Jurnal Survey Lokasi Usulan RPJMDes 2023 - 2029 Dusun 3
Jurnal Survey Lokasi Usulan RPJMDes 2023 - 2029 Dusun 3
BIDANG PEMBANGUNAN
LOKASI RW 07
NO. KATEGORI SUB KATEGORI DESKRIPSI PEKERJAAN UKURAN PEKERJAAN DOKEMENTASI KETERANGAN
Rutilahu 10 Unit
Rehabilitasi
Posyandu P = 6m L = 5m
Rehabilitasi Jalan
Lingkungan P = 404m L = 1m
Rehabilitasi Jalan
P = 25m L = 1m
Usaha Tani
Rehabilitasi MCK
Umum P = 4,5m L = 4m
Rehabilitasi Saluran
P = 50m L = 1m
Drainase Lingkungan
Pemasangan PJU
6 Titik
baru
Rehabilitasi Sarana
dan Prasarana Olah P = 10,5m L = 6,5m
Raga
Rehabilitasi sarana
1 Paket
air bersih
Rehabilitasi
jembatan
penghunbung P = 40m L = 1,5m
Lingkungan
Rehabilitasi
Pemakaman 1. P = 250m Tg =
Umum/Pembanguna 5m, 2. P = 50m L =
n TPT dan jalan 1,5m
lingkungan Makam
Pembangunan
L = 3m Tg = 2m
gapura lingkungan
NO. KATEGORI SUB KATEGORI DESKRIPSI PEKERJAAN UKURAN PEKERJAAN DOKEMENTASI KETERANGAN
Rutilahu 10 Unit
Rehabilitasi
Posyandu P = 7m L = 6m
Pembangunan
Tembok Penahan 1. P = 25m Tg =
tanah aliran DAS 3m, 2. P = 20m Tg
Sungai dan = 2m
lingkungan
Rehabilitasi jalan
P = 610m L = 1m
Lingkungan
Pembangunan &
Rehabilitasi jalan P = 610m L = 1m
Lingkungan
Pembangunan dan
rehabilitasi Jalan P = 150m L = 1m
Usaha Tani
Pembangunan dan
P = 5m L = 4m Tg =
Rehabilitasi MCK 2m
Umum
Pembangunan/
Rehabilitasi Kirmir P = 35m Tg = 2m
Lingkungan (TPT )
Pembangunan/
Rehabilitasi Kirmir P = 35m Tg = 2m
Lingkungan (TPT )
Pembangunan
1. P = 9m L = 1,5m,
Jembatan
2. P = 13m L =
Penghubung 1,5m
Lingkungan
NO. KATEGORI SUB KATEGORI DESKRIPSI PEKERJAAN UKURAN PEKERJAAN DOKEMENTASI KETERANGAN
Rutilahu 36 Unit
Pembangunan/
Rehabilitasi Drainase P = 103m L = 1m
Lingkungan
1. P = 167m Tg =
Pembangunan 2m, 2. P = 58m Tg
tembok Penahan = 2,5m, 3. P = 23m
tanah Lingkungan Tg = 3m, 4. P =
73m Tg = 4m
Pembangunan dan
rehabilitasi jalan P = 893m L = 1m
lingkungan
Rehabilitasi jalan
Desa P = 210m L = 4,5m
Rehabilitasi Irigasi
P = 80m L = 1m
Pertanian
Pembangunan/ 1. P = 7m L = 3m,
rehabilitasi MCK 2. P = 4,5m L =
Umum 4,5m
NO. KATEGORI SUB KATEGORI DESKRIPSI PEKERJAAN UKURAN PEKERJAAN DOKEMENTASI KETERANGAN
Rutilahu 37 Unit
Pembangunan /
Rehabilitasi Jalan P = 423m L = 1m
Lingkungan
Pembangunan
Tempat P =8m L = 5m Tg =
pembuangan 2m
Sampah
Pembangunan
Saluran
P = 120m L = 1,5m
Penanggulangan
banjir
1. P = 45m Tg
Pembangunan 1,5m, 2. P = 28m
Tembok Penahan Tg = 2m, 3. P =
Tanah Lingkungan 75m Tg = 3m, 4. P
= 31m Tg = 1m
NO. KATEGORI SUB KATEGORI DESKRIPSI PEKERJAAN UKURAN PEKERJAAN DOKEMENTASI KETERANGAN
Rutilahu 25 Unit
Pembangunan P = 8m L = 5m Tg =
Posyandu 4m
1. P = 45m Tg =
Pembangunan 1m, 2. P = 83m Tg
Tembok Penahan = 2m, 3. P = 24m
Tanah Lingkungan Tg = 2,5m, 4. P =
26m Tg = 3,5m
Pembangunan/
Rehabilitasi Jalan P = 658m L = 1m
Lingkungan
Pembangunan/ 1. P = 4m L = 2m
Rehabilitasi MCK Tg = 3m, 2. P = 8m
Umum L = 3m Tg = 3m
Pengadaan Sarana
P = 10m L = 4m Tg
Pompa Air dan Bak
penampung Air = 2m