A BARANG
I. Material Langsung 1,127,250,227.13 1,127,250,227.13 75.00% 1,127,250,227.13
(Bahan Baku)
II. Peralatan (Barang Jadi) 150,300,030.28 150,300,030.28 10.00% 150,300,030.28
Sub Total Barang (A) 1,277,550,257.41 85.00% 1,277,550,257.41
B. Jasa
III. Manajemen Proyek dan Perekayasaan 105,210,021.20 105,210,021.20 7.00% 105,210,021.20
IV. Alat Kerja / Fasilitas Kerja 7,515,001.51 7,515,001.51 0.50% 7,515,001.51
V. Konstruksi dan Fabrikasi 112,725,022.71 112,725,022.71 7.50% 112,725,022.71
VI. Jasa Umum - - 0.00% -
Sub Total Jasa (B) 225,450,045.43 15.00% 225,450,045.43
Formulasi Perhitungan :
= 1,277,550,257.41 - 0.00
1,503,000,302.84
= 1,277,550,257.41
1,503,000,302.84
= 85.00%
Jasa :
= 225,450,045.43 - 0.00
1,503,000,302.84
= 225,450,045.43
1,503,000,302.84
= 15.00%