

Biaya Operasi Per Jam = ( H+ I + K + L + M ) P Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G +P ) S Rupiah

E. LAIN - LAIN

Tingkat Suku Bunga i % Tahun


Upah Operator / Sopir U1 Rp./jam
Upah Pembantu Operator / Pembantu Sopir/Pem.Mekanik U2 Rp./jam
Bahan Bakar Bensin Mb Liter
Bahan Bakar Solar Ms Liter
Minyak Pelumas Mp Liter
ANALISA BIAYA OPERASI PERALATAN
No. URAIAN KODE KOEFISIEN SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan MESIN LAS PIPA
(Merk/Type Alat)
2. Tenaga Pw HP
3. Kapasitas Cp --
4. Alat yang dipakai : a. Umur Ekonomis A Tahun
b. Jam Kerja dalam 1 tahun W Jam
c. Harga Alat B Rupiah

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x B C Rupiah

2. Faktor Angsuran Modal = i x ( 1+ i ) ^ A'


D -
( 1 + i ) ^ A - 1

Biaya Pasti Perjam :


a. Biaya Pengembalian Modal = ( B- C ) x D
E Rupiah
W

b. Asuransi, dan Lain -Lain = - x B


F Rupiah
W

Biaya Pasti Perjam = ( E + F ) G Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = ( 0,125 - 0,175 Ltr/Hp/Jam ) x Pw x Ms H Rupiah

2. Pelumas = ( 0,01 - 0,020 Ltr/Hp/Jam ) x Pw x Mp I Rupiah

3. Perawatan dan Perbaikan = ( 12,5 % - 17,5 % ) x B


K Rupiah
W
4. Operator = ( 1 Orang / Jam ) x U1 L Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M Rupiah

Biaya Operasi Per Jam = ( H+ I + K + L + M ) P Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G +P ) S Rupiah

E. LAIN - LAIN

Tingkat Suku Bunga i % Tahun


Upah Operator / Sopir U1 Rp./jam
Upah Pembantu Operator / Pembantu Sopir U2 Rp./jam
Bahan Bakar Bensin Mb Liter
Bahan Bakar Solar Ms Liter
Minyak Pelumas Mp Liter
Jenis Pekerjaan : Mobilisasi & Demobilisasi
Satuan Mata Pembayaran : -
Kuantitas Pekerjaan -
Harga Satuan : Rp. -

Lembar 1
HARGA JUMLAH
No. URAIAN SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)

A. BASE CAMP
Beli / sewa tanah untuk Base Camp M2 - - -

B. PERALATAN
Periksa lembar ke-2 LS 1,00 - -

C. FASILITAS KONTRAKTOR
1 Base Camp M2 - - -
4 Workshop / Bengkel M2 - - -
5 Gudang, dan lain-lain LS 1,00 -
6 Pembuatan Los Pekerja LS 1,00 -

D. FASILITAS DIREKSI TEKNIS


1 Kantor M2 - - -
2 Administrasi (Pelaporan) LS - - -

E. MOBILISASI LAINNYA
E.I. PEKERJAAN DARURAT

E.II. LAIN-LAIN
1 Pengukuran & Pematokan LS 1,00 -
2 Shop Drawings Set 1,00 -
3 As Built Drawing Set 1,00 -
4 Quality Control LS - - -
5 Pelaporan dan Dokumentasi LS 1,00 -

F. DEMOBILISASI LS - - -

Total Biaya Mobilisasi -

Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.

Jenis Pekerjaan : Mobilisasi & Demobilisasi


Satuan Mata Pembayaran : -
Lembar 2
HARGA JUMLAH
NO. JENIS ALAT KODE ALAT SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)

B. PERALATAN

1 CONCRETE MIXER 0.3-0.6 M3 E06 Unit - - -


2 DUMP TRUCK 3-4 M3 E08 Unit - - -
3 DUMP TRUCK E09 Unit
4 EXCAVATOR 80-140 HP E10 Unit - - -
5 VIBRATORY ROLLER 5-8 T. E19 Unit - - -
6 CONCRETE VIBRATOR E20 Unit - - -
7 MESIN LAS Unit - - -

Total untuk Item B pada Lembar 1 -