Tlogo Ga Rapi
Tlogo Ga Rapi
KETERANGAN KEBUTUHAN
NO TANGGAL VOL SATUAN
BAHAN
1 11/19/2021 SALDO AWAL PENCAIRAN
2 8/20/2021 Makan Pembentukan KKM 15 org
3 8/24/2021 Makan Koordinasi Penerima Bantuan 30 org
4 8/24/2021 Makan Koordinasi Pembuatan RKM 2 kali 12 org
6 8/28/2021 Makan Surve Lapangan 7 org
7 9/23/2021 Transports Pelatihan Ke bantur 2 hari P.Paeno 1 org
8 9/18/2021 Makan koordinasi Pencairan 6 org
9 9/19/2021 Transport Perdin Atim,Efendi 2 org
11 11/20/2021 Cetakan Jamban/Molding 1 bh
12 11/20/2021 Pasir 8 m3
13 11/24/2021 Besi 10mm 20 bh
14 11/24/2021 PVC 3" 11 bh
15 11/24/2021 Tutup 3" 10 bh
16 11/24/2021 PVC 4" 1 bh
17 11/24/2021 Keni 3" 8 bh
18 11/24/2021 PVC 2" 4 bh
19 11/24/2021 Tcc 2" 4 bh
20 11/24/2021 Semen Gresik 66 bh
21 11/24/2021 kawat Bendrat 2 Kg
22 11/24/2021 Lem Paralon 2 bh
23 11/26/2021 Koral / Batu Pecah 11 m2
25 11/27/2021 Tempat cucian 15 bh
26 11/27/2021 Batako 1200 org
32 11/29/2021 Kloset 8 bh
33 11/29/2021 Paku 1 Kg
34 11/29/2021 Kayu reng 10 bh
36 11/29/2021 Grace Trap/Titip Bella 15 bh
41 11/30/2021 Tutup 4" 10 bh
43 11/30/2021 Tee 3" 22 bh
46 11/30/2021 Baut 20 bh
51 11/30/2021 PVC 1 1/2 7 bh
52 11/30/2021 Kne 1.1/2 8 bh
53 11/30/2021 Beton Bis 80 16 bh
54 11/30/2021 Knee 2" 8 bh
55 12/2/2021 2 Rol Plastik 2 bh
63 Tee 1.1/2 8 bh
64 Tukang 16 hari
Pekerja 54 hari
65 3/12/2021 Kunjungan Dinkes (Mamin) 7 org
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
KEBUTUHAN PKTD/JAMBAN
32550000 430
#REF!
A #REF! P 11/29/2021
#REF!
#REF!
SUMBEROTO TLOGOREJO
45,131,500 44,285,000
47.46% progres 46.57% progres
50.00% 50.00%
2.54% sisa 3.43% sisa
2,418,500 3,265,000