RAB Rumah Produksi Pandai Besi Ok
RAB Rumah Produksi Pandai Besi Ok
(ENGINEERING ESTIMATE)
#REF!
#REF!
#REF!
#REF!
I. PEKERJAAN LANSEKAP.
1 Penanaman Rumput Gajah mini 175.00 m2 25,000.00 4,375,000.00
2 Penanaman Pohon 111.00 phn 175,000.00 19,425,000.00
SUB TOTAL. I.PEKERJAAN LANSEKAP. : 23,800,000.00
II. PEKERJAAN AREA PARKIR MOTOR, MOBIL & TERMINAL ANGKOT.
- Pek.Kanstin 260.70 m1 115,000.00 29,980,500.00
- Pek.Lantai kerja bawah kanstin t = 5 cm 1.96 m3 #REF! #REF!
- Galian,Perataan Tanah & Pemadatan 1,788.00 m2 #REF! #REF!
- Pek.Sub Base tebal = 30 cm 536.40 m3 375,000.00 201,150,000.00
- Pek.Base Course tebal = 15 cm 268.20 m3 350,000.00 93,870,000.00
- Pek.Lapis Resap Pengikat / Prime Coat ( 1,2 ltr/m2 ) 1,788.00 m2 9,500.00 16,986,000.00
- Pek.Lapis Pondasi Aspalt Treade Base ( ATB/Penetrasi ),tebal 5 cm 1,788.00 m2 125,000.00 223,500,000.00
- Pek.Marka Jalan 239.00 m1 150,000.00 35,850,000.00
- Pek.Car Stoper 25.00 m1 75,000.00 1,875,000.00
SUB TOTAL. II.PEKERJAAN AREA PARKIR MOTOR, MOBIL & TERMINAL ANGKOT. : #REF!
#REF!
#REF!
#REF!
PULUH
RUPIAH
HARGA PERKIRAAN SENDIRI
SUB KEGIATAN : Koordinasi, Sinkronisasi, dan Pelaksanaan Pembangunan Sarana dan Prasarana Industri
PEKERJAAN : Perencanaan Pembangunan Rumah Produksi Pandai Besi
LOKASI : Kelurahan Polewali Kecamatan Tanete Riattang Barat Kabupaten Bone
HARGA JUMLAH
No. URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(Rp.) (Rp.)
A PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1.00 bh 238,694.40 238,694.40
2 Pemasangan Bouwplank 1.00 ls 1,500,000.00 750,000.00
988,694.40
B PEKERJAAN TANAH DAN BATU
1 Pekerjaan galian tanah 11.18 m3 77,275.00 863,934.50
2 Urugan Tanah Kembali 1.12 m3 55,550.00 62,104.90
3 Urugan Tanah Bawah Lantai 11.89 m3 156,310.00 1,859,151.14
4 Urugan Pasir 2.68 m3 156,310.00 418,598.18
5 Pasangan Batu Gunung 1 SP : 4 PPP 8.93 m3 2,904,357.50 25,921,390.69
6 Pasangan Aanstamping 5.60 m3 421,987.50 2,363,130.00
31,488,309.41
C PEKERJAAN BETON
1 f’c = 14,5 Mpa 2.57 m3 1,011,849.14 2,602,265.53
2 f'c 7,4 mpa 3.37 m3 906,070.79 3,054,545.83
5,656,811.36
D PEKERJAAN PEMBESIAN
1 Pembesian 534.43 kg 15,937.85 8,517,586.25
8,517,586.25
E PEKERJAAN BEKISTING
1 Sloof 4.67 m2 248,259.00 1,158,542.00
2 K1 1.19 m2 421,019.50 502,977.96
3 KP1 1.64 m2 421,019.50 691,594.70
4 KP2 0.03 m2 421,019.50 13,472.62
5 BL 12/20 4.67 m2 432,734.50 2,019,427.67
6 BL 8/16 0.05 m2 432,734.50 23,079.17
7 BL 8/8 0.17 m2 432,734.50 73,853.35
8 Gewel 0.87 m2 432,734.50 378,036.86
4,860,984.34
F PEKERJAAN DINDING
1 Dinding 1/2 Bata Camp. 1:4 54.44 m2 272,255.50 14,820,772.65
2 Plesteran 1 : 4 tebal 15 mm 110.07 m2 142,543.50 15,690,333.22
3 Dinding 1 Bata camp. 1 : 4 0.60 m2 596,315.50 357,789.30
30,868,895.17
G PEKERJAAN KAYU DAN KELENGKAPANNYA
1 Pekerjaan Kusen 19.46 m' 55,000.00 1,070,300.00
2 Pekerjaan Daun Pintu 2.00 Bh 700,000.00 1,400,000.00
3 Roster Beton 6.00 bh 45,000.00 270,000.00
4 Kunci Pintu Tanam biasa 2.00 bh 256,000.00 512,000.00
5 Engsel Pintu (1 daun x 3 bh) 6.00 bh 33,000.00 198,000.00
6 Engsel Jendela (jendela buka samping) 2.00 bh 25,000.00 50,000.00
7 Kait Angin 1.00 bh 17,700.00 17,700.00
8 Grendel 1.00 bh 28,000.00 28,000.00
3,546,000.00
H PEKERJAAN ATAP
1 Pekerjaan Rangka + Penutup atap (1 paket) 68.89 m2 230,000.00 15,844,716.40
- Kuda - Kuda (Baja Ringan) C.75/75
- Atap Spandek
- Bubungan/NOK
2 Woodplank 33.18 m' 35,000.00 1,161,440.00
17,006,156.40
J PEKERJAAN KERAMIK
1 Keramik Lantai 40x40 (Kasar) 1.83 m2 167,328.86 306,278.74
2 Keramik Lantai 40x40 (Halus) 6.91 m2 167,328.86 1,155,640.02
3 Keramik Dinding 40x40 (Halus) 9.67 m2 167,328.86 1,617,735.39
3,079,654.15
K PEKERJAAN INSTALASI LISTRIK
1 Instalasi titik lampu 10.00 ttk 110,000.00 1,100,000.00
2 Saklar Tunggal 2.00 bh 27,000.00 54,000.00
3 Saklar Ganda 1.00 bh 30,000.00 30,000.00
4 Stop Kontak 1.00 bh 28,000.00 28,000.00
5 MCB 4A 1.00 bh 382,000.00 382,000.00
6 Box MCB 2 group 1.00 unit 124,000.00 124,000.00
7 Lampu SL 12 watt 5.00 bh 39,000.00 195,000.00
1,913,000.00
L PEKERJAAN FINISHING CAT - CATAN
1 Cat Dinding 110.07 m2 20,794.40 2,288,922.79
3 Cat Kilap 7.15 m2 40,836.13 292,027.30
2,580,950.08
M PEKERJAAN SANITASI
1 Pasang WC jongkok 1.00 bh 225,000.00 225,000.00
2 Pasang kran air 1/2" 1.00 bh 25,000.00 25,000.00
3 Pipa PVC AW 3/4" saluran air bersih 8.00 m' 23,000.00 184,000.00
4 Pipa PVC AW 2 " saluran air kotor 1.00 m' 12,500.00 12,500.00
5 Pipa PVC AW 4" saluran disposal 4.00 m' 52,500.00 210,000.00
6 Floor drain 1.00 Buah 25,000.00 25,000.00
7 Septicktank + resapan 1.00 Ls 1,750,000.00 1,750,000.00
2,431,500.00
REKAPITULASI
HARGA PERKIRAAN SENDIRI
KEGIATAN : Koordinasi, Sinkronisasi, dan Pelaksanaan Pembangunan Sarana dan Prasarana Industri
PEKERJAAN : Perencanaan Pembangunan Rumah Produksi Pandai Besi
LOKASI : Kelurahan Polewali Kecamatan Tanete Riattang Barat Kabupaten Bone
JUMLAH
No. URAIAN PEKERJAAN HARGA
(Rp.)
Jumlah 99,075,802.79
PPN 11% 10,898,338.31
Total 109,974,141.09
Pembulatan 109,970,000.00
Terbilang :
Seratus Sembilan Juta Sembilan Ratus Tujuh Puluh Ribu Rupiah
DAFTAR ANALISA
SUB KEGIATAN : Koordinasi, Sinkronisasi, dan Pelaksanaan Pembangunan Sarana dan Prasarana Industri
PEKERJAAN : Perencanaan Pembangunan Rumah Produksi Pandai Besi
LOKASI PEKERJAAN : Kelurahan Polewali Kecamatan Tanete Riattang Barat Kabupaten Bone
SUMBER DANA : APBD Kabupaten
TAHUN : 2022 Over head: 10%
A.4.1.1.5 1 m3 Membuat beton mutu f'c = 14,5 Mpa slump (120 +/- 20) mm
Permen PU a. Bahan
No. 11 / 2016 326.000 kg Semen portland @ Rp 1,300.00 Rp 423,800.00
760.000 kg Pasir beton @ Rp 190.71 Rp 144,942.86
1,029.000 kg Kerikil (maks 30 mm) @ Rp 116.67 Rp 120,050.00
215.000 Liter Air @ Rp 200.00 Rp 43,000.00
Rp 731,792.86
b. Tenaga
1.650 OH Pekerja @ Rp 90,000.00 Rp 148,500.00
0.275 OH Tukang batu @ Rp 100,000.00 Rp 27,500.00
0.028 OH Kepala tukang @ Rp 105,000.00 Rp 2,940.00
0.083 OH Mandor @ Rp 110,000.00 Rp 9,130.00
Rp 188,070.00
Rp 919,862.86
jumlah dan Overhead/resiko penyedia jasa 10% Rp 1,011,849.14
A.4.1.1.17 10 kg Pembesian dengan besi polos atau besi ulir
Permen PU a. Bahan
No. 11 / 2016 10.500 kg Besi beton (polos/ulir) @ Rp 12,000.00 Rp 126,000.00
0.015 kg Kawat beton @ Rp 30,300.00 Rp 454.50
Rp 126,454.50
b. Tenaga
0.070 OH Pekerja @ Rp 90,000.00 Rp 6,300.00
0.070 OH Tukang besi @ Rp 100,000.00 Rp 7,000.00
0.007 OH Kepala tukang @ Rp 105,000.00 Rp 735.00
0.040 OH Mandor @ Rp 110,000.00 Rp 4,400.00
Rp 18,435.00
Rp 144,889.50
jumlah dan Overhead/resiko penyedia jasa 10% Rp 159,378.45
b. Tenaga
0.600 OH Pekerja @ Rp 90,000.00 Rp 54,000.00
0.200 OH Tukang batu @ Rp 100,000.00 Rp 20,000.00
0.020 OH Kepala tukang @ Rp 105,000.00 Rp 2,100.00
0.030 OH Mandor @ Rp 110,000.00 Rp 3,300.00
Rp 79,400.00
Rp 542,105.00
jumlah dan Overhead/resiko penyedia jasa 10% Rp 596,315.50
A.4.4.1.9 1 m2 pemasangan dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 4PP
a. Bahan
70.000 buah Bata merah @ 750.00 Rp 52,500.00
11.500 kg Semen Portland @ 13,000.00 Rp 149,500.00
0.043 m3 Pasir Pasang @ 135,000.00 Rp 5,805.00
Rp 207,805.00
b. Tenaga
0.300 OH Pekerja @ Rp 90,000.00 Rp 27,000.00
0.100 OH Tukang batu @ Rp 100,000.00 Rp 10,000.00
0.010 OH Kepala tukang @ Rp 105,000.00 Rp 1,050.00
0.015 OH Mandor @ Rp 110,000.00 Rp 1,650.00
Rp 39,700.00
Rp 247,505.00
jumlah dan Overhead/resiko penyedia jasa 10% Rp 272,255.50
b. Tenaga
0.300 OH Pekerja @ Rp 90,000.00 Rp 27,000.00
0.150 OH Tukang batu @ Rp 100,000.00 Rp 15,000.00
0.015 OH Kepala tukang @ Rp 105,000.00 Rp 1,575.00
0.015 OH Mandor @ Rp 110,000.00 Rp 1,650.00
Rp 45,225.00
Rp 129,585.00
jumlah dan Overhead/resiko penyedia jasa 10% Rp 142,543.50
b. Tenaga
0.250 OH Pekerja @ Rp 90,000.00 Rp 22,500.00
0.125 OH Tukang batu @ Rp 100,000.00 Rp 12,500.00
0.013 OH Kepala tukang @ Rp 105,000.00 Rp 1,365.00
0.013 OH Mandor @ Rp 110,000.00 Rp 1,430.00
Rp 37,795.00
Rp 152,117.14
jumlah dan Overhead/resiko penyedia jasa 10% Rp 167,328.86
A.4.4.3.54 1 m2 Pasang dinding keramik 40 cm x 40 cm
Permen PU a. Bahan
No. 28 / 2016 6.630 buah Keramik artistik @ Rp 12,142.86 Rp 80,507.14
9.300 kg PC @ Rp 13,000.00 Rp 120,900.00
0.018 m3 PP @ Rp 135,000.00 Rp 2,430.00
1.940 kg Semen Warna @ Rp 25,000.00 Rp 48,500.00
Rp 252,337.14
b. Tenaga
0.900 OH Pekerja @ Rp 90,000.00 Rp 81,000.00
0.450 OH Tukang batu @ Rp 100,000.00 Rp 45,000.00
0.045 OH Kepala tukang @ Rp 105,000.00 Rp 4,725.00
0.045 OH Mandor @ Rp 110,000.00 Rp 4,950.00
Rp 135,675.00
Rp 388,012.14
jumlah dan Overhead/resiko penyedia jasa 10% Rp 426,813.36
A.4.7.1.4.(K3) 1 m2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup
Permen PU a. Bahan
No. 11 / 2016 0.200 kg Cat meni @ Rp 28,000.00 Rp 5,600.00
0.150 kg Plamuur @ Rp 3,125.00 Rp 468.75
0.170 kg Cat dasar @ Rp 17,500.00 Rp 2,975.00
0.260 kg Cat penutup @ Rp 67,000.00 Rp 17,420.00
0.010 buah Kuas @ Rp 10,000.00 Rp 100.00
0.030 kg Pengencer @ Rp 40,000.00 Rp 1,200.00
0.200 Lbr Amplas @ Rp 6,000.00 Rp 1,200.00
Rp 28,963.75
b. Tenaga
0.070 OH Pekerja @ Rp 90,000.00 Rp 6,300.00
0.009 OH Tukang cat @ Rp 100,000.00 Rp 900.00
0.006 OH Kepala tukang @ Rp 105,000.00 Rp 630.00
0.003 OH Mandor @ Rp 110,000.00 Rp 330.00
Rp 8,160.00
Rp 37,123.75
jumlah dan Overhead/resiko penyedia jasa 10% Rp 40,836.13
A.4.7.1.10.(K3) 1 m2 Pengecatan tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Permen PU a. Bahan
No. 11 / 2016 0.100 kg Plamuur @ Rp 3,125.00 Rp 312.50
0.100 kg Cat dasar @ Rp 17,000.00 Rp 1,700.00
0.260 kg Cat penutup @ Rp 30,000.00 Rp 7,800.00
Rp 9,812.50
b. Tenaga
0.020 OH Pekerja @ Rp 90,000.00 Rp 1,800.00
0.063 OH Tukang cat @ Rp 100,000.00 Rp 6,300.00
0.0063 OH Kepala tukang @ Rp 105,000.00 Rp 661.50
0.003 OH Mandor @ Rp 110,000.00 Rp 330.00
Rp 9,091.50
Rp 18,904.00
jumlah dan Overhead/resiko penyedia jasa 10% Rp 20,794.40
BACK UP DATA PERHITUNGAN VOLUME
SUB KEGIATAN : Koordinasi, Sinkronisasi, dan Pelaksanaan Pembangunan Sarana dan Prasarana Industri
PEKERJAAN : Perencanaan Pembangunan Rumah Produksi Pandai Besi
LOKASI : Kelurahan Polewali Kecamatan Tanete Riattang Barat Kabupaten Bone
DATA PERHITUNGAN
NO PEKERJAAN SAT VOLUME
Panjang Lebar Tinggi Jumlah
1 PASANG BOUWPLANK
- Bouwplank m' 10.00 6.00 - 20.00 12.00 32.00
Jumlah 32.00
2 PEKERJAAN BAWAH LANTAI
1 Galian Tanah
Pondasi Bangunan (Batu Gunung) m³ 35.00 0.60 0.50 10.50
8 Urugan Pasir
a Urugan Pasir Bawah Pondasi m3 35.00 0.60 0.05 1.05
b Urugan Pasir Bawah Lantai m3 7.40 4.40 0.05 1.63
Total Urugan Pasir 2.68
6 PEKERJAAN BATA
2 Dinding Camp. 1:4
Dinding +2.75 m2 18.00 2.75 49.50
Dinding +0.90 m2 6.00 0.90 5.40
Dinding +0.50 (kolam pendingin) m2 1.40 0.50 0.70
Dinding +0.60 (pembakaran) m2 1.00 0.60 0.60
Dinding ps. 1 bata +0.60 (pembakaran) m2 1.00 0.60 0.60
Dinding Gewel m2 5.00 x 1 / 2 3 7.50
Dinding Rabat bangunan m2 0.43 -
Dinding Rabat Tangga m2 0.23 -
Jumlah 64.30
Pengurangan
1 Kusen P1 m2 2.10 0.90 1 1.89
Kusen P2 m2 2.10 0.90 1 1.89
Kusen P3 m2 2.10 0.70 1 1.47
Jendela J1 m2 1.18 0.50 1 0.59
Roster m2 0.25 0.25 6 0.38
K1 m2 0.20 0.90 2 0.36
Kp1 m2 0.12 2.75 8 2.64
Kp2 m2 0.08 0.60 1 0.05
Jumlah 9.26
Total Pas. Bata 1:4 m2 55.04
9 KERAMIK
1 Keramik 40 x 40 Kasar
Lantai WC m2 0.88 1.88 1.65
Dinding klossed m2 0.88 0.20 0.18
Total Pasangan Dinding 40 x 40 kasar 1.83
2 Keramik 40 x 40 Halus
Lantai Ruangan (R.Istirahat + Gudang) m2 3.14 1.88 5.90
Dinding WC m2 4.78 1.60 7.65
Dinding Kolam m2 4.04 0.50 2.02
Lantai Kolam m2 0.88 1.14 1.00
Total Pasangan Dinding 40 x 40 halus 10.67
12 PEKERJAAN SANITASI
1 Pasang WC jongkok bh 1.00 1.00
2 Pasang kran air 1/2" bh 1.00 1.00
3 Pipa PVC AW 3/4" saluran air bersih m1 8.00 8.00
4 Pipa PVC AW 2" saluran air kotor m1 1.00 1.00
5 Pipa PVC AW 4" saluran disposal m1 4.00 4.00
6 Floor drain Bh 1.00 1.00
7 Septicktank + resapan Ls 1.00 1.00
BACKUP DATA
BACKUP DATA
GALIAN TANAH
P L T JML VOL SATUAN
S1 58.00 0.80 0.45 20.88
4.64 m3
URUGAN TANAH
A B T P LUAS JML VOL SATUAN
RABAT 0.38 0.18 0.50 27.24 0.29 7.88
DALM 3.85 3.40 0.55 6.85 1.99 13.66
DALM 2.85 2.40 0.55 1.35 1.44 2.00 3.90
WC 1.70 1.40 0.50 1.35 0.78 4.00 4.19
TRS 1.27 0.90 0.50 6.85 0.54 3.72
33.34 m3
BACKUP DATA
BACKUP DATA
4.63 m3
BACKUP DATA
BACKUP DATA
BACKUP DATA
25.41 m3
6.96 m3
CERUCUK ULIN
P JARAK VOL SATUAN
58.00 1.50 38.00
38.00 TTK
BACKUP DATA
23.20 m2
BACKUP DATA
1.74 m3
BACKUP DATA
BACKUP DATA
BACKUP DATA
BEGESTING KP
P L JML VOL SATUAN
3.50 0.48 11.00 18.48 m2
PEMBESIAN KOLOM KP
P DIA JML KOEF JML KOLOM VOL SATUAN
3.90 10.00 4.00 0.62 11.00 9.62
0.38 8.00 23.33 0.39 3.50
0.6 8.00 7.00 0.39 1.66
162.50 KG
BETON KP
P L T JML VOL SATUAN
3.50 0.12 0.12 11.00 0.55
0.55 m3
BACKUP DATA
BETON 12/15
P L T JML VOL SATUAN
3.50 0.12 0.15 6.00 0.38
0.38 m3
BACKUP DATA
BACKUP DATA
BACKUP DATA
295.43 KG
1.80 m3
BACKUP DATA
BACKUP DATA
BACKUP DATA
KOLOM 20/20
P L JML VOL SATUAN
2.70 0.80 3.00 2.16
6.48 m2
38.27 KG
0.32 m3
BACKUP DATA
117.10
117.10 m2
PEKERJAAN TRASERAM CAMP 1:2
P H JML L.KUSEN VOL SATUAN
44.20
44.20 m2
BACKUP DATA
BACKUP DATA
BACKUP DATA
10.57 m2
BACKUP DATA
26.69 m2
PEKERJAAN LANTAI KERAMIK 40/40 KASAR
P L k1 JML VOL SATUAN
TRS 7.00 1.50 0.16 10.34
TGH 1.38 3.00 2.00 8.28
18.62 m2
BACKUP DATA
9.30 m2
29.72 m2
BACKUP DATA
BACKUP DATA
BACKUP DATA
81.48 m2
BACKUP DATA
PEKERJAAN PLAFOND
P L JML VOL SATUAN
TGH 6.88 3.88 26.69
TGH 2.88 1.38 2.00 7.95
34.64 m2
PEKERJAAN PLAFOND TERAS
P L JML VOL SATUAN
6.88 1.38 1.00 9.49
9.49 m2
BACKUP DATA
10.38 m2
PEKERJAAN PLAFOND RABAT
P L JML VOL SATUAN
31.00 0.70 1.00 21.70
21.70 m2
TOTAL 76.22 m2
BACKUP DATA
BACKUP DATA
BACKUP DATA
76.99 KG
0.53 m3
BEGESTING CANOPY
P L JML VOL SATUAN
8.00 2.00 1.00 16.00
16.00 m2
PEMBESIAN CANOPY
P DIA JML KOEF VOL SATUAN
1.95 8.00 46.67 0.39 35.90
0.60 8.00 10.00 0.39 2.37
7.00 8.00 13.00 0.39 35.90
2.00 8.00 3.33 0.39 2.63
76.81 KG
BETON CANOPY
P L T JML VOL SATUAN
8.00 2.00 0.10 1.60
1.60 m3
BEGESTING CANOPY 2
P L JML VOL SATUAN
10.70 0.30 1.00 3.21
3.21 m2
PEMBESIAN CANOPY 2
P DIA JML KOEF VOL SATUAN
0.25 8.00 71.33 0.39 7.04
14.07 KG
BETON CANOPY 2
P L T JML VOL SATUAN
10.70 0.30 0.07 0.22
BACKUP DATA
BACKUP DATA
0.22 m3
BACKUP DATA
BACKUP DATA
BACKUP DATA
PEKERJAAN KUSEN
P H T JML VOL SATUAN
p1 7.75 0.12 0.05 1.00 0.05
p2 4.50 0.12 0.05 4.00 0.11
j2 11.20 0.12 0.05 3.00 0.20
v 2.00 0.12 0.05 4.00 0.05
J1 4.90 0.12 0.05 2.00 0.06
0.46 m3
PEKERJAAN CAT KUSEN
P H JML VOL SATUAN
p1 7.75 0.20 1.00 1.55
p2 4.50 0.20 4.00 3.60
j2 11.20 0.20 3.00 6.72
v 2.00 0.20 4.00 1.60
J1 4.90 0.20 2.00 1.96
15.43 m2
BACKUP DATA
123.43
123.43 m2
BACKUP DATA
BACKUP DATA
BACKUP DATA
PLESTER INTERIOR
P H JML L.KUSEN VOL SATUAN
D.TEPI 21.52 3.50 14.34 60.98
WC 6.52 1.80 4.00 7.60 16.54
77.52
PLESTER EKSTERIOR
D.TEPI 39.76 3.50 27.23 111.93
VOID 2.76 0.60 1.66
TERAS 9.66 0.30 2.00 5.80
132.83
TOTAL 210.35 m2
BACKUP DATA
PEKERJAAAN KAYU
Pasang Daun Pintu P2 4.00 Bh
Pasang Daun Pintu P1 2.00 Bh
Pasang Daun Jendela J2 9.00 Bh
Pasang Daun Jendela J1 2.00 Bh
Pasang Ventilasi atas P1 2.00 Bh
Pasang Ventilasi km/wc 4.00 Bh
Angin-Angin 15/20 12.00 Bh
PEKERJAAN PLAFOND
List Plafond Kayu 146.00 M1
PEKERJAAN INSTALASI LISTRIK
Saklar Ganda 4.00 BH
Saklar Tunggal 2.00 BH
Stop Kontak 2.00 BH
Stop Kontak AC 1.00 BH
BOX MCB 1.00 BH
MCB 6A 2.00 BH
Pasang Down light 3" 12.00 BH
PEKERJAAN SANITASI
Pasang WC jongkok 4.00 ttk
Pasang Wastafel 1.00 Bh
Pasang kran air 3/4" Stainless 4.00 BH
Pipa PVC AW 3/4" saluran air bersih 10.00 BH
Pipa PVC D 2 " saluran air kotor 5.00 BH
Pipa PVC D 3" saluran wc 10.00 BH
Floor drain 4.00 Roll
Profil / Tandon air 1200 Ltr 2.00 Bh
Septicktank + resapan 1.00 Ls
Menara Tandon 1.00 Ls
BACKUP DATA
BACKUP DATA
PEKERJAAN LAIN-LAIN
URAIAN P L L.JENDELA VOL SAT
BATU ALAM 5.44 1.00 0.51 4.93 M2
PEKERJAAN LAIN-LAIN
Profil Kolom Teras 1.00 Ls
List Profil Dinding 1.00 Ls
Pasang Tangga Depan 1.00 Ls
TABEL BERAT BESI POLOS HARGA DI TOKO PANJANG BERAT TOTAL HARGA PER KG
mm Kg/m
6.00 0.222
8.00 0.393
10.00 0.620 Rp 45,000.00 12 7.44 Rp 6,048.39
12.00 0.887 Rp 75,000.00 12 10.64 Rp 7,046.22
14.00 1.209 Rp 115,000.00 12 14.51 Rp 7,926.66
16.00 1.580
20.00 2.465
22.00 3.800
20.00 2.465