Laporan OJT Riza
Laporan OJT Riza
Republik Indonesia
LAPORAN OJT
(On the Job Training)
Oleh:
2017
LEMBAR PERSETUJUAN
BAB I. PENDAHULUAN
1.1 Latar Belakang ............................................................................................................. 1
1.2 Tujuan ......................................................................................................................... 1
1.3 Waktu Pelaksanaan ..................................................................................................... 1
1.2 Tujuan
Tujuan Umum
Sebagai tugas syarat menyelesaikan pembinaan Ahli K3 Listrik pada tanggal 13 –
25 Maret 2017
Tujuan Khusus
Untuk menetukan kelayakan 1 unit Transformer dengan Tag Number 4101 A yang
akan di energize.
1
BAB II
PROFIL LOKASI OJT
2.1 Profil
PT Pertamina EP adalah perusahaan yang menyelenggarakan kegiatan usaha di sektor hulu
bidang minyak dan gas bumi, meliputi eksplorasi dan eksploitasi. Di samping itu,
Pertamina EP juga melaksanakan kegiatan usaha penunjang lain yang secara langsung
maupun tidak langsung mendukung bidang kegiatan usaha utama.
Saat ini tingkat produksi Pertamina EP adalah sekitar 100.000 barrel oil per day (BOPD)
untuk minyak dan sekitar 1.016 million standard cubic feet per day (MMSCFD) untuk gas.
Wilayah Kerja (WK) Pertamina EP seluas 113,613.90 kilometer persegi merupakan
limpahan dari sebagian besar Wilayah Kuasa Pertambangan Migas PT PERTAMINA
(PERSERO). Pola pengelolaan usaha WK seluas itu dilakukan dengan cara dioperasikan
sendiri (own operation) dan kerja sama dalam bentuk kemitraan, yakni 4 proyek
pengembangan migas, 7 area unitisasi dan 39 area kontrak kerjasama kemitraan terdiri dari
24 kontrak Technical Assistant Contract (TAC), 15 kontrak Kerja Sama Operasi (KSO).
Jika dilihat dari rentang geografinya, Pertamina EP beroperasi hampir di seluruh wilayah
Indonesia, dari Sabang sampai Merauke.
WK Pertamina EP terbagi ke dalam lima asset. Operasi kelima asset terbagi ke dalam 21
Field, yakni
Asset 1 : Rantau Field, Pangkalan Susu Field, Lirik Field, Jambi Field, dan Ramba
Field
Asset 2 : Prabumulih Field, Pendopo Field, Limau Field dan Adera Field
Asset 3 : Subang Field, Jatibarang Field dan Tambun Field
Asset 4 : Cepu Field, Poleng Field dan Matindok Field
Asset 5 : Sangatta Field, Bunyu Field, Tanjung Field, Sangasanga Field, Tarakan
Field dan Papua Field
Instalasi CPP Area Gundih terletak di Kec. Kradenan, Kab. Blora, Jawa Tengah. CPP Area
Gundih merupakan fasilitas yang mengolah gas alam menjadi sales gas sebagai produk
2
utamanya. Kegiatan konstruksi CPP Area Gundih telah dimulai sejak tahun 2012 dan
beroperasi pada tahun 2014 oleh PT. Pertamina EP. Kapasitas desain instalasi CPP Area
Gundih adalah 75 MMSCFD (gas); 600 BOPD (kondensat); 2500 BWPD (air pengolahan).
3
BAB III
PEMERIKSAAN DAN PENGUJIAN
3.1.1 Dokumen
Pemeriksaan dokumen berupa penelaahan dari :
a) Spesifikasi Pemilik
b) Gambar
One line diagram
Plot plan
Area classification
Grounding layout
c) Data teknis
d) Sertifikat material
General Information
Manufacture : PT. Trafo Indo Prima Perkasa Rated Voltage : 6600 / 400 Volt
Type : Oil Filled Rated Arus : 157.46 / 2598.08 Ampere
Serial No. : 121308435 Capacity : 1800 kVA
Tag No : TR-4101 A Impedance : 6%
Frequency : 50 Hz Standard : IEC-60076
Phase : 3 Insulation Class : A
ACCEPTANCE
LEVEL OF
NO. DESCRIPTION RESULT CRITERIA / REMARKS
ACCEPTANCE
REFERENCE
1. DOCUMENT REVIEWED
a. Spesifikasi pemilik Reviewed PPGJ-ELE-SPC-50.007 OK Lampiran I
b. Gambar
- Overall One Line Diagram Reviewed PPGJ-ELE-SLD-50.101 OK
- Plot plan Reviewed PPGJ-ELE-LAY-41.501 OK Lampiran II
- Area classification Reviewed PPGJ-ELE-ACD-50.101-01 OK
- Grounding layout Reviewed PPGJ-ELE-LAY-41.301-01 OK
c. Data teknis Reviewed PPGJ-ELE-DTS-50.103 OK Lampiran III
d. Sertifikat material Reviewed No ID Document OK Lampiran IV
4
3.1.2 Pemeriksaan Fisik
Pemeriksaan fisik berupa verifikasi pada bagian-bagian dari trafo, yaitu:
a) Name plate
b) Warning sign
c) Terminal kabel
d) Pembagian area
e) Bushing dan Insulator
f) Lifting facilities
g) Drain valve
h) Dielectric sampling facilities
i) Grounding connection
j) Peralatan bantu lainnya
General Information
Manufacture : PT. Trafo Indo Prima Perkasa Rated Voltage : 6600 / 400 Volt
Type : Oil Filled Rated Arus : 157.46 / 2598.08 Ampere
Serial No. : 121308435 Capacity : 1800 kVA
Tag No : TR-4101 A Impedance : 6%
Frequency : 50 Hz Standard : IEC-60076
Phase : 3 Insulation Class : A
ACCEPTANCE
LEVEL OF
NO. DESCRIPTION RESULT CRITERIA / REMARKS
ACCEPTANCE
REFERENCE
1. VISUAL CHECK
a. Name plate Verified As per Data Sheet Ok
b. Physical condition Verified As per Spec Ok
c. Bushing & insulator Verified As per Spec Ok
d. Lifting facilities Verified As per Spec Ok
e. Drain valve operational & lockable Verified As per Spec Ok
f. Dielectric sampling facilities Verified As per Spec Ok
g. Main and control cable Verified As per Spec Ok
h. Grounding connection Verified As per Spec Ok
i. Temperature and pressure gauges Verified As per Spec Ok
j. Warning sign & safety equipment Verified As per Spec Ok
k. Area classification Verified As per Spec Ok
5
Name Plate Drawing Tag Number
6
Name Plate Grounding
3.2 Pengujian
Pengujian yang dilakukan mencakup:
1) Insulation tester & Polarization index test
Data Primary
60 s Acceptance Criteria Level of
No Combination Remarks
(MΩ) (MΩ) Acceptance
1 1R - G 14700 1000 Accepted
2 1S - G 22600 1000 Accepted
3 1T - G 22200 1000 Accepted
Data Secondary
60 s Acceptance Criteria Level of
No Combination Remarks
(MΩ) (MΩ) Acceptance
1 2R - G 17300 1000 Accepted
2 2S - G 18300 1000 Accepted
3 2T - G 20600 1000 Accepted
Polarization Index
7
INSULATION RESISTANCE
8
INSULATION RESISTANCE & POLARIZATION INDEX
9
2) Voltage ratio test
1 6930 400 10.014 394.2 397.5 397.4 22.83 23.02 22.83 9.981 9.981 10.062 10.008
2 6765 400 9.776 394.2 397.5 397.4 23.37 23.56 23.36 9.750 9.752 9.834 9.779
3 6600 400 9.538 394.1 397.4 397.4 23.93 24.13 23.93 9.520 9.520 9.599 9.546
4 6435 400 9.299 394.2 397.3 397.3 24.59 24.8 24.6 9.266 9.260 9.335 9.287
5 6270 400 9.061 394.1 397.5 397.2 25.22 25.42 25.21 9.033 9.039 9.107 9.060
Tabel Lanjutan
Acceptance Criteria
HV LV Result ± 0.5% Cal ratio
Tap Cal Level of
Line Line Cal Remarks
Pos ratio Acceptance
(V) (V) Ratio Batas bawah Batas atas
10
VOLTAGE RATIO TEST – TAP 1
11
VOLTAGE RATIO TEST – TAP 2
12
VOLTAGE RATIO TEST – TAP 3
13
VOLTAGE RATIO TEST – TAP 4
14
VOLTAGE RATIO TEST – TAP 5
15
3) Vector grup test & Polarity test
Supply Hasil
No Combination
Tegangan Pengukuran
ACCEPTANCE CRITERIA :
a) 1S – 2S = 1S – 2T ~ 387.5 Volt = 387.5 Volt ----- Accepted
b) 1T – 2T < 1T – 2R ~ 387.5 Volt < 404.5 Volt ----- Accepted
16
4) Breakdown voltage test
17
HASIL PENGUJIAN MINYAK TRANSFORMER
18
General Information
Manufacture : PT. Trafo Indo Prima Perkasa Rated Voltage : 6600 / 400 Volt
Type : Oil Filled Rated Arus : 157.46 / 2598.08 Ampere
Serial No. : 121308435 Capacity : 1800 kVA
Tag No : TR-4101 A Impedance : 6%
Frequency : 50 Hz Standard : IEC-60076
Phase : 3 Insulation Class : A
ACCEPTANCE
LEVEL OF
NO. DESCRIPTION RESULT CRITERIA / REMARKS
ACCEPTANCE
REFERENCE
1. VERIFICATION OF TEST RESULT
a. Insulation tester 14.7 GΩ 1 GΩ OK HV- G (1R-G)
b. Polarization Index 2.4 2 OK HV - LV
c. Tap Changer mechanism Tested Mechanism Abnormally OK
d. Voltage ratio 9.546 9.490 - 9.585 OK Pos 3
e. Polarity & vector group test 387.5 V = 387.5 V 1S – 2S = 1S – 2T OK
f. Breakdown voltage test 55.86 kV/ 2.5 mm > 50 kV/ 2.5 mm OK
g. First energizing and performance test Tested Commisioning OK
Procedure
h. Protection system OK Commisioning OK
Procedure
i. Induced potential test OK No flash Over OK FAT Report
j. Applied potential test 60 s OK No flash Over OK FAT Report
k. Impedansi 6.23 % 5.7% - 6.3% OK FAT Report
l. Losses (watt) 23983 ≤ 24200 OK FAT Report
19
BAB IV
PENUTUP
4.1 Kesimpulan
Berdasarkan dari hasil pemeriksaan dan pengujian, Trafo dengan tag no. 4101 A layak
untuk dioperasikan.
4.2 Saran
Dibuatkan prosedur pemeliharaan yang sesuai dengan manual book dari manufacture.
20