B JASA
III Manajeman Proyek dan Perekayasaan 740,391,883.21 - 740,391,883.21 0.00% 10.00% 3.00%
IV Alat Kerja/ Fasilitas Kerja 2,467,972,944.05 - 2,467,972,944.05 0.00% 33.33% 10.00%
V Konstruksi dan Fabrikasi 3,701,959,416.07 - 3,701,959,416.07 100.00% 50.00% 15.00%
VI Jasa Umum 493,594,588.81 - 493,594,588.81 0.00% 6.67% 2.00%
B. Sub Total Jasa 7,403,918,832.14 - 7,403,918,832.14 100.00% 100.00% 30.00%
C. TOTAL Biaya (A + B) 24,679,729,440.46 - 24,679,729,440.46 100.00% 200.00% 100.00%
Formulasi Perhitungan
(Nilai Barang Total - Nilai Barang Luar Negeri) + (Nilai Jasa Total - Nilai Jasa Luar Negeri)
% TKDN (Gabungan Barang dan Jasa) =
Nilai Gabungan Barang dan Jasa
24,679,729,440.46
=
24,679,729,440.46
= 100.0%
MELKISEDEK MAGANG
Kepala Cabang Alor