FORMULIR REKAPITULASI PERHITUNGAN

TINGKAT KOMPONEN DALAM NEGERI (TKDN)

Nama Penyedia Jasa : PT. DONNY PUTRA MANDIRI


Alamat : JL PAUS UJUNG NO 129 E PEKANBARU
Nama Pengguna Jasa : PPK 2.5
Nama Paket Pekerjaan : Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar

Nilai Gabungan Barang dan Jasa (Rp) TKDN Barang &


Jasa (%)
URAIAN PEKERJAAN Total
Barang /
KDN KLN % Gab
Jasa
Ribu (Rp) KDN
(1) (2) (3) (4) (5) (6) (7)
BARANG
I. Material Langsung (Bahan Baku)
DIV.I Umum 421,845,000.00 - 421,845,000.00 100% 1.25
DIV. II Pekerjaan Drainase 120,728,447.90 - 120,728,447.90 100% 0.36
DIV. III Pekerjaan Tanah dan Geosintetik 125,453,048.07 - 125,453,048.07 100% 0.37
DIV. IV Pekerjaan Prevenntif - - - 100% -
DIV. V Pekerasan Berbutir dan Perkerasan Beton Semen 1,736,565,846.52 - 1,736,565,846.52 100% 5.13
DIV. VI Perkerasan Aspal 20,923,039,936.94 - 20,923,039,936.94 100% 61.76
DIV. VII Struktur 2,705,283,453.72 - 2,705,283,453.72 100% 7.98
DIV. VIII Rehabilitasi Jembatan 190,935,988.99 - 190,935,988.99 100% 0.56
DIV. IX Pekerjaan Harian dan Pekerjaan Lain Lain 1,335,213,517.49 - 1,335,213,517.49 100% 3.94
DIV. X Pemeliharaan Rutin Kinerja 6,320,601,968.33 - 6,320,601,968.33 100% 18.66

II. Peralatan (Barang Jadi)


A. Sub Total Barang 33,879,667,207.97 - 33,879,667,207.97 100.00 100%

JASA
III. Managemen Proyek dan Perekayasaan - - 0.00%
IV. Alat Kerja / Fasilitas Kerja - - - 0.00%
V. Konstruksi dan Fabrikasi - - - 0.00%
VI. Jasa Umum - - - 0.00%
B. Sub Total Jasa - - - 0.00% 0.00%

C. TOTAL BIAYA (A+B) 33,879,667,207.97 - 33,879,667,207.97 100.00 100%

% TKDN (Gabungan Barang dan Jasa)


Pekanbaru, 10 Desember 2020
Penawar
= 33,879,667,207.97 x 100 % PT. DONNY PUTRA MANDIRI
33,879,667,207.97

= 100%
ADHI WIRATAMA
Direktur
DAFTAR BARANG YANG DIIMPOR

Nama Paket : Muara Lembu - Batas Prov. Sumbar


NO. PAKET : PPK 2.5
Prop/ Kab/Kodya : Riau
Panjang Jalan :
Satker : Pelaksanaan Jalan Nasional Wilayah II Provinsi Riau

NO NAMA BARANG/URAIAN SPESIFIKASI SATUAN JUMLAH HARGA NEGARA ASAL

4
NIHIL
5

Pekanbaru, 10 Desember 2020


Penawar
PT. DONNY PUTRA MANDIRI

ADHI WIRATAMA
Direktur
SPESIFIKASI TEKNIS

Nama Paket : Muara Lembu - Batas Prov. Sumbar


NO. PAKET : PPK 2.5
Prop/ Kab/Kodya : Riau
Panjang Jalan :
Satker : Pelaksanaan Jalan Nasional Wilayah II Provinsi Riau

Mengikuti Spek yang


Ditentukan Sesuai
Dengan Dokumen
Lelang

Pekanbaru, 10 Desember 2020


Penawar
PT. DONNY PUTRA MANDIRI

ADHI WIRATAMA
Direktur
METODE PELAKSANAAN

Nama Paket : Muara Lembu - Batas Prov. Sumbar


NO. PAKET : PPK 2.5
Prop/ Kab/Kodya : Riau
Panjang Jalan :
Satker : Pelaksanaan Jalan Nasional Wilayah II Provinsi Riau

Metoda Pelaksanaan tidak dipersyaratkan (Metode pelaksanaan pekerjaan untuk pekerjaan kompleks dan/atau
pekerjaan yang diperuntukkan bagi kualifikasi usaha besar;)

Pekanbaru, 10 Desember 2020


Penawar
PT. DONNY PUTRA MANDIRI

ADHI WIRATAMA
Direktur
Nomor : 007/PNWR-APBN/DPM-PKU/XII/2020 Pekanbaru, 10 Desember 2020
Lampiran : 1 (satu) berkas

Kepada Yth,
Pokja Pemilihan 4.5 Balai Pelaksana Pemilihan Jasa Konstruksi (BP2JK) Wilayah Riau
Kementerian Pekerjaan Umum dan Perumahan Rakyat
di -
Jl. Cut Nyak Dhien Pekanbaru No. 01 (Kantor BWS Sumatera III).

Perihal : Penawaran Pekerjaan Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar

Sehubungan dengan pengumuman tender Pascakualifikasi dan Dokumen Pemilihan nomor :


FSK.01/BM/DOK-PIL/POKJA-4.5/BP2JKW-RIAU/XI/2020 tanggal 26 November 2020 dan setelah
kami pelajari dengan saksama Dokumen Pemilihan dan Berita Acara Pemberian Penjelasan [serta
adendum Dokumen Pemilihan], dengan ini kami mengajukan penawaran untuk pekerjaan
Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar sebesar :
Rp. 37,267,633,928.76
Tiga Puluh Tujuh Milyar Dua Ratus Enam Puluh Tujuh Juta Enam Ratus Tiga Puluh
( )
Tiga Ribu Sembilan Ratus Dua Puluh Delapan 76/100 Rupiah.
termasuk PPN.

Penawaran ini sudah memperhatikan ketentuan dan persyaratan yang tercantum dalam Dokumen
Pemilihan untuk melaksanakan pekerjaan tersebut.

Penawaran ini berlaku selama 90 (sembilan puluh) hari kalender sejak batas akhir pemasukan
penawaran.

Sesuai dengan persyaratan, bersama Surat Penawaran ini kami lampirkan :

1. Jaminan Penawaran Asli;


2. Surat perjanjian Kerja Sama Operasi, (apabila ber-KSO);
3. Dokumen Penawaran teknis, terdiri atas:
a. Metode pelaksanaan pekerjaan;
b. Jangka waktu pelaksanaan pekerjaan;
c. Daftar isian Peralatan utama beserta bukti/dokumen pendukung;
d. Daftar isian personel manajerial beserta daftar riwayat pengalaman kerja atau referensi
kerja dari pemberi tugas dan Surat pernyataan kepemilikan sertifikat kompetensi kerja

e. Rencana Keselamatan Konstruksi (RKK);


f. Daftar isian bagian pekerjaan yang akan disubkontrakkan (apabila disyaratkan); dan
g. Dokumen lain yang disyaratkan (apabila ada).
4. Dokumen Penawaran Harga terdiri atas:
a. Daftar Kuantitas dan Harga;
5. Dokumen lain:
a. Formulir rekapitulasi perhitungan Tingkat Komponen Dalam Negeri (TKDN), (apabila
memenuhi syarat untuk diberikan preferensi harga); dan
b. Daftar barang yang diimpor (apabila ada)

Dengan disampaikannya Surat Penawaran ini, maka kami menyatakan sanggup dan akan tunduk
pada semua ketentuan yang tercantum dalam Dokumen Pemilihan serta Pokja Pemilihan tidak
terikat untuk menetapkan penawaran terendah sebagai pemenang. Apabila dana dalam dokumen
anggaran yang telah disahkan tidak tersedia atau tidak cukup tersedia dalam DIPA Tahun
Anggaran, maka Pengadaan Barang/Jasa dapat dibatalkan dan kami tidak akan menuntut ganti rugi
dalam bentuk apapun

Penawar
PT. DONNY PUTRA MANDIRI

ADHI WIRATAMA
Direktur
HARGA & JARAK RATA-RATA
DARI SUMBER BAHAN (QUARRY)
HARGA JARAK
No. URAIAN SATUAN ROYALTY QUARRY KET.
(Rp) ( Km )

1. M01 - P a s i r Pasang M3 90,000.00 60.02 Ke Base Camp


M01 - P a s i r Beton M3 98,000.00 4.00 Ke Lokasi Pek.
2. M02 - Batu Kali M3 299,000.00 123.02 Ke Lokasi Pek.

3. M06 - Batu Belah/Batu Quarry Besar M3 180,000.00 123.02 Ke Lokasi Pek.

4. M07 - G r a v e l M3 180,000.00 4.00 Ke Base Camp

5. M10 - Aspal Cement (Pelabuhan) KG 59.08 Ke Base Camp

6. M16 - S i r t u M3 140,000.00 4.00 Ke Lokasi Pek.

7. M44 - Pasir Urug M3 95,000.00 4.00 Ke Lokasi Pek.

8 M08 - Tanah Timbun M3 20,500.00 4.00 Ke Lokasi Pek.

9 M09 - Material Pilihan M3 120,500.00 4.00 Ke Lokasi Pek.

Catatan : Harga Royalty sudah ditambah biaya retribusi sebesar Rp. 500,-/m3

Lokasi Quarry Rimbo Panjang


- Base A
- Base B
- CA/FA
- Aspal

Ke Payakumbuh 8 Km Ke Pekanbaru
MA LEMBU 9 Km
8
48 6.00 Km
BTS. KAB. KUANSING 58.02 Km 2 Km MARPOYAN
Lokasi Quarry Tanah Timbun = 10.00 km
TARATAK BULUH
Base Camp - Pasir Pasang
- Pasir Beton
-

PETA LOKASI QUARRY

Catatan :

Rimbo Panjang - Base Camp = 75.01 Km


Base Camp - Lokasi Proyek = 15.73 Km
Sumber Quarry s/d Lokasi Proyek = 123.02 Km

Lokasi Proyek - Base Camp = 15.73 Km


Total Sumber Quarry Pangkalan s/d Base Camp = 75.01 Km

Jarak Quarry Bt. Kali/Belah ke B. Camp diperkirakan = 75.01 Km


Jarak Quarry Bt. Kali/Belah ke Lokasi Proyek diperkirakan = 75.01 Km
Jarak Quarry Pasir ke Base Camp diperkirakan = 60.02 Km
Jarak Quarry Pasir ke Lokasi Proyek diperkirakan = 4.00 Km
Jarak Quarry Tanah Timbun ke Lokasi Proyek diperkirakan = 4.00 Km
Perkiraan Jarak Toko/Agen (Pekanbaru) ke Base Camp = 59.08 Km
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M01a - Pasir Pasang
Lokasi : Quarry
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 60.02 Km
4 Harga satuan pasir di Quarry RpM01 1.00 M3 90,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 478,053.67
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 408,698.87
7 Berat volume pasir Bil 1.42 ton/m3

II. URUTAN KERJA


1 Pasir digali dengan Excavator
2 Excavator sekaligus memuat pasir hasil
galian ke dalam Dump Truck
3 Dump Truck mengangkut pasir ke lokasi
Base Camp

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.32 menit
- Lain-lain T2 0.10 menit
Ts1 0.42 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 99.24428571429 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 4,816.94 Rupiah

DUMP TRUCK (E09)


Kapasitas bak V 15.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 30.00 KM/Jam
Kecepatan rata-rata kosong v2 0.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/Q1 x Bil) T1 6.39 menit
- Waktu tempuh isi = (L/v1) x 60 T2 120.04 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 0.00 menit
- Lain-lain T4 1.00 menit
Ts2 127.43 menit

Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M01a - Pasir Pasang
Lokasi : Quarry
Tujuan : Base Camp

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 4.13 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 98,998.87 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI BASE CAMP

Harga Satuan Dasar Pasir =

( RpM01 + Rp1 + Rp2 ) M01 193,815.81 Rupiah

Dibulatkan : M01 193,800.00 Rupiah

ANALISA HARGA DASAR SATUAN BAHAN


Jenis : M02 - Batu Kali
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 0.00 Km
4 Harga satuan batu kali di Quarry RpM02 1.00 M3 299,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 478,053.67
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 408,698.87
7 Berat volume batu kali Bil 1.44 ton/m3

II. URUTAN KERJA


1 Batu kali digali dengan Excavator
2 Excavator sekaligus memuat batu kali
hasil galian ke dalam Dump Truck
3 Dump Truck mengangkut batu kali ke
lokasi pekerjaan

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 17,203.35 Rupiah

DUMP TRUCK (E09)


Kapasitas bak V 8.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 30.00 KM/Jam
Kecepatan rata-rata kosong v2 0.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 12.00 menit
- Waktu tempuh isi = (L/v1) x 60 T2 0.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 0.00 menit
- Lain-lain T4 1.00 menit
Ts2 13.00 menit

Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M02 - Batu Kali
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 21.29 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 19,197.15 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar Batu kali =

( RpM02 + Rp1 + Rp2 ) M02 335,400.50 Rupiah

Dibulatkan : M02 335,400.00 Rupiah

ANALISA HARGA DASAR SATUAN BAHAN


Jenis : M06 - Batu Belah
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 0.00 Km
4 Harga satuan batu kali di Quarry RpM06 1.00 M3 180,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 478,053.67
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 408,698.87
7 Harga Satuan Dasar Wheel Loader RpE15 1.00 Jam 345,037.95
8 Harga Satuan Upah Pekerja RpL01 1.00 Jam 21,428.57
9 Berat volume batu belah Bil 1.60 ton/m3

II. URUTAN KERJA


1 Batu kali digali dengan Excavator
2 Batu kali dibelah oleh Pekerja
3 Dengan Wheel Loader batu belah dimuat
ke Dump Truck yang mengangkut batu
belah ke lokasi pekerjaan
III. PERHITUNGAN

3.a EXCAVATOR (E10)


Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 17,203.35 Rupiah

3.b WHEEL LOADER (E15)


Kapasitas Bucket V 1.50 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi Alat Fa 0.83 -
Waktu sklus Ts1
- Muat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kapasitas Produksi / Jam =
V x Fb x Fa x 60 Q2 44.82 M3 / Jam
Ts1
Biaya Excavator / M3 = (1 : Q2) x RpE15 Rp2 7,698.30 Rupiah

Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M06 - Batu Belah
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

3.c DUMP TRUCK (E09)


Kapasitas bak V 15.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 25.00 KM/Jam
Kecepatan rata-rata kosong v2 0.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 20.24 menit
- Waktu tempuh isi = (L/v1) x 60 T2 0.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 0.00 menit
- Lain-lain T4 1.00 menit
Ts2 21.24 menit

Kapasitas Produksi / Jam =


V x Fa x 60 Q3 21.98 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q3) x RpE08 Rp3 18,595.31 Rupiah

3.d PEKERJA

Produksi menentukan : Excavator Q1 27.7884 M3 / Jam


Hasil galian batu / hari = Q1 x 7 Jam Qt 194.5188 M3 / 7 jam
Kebutuhan Pekerja P 10.00 Orang

Biaya Pekerja / M3 =
{ (7 Jam x P) : Qt } x RpL01 Rp4 7,711.34 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar Batu belah =

( RpM06 + Rp1 + Rp2 + Rp3 + Rp4 ) M06 231,208.31 Rupiah

Dibulatkan : M06 231,200.00 Rupiah

ANALISA HARGA DASAR SATUAN BAHAN


Jenis : M07 - Gravel
Lokasi : Quarry
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 4.00 Km
4 Harga satuan Gravel di Quarry RpM07 1.00 M3 180,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 478,053.67
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 408,698.87
7 Berat volume gravel Bil 2.20 ton/m3

II. URUTAN KERJA


1 Gravel digali dengan Excavator
2 Excavator sekaligus memuat gravel
hasil galian ke dalam Dump Truck
3 Dump Truck mengangkut gravel ke
lokasi pekerjaan

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 17,203.35 Rupiah

DUMP TRUCK (E09)


Kapasitas bak V 8.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 50.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 7.85 menit
- Waktu tempuh isi = (L/v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 4.80 menit
- Lain-lain T4 1.00 menit
Ts2 19.65 menit

Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M07 - Gravel
Lokasi : Quarry
Tujuan : Base Camp

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 9.22 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 44,351.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI BASE CAMP
Harga Satuan Dasar Gravel =

( RpM07 + Rp1 + Rp2 ) M07 241,554.36 Rupiah

Dibulatkan : M07 241,600.00 Rupiah

ANALISA HARGA DASAR SATUAN BAHAN


Jenis : M16 - Sirtu
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 4.00 Km
4 Harga satuan Sirtu di Quarry RpM16 1.00 M3 140,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 478,053.67
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 408,698.87
7 Berat volume sirtu Bil 1.51 ton/m3

II. URUTAN KERJA


1 Sirtu digali dengan Excavator
2 Excavator sekaligus memuat sirtu hasil
galian ke dalam Dump Truck
3 Dump Truck mengangkut sirtu ke lokasi
Base Camp

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 11,468.90 Rupiah

DUMP TRUCK (E09)


Kapasitas bak V 8.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 50.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 7.63 menit
- Waktu tempuh isi = (L/v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 4.80 menit
- Lain-lain T4 1.00 menit
Ts2 19.43 menit

Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M16 - Sirtu
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 13.58 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 30,091.89 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar Sirtu =

( RpM16 + Rp1 + Rp2 ) M16 181,560.79 Rupiah

Dibulatkan : M16 181,600.00 Rupiah


ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M44 - Pasir Urug
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 4.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3 95,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 478,053.67
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 408,698.87
7 Berat volume pasir urug Bil 1.42 ton/m3

II. URUTAN KERJA


1 pasir urug digali dengan Excavator
2 Excavator sekaligus memuat pasir urug
hasil galian ke dalam Dump Truck
3 Dump Truck mengangkut pasir urug
ke lokasi pekerjaan

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 11,468.90 Rupiah

DUMP TRUCK (E09)


Kapasitas bak V 8.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 50.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 8.11 menit
- Waktu tempuh isi = (L/v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 4.80 menit
- Lain-lain T4 1.00 menit
Ts2 19.91 menit

Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M44 - Pasir Urug
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 14.09 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 29,002.43 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar pasir urug =

( RpM44 + Rp1 + Rp2 ) M44 135,471.34 Rupiah

Dibulatkan : M44 135,500.00 Rupiah


ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M1c- Pasir Beton
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 4.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3 98,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 478,053.67
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 408,698.87
7 Berat isi volume pasir beton Bil 1.69 ton/m3

II. URUTAN KERJA


1 pasir urug digali dengan Excavator
2 Excavator sekaligus memuat pasir urug
hasil galian ke dalam Dump Truck
3 Dump Truck mengangkut pasir urug
ke lokasi pekerjaan

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 22.41 M3 / Jam
Ts1
Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 21,332.16 Rupiah

DUMP TRUCK (E09)


Kapasitas bak V 8.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 50.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 12.67 menit
- Waktu tempuh isi = (L/v1) x 60 T1 6.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T2 4.80 menit
- Lain-lain T4 1.00 menit
Ts2 24.47 menit

Bersambung

ANALISA HARGA DASAR SATUAN BAHAN


Jenis : M1c- Pasir Beton
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 9.63 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 42,430.22 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar pasir urug =

( RpM44 + Rp1 + Rp2 ) M44 161,762.37 Rupiah

Dibulatkan : M44 161,800.00 Rupiah


HARGA & JARAK RATA-RATA
DARI SUMBER BAHAN JADI (TANPA STONE CRUSHER)
HARGA JARAK
No. URAIAN SATUAN ROYALTY QUARRY KET.
(Rp) ( Km )

1. Ca / Fa M3 350,000.00 75.01 Ke Base Camp

2. Aggregat Base - A M3 230,000.00 123.02 Ke Lokasi Pek.

3. Aggregat Base - B M3 210,000.00 123.02 Ke Lokasi Pek.

4. Aggregat Base - S M3 115,000.00 123.02 Ke Lokasi Pek.

5.

6. Aggregat 0 - 5 M3 200,000.00 75.01 Ke Base Camp

7. Aggregat 5 - 10 M3 220,000.00 75.01 Ke Base Camp

8 Medium M3 220,000.00 75.01 Ke Base Camp

9
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : Ca / Fa
Lokasi : Quarry
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 75.01 Km
4 Harga satuan aggregat di Quarry RpM01 1.00 M3 350,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 478,053.67
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 408,698.87
7 Berat volume Bil 1.51 ton/m3

II. URUTAN KERJA


1 Pasir digali dengan Excavator
2 Excavator sekaligus memuat pasir hasil
galian ke dalam Dump Truck
3 Dump Truck mengangkut pasir ke lokasi
Base Camp

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 11,468.90 Rupiah

DUMP TRUCK (E09)


Kapasitas bak V 8.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 50.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/Q1 x Bil) T1 7.63 menit
- Waktu tempuh isi = (L/v1) x 60 T2 112.52 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 90.01 menit
- Lain-lain T4 1.00 menit
Ts2 211.15 menit
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : Ca / Fa
Lokasi : Quarry
Tujuan : Base Camp

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 1.25 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 327,083.60 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI BASE CAMP

Harga Satuan Dasar =

( RpM01 + Rp1 + Rp2 ) M01 688,552.50 Rupiah

Dibulatkan : M01 688,600.00 Rupiah


ANALISA HARGA DASAR SATUAN BAHAN
Jenis : Aggregat - A
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 123.02 Km
4 Harga satuan Aggregat di Quarry RpM02 1.00 M3 230,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 478,053.67
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 408,698.87
7 Berat volume Aggregat Bil 1.44 ton/m3

II. URUTAN KERJA


1 Batu kali digali dengan Excavator
2 Excavator sekaligus memuat batu kali
hasil galian ke dalam Dump Truck
3 Dump Truck mengangkut batu kali ke
lokasi pekerjaan

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 17,203.35 Rupiah

DUMP TRUCK (E09)


Kapasitas bak V 15.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 0.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 22.49 menit
- Waktu tempuh isi = (L/v1) x 60 T2 184.53 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 0.00 menit
- Lain-lain T4 1.00 menit
Ts2 208.02 menit

Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : Aggregat - A
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 2.49 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 163,890.33 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar =

( RpM02 + Rp1 + Rp2 ) M02 411,093.69 Rupiah

Dibulatkan : M02 411,100.00 Rupiah


ANALISA HARGA DASAR SATUAN BAHAN
Jenis : Aggregat - B
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 123.02 Km
4 Harga satuan Aggregat di Quarry RpM06 1.00 M3 210,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 478,053.67
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 408,698.87
7 Berat volume Aggregat Bil 1.42 ton/m3

II. URUTAN KERJA


1 Batu kali digali dengan Excavator
2 Batu kali dibelah oleh Pekerja
3 Dengan Wheel Loader batu belah dimuat
ke Dump Truck yang mengangkut batu
belah ke lokasi pekerjaan
III. PERHITUNGAN

3.a EXCAVATOR (E10)


Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 17,203.35 Rupiah


Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : Aggregat - B
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

3.c DUMP TRUCK (E09)


Kapasitas bak V 8.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 0.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 12.16 menit
- Waktu tempuh isi = (L/v1) x 60 T2 184.53 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 0.00 menit
- Lain-lain T4 1.00 menit
Ts2 197.69 menit

Kapasitas Produksi / Jam =


V x Fa x 60 Q3 1.42 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q3) x RpE08 Rp3 287,982.92 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar =

( RpM06 + Rp1 + Rp2 + Rp3 + Rp4 ) M06 515,186.28 Rupiah

Dibulatkan : M06 515,200.00 Rupiah


ANALISA HARGA DASAR SATUAN BAHAN
Jenis : Aggregat - S
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 123.02 Km
4 Harga satuan Aggregat di Quarry RpM07 1.00 M3 115,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 478,053.67
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 408,698.87
7 Berat volume Aggregat Bil 1.20 ton/m3

II. URUTAN KERJA


1 Gravel digali dengan Excavator
2 Excavator sekaligus memuat gravel
hasil galian ke dalam Dump Truck
3 Dump Truck mengangkut gravel ke
lokasi pekerjaan

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 17,203.35 Rupiah

DUMP TRUCK (E09)


Kapasitas bak V 15.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 0.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 26.99 menit
- Waktu tempuh isi = (L/v1) x 60 T2 184.53 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 0.00 menit
- Lain-lain T4 1.00 menit
Ts2 212.52 menit

Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : Aggregat - S
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 2.93 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 139,528.60 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI BASE CAMP

Harga Satuan Dasar =

( RpM07 + Rp1 + Rp2 ) M07 271,731.95 Rupiah

Dibulatkan : M07 271,700.00 Rupiah


ANALISA HARGA DASAR SATUAN BAHAN
Jenis : Aggregat 0 - 5
Lokasi : Quarry
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 75.01 Km
4 Harga satuan Aggregat di Quarry RpM16 1.00 M3 200,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 478,053.67
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 408,698.87
7 Berat volume Bil 1.51 ton/m3

II. URUTAN KERJA


1 Sirtu digali dengan Excavator
2 Excavator sekaligus memuat sirtu hasil
galian ke dalam Dump Truck
3 Dump Truck mengangkut sirtu ke lokasi
Base Camp

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 11,468.90 Rupiah

DUMP TRUCK (E09)


Kapasitas bak V 15.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 25.00 KM/Jam
Kecepatan rata-rata kosong v2 0.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 14.30 menit
- Waktu tempuh isi = (L/v1) x 60 T2 180.02 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 0.00 menit
- Lain-lain T4 1.00 menit
Ts2 195.32 menit

Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : Aggregat 0 - 5
Lokasi : Quarry
Tujuan : Base Camp

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 2.53 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 161,366.56 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar =

( RpM16 + Rp1 + Rp2 ) M16 372,835.46 Rupiah

Dibulatkan : M16 372,800.00 Rupiah


ANALISA HARGA DASAR SATUAN BAHAN
Jenis : Aggregat 5 - 10
Lokasi : Quarry
Tujuan : Base Camp
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 75.01 Km
4 Harga satuan aggregat di Quarry RpM44 1.00 M3 220,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 478,053.67
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 408,698.87
7 Berat volume Bil 1.42 ton/m3

II. URUTAN KERJA


1 pasir urug digali dengan Excavator
2 Excavator sekaligus memuat pasir urug
hasil galian ke dalam Dump Truck
3 Dump Truck mengangkut pasir urug
ke lokasi pekerjaan

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 11,468.90 Rupiah

DUMP TRUCK (E09)


Kapasitas bak V 15.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 30.00 KM/Jam
Kecepatan rata-rata kosong v2 0.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 15.21 menit
- Waktu tempuh isi = (L/v1) x 60 T2 150.02 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 0.00 menit
- Lain-lain T4 1.00 menit
Ts2 166.23 menit

Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : Aggregat 5 - 10
Lokasi : Quarry
Tujuan : Base Camp

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 3.16 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 129,142.36 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar =

( RpM44 + Rp1 + Rp2 ) M44 360,611.26 Rupiah

Dibulatkan : M44 360,600.00 Rupiah


ANALISA HARGA DASAR SATUAN BAHAN
Jenis : Medium
Lokasi : Quarry
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 75.01 Km
4 Harga satuan aggregat di Quarry RpM44 1.00 M3 220,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 478,053.67
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 408,698.87
7 Berat isi volume Bil 1.51 ton/m3

II. URUTAN KERJA


1 pasir urug digali dengan Excavator
2 Excavator sekaligus memuat pasir urug
hasil galian ke dalam Dump Truck
3 Dump Truck mengangkut pasir urug
ke lokasi pekerjaan

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 22.41 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 21,332.16 Rupiah

DUMP TRUCK (E09)


Kapasitas bak V 8.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 40.00 KM/Jam
Kecepatan rata-rata kosong v2 50.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 14.18 menit
- Waktu tempuh isi = (L/v1) x 60 T1 112.52 menit
- Waktu tempuh kosong = (L/v2) x 60 T2 90.01 menit
- Lain-lain T4 1.00 menit
Ts2 217.71 menit

Bersambung

ANALISA HARGA DASAR SATUAN BAHAN


Jenis : Medium
Lokasi : Quarry
Tujuan : Base Camp

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 1.21 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 337,243.02 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar =

( RpM44 + Rp1 + Rp2 ) M44 578,575.18 Rupiah

Dibulatkan : M44 578,600.00 Rupiah


INFORMASI UMUM
No. URAIAN INFORMASI

1. Nomor Paket Kontrak : 2.5 B

2. Nama Paket : Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar

3. Propinsi / Kabupaten / Kotamadya : RIAU

4. Lokasi pekerjaan Periksa lampiran

5. Kondisi jalan lama ..............................

6. Panjang efektif ( lihat sketsa di bawah ) 62.420 Kilometer ( Leff = a + b )

7. Lebar jalan lama ( bahu + perkerasan + bahu ) ( 0.50 + 6.00 + 0.50 ) meter

8. Lebar Rencana ( bahu + perkerasan + bahu ) ( 1.00 + 6.00 + 1.00 ) meter

9. Penampang jalan, jenis dan volume pekerjaan pokok Lihat lampiran.

10. Jangka waktu pelaksanaan pekerjaan 335 hari kalender


Atau : 11.17 bulan (Periode Pelaksanaan)

11. Jarak rata-rata Base Camp ke lokasi pekerjaan ---> L= 15.73 Kilometer

Perhitungan didasarkan pada sketsa di bawah ini : L = { (c+a/2)*a + (c+b/2)*b } / (a+b)

30.00 Km = a C 32.42 Km = b

A B
0.10 Km = c
Base Camp --------->
D

Kalkulasi Jarak Rata-Rata =

12. Jam kerja efektif dalam 1 hari 7.0 jam


13. Asuransi, Pajak, dsb. untuk Peralatan 0.003 x Harga Pokok Alat
14. Tingkat Suku Bunga Investasi Alat 10.42 %
15. Biaya Umum dan Keuntungan 10.00 % x Biaya Langsung

16. RINGKASAN METODE PELAKSANAAN

a. Mobilisasi dilaksanakan sesuai ketentuan yang berlaku dalam Kontrak.

b. Pekerjaan Tanah dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .


...........................................................................
c. Pekerjaan Lapis Pondasi Agregat dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
...........................................................................
d. Pekerjaan Campuran Aspal Panas dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
...........................................................................
e. Pekerjaan Pasangan Batu dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
...........................................................................
f. Pekerjaan Pengembalian Kondisi dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
...........................................................................
g. ...........................................................................
...........................................................................

17. Lokasi Quarry Periksa lampiran.

18 Jumlah Jembatan = ...................... Buah Periksa lampiran.

19 Total Bentang Jembatan = .................. Buah Periksa lampiran.

20 ....................................

21 ....................................
22 ....................................
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI

% TERHADAP TOTAL BIAYA PROYEK = 0.2506 %


Lembar 1.2-1
HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

A. Sewa Tanah M2 10,000.00 600.00 6,000,000.00

B. PERALATAN
Periksa lembar 1.2-2 48,000,000.00

C. Kantor Lapangan dan Fasilitas


1 Base Camp 100.00 20,000.00 2,000,000.00
2 Kantor 120.00 25,000.00 3,000,000.00
3 Barak 100.00 15,000.00 1,500,000.00
4 Bengkel -
5 Gudang, dan lain-lain -
6 ...................... ....

D. MOBILISASI FASILITAS LABORATORIUM


1 Ruang laboratorium (sesuai gambar) Set 1.00 10,000,000.00 10,000,000.00
2 Soil & Aggregate Testing Set 15,000,000 -
Compaction Test Set 20,000,000 -
CBR Test Set 5,000,000 -
Specific Gravity Set 5,000,000 -
Atterberg Limits Set 12,500,000 -
Grain Size Analysis Set 6,500,000 -
Field Density Test by Sand Cone Methode Set 6,000,000 -
Moisture Content Bln 5,000,000 -
Abrasion of Aggregate by Los Angeles Machine

3 Bituminous Testing Set 20,000,000 -


Marshall Asphalt Test Set 9,000,000 -
Extraction Test, Centrifuge/Refflux Method Set 9,000,000 -
Specific Gravity for Coarse Aggregate Set 9,000,000 -
Specific Gravity for Fine Aggregate Set 15,000,000 -
Mix Air Viod Content (Accurate Method) Set 15,000,000 -
Core Drill Set 1,000,000 -
Metal Thermometer Set 5,000,000 -
Accessories and Tolls Bln 1,000,000 -
Penetration Test Set 6,000,000 -
Softening Point Set 15,000,000 -
Refusal Density Compactor

4 Concrete Testing Set 500,000 -


Slump Cone Set 10,000,000 -
Cylinder/Cube Mould for Compressive Strength Set 10,000,000 -
Beam Mould for Flexural Strength (RIGID) Set 50,000,000 -
Crushing Machine
0
5 Pendukung (Periksa Fasilitas Laboratorium)
0
6 Operasional (Periksa Fasilitas Laboratorium)
E. MOBILISASI PERSONIL BLN 1,200,000.00 -
E.I. Personil Sesuai Struktur Organisasi LS 25,000,000 0
1 GS
2 Tenaga Ahli Jalan
3 Tenaga Ahli Jembatan ....
4 ...................... ....
5 ...................... ....
6 ...................... ....

E.II. Personi Lainnya Set 25,000,000 0


1 Koordinator Manajemen dan Keselamatan Lalu Linta ....
2 Manajer Kendal Mutu ....
3 ...................... ....
4 ...................... ....
5 ...................... ....
6 ...................... ....

F. Manajemen dan Keselamatan Lalu Lintas Ls 0

G. DEMOBILISASI LS 1 14,400,000 14,400,000

Total Biaya Mobilisasi 84,900,000

Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
Lembar 1.2-2
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

B. PERALATAN

1 ASPHALT FINISHER E02 Unit 1 1,200,000 1,200,000


2 POWER BROOM E03 Unit 1 600,000 600,000
3 BULLDOZER 100-150 HP E04 Unit 1 1,200,000 1,200,000
4 COMPRESSOR 4000-6500 L\M E05 Unit 1 600,000 600,000
5 CONCRETE MIXER 0.3-0.6 M3 E06 Unit 1 600,000 600,000
6 CRANE 10-15 TON E07 Unit 1 1,200,000 1,200,000
7 DUMP TRUCK 4 TON (2-3 m3) E08 Unit 4 600,000 2,400,000
8 DUMP TRUCK 10 Ton (6 - 8 M3) E09 Unit 5 600,000 3,000,000
9 EXCAVATOR 80-140 HP E10 Unit 3 1,200,000 3,600,000
10 FLAT BED TRUCK 3-4 M3 E11 Unit 1 600,000 600,000
11 GENERATOR SET E12 Unit 1 600,000 600,000
12 MOTOR GRADER >100 HP E13 Unit 1 1,200,000 1,200,000
13 WHEEL LOADER 1.0-1.6 M3 E15 Unit 1 1,200,000 1,200,000
14 THREE WHEEL ROLLER 6-8 T E16 Unit 2 1,200,000 2,400,000
15 TANDEM ROLLER 6-8 T. E17 Unit 1 1,200,000 1,200,000
16 TIRE ROLLER 8-10 T. E18 Unit 1 1,200,000 1,200,000
17 VIBRATORY ROLLER 5-8 T. E19 Unit 1 1,200,000 1,200,000
18 WATER PUMP 70-100 mm E22 Unit 2 600,000 1,200,000
19 WATER TANKER 3000-4500 L. E23 Unit 1 600,000 600,000
20 TAMPER E25 Unit 1 600,000 600,000
21 JACK HAMMER E26 Unit 1 600,000 600,000
22 TRAILER 20 TON E29 Unit 1 1,200,000 1,200,000
23 COLD MILLING MACHINE E37 Unit 1 1,200,000 1,200,000

C. LOKASI RUTIN
1 PICK UP TERBUKA Unit 1 600,000 600,000
2 BACKHOE LOADER Unit 1 1,200,000 1,200,000
3 GRASS CUTTER Unit 10 600,000 6,000,000
4 ASPHALT CUTTER Unit 2 600,000 1,200,000
5 BABY ROLLER Unit 2 600,000 1,200,000
6 COMPRESSOR 4000-6500 L\M Unit 1 600,000 600,000
7 MOTOR GRADER >100 HP Unit 1 1,200,000 1,200,000
8 WATER TANKER 3000-4500 L. Unit 1 600,000 600,000
9 JACK HAMMER Unit 2 600,000 1,200,000
10 VIBRATORY ROLLER 5-8 T. Unit 1 1,200,000 1,200,000
11 DUMP TRUCK 4 TON (2-3 M3) Unit 3 600,000 1,800,000
12 FLAT BED TRUCK 3-4 TON Unit 1 600,000 600,000
13 TRUCK CRANE Unit 1 1,200,000 1,200,000

Total untuk Item B pada Lembar 1 48,000,000


ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI

% TERHADAP TOTAL BIAYA PROYEK = 0.0811 %


Lembar 1.2-1
HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

A. Sewa Tanah M2 2,000.00 3,000.00 6,000,000.00

B. PERALATAN
Periksa lembar 1.2-2 11,200,000.00

C. Kantor Lapangan dan Fasilitas


1 Base Camp 20,000.00 -
2 Kantor 25,000.00 -
3 Barak 15,000.00 -
4 Bengkel -
5 Gudang, dan lain-lain -
6 ...................... ....

D. MOBILISASI FASILITAS LABORATORIUM


1 Ruang laboratorium (sesuai gambar) Set 20,000,000.00 -
2 Soil & Aggregate Testing Set 15,000,000 -
Compaction Test Set 20,000,000 -
CBR Test Set 5,000,000 -
Specific Gravity Set 5,000,000 -
Atterberg Limits Set 12,500,000 -
Grain Size Analysis Set 6,500,000 -
Field Density Test by Sand Cone Methode Set 6,000,000 -
Moisture Content Bln 5,000,000 -
Abrasion of Aggregate by Los Angeles Machine

3 Bituminous Testing Set 20,000,000 -


Marshall Asphalt Test Set 9,000,000 -
Extraction Test, Centrifuge/Refflux Method Set 9,000,000 -
Specific Gravity for Coarse Aggregate Set 9,000,000 -
Specific Gravity for Fine Aggregate Set 15,000,000 -
Mix Air Viod Content (Accurate Method) Set 15,000,000 -
Core Drill Set 1,000,000 -
Metal Thermometer Set 5,000,000 -
Accessories and Tolls Bln 1,000,000 -
Penetration Test Set 6,000,000 -
Softening Point Set 15,000,000 -
Refusal Density Compactor

4 Concrete Testing Set 500,000 -


Slump Cone Set 10,000,000 -
Cylinder/Cube Mould for Compressive Strength Set 10,000,000 -
Beam Mould for Flexural Strength (RIGID) Set 50,000,000 -
Crushing Machine
0
5 Pendukung (Periksa Fasilitas Laboratorium)
0
6 Operasional (Periksa Fasilitas Laboratorium)
E. MOBILISASI PERSONIL BLN 1,200,000.00 -
E.I. Personil Sesuai Struktur Organisasi LS 1 3,000,000 3,000,000
1 GS
2 Tenaga Ahli Jalan
3 Tenaga Ahli Jembatan ....
4 ...................... ....
5 ...................... ....
6 ...................... ....

E.II. Personi Lainnya Set 25,000,000 0


1 Koordinator Manajemen dan Keselamatan Lalu Linta ....
2 Manajer Kendal Mutu ....
3 ...................... ....
4 ...................... ....
5 ...................... ....
6 ...................... ....

F. Manajemen dan Keselamatan Lalu Lintas Ls 3,000,000

G. DEMOBILISASI LS 1 4,260,000 4,260,000

Total Biaya Mobilisasi 27,460,000

Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
Lembar 1.2-2
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

B. PERALATAN

1 ASPHALT MIXING PLANT E01 Unit 75,000,000.00 -


2 ASPHALT FINISHER E02 Unit 1,500,000.00 -
3 POWER BROOM E03 Unit 800,000.00 -
4 BULLDOZER 100-150 HP E04 Unit 1,500,000.00 -
5 COMPRESSOR 4000-6500 L\M E05 Unit 1.00 800,000.00 800,000.00
6 CONCRETE MIXER 0.3-0.6 M3 E06 Unit 2.00 800,000.00 1,600,000.00
7 CRANE 10-15 TON E07 Unit 1,500,000.00 -
8 DUMP TRUCK 4 TON (2-3 m3) E08 Unit 2.00 800,000.00 1,600,000.00
9 DUMP TRUCK 10 Ton (6 - 8 M3) E09 Unit 800,000.00 -
10 EXCAVATOR 80-140 HP E10 Unit 1,500,000.00 -
11 FLAT BED TRUCK 3-4 M3 E11 Unit 1.00 800,000.00 800,000.00
12 GENERATOR SET E12 Unit 1.00 800,000.00 800,000.00
13 MOTOR GRADER >100 HP E13 Unit 1,500,000.00 -
14 TRACK LOADER 75-100 HP E14 Unit 1,500,000.00 -
15 WHEEL LOADER 1.0-1.6 M3 E15 Unit 1,500,000.00 -
16 THREE WHEEL ROLLER 6-8 T E16 Unit 1,500,000.00 -
17 TANDEM ROLLER 6-8 T. E17 Unit 1,500,000.00 -
18 TIRE ROLLER 8-10 T. E18 Unit 1,500,000.00 -
19 VIBRATORY ROLLER 5-8 T. E19 Unit 1,500,000.00 -
20 CONCRETE VIBRATOR E20 Unit 1.00 800,000.00 800,000.00
21 STONE CRUSHER E21 Unit 100,000,000.00 -
22 WATER PUMP 70-100 mm E22 Unit 2.00 800,000.00 1,600,000.00
23 WATER TANKER 3000-4500 L. E23 Unit 1.00 800,000.00 800,000.00
24 PEDESTRIAN ROLLER E24 Unit 250,000.00 -
25 TAMPER E25 Unit 1.00 800,000.00 800,000.00
26 JACK HAMMER E26 Unit 1.00 800,000.00 800,000.00
27 FULVI MIXER E27 Unit 1,500,000.00 -
28 CONCRETE PUMP E28 Unit 1,000,000.00 -
29 TRAILER 20 TON E29 Unit 1,500,000.00 -
30 PILE DRIVER + HAMMER E30 Unit 5,000,000.00 -
31 CRANE ON TRACK 35 TON E31 Unit 5,000,000.00 -
32 WELDING SET E32 Unit 1.00 800,000.00 800,000.00
33 BORE PILE MACHINE E33 Unit 5,000,000.00 -
34 ASPHALT LIQUID MIXER E34 Unit 300,000.00 -
35 TRONTON 15 TON E35 Unit -
36 COLD MILLING MACHINE E37 Unit 1,500,000.00 -
37 ROCK DRILL BREAKER E36 Unit -
38 COLD RECYCLER E38 Unit 300,000,000.00 -
39 HOT RECYCLER E39 Unit -
40 AGGREGAT (CHIP) SPREADER E40 Unit -
41 ASPHALT DISTRIBUTOR E41 Unit 100,000,000.00 -
42 SLIP FORM PAVER E42 Unit 100,000,000.00 -
43 CONCRETE PAN MIXER E43 Unit 800,000.00 -
44 CONCRETE BREAKER E44 Unit
45 ASPHALT TANKER E45 Unit
46 CEMENT TANKER E46 Unit
47 CONCRETE MIXER (350) E47 Unit
48 VIBRATING RAMMER E48 Unit
49 TRUK MIXER (AGITATOR) E49 Unit
50 BORE PILE MACHINE E50 Unit
51 CRANE ON TRACK 75-100 TON E51 Unit

Total untuk Item B pada Lembar 1 11,200,000


B.1.Identifikasi bahaya, Penilaian risiko, Pengendalian dan Peluang

TABEL 1. IDENTIFIKASI BAHAYA, PENILAIAN RISIKO, PENETAPAN PENGENDALIAN RISIKO K3


NAMA PERUSAHAAN PT. DONNY PUTRA MANDIRI
NAMA PAKET PEKERJAAN : Muara Lembu - Batas Prov. Sumbar
LOKASI :
TANGGAL DIBUAT Pekanbaru, 10 Desember 2020
Identifikasi Bahaya :

DESKIRPSI RESIKO PERSYARATAN Penilaian Tingkat Resiko Penilaian Sisa Resiko


PENGENDALIAN Pengendalian
No PEMENUHAN Keterangan
AWAL Nilai Resiko Lanjutan Nilai Resiko Biaya Rp
URAIAN PEKERJAAN Identifikasi Bahaya (skenario bahaya) Jenis Bahaya (tipe kecelakaan) PERATURAN Kemungkinan (F) Keparahan (A) Tingkat Resiko (TR) Kemungkinan (F) Keparahan (A) Tingkat Resiko (TR)
(FxA) (FxA)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 Pekerjaan Mobilisasi (jalan) Terjepit dan Tergiling Kecelakaan kerja dan kecelakaan lalu lintas UU No. 1/1970 Tentang - Menyediakan kotak 1 1 1 KECIL Administratif N/A N/A N/A N/A Rp 8,000,000
Keselamatan Kerja PK3K pada lokasi
pekerjaan
Permen PU No 5 / 2014, - Seluruh pekerja
Pedoman Sistem menggunakan APD
Manajemen K3 yang lengkap, Masker,
Konstruksi Bidang Helm proyek, sepatu
Pekerjaan Umum safety, sarung tangan,
kacamata, dll.

UU Nomor 13 Tahun 2003 - Pasang rambu-rambu


Tentang Ketenagakerjaan pengaturan lalu lintas
di lokasi kerja.

UU Nomor 2 Tahun 2017 - Menyusun istruksi


Tentang Jasa Konstruksi pekerjaan

- Operator dan pekerja


harus mempunyai
pengalaman dalam
mengoperasikan alat
untuk pekerjaan yang
serupa.

- Melakukan pelatihan
kepada tenaga kerja

2 Pekerjaan Manajemen dan Keselamatan Lalu Terjepit dan Tergiling Kecelakaan kerja dan kecelakaan lalu lintas UU No. 1/1970 Tentang - Menyediakan kotak 1 1 1 KECIL 1 2 3 3 8 1 Rp 10,000,000
Lintas (jalan) Keselamatan Kerja PK3K pada lokasi
pekerjaan
Permen PU No 5 / 2014, - Seluruh pekerja
Pedoman Sistem menggunakan APD
Manajemen K3 yang lengkap, Masker,
Konstruksi Bidang Helm proyek, sepatu
Pekerjaan Umum safety, sarung tangan,
kacamata, dll.

UU Nomor 13 Tahun 2003 - Pasang rambu-rambu


Tentang Ketenagakerjaan pengaturan lalu lintas
di lokasi kerja.

UU Nomor 2 Tahun 2017 - Menyusun istruksi


Tentang Jasa Konstruksi pekerjaan

- Operator dan pekerja


harus mempunyai
pengalaman dalam
mengoperasikan alat
untuk pekerjaan yang
serupa.

- Melakukan pelatihan
kepada tenaga kerja

3 Pekerjaan Keselamatan dan Kesehatan Kerja Kecelakaan Kerja Kecelakaan kerja dan kecelakaan lalu lintas UU No. 1/1970 Tentang - Menyediakan kotak 1 1 1 KECIL 1 3 3 3 8 1 Rp 5,000,000
Keselamatan Kerja PK3K pada lokasi
pekerjaan
Permen PU No 5 / 2014, - Seluruh pekerja
Pedoman Sistem menggunakan APD
Manajemen K3 yang lengkap, Masker,
Konstruksi Bidang Helm proyek, sepatu
Pekerjaan Umum safety, sarung tangan,
kacamata, dll.

UU Nomor 13 Tahun 2003 - Pasang rambu-rambu


Tentang Ketenagakerjaan pengaturan lalu lintas
di lokasi kerja.

UU Nomor 2 Tahun 2017 - Menyusun istruksi


Tentang Jasa Konstruksi pekerjaan

- Operator dan pekerja


harus mempunyai
pengalaman dalam
mengoperasikan alat
untuk pekerjaan yang
serupa.

- Melakukan pelatihan
kepada tenaga kerja

4 Pekerjaan Manajemen Mutu Terpeleset dan kecelakaan kerja Kecelakaan kerja dan kecelakaan lalu lintas UU No. 1/1970 Tentang - Menyediakan kotak 1 1 1 KECIL 1 3 3 3 8 1 Rp 5,000,000
Keselamatan Kerja PK3K pada lokasi
pekerjaan
Permen PU No 5 / 2014, - Seluruh pekerja
Pedoman Sistem menggunakan APD
Manajemen K3 yang lengkap, Masker,
Konstruksi Bidang Helm proyek, sepatu
Pekerjaan Umum safety, sarung tangan,
kacamata, dll.

UU Nomor 13 Tahun 2003 - Pasang rambu-rambu


Tentang Ketenagakerjaan pengaturan lalu lintas
di lokasi kerja.

UU Nomor 2 Tahun 2017 - Menyusun istruksi


Tentang Jasa Konstruksi pekerjaan

- Operator dan pekerja


harus mempunyai
pengalaman dalam
mengoperasikan alat
untuk pekerjaan yang
serupa.

- Melakukan pelatihan
kepada tenaga kerja

5 Pekerjaan Galian Perkerasan Beraspal tanpa Tertimbun dan kecelakaan lalulintas Kecelakaan kerja dan kecelakaan lalu lintas UU No. 1/1970 Tentang - Menyediakan kotak 1 1 1 KECIL 1 3 3 3 8 1 Rp 5,000,000
Cold Milling Machine Keselamatan Kerja PK3K pada lokasi
pekerjaan
Permen PU No 5 / 2014, - Seluruh pekerja
Pedoman Sistem menggunakan APD
Manajemen K3 yang lengkap, Masker,
Konstruksi Bidang Helm proyek, sepatu
Pekerjaan Umum safety, sarung tangan,
kacamata, dll.

UU Nomor 13 Tahun 2003 - Pasang rambu-rambu


Tentang Ketenagakerjaan pengaturan lalu lintas
di lokasi kerja.

UU Nomor 2 Tahun 2017 - Menyusun istruksi


Tentang Jasa Konstruksi pekerjaan

- Operator dan pekerja


harus mempunyai
pengalaman dalam
mengoperasikan alat
untuk pekerjaan yang
serupa.

- Melakukan pelatihan
kepada tenaga kerja

6 Pekerjaan Penyiapan Badan Jalan Kecelakaan lalulintas Kecelakaan kerja dan kecelakaan lalu lintas UU No. 1/1970 Tentang - Menyediakan kotak 1 1 1 KECIL 1 3 3 3 8 1 Rp 5,000,000
Keselamatan Kerja PK3K pada lokasi
pekerjaan
Permen PU No 5 / 2014, - Seluruh pekerja
Pedoman Sistem menggunakan APD
Manajemen K3 yang lengkap, Masker,
Konstruksi Bidang Helm proyek, sepatu
Pekerjaan Umum safety, sarung tangan,
kacamata, dll.

UU Nomor 13 Tahun 2003 - Pasang rambu-rambu


Tentang Ketenagakerjaan pengaturan lalu lintas
di lokasi kerja.

UU Nomor 2 Tahun 2017 - Menyusun istruksi


Tentang Jasa Konstruksi pekerjaan

- Operator dan pekerja


harus mempunyai
pengalaman dalam
mengoperasikan alat
untuk pekerjaan yang
serupa.

- Melakukan pelatihan
kepada tenaga kerja

7 Pekerjaan Laston Lapis Aus (AC-WC) Terkena Panas dan kecelakaan lalulintas Kecelakaan kerja dan kecelakaan lalu lintas UU No. 1/1970 Tentang - Menyediakan kotak 1 1 1 KECIL 1 3 3 3 8 1 Rp 5,000,000
Keselamatan Kerja PK3K pada lokasi
pekerjaan
Permen PU No 5 / 2014, - Seluruh pekerja
Pedoman Sistem menggunakan APD
Manajemen K3 yang lengkap, Masker,
Konstruksi Bidang Helm proyek, sepatu
Pekerjaan Umum safety, sarung tangan,
kacamata, dll.

UU Nomor 13 Tahun 2003 - Pasang rambu-rambu


Tentang Ketenagakerjaan pengaturan lalu lintas
di lokasi kerja.

UU Nomor 2 Tahun 2017 - Menyusun istruksi


Tentang Jasa Konstruksi pekerjaan

- Operator dan pekerja


harus mempunyai
pengalaman dalam
mengoperasikan alat
untuk pekerjaan yang
serupa.

- Melakukan pelatihan
kepada tenaga kerja

8 Pekerjaan Laston Lapis Aus Asbuton (AC-WC Terkena Panas dan kecelakaan lalulintas Kecelakaan kerja dan kecelakaan lalu lintas UU No. 1/1970 Tentang - Menyediakan kotak 1 1 1 KECIL 1 3 3 3 8 1 Rp 5,000,000
Asb) Keselamatan Kerja PK3K pada lokasi
pekerjaan
Permen PU No 5 / 2014, - Seluruh pekerja
Pedoman Sistem menggunakan APD
Manajemen K3 yang lengkap, Masker,
Konstruksi Bidang Helm proyek, sepatu
Pekerjaan Umum safety, sarung tangan,
kacamata, dll.

UU Nomor 13 Tahun 2003 - Pasang rambu-rambu


Tentang Ketenagakerjaan pengaturan lalu lintas
di lokasi kerja.

UU Nomor 2 Tahun 2017 - Menyusun istruksi


Tentang Jasa Konstruksi pekerjaan

- Operator dan pekerja


harus mempunyai
pengalaman dalam
mengoperasikan alat
untuk pekerjaan yang
serupa.

- Melakukan pelatihan
kepada tenaga kerja

9 Pekerjaan Laston Lapis Antara Asbuton (AC- Terkena Panas dan kecelakaan lalulintas Kecelakaan kerja dan kecelakaan lalu lintas UU No. 1/1970 Tentang - Menyediakan kotak 1 1 1 KECIL 1 3 3 3 8 1 Rp 5,000,000
BC Asb) Keselamatan Kerja PK3K pada lokasi
pekerjaan
Permen PU No 5 / 2014, - Seluruh pekerja
Pedoman Sistem menggunakan APD
Manajemen K3 yang lengkap, Masker,
Konstruksi Bidang Helm proyek, sepatu
Pekerjaan Umum safety, sarung tangan,
kacamata, dll.

UU Nomor 13 Tahun 2003 - Pasang rambu-rambu


Tentang Ketenagakerjaan pengaturan lalu lintas
di lokasi kerja.

UU Nomor 2 Tahun 2017 - Menyusun istruksi


Tentang Jasa Konstruksi pekerjaan

- Operator dan pekerja


harus mempunyai
pengalaman dalam
mengoperasikan alat
untuk pekerjaan yang
serupa.
KECIL

Identifikasi Bahaya :

DESKIRPSI RESIKO PERSYARATAN Penilaian Tingkat Resiko Penilaian Sisa Resiko


PENGENDALIAN Pengendalian
No PEMENUHAN Keterangan
AWAL
- Melakukan pelatihan Lanjutan Biaya Rp
PERATURAN
kepada tenaga kerja

10 Pekerjaan Pengecatan struktur baja pada Tersiram dan Terjatuh Kecelakaan kerja dan kecelakaan lalu lintas UU No. 1/1970 Tentang - Menyediakan kotak 1 1 1 KECIL 1 3 3 3 8 1 Rp 5,000,000
daerah kering tebal 80 mikron Keselamatan Kerja PK3K pada lokasi
pekerjaan
Permen PU No 5 / 2014, - Seluruh pekerja
Pedoman Sistem menggunakan APD
Manajemen K3 yang lengkap, Masker,
Konstruksi Bidang Helm proyek, sepatu
Pekerjaan Umum safety, sarung tangan,
kacamata, dll.

UU Nomor 13 Tahun 2003 - Pasang rambu-rambu


Tentang Ketenagakerjaan pengaturan lalu lintas
di lokasi kerja.

UU Nomor 2 Tahun 2017 - Menyusun istruksi


Tentang Jasa Konstruksi pekerjaan

- Operator dan pekerja


harus mempunyai
pengalaman dalam
mengoperasikan alat
untuk pekerjaan yang
serupa.

- Melakukan pelatihan
kepada tenaga kerja

11 Pekerjaan Pengecatan pada elemen sandaran Tersiram dan Terjatuh Kecelakaan kerja dan kecelakaan lalu lintas UU No. 1/1970 Tentang - Menyediakan kotak 1 1 1 KECIL 1 3 3 3 8 1 Rp 5,000,000
dan/atau pagar pengaman (gruard Keselamatan Kerja PK3K pada lokasi
rail) 80 mikron pekerjaan

Permen PU No 5 / 2014, - Seluruh pekerja


Pedoman Sistem menggunakan APD
Manajemen K3 yang lengkap, Masker,
Konstruksi Bidang Helm proyek, sepatu
Pekerjaan Umum safety, sarung tangan,
kacamata, dll.

UU Nomor 13 Tahun 2003 - Pasang rambu-rambu


Tentang Ketenagakerjaan pengaturan lalu lintas
di lokasi kerja.

UU Nomor 2 Tahun 2017 - Menyusun istruksi


Tentang Jasa Konstruksi pekerjaan

- Operator dan pekerja


harus mempunyai
pengalaman dalam
mengoperasikan alat
untuk pekerjaan yang
serupa.

- Melakukan pelatihan
kepada tenaga kerja

12 Pekerjaan Stabilisasi dengan Tanaman Tercangkul dan kecelakaan lalulintas Kecelakaan kerja dan kecelakaan lalu lintas UU No. 1/1970 Tentang - Menyediakan kotak 1 1 1 KECIL 1 3 3 3 8 1 Rp 5,000,000
Keselamatan Kerja PK3K pada lokasi
pekerjaan
Permen PU No 5 / 2014, - Seluruh pekerja
Pedoman Sistem menggunakan APD
Manajemen K3 yang lengkap, Masker,
Konstruksi Bidang Helm proyek, sepatu
Pekerjaan Umum safety, sarung tangan,
kacamata, dll.

UU Nomor 13 Tahun 2003 - Pasang rambu-rambu


Tentang Ketenagakerjaan pengaturan lalu lintas
di lokasi kerja.

UU Nomor 2 Tahun 2017 - Menyusun istruksi


Tentang Jasa Konstruksi pekerjaan

- Operator dan pekerja


harus mempunyai
pengalaman dalam
mengoperasikan alat
untuk pekerjaan yang
serupa.

- Melakukan pelatihan
kepada tenaga kerja

13 Pekerjaan Galian pada Saluran Air atau Lereng Tertimbun dan kecelakaan lalulintas Kecelakaan kerja dan kecelakaan lalu lintas UU No. 1/1970 Tentang - Menyediakan kotak 1 1 1 KECIL 1 3 3 3 8 1 Rp 5,000,000
untuk Pemeliharaan Keselamatan Kerja PK3K pada lokasi
pekerjaan
Permen PU No 5 / 2014, - Seluruh pekerja
Pedoman Sistem menggunakan APD
Manajemen K3 yang lengkap, Masker,
Konstruksi Bidang Helm proyek, sepatu
Pekerjaan Umum safety, sarung tangan,
kacamata, dll.

UU Nomor 13 Tahun 2003 - Pasang rambu-rambu


Tentang Ketenagakerjaan pengaturan lalu lintas
di lokasi kerja.

UU Nomor 2 Tahun 2017 - Menyusun istruksi


Tentang Jasa Konstruksi pekerjaan

- Operator dan pekerja


harus mempunyai
pengalaman dalam
mengoperasikan alat
untuk pekerjaan yang
serupa.

- Melakukan pelatihan
kepada tenaga kerja

14 Pekerjaan Pebaikan Pasangan Batu dengan Tertimbun dan kecelakaan lalulintas Kecelakaan kerja dan kecelakaan lalu lintas UU No. 1/1970 Tentang - Menyediakan kotak 1 1 1 KECIL 1 3 3 3 8 1 Rp 5,000,000
Mortar Keselamatan Kerja PK3K pada lokasi
pekerjaan
Permen PU No 5 / 2014, - Seluruh pekerja
Pedoman Sistem menggunakan APD
Manajemen K3 yang lengkap, Masker,
Konstruksi Bidang Helm proyek, sepatu
Pekerjaan Umum safety, sarung tangan,
kacamata, dll.
KECIL

Identifikasi Bahaya :

DESKIRPSI RESIKO PERSYARATAN Penilaian Tingkat Resiko Penilaian Sisa Resiko


PENGENDALIAN Pengendalian
No PEMENUHAN Keterangan
UU Nomor 13 Tahun 2003 - PasangAWALrambu-rambu Lanjutan Biaya Rp
PERATURAN
Tentang Ketenagakerjaan pengaturan lalu lintas
di lokasi kerja.

UU Nomor 2 Tahun 2017 - Menyusun istruksi


Tentang Jasa Konstruksi pekerjaan

- Operator dan pekerja


harus mempunyai
pengalaman dalam
mengoperasikan alat
untuk pekerjaan yang
serupa.

- Melakukan pelatihan
kepada tenaga kerja

15 Pekerjaan Perbaikan Campuran Aspal Panas Terkena panas dan kecelakaan lalulintas Kecelakaan kerja dan kecelakaan lalu lintas UU No. 1/1970 Tentang - Menyediakan kotak 1 1 1 KECIL 1 3 3 3 8 1 Rp 5,000,000
Keselamatan Kerja PK3K pada lokasi
pekerjaan
Permen PU No 5 / 2014, - Seluruh pekerja
Pedoman Sistem menggunakan APD
Manajemen K3 yang lengkap, Masker,
Konstruksi Bidang Helm proyek, sepatu
Pekerjaan Umum safety, sarung tangan,
kacamata, dll.

UU Nomor 13 Tahun 2003 - Pasang rambu-rambu


Tentang Ketenagakerjaan pengaturan lalu lintas
di lokasi kerja.

UU Nomor 2 Tahun 2017 - Menyusun istruksi


Tentang Jasa Konstruksi pekerjaan

- Operator dan pekerja


harus mempunyai
pengalaman dalam
mengoperasikan alat
untuk pekerjaan yang
serupa.

- Melakukan pelatihan
kepada tenaga kerja

16 Pekerjaan Pengendalian Tanaman (jalan) Terpotong dan kecelakaan laulintas Kecelakaan kerja dan kecelakaan lalu lintas UU No. 1/1970 Tentang - Menyediakan kotak 1 1 1 KECIL 1 3 3 3 8 1 Rp 5,000,000
Keselamatan Kerja PK3K pada lokasi
pekerjaan
Permen PU No 5 / 2014, - Seluruh pekerja
Pedoman Sistem menggunakan APD
Manajemen K3 yang lengkap, Masker,
Konstruksi Bidang Helm proyek, sepatu
Pekerjaan Umum safety, sarung tangan,
kacamata, dll.

UU Nomor 13 Tahun 2003 - Pasang rambu-rambu


Tentang Ketenagakerjaan pengaturan lalu lintas
di lokasi kerja.

UU Nomor 2 Tahun 2017 - Menyusun istruksi


Tentang Jasa Konstruksi pekerjaan

- Operator dan pekerja


harus mempunyai
pengalaman dalam
mengoperasikan alat
untuk pekerjaan yang
serupa.

- Melakukan pelatihan
kepada tenaga kerja

Pekanbaru, 10 Desember 2020


Penawar
PT. DONNY PUTRA MANDIRI

ADHI WIRATAMA
Direktur
B.1.Identifikasi bahaya, Penilaian risiko, Pengendalian dan Peluang

TABEL 1. IDENTIFIKASI BAHAYA, PENILAIAN RISIKO, PENETAPAN PENGENDALIAN RISIKO K3


NAMA PERUSAHAAN PT. DONNY PUTRA MANDIRI
NAMA PAKET PEKERJAAN : Muara Lembu - Batas Prov. Sumbar
LOKASI :
TANGGAL DIBUAT Pekanbaru, 10 Desember 2020
Identifikasi Bahaya :

No URAIAN PEKERJAAN Identifikasi Bahaya Sasaran K3 Proyek Pengendalian Resiko K3 Program Sumber Daya Biaya Rp

1 2 3 4 5 6 7

1 Pekerjaan Mobilisasi (jalan) Terjepit dan Tergiling Nihil Kecelakaan Fatal - Menyediakan kotak PK3K pada lokasi pekerjaan - Kotak PK3K Rp 8,000,000

- Seluruh pekerja menggunakan APD yang lengkap, - Peralatan APD, Masker, Helm, Sepatu Safety,
Masker, Helm proyek, sepatu safety, sarung tangan, Sarung tangan, kacamata
kacamata, dll.
- Pasang rambu-rambu pengaturan lalu lintas di - Pengadaan rambu dan barekade
lokasi kerja.
- Menyusun istruksi pekerjaan - Sosialisasi instruksi pekerjaan
- Operator dan pekerja harus mempunyai -Operator memiliki Sertifikat
pengalaman dalam mengoperasikan alat untuk
pekerjaan yang serupa.
- Melakukan pelatihan kepada tenaga kerja -Instruktur dan materi pelatihan
2 Pekerjaan Manajemen dan Keselamatan Lalu Terjepit dan Tergiling Nihil Kecelakaan Fatal - Menyediakan kotak PK3K pada lokasi pekerjaan - Kotak PK3K Rp 10,000,000
Lintas (jalan)
- Seluruh pekerja menggunakan APD yang lengkap, - Peralatan APD, Masker, Helm, Sepatu Safety,
Masker, Helm proyek, sepatu safety, sarung tangan, Sarung tangan, kacamata
kacamata, dll.
- Pasang rambu-rambu pengaturan lalu lintas di - Pengadaan rambu dan barekade
lokasi kerja.
- Menyusun istruksi pekerjaan - Sosialisasi instruksi pekerjaan
- Operator dan pekerja harus mempunyai -Operator memiliki Sertifikat
pengalaman dalam mengoperasikan alat untuk
pekerjaan yang serupa.
- Melakukan pelatihan kepada tenaga kerja -Instruktur dan materi pelatihan
3 Pekerjaan Keselamatan dan Kesehatan Kerja Kecelakaan Kerja Nihil Kecelakaan Fatal - Menyediakan kotak PK3K pada lokasi pekerjaan - Kotak PK3K Rp 5,000,000

- Seluruh pekerja menggunakan APD yang lengkap, - Peralatan APD, Masker, Helm, Sepatu Safety,
Masker, Helm proyek, sepatu safety, sarung tangan, Sarung tangan, kacamata
kacamata, dll.
- Pasang rambu-rambu pengaturan lalu lintas di - Pengadaan rambu dan barekade
lokasi kerja.
- Menyusun istruksi pekerjaan - Sosialisasi instruksi pekerjaan
- Operator dan pekerja harus mempunyai -Operator memiliki Sertifikat
pengalaman dalam mengoperasikan alat untuk
pekerjaan yang serupa.
- Melakukan pelatihan kepada tenaga kerja -Instruktur dan materi pelatihan
4 Pekerjaan Manajemen Mutu Terpeleset dan kecelakaan kerja Nihil Kecelakaan Fatal - Menyediakan kotak PK3K pada lokasi pekerjaan - Kotak PK3K Rp 5,000,000

- Seluruh pekerja menggunakan APD yang lengkap, - Peralatan APD, Masker, Helm, Sepatu Safety,
Masker, Helm proyek, sepatu safety, sarung tangan, Sarung tangan, kacamata
kacamata, dll.
- Pasang rambu-rambu pengaturan lalu lintas di - Pengadaan rambu dan barekade
lokasi kerja.
- Menyusun istruksi pekerjaan - Sosialisasi instruksi pekerjaan
- Operator dan pekerja harus mempunyai -Operator memiliki Sertifikat
pengalaman dalam mengoperasikan alat untuk
pekerjaan yang serupa.
- Melakukan pelatihan kepada tenaga kerja -Instruktur dan materi pelatihan
5 Pekerjaan Galian Perkerasan Beraspal tanpa Tertimbun dan kecelakaan lalulintas Nihil Kecelakaan Fatal - Menyediakan kotak PK3K pada lokasi pekerjaan - Kotak PK3K Rp 5,000,000
Cold Milling Machine
- Seluruh pekerja menggunakan APD yang lengkap, - Peralatan APD, Masker, Helm, Sepatu Safety,
Masker, Helm proyek, sepatu safety, sarung tangan, Sarung tangan, kacamata
kacamata, dll.
- Pasang rambu-rambu pengaturan lalu lintas di - Pengadaan rambu dan barekade
lokasi kerja.
- Menyusun istruksi pekerjaan - Sosialisasi instruksi pekerjaan
- Operator dan pekerja harus mempunyai -Operator memiliki Sertifikat
pengalaman dalam mengoperasikan alat untuk
pekerjaan yang serupa.
- Melakukan pelatihan kepada tenaga kerja -Instruktur dan materi pelatihan
6 Pekerjaan Penyiapan Badan Jalan Kecelakaan lalulintas Nihil Kecelakaan Fatal - Menyediakan kotak PK3K pada lokasi pekerjaan - Kotak PK3K Rp 5,000,000

- Seluruh pekerja menggunakan APD yang lengkap, - Peralatan APD, Masker, Helm, Sepatu Safety,
Masker, Helm proyek, sepatu safety, sarung tangan, Sarung tangan, kacamata
kacamata, dll.
- Pasang rambu-rambu pengaturan lalu lintas di - Pengadaan rambu dan barekade
lokasi kerja.
- Menyusun istruksi pekerjaan - Sosialisasi instruksi pekerjaan
- Operator dan pekerja harus mempunyai -Operator memiliki Sertifikat
pengalaman dalam mengoperasikan alat untuk
pekerjaan yang serupa.
- Melakukan pelatihan kepada tenaga kerja -Instruktur dan materi pelatihan
7 Pekerjaan Laston Lapis Aus (AC-WC) Terkena Panas dan kecelakaan lalulintas Nihil Kecelakaan Fatal - Menyediakan kotak PK3K pada lokasi pekerjaan - Kotak PK3K Rp 5,000,000

- Seluruh pekerja menggunakan APD yang lengkap, - Peralatan APD, Masker, Helm, Sepatu Safety,
Masker, Helm proyek, sepatu safety, sarung tangan, Sarung tangan, kacamata
kacamata, dll.
- Pasang rambu-rambu pengaturan lalu lintas di - Pengadaan rambu dan barekade
lokasi kerja.
- Menyusun istruksi pekerjaan - Sosialisasi instruksi pekerjaan
- Operator dan pekerja harus mempunyai -Operator memiliki Sertifikat
pengalaman dalam mengoperasikan alat untuk
pekerjaan yang serupa.
- Melakukan pelatihan kepada tenaga kerja -Instruktur dan materi pelatihan
8 Pekerjaan Laston Lapis Aus Asbuton (AC-WC Terkena Panas dan kecelakaan lalulintas Nihil Kecelakaan Fatal - Menyediakan kotak PK3K pada lokasi pekerjaan - Kotak PK3K Rp 5,000,000
Asb)
- Seluruh pekerja menggunakan APD yang lengkap, - Peralatan APD, Masker, Helm, Sepatu Safety,
Masker, Helm proyek, sepatu safety, sarung tangan, Sarung tangan, kacamata
kacamata, dll.
- Pasang rambu-rambu pengaturan lalu lintas di - Pengadaan rambu dan barekade
lokasi kerja.
- Menyusun istruksi pekerjaan - Sosialisasi instruksi pekerjaan
- Operator dan pekerja harus mempunyai -Operator memiliki Sertifikat
pengalaman dalam mengoperasikan alat untuk
pekerjaan yang serupa.
- Melakukan pelatihan kepada tenaga kerja -Instruktur dan materi pelatihan
9 Pekerjaan Laston Lapis Antara Asbuton (AC- Terkena Panas dan kecelakaan lalulintas Nihil Kecelakaan Fatal - Menyediakan kotak PK3K pada lokasi pekerjaan - Kotak PK3K Rp 5,000,000
BC Asb)
- Seluruh pekerja menggunakan APD yang lengkap, - Peralatan APD, Masker, Helm, Sepatu Safety,
Masker, Helm proyek, sepatu safety, sarung tangan, Sarung tangan, kacamata
kacamata, dll.
- Pasang rambu-rambu pengaturan lalu lintas di - Pengadaan rambu dan barekade
lokasi kerja.
- Menyusun istruksi pekerjaan - Sosialisasi instruksi pekerjaan
- Operator dan pekerja harus mempunyai -Operator memiliki Sertifikat
pengalaman dalam mengoperasikan alat untuk
pekerjaan yang serupa.
- Melakukan pelatihan kepada tenaga kerja -Instruktur dan materi pelatihan
10 Pekerjaan Pengecatan struktur baja pada Tersiram dan Terjatuh Nihil Kecelakaan Fatal - Menyediakan kotak PK3K pada lokasi pekerjaan - Kotak PK3K Rp 5,000,000
daerah kering tebal 80 mikron
- Seluruh pekerja menggunakan APD yang lengkap, - Peralatan APD, Masker, Helm, Sepatu Safety,
Masker, Helm proyek, sepatu safety, sarung tangan, Sarung tangan, kacamata
kacamata, dll.
- Pasang rambu-rambu pengaturan lalu lintas di - Pengadaan rambu dan barekade
lokasi kerja.
- Menyusun istruksi pekerjaan - Sosialisasi instruksi pekerjaan
- Operator dan pekerja harus mempunyai -Operator memiliki Sertifikat
pengalaman dalam mengoperasikan alat untuk
pekerjaan yang serupa.
- Melakukan pelatihan kepada tenaga kerja -Instruktur dan materi pelatihan
11 Pekerjaan Pengecatan pada elemen sandaran Tersiram dan Terjatuh Nihil Kecelakaan Fatal - Menyediakan kotak PK3K pada lokasi pekerjaan - Kotak PK3K Rp 5,000,000
dan/atau pagar pengaman (gruard
rail) 80 mikron

- Seluruh pekerja menggunakan APD yang lengkap, - Peralatan APD, Masker, Helm, Sepatu Safety,
Masker, Helm proyek, sepatu safety, sarung tangan, Sarung tangan, kacamata
kacamata, dll.
- Pasang rambu-rambu pengaturan lalu lintas di - Pengadaan rambu dan barekade
lokasi kerja.
- Menyusun istruksi pekerjaan - Sosialisasi instruksi pekerjaan
- Operator dan pekerja harus mempunyai -Operator memiliki Sertifikat
pengalaman dalam mengoperasikan alat untuk
pekerjaan yang serupa.
- Melakukan pelatihan kepada tenaga kerja -Instruktur dan materi pelatihan
12 Pekerjaan Stabilisasi dengan Tanaman Tercangkul dan kecelakaan lalulintas Nihil Kecelakaan Fatal - Menyediakan kotak PK3K pada lokasi pekerjaan - Kotak PK3K Rp 5,000,000

- Seluruh pekerja menggunakan APD yang lengkap, - Peralatan APD, Masker, Helm, Sepatu Safety,
Masker, Helm proyek, sepatu safety, sarung tangan, Sarung tangan, kacamata
kacamata, dll.
- Pasang rambu-rambu pengaturan lalu lintas di - Pengadaan rambu dan barekade
lokasi kerja.
- Menyusun istruksi pekerjaan - Sosialisasi instruksi pekerjaan
- Operator dan pekerja harus mempunyai -Operator memiliki Sertifikat
pengalaman dalam mengoperasikan alat untuk
pekerjaan yang serupa.
- Melakukan pelatihan kepada tenaga kerja -Instruktur dan materi pelatihan
13 Pekerjaan Galian pada Saluran Air atau Lereng Tertimbun dan kecelakaan lalulintas Nihil Kecelakaan Fatal - Menyediakan kotak PK3K pada lokasi pekerjaan - Kotak PK3K Rp 5,000,000
untuk Pemeliharaan
- Seluruh pekerja menggunakan APD yang lengkap, - Peralatan APD, Masker, Helm, Sepatu Safety,
Masker, Helm proyek, sepatu safety, sarung tangan, Sarung tangan, kacamata
kacamata, dll.
- Pasang rambu-rambu pengaturan lalu lintas di - Pengadaan rambu dan barekade
lokasi kerja.
- Menyusun istruksi pekerjaan - Sosialisasi instruksi pekerjaan
- Operator dan pekerja harus mempunyai -Operator memiliki Sertifikat
pengalaman dalam mengoperasikan alat untuk
pekerjaan yang serupa.
- Melakukan pelatihan kepada tenaga kerja -Instruktur dan materi pelatihan
14 Pekerjaan Pebaikan Pasangan Batu dengan Tertimbun dan kecelakaan lalulintas Nihil Kecelakaan Fatal - Menyediakan kotak PK3K pada lokasi pekerjaan - Kotak PK3K Rp 5,000,000
Mortar
- Seluruh pekerja menggunakan APD yang lengkap, - Peralatan APD, Masker, Helm, Sepatu Safety,
Masker, Helm proyek, sepatu safety, sarung tangan, Sarung tangan, kacamata
kacamata, dll.
- Pasang rambu-rambu pengaturan lalu lintas di - Pengadaan rambu dan barekade
lokasi kerja.
- Menyusun istruksi pekerjaan - Sosialisasi instruksi pekerjaan
- Operator dan pekerja harus mempunyai -Operator memiliki Sertifikat
pengalaman dalam mengoperasikan alat untuk
pekerjaan yang serupa.
- Melakukan pelatihan kepada tenaga kerja -Instruktur dan materi pelatihan
15 Pekerjaan Perbaikan Campuran Aspal Panas Terkena panas dan kecelakaan lalulintas Nihil Kecelakaan Fatal - Menyediakan kotak PK3K pada lokasi pekerjaan - Kotak PK3K Rp 5,000,000

- Seluruh pekerja menggunakan APD yang lengkap, - Peralatan APD, Masker, Helm, Sepatu Safety,
Masker, Helm proyek, sepatu safety, sarung tangan, Sarung tangan, kacamata
kacamata, dll.
- Pasang rambu-rambu pengaturan lalu lintas di - Pengadaan rambu dan barekade
lokasi kerja.
- Menyusun istruksi pekerjaan - Sosialisasi instruksi pekerjaan
- Operator dan pekerja harus mempunyai -Operator memiliki Sertifikat
pengalaman dalam mengoperasikan alat untuk
pekerjaan yang serupa.
- Melakukan pelatihan kepada tenaga kerja -Instruktur dan materi pelatihan
16 Pekerjaan Pengendalian Tanaman (jalan) Terpotong dan kecelakaan laulintas Nihil Kecelakaan Fatal - Menyediakan kotak PK3K pada lokasi pekerjaan - Kotak PK3K Rp 5,000,000

- Seluruh pekerja menggunakan APD yang lengkap, - Peralatan APD, Masker, Helm, Sepatu Safety,
Masker, Helm proyek, sepatu safety, sarung tangan, Sarung tangan, kacamata
kacamata, dll.
- Pasang rambu-rambu pengaturan lalu lintas di - Pengadaan rambu dan barekade
lokasi kerja.
- Menyusun istruksi pekerjaan - Sosialisasi instruksi pekerjaan
- Operator dan pekerja harus mempunyai -Operator memiliki Sertifikat
pengalaman dalam mengoperasikan alat untuk
pekerjaan yang serupa.
- Melakukan pelatihan kepada tenaga kerja -Instruktur dan materi pelatihan

Pekanbaru, 10 Desember 2020


Penawar
PT. DONNY PUTRA MANDIRI

ADHI WIRATAMA
Direktur
MATA PEKERJAAN UTAMA

Nama Paket : Muara Lembu - Batas Prov. Sumbar


NO. PAKET : PPK 2.5
Prop/ Kab/Kodya : Riau
Satker : Pelaksanaan Jalan Nasional Wilayah II Provinsi Riau

% THD
NO. MATA TOTAL HARGA JUMLAH
No. URAIAN JENIS PEKERJAAN SATUAN KUANTITAS HARGA SATUAN PEKERJAAN (Rp.) HARGA
KET
PEMBAYARAN
PEKERJAAN

1 5.1.(3) Lapis Pondasi Agregat Kelas S M3 3,087.00 394,515.64 1,217,869,774.31 3.59


2 6.5.(1) Laston Lapis Aus Asbuton (AC-WC Asb) Ton 3,698.40 1,541,347.37 5,700,519,095.29 16.83
3 6.5.(2) Laston Lapis Antara Asbuton (AC-BC Asb) Ton 9,113.63 1,450,379.30 13,218,220,319.48 39.02
4 7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 2,141.61 1,206,689.00 2,584,257,229.29 7.63
5 10.1.(9) Perbaikan Campuran Aspal Panas M3 834.85 3,409,317.53 2,846,258,515.26 8.40
6 10.1.(22) Pengendalian Tanaman (jalan) M2 1,977,360.00 577.50 1,141,925,400.00 3.37
7 SKh-1.9.4.(2) Pasangan Batu dengan Mortar dengan Padat Karya M3 1,032.00 1,575,478.82 1,625,894,139.10 4.80

JUMLAH % 28,334,944,472.73 83.63

Pekanbaru, 10 Desember 2020


Penawar
PT. DONNY PUTRA MANDIRI

ADHI WIRATAMA
Direktur
MATA PEKERJAAN PENUNJANG

Nama Paket : Muara Lembu - Batas Prov. Sumbar


NO. PAKET : PPK 2.5
Prop/ Kab/Kodya : Riau
Panjang Jalan :
Satker : Pelaksanaan Jalan Nasional Wilayah II Provinsi Riau

NO. MATA % THD JUMLAH


TOTAL HARGA
No. PEMBAYAR URAIAN JENIS PEKERJAAN SATUAN KUANTITAS HARGA SATUAN PEKERJAAN (Rp.)
HARGA KET
AN PEKERJAAN

1 1.2 Mobilisasi (jalan) LS 1.00 84,900,000.00 84,900,000.00 0.25


2 0 Mobilisasi (berkala jalan) LS 1.00 27,460,000.00 27,460,000.00 0.08
3 1.8.(1) Manajemen dan Keselamatan Lalu Lintas (jalan) LS 1.00 79,950,000.00 79,950,000.00 0.24
4 1.8.(2) Manajemen dan Keselamatan Lalu Lintas (Berkala Jembatan) LS 1.00 18,600,000.00 18,600,000.00 0.05
5 1.17.(1a) Pengujian pH Buah 9.00 450,000.00 4,050,000.00 0.01
6 1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 9.00 460,000.00 4,140,000.00 0.01
7 1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 9.00 350,000.00 3,150,000.00 0.01
8 1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 9.00 360,000.00 3,240,000.00 0.01
9 1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 9.00 355,000.00 3,195,000.00 0.01
10 1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 9.00 390,000.00 3,510,000.00 0.01
11 1.17.(1g) Pengujian Coliform Buah 9.00 380,000.00 3,420,000.00 0.01
12 1.17.(1h) Pengujian E. Coli Buah 9.00 350,000.00 3,150,000.00 0.01
13 1.17.(1i) Pengujian Destruksi Cu, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn Buah 9.00 350,000.00 3,150,000.00 0.01
14 1.17.(1j) Pengujian Temperatur (Suhu) Buah 9.00 350,000.00 3,150,000.00 0.01
15 1.17.(2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Kesehatan Buah 9.00 410,000.00 3,690,000.00 0.01
16 1.17.(2b) Pengujian tingkat getaran kendaraan bermotor Buah 9.00 520,000.00 4,680,000.00 0.01
17 1.17.(3a) Pengujian NoX Buah 9.00 300,000.00 2,700,000.00 0.01
18 1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 9.00 350,000.00 3,150,000.00 0.01
19 1.17.(3c) Pengujian Karbondioksida (CO2) Buah 9.00 360,000.00 3,240,000.00 0.01
20 1.17.(3d) Pengujian Hidro Carbon (HC)-CH4 Buah 9.00 350,000.00 3,150,000.00 0.01
21 1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 9.00 300,000.00 2,700,000.00 0.01
22 1.17.(3g) Pengujian Timah Hitam (Pb) Buah 9.00 360,000.00 3,240,000.00 0.01
23 1.19 Keselamatan dan Kesehatan Kerja LS 1.00 22,730,000.00 22,730,000.00 0.07
24 1.21 Manajemen Mutu LS 1.00 127,500,000.00 127,500,000.00 0.38
26 2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 133.20 38,371.24 5,111,049.59 0.02
27 2.2.(1) Pasangan Batu dengan Mortar M3 100.80 1,146,998.00 115,617,398.32 0.34
29 3.1.(1) Galian Biasa M3 1,505.64 11,613.70 17,486,053.88 0.05
30 3.1.(7) Galian Perkerasan Beraspal dengan Cold Milling Machine M3 50.00 570,478.07 28,523,903.66 0.08
31 3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 98.60 367,147.74 36,200,767.66 0.11
32 3.2.(1a) Timbunan Biasa dari sumber galian M3 347.29 121,800.37 42,300,049.50 0.12
33 3.3.(1) Penyiapan Badan Jalan M2 360.00 2,617.43 942,273.38 0.00
35 5.1.(1) Lapis Pondasi Agregat Kelas A M3 846.00 613,115.92 518,696,072.21 1.53
38 6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter 288.00 10,704.48 3,082,889.07 0.01
39 6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 30,174.00 14,895.16 449,446,419.63 1.33
40 6.3(5a) Laston Lapis Aus (AC-WC) Ton 250.56 1,502,565.13 376,482,718.71 1.11
41 6.3(6a) Laston Lapis Antara (AC-BC) Ton 375.84 1,450,376.96 545,109,678.07 1.61
42 6.3(7a) Laston Lapis Fondasi (AC-Base) Ton 156.60 1,294,847.22 202,773,074.07 0.60
43 6.3.(8) Bahan anti pengelupasan Kg 149.63 67,980.00 10,171,847.40 0.03
46 6.5.(3) Laston Lapis Fondasi Asbuton (AC-Base Asb) Ton 313.20 1,332,164.42 417,233,895.20 1.23
48 7.1 (6a) Beton struktur, fc’25 Mpa M3 60.00 2,017,103.74 121,026,224.43 0.36
51 8.3.(2a) Pengecetan dekoratif pada elemen struktur beton, tebal : 100 µm M2 459.58 76,977.74 35,377,430.04 0.10
52 8.7.(1a) Pengecatan struktur baja pada daerah kering tebal 80 mikron M2 52.48 96,121.01 5,044,430.65 0.01
53 8.7.(3a) Pengecatan pada elemen sandaran dan/atau pagar pengaman (gru M2 130.41 108,149.17 14,103,733.12 0.04
54 8.11.(1) Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic M1 76.00 1,794,873.62 136,410,395.18 0.40
56 9.1.(1) Mandor Jam 250.00 33,731.96 8,432,990.67 0.02
57 9.1.(2) Pekerja Biasa Jam 250.00 20,197.92 5,049,479.98 0.01
58 9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 270.00 277,047.12 74,802,723.31 0.22
59 9.1.(8) Motor Grader min 100 PK Jam 270.00 424,539.13 114,625,564.00 0.34
60 9.1.(11) Alat Penggali (Excavator) 80 - 140 PK Jam 200.00 525,859.03 105,171,806.39 0.31
61 9.1.(14) Penggilas Bervibrasi 5 - 8 Ton Jam 270.00 485,794.78 131,164,590.70 0.39
62 9.2.(1) Marka Jalan Termoplastik M2 4,066.65 130,326.90 529,993,876.29 1.56
63 9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Buah 22.00 801,954.35 17,642,995.71 0.05
64 9.2.(5) Patok Pengarah Buah 166.00 340,428.64 56,511,153.69 0.17
65 9.2.(6a) Patok Kilometer Buah 7.00 639,325.39 4,475,277.74 0.01
66 9.2.(7) Rel Pengaman M1 300.00 672,319.87 201,695,961.21 0.60
67 9.2.(22a) Stabilisasi dengan Tanaman M2 2,250.00 38,065.38 85,647,097.80 0.25
69 10.1.(1) Galian pada Saluran Air atau Lereng untuk Pemeliharaan M3 178.64 127,415.12 22,761,437.00 0.07
70 10.1.(3) Pebaikan Pasangan Batu dengan Mortar M3 33.64 1,206,508.24 40,586,937.22 0.12
71 10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 479.66 690,732.85 331,316,918.79 0.98
72 10.1.(6) Perbaikan Lapis Fondasi Agregat Kelas S M3 133.38 501,351.06 66,870,204.14 0.20
74 10.1.(11) Perbaikan Asbuton Campuran Panas Hampar Dingin M3 9.14 5,206,586.89 47,588,204.14 0.14
10.1.(11) Perbaikan Asbuton Campuran Panas Hampar Dingin (bahan dised M3 55.00 334,245.27 18,383,490.00 0.05
10.1.(19) Pembersihan Patok Buah 330.00 21,794.93 7,192,327.05 0.02
10.1.(20) Pembersihan Rambu Buah 23.00 21,794.93 501,283.40 0.00
10.1.(21) Pembersihan Drainase M 1,200.00 13,752.70 16,503,234.15 0.05
10.1.(22) Pengendalian Tanaman (jembatan) M2 27,200.00 984.50 26,778,400.00 0.08
SKh-1.9.4.(1) Galian untuk Selokan Drainase dan Saluran Air dengan Padat Ka M3 1,548.00 82,714.13 128,041,478.08 0.38

JUMLAH % 5,544,722,735.24 16.37

Pekanbaru, 10 Desember 2020


Penawar
PT. DONNY PUTRA MANDIRI

ADHI WIRATAMA
Direktur
DAFTAR USULAN PEKERJAAN YANG DISUBKONTRAKKAN

Nama Paket : Muara Lembu - Batas Prov. Sumbar


NO. PAKET : PPK 2.5
Prop/ Kab/Kodya : Riau
Panjang Jalan :
Satker : Pelaksanaan Jalan Nasional Wilayah II Provinsi Riau

No. No. Mata Jenis Pekerjaan Persentase Persentase Nama Sub


Pembayaran dari Harga dari Harga Penyedia
Total mata Penawaran Jasa
Pembayaran
(%) (%)

1 7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis 100.00 7.63 CV. Panca Karya Abadi
2 9.2.(7) Rel Pengaman 100.00 0.17 CV. Panca Karya Abadi
3 9.2.(1) Marka Jalan Termoplastik 100.00 1.56 CV. Panca Karya Abadi

TOTAL 9.36

Pekanbaru, 10 Desember 2020


Penawar
PT. DONNY PUTRA MANDIRI

ADHI WIRATAMA
Direktur
JADWAL WAKTU PELAKSANAAN PEKERJAAN
Penanganan Drainase
PPK : ………………………………………………
No. Paket Kontrak 2.5 B
Nama Paket Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
Prop / Kab / Kodya RIAU

No. Mata Uraian Satuan Harga


Penanganan Drainase Rehabilitasi Mayor Jalan Penanganan Longsor Pemeliharaan Rutin Kondisi Penunjangan Jalan / Holding Pemeliharaan Berkala Jemb
Pembayaran Satuan
m m
(Rupiah) Volume Jumlah Harga (Rp.) Bobot (%) Volume Jumlah Harga (Rp.) Bobot (%) Volume Bobot (%) Volume Bobot (%) Volume Jumlah Harga (Rp.) Bobot (%) Volume
a b c d e f g h i j k l d e m

DIVISI 1. UMUM
1.2 Mobilisasi (jalan) 1.00 0.25 LS 84,900,000 - - - 1.0 84,900,000.00 0.37 - - - - - - - - - -
0 Mobilisasi (berkala jalan) 1.00 0.08 LS 27,460,000 - - - - - - - - - - - - - - - 1.0
1.8.(1) Manajemen dan Keselamatan Lalu Lintas (jalan) 1.00 0.24 LS 79,950,000 - - - 1.0 79,950,000.00 0.35 - - - - - - - - - -
1.8.(2) Manajemen dan Keselamatan Lalu Lintas (Berkala Jembatan) 1.00 0.05 LS 18,600,000 - - - - - - - - - - - - - - - 1.0
1.17.(1a) Pengujian pH 9.00 0.01 Buah 450,000 - - - 9.0 4,050,000.00 0.02 - - - - - - - - - -
1.17.(1b) Pengujian Oksigen Terlarut (DO) 9.00 0.01 Buah 460,000 - - - 9.0 4,140,000.00 0.02 - - - - - - - - - -
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) 9.00 0.01 Buah 350,000 - - - 9.0 3,150,000.00 0.01 - - - - - - - - - -
1.17.(1d) Pengujian Zat Tersuspensi (TSS) 9.00 0.01 Buah 360,000 - - - 9.0 3,240,000.00 0.01 - - - - - - - - - -
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) 9.00 0.01 Buah 355,000 - - - 9.0 3,195,000.00 0.01 - - - - - - - - - -
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) 9.00 0.01 Buah 390,000 - - - 9.0 3,510,000.00 0.02 - - - - - - - - - -
1.17.(1g) Pengujian Coliform 9.00 0.01 Buah 380,000 - - - 9.0 3,420,000.00 0.01 - - - - - - - - - -
1.17.(1h) Pengujian E. Coli 9.00 0.01 Buah 350,000 - - - 9.0 3,150,000.00 0.01 - - - - - - - - - -
1.17.(1i) Pengujian Destruksi Cu, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn 9.00 0.01 Buah 350,000 - - - 9.0 3,150,000.00 0.01 - - - - - - - - - -
1.17.(1j) Pengujian Temperatur (Suhu) 9.00 0.01 Buah 350,000 - - - 9.0 3,150,000.00 0.01 - - - - - - - - - -
1.17.(2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Kesehatan 9.00 0.01 Buah 410,000 - - - 9.0 3,690,000.00 0.02 - - - - - - - - - -
1.17.(2b) Pengujian tingkat getaran kendaraan bermotor 9.00 0.01 Buah 520,000 - - - 9.0 4,680,000.00 0.02 - - - - - - - - - -
1.17.(3a) Pengujian NoX 9.00 0.01 Buah 300,000 - - - 9.0 2,700,000.00 0.01 - - - - - - - - - -
1.17.(3b) Pengujian Sulfurdioksida (SO2) 9.00 0.01 Buah 350,000 - - - 9.0 3,150,000.00 0.01 - - - - - - - - - -
1.17.(3c) Pengujian Karbondioksida (CO2) 9.00 0.01 Buah 360,000 - - - 9.0 3,240,000.00 0.01 - - - - - - - - - -
1.17.(3d) Pengujian Hidro Carbon (HC)-CH4 9.00 0.01 Buah 350,000 - - - 9.0 3,150,000.00 0.01 - - - - - - - - - -
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu 9.00 0.01 Buah 300,000 - - - 9.0 2,700,000.00 0.01 - - - - - - - - - -
1.17.(3g) Pengujian Timah Hitam (Pb) 9.00 0.01 Buah 360,000 - - - 9.0 3,240,000.00 0.01 - - - - - - - - - -
1.19 Keselamatan dan Kesehatan Kerja 1.00 0.07 LS 22,730,000 - - - - - - - - - - - - - - - 1.0
1.21 Manajemen Mutu 1.00 0.38 LS 127,500,000 - - - 1.0 127,500,000.00 0.56 - - - - - - - - - -
0 DIVISI 2. DRAINASE - - 0 - - - - - - - - - - - - - - - - -
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air 133.20 0.02 M3 38,371 133.2 5,111,049.59 0.27 - - - - - - - - - - - - -
2.2.(1) Pasangan Batu dengan Mortar 100.80 0.34 M3 1,146,998 100.8 115,617,398.32 6.17 - - - - - - - - - - - - -
0 DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK - - 0 - - - - - - - - - - - - - - - - -
3.1.(1) Galian Biasa 1,505.64 0.05 M3 11,614 - - - - - - 1,505.6 17,486,053.88 0.39 - - - - - - -
3.1.(7) Galian Perkerasan Beraspal dengan Cold Milling Machine 50.00 0.08 M3 570,478 - - - 50.0 28,523,903.66 0.12 - - - - - - - - - -
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine 98.60 0.11 M3 367,148 - - - 67.0 24,598,898.91 0.11 - - - 10.1 3,689,834.84 0.18 21.55 7,912,033.90 0.41 -
3.2.(1a) Timbunan Biasa dari sumber galian 347.29 0.12 M3 121,800 - - - 21.4 2,601,655.84 0.01 325.9 39,698,393.65 0.89 - - - - - - -
3.3.(1) Penyiapan Badan Jalan 360.00 0.00 M2 2,617 - - - - - - 360.0 942,273.38 0.02 - - - - - - -
0 DIVISI 5. PERKERASAN BERBUTIR - - 0 - - - - - - - - - - - - - - - - -
5.1.(1) Lapis Pondasi Agregat Kelas A 846.00 1.53 M3 613,116 - - - 603.0 369,708,902.53 1.62 243.0 148,987,169.68 3.35 - - - - - - -
5.1.(3) Lapis Pondasi Agregat Kelas S 3,087.00 3.59 M3 394,516 - - - 3,019.5 1,191,239,968.75 5.22 67.5 26,629,805.56 0.60 - - - - - - -
0 DIVISI 6. PERKERASAN ASPAL - - 0 - - - - - - - - - - - - - - - - -
6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi 288.00 0.01 Liter 10,704 - - - - - - 288.0 3,082,889.07 0.07 - - - - - - -
6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi 30,174.00 1.33 Liter 14,895 - - - 28,770.0 428,533,621.43 1.88 1,404.0 20,912,798.21 0.47 - - - - - - -
6.3(5a) Laston Lapis Aus (AC-WC) 250.56 1.11 Ton 1,502,565 - - - - - - 250.6 376,482,718.71 8.47 - - - - - - -
6.3(6a) Laston Lapis Antara (AC-BC) 375.84 1.61 Ton 1,450,377 - - - - - - 375.8 545,109,678.07 12.26 - - - - - - -
6.3(7a) Laston Lapis Fondasi (AC-Base) 156.60 0.60 Ton 1,294,847 - - - - - - 156.6 202,773,074.07 4.56 - - - - - - -
6.3.(8) Bahan anti pengelupasan 149.63 0.03 Kg 67,980 - - - - - - 149.6 10,171,847.40 0.23 - - - - - - -
6.5.(1) Laston Lapis Aus Asbuton (AC-WC Asb) 3,698.40 16.83 Ton 1,541,347 - - - 3,698.4 5,700,519,095.29 24.97 - - - - - - - - - -
6.5.(2) Laston Lapis Antara Asbuton (AC-BC Asb) 9,113.63 39.02 Ton 1,450,379 - - - 9,113.6 13,218,220,319.48 57.90 - - - - - - - - - -
6.5.(3) Laston Lapis Fondasi Asbuton (AC-Base Asb) 313.20 1.23 Ton 1,332,164 - - - 313.2 417,233,895.20 1.83 - - - - - - - - - -
0 DIVISI 7. STRUKTUR - - 0 - - - - - - - - - - - - - - - - -
7.1 (6a) Beton struktur, fc’25 Mpa 60.00 0.36 M3 2,017,104 - - - - - - 60.0 121,026,224.43 2.72 - - - - - - -
7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis 2,141.61 7.63 M3 1,206,689 - - - - - - 2,141.6 2,584,257,229.29 58.11 - - - - - - -
0 DIVISI 8. REHABILITASI JEMBATAN - - 0 - - - - - - - - - - - - - - - - -
8.3.(2a) Pengecetan dekoratif pada elemen struktur beton, tebal : 100 µm 459.58 0.10 M2 76,978 - - - - - - - - - - - - - - - 459.6
8.7.(1a) Pengecatan struktur baja pada daerah kering tebal 80 mikron 52.48 0.01 M2 96,121 - - - - - - - - - - - - - - - 52.5
8.7.(3a) Pengecatan pada elemen sandaran dan/atau pagar pengaman (gruard rail) 80 mikron 130.41 0.04 M2 108,149 - - - - - - - - - - - - - - - 130.4
8.11.(1) Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic Plug 76.00 0.40 M1 1,794,874 - - - - - - - - - - - - - - - 76.0
0 DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN - - 0 - - - - - - - - - - - - - - - - -
9.1.(1) Mandor 250.00 0.02 Jam 33,732 - - - - - - - - - 100.0 3,373,196.27 0.16 150.00 5,059,794.40 0.26 -
9.1.(2) Pekerja Biasa 250.00 0.01 Jam 20,198 - - - - - - - - - 100.0 2,019,791.99 0.10 150.00 3,029,687.99 0.16 -
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ 270.00 0.22 Jam 277,047 - - - - - - - - - 150.0 41,557,068.51 2.00 120.00 33,245,654.81 1.73 -
9.1.(8) Motor Grader min 100 PK 270.00 0.34 Jam 424,539 - - - - - - - - - 150.0 63,680,868.89 3.07 120.00 50,944,695.11 2.65 -
9.1.(11) Alat Penggali (Excavator) 80 - 140 PK 200.00 0.31 Jam 525,859 - - - - - - - - - 100.0 52,585,903.19 2.53 100.00 52,585,903.19 2.73 -
9.1.(14) Penggilas Bervibrasi 5 - 8 Ton 270.00 0.39 Jam 485,795 - - - - - - - - - 150.0 72,869,217.06 3.51 120.00 58,295,373.65 3.03 -
9.2.(1) Marka Jalan Termoplastik 4,066.65 1.56 M2 130,327 - - - 2,113.7 275,465,446.16 1.21 141.8 18,473,837.67 0.42 78.8 10,263,243.15 0.49 1,732.50 225,791,349.31 11.73 -
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade 22.00 0.05 Buah 801,954 - - - 8.0 6,415,634.80 0.03 4.0 3,207,817.40 0.07 4.0 3,207,817.40 0.15 6.00 4,811,726.10 0.25 -
9.2.(5) Patok Pengarah 166.00 0.17 Buah 340,429 - - - 30.0 10,212,859.10 0.04 120.0 40,851,436.40 0.92 - - - - - - 16.0
9.2.(6a) Patok Kilometer 7.00 0.01 Buah 639,325 - - - 7.0 4,475,277.74 0.02 - - - - - - - - - -
9.2.(7) Rel Pengaman 300.00 0.60 M1 672,320 - - - - - - 300.0 201,695,961.21 4.54 - - - - - - -
9.2.(22a) Stabilisasi dengan Tanaman 2,250.00 0.25 M2 38,065 - - - - - - 2,250.0 85,647,097.80 1.93 - - - - - - -
0 DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA - - 0 - - - - - - - - - - - - - - - - -
10.1.(1) Galian pada Saluran Air atau Lereng untuk Pemeliharaan 178.64 0.07 M3 127,415 - - - 16.2 2,069,221.55 0.01 - - - 46.4 5,912,061.56 0.28 116.00 14,780,153.89 0.77 -
10.1.(3) Pebaikan Pasangan Batu dengan Mortar 33.64 0.12 M3 1,206,508 - - - 6.8 8,204,256.04 0.04 - - - 13.2 15,974,169.11 0.77 13.60 16,408,512.07 0.85 -
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A 479.66 0.98 M3 690,733 - - - 100.5 69,418,651.42 0.30 - - - 150.2 103,720,444.74 5.00 198.00 136,765,104.28 7.10 31.0
10.1.(6) Perbaikan Lapis Fondasi Agregat Kelas S 133.38 0.20 M3 501,351 - - - - - - - - - 52.4 26,260,768.43 1.27 81.00 40,609,435.71 2.11 -
10.1.(9) Perbaikan Campuran Aspal Panas 834.85 8.40 M3 3,409,318 - - - 171.8 585,788,938.68 2.57 - - - 270.4 922,015,833.88 44.43 273.42 932,175,600.13 48.41 119.2
10.1.(11) Perbaikan Asbuton Campuran Panas Hampar Dingin 9.14 0.14 M3 5,206,587 - - - -

M
M M
M
M M
KTU PELAKSANAAN PEKERJAAN
Penanganan Drainase

Jangka waktu pelaksanaan 335 HK


Pemeliharaan Berkala Jembatan Masa Pemel
Jumlah Harga (Rupiah) Bula Bobot %
Bulan 1 Bulan 2 Bulan 3 Bulan 4 Bulan 5 Bulan 6 Bulan 7 Bulan 8 Bulan 9 Bulan 10 Bulan 11
Jumlah Harga (Rp.) Bobot (%) n 12

n s 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45

- - 84,900,000.00
27,460,000.00 3.78 27,460,000.00
- - 79,950,000.00
18,600,000.00 2.56 18,600,000.00
- - 4,050,000.00
- - 4,140,000.00
- - 3,150,000.00
- - 3,240,000.00
- - 3,195,000.00
- - 3,510,000.00
- - 3,420,000.00
- - 3,150,000.00
- - 3,150,000.00
- - 3,150,000.00
- - 3,690,000.00
- - 4,680,000.00
- - 2,700,000.00
- - 3,150,000.00
- - 3,240,000.00
- - 3,150,000.00
- - 2,700,000.00
- - 3,240,000.00
22,730,000.00 3.13 22,730,000.00
- - 127,500,000.00
- - -
- - 5,111,049.59
- - 115,617,398.32
- - -
- - 17,486,053.88
- - 28,523,903.66
- - 36,200,767.66
- - 42,300,049.50
- - 942,273.38
- - -
- - 518,696,072.21
- - 1,217,869,774.31
- - -
- - 3,082,889.07
- - 449,446,419.63
- - 376,482,718.71
- - 545,109,678.07
- - 202,773,074.07
- - 10,171,847.40
- - 5,700,519,095.29
- - 13,218,220,319.48
- - 417,233,895.20
- - -
- - 121,026,224.43
- - 2,584,257,229.29
- - -
35,377,430.04 4.87 35,377,430.04
5,044,430.65 0.69 5,044,430.65
14,103,733.12 1.94 14,103,733.12
136,410,395.18 18.76 136,410,395.18
- - -
- - 8,432,990.67
- - 5,049,479.98
- - 74,802,723.31
- - 114,625,564.00
- - 105,171,806.39
- - 131,164,590.70
- - 529,993,876.29
- - 17,642,995.71
5,446,858.19 0.75 56,511,153.69
- - 4,475,277.74
- - 201,695,961.21
- - 85,647,097.80
- - -
- - 22,761,437.00
- - 40,586,937.22
21,412,718.35 2.95 331,316,918.79
- - 66,870,204.14
406,278,142.57 55.88 2,846,258,515.26
- - 47,588,204.14
- - 18,383,490.00
6,974,377.75 0.96 7,192,327.05
392,308.75 0.05 501,283.40
- - 16,503,234.15
- - 1,141,925,400.00
26,778,400.00 3.68 26,778,400.00
- - 128,041,478.08
- - 1,625,894,139.10

727,008,794.59 100.00 33,879,667,207.97 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -


- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
JADWAL WAKTU PELAKSANAAN PEKERJAAN
PENANGANAN DRAINASE
PPK : 2.5 PROPINSI RIAU
No. Paket Kontrak :
Nama Paket : Preservasi Ma. Lembu - Bts. Sumbar
Prop / Kab / Kodya : Riau

Jangka waktu pelaksanaan 240 HK


PENANGANAN DRAINASE
JANUARI FEBRUARI MARET APRIL MAY JUNI JULI AGUSTUS SEPTEMBER
URAIAN SATUANHARGA SATUAN MASA BOBOT
NO. MATA 22-Jan 25-Jan 1-Feb 8-Feb 15-Feb 22-Feb 1-Mar 8-Mar 15-Mar 22-Mar 29-Mar 5-Apr 12-Apr 19-Apr 26-Apr 3-May 10-May 17-May 24-May 31-May 7-Jun 14-Jun 21-Jun 28-Jun 5-Jul 12-Jul 19-Jul 26-Jul 2-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep PEMELIHA
PEMBAYARAN Bobot
Jumlah Harga RAAN
Volume S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D
(Rp.)
(%)
(Rupiah) 24-Jan 31-Jan 7-Feb 14-Feb 21-Feb 28-Feb 7-Mar 14-Mar 21-Mar 28-Mar 4-Apr 11-Apr 18-Apr 25-Apr 2-May 9-May 16-May 23-May 30-May 6-Jun 13-Jun 20-Jun 27-Jun 4-Jul 11-Jul 18-Jul 25-Jul 1-Aug 8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep (%)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

100%

LIBUR HARI RAYA IDUL FITRI 1442 H


DIVISI 2. DRAINASE SCHEDULE KONTRAK
80%

MASA PERSIAPAN PHO


2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 38,371 133.2 5,111,049.59 0.27 0.02 0.02 0.02 0.02 0.02 0.02 - - 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
60%

365 HK
2.2.(1) Pasangan Batu dengan Mortar M3 1,146,998 100.8 115,617,398.32 6.17 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA 0 - - - - 40%

SKh-1.9.4.(1) Galian untuk Selokan Drainase dan Saluran Air dengan Padat Karya M3 82,714 1,548.0 128,041,478.08 6.83 0.11 0.11 0.11 0.11 0.11 0.11 0.15 0.15 0.15 0.22 0.22 0.29 0.29 0.29 - - 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.19 0.19 0.19 0.19 0.17
20%

SKh-1.9.4.(2) Pasangan Batu dengan Mortar dengan Padat Karya M3 1,575,479 1,032.0 1,625,894,139.10 86.73 1.67 1.67 1.67 1.67 1.75 1.75 2.45 2.45 2.45 - - 3.19 3.19 3.19 3.19 4.14 4.14 4.14 4.14 4.35 4.35 4.35 4.52 4.52 4.52 4.52 4.52 4.21 0%

- 20
40
0

TOTAL RENCANA PER MINGGU 1,874,664,065.08 100.00 - - 0.11 0.11 0.11 0.11 0.11 1.78 1.82 1.82 1.84 1.99 1.99 2.76 2.76 2.76 - - 3.52 3.52 3.94 3.94 4.89 4.89 4.89 4.89 5.08 5.08 5.08 5.13 5.13 5.13 5.13 5.11 4.62

KUMULATIF RENCANA PER MINGGU - - 0.11 0.23 0.34 0.46 0.57 2.35 4.17 5.98 7.82 9.81 11.80 14.56 17.32 20.08 20.08 20.08 23.61 27.13 31.07 35.00 39.89 44.79 49.68 54.57 59.65 64.73 69.81 74.93 80.06 85.19 90.31 95.42 100.0

TOTAL REALISASI PER MINGGU

KUMULATIF REALISASI PER MINGGU


Pekanbaru, 1 Februari 2021
Disetujui Oleh #REF! Dibuat Oleh
PEJABAT PEMBUAT KOMITMEN #REF! KONTRAKTOR PELAKSANA
(PPK) 2.5. PROPINSI RIAU PT. DONNY PUTRA MANDIRI
#REF!

#REF! #REF! M. ASBI EFENDI, ST


#REF! #REF! General Superintenden
JADWAL WAKTU PELAKSANAAN PEKERJAAN
REHAB MINOR
PPK : 2.5 PROPINSI RIAU
No. Paket Kontrak :
Nama Paket : Preservasi Ma. Lembu - Bts. Sumbar
Prop / Kab / Kodya : Riau

Jangka waktu pelaksanaan 240 HK


REHAB MAYOR
URAIAN SATUAN
HARGA JANUARI FEBRUARI MARET APRIL MAY JUNI JULI AGUSTUS SEPTEMBER MASA BOBOT
NO. MATA SATUAN
PEMBAYARA 22-Jan 25-Jan 1-Feb 8-Feb 15-Feb 22-Feb 1-Mar 8-Mar 15-Mar 22-Mar 29-Mar 5-Apr 12-Apr 19-Apr 26-Apr 3-May 10-May 17-May 24-May 31-May 7-Jun 14-Jun 21-Jun 28-Jun 5-Jul 12-Jul 19-Jul 26-Jul 2-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep PEMELIHA
Jumlah Harga Bobot RAAN
N Volume S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D
(Rp.) (%)
(Rupiah) 24-Jan 31-Jan 7-Feb 14-Feb 21-Feb 28-Feb 7-Mar 14-Mar 21-Mar 28-Mar 4-Apr 11-Apr 18-Apr 25-Apr 2-May 9-May 16-May 23-May 30-May 6-Jun 13-Jun 20-Jun 27-Jun 4-Jul 11-Jul 18-Jul 25-Jul 1-Aug 8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep
a b c d g h 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 (%)

DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK 0 - - - - 100%


3.1.(7) Galian Perkerasan Beraspal dengan Cold Milling Machine M3 570,478 37.6 21,449,975.55 0.29 0.04 0.04 0.04 0.04 0.04 0.04 0.04

3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 367,148 45.1 16,565,706.25 0.22 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
3.2.(1a) Timbunan Biasa dari sumber galian M3 121,800 10.0 1,218,003.67 0.02 0.00 0.00 0.00 0.00
DIVISI 5. PERKERASAN BERBUTIR 0 - - - - 80%
5.1.(1) Lapis Pondasi Agregat Kelas A M3 613,116 451.2 276,637,905.18 3.75 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42

LIBUR HARI RAYA IDUL FITRI 1442 H


5.1.(3) Lapis Pondasi Agregat Kelas S M3 394,516 1,692.0 667,520,459.39 9.06 SCHEDULE 1.51 1.51 1.51 1.51 1.51 1.51
KONTRAK

MASA PERSIAPAN PHO


DIVISI 6. PERKERASAN ASPAL 0 - - - -
6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 14,895 7,896.0 117,612,147.19 1.60 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08
60%
6.5.(1) Laston Lapis Aus Asbuton (AC-WC Asb) Ton 1,541,347 2,075.5 3,199,097,283.33 43.40 5.30 5.30 5.30 4.77 4.77 4.77 4.58 4.35 4.22

365 HK
6.5.(2) Laston Lapis Antara Asbuton (AC-BC Asb) Ton 1,450,379 1,729.6 2,508,576,041.00 34.03 2.98 2.98 4.02 4.02 5.99 5.99 5.41 2.65
DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN 0 - - - -

9.1.(1) Mandor Jam 33,732 -


9.2.(1) Marka Jalan Termoplastik M2 130,327 1,353.6 176,410,487.98 2.39 0.60 0.60 0.60 0.60 40%
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade Buah 801,954 3.0 2,405,863.05 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA 0 - - - -


10.1.(1) Galian pada Saluran Air atau Lereng untuk Pemeliharaan M3 127,415 7.0 886,809.23 0.01 0.01 0.01
10.1.(3) Pebaikan Pasangan Batu dengan Mortar M3 1,206,508 2.7 3,283,391.53 0.04 0.04 20%
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 690,733 56.4 38,957,332.74 0.53 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
10.1.(9) Perbaikan Campuran Aspal Panas M3 3,409,318 79.0 269,199,712.48 3.65 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28

10.1.(22) Pengendalian Tanaman (jalan) M2 578 124,080.0 71,656,200.00 0.97 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
- 0%
TOTAL RENCANA PER MINGGU 7,371,477,318.58 100.00 - - 0.03 0.07 0.07 0.38 0.38 0.80 0.83 0.83 0.78 0.78 0.91 0.83 0.83 0.83 - - 3.39 3.39 4.15 4.15 6.12 6.12 5.54 2.79 5.45 6.04 7.55 7.02 7.00 6.40 6.21 5.98 4.30
KUMULATIF RENCANA PER MINGGU - - 0.03 0.11 0.18 0.56 0.95 1.75 2.57 3.40 4.18 4.97 5.87 6.71 7.54 8.37 8.37 8.37 11.77 15.16 19.31 23.47 29.59 35.72 41.26 44.05 49.50 55.54 63.09 70.11 77.11 83.51 89.72 95.70 100.0 20
0
40
TOTAL REALISASI PER MINGGU
KUMULATIF REALISASI PER MINGGU
Pekanbaru, 1 Februari 2021
Disetujui Oleh 7371477365.726 #REF! Dibuat Oleh
PEJABAT PEMBUAT KOMITMEN #REF! KONTRAKTOR PELAKSANA
(PPK) 2.5. PROPINSI RIAU PT. DONNY PUTRA MANDIRI
#REF!

#REF! #REF! M. ASBI EFENDI, ST


#REF! - #REF! General Superintenden
JADWAL WAKTU PELAKSANAAN PEKERJAAN
REHAB MAYOR
PPK : 2.5 PROPINSI RIAU
No. Paket Kontrak :
Nama Paket : Preservasi Ma. Lembu - Bts. Sumbar
Prop / Kab / Kodya : Riau

Jangka waktu pelaksanaan 240 HK


REHAB MAYOR
URAIAN SATUAN
HARGA JANUARI FEBRUARI MARET APRIL MAY JUNI JULI AGUSTUS SEPTEMBER MASA BOBOT
NO. MATA SATUAN
PEMBAYARA 22-Jan 25-Jan 1-Feb 8-Feb 15-Feb 22-Feb 1-Mar 8-Mar 15-Mar 22-Mar 29-Mar 5-Apr 12-Apr 19-Apr 26-Apr 3-May 10-May 17-May 24-May 31-May 7-Jun 14-Jun 21-Jun 28-Jun 5-Jul 12-Jul 19-Jul 26-Jul 2-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep PEMELIHA
Jumlah Harga Bobot RAAN
N Volume S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D
(Rp.) (%)
(Rupiah) 24-Jan 31-Jan 7-Feb 14-Feb 21-Feb 28-Feb 7-Mar 14-Mar 21-Mar 28-Mar 4-Apr 11-Apr 18-Apr 25-Apr 2-May 9-May 16-May 23-May 30-May 6-Jun 13-Jun 20-Jun 27-Jun 4-Jul 11-Jul 18-Jul 25-Jul 1-Aug 8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep
a b c d g h 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 (%)

DIVISI 1. UMUM 100%


1.2 Mobilisasi (jalan) LS 84,900,000 1.0 84,900,000.00 0.55 0.13 0.13 0.13 0.08 0.08
1.8.(1) Manajemen dan Keselamatan Lalu Lintas (jalan) LS 79,950,000 1.0 79,950,000.00 0.52 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
1.17.(1a) Pengujian pH Buah 450,000 9.0 4,050,000.00 0.03 0.00 0.00 0.00 0.00 0.00 0.00
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 460,000 9.0 4,140,000.00 0.03 0.00 0.00 0.00 0.00 0.00 0.00
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 350,000 9.0 3,150,000.00 0.02 0.00 0.00 0.00 0.00 0.00 0.00
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 360,000 9.0 3,240,000.00 0.02 0.00 0.00 0.00 0.00 0.00 0.00
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 355,000 9.0 3,195,000.00 0.02 0.00 0.00 0.00 0.00 0.00 0.00
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 390,000 9.0 3,510,000.00 0.02 0.00 0.00 0.00 0.00 0.00 0.00
1.17.(1g) Pengujian Coliform Buah 380,000 9.0 3,420,000.00 0.02 0.00 0.00 0.00 0.00 0.00 0.00 80%
1.17.(1h) Pengujian E. Coli Buah 350,000 9.0 3,150,000.00 0.02 0.00 0.00 0.00 0.00 0.00 0.00
1.17.(1i) Pengujian Destruksi Cu, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn Buah 350,000 9.0 3,150,000.00 0.02 0.00 0.00 0.00 0.00 0.00 0.00
1.17.(1j) Pengujian Temperatur (Suhu) Buah 350,000 9.0 3,150,000.00 0.02 0.00 0.00 0.00 0.00 0.00 0.00
1.17.(2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Kesehatan Buah 410,000 9.0 3,690,000.00 0.02 0.00 0.00 0.00 0.00 0.00 0.00
1.17.(2b) Pengujian tingkat getaran kendaraan bermotor Buah 520,000 9.0 4,680,000.00 0.03 0.01 0.01 0.01 0.01 0.01 0.01
1.17.(3a) Pengujian NoX Buah 300,000 9.0 2,700,000.00 0.02 0.00 0.00 0.00 0.00 0.00 0.00
1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 350,000 9.0 3,150,000.00 0.02 0.00 0.00 0.00 0.00 0.00 0.00
1.17.(3c) Pengujian Karbondioksida (CO2) Buah 360,000 9.0 3,240,000.00 0.02 0.00 0.00 SCHEDULE 0.00 0.00 0.00 0.00
KONTRAK

LIBUR HARI RAYA IDUL FITRI 1442 H


1.17.(3d) Pengujian Hidro Carbon (HC)-CH4 Buah 350,000 9.0 3,150,000.00 0.02 0.00 0.00 0.00 0.00 0.00 0.00
60%
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 300,000 9.0 2,700,000.00 0.02 0.00 0.00 0.00 0.00 0.00 0.00

MASA PERSIAPAN PHO


1.17.(3g) Pengujian Timah Hitam (Pb) Buah 360,000 9.0 3,240,000.00 0.02 0.00 0.00 0.00 0.00 0.00 0.00
1.21 Manajemen Mutu LS 127,500,000 1.0 127,500,000.00 0.82 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK 0 - - - -

365 HK
3.1.(7) Galian Perkerasan Beraspal dengan Cold Milling Machine M3 570,478 12.4 7,073,928.11 0.05 0.01 0.01 0.01 0.01 0.01 0.01 0.01
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 367,148 21.9 8,033,192.66 0.05 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
3.2.(1a) Timbunan Biasa dari sumber galian M3 121,800 11.4 1,383,652.17 0.01 0.00 0.00 0.00 0.00
DIVISI 5. PERKERASAN BERBUTIR 0 - - - -
5.1.(1) Lapis Pondasi Agregat Kelas A M3 613,116 151.8 93,070,997.35 0.60 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07
40%
5.1.(3) Lapis Pondasi Agregat Kelas S M3 394,516 1,327.5 523,719,509.36 3.39 0.56 0.56 0.56 0.56 0.56 0.56
DIVISI 6. PERKERASAN ASPAL 0 - - - -
6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 14,895 20,874.0 310,921,474.23 2.01 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
6.5.(1) Laston Lapis Aus Asbuton (AC-WC Asb) Ton 1,541,347 1,622.9 2,501,421,811.96 16.18 1.98 1.98 1.98 1.78 1.78 1.78 1.71 1.62 1.57
6.5.(2) Laston Lapis Antara Asbuton (AC-BC Asb) Ton 1,450,379 7,384.0 10,709,644,278.48 69.28 6.06 6.06 8.18 8.18 12.19 12.19 11.01 5.40
6.5.(3) Laston Lapis Fondasi Asbuton (AC-Base Asb) Ton 1,332,164 313.2 417,233,895.20 2.70 0.40 0.40 0.40 0.45 0.53 0.51
DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN 0 - - - -
9.1.(1) Mandor Jam 33,732
9.2.(1) Marka Jalan Termoplastik M2 130,327 760.1 99,054,958.18 0.64 0.16 0.16 0.16 0.16 20%
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade Buah 801,954 5.0 4,009,771.75 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.2.(5) Patok Pengarah Buah 340,429 30.0 10,212,859.10 0.07 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
9.2.(6a) Patok Kilometer Buah 639,325 7.0 4,475,277.74 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA 0 - - - -
10.1.(1) Galian pada Saluran Air atau Lereng untuk Pemeliharaan M3 127,415 9.3 1,182,412.31 0.01 0.00 0.00
10.1.(3) Pebaikan Pasangan Batu dengan Mortar M3 1,206,508 4.1 4,928,344.86 0.03 0.03
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 690,733 44.1 30,461,318.68 0.20 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
10.1.(9) Perbaikan Campuran Aspal Panas M3 3,409,318 92.9 316,589,226.20 2.05 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16
10.1.(21) Pembersihan Drainase M 13,753 - - - 0%
10.1.(22) Pengendalian Tanaman (jalan) M2 578 106,920.0 61,746,300.00 0.40 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
-
TOTAL RENCANA PER MINGGU 15,458,218,208.35 100.00 - 0.17 0.19 0.27 0.14 0.24 0.30 0.30 0.30 0.30 0.30 0.30 0.83 0.79 0.79 0.77 - - 0.85 6.89 6.22 8.41 8.41 12.36 12.35 11.16 7.54 2.31 2.87 2.67 2.68 2.51 2.51 2.51 1.75
KUMULATIF RENCANA PER MINGGU - 0.17 0.37 0.63 0.77 1.01 1.31 1.62 1.92 2.22 2.52 2.82 3.66 4.45 5.24 6.00 6.00 6.00 6.86 13.75 19.97 28.38 36.80 49.15 61.50 72.66 80.20 82.51 85.38 88.05 90.72 93.24 95.75 98.25 100.0 20
0
40
TOTAL REALISASI PER MINGGU
KUMULATIF REALISASI PER MINGGU
Pekanbaru, 1 Februari 2021
Disetujui Oleh 15458218300.89 #REF! Dibuat Oleh
PEJABAT PEMBUAT KOMITMEN #REF! KONTRAKTOR PELAKSANA
(PPK) 2.5. PROPINSI RIAU PT. DONNY PUTRA MANDIRI
#REF!

#REF! #REF! M. ASBI EFENDI, ST


#REF! - #REF! General Superintenden
JADWAL WAKTU PELAKSANAAN PEKERJAAN
PEMEL. BERKALA JEMBATAN
PPK : 2.5 PROPINSI RIAU
No. Paket Kontrak :
Nama Paket : Preservasi Ma. Lembu - Bts. Sumbar
Prop / Kab / Kodya : Riau

Jangka waktu pelaksanaan 240 HK


NO. MATA PEMEL. BERKALA JEMBATAN
HARGA JANUARI FEBRUARI MARET APRIL MAY JUNI JULI AGUSTUS SEPTEMBER MASA
PEMBAYA SATUAN
URAIAN SATUAN 22-Jan 25-Jan 1-Feb 8-Feb 15-Feb 22-Feb 1-Mar 8-Mar 15-Mar 22-Mar 29-Mar 5-Apr 12-Apr 19-Apr 26-Apr 3-May 10-May 17-May 24-May 31-May 7-Jun 14-Jun 21-Jun 28-Jun 5-Jul 12-Jul 19-Jul 26-Jul 2-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep PEMELIHARA BOBOT
RAN
Jumlah Harga Bobot S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D AN
Volume
(Rp.) (%)
(Rupiah) 24-Jan 31-Jan 7-Feb 14-Feb 21-Feb 28-Feb 7-Mar 14-Mar 21-Mar 28-Mar 4-Apr 11-Apr 18-Apr 25-Apr 2-May 9-May 16-May 23-May 30-May 6-Jun 13-Jun 20-Jun 27-Jun 4-Jul 11-Jul 18-Jul 25-Jul 1-Aug 8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

100%
DIVISI 1. UMUM

Mobilisasi (berkala jalan) LS 27,460,000 1.0 27,460,000.00 3.78 0.44 0.44 0.44 0.44 0.44 0.44 0.57 0.57

1.8.(2) Manajemen dan Keselamatan Lalu Lintas (Berkala Jembatan) LS 18,600,000 1.0 18,600,000.00 2.56 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09
80%
1.19 Keselamatan dan Kesehatan Kerja LS 22,730,000 1.0 22,730,000.00 3.13 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10

DIVISI 8. REHABILITASI JEMBATAN 0 - - - -

8.3.(2a) Pengecetan dekoratif pada elemen struktur beton, tebal : 100 µm M2 76,978 459.6 35,377,430.04 4.87 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29

LIBUR HARI RAYA IDUL FITRI 1442 H


60%
8.7.(1a) Pengecatan struktur baja pada daerah kering tebal 80 mikron M2 96,121 52.5 5,044,430.65 0.69 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03

MASA PERSIAPAN PHO


8.7.(3a) Pengecatan pada elemen sandaran dan/atau pagar pengaman (gruard rail) 80 mikron M2 108,149 130.4 14,103,733.12 1.94 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10

365 HK
8.11.(1) Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic Plug M1 1,794,874 76.0 136,410,395.18 18.76 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10

DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN 0 - - - -


40%
9.2.(5) Patok Pengarah Buah 340,429 16.0 5,446,858.19 0.75 0.12 0.12 0.12 0.12 0.12 0.12

SCHEDULE KONTRAK
DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA 0 - - - -

10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 690,733 31.0 21,412,718.35 2.95 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29

20%
10.1.(9) Perbaikan Campuran Aspal Panas M3 3,409,318 119.2 406,278,142.57 55.88 6.99 6.99 6.99 6.99 6.99 6.99 6.99 6.99

10.1.(19) Pembersihan Patok Buah 21,795 320.0 6,974,377.75 0.96 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08

10.1.(20) Pembersihan Rambu Buah 21,795 18.0 392,308.75 0.05 0.01 0.01 0.01 0.01 0.01 0.01

0%
10.1.(22) Pengendalian Tanaman (jembatan) M2 985 27,200.0 26,778,400.00 3.68 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12

-
20
40
0
TOTAL RENCANA PER MINGGU 727,008,794.59 100.00 - 0.63 0.75 0.75 0.75 0.75 0.75 0.31 0.31 0.31 0.31 0.35 0.35 0.44 0.73 0.73 - - 1.83 1.83 1.92 2.22 2.22 2.21 9.19 9.19 9.19 9.32 9.33 9.33 9.33 9.02 2.40 1.89 1.32

KUMULATIF RENCANA PER MINGGU - 0.63 1.38 2.14 2.89 3.64 4.39 4.71 5.02 5.33 5.64 5.99 6.34 6.78 7.51 8.24 8.24 8.24 10.08 11.91 13.83 16.05 18.27 20.48 29.67 38.86 48.06 57.38 66.70 76.03 85.36 94.38 96.79 98.68 100.0

TOTAL REALISASI PER MINGGU

KUMULATIF REALISASI PER MINGGU


Pekanbaru, 1 Februari 2021
Disetujui Oleh #REF! Dibuat Oleh
PEJABAT PEMBUAT KOMITMEN #REF! KONTRAKTOR PELAKSANA
(PPK) 2.5. PROPINSI RIAU PT. DONNY PUTRA MANDIRI
#REF!

#REF! #REF! M. ASBI EFENDI, ST


#REF! #REF! General Superintenden
JADWAL WAKTU PELAKSANAAN PEKERJAAN
PENANGANAN LONGSOR
PPK : 2.5 PROPINSI RIAU
No. Paket Kontrak :
Nama Paket : Preservasi Ma. Lembu - Bts. Sumbar
Prop / Kab / Kodya : Riau

Jangka waktu pelaksanaan 335 HK


PENANGANAN LONGSOR
NO. MATA JANUARI FEBRUARI MARET APRIL MAY JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER MASA
SATUAN HARGA SATUAN
PEMBAYARAN URAIAN 22-Jan 25-Jan 1-Feb 8-Feb 15-Feb 22-Feb 1-Mar 8-Mar 15-Mar 22-Mar 29-Mar 5-Apr 12-Apr 19-Apr 26-Apr 3-May 10-May 17-May 24-May 31-May 7-Jun 14-Jun 21-Jun 28-Jun 5-Jul 12-Jul 19-Jul 26-Jul 2-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep 20-Sep 27-Sep 4-Oct 11-Oct 18-Oct 25-Oct 1-Nov 8-Nov 15-Nov 22-Nov 29-Nov 6-Dec 13-Dec 20-Dec 27-Dec PEMELIH BOBOT
Volume Jumlah Harga (Rp.) Bobot (%) S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D ARAAN
(Rupiah) 24-Jan 31-Jan 7-Feb 14-Feb 21-Feb 28-Feb 7-Mar 14-Mar 21-Mar 28-Mar 4-Apr 11-Apr 18-Apr 25-Apr 2-May 9-May 16-May 23-May 30-May 6-Jun 13-Jun 20-Jun 27-Jun 4-Jul 11-Jul 18-Jul 25-Jul 1-Aug 8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep 26-Sep 3-Oct 10-Oct 17-Oct 24-Oct 31-Oct 7-Nov 14-Nov 21-Nov 28-Nov 5-Dec 12-Dec 19-Dec 26-Dec 31-Dec
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK - - - - 100%

3.1.(1) Galian Biasa M3 11,614 1,505.6 17,486,053.88 0.39 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

3.2.(1a) Timbunan Biasa dari sumber galian M3 121,800 325.9 39,698,393.65 0.89 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04

3.3.(1) Penyiapan Badan Jalan M2 2,617 360.0 942,273.38 0.02 0.00 0.00 0.00 0.00 0.00

DIVISI 5. PERKERASAN BERBUTIR - - - -


80%
5.1.(1) Lapis Pondasi Agregat Kelas A M3 613,116 243.0 148,987,169.68 3.35 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42

5.1.(3) Lapis Pondasi Agregat Kelas S M3 394,516 67.5 26,629,805.56 0.60 0.20 0.20 0.20

DIVISI 6. PERKERASAN ASPAL - - - -

LIBUR HARI RAYA IDUL FITRI 1442 H


6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter 10,704 288.0 3,082,889.07 0.07 0.01 0.01 0.01 0.01 0.01 0.01

60%
6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 14,895 1,404.0 20,912,798.21 0.47

MASA PERSIAPAN PHO


0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05

6.3(5a) Laston Lapis Aus (AC-WC) Ton 1,502,565 250.6 376,482,718.71 8.47 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06

365 HK
6.3(6a) Laston Lapis Antara (AC-BC) Ton 1,450,377 375.8 545,109,678.07 12.26 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23

6.3(7a) Laston Lapis Fondasi (AC-Base) Ton 1,294,847 156.6 202,773,074.07 4.56 0.76 0.76 0.76 0.76 0.76 0.76

6.3.(8) Bahan anti pengelupasan Kg 67,980 149.6 10,171,847.40 0.23 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
40%
DIVISI 7. STRUKTUR - - - -

7.1 (6a) Beton struktur, fc’25 Mpa M3 2,017,104 60.0 121,026,224.43 2.72 0.39 0.39 0.39 0.39 0.39 0.39 0.39

7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 1,206,689 2,141.6 2,584,257,229.29 58.11 1.16 1.16 1.16 1.16 1.51 1.51 1.51 1.96 1.96 1.96 1.96 2.36 2.36 2.36 2.36 2.36 2.36 2.36 2.36 2.36 2.36 2.36 2.36 2.36 2.00 2.00 2.00 1.72 1.72 0.97
SCHEDULE KONTRAK
DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN - - - -

9.2.(1) Marka Jalan Termoplastik M2 130,327 141.8 18,473,837.67 0.42 0.21 0.21 20%

9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade Buah 801,954 4.0 3,207,817.40 0.07 0.04 0.04

9.2.(5) Patok Pengarah Buah 340,429 120.0 40,851,436.40 0.92 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11

9.2.(7) Rel Pengaman M1 672,320 300.0 201,695,961.21 4.54 1.13 1.13 1.13 1.13

9.2.(22a) Stabilisasi dengan Tanaman M2 38,065 2,250.0 85,647,097.80 1.93 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0%

-
0
20
40
TOTAL RENCANA PER MINGGU 4,447,436,305.89 100.00 - 0.00 0.05 0.07 0.07 0.07 0.06 1.22 1.22 1.26 1.26 1.61 1.61 1.61 2.48 2.48 - - 2.48 2.48 2.87 3.66 3.66 3.66 3.24 3.22 3.22 3.72 3.72 3.72 3.72 3.72 3.72 3.36 3.36 3.33 4.11 3.03 2.28 1.31 1.11 1.22 1.61 1.61 1.68 1.72 1.72 1.89 0.75 0.04

KUMULATIF RENCANA PER MINGGU - 0.00 0.05 0.12 0.18 0.25 0.31 1.53 2.76 4.02 5.28 6.89 8.50 10.11 12.59 15.07 15.07 15.07 17.55 20.03 22.91 26.56 30.22 33.87 37.11 40.33 43.55 47.26 50.98 54.70 58.42 62.14 65.86 69.22 72.59 75.91 80.02 83.05 85.33 86.64 87.75 88.98 90.59 92.2 93.9 95.6 97.3 99.2 100.0 100.0

TOTAL REALISASI PER MINGGU

KUMULATIF REALISASI PER MINGGU


Pekanbaru, 1 Februari 2021
Disetujui Oleh #REF! Dibuat Oleh
PEJABAT PEMBUAT KOMITMEN #REF! KONTRAKTOR PELAKSANA
(PPK) 2.5. PROPINSI RIAU PT. DONNY PUTRA MANDIRI
#REF!

#REF! #REF! M. ASBI EFENDI, ST


#REF! - #REF! General Superintenden
JADWAL WAKTU PELAKSANAAN PEKERJAAN
PEMEL. RUTIN KONDISI
PPK : 2.5 PROPINSI RIAU
No. Paket Kontrak :
Nama Paket : Preservasi Ma. Lembu - Bts. Sumbar
Prop / Kab / Kodya : Riau

Jangka waktu pelaksanaan 335 HK


PEMEL. RUTIN KONDISI
NO. MATA SATUA HARGA JANUARI FEBRUARI MARET APRIL MAY JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER MASA
URAIAN
PEMBAYARAN N SATUAN 22-Jan 25-Jan 1-Feb 8-Feb 15-Feb 22-Feb 1-Mar 8-Mar 15-Mar 22-Mar 29-Mar 5-Apr 12-Apr 19-Apr 26-Apr 3-May 10-May 17-May 24-May 31-May 7-Jun 14-Jun 21-Jun 28-Jun 5-Jul 12-Jul 19-Jul 26-Jul 2-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep 20-Sep 27-Sep 4-Oct 11-Oct 18-Oct 25-Oct 1-Nov 8-Nov 15-Nov 22-Nov 29-Nov 6-Dec 13-Dec 20-Dec 27-Dec PEMELIHAR BOBOT
Bobot S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D AAN
Volume Jumlah Harga (Rp.)
(%)
(Rupiah) 24-Jan 31-Jan 7-Feb 14-Feb 21-Feb 28-Feb 7-Mar 14-Mar 21-Mar 28-Mar 4-Apr 11-Apr 18-Apr 25-Apr 2-May 9-May 16-May 23-May 30-May 6-Jun 13-Jun 20-Jun 27-Jun 4-Jul 11-Jul 18-Jul 25-Jul 1-Aug 8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep 26-Sep 3-Oct 10-Oct 17-Oct 24-Oct 31-Oct 7-Nov 14-Nov 21-Nov 28-Nov 5-Dec 12-Dec 19-Dec 26-Dec 31-Dec
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK 0 - - - -


100%
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 367,148 10.1 3,689,834.84 0.18 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01

DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN 0 - - - -

9.1.(1) Mandor Jam 33,732 100.0 3,373,196.27 0.16 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01

9.1.(2) Pekerja Biasa Jam 20,198 100.0 2,019,791.99 0.10 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
80%
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 277,047 150.0 41,557,068.51 2.00 0.33 0.33 0.33 0.33 0.33 0.33

9.1.(8) Motor Grader min 100 PK Jam 424,539 150.0 63,680,868.89 3.07 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.23 0.23 0.23 0.23 0.23 0.23 0.18 0.18 0.18 0.18 0.18 0.10

9.1.(11) Alat Penggali (Excavator) 80 - 140 PK Jam 525,859 100.0 52,585,903.19 2.53

LIBUR HARI RAYA IDUL FITRI 1442 H


0.42 0.42 0.42 0.42 0.42 0.42

9.1.(14) Penggilas Bervibrasi 5 - 8 Ton Jam 485,795 150.0 72,869,217.06 3.51 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.26 0.26 0.26 0.26 0.26 0.26 0.21 0.21 0.21 0.21 0.21 0.11

MASA PERSIAPAN PHO


9.2.(1) Marka Jalan Termoplastik M2 130,327 78.8 10,263,243.15 0.49 SCHEDULE KONTRAK 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 60%

9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade Buah 801,954 4.0 3,207,817.40 0.15 0.04 0.04 0.04 0.04

365 HK
DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA 0 - - - -
10.1.(1) Galian pada Saluran Air atau Lereng untuk Pemeliharaan M3 127,415 46.4 5,912,061.56 0.28 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04

10.1.(3) Pebaikan Pasangan Batu dengan Mortar M3 1,206,508 13.2 15,974,169.11 0.77 0.13 0.13 0.13 0.13 0.13 0.13 40%
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 690,733 150.2 103,720,444.74 5.00 0.19 0.19 0.19 0.19 0.19 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.15 0.15 0.15 0.15 0.17 0.17 0.14 0.02

10.1.(6) Perbaikan Lapis Fondasi Agregat Kelas S M3 501,351 52.4 26,260,768.43 1.27 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14

10.1.(9) Perbaikan Campuran Aspal Panas M3 3,409,318 270.4 922,015,833.88 44.43 0.57 0.57 0.57 0.57 0.57 0.79 0.79 0.79 0.79 0.79 1.11 1.11 1.11 1.77 1.77 1.77 2.75 2.75 2.75 2.75 2.34 2.34 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67

10.1.(11) Perbaikan Asbuton Campuran Panas Hampar Dingin M3 5,206,587 9.1 47,588,204.14 2.29 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 - -
20%
10.1.(11) Perbaikan Asbuton Campuran Panas Hampar Dingin (bahan disediakan pengguna jasa) M3 334,245 55.0 18,383,490.00 0.89 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06

10.1.(19) Pembersihan Patok Buah 21,795 10.0 217,949.30 0.01 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

10.1.(20) Pembersihan Rambu Buah 21,795 5.0 108,974.65 0.01 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

10.1.(21) Pembersihan Drainase M 13,753 1,200.0 16,503,234.15 0.80 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
0%
10.1.(22) Pengendalian Tanaman (jalan) M2 578 1,152,360.0 665,487,900.00 32.07 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70
-
20
40
0
TOTAL RENCANA PER MINGGU 2,075,419,971.26 100.00 - - 0.93 0.93 0.93 0.93 1.50 1.50 1.50 1.29 1.29 1.81 1.81 1.81 1.81 1.81 - - 2.16 2.15 2.15 2.82 2.82 2.82 3.79 3.79 3.79 3.79 3.38 3.89 2.30 2.31 2.16 2.15 2.05 1.74 1.11 1.11 1.11 1.18 1.33 1.33 2.73 3.02 3.05 3.05 2.95 2.95 2.73 2.38

KUMULATIF RENCANA PER MINGGU - - 0.93 1.85 2.78 3.71 5.20 6.71 8.21 9.50 10.80 12.61 14.43 16.24 18.05 19.87 19.87 19.87 22.02 24.18 26.33 29.14 31.96 34.78 38.57 42.36 46.15 49.94 53.32 57.21 59.51 61.82 63.98 66.14 68.19 69.93 71.04 72.14 73.25 74.44 75.77 77.10 79.8 82.9 85.9 89.0 91.9 94.9 97.6 100.0

TOTAL REALISASI PER MINGGU

KUMULATIF REALISASI PER MINGGU


Pekanbaru, 1 Februari 2021
Disetujui Oleh #REF! Dibuat Oleh
PEJABAT PEMBUAT KOMITMEN #REF! KONTRAKTOR PELAKSANA
(PPK) 2.5. PROPINSI RIAU PT. DONNY PUTRA MANDIRI
#REF!

#REF! #REF! M. ASBI EFENDI, ST


#REF! - #REF! General Superintenden
JADWAL WAKTU PELAKSANAAN PEKERJAAN
PENUNJANG/ HOLDING
PPK : 2.5 PROPINSI RIAU
No. Paket Kontrak :
Nama Paket : Preservasi Ma. Lembu - Bts. Sumbar
Prop / Kab / Kodya : Riau

Harga Jangka waktu pelaksanaan 335 HK


PENUNJANG/ HOLDING
Satuan JANUARI FEBRUARI MARET APRIL MAY JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER
NO. MATA
PEMBAYARAN 22-Jan 25-Jan 1-Feb 8-Feb 15-Feb 22-Feb 1-Mar 8-Mar 15-Mar 22-Mar 29-Mar 5-Apr 12-Apr 19-Apr 26-Apr 3-May 10-May 17-May 24-May 31-May 7-Jun 14-Jun 21-Jun 28-Jun 5-Jul 12-Jul 19-Jul 26-Jul 2-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep 20-Sep 27-Sep 4-Oct 11-Oct 18-Oct 25-Oct 1-Nov 8-Nov 15-Nov 22-Nov 29-Nov 6-Dec 13-Dec 20-Dec 27-Dec
URAIAN Satuan Bobot %
Jumlah Harga Bobot Masa Pemel
Volume S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D
(Rp.) (%)
(Rupiah) 24-Jan 31-Jan 7-Feb 14-Feb 21-Feb 28-Feb 7-Mar 14-Mar 21-Mar 28-Mar 4-Apr 11-Apr 18-Apr 25-Apr 2-May 9-May 16-May 23-May 30-May 6-Jun 13-Jun 20-Jun 27-Jun 4-Jul 11-Jul 18-Jul 25-Jul 1-Aug 8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep 26-Sep 3-Oct 10-Oct 17-Oct 24-Oct 31-Oct 7-Nov 14-Nov 21-Nov 28-Nov 5-Dec 12-Dec 19-Dec 26-Dec 31-Dec

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44

100%
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK - - - -

3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 367,148 21.55 7,912,033.90 0.41 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05

DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN - - - -

9.1.(1) Mandor Jam 33,732 150.00 5,059,794.40 0.26 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

9.1.(2) Pekerja Biasa Jam 20,198 150.00 3,029,687.99 0.16 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
80%

9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 277,047 120.00 33,245,654.81 1.73 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12

9.1.(8) Motor Grader min 100 PK Jam 424,539 120.00 50,944,695.11 2.65 0.11 0.11 0.11 0.11 0.11 0.22 0.22 0.22 0.22 0.22 0.22 0.26 0.26 0.26

9.1.(11) Alat Penggali (Excavator) 80 - 140 PK Jam 525,859 100.00 52,585,903.19 2.73 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18

9.1.(14) Penggilas Bervibrasi 5 - 8 Ton Jam 485,795 120.00 58,295,373.65 3.03 0.12 0.12 0.12 0.12 0.12 0.25 0.25 0.25 0.25 0.25 0.25 0.30 0.30 0.30 -

60%

LIBUR HARI RAYA IDUL FITRI 1442 H


9.2.(1) Marka Jalan Termoplastik M2 130,327 1,732.50 225,791,349.31 11.73 1.17 1.17 1.17 1.17 1.17 1.17 1.17 1.17 1.17 1.17

MASA PERSIAPAN PHO


9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade Buah 801,954 6.00 4,811,726.10 0.25 0.06 0.06 0.06 0.06

365 HK
DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA - - - -

10.1.(1) Galian pada Saluran Air atau Lereng untuk Pemeliharaan M3 127,415 116.00 14,780,153.89 0.77 SCHEDULE KONTRAK 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10

40%
10.1.(3) Pebaikan Pasangan Batu dengan Mortar M3 1,206,508 13.60 16,408,512.07 0.85 0.21 0.21 0.21 0.21

10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 690,733 198.00 136,765,104.28 7.10 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27

10.1.(6) Perbaikan Lapis Fondasi Agregat Kelas S M3 501,351 81.00 40,609,435.71 2.11 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23

10.1.(9) Perbaikan Campuran Aspal Panas M3 3,409,318 273.42 932,175,600.13 48.41 0.68 0.68 0.68 0.68 0.68 0.68 0.81 0.81 0.81 0.81 1.14 1.14 1.59 1.59 1.59 1.59 1.59 2.39 2.39 2.39 2.39 2.39 2.18 2.18 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82

10.1.(11) Perbaikan Asbuton Campuran Panas Hampar Dingin M3 5,206,587 - - -


20%

10.1.(11) Perbaikan Asbuton Campuran Panas Hampar Dingin (bahan disediakan penggun M3 334,245 - - -

10.1.(19) Pembersihan Patok Buah 21,795 - - -

10.1.(20) Pembersihan Rambu Buah 21,795 - - -

10.1.(21) Pembersihan Drainase M 13,753 - - - - - - - - - - - - - - -


0%
10.1.(22) Pengendalian Tanaman (jalan) M2 578 594,000.00 343,035,000.00 17.82 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39

40
20
0
TOTAL RENCANA PER MINGGU 1,925,450,024.56 100.00 - 0.24 0.68 0.68 1.36 1.36 1.12 1.42 1.42 1.42 1.51 1.72 1.41 1.41 3.16 2.95 - - 2.23 2.23 2.23 2.23 2.23 3.03 3.03 3.03 3.50 3.50 3.62 3.62 1.43 1.43 0.96 0.64 0.64 1.81 1.79 1.79 1.79 1.95 1.95 4.03 4.03 3.12 3.12 2.89 3.46 3.36 3.04 0.39

KUMULATIF RENCANA PER MINGGU - 0.24 0.93 1.61 2.97 4.33 5.45 6.87 8.30 9.72 11.23 12.95 14.36 15.78 18.94 21.89 21.89 21.89 24.12 26.35 28.58 30.81 33.04 36.06 39.09 42.12 45.62 49.12 52.73 56.35 57.79 59.22 60.18 60.82 61.45 63.26 65.06 66.85 68.64 70.60 72.55 76.58 80.62 83.74 86.87 89.76 93.22 96.58 99.61 100.00

TOTAL REALISASI PER MINGGU

KUMULATIF REALISASI PER MINGGU


Pekanbaru, 1 Februari 2021
Disetujui Oleh Diperiksa Oleh Dibuat Oleh
PEJABAT PEMBUAT KOMITMEN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
(PPK) 2.5. PROPINSI RIAU PT. BINTANG INTI REKATAMA PT. DONNY PUTRA MANDIRI
TOTAL ###
###
### ###
###
#REF! - Ir. KHOLID WIJANARKO M. ASBI EFENDI, ST
#REF! - Supervisi Enginer General Superintenden
JADWAL WAKTU PELAKSANAAN PEKERJAAN
GABUNGAN
PPK : 2.5 PROPINSI RIAU
No. Paket Kontrak :
Nama Paket : Preservasi Ma. Lembu - Bts. Sumbar
Prop / Kab / Kodya : Riau

Jangka waktu pelaksanaan 335 HK


PEMEL. RUTIN KONDISI M
NO MA A A UA HARGA JANUARI FEBRUARI MARET APRIL MAY JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER
URAIAN M
MBA ARAN N A UAN 22-Jan 25-Jan 1-Feb 8-Feb 15-Feb 22-Feb 1-Mar 8-Mar 15-Mar 22-Mar 29-Mar 5-Apr 12-Apr 19-Apr 26-Apr 3-May 10-May 17-May 24-May 31-May 7-Jun 14-Jun 21-Jun 28-Jun 5-Jul 12-Jul 19-Jul 26-Jul 2-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep 20-Sep 27-Sep 4-Oct 11-Oct 18-Oct 25-Oct 1-Nov 8-Nov 15-Nov 22-Nov 29-Nov 6-Dec 13-Dec 20-Dec 27-Dec BOBOT
B H R
Volume Jumlah Harga (Rp.) S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D N
%
(Rupiah) 24-Jan 31-Jan 7-Feb 14-Feb 21-Feb 28-Feb 7-Mar 14-Mar 21-Mar 28-Mar 4-Apr 11-Apr 18-Apr 25-Apr 2-May 9-May 16-May 23-May 30-May 6-Jun 13-Jun 20-Jun 27-Jun 4-Jul 11-Jul 18-Jul 25-Jul 1-Aug 8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep 26-Sep 3-Oct 10-Oct 17-Oct 24-Oct 31-Oct 7-Nov 14-Nov 21-Nov 28-Nov 5-Dec 12-Dec 19-Dec 26-Dec 31-Dec
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

%
DIVISI 1. UMUM
1.2 Mobilisasi (jalan) LS 84,900,000 1.0 84,900,000.00 0.25 - 0.06 0.06 0.06 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.04 0.04 - - - - - - - - - - - - -
0 Mobilisasi (berkala jalan) LS 27,460,000 1.0 27,460,000.00 0.08 - 0.01 0.01 0.01 0.01 0.01 0.01 - - - - - - - - - - - - - - - - - - - - - - - - - 0.01 0.01 - - - - - - - - - - - - - -
1.8.(1) Manajemen dan Keselamatan Lalu Lintas (jalan) LS 79,950,000 1.0 79,950,000.00 0.24 - 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 - - 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 - - - - - - - - - - - - -
1.8.(2) Manajemen dan Keselamatan Lalu Lintas (Berkala Jembatan) LS 18,600,000 1.0 18,600,000.00 0.05 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - - - - - - - - - - - - - -
1.17.(1a) Pengujian pH Buah 450,000 9.0 4,050,000.00 0.01 - - - 0.00 0.00 - - - - - - - - - - - - - - - - 0.00 0.00 - - - - - - - - - 0.00 0.00 - - - - - - - - - - - - - -
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 460,000 9.0 4,140,000.00 0.01 - - - 0.00 0.00 - - - - - - - - - - - - - - - - 0.00 0.00 - - - - - - - - - 0.00 0.00 - - - - - - - - - - - - - -
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 350,000 9.0 3,150,000.00 0.01 - - - 0.00 0.00 - - - - - - - - - - - - - - - - 0.00 0.00 - - - - - - - - - 0.00 0.00 - - - - - - - - - - - - - -
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 360,000 9.0 3,240,000.00 0.01 - - - 0.00 0.00 - - - - - - - - - - - - - - - - 0.00 0.00 - - - - - - - - - 0.00 0.00 - - - - - - - - - - - - - -
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 355,000 9.0 3,195,000.00 0.01 - - - 0.00 0.00 - - - - - - - - - - - - - - - - 0.00 0.00 - - - - - - - - - 0.00 0.00 - - - - - - - - - - - - - -
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 390,000 9.0 3,510,000.00 0.01 - - - 0.00 0.00 - - - - - - - - - - - - - - - - 0.00 0.00 - - - - - - - - - 0.00 0.00 - - - - - - - - - - - - - -
1.17.(1g) Pengujian Coliform Buah 380,000 9.0 3,420,000.00 0.01 - - - 0.00 0.00 - - - - - - - - - - - - - - - - 0.00 0.00 - - - - - - - - - 0.00 0.00 - - - - - - - - - - - - - -
1.17.(1h) Pengujian E. Coli Buah 350,000 9.0 3,150,000.00 0.01 - - - 0.00 0.00 - - - - - - - - - - - - - - - - 0.00 0.00 - - - - - - - - - 0.00 0.00 - - - - - - - - - - - - - -
1.17.(1i) Pengujian Destruksi Cu, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn Buah 350,000 9.0 3,150,000.00 0.01 - - - 0.00 0.00 - - - - - - - - - - - - - - - - 0.00 0.00 - - - - - - - - - 0.00 0.00 - - - - - - - - - - - - - -
1.17.(1j) Pengujian Temperatur (Suhu) Buah 350,000 9.0 3,150,000.00 0.01 - - - 0.00 0.00 - - - - - - - - - - - - - - - - 0.00 0.00 - - - - - - - - - 0.00 0.00 - - - - - - - - - - - - - -
1.17.(2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Kesehatan Buah 410,000 9.0 3,690,000.00 0.01 - - - 0.00 0.00 - - - - - - - - - - - - - - - - 0.00 0.00 - - - - - - - - - 0.00 0.00 - - - - - - - - - - - - - -
1.17.(2b) Pengujian tingkat getaran kendaraan bermotor Buah 520,000 9.0 4,680,000.00 0.01 - - - 0.00 0.00 - - - - - - - - - - - - - - - - 0.00 0.00 - - - - - - - - - 0.00 0.00 - - - - - - - - - - - - - - %
1.17.(3a) Pengujian NoX Buah 300,000 9.0 2,700,000.00 0.01 - - - 0.00 0.00 - - - - - - - - - - - - - - - - 0.00 0.00 - - - - - - - - - 0.00 0.00 - - - - - - - - - - - - - -
1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 350,000 9.0 3,150,000.00 0.01 - - - 0.00 0.00 - - - - - - - - - - - - - - - - 0.00 0.00 - - - - - - - - - 0.00 0.00 - - - - - - - - - - - - - -
1.17.(3c) Pengujian Karbondioksida (CO2) Buah 360,000 9.0 3,240,000.00 0.01 - - - 0.00 0.00 - - - - - - - - - - - - - - - - 0.00 0.00 - - - - - - - - - 0.00 0.00 - - - - - - - - - - - - - -
1.17.(3d) Pengujian Hidro Carbon (HC)-CH4 Buah 350,000 9.0 3,150,000.00 0.01 - - - 0.00 0.00 - - - - - - - - - - - - - - - - 0.00 0.00 - - - - - - - - - 0.00 0.00 - - - - - - - - - - - - - -
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 300,000 9.0 2,700,000.00 0.01 - - - 0.00 0.00 - - - - - - - - - - - - - - - - 0.00 0.00 - - - - - - - - - 0.00 0.00 - - - - - - - - - - - - - -
1.17.(3g) Pengujian Timah Hitam (Pb) Buah 360,000 9.0 3,240,000.00 0.01 - - - 0.00 0.00 - - - - - - - - - - - - - - - - 0.00 0.00 - - - - - - - - - 0.00 0.00 - - - - - - - - - - - - -
1.19 Keselamatan dan Kesehatan Kerja LS 22,730,000 1.0 22,730,000.00 0.07 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - - - - - - - - - - - - - -
1.21 Manajemen Mutu LS 127,500,000 1.0 127,500,000.00 0.38 - 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 - - 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 - - - - - - - - - - - - - -
0 DIVISI 2. DRAINASE 0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 38,371 133.2 5,111,049.59 0.02 - - - - - - - - - - 0.00 0.00 0.00 0.00 0.00 0.00 - - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - - - - - - - - - - - - - - - - - - - - -
2.2.(1) Pasangan Batu dengan Mortar M3 1,146,998 100.8 115,617,398.32 0.34 - - - - - - - - - - - - - - - - - - - - 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 - - - - - - - - - - - - -
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK 0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3.1.(1) Galian Biasa M3 11,614 1,505.6 17,486,053.88 0.05 - - - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - - - - - - - - - - - - - - - - - - - - - - - -
3.1.(7) Galian Perkerasan Beraspal dengan Cold Milling Machine M3 570,478 50.0 28,523,903.66 0.08 - - - 0.01 0.01 0.01 0.01 0.01 0.01 0.01 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 367,148 98.6 36,200,767.66 0.11 - - 0.00 0.00 0.00 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.00 0.00 0.00 - - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - - - - - - - - - - - - - -
3.2.(1a) Timbunan Biasa dari sumber galian M3 121,800 347.3 42,300,049.50 0.12 - - - - - - - - - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.01 0.00 - - - - - - - - - - - - - %
3.3.(1) Penyiapan Badan Jalan M2 2,617 360.0 942,273.38 0.00 - 0.00 0.00 0.00 0.00 0.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
0 DIVISI 5. PERKERASAN BERBUTIR 0 - - - - - - - - - - - - - - - - - - - - - - - - - - -U ON- - - - - - - - - - - - - - - - - - - - - - - - -
5.1.(1) Lapis Pondasi Agregat Kelas A M3 613,116 846.0 518,696,072.21 1.53 - - - - - - 0.03 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.18 0.15 - - 0.05 0.05 0.05 0.05 0.05 0.05 - - - - - - - - - - - - - - - - - - - - - - - -
5.1.(3) Lapis Pondasi Agregat Kelas S M3 394,516 3,087.0 1,217,869,774.31 3.59 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.59 0.59 0.59 0.59 0.59 0.59 - - - 0.05 0.03 - - - - - - - - - -

U
0 DIVISI 6. PERKERASAN ASPAL 0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter 10,704 3,082,889.07 0.01

M
288.0 - - - - - - - - - - - - - - - - - - - - - 0.00 0.00 0.00 0.00 0.00 0.00 - - - - - - - - - - - - - - - - - - - - - - -
6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 14,895 30,174.0 449,446,419.63 1.33 - - - - - - - - - - - - 0.06 0.06 0.06 0.06 - - 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.01 0.01 - - - - - - - - - - -
6.3(5a) Laston Lapis Aus (AC-WC) Ton 1,502,565 250.6 376,482,718.71 1.11 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 - - - - - -
6.3(6a) Laston Lapis Antara (AC-BC) Ton 1,450,377 375.8 545,109,678.07 1.61 - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 - - - - - - - - - - - - -
6.3(7a) Laston Lapis Fondasi (AC-Base) Ton 1,294,847 202,773,074.07 0.60

U
156.6 - - - - - - - - - - - - - - - - - - - - - 0.10 0.10 0.10 0.10 0.10 0.10 - - - - - - - - - - - - - - - - - - - - - - -
6.3.(8) Bahan anti pengelupasan Kg 67,980 149.6 10,171,847.40 0.03 - - - - - - - - - - - - - - - - - - - - - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - - - - -

N
6.5.(1) Laston Lapis Aus Asbuton (AC-WC Asb) Ton 1,541,347 3,698.4 5,700,519,095.29 16.83 - - - - - - - - - - - - - - - - - - - - - - - - - - 2.06 2.06 2.06 1.85 1.85 1.85 1.78 1.69 1.64 - - - - - - - - - - - -
6.5.(2) Laston Lapis Antara Asbuton (AC-BC Asb) Ton 1,450,379 13,218,220,319.48 39.02

O
9,113.6 - - - - - - - - - - - - - - - - - - 0.65 3.41 3.64 4.61 5.04 6.87 6.74 5.60 2.46 - - - - - - - - - - - - - - - - - - - -
6.5.(3) Laston Lapis Fondasi Asbuton (AC-Base Asb) Ton 1,332,164 313.2 417,233,895.20 1.23 - - - - - - - - - - - - 0.18 0.18 0.18 0.20 - - 0.24 0.23 - - - - - - - - - - - - - - - - - - - - - - - - - - -
0 DIVISI 7. STRUKTUR 0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
7.1 (6a) Beton struktur, fc’25 Mpa M3 2,017,104 60.0 121,026,224.43 0.36 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.05 0.05 0.05 0.05 0.05 0.05 0.05 -
7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 1,206,689 2,141.6 2,584,257,229.29 7.63 - - - - - - - 0.15 0.15 0.15 0.15 0.20 0.20 0.20 0.26 0.26 - - 0.26 0.26 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.26 0.26 0.26 0.23 0.23 0.13 - - - - - - - - - - -
%
0 DIVISI 8. REHABILITASI JEMBATAN 0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
8.3.(2a) Pengecetan dekoratif pada elemen struktur beton, tebal : 100 µm M2 76,978 459.6 35,377,430.04 0.10 - - - - - - - - - - - - - - 0.01 0.01 - - 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 - - - - - - - - - - - - - - -
8.7.(1a) Pengecatan struktur baja pada daerah kering tebal 80 mikron M2 96,121 52.5 5,044,430.65 0.01 - - - - - - - - - - - 0.00 0.00 0.00 0.00 0.00 - - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - - - - - - - - - - - - - -
8.7.(3a) Pengecatan pada elemen sandaran dan/atau pagar pengaman (gruard rail) 80 mikron M2 108,149 130.4 14,103,733.12 0.04 - - - - - - - - - - - - - 0.00 0.00 0.00 - - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - - - - - - - - - - - -
8.11.(1) Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic Plug M1 1,794,874 76.0 136,410,395.18 0.40 - - - - - - - - - - - - - - - - - - 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 - - - - - - - - - - - - -
DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN 0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
9.1.(1) Mandor Jam 33,732 250.0 8,432,990.67 0.02 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - - - - - - - - - - - - - - - - - - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - - - - - - - 0.00 0.00 0.00 0.00 0.00 0.00 -
9.1.(2) Pekerja Biasa Jam 20,198 250.0 5,049,479.98 0.01 - - - - - - - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - 0.00 - - - - - - - - - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - - - - - - - 0.00 0.00 0.00 0.00 0.00 - -
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 277,047 270.0 74,802,723.31 0.22 - - - - - - - 0.01 0.01 0.01 0.01 0.01 - - - - - - - - - - - - - - - - 0.01 0.01 0.03 0.03 0.03 0.02 0.02 0.02 - - - - - - - 0.01 0.01 0.01 0.01 0.01 - -
9.1.(8) Motor Grader min 100 PK Jam 424,539 270.0 114,625,564.00 0.34 - 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 - - - - - - - - - - - - - - - - - 0.01 0.01 0.01 0.03 0.03 0.03 0.01 0.01 0.01 - - - - - - - - 0.01 0.01 0.01 0.03 0.03 0.03 -
9.1.(11) Alat Penggali (Excavator) 80 - 140 PK Jam 525,859 200.0 105,171,806.39 0.31 - - - - - - - 0.01 0.01 0.01 0.01 0.01 - - - - - - - - - -
m
M m M
R m m m G

m %
R m M
m M
D K R AAN M HARAAN K N R A
G m M
M M
M
M
C m M
C m H m D M
C m H m D M
m
m R m
m D M
m M

O R NC N R M NGGU
UMU R NC N R M NGGU
O R R M NGGU
UMU R R M NGGU
P F
D O REF D O
PE ABAT PEMBUAT KOM TMEN REF KONTRAKTOR PELAKSANA
PPK PROP NS R AU PT DONNY PUTRA MAND R
REF

REF REF M ASB EFEND ST


REF REF G S
PROGRAM MUTU / JADWAL PENGENDALIAN MUTU

Nama Paket : Muara Lembu - Batas Prov. Sumbar


NO. PAKET : PPK 2.5
Prop/ Kab/Kodya : Riau
Panjang Jalan :
Satker : Pelaksanaan Jalan Nasional Wilayah II Provinsi Riau

NO JENIS PEKERJAAN 0 Pemel

BULAN
Tahapan Kegiatan Pengujian BULAN KE 1 BULAN KE 2 BULAN KE 3 BULAN KE 4 BULAN KE 5 BULAN KE 6 BULAN KE 7 BULAN KE 8 BULAN KE 9 BULAN KE 10 BULAN KE 11 KE 12 44,536
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45
1 2 3 4 5
1 DRAINASE
Persiapan: 1. Material ada di Base Camp
2. Dapat Pesetujuan
Pelaksanaan: 1. Pengakutan Material
2. Pemasangan Material
Penyelesaian: 1. Pengukuran Hasil Kerja
2 PEKERJAAN TANAH
Persiapan: 1. Menentukan Material Tanah
2. Mencari Quarry tanah/Pasir
3. Pemeriksaan Tanah
Pelaksanaan: 1. Penimbunan
2. Quality Kontrol
Penyelesaian: 1. Tes Kepadatan
3 PERKERASAN BERBUTIR
Persiapan: 1. Material ada di Base Camp
2. Job Mix Desain
3. Dapat Pesetujuan
Pelaksanaan: 1. Agregat Campuran
2. Penghamparan Agregat
3. Pemadatan
4. Quality Control
Penyelesaian: 1. Ukur Ketebalan
2. Tes Kepadatan
4 PEKERJAAN ASPAL
Persiapan: 1. Material ada Di Base Camp
2. Job Mix Desain
3. mengadakan Trial hotmix
Pelaksanaan: 1. Temperatur
2. Droping Hotmix
3. Pemadatan
Penyelesaian: 1. kepadatan Material
2. Ukur Ketebalan
5 STRUKTUR
Persiapan: 1. Material ada di base Camp
2. Job Mix Desain
Pelaksanaan: 1. Membuat Gambar Kerja
2. Job Perancah/Mal
3. Campuran harus sesuai
4. Quality Control
Penyelesaian: 1. Pembersihan Perancah/Mal
2. Pengukuran Hasil Kerja
3. Pengetesan Mutu Beton
REKAPITULASI TOTAL
PERKIRAAN HARGA PEKERJAAN (SPEK 2018 REV-2)

Paket Pekerjaan : Preservasi Jalan Nasional Provinsi Riau


No. Paket : PPK 2.5 Rutin Kondisi Jalan 34.92 Km
Ruas Jalan : Muara Lembu - Batas Prov. Sumbar Penunjangan/Holding 18.80 Km
Panjang Jalan : 60.42 KM Rehabilitasi Mayor Jalan 6.70 Km
Nama Penyedia PT. DONNY PUTRA MANDIRI Penanganan Longsor 0.19 Km
Penanganan Drainase 1.35 Km
Pemeliharaan Berkala Jembatan 116.30 M

Lingkup Pekerjaan

Penanganan Drainase Rehabilitasi Mayor Jalan Penanganan Longsor Pemeliharaan Rutin Kondisi Penunjangan Jalan / Holding Pemeliharaan Berkala Jembatan Bobot Harga
No Divisi Uraian Pekerjaan Jumlah Harga (Rp.)
(%)
Harga Per Divisi Bobot Harga Per Divisi Bobot Harga Per Divisi Bobot Harga Per Divisi Bobot Harga Per Divisi Bobot Harga Per Divisi Bobot
1 Umum - - 353,055,000.00 1.042 - 68,790,000.00 0.203 421,845,000.00 1.25
2 Pekerjaan Drainase 120,728,447.90 0.356 - - - - - - - - - - 120,728,447.90 0.36
3 Pekerjaan Tanah dan Geosintetik - - 55,724,458.42 0.164 58,126,720.91 0.172 3,689,834.84 0.011 7,912,033.90 0.023 - - 125,453,048.07 0.37
4 Pekerjaan Prevenntif - - - - - - - - -
5 Pekerasan Berbutir dan Perkerasan Beton Semen - - 1,560,948,871.28 4.607 175,616,975.24 0.518 - - - - - 1,736,565,846.52 5.13
6 Perkerasan Aspal - - 19,764,506,931.40 58.337 1,158,533,005.54 3.420 - - - - - - 20,923,039,936.94 61.76
7 Struktur - - 2,705,283,453.72 7.985 - - - - - 2,705,283,453.72 7.98
8 Rehabilitasi Jembatan - - - - - - 190,935,988.99 0.564 190,935,988.99 0.56
9 Pekerjaan Harian dan Pekerjaan Lain Lain - - 296,569,217.80 0.875 349,876,150.49 1.033 249,557,106.46 0.737 433,764,184.56 1.280 5,446,858.19 0.016 1,335,213,517.49 3.94
10 Pemeliharaan Rutin Kinerja 1,753,935,617.18 5.177 798,883,567.68 2.358 - - 1,822,173,029.97 5.378 1,483,773,806.09 4.380 461,835,947.41 1.363 6,320,601,968.33 18.66
-
-
-
a Harga Konstruksi 1,874,664,065.08 5.533 22,829,688,046.58 67.385 4,447,436,305.89 13.127 2,075,419,971.26 6.126 1,925,450,024.56 5.683 727,008,794.59 2.146 33,879,667,207.97 100.00
(T = A + B + C+D+E+F) 33,879,667,207.97
c Bobot Tertimbang (a/b)x100% 5.533 67.385 13.127 6.126 5.683 2.146 100.00
d Pajak Pertambahan Nilai (PPN) = 10%xT 187,466,406.51 2,282,968,804.66 444,743,630.59 207,541,997.13 192,545,002.46 72,700,879.46 3,387,966,720.80
e Total Harga + PPN = b + d 2,062,130,471.59 25,112,656,851.23 4,892,179,936.48 2,282,961,968.39 2,117,995,027.01 799,709,674.05 37,267,633,928.76
f Dibulatkan 2,062,130,471.59 25,112,656,851.23 4,892,179,936.48 2,282,961,968.39 2,117,995,027.01 799,709,674.05 37,267,633,928.76
- - - - - - -
Terbilang : Tiga Puluh Tujuh Milyar Dua Ratus Enam Puluh Tujuh Juta Enam Ratus Tiga Puluh Tiga Ribu Sembilan Ratus Dua Puluh Delapan 76/100 Rupiah.

- - - - Pekanbaru, 10 Desember 2020


PT. DONNY PUTRA MANDIRI

7,559,487,000.00
5,497,356,528.41

ADHI WIRATAMA
Direktur
DAFTAR KUANTITAS DAN HARGA
SPESIFIKASI UMUM 2018 (REV-3) Rutin Kondisi Jalan 34.923 Km
Paket Pekerjaan : Preservasi Jalan Nasional Provinsi Riau Penunjangan/Holding 18.8 Km
No. Paket : PPK 2.5 Rehabilitasi Mayor Jalan 6.7 Km
Ruas Jalan : Muara Lembu - Batas Prov. Sumbar Penanganan Longsor 0.19 Km
Panjang Jalan : 60.42 KM Penanganan Drainase 1.35 Km
Nama Penyedia PT. DONNY PUTRA MANDIRI Pemeliharaan Berkala Jembatan 116.3 M

No. Mata Uraian Satuan Harga Pemeliharaan Berkala


Penanganan Drainase Rehabilitasi Mayor Jalan Penanganan Longsor Pemeliharaan Rutin Kondisi Penunjangan Jalan / Holding
Pembayaran Satuan Jembatan
Jumlah Harga (Rupiah)
Jumlah Harga Jumlah Harga Jumlah Harga
(Rupiah) Volume Jumlah Harga (Rp.) Volume Jumlah Harga (Rp.) Volume Volume Volume Jumlah Harga (Rp.) Volume
(Rp.) (Rp.) (Rp.)
a b c d e f g h i j k l m n q r s

DIVISI 1. UMUM
1.2 Mobilisasi
1.2 Mobilisasi (jalan) LS 84,900,000 - 1.00 84,900,000.00 - - - - 84,900,000.00
Mobilisasi (berkala jalan) LS 27,460,000 - - - - - 1.00 27,460,000.00 27,460,000.00
1.8 Manajemen dan Keselamatan Lalu Lintas - - -
1.8.(1) Manajemen dan Keselamatan Lalu Lintas (jalan) LS 79,950,000 - 1.00 79,950,000.00 - - - - 79,950,000.00
1.8.(2) Manajemen dan Keselamatan Lalu Lintas (Berkala Jembatan) LS 18,600,000 - - - - - 1.00 18,600,000.00 18,600,000.00
- - - - - -
1.17 Pengamanan Lingkungan Hidup - - - - - -
1.17.(1a) Pengujian pH Buah 450,000.0 - 9.00 4,050,000.00 - - - - 4,050,000.00
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 460,000.0 - 9.00 4,140,000.00 - - - - 4,140,000.00
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 350,000.0 - 9.00 3,150,000.00 - - - - 3,150,000.00
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 360,000.0 - 9.00 3,240,000.00 - - - - 3,240,000.00
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 355,000.0 - 9.00 3,195,000.00 - - - - 3,195,000.00
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 390,000.0 - 9.00 3,510,000.00 - - - - 3,510,000.00
1.17.(1g) Pengujian Coliform Buah 380,000.0 - 9.00 3,420,000.00 - - - - 3,420,000.00
1.17.(1h) Pengujian E. Coli Buah 350,000.0 - 9.00 3,150,000.00 - - - - 3,150,000.00
1.17.(1i) Pengujian Destruksi Cu, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn Buah 350,000.0 - 9.00 3,150,000.00 - - - - 3,150,000.00
1.17.(1j) Pengujian Temperatur (Suhu) Buah 350,000.0 - 9.00 3,150,000.00 - - - - 3,150,000.00
1.17.(2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Kesehatan Buah 410,000.0 - 9.00 3,690,000.00 - - - - 3,690,000.00
1.17.(2b) Pengujian tingkat getaran kendaraan bermotor Buah 520,000.0 - 9.00 4,680,000.00 - - - - 4,680,000.00
1.17.(3a) Pengujian NoX Buah 300,000.0 - 9.00 2,700,000.00 - - - - 2,700,000.00
1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 350,000.0 - 9.00 3,150,000.00 - - - - 3,150,000.00
1.17.(3c) Pengujian Karbondioksida (CO2) Buah 360,000.0 - 9.00 3,240,000.00 - - - - 3,240,000.00
1.17.(3d) Pengujian Hidro Carbon (HC)-CH4 Buah 350,000.0 - 9.00 3,150,000.00 - - - - 3,150,000.00
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 300,000.0 - 9.00 2,700,000.00 - - - - 2,700,000.00
1.17.(3g) Pengujian Timah Hitam (Pb) Buah 360,000.0 - 9.00 3,240,000.00 - - - - 3,240,000.00
- - - - - -
1.19 Keselamatan dan Kesehatan Kerja - - - - - -
1.19 Keselamatan dan Kesehatan Kerja LS 22,730,000 - - - - - 1.00 22,730,000.00 22,730,000.00
- - - - - -
1.21 Manajemen Mutu - - - - - -
1.21 Manajemen Mutu LS 127,500,000 - 1.00 127,500,000.00 - - - - 127,500,000.00

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) - 353,055,000.00 - - - 68,790,000.00 421,845,000.00

DIVISI 2. DRAINASE -
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 38,371.24 133.20 5,111,049.59 - - - - - 5,111,049.59
2.2.(1) Pasangan Batu dengan Mortar M3 1,146,998.00 100.80 115,617,398.32 - - - - - 115,617,398.32

Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 120,728,447.90 - - - - - 120,728,447.90

DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK -


3.1.(1) Galian Biasa M3 11,613.70 - 1,505.64 17,486,053.88 - - - 17,486,053.88
3.1.(7) Galian Perkerasan Beraspal dengan Cold Milling Machine M3 570,478.07 - 50.00 28,523,903.66 - - - - 28,523,903.66
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 367,147.74 - 67.00 24,598,898.91 - 10.05 3,689,834.84 21.55 7,912,033.90 - 36,200,767.66
3.2.(1a) Timbunan Biasa dari sumber galian M3 121,800.37 - 21.36 2,601,655.84 325.93 39,698,393.65 - - - 42,300,049.50
3.3.(1) Penyiapan Badan Jalan M2 2,617.43 - 360.00 942,273.38 - - - 942,273.38

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) - 55,724,458.42 58,126,720.91 3,689,834.84 7,912,033.90 - 125,453,048.07

DIVISI 4. PEKERJAAN PREVENTIF

Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) - - - - - - -
DIVISI 5. PERKERASAN BERBUTIR -
5.1.(1) Lapis Pondasi Agregat Kelas A M3 613,115.92 - 603.00 369,708,902.53 243.00 148,987,170 - - - 518,696,072.21
5.1.(3) Lapis Pondasi Agregat Kelas S M3 394,515.64 - 3,019.50 1,191,239,968.75 67.50 26,629,806 - - - 1,217,869,774.31

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) - 1,560,948,871.28 175,616,975.24 - - - 1,736,565,846.52

DIVISI 6. PERKERASAN ASPAL


6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter 10,704.48 - - 288.00 3,082,889.07 - - - 3,082,889.07
6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 14,895.16 - 28,770.00 428,533,621.43 1,404.00 20,912,798.21 - - - 449,446,419.63
6.3(5a) Laston Lapis Aus (AC-WC) Ton 1,502,565.13 - - 250.56 376,482,718.71 - - - 376,482,718.71
6.3(6a) Laston Lapis Antara (AC-BC) Ton 1,450,376.96 - - 375.84 545,109,678.07 - - - 545,109,678.07
6.3(7a) Laston Lapis Fondasi (AC-Base) Ton 1,294,847.22 - - 156.60 202,773,074.07 - - - 202,773,074.07
6.3.(8) Bahan anti pengelupasan Kg 67,980.00 - - 149.63 10,171,847.40 - - - 10,171,847.40
6.5.(1) Laston Lapis Aus Asbuton (AC-WC Asb) Ton 1,541,347.37 - 3,698.40 5,700,519,095.29 - - - - 5,700,519,095.29
6.5.(2) Laston Lapis Antara Asbuton (AC-BC Asb) Ton 1,450,379.30 - 9,113.63 13,218,220,319.48 - - - - 13,218,220,319.48
6.5.(3) Laston Lapis Fondasi Asbuton (AC-Base Asb) Ton 1,332,164.42 - 313.20 417,233,895.20 - - - - 417,233,895.20

Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) - 19,764,506,931.40 1,158,533,005.54 - - - 20,923,039,936.94

DIVISI 7. STRUKTUR
7.1 (6a) Beton struktur, fc’25 Mpa M3 2,017,103.74 - - 60.00 121,026,224.43 - - - 121,026,224.43
7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 1,206,689.00 - - 2,141.61 2,584,257,229.29 - - - 2,584,257,229.29

Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) - - 2,705,283,453.72 - - - 2,705,283,453.72

DIVISI 8. REHABILITASI JEMBATAN


8.3.(2a) Pengecetan dekoratif pada elemen struktur beton, tebal : 100 µm M2 76,977.74 - - - - - 459.58 35,377,430.04 35,377,430.04
8.7.(1a) Pengecatan struktur baja pada daerah kering tebal 80 mikron M2 96,121.01 - - - - - 52.48 5,044,430.65 5,044,430.65
8.7.(3a) Pengecatan pada elemen sandaran dan/atau pagar pengaman (gruard rail) 80 mikron M2 108,149.17 - - - - - 130.41 14,103,733.12 14,103,733.12
8.11.(1) Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic Plug M1 1,794,873.62 - - - - - 76.00 136,410,395.18 136,410,395.18
- - - - - -

Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) - - - - - 190,935,988.99 190,935,988.99

DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN


9.1.(1) Mandor Jam 33,731.96 - - - 100.00 3,373,196.27 150.00 5,059,794.40 - 8,432,990.67
9.1.(2) Pekerja Biasa Jam 20,197.92 - - - 100.00 2,019,791.99 150.00 3,029,687.99 - 5,049,479.98
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 277,047.12 - - - 150.00 41,557,068.51 120.00 33,245,654.81 - 74,802,723.31
9.1.(8) Motor Grader min 100 PK Jam 424,539.13 - - - 150.00 63,680,868.89 120.00 50,944,695.11 - 114,625,564.00
9.1.(11) Alat Penggali (Excavator) 80 - 140 PK Jam 525,859.03 - - - 100.00 52,585,903.19 100.00 52,585,903.19 - 105,171,806.39
9.1.(14) Penggilas Bervibrasi 5 - 8 Ton Jam 485,794.78 - - - 150.00 72,869,217.06 120.00 58,295,373.65 - 131,164,590.70
9.2.(1) Marka Jalan Termoplastik M2 130,326.90 - 2,113.65 275,465,446.16 141.75 18,473,837.67 78.75 10,263,243.15 1,732.50 225,791,349.31 - 529,993,876.29
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade Buah 801,954.35 - 8.00 6,415,634.80 4.00 3,207,817.40 4.00 3,207,817.40 6.00 4,811,726.10 - 17,642,995.71
9.2.(5) Patok Pengarah Buah 340,428.64 - 30.00 10,212,859.10 120.00 40,851,436.40 - - 16.00 5,446,858.19 56,511,153.69
9.2.(6a) Patok Kilometer Buah 639,325.39 - 7.00 4,475,277.74 - - - - 4,475,277.74
9.2.(7) Rel Pengaman M 1
672,319.87 - - 300.00 201,695,961.21 - - - 201,695,961.21
9.2.(22a) Stabilisasi dengan Tanaman M 2
38,065.38 - - 2,250.00 85,647,097.80 - - - 85,647,097.80

Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) - 296,569,217.80 349,876,150.49 249,557,106.46 433,764,184.56 5,446,858.19 1,335,213,517.49

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA


10.1.(1) Galian pada Saluran Air atau Lereng untuk Pemeliharaan M3 127,415.12 - 16.24 2,069,221.55 - 46.40 5,912,061.56 116.00 14,780,153.89 - 22,761,437.00
10.1.(3) Pebaikan Pasangan Batu dengan Mortar M3 1,206,508.24 - 6.80 8,204,256.04 - 13.24 15,974,169.11 13.60 16,408,512.07 - 40,586,937.22
10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M 3
690,732.85 - 100.50 69,418,651.42 - 150.16 103,720,444.74 198.00 136,765,104.28 31.00 21,412,718.35 331,316,918.79
10.1.(6) Perbaikan Lapis Fondasi Agregat Kelas S M 3
501,351.06 - - - 52.38 26,260,768.43 81.00 40,609,435.71 - 66,870,204.14
10.1.(9) Perbaikan Campuran Aspal Panas M3 3,409,317.53 - 171.82 585,788,938.68 - 270.44 922,015,833.88 273.42 932,175,600.13 119.17 406,278,142.57 2,846,258,515.26
10.1.(11) Perbaikan Asbuton Campuran Panas Hampar Dingin M 3
5,206,586.89 - - - 9.14 47,588,204.14 - - 47,588,204.14
10.1.(11) Perbaikan Asbuton Campuran Panas Hampar Dingin (bahan disediakan pengguna jasa) M3 334,245.27 - - - 55.00 18,383,490.00 - - 18,383,490.00
10.1.(19) Pembersihan Patok Buah 21,794.93 - - - 10.00 217,949.30 - 320.00 6,974,377.75 7,192,327.05
10.1.(20) Pembersihan Rambu Buah 21,794.93 - - - 5.00 108,974.65 - 18.00 392,308.75 501,283.40
10.1.(21) Pembersihan Drainase M 13,752.70 - - - 1,200.00 16,503,234.15 - - 16,503,234.15
10.1.(22) Pengendalian Tanaman (jalan) M2 577.50 - 231,000.00 133,402,500.00 - 1,152,360.00 665,487,900.00 594,000.00 343,035,000.00 - 1,141,925,400.00
10.1.(22) Pengendalian Tanaman (jembatan) M2 984.50 - - - - - 27,200.00 26,778,400.00 26,778,400.00
SKh-1.9.4.(1) Galian untuk Selokan Drainase dan Saluran Air dengan Padat Karya M3 82,714.13 1,548.00 128,041,478.08 - - - - - 128,041,478.08
SKh-1.9.4.(2) Pasangan Batu dengan Mortar dengan Padat Karya M3 1,575,478.82 1,032.00 1,625,894,139.10 - - - - - 1,625,894,139.10

Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 1,753,935,617 798,883,568 - 1,822,173,030 1,483,773,806 461,835,947 6,320,601,968
Pasangan Batu dengan Mortar 100.80
Pebaikan Pasangan Batu dengan Mortar 33.64
Pasangan Batu dengan Mortar dengan Padat Karya 1,032.00
1,166.44 M3

Lapis Pondasi Agregat Kelas A 846.00 479.66 1,325.66 m3


Lapis Pondasi Agregat Kelas S 3,087.00 133.38 3,220.38 m3

ASPAL
Laston Lapis Aus (AC-WC) 250.56
Laston Lapis Antara (AC-BC) 375.84
Laston Lapis Fondasi (AC-Base) 156.60
Perbaikan Campuran Aspal Panas 834.85 2.30 1,920.15
aspal 2,703.15 ton

ASBUTON
Laston Lapis Aus Asbuton (AC-WC Asb) 3,698.40
Laston Lapis Antara Asbuton (AC-BC Asb) 9,113.63
Laston Lapis Fondasi Asbuton (AC-Base Asb) 313.20
13,125.23 TON 393.76 ASBUTON BUTIR

Perbaikan Asbuton Campuran Panas Hampar Dingin 9.14 2.30 21.02


Perbaikan Asbuton Campuran Panas Hampar Dingin (bahan disediakan pengguna jasa) 55.00 2.30 126.50
147.52

Beton struktur, fc’25 Mpa 60.00

Bronjong dengan kawat yang dilapisi Galvanis 2,141.61 M3 1,070.81 UNIT

Marka Jalan Termoplastik 4,066.65

Pengendalian Tanaman (jalan) 1,977,360.00


Pengendalian Tanaman (jembatan) 27,200.00
HPP PEKANBARU

1 HPP HOTMIX AC BASE PER TON

MATERIAL ASPAL AC BASE 94.9% x Rp 250,000 = Rp 237,250


BIAYA PENYUSUTAN AMP = Rp 120,000
BIAYA TRANSPORT (± JAUH, DEKAT) = Rp 100,000
BIAYA HAMPAR (SEWA ALAT, UPAH HAMPAR) Rp 100,000 = Rp 75,000
BBM AMP SOLAR INDUSTRI (PEMBAKARAN) 18 LTR x Rp 10,000 = Rp 180,000
ASPAL 51 KG x Rp 8,000 = Rp 408,000
TOTAL = Rp 1,120,250
CATATAN :
HARGA BELUM TERMASUK PPH, DISCONTO, BUNGA BANK

2 HPP HOTMIX AC BC PER TON

MATERIAL ASPAL AC BASE 94.5% x Rp 250,000 = Rp 236,250


BIAYA PENYUSUTAN AMP = Rp 120,000
BIAYA TRANSPORT (± JAUH, DEKAT) = Rp 100,000
BIAYA HAMPAR (SEWA ALAT, UPAH HAMPAR) Rp 100,000 = Rp 75,000
BBM AMP SOLAR INDUSTRI (PEMBAKARAN) 18 LTR x Rp 10,000 = Rp 180,000
ASPAL 55 KG x Rp 8,000 = Rp 440,000
TOTAL = Rp 1,151,250
CATATAN :
HARGA BELUM TERMASUK PPH, DISCONTO, BUNGA BANK

3 HPP HOTMIX AC WC PER TON

MATERIAL ASPAL AC BASE 94.2% x Rp 250,000 = Rp 235,500


BIAYA PENYUSUTAN AMP = Rp 120,000
BIAYA TRANSPORT (± JAUH, DEKAT) = Rp 100,000
BIAYA HAMPAR (SEWA ALAT, UPAH HAMPAR) Rp 100,000 = Rp 75,000
BBM AMP SOLAR INDUSTRI (PEMBAKARAN) 18 LTR x Rp 10,000 = Rp 180,000
ASPAL 58 KG x Rp 8,000 = Rp 464,000
TOTAL = Rp 1,174,500
HPP PEKANBARU

1 HPP HOTMIX AC BASE ASB PER TON

MATERIAL ASPAL AC BASE 92.9% x Rp 250,000 = Rp 232,250


BIAYA PENYUSUTAN AMP = Rp 120,000
BIAYA TRANSPORT (± JAUH, DEKAT) = Rp 100,000
BIAYA HAMPAR (SEWA ALAT, UPAH HAMPAR) Rp 100,000 = Rp 75,000
BBM AMP SOLAR INDUSTRI (PEMBAKARAN) 18 LTR x Rp 10,000 = Rp 180,000
ASB 25 KG x Rp 3,700 = Rp 92,500
ASPAL 46 KG x Rp 8,000 = Rp 368,000
TOTAL = Rp 1,167,750
CATATAN :
HARGA BELUM TERMASUK PPH, DISCONTO, BUNGA BANK

2 HPP HOTMIX AC BC PER TON

MATERIAL ASPAL AC BASE 92.1% x Rp 250,000 = Rp 230,250


BIAYA PENYUSUTAN AMP = Rp 120,000
BIAYA TRANSPORT (± JAUH, DEKAT) = Rp 100,000
BIAYA HAMPAR (SEWA ALAT, UPAH HAMPAR) Rp 100,000 = Rp 75,000
BBM AMP SOLAR INDUSTRI (PEMBAKARAN) 18 LTR x Rp 10,000 = Rp 180,000
ASB 25 KG x Rp 3,700 = Rp 92,500
ASPAL 48 KG x Rp 8,000 = Rp 384,000
TOTAL = Rp 1,181,750
CATATAN :
HARGA BELUM TERMASUK PPH, DISCONTO, BUNGA BANK

3 HPP HOTMIX AC WC PER TON

MATERIAL ASPAL AC BASE 91.8% x Rp 250,000 = Rp 229,500


BIAYA PENYUSUTAN AMP = Rp 120,000
BIAYA TRANSPORT (± JAUH, DEKAT) = Rp 100,000
BIAYA HAMPAR (SEWA ALAT, UPAH HAMPAR) Rp 100,000 = Rp 75,000
BBM AMP SOLAR INDUSTRI (PEMBAKARAN) 18 LTR x Rp 10,000 = Rp 180,000
ASB 25 KG x Rp 3,700 = Rp 92,500
ASPAL 51 KG x Rp 8,000 = Rp 408,000
TOTAL = Rp 1,205,000
TABEL BIAYA PADAT KARYA

Paket Pekerjaan : Preservasi Jalan Nasional Provinsi Riau


No. Paket : PPK 2.5
Ruas Jalan : Muara Lembu - Batas Prov. Sumbar
Panjang Jalan : 60.42 KM
Satker : Pelaksanaan Jalan Nasional Wilayah II Provinsi Riau
Nama Penyedia PT. DONNY PUTRA MANDIRI

Uraian Satuan Harga


Pembayaran Satuan Volume Jumlah Harga (Rupiah) Keterangan
(Rupiah)

2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 38,371.24 150.00 5,755,686.47
2.2.(1) Pasangan Batu dengan Mortar M3 1,146,998.00 100.00 114,699,799.92
10.1.(21) Pembersihan Drainase M 13,752.70 2,000.00 27,505,390.25 Biaya upah sesuai
10.1.(22) Pengendalian Tanaman (jalan) M2 577.50 1,746,360.00 1,141,925,400.00 dengan UMR Propinsi
Riau
10.1.(22) Pengendalian Tanaman (jembatan) M2 984.50 27,200.00 26,778,400.00
SKh-1.9.4.(1) Galian untuk Selokan Drainase dan Saluran Air dengan Padat Karya M3 82,714.13 1,548.00 128,041,478.08
SKh-1.9.4.(2) Pasangan Batu dengan Mortar dengan Padat Karya M3 1,575,478.82 1,032.00 1,625,894,139.10

total 2,950,144,807 -
DAFTAR
HARGA DASAR SATUAN BAHAN
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)

1 Pasir Pasang (Sedang) M01b M3 193,800.00 Base Camp


2 Pasir Beton (Kasar) M01a M3 161,800.00 Base Camp
3 Pasir Halus (untuk HRS) M01c M3 150,000.00 Base Camp
4 Pasir Urug (ada unsur lempung) M01d M3 161,800.00 Base Camp
5 Batu Kali M02 M3 335,400.00 Lokasi Pekerjaan
6 Agregat Pecah Kasar M03 M3 360,600.00 Base Camp
7 Agg. Halus LP A M04 M3 153,985.71 Base Camp
8 Agregat Lolos # 1 " M38 M3 187,323.65 Base Camp
9 Lolos screen1 ukuran ( 0 - 5) M89a M3 153,985.71 Base Camp
10 Lolos screen2 ukuran ( 0 - 5) M89b M3 210,985.48 Base Camp
11 Lolos screen2 ukuran ( 5 - 9,5) M89c M3 187,323.65 Base Camp
12 Lolos screen2 ukuran ( 9.5 - 19,0) M89d M3 168,394.19 Base Camp
13 F i l l e r (non semen) (limestone dust, kapur padam, dolomit, fly ash) M05 Kg 600.00 Proses/Base Camp
14 Batu Belah / Kerakal M06 M3 231,200.00 Lokasi Pekerjaan
15 Gravel M07 M3 241,600.00 Base Camp
16 Bahan Tanah Timbunan M08 M3 20,500.00 Borrow Pit/quarry
17 Bahan Pilihan M09 M3 125,000.00 Quarry
18 Aspal M10 Kg 14,470.90 Base Camp
19 Kerosen / Minyak Tanah M11 LITER 13,853.90 Base Camp
20 Semen / PC (50kg) - Zak 72,768.04 zak 50 kg Pekanbaru
21 Semen / PC (kg) M12 Kg 1,455.36
22 Besi Beton M13 Kg 10,000.00 Lokasi Pekerjaan
23 Kawat Beton M14 Kg 16,000.00 Lokasi Pekerjaan
24 Kawat Bronjong M15 Kg 12,000.00 Lokasi Pekerjaan
25 Sirtu M16 M3 140,000.00 Lokasi Pekerjaan
26 S i r t u (4 ≤ PI ≤10 ; LL ≤ 35 %) M3 140,000.00
27 S i r t u (4 ≤ PI ≤15 ; LL ≤ 35 %) M3 140,000.00
28 Cat Marka (Non Thermoplas) M17a Kg 35,000.00 Lokasi Pekerjaan
29 Cat Marka (Thermoplastic) M17b Kg 30,000.00 Lokasi Pekerjaan
30 Paku M18 Kg 16,500.00 Lokasi Pekerjaan
31 Kayu Perancah M19 M3 1,700,000.00 Lokasi Pekerjaan
32 Bensin M20 LITER 7,100.00 Pertamina
33 Solar M21 LITER 12,000.00 Pertamina
34 Minyak Pelumas / Oli M22 LITER 35,000.00 Pertamina
35 Plastik Filter M23 M2 18,000.00 Lokasi Pekerjaan
36 Pipa Galvanis Dia. 1.6" M24 Batang 254,000.00 Lokasi Pekerjaan
37 Pipa Porus diameter 4" M25 M' 140,000.00 Lokasi Pekerjaan
39 Agr. Kelas A (analisis) M26 M3 411,100.00 Base Camp
41 Agr. Kelas B (analisis) M27 M3 287,982.92 Base Camp
44 Agr. Kelas S (analisis) M29 M3 271,700.00 Base Camp
45 Lapis Drainase (analisis) M3 222,069.27 Base Camp
46 Geotextile M30 M2 27,500.00 Lokasi Pekerjaan
47 Aspal Emulsi CSS-1 atau SS-1 M31a ltr 14,400.00 Base Camp
48 Aspal Emulsi CRS-1 atau atau RS-1 M31b ltr 16,000.00
49 Gebalan Rumput M32 M2 3,500.00 Lokasi Pekerjaan
50 Thinner M33 LITER 29,000.00 Lokasi Pekerjaan
51 Glass Bead M34 Kg 20,000.00 Lokasi Pekerjaan
52 Pelat Rambu (Eng. Grade) M35a BH 186,000.00 Lokasi Pekerjaan
53 Pelat Rambu (High I. Grade) M35b BH 418,200.00 Lokasi Pekerjaan
54 Rel Pengaman M36 M' 550,000.00 Lokasi Pekerjaan
55 Beton Struktur Fc' 25 Mpa M37 M3 1,833,730.67 Lokasi Pekerjaan
56 Baja Tulangan (Polos) U24 M39a Kg 10,000.00 Lokasi Pekerjaan
57 Baja Tulangan (Ulir) D32 M39b Kg 13,000.00 Lokasi Pekerjaan
58 Kapur M40 M3 38,000.00 Hasil Proses
59 Chipping M41 M3 305,000.00 Base Camp
60 Chipping (kg) M41 Kg 161.82 Base Camp
61 Cat M42 Kg 32,000.00 Base Camp
62 Pemantul Cahaya (Reflector) M43 Bh. 12,800.00 Base Camp
63 Pasir Urug M44 M3 135,500.00 Base Camp
64 Arbocell M45 Kg. 35,000.00 Base Camp
65 Baja Bergelombang M46 Kg 13,000.00 Lokasi Pekerjaan
66 Beton Fc' 10 MPa M47 M3 1,666,946.00 Lokasi Pekerjaan
67 Baja Struktur M48 Kg 30,000.00 Pelabuhan terdekat
68 Dudukan, mur, baut dll M49 Kg 32,000.00 Lokasi Pekerjaan
69 Tiang Pancang Baja M49 M' 25,247.37 Lokasi Pekerjaan
70 Tiang Pancang Beton Pratekan M50 Buah 854,000.00 Lokasi Pekerjaan
71 Kawat Las M51 Dos 16,500.00 Lokasi Pekerjaan
72 Pipa Baja M52 Kg 18,000.00 Pelabuhan terdekat
73 Minyak Fluks M53 Liter 6,500.00 Base Camp
74 Bunker Oil M54 Liter 3,800.00 Base Camp
75 Asbuton Halus M55 Ton 325,000.00 Base Camp
76 Baja Prategang M56 Kg 509,494.60 Base Camp
77 Baja Tulangan M57a Kg 13,070.90 Lokasi Pekerjaan
78 Baja Tulangan Polos BjTP 280 M57a Kg 12,000.00 Lokasi Pekerjaan
79 Baja Tulangan (Ulir) D39 M39c Kg 8,450.00 Lokasi Pekerjaan
80 Baja Tulangan (Ulir) D48 M39d Kg 9,000.00 Lokasi Pekerjaan
81 PCI Girder L=17m M58a Buah 86,000,000 Pelabuhan terdekat
82 PCI Girder L=21m M58b Buah 97,000,000 Pelabuhan terdekat
83 PCI Girder L=26m M58c Buah 124,000,000 Pelabuhan terdekat
84 PCI Girder L=30m M58d Buah 328,000,000 Lokasi Proyek
85 PCI Girder L=36m M58e Buah 168,000,000 Pelabuhan terdekat
86 PCI Girder L=41m M58f Buah 192,000,000 Pelabuhan terdekat
87 Beton Struktur Fc' 30 MPa M59 M3 2,011,397.39 Lokasi Pekerjaan
88 Beton Struktur Fc' 15 MPa M60 M3 1,870,650.31 Lokasi Pekerjaan
89 Cerucuk M61 M 18,000
90 Elastomer M62 buah 320,000
91 Bahan pengawet: kreosot M63 liter 5,000
92 Mata Kucing M64 buah 75,000
93 Anchorage M65 buah 30,569,676
94 Bahan anti pengelupasan M66 Kg 60,000.00
95 Bahan Modifikasi M67 Kg 1,000.00
96 Beton Struktur Fc' 50 MPa M68 M3 2,190,847.45
97 Beton Struktur Fc' 40 MPa M69 M3 2,071,566.70
98 Ducting (Kabel prestress) M70 M' 150,000
99 Ducting (Strand prestress) M71 M' 50,000
100 Beton Fc' 35 MPa M72 M3 2,072,246.05
101 Multipleks 12 mm M73 Lbr 181,500.00
102 Elastomer jenis 1 M74a buah 385,500.00 Base Camp
103 Elastomer jenis 2 M74b buah 650,000.00 Base Camp
104 Elastomer jenis 3 M74c buah 4,346,055.00 Base Camp
105 Expansion Tipe Joint Asphaltic Plug M75d M 1,000,000.00 Base Camp
106 Expansion Join Tipe Rubber M75e M 1,200,000.00 Base Camp
107 Expansion Join Baja Siku M75f M 275,000.00 Base Camp
108 Marmer M76 Buah 400,000.00 Base Camp
109 Kerb Type A M77 Buah 45,000.00 Base Camp
110 Agregat 14 - 20 mm M77 kg 800.00
111 Paving Block M78 Buah 40,000.00 Lokasi Pekerjaan
112 Mini Timber Pile M79 Buah 27,000.00 Lokasi Pekerjaan
113 Expansion Joint Tipe Torma M80 M1 1,200,000.00 Lokasi Pekerjaan
114 Strip Bearing M81 Buah 229,500.00 Lokasi Pekerjaan
115 Joint Socket Pile 35x35 M82 Set 607,500.00 Lokasi Pekerjaan
116 Joint Socket Pile 16x16x16 M83 Set 67,500.00 Lokasi Pekerjaan
117 Mikro Pile 16x16x16 M84 M1 60,750.00 Lokasi Pekerjaan
118 Matras Concrete M85 Buah 405,000.00 Lokasi Pekerjaan
119 Assetilline M86 Botol 229,500.00 Lokasi Pekerjaan
120 Oxygen M87 Botol 114,750.00 Lokasi Pekerjaan
121 Batu Bara M88 Kg 600.00 Lokasi Pekerjaan
122 Pipa Galvanis Dia 3" M24a M 20,000.00
123 Pipa Galvanis Dia 1,5" M24b M 15,000.00
124 Agregat Pecah Mesin 0-5 mm M91 M3 372,800.00
125 Agregat Pecah Mesin 5-10 & 10-20 mm M92 M3 360,600.00
126 Agregat Pecah Mesin 20-30 mm M93 M3 205,977.42
127 Joint Sealent M94 Kg 34,100.00
128 Cat Anti Karat M95 Kg 35,750.00
129 Expansion Cap M96 Kg 6,050.00
130 Polytene 125 mikron M97 Kg 19,250.00
131 Curing Compound M98 Ltr 38,500.00
132 Kayu Acuan M99 Kg 1,700,000.00
133 Additive M67a Kg 38,500.00
134 Casing M100 M2 9,000.00
135 Pasir Tailing M101 M3 259,000.00 Base Camp
136 Polimer M102 45,000.00 Base Camp
137 Batubara M103 kg 500.00 Base Camp
138 Kerb jenis 1 M104 Buah 45,000.00
139 Kerb jenis 2 M105 Buah 50,000.00
140 Kerb jenis 3 M106 Buah 55,000.00
141 Bahan Modifikasi M107 Kg 75,000.00
142 Aditif anti pengelupasan M108 Liter 100,000.00
143 Bahan Pengisi (Filler) Tambahan M109 Kg 1,455.36
144 Asbuton yang diproses M110 Kg 30,000.00
145 Elastomer Alam M111 Kg 30,000.00
146 Elastomer Sintesis M112 Kg 30,000.00
147 Anchorage M113 Buah 255,750.00
148 - hidup M114 bh 750,000.00
149 - mati M115 bh 400,000.00
150 Kabel Prategang M116 Kg 192,256.00
151 - Selongsong M117 M' 98,400.00
152 - Baja Prategang M118 Kg 560,444.06
153 - Grouting M119 M2 6,759.16
158 Dry Epoxy M124 Kg 650,000.00
159 Wet Epoxy M43d Liter 1,045,000.00
160 Cairan Perekat (Epoxy Resin) M125 Kg 171,000.00
161 Epoxy Bahan Penutup (sealant) M126 Kg 73,000.00
162 Alat Penyuntik Anti Gravitasi M127 Kg 18,000.00 alat penyuntik epoxy
164 Anti Korosif Baja M129 Kg 9,000.00
165 Acuan/multipleks M130 M3 17,000.00
167 Pipa Galvanis Dia 8" M132 M 550,000.00
168 Bridging Plate M133 Kg 19,000.00
169 Baut Angkur M134 Kg 35,000.00
176 Bahan Grouting M141 Kg 4,750.00
177 Kayu Kelas 1 M142 Kg 5,000,000.00
179 Timbunan/urugan Porous M144 M3 245,773.23
194 Aspal Pen. 60/70 M31a Liter 14,470.90 Base Camp
195 Aspal Emulsi CRS-1 atau RS-1 M31b Liter 14,470.90 Base Camp
196 Aspal Emulsi Modifikasi Polimer 1h M31c Liter 12,300.00 Base Camp
197 Aspal Emulsi Modifikasi Polimer 2h M31d Liter 12,300.00 Base Camp
198 Serat Selulosa M158 KG 22,500.00 mulai ganti nomor
199 Zeolit M159 KG 6,000.00
200 Wax M160 KG 32,085.00
201 Asbuton B 5/20 M161 KG 4,000.00
202 CPHMA M162 Ton 2,000,000.00
203 Asbuton B 50/20 M163 KG 1,000.00
204 Pasir Kasar M164 M3 195,000.00
205 Road Backer M165 m' 900.00
206 Pipa Porus diameter 5" M25a M' 257,000.00
207 Pipa Porus diameter 6" M25b M' 110,000.00
208 Pipa Porus diameter 8" M25c M' 142,500.00
209 Backer rod 3/8 inci M165 Kg 10,833.33
210 Cairan Perekat (Epoxy Resin) 2 komponen M166 Ltr 350,000.00
211 Semen alumina M167 Kg 13,493.16
212 Semen (OPC) M168 Kg 1,440.00
213 Pasir Kasar M134 M3 195,000.00
214 AK-2 (10/20) M169 M3 235,000.00
215 Air M170 Liter 13.00
216 Super plastiziser, maks 0,3 % Sm M171 Kg 40,000.00
217 curing compound (pigmen putih) M172 Ltr 38,500.00
218 BjTP 280 M173 Kg 8,889.00
219 Concrete Grouting Non srinkage HWR M174 Kg 6,759.16
220 Plastik membrane polyethylene 125 mikron M175 Kg 63,250.00
221 Mortar semen cepat mengeras (RSC) M176 Kg 4,296.30
222 Mortar pre-packed untuk stiching M177 Kg 7,100.00
223 Termoplastik (sealant tuang panas) M178 Kg 28,985.00
224 Backer rod 1 1/6 inci M179 M1 16,554.86
225 Termoseting (sealant tuang dingin) M180 Kg 65,333.33
226 Bahan grouting tersedia jenis preformed M181 Kg 24,722.50
227 Plastizier' M182 Kg 40,000.00
228 Rapid Setting Material (Beton Semen Fast Track < 24 jam) M183 M3 2,799,726.05
229 Thermocouple M184 Buah 25,000.00
230 Beton Struktur fc' 45 MPa M185 M3 2,136,434.77
231 Beton Struktur fc' 15 MPa M186 M4 1,575,738.01
232 Baja Struktur Grade 345 (Kuat Leleh 345 MPa) M187 Kg 17,000.00
233 Baja Struktur Grade 485 (Kuat Leleh 485 MPa) M188 Kg 18,000.00
234 Baja Struktur Grade 690 (Kuat Leleh 690 Mpa untuk Tebal Pelat ≤ 2,5 i M189 Kg 22,000.00
235 Baja Struktur Grade 690 (Kuat Leleh 620 Mpa untuk Tebal Pelat > 2,5 - M190 Kg 19,000.00
236 Casing, diameter 800 mm M191 Rp/M' 42,464.64
237 Bahan turap kayu tanpa pengawetan M192 M3/M' 1,300,000.00
238 Berat H Beam per m' M193 8,789.14
239 Strand 1/2 inci M194 19,182.87
240 Perancah/ formwoks M195 m2 20,000.00
241 Perancah (scaffolding) M195 m2 25,000.00
242 Bahan Turap Kayu dengan pengawetan M196 M3/M' 1,000,000.00
243 Kreosot M197 Kg 10,000.00
244 Bonding Agent M198 Ltr 37,000.00
245 Cat dasar beton M199 Kg 45,000.00
246 Cat akhir protektif beton M200 Kg 95,000.00
247 Cat akhir dekoratif beton M201 Kg 20,000.00
248 Cat dasar baja M202 Kg 28,000.00
249 Cat akhir protektif baja M203 M2 70,000.00
250 FRP jenis E-glass untuk daerah kering M204 M2 650,000.00
251 FRP jenis E-glass untuk daerah basah M205 M2 650,000.00
256 Baut mutu tinggi A325 Tipe 1 diameter M25 M210 Buah 48,000.00
257 Baut Mutu Tinggi A490 Tipe 1 diameter M25 M211 Buah 19,500.00
262 Elektroda Las SAW M216 Kg 15,000.00
269 Baut dan Mur M223 Buah 13,000.00
270 Cat dasar kayu M224 Kg 30,000.00
271 Cat akhir protektif kayu M225 Kg 65,000.00
272 Rubber bitumen M225 Kg 40,000.00
273 Perkerasan beton fast track <8 jam M226 Kg 3,156,719.74
274 Silicon Seal M227 Kg 30,000.00
275 Karet Pengisi Sambungan Strip Seal M228 M' 1,200,000.00
276 Karet Pengisi Sambungan Compression Seal M229 M' 1,200,000.00
277 Sambungan siar muai tipe modular M230 M' 40,000.00
278 Sambungan siar muai tipe finger plate M231 M' 3,500,000.00
281 Landasan logam berongga (Pot Bearing) M234 Buah 3,331,619.28
282 Landasan logam jenis Spherical M235 Buah 4,500,000.00
284 Lem PVC M237 Kg 45,000.00
285 Tiang sandaran baja M238 M' 150,000.00
286 Deck Drain M239 Buah 100,000.00
287 Pipa PVC M240 M' 75,000.00
288 Pipa Baja M241 M' 450,000.00
289 Sambungan Pipa PVC M242 Buah 15,000.00
290 Sambungan Pipa Baja M243 Buah 35,000.00
291 Baja Tulangan (Furnished) M57b Kg 13,676.46
292 Bronjong dengan kawat dilapisi galvanis M15a Kg 25,000.00
293 Bronjong dengan kawat dilapisi PVC M15b Kg 21,000.00
294 Turap Beton M244 Kg 2,072,246.05
295 Tiang Pancang Kayu M245 M3 1,000,000.00
296 Plat sepatu tiang pancang / plat sambung M246 Kg 15,500.00
297 Beton strukutr bervolome besar, fc'30 MPa M247 M3 1,991,919.13
298 Beton struktur bervolume besar, fc’25 Mpa M248 M3 1,931,948.93
299 Beton strukut bervolume besar, fc’20 MPa M249 M3 2,080,044.97
300 Beton strukutr memadat sendiri, fc'30 MPa M250 M3 1,920,763.79
301 Beton struktur memadat sendiri, fc’25 Mpa M251 M3 1,887,204.71
302 Beton strukut memadat sendiri, fc’20 MPa M252 M3 2,065,892.73
303 Beton Fc' 35 MPa M253 M3 2,072,246.05
304 BjTS 280 M254 Kg 17,933.02
305 Asphaltic plug M255 Kg 21,000.00
306 Asphaltic plug Moveable M256 Kg 45,000.00
307 accelerator M256 Kg 17,500.00
308 Insulasi M257 m2 300,000.00
309 Anyaman Kawat Baja Dilas M258 Kg 32,000.00
310 Curing membrane M259 Kg 200,000.00
311 Sambungan siar muai tipe Karet (Preformed T-shape) M260 Kg 40,920.00
312 Bridging Plate PL 125 x 6 M261 Kg 15,500.00
313 Perletakan logam tipe fixed 150 Ton M262 Buah 1,500,000.00
314 Perletakan logam tipe movable 150 Ton M263 Buah 2,000,000.00
315 Elastomer bearing pad; (450x400x45) mm3 M264 Buah 1,071,000.00
316 Beton c 10 MPa M265 M3 1,515,405.45
317 Marmer M266 M2 200,000.00
318 Baja Tulangan Angkur M267 Kg 13,676.5
319 BjTS 420 M268 Kg 17,933.0
320 Grauting berbahan dasar semen M269 Kg 350,000.00
321 Graut berbahan dasar Cellular Plastic M270 Kg 350,000.00
322 Tanah humus M271 M3 140,000.00
323 Pupuk M272 Kg 30,000.00
324 Gebalan/ Rumput M273 M2 30,000.00
325 Tanah Liat M274 M3 90,000.00
326 Pipa Galvanise Dia 6" M275 M 454,000.00
327 Lampu penerangan Jalan Tipe Merkuri 400 Watt M276 Buah 950,000.00
328 Lampu penerangan Jalan Tipe Merkuri 250 Watt M277 Buah 700,000.00
329 Lampu LED 100 watt M278 Buah 2,015,000.00
330 Mortar M279 Kg 27,748.25
331 Paku jalan Tidak Memantul M280 Buah 48,000.00
332 Paku Jalan Memantul Bujur Sangkar M281 Buah 54,000.00
333 Paku Jalan Memantul Persegi Panjang M282 Buah 66,000.00
334 Box 100 cm x 100 cm Tebal 23 cm m1 4,500,000.00
335 Box 150 cm x 150 cm Tebal 25 cm m1 5,500,000.00
HARGA DASAR SATUAN UPAH
HARGA HARGA
No. URAIAN KODE SATUAN YG DIGUNAKAN SATUAN
( Rp.) ( Rp.)

1. Pekerja (L01) Jam 21,428.57 150,000.00


2. Tukang (L02) Jam 25,714.29 180,000.00
3. Mandor (L03) Jam 28,571.43 200,000.00
4. Operator (L04) Jam 28,571.43 200,000.00
5. Pembantu Operator (L05) Jam 25,714.29 180,000.00
6. Sopir / Driver (L06) Jam 25,714.29 180,000.00
7. Pembantu Sopir / Driver (L07) Jam 21,428.57 150,000.00
8. Mekanik (L08) Jam 25,714.29 180,000.00
9. Pembantu Mekanik (L09) Jam 21,428.57 150,000.00
10. Kepala Tukang (L10) Jam 28,571.43 200,000.00
11 Tenaga Ahli Muda S1 (1 Tahun) (L11) Jam 45,714.29 320,000.00
12 Tenaga Ahli Muda S1 (5 Tahun) (L12) Jam 57,142.86 400,000.00
13 CAD / CAM OPERATOR (L16) Jam 28,571.43 200,000.00
14 SOFTWARE PROGRAMMER / IMPLEMENTER (L17) Jam 28,571.43 200,000.00
15 HARDWARE TECHNICIAN (L18) Jam 28,571.43 200,000.00
16 FACILITATOR (L19) Jam 28,571.43 200,000.00
17 SENIOR ASSISTANT PROFESSIONAL STAFF (L20) Jam 45,714.29 320,000.00
18 ASSISTANT PROFESSIONAL STAFF (L21) Jam 40,000.00 280,000.00
19 SPECIAL TECHNICIAN / INSPECTOR (L22) Jam 45,714.29 320,000.00
20 TECHNICIAN (L23) Jam 40,000.00 280,000.00
21 INSPECTOR (L24) Jam 40,000.00 280,000.00
22 SURVEYOR (L25) Jam 28,571.43 200,000.00
KETERANGAN

Sesuai dengan peraturan


dan ketentuan yang
berlaku
(Perpres yg berlaku)
contoh :
UMR Riau Tahun 2020

8,000,000.00
10,000,000.00
5,000,000.00
5,000,000.00
5,000,000.00
5,000,000.00
8,000,000.00
7,000,000.00
8,000,000.00
7,000,000.00
7,000,000.00
5,000,000.00
DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA

BIAYA
No. URAIAN KO HP KAP. HARGA SEWA KET.
DE ALAT ALAT/JAM
(di luar PPN)

1 ASPHALT MIXING PLANT E01 294.0 60.0 T/Jam 5,150,000,000 7,897,081.39


2 ASPHALT FINISHER E02 72.4 10.0 Ton 600,000,000 305,923.51
3 ASPHALT SPRAYER E03 12.0 4,000.0 M2/Jam 34,452,000 83,198.21
4 BULLDOZER 100-150 HP E04 155.0 - - 2,500,000,000 671,311.33
5 COMPRESSOR 4000-6500 L\M E05 75.0 5,000.0 CPM/(L/m) 19,800,000 154,154.52
6 CONCRETE MIXER 0.3-0.6 M3 E06 20.0 500.0 Liter 35,000,000 100,503.95
7 CRANE 10-15 TON E07 138.0 15.0 Ton 1,951,950,000 557,907.57
8 DUMP TRUCK 3 - 4 M3 E08 100.0 4.0 M3 412,164,000 251,861.02
9 DUMP TRUCK 6-8 M3 E09 190.0 8.0 M3 657,472,200 408,698.87
10 EXCAVATOR 80-140 HP E10 133.0 0.9 M3 1,512,291,996 478,053.67
11 FLAT BED TRUCK 3-4 TON E11 100.0 4.0 ton 700,000,000 299,925.39
12 GENERATOR SET E12 180.0 135.0 KVA 238,766,220 325,906.15
13 MINI GENERATOR SET E12 108,635.38
14 MOTOR GRADER >100 HP E13 135.0 10,800.0 - 1,357,070,000 454,708.88
15 TRACK LOADER 75-100 HP E14 70.0 0.8 M3 1,446,438,840 385,944.66
16 WHEEL LOADER 1.0-1.6 M3 E15 96.0 1.5 M3 1,001,000,000 345,037.95
17 THREE WHEEL ROLLER 6-8 T E16 55.0 8.0 Ton 858,675,000 268,484.27
18 TANDEM ROLLER 6-8 T. E17 74.3 6.9 Ton 2,593,690,000 583,042.05
19 TIRE ROLLER 8-10 T. E18 135.0 10.9 Ton 1,332,750,000 450,647.80
20 VIBRATORY ROLLER 5-8 T. E19 82.0 7.1 Ton 1,687,400,000 441,631.62
21 CONCRETE VIBRATOR E20 5.5 25.0 - 4,836,900 64,816.69
22 STONE CRUSHER E21 220.0 60.0 T/Jam 2,910,600,000 849,277.26
23 WATER PUMP 70-100 mm E22 6.0 - - 14,308,500 65,291.53
24 WATER TANKER 3000-4500 L. E23 135.0 4,000.0 Liter 361,318,700 288,433.11
25 PEDESTRIAN ROLLER E24 8.8 835.00 Ton 184,029,301 107,812.01
26 TAMPER E25 1.5 121.00 Ton 11,436,200 61,209.77
27 JACK HAMMER E26 0.0 1,330.00 - 46,000,000 61,967.04
28 FULVI MIXER E27 345.0 2,005.00 - 1,038,114,000 1,009,122.54
29 CONCRETE PUMP E28 150.0 100.00 M3/jam 572,450,000 334,193.14
30 TRAILER 20 TON E29 175.0 20.00 Ton 692,076,000 384,515.74
31 PILE DRIVER + HAMMER E30 25.0 2.50 Ton 1,009,277,500 255,007.67
32 CRANE ON TRACK 35 TON E31 125.0 35.0 Ton 6,379,682,400 1,182,372.01
33 WELDING SET E32 11.0 250.0 Amp 17,500,000 71,370.46
34 BORE PILE MACHINE E33 150.0 2,000.0 Meter 2,250,000,000 588,506.81
35 ASPHALT LIQUID MIXER E34 5.0 1,000.0 Liter 15,000,000 63,577.03
36 TRONTON 15 TON E35 150.0 15.0 Ton 800,000,000 483,622.04
37 COLD MILLING E36 240.0 1,000.0 m 5,330,710,000 1,304,864.21
38 ROCK DRILL BREAKER E37 2.7 0.7 M3 1,038,114,000 525,859.03
39 COLD RECYCLER E38 900.0 2.2 M 7,400,000,000 2,500,155.11
40 HOT RECYCLER E39 400.0 3.0 M 16,000,000,000 3,292,478.22
41 AGGREGAT (CHIP) SPREADER E40 115.0 3.5 M 395,000,000 435,781.96
42 ASPHALT DISTRIBUTOR E41 115.0 4,000.0 Liter 395,000,000 395,399.57
43 SLIP FORM PAVER E42 174.0 7.0 M 13,769,105,700 2,417,111.85
44 CONCRETE PAN MIXER E43 15.4 500.0 Liter 20,988,000 133,542.37
45 CONCRETE BREAKER E44 290.0 20.0 m3/jam 1,038,114,000 652,439.01
46 ASPAHLT TANKER E45 190.0 4,000.0 liter 500,000,000 422,709.85
47 CEMENT TANKER E46 190.0 4,000.0 liter 893,022,000 434,291.30
48 CONCRETE MIXER (350) E47 20.0 350.0 liter 35,000,000 90,806.89
49 VIBRATING RAMMER E48 4.2 80.0 KG 1,037,536,200 455,847.91
50 TRUK MIXER (AGITATOR) E49 220.0 5.0 M3 750,000,000 462,774.65
51 BORE PILE MACHINE E50 125.0 60.0 CM 1,170,000,000 459,514.87
52 CRANE ON TRACK 75-100 TON E51 200.0 75.0 Ton 10,735,042,500 2,104,379.43
53 BLENDING EQUIPMENT E52 50.0 30.0 Ton 576,730,000 235,885.27
54 ASPHALT LIQUID MIXER E34a 40.0 20,000.0 Liter 15,000,000 108,639.53
55 BAR BENDER E53 3.0 0.0 0 26,000,000 64,495.35
56 BAR CUTTER E54 3.0 0.0 0 1,500,000 59,291.80
57 BREAKER E55 170.0 15.0 m3/jam 12,000,000 275,164.54
58 GROUTING PUMP E56 100.0 15.0 Ton 105,000,000 200,569.17
59 JACK HIDROLIC E57 10.0 - - 6,000,000 68,162.63
60 MESIN LAS E58 3.0 0.2 Ton 15,000,000 66,619.59
61 PILE DRIVER LEADER, 75 kw E59 70.0 75.0 kw 600,000,000 165,283.87
62 PILE HAMMER E60 10.0 0.0 0 100 69,910.77
63 PILE HAMMER, 2,5 Ton E61 1.0 2.5 Ton 400,000,000 72,271.74
64 STRESSING JACK E62 89.0 15.0 Ton 300,000,000 224,534.96
65 WELDING MACHINE, 300 A E63 5.0 0.0 0 35,530,000 61,909.81
66 ASPHALT MIXING PLANT (WARM MIE01a 294.0 60.0 T/Jam 5,500,000,000 7,959,876.97
67 ASPHALT MIXING PLANT (MODIFIK E01b 294.0 60.0 T/Jam 5,500,000,000 7,959,876.97
68 TANDEM ROLLER 8-10 T. E17a 100.0 10.0 Ton 1,550,000,000 441,862.85
70 TRAILER TRONTON 30 T; 200 HP E35a 386,887.65
71 MINI EXCAVATOR 40-60 HP E10a 50.0 0.2 M3 450,000,000 239,134.65
72 BABY VIBRATORY ROLLER 1-2 T. E19a 7.6 1.5 Ton 120,000,000 96,752.08
73 WATER JET BLASTING E64 6.5 100.0 Liter 16,000,000 68,142.36
74 MESIN POTONG RUMPUT E65 28.8 150.0 M2 20,000.00
77 PONTON + TUG BOAT; 40 TON; 80 E66 371,500.00
78 SILICON SEAL PUMP E67 135,000.00
79 POMPA (+MIXER) PENGISI BAHAN E68 36,000.00
80 GERINDA TANGAN GWS 750-100 4"; E69 37,100.00
81 HAND MIXER E70 120,000.00
82 MESIN BOR E71 120,000.00
84 MESIN AMPLAS KAYU E73 25,000.00
85 KUNCI TORSI 200-1000N.M E74 0.0 1.0 buah baut 15,000,000.00 61,981.91
86 POMPA + MIXER EPOXY, 810 Watt E75 1.1 0.8 l/mnt 7,000,000.00 57,877.27
87 CONCRETE CUTTER 130 feet/mnt E76 13.0 39.6 m/menit 26,000,000.00 67,625.79
88 ASPHALT CUTTER E76 13.0 39.6 m/menit 26,000,000.00 67,625.79
89 SAND BLASTING E77 75.0 10.0 m2/jam 7,500,000.00 58,133.81
90 MOBILE CRANE 1 TON E78 190.0 1.0 Ton 900,000,000.00 204,572.44
91 DRUM MIXER E79 20.0 4.0 Ton/jam 600,000,000.00 362,133.71
92 STAMPER E81 22.0 60.0 m2/jam 30,000,000.00 69,678.11
93 JACK HIDROLIK JEMBATAN E82 22.0 50.0 Ton 75,000,000.00 75,171.37
94 HYDROLIC PUMP E83 22.0 30.0 Mpa 16,000,000.00 58,741.32
95 MANIFOLD E84 0.0 1.0 0.0 5,000,000.00 56,851.11
96 THERMOPLASTIC ROAD MARKING E85 5.5 1,300.0 m/jam 120,000,000.00 87,702.76
97 COLD PAINT SRAY MACHINE E86 5.5 1,300.0 m/jam 70,000,000.00 73,778.99
98 CONCRETE BATCHING PLANT E80 7.6 500.0 Ton 120,000,000 133,542.37
99 PICK UP 155,000.00
Analisa El - 181
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.8.(1)


JENIS PEKERJAAN : Manajemen dan Keselamatan Lalu Lintas
SATUAN PEMBAYARAN : Lump Sum

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA KETERANGAN
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Panjang Lokasi Pekerjaan KM
2 Total Masa Pelaksanaan Kegiatan Bulan 8.00
3 Masa Mobilisasi Bulan 2.00
4 Periode Pekerjaan Perkerasan Jalan Bulan 8.00
5 Panjang zona kerja Perkerasan Jalan M 6,700.00 sesuai dengan sheet info

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan keselamatan jalan selama
periode konstruksi sesuai ketentuan
2 Buat rencana kerja manajemen lalu-lintas sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Kelompok kerja pengatur lalu-lintas selama konstruksi
menggunakan tenaga pengatur dan flagman dengan 3 shift
4 Pengalihan arus lalu-lintas harus ijin PPK dan pihak terkait
5 Semua rambu harus jelas dan terbaca oleh Pengguna Jalan

C. PERALATAN KESELAMATAN LALU LINTAS


1 Rambu Batas Kecepatan Tabel 1.8.B.1 Lampiran Buah 20.00 450,000.00 9,000,000.00
2 Rambu Perintah Mengikuti Lajur Tabel 1.8.B.1 Lampiran Buah 4.00 450,000.00 1,800,000.00
3 Rambu Pengarah Tikungan Tabel 1.8.B.1 Lampiran Buah 3.00 450,000.00 1,350,000.00 (minimum 3)
4 Rambu Larangan Berjalan Terus (Giveaw Tabel 1.8.B.1 Lampiran Buah - 660,000.00 -
5 Rambu Larangan Menyalip Kendaraan La Tabel 1.8.B.1 Lampiran Buah 4.00 450,000.00 1,800,000.00
6 Rambu Peringatan Jalan Licin Tabel 1.8.B.1 Lampiran Buah - 660,000.00 -
7 Rambu Pengarah Tikungan Ganda Tabel 1.8.B.1 Lampiran Buah - 660,000.00 -
8 Rambu APILL Tabel 1.8.B.1 Lampiran Buah - 660,000.00 -
9 Rambu Peringatan dengan Kata-Kata Tabel 1.8.B.1 Lampiran Buah 24.00 250,000.00 6,000,000.00
10 Rambu Peringatan Pekerjaan di Jalan Tabel 1.8.B.1 Lampiran Buah 4.00 250,000.00 1,000,000.00
11 Rambu Peringatan Lalu Lintas Dua Arah Tabel 1.8.B.1 Lampiran Buah - 660,000.00 -
12 Water Barrier Tabel 1.8.B.1 Lampiran Buah - 1,074,000.00 -
Jarak antar Cone Maks
Traffic Cone Tabel 1.8.B.1 Lampiran Buah 40.00 350,000.00 14,000,000.00
13 5m
Disesuaikan dengan
Police Line Tabel 1.8.B.1 Lampiran Buah - 78,000.00 -
14 Lokasi
Disesuaikan dengan
Concrete Barrier Tabel 1.8.B.1 Lampiran Buah - 840,960.00 -
15 Lokasi
Disesuaikan dengan
Lampu Sementara Tabel 1.8.B.1 Lampiran Buah - 203,880.00 -
16 Kebutuhan
17 APILL Sementara Tabel 1.8.B.1 Lampiran Buah - 3,240,000.00 -
Exercise marka sesuai
Marka Jalan Sementara M2 100,000.00 - pemenhub No.67 tahun
18 2018
19 Jalur Evakuasi (Escape Road) SE No. 11 Tahun 2019 Ls 0.00 -
20 Tongkat Pengatur Lalu Lintas (Warning Light StickSE No. 11 Tahun 2019 Buah 45,000.00 -
21 Lampu Putar (Rotary Lamp) SE No. 11 Tahun 2019 Buah 90,000.00 -
22 Lampu Selang Lalu Lintas SE No. 11 Tahun 2019 Ls 342,000.00 -
23 Pagar jaring pengaman termasuk perlengkapannya M' - 7,800.00 - Asumsi Pek. Per 200 m
24 Peralatan komunikasi dan Lainnya …… Set 2.00 2,500,000.00 5,000,000.00
25 Alat Bantu Ls - 0.00

D. TENAGA / PERSONIL

1 Pekerja (Flagman) OB 10.00 2,500,000.00 25,000,000.00


2 Koordinator / Pengatur OB 5.00 3,000,000.00 15,000,000.00

E TOTAL BIAYA MANAJEMEN DAN KESELAMATAN LALU LINTAS 79,950,000.00

Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
Asuransi Tenaga Kerja dan pengeluaran lainnya.
2. Biaya Satuan tersebut sudah termasuk biaya perlengkapan personil pengatur lalu-lintas dan
biaya perijinan yang diperlukan dengan pihak terkait dengan manajemen lalu-lintas
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan seperti material habis pakai baterai, lampu dan sebagainya
4. Jumlah atau Kuantitas disesuaikan Pada Lampiran Spesifikasi 2018 Tabel 1.8.B.1 Kondisi Zona 7
5. Harga Peralatan Lalu Lintas ditambah 20% (asumsi ongkir dan biaya pasang)
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.17(a)


JENIS PEKERJAAN : Pengamanan Lingkungan
SATUAN PEMBAYARAN : Buah

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA KETERANGAN
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Kegiatan yang dilakukan adalah pengukuran baku mutu air tanah dan air permukaan
2 Pengambilan sampel minimal 3 titik Titik 3.00
3 Lokasi pengambilan sampel : Basecamp, daerah pemukiman dan daerah Quarry

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air Contoh: Diambil dari
2 Buat rencana kerja pengujian lingkungan sesuai schedule Tarif Jasa Layanan
Teknis, Balai Riset dan
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
Standardisasi Industri
3 Pemilihan lokasi pengujian
Samarinda + biaya
4 Melaksanakan pengujian Transportasi

C. PENGUJIAN PARAMETER KUALITAS LINGKUNGAN


2 Pengukuran Kebisingan, Parameter yang diambil
1.17.(1a) Pengujian pH sampel 9.00 450,000.00 4,050,000

D TOTAL BIAYA PENGAMANAN LINGKUNGAN / TITIK PENGUJIAN 4,050,000.00

Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.17(b)


JENIS PEKERJAAN : Pengamanan Lingkungan
SATUAN PEMBAYARAN : Buah

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA KETERANGAN
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Kegiatan yang dilakukan adalah pengukuran baku mutu air tanah dan air permukaan
2 Pengambilan sampel minimal 3 titik Titik 3.00
3 Lokasi pengambilan sampel : Basecamp, daerah pemukiman dan daerah Quarry

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air Contoh: Diambil dari
2 Buat rencana kerja pengujian lingkungan sesuai schedule Tarif Jasa Layanan
Teknis, Balai Riset dan
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
Standardisasi Industri
3 Pemilihan lokasi pengujian
Samarinda + biaya
4 Melaksanakan pengujian Transportasi

C. PENGUJIAN PARAMETER KUALITAS LINGKUNGAN


1 Pengukuran Kebisingan, Parameter yang diambil
1.17.(1b) Pengujian Oksigen Terlarut (DO) sampel 9.00 460,000.00 4,140,000

D TOTAL BIAYA PENGAMANAN LINGKUNGAN / TITIK PENGUJIAN 4,140,000.00

Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.17(c)


JENIS PEKERJAAN : Pengamanan Lingkungan
SATUAN PEMBAYARAN : Buah

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA KETERANGAN
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Kegiatan yang dilakukan adalah pengukuran baku mutu air tanah dan air permukaan
2 Pengambilan sampel minimal 3 titik Titik 3.00
3 Lokasi pengambilan sampel : Basecamp, daerah pemukiman dan daerah Quarry

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air Contoh: Diambil dari
2 Buat rencana kerja pengujian lingkungan sesuai schedule Tarif Jasa Layanan
Teknis, Balai Riset dan
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
Standardisasi Industri
3 Pemilihan lokasi pengujian Samarinda + biaya
4 Melaksanakan pengujian Transportasi

C. PENGUJIAN PARAMETER KUALITAS LINGKUNGAN


1 Pengukuran Kebisingan, Parameter yang diambil
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) sampel 9.00 350,000.00 3,150,000

D TOTAL BIAYA PENGAMANAN LINGKUNGAN / TITIK PENGUJIAN 3,150,000.00

Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.17(d)


JENIS PEKERJAAN : Pengamanan Lingkungan
SATUAN PEMBAYARAN : Buah

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA KETERANGAN
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Kegiatan yang dilakukan adalah pengukuran baku mutu air tanah dan air permukaan
2 Pengambilan sampel minimal 3 titik Titik 3.00
3 Lokasi pengambilan sampel : Basecamp, daerah pemukiman dan daerah Quarry

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air Contoh: Diambil dari
2 Buat rencana kerja pengujian lingkungan sesuai schedule Tarif Jasa Layanan
Teknis, Balai Riset dan
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
Standardisasi Industri
3 Pemilihan lokasi pengujian
Samarinda + biaya
4 Melaksanakan pengujian Transportasi

C. PENGUJIAN PARAMETER KUALITAS LINGKUNGAN


1 Pengukuran Kebisingan, Parameter yang diambil
1.17.(1d) Pengujian Zat Tersuspensi (TSS) sampel 9.00 360,000.00 3,240,000

D TOTAL BIAYA PENGAMANAN LINGKUNGAN / TITIK PENGUJIAN 3,240,000.00

Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.17(e)


JENIS PEKERJAAN : Pengamanan Lingkungan
SATUAN PEMBAYARAN : Buah

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA KETERANGAN
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Kegiatan yang dilakukan adalah pengukuran baku mutu air tanah dan air permukaan
2 Pengambilan sampel minimal 3 titik Titik 3.00
3 Lokasi pengambilan sampel : Basecamp, daerah pemukiman dan daerah Quarry

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air Contoh: Diambil dari
2 Buat rencana kerja pengujian lingkungan sesuai schedule Tarif Jasa Layanan
Teknis, Balai Riset dan
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
Standardisasi Industri
3 Pemilihan lokasi pengujian Samarinda + biaya
4 Melaksanakan pengujian Transportasi

C. PENGUJIAN PARAMETER KUALITAS LINGKUNGAN


2 Pengukuran Kebisingan, Parameter yang diambil
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) sampel 9.00 355,000.00 3,195,000

D TOTAL BIAYA PENGAMANAN LINGKUNGAN / TITIK PENGUJIAN 3,195,000.00

Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.17(f)


JENIS PEKERJAAN : Pengamanan Lingkungan
SATUAN PEMBAYARAN : Buah

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA KETERANGAN
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Kegiatan yang dilakukan adalah pengukuran baku mutu air tanah dan air permukaan
2 Pengambilan sampel minimal 3 titik Titik 3.00
3 Lokasi pengambilan sampel : Basecamp, daerah pemukiman dan daerah Quarry

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air Contoh: Diambil dari
2 Buat rencana kerja pengujian lingkungan sesuai schedule Tarif Jasa Layanan
Teknis, Balai Riset dan
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
Standardisasi Industri
3 Pemilihan lokasi pengujian Samarinda + biaya
4 Melaksanakan pengujian Transportasi

C. PENGUJIAN PARAMETER KUALITAS LINGKUNGAN


2 Pengukuran Kebisingan, Parameter yang diambil
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) sampel 9.00 390,000.00 3,510,000

D TOTAL BIAYA PENGAMANAN LINGKUNGAN / TITIK PENGUJIAN 3,510,000.00

Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.17(g)


JENIS PEKERJAAN : Pengamanan Lingkungan
SATUAN PEMBAYARAN : Buah

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA KETERANGAN
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Kegiatan yang dilakukan adalah pengukuran baku mutu air tanah dan air permukaan
2 Pengambilan sampel minimal 3 titik Titik 3.00
3 Lokasi pengambilan sampel : Basecamp, daerah pemukiman dan daerah Quarry

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air Contoh: Diambil dari
2 Buat rencana kerja pengujian lingkungan sesuai schedule Tarif Jasa Layanan
Teknis, Balai Riset dan
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
Standardisasi Industri
3 Pemilihan lokasi pengujian Samarinda + biaya
4 Melaksanakan pengujian Transportasi

C. PENGUJIAN PARAMETER KUALITAS LINGKUNGAN


2 Pengukuran Kebisingan, Parameter yang diambil
1.17.(1g) Pengujian Coliform sampel 9.00 380,000.00 3,420,000

D TOTAL BIAYA PENGAMANAN LINGKUNGAN / TITIK PENGUJIAN 3,420,000.00

Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.17(h)


JENIS PEKERJAAN : Pengamanan Lingkungan
SATUAN PEMBAYARAN : Buah

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA KETERANGAN
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Kegiatan yang dilakukan adalah pengukuran baku mutu air tanah dan air permukaan
2 Pengambilan sampel minimal 3 titik Titik 3.00
3 Lokasi pengambilan sampel : Basecamp, daerah pemukiman dan daerah Quarry

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air Contoh: Diambil dari
2 Buat rencana kerja pengujian lingkungan sesuai schedule Tarif Jasa Layanan
Teknis, Balai Riset dan
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
Standardisasi Industri
3 Pemilihan lokasi pengujian Samarinda + biaya
4 Melaksanakan pengujian Transportasi

C. PENGUJIAN PARAMETER KUALITAS LINGKUNGAN


2 Pengukuran Kebisingan, Parameter yang diambil
1.17.(1h) Pengujian E. Coli sampel 9.00 350,000.00 3,150,000

D TOTAL BIAYA PENGAMANAN LINGKUNGAN / TITIK PENGUJIAN 3,150,000.00

Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.17(i)


JENIS PEKERJAAN : Pengamanan Lingkungan
SATUAN PEMBAYARAN : Buah

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA KETERANGAN
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Kegiatan yang dilakukan adalah pengukuran baku mutu air tanah dan air permukaan
2 Pengambilan sampel minimal 3 titik Titik 3.00
3 Lokasi pengambilan sampel : Basecamp, daerah pemukiman dan daerah Quarry

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air Contoh: Diambil dari
2 Buat rencana kerja pengujian lingkungan sesuai schedule Tarif Jasa Layanan
Teknis, Balai Riset dan
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
Standardisasi Industri
3 Pemilihan lokasi pengujian Samarinda + biaya
4 Melaksanakan pengujian Transportasi

C. PENGUJIAN PARAMETER KUALITAS LINGKUNGAN


2 Pengukuran Kebisingan, Parameter yang diambil
1.17.(1i) Pengujian Destruksi Cu, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn sampel 9.00 350,000.00 3,150,000

D TOTAL BIAYA PENGAMANAN LINGKUNGAN / TITIK PENGUJIAN 3,150,000.00

Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.17(j)


JENIS PEKERJAAN : Pengamanan Lingkungan
SATUAN PEMBAYARAN : Buah

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA KETERANGAN
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Kegiatan yang dilakukan adalah pengukuran baku mutu air tanah dan air permukaan
2 Pengambilan sampel minimal 3 titik Titik 3.00
3 Lokasi pengambilan sampel : Basecamp, daerah pemukiman dan daerah Quarry

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk melakukan uji mutu air Contoh: Diambil dari
2 Buat rencana kerja pengujian lingkungan sesuai schedule Tarif Jasa Layanan
Teknis, Balai Riset dan
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
Standardisasi Industri
3 Pemilihan lokasi pengujian Samarinda + biaya
4 Melaksanakan pengujian Transportasi

C. PENGUJIAN PARAMETER KUALITAS LINGKUNGAN


2 Pengukuran Kebisingan, Parameter yang diambil
1.17.(1j) Pengujian Temperatur (Suhu) sampel 9.00 350,000.00 3,150,000

D TOTAL BIAYA PENGAMANAN LINGKUNGAN / TITIK PENGUJIAN 3,150,000.00

Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Air adalah Rp 2.000.000,00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.17(2a)


JENIS PEKERJAAN : Pengamanan Lingkungan
SATUAN PEMBAYARAN : Buah

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Kegiatan yang dilakukan adalah pengukuran Kebisingan
2 Pengambilan sampel minimal 3 titik Titik 3.00
3 Lokasi pengambilan sampel : Basecamp, daerah pemukiman dan daerah Quarry

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji kebisingan
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian

C. PENGUJIAN PARAMETER KUALITAS LINGKUNGAN


1 Pengukuran Kebisingan, Parameter yang diambil
1.17.(2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Kesehatan sampel 9.00 410,000.00 3,690,000

D TOTAL BIAYA PENGAMANAN LINGKUNGAN / TITIK PENGUJIAN 3,690,000.00

Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Kebisingan adalah Rp 1.300.000,00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.17(2b)


JENIS PEKERJAAN : Pengamanan Lingkungan
SATUAN PEMBAYARAN : Buah

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Kegiatan yang dilakukan adalah pengukuran Kebisingan
2 Pengambilan sampel minimal 3 titik Titik 3.00
3 Lokasi pengambilan sampel : Basecamp, daerah pemukiman dan daerah Quarry

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji kebisingan
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian

C. PENGUJIAN PARAMETER KUALITAS LINGKUNGAN


1 Pengukuran Kebisingan, Parameter yang diambil
1.17.(2b) Pengujian tingkat getaran kendaraan bermotor sampel 9.00 520,000.00 4,680,000

D TOTAL BIAYA PENGAMANAN LINGKUNGAN / TITIK PENGUJIAN 4,680,000.00

Catatan : Asumsi Total Biaya Transport dan Lain-Lain untuk pengujian Kebisingan adalah Rp 1.300.000,00
Analisa El - 117(c)

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.17(3a)


JENIS PEKERJAAN : Pengamanan Lingkungan
SATUAN PEMBAYARAN : Buah

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA KETERANGAN
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Kegiatan yang dilakukan, pengukuran baku mutu udara
(Uji Udara Emisi dan Ambien)
2 Pengambilan sampel Titik 3.00
3 Lokasi pengambilan sampel : Basecamp, daerah pemukiman dan daerah Quarry

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji udara emisi dan ambien
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian

C. PENGUJIAN PARAMETER KUALITAS LINGKUNGAN


1 Uji Udara Emisi dan Ambien Tarif Jasa Layanan
1.17.(3a) Pengujian NoX sampel 9.00 300,000.00 2,700,000 Teknis, Balai Riset dan
Standardisasi Industri
Samarinda + biaya
D TOTAL BIAYA PENGAMANAN LINGKUNGAN / TITIK PENGUJIAN 2,700,000.00

Catatan : Total Biaya Transport dan Lain-Lain untuk pengujian Kebisingan adalah Rp 1.700.000,00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.17(3b)


JENIS PEKERJAAN : Pengamanan Lingkungan
SATUAN PEMBAYARAN : Buah

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA KETERANGAN
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Kegiatan yang dilakukan, pengukuran baku mutu udara
(Uji Udara Emisi dan Ambien)
2 Pengambilan sampel Titik 3.00
3 Lokasi pengambilan sampel : Basecamp, daerah pemukiman dan daerah Quarry

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji udara emisi dan ambien
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian

C. PENGUJIAN PARAMETER KUALITAS LINGKUNGAN


1 Uji Udara Emisi dan Ambien
1.17.(3b) Pengujian Sulfurdioksida (SO2) sampel 9.00 350,000.00 3,150,000

D TOTAL BIAYA PENGAMANAN LINGKUNGAN / TITIK PENGUJIAN 3,150,000.00

Catatan : Total Biaya Transport dan Lain-Lain untuk pengujian Kebisingan adalah Rp 1.700.000,00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.17(3c)


JENIS PEKERJAAN : Pengamanan Lingkungan
SATUAN PEMBAYARAN : Buah

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA KETERANGAN
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Kegiatan yang dilakukan, pengukuran baku mutu udara
(Uji Udara Emisi dan Ambien)
2 Pengambilan sampel Titik 3.00
3 Lokasi pengambilan sampel : Basecamp, daerah pemukiman dan daerah Quarry

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji udara emisi dan ambien
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian

C. PENGUJIAN PARAMETER KUALITAS LINGKUNGAN


1 Uji Udara Emisi dan Ambien
1.17.(3c) Pengujian Karbondioksida (CO2) sampel 9.00 360,000.00 3,240,000

D TOTAL BIAYA PENGAMANAN LINGKUNGAN / TITIK PENGUJIAN 3,240,000.00

Catatan : Total Biaya Transport dan Lain-Lain untuk pengujian Kebisingan adalah Rp 1.700.000,00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.17(3d)


JENIS PEKERJAAN : Pengamanan Lingkungan
SATUAN PEMBAYARAN : Buah

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA KETERANGAN
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Kegiatan yang dilakukan, pengukuran baku mutu udara
(Uji Udara Emisi dan Ambien)
2 Pengambilan sampel Titik 3.00
3 Lokasi pengambilan sampel : Basecamp, daerah pemukiman dan daerah Quarry

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji udara emisi dan ambien
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian

C. PENGUJIAN PARAMETER KUALITAS LINGKUNGAN


1 Uji Udara Emisi dan Ambien
1.17.(3d) Pengujian Hidro Carbon (HC)-CH4 sampel 9.00 350,000.00 3,150,000

D TOTAL BIAYA PENGAMANAN LINGKUNGAN / TITIK PENGUJIAN 3,150,000.00

Catatan : Total Biaya Transport dan Lain-Lain untuk pengujian Kebisingan adalah Rp 1.700.000,00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.17(3f)


JENIS PEKERJAAN : Pengamanan Lingkungan
SATUAN PEMBAYARAN : Buah

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA KETERANGAN
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Kegiatan yang dilakukan, pengukuran baku mutu udara
(Uji Udara Emisi dan Ambien)
2 Pengambilan sampel Titik 3.00
3 Lokasi pengambilan sampel : Basecamp, daerah pemukiman dan daerah Quarry

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji udara emisi dan ambien
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian

C. PENGUJIAN PARAMETER KUALITAS LINGKUNGAN


1 Uji Udara Emisi dan Ambien
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu sampel 9.00 300,000.00 2,700,000

D TOTAL BIAYA PENGAMANAN LINGKUNGAN / TITIK PENGUJIAN 2,700,000.00

Catatan : Total Biaya Transport dan Lain-Lain untuk pengujian Kebisingan adalah Rp 1.700.000,00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.17(3g)


JENIS PEKERJAAN : Pengamanan Lingkungan
SATUAN PEMBAYARAN : Buah

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA KETERANGAN
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Kegiatan yang dilakukan, pengukuran baku mutu udara
(Uji Udara Emisi dan Ambien)
2 Pengambilan sampel Titik 3.00
3 Lokasi pengambilan sampel : Basecamp, daerah pemukiman dan daerah Quarry

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengabilan sampel serta menghubungi
petugas untuk mendatangkan peralatan uji udara emisi dan ambien
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian

C. PENGUJIAN PARAMETER KUALITAS LINGKUNGAN


1 Uji Udara Emisi dan Ambien
1.17.(3g) Pengujian Timah Hitam (Pb) sampel 9.00 360,000.00 3,240,000

D TOTAL BIAYA PENGAMANAN LINGKUNGAN / TITIK PENGUJIAN 3,240,000.00

Catatan : Total Biaya Transport dan Lain-Lain untuk pengujian Kebisingan adalah Rp 1.700.000,00
Analisa El - 119
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.19


JENIS PEKERJAAN : Keselamatan Dan Kesehatan Kerja
SATUAN PEMBAYARAN : Lump Sum

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. DATA DAN ASUMSI SE Menteri No. 11 Tahun 2019

1 Pekerjaan Jalan dan Jembatan


Nilai Pekerjaan Jalan Asumsi Rp
Nilai Pekerjaan Jembatan Asumsi Rp

2 Jangka Waktu Pekerjaan Jalan Merujuk Ke Masa Pelaksanaan Bulan 11.17


Jangka Waktu Pekerjaan Jembatan Merujuk Ke Masa Pelaksanaan Bulan 11.17

3 Penyuluhan Penanggulangan HIVAIDS Jika disebutkan dalam kontrak Org -

B. Keselamatan dan Kesehatan Kerja SE Menteri No. 11 Tahun 2019


1 Penyiapan RKK :
a Pembuatan Dokumen Rencana Keselematan Konstruksi Set 3,000,000.00 -
b Pembuatan Prosedur dan Instruksi Kerja
c Penyiapan Formulir

2 Sosialisasi dan Promosi Dan Pelatihan:


a Induksi K3 (Safety Induction) Org 7,000.00 -
b Pengarahan K3 (Safety briefing). -
c Pertemuan keselamatan (Safety Talk /Tool Box Meeting Org 10,000.00 -
d Pelatihan K3 -
e P3K Org 3,000,000.00 -
f Bekerja Di Ketinggian Org -
g Simulasi K3 Org 50,000.00 -
h Spanduk (Banner) Lbr 200,000.00 -
i Poster Lbr 200,000.00 -
j Papan Informasi K3 Buah 2,500,000.00 -

3 Alat Pelindung Kerja (APK) dan Alat Pelindung Diri (APD)


Alat Pelindung Kerja (APK)antara lains:
a Jaring pengaman (Safety Net) Sesuai kebutuhan Ls -
b Tali keselamatan (Life Line) Sesuai kebutuhan Ls -
c Penahan Jatuh (Safety Deck) Sesuai kebutuhan Ls -
d Pagar pengaman (Guard Railling) Sesuai kebutuhan Ls 2,000,000.00 -
e Pembatas Area (Restricted Area) Sesuai kebutuhan Ls 2,500,000.00 -
Alat Pelindung Diri (APD) terdiri atas:
a Topi pelindung (Safety helmet) Pekerja, Staf, dan Tamu Buah 20.00 70,000.00 1,400,000.00
b Pelindung mata (Goggles, Spectacles) Sesuai Kebutuhan Psg 20.00 80,000.00 1,600,000.00
c Tameng muka (Face shield) Sesuai Kebutuhan Buah 20.00 100,000.00 2,000,000.00
d Pelindung pernafasan dan mulut (Masker)Sesuai Kebutuhan Box 10.00 25,000.00 250,000.00
e Sarung tangan (Safety gloves) Sesuai Kebutuhan Psg 20.00 25,000.00 500,000.00
f Sepatu keselamatan (Safety shoes) Pekerja, Staf, dan Tamu Psg 20.00 350,000.00 7,000,000.00
g Penunjang seluruh tubuh (Full bodu harneSesuai Kebutuhan Buah 250,000.00 -
h Rompi keselamatan (Safety vest) Sesuai Kebutuhan Buah 20.00 80,000.00 1,600,000.00
i Celemek (A[ron/coveralls) Sesuai Kebutuhan Buah - -
k Pelindung jatuh (Fall arrester) Sesuai Kebutuhan Buah 200,000.00 -
-
4 Asuransi dan Perizinan
a Asuransi dan Perizinan Ls -
b Surat izinKompetensi
Sertifikat Laik OperasiOperator yang diterbitkan oleh Lembaga/Instansi Buah -
c yang berwenang sesuai dengan ketentuan peraturan perundang- -
Buah
undangan
d Surat Pengesahan Organisasi K3 (P2K3), seusai dengan ketentuan -
Ls
peraturan perundang-undangan
e Perizinan terkait lingkungan kerja

5 Personel K3 Konstruksi Bulan


a Ahli K3 Risiko K3 Tinggi OB 3,000,000.00 -
b Petugas K3 Risiko K3 Sedang/kecil OB - 4,000,000.00 -
c Petugas tanggap darurat OB - 3,500,000.00 -
d Petugas P3K OB -
e Petugas Paramedis OB -

6 Fasilitas sarana kesehatan


a Peralatan P3K (Kotak P3K, Tandu, Obat Luka, Perban, Dll) Ls 1.00 1,500,000.00 1,500,000.00
b Ruang P3K (tempat Tidur Pasien, Stetoskop, Timbangan berat badan) Ls 1.00 3,000,000.00 3,000,000.00
c Peralatan pengasapan (fogging) LS 500,000.00 -
7 Rambu-rambu terdiri atas: Ada di 1.8 (Manajemen Keselamatan Lalu Lintas)
8 Konsultasi dengan Ahli Terkait Keselamatan Konstruksi
a Ahli Keselamatan terkait Jembatan OJ -
b Ahli Keselamatan terkait Jalan OJ -

9 Lain-lain terkait pengendalian risiko K3


a Alat pemadam api ringan (APAR) Buah 1.00 500,000.00 500,000.00
b Bendera K3 Buah 1.00 180,000.00 180,000.00
c Lampu darurat (Emergency lamp) Buah 2.00 250,000.00 500,000.00
d Pembuatan Kartu Identitas Pekerja (KIP) Lb 20.00 20,000.00 400,000.00
e Program inspeksi Ls 1.00 700,000.00 700,000.00
f Pelaporan dan penyelidikan insiden Ls 1.00 1,600,000.00 1,600,000.00
g Titik Kumpul (assembly Poin) Ls - -
h Ambulance atau Mobil untuk angkutan ke RS Bulan - -

E TOTAL BIAYA KESELAMATAN DAN KESEHATAN KERJA 22,730,000.00

Catatan : 1. Perkiraan Kuantitas harus disesuaikan dengan kebutuhan di lapangan


2. Harga perlu disesuaikan dengan harga terbaru, termasuk biaya personil
3. Yang dimaksud dengan konsultansi dengan Ahli terkait keselamatan konstruksi termasuk pakar dan praktisi
Analisa El - 121
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.21.


JENIS PEKERJAAN : Manajemen Mutu
SATUAN PEMBAYARAN : Lump Sum

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Tidak ada pengadaan peralatan pengujian mutu dan
perlengkapan perangkat alat tulis dan kantor
2 Hanya Jasa Pengendalian Mutu Pekerjaan dilapangan
selama masa pelaksanaan pekerjaan
3 Personil melakukan pengendalian mutu berdasarkan spesifikasi
pekerjaan dan membuat laporan mutu pekerjaan
4 Manajemen Mutu sesuai ketentuan Ditjen Bina Marga

B. URUTAN KERJA
1 Penyedia setelah menerima SPMK mengusulkan personil
Tenaga Ahli Mutu Pekerjaan sbg Manajer Kendali Mutu
2 Tenaga Ahli dibantu oleh Asisten Kendali Mutu yang
berpengalaman dibidangnya dan tenaga pendukung
3 Membuat RMK dan laporan mutu yg disetujui PPK
4 Melakukan pengendalian mutu semua pekerjaan dan
membuat laporan secara berkala

C. TENAGA / PERSONIL

Masa Pelaksanaan Pekerjaan Disesuaikan dengan Kontrak Bulan 12.00


1 Manajer Kendali Mutu (QCM) OB 3.00 12,500,000.00 37,500,000.00

2 Asisten Ahli Kendali Mutu (sesuai kebutuhan) OB - -

3 Staff Pendukung (supporting Staff) (minimal 3 orang) OB 10.00 5,500,000.00 55,000,000.00

4 Laporan Kendali Mutu Bulan 10.00 3,500,000.00 35,000,000.00

D TOTAL BIAYA PENGENDALIAN MUTU 127,500,000.00

Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
Asuransi Tenaga Kerja dan pengeluaran lainnya.
2. Biaya tersebut sudah termasuk biaya pembuatan laporan yang terkait dengan mutu pekerjaan
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan pembuatan laporan mutu seperti komputer, printer, kertas dan sebagainya.
Analisa El - 181
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.8.(1)


JENIS PEKERJAAN : Manajemen dan Keselamatan Lalu Lintas
SATUAN PEMBAYARAN : Lump Sum

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA KETERANGAN
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Panjang Lokasi Pekerjaan KM
2 Total Masa Pelaksanaan Kegiatan Bulan 8.00
3 Masa Mobilisasi Bulan 2.00
4 Periode Pekerjaan Perkerasan Jalan Bulan 8.00
5 Panjang zona kerja Perkerasan Jalan M 116.30 sesuai dengan sheet info

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan keselamatan jalan selama
periode konstruksi sesuai ketentuan
2 Buat rencana kerja manajemen lalu-lintas sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Kelompok kerja pengatur lalu-lintas selama konstruksi
menggunakan tenaga pengatur dan flagman dengan 3 shift
4 Pengalihan arus lalu-lintas harus ijin PPK dan pihak terkait
5 Semua rambu harus jelas dan terbaca oleh Pengguna Jalan

C. PERALATAN KESELAMATAN LALU LINTAS


1 Rambu Batas Kecepatan Tabel 1.8.B.1 Lampiran Buah 3.00 450,000 1,350,000.00
2 Rambu Perintah Mengikuti Lajur Tabel 1.8.B.1 Lampiran Buah 450,000 -
3 Rambu Pengarah Tikungan Tabel 1.8.B.1 Lampiran Buah 450,000 - (minimum 3)
4 Rambu Larangan Berjalan Terus (Giveaw Tabel 1.8.B.1 Lampiran Buah - 660,000 -
5 Rambu Larangan Menyalip Kendaraan La Tabel 1.8.B.1 Lampiran Buah 450,000 -
6 Rambu Peringatan Jalan Licin Tabel 1.8.B.1 Lampiran Buah - 660,000 -
7 Rambu Pengarah Tikungan Ganda Tabel 1.8.B.1 Lampiran Buah - 660,000 -
8 Rambu APILL Tabel 1.8.B.1 Lampiran Buah - 660,000 -
9 Rambu Peringatan dengan Kata-Kata Tabel 1.8.B.1 Lampiran Buah 3.00 250,000 750,000.00
10 Rambu Peringatan Pekerjaan di Jalan Tabel 1.8.B.1 Lampiran Buah 250,000 -
11 Rambu Peringatan Lalu Lintas Dua Arah Tabel 1.8.B.1 Lampiran Buah - 660,000 -
12 Water Barrier Tabel 1.8.B.1 Lampiran Buah - 1,074,000 -
Jarak antar Cone Maks
Traffic Cone Tabel 1.8.B.1 Lampiran Buah 10.00 3,500,000.00
13 350,000 5m
Disesuaikan dengan
Police Line Tabel 1.8.B.1 Lampiran Buah - -
14 78,000 Lokasi
Disesuaikan dengan
Concrete Barrier Tabel 1.8.B.1 Lampiran Buah - -
15 840,960 Lokasi
Disesuaikan dengan
Lampu Sementara Tabel 1.8.B.1 Lampiran Buah - -
16 203,880 Kebutuhan
17 APILL Sementara Tabel 1.8.B.1 Lampiran Buah - 3,240,000 -
Exercise marka sesuai
Marka Jalan Sementara M2 - pemenhub No.67 tahun
18 100,000 2018
19 Jalur Evakuasi (Escape Road) SE No. 11 Tahun 2019 Ls - -
20 Tongkat Pengatur Lalu Lintas (Warning Lig SE No. 11 Tahun 2019 Buah 45,000 -
21 Lampu Putar (Rotary Lamp) SE No. 11 Tahun 2019 Buah 90,000 -
22 Lampu Selang Lalu Lintas SE No. 11 Tahun 2019 Ls 342,000 -
23 Pagar jaring pengaman termasuk perlengkapannya M' - 7,800 - Asumsi Pek. Per 200 m
24 Peralatan komunikasi dan Lainnya …… Set 2.00 2,500,000 5,000,000.00
25 Alat Bantu Ls - - 0.00
-
D. TENAGA / PERSONIL -
-
1 Pekerja (Flagman) OB 2.00 2,500,000 5,000,000.00
-
2 Koordinator / Pengatur OB 1.00 3,000,000 3,000,000.00

E TOTAL BIAYA MANAJEMEN DAN KESELAMATAN LALU LINTAS 18,600,000.00

Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
Asuransi Tenaga Kerja dan pengeluaran lainnya.
2. Biaya Satuan tersebut sudah termasuk biaya perlengkapan personil pengatur lalu-lintas dan
biaya perijinan yang diperlukan dengan pihak terkait dengan manajemen lalu-lintas
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan seperti material habis pakai baterai, lampu dan sebagainya
4. Jumlah atau Kuantitas disesuaikan Pada Lampiran Spesifikasi 2018 Tabel 1.8.B.1 Kondisi Zona 7
5. Harga Peralatan Lalu Lintas ditambah 20% (asumsi ongkir dan biaya pasang)
Analisa EI-211

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 2.1.(1) PERKIRAAN VOL. PEK. : 133.20
JENIS PEKERJAAN : Galian untuk Selokan Drainase dan Saluran ATOTAL HARGA (Rp.) : 5,111,049.59
SATUAN PEMBAYARAN : M3 0 % THD. BIAYA PROYEK : 0.01

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0770 21,428.57 1,649.45


2. Mandor (L03) jam 0.0192 28,571.43 549.82

JUMLAH HARGA TENAGA 2,199.27

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Mini Excavator (E10a) jam 0.0192 239,134.65 4,601.82


2. Dump Truck (E08) jam 0.1113 251,861.02 28,031.85
3. Alat Bantu Ls 1.0000 50.00 50.00

JUMLAH HARGA PERALATAN 32,683.68

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 34,882.95


E. OVERHEAD & PROFIT 10.0 % x D 3,488.29
F. HARGA SATUAN PEKERJAAN ( D + E ) 38,371.24
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-221

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 2.2.(1) PERKIRAAN VOL. PEK. : 100.80
JENIS PEKERJAAN : Pasangan Batu dengan Mortar TOTAL HARGA (Rp.) : 115,617,398.32
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.31

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 4.2353 21,428.57 90,756.30


2. Tukang Batu (L02) jam 2.8235 25,714.29 72,605.04
3. Mandor (L03) jam 0.3529 28,571.43 10,084.03

JUMLAH HARGA TENAGA 173,445.38

B. BAHAN

1. Batu (M02) M3 1.2000 335,400.00 402,480.00


2. Semen (PC) (M12) Kg 232.0000 1,455.36 337,643.71
3. Pasir (M01) M3 0.4808 193,800.00 93,184.39

JUMLAH HARGA BAHAN 833,308.09

C. PERALATAN

1. Conc. Mixer (E06) jam 0.3529 100,503.95 35,471.98


2. Alat Bantu Ls 1.0000 500.00 500.00

JUMLAH HARGA PERALATAN 35,971.98

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,042,725.45


E. OVERHEAD & PROFIT 10.0 % x D 104,272.55
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,146,998.00
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 3.1.(1) PERKIRAAN VOL. PEK. : 1,505.64
JENIS PEKERJAAN : Galian Biasa TOTAL HARGA (Rp.) : 17,486,053.88
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.05

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0077 21,428.57 164.51


2. Mandor (L03) Jam 0.0038 28,571.43 109.67

JUMLAH HARGA TENAGA 274.18

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Excavator (E10) Jam 0.0038 478,053.67 1,835.02


2. Dump Truck (E09) Jam 0.0333 251,861.02 8,398.71
3. Alat Bantu Ls 1.0000 50.00 50.00

UMLAH HARGA PERALATAN 10,283.73

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 10,557.91


E. OVERHEAD & PROFIT 10.0 % x D 1,055.79
F. HARGA SATUAN PEKERJAAN ( D + E ) 11,613.70
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 3.1.(7) PERKIRAAN VOL. PEK. : 50.00
JENIS PEKERJAAN : Galian Perkerasan Beraspal dengan ColTOTAL HARGA (Rp.) : 28,523,903.66
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.08

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 1.3369 21,428.57 28,647.82


2. Mandor (L03) Jam 0.2228 28,571.43 6,366.18

JUMLAH HARGA TENAGA 35,014.01

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN
1. Cold Milling (E36) Jam 0.2228 1,304,864.21 290,745.14
2 Dump Truck (E09) Jam 0.4562 408,698.87 186,436.27
3. Water Tanker (E32) M3 0.0221 288,433.11 6,371.01
4. Alat bantu Ls 1.0000 50.00 50.00

UMLAH HARGA PERALATAN 483,602.42

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 518,616.43


E. OVERHEAD & PROFIT 10.0 % x D 51,861.64
F. HARGA SATUAN PEKERJAAN ( D + E ) 570,478.07
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 3.1.(8) PERKIRAAN VOL. PEK. : 98.60
JENIS PEKERJAAN : Galian Perkerasan Beraspal tanpa ColdTOTAL HARGA (Rp.) : 36,200,767.66
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.10

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 8.3664 21,428.57 179,280.00


2. Mandor (L03) Jam 1.3944 28,571.43 39,840.00

JUMLAH HARGA TENAGA 219,120.00

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN
1. Concrete Cutter E76 Jam 0.0268 67,625.79 1,810.60
2. Jack Hammer E26 Jam 0.7172 61,967.04 44,439.93
3. Mini Generator Set 2000 Watt Jam 0.3586 108,635.38 38,954.17
4. Dump Truck E09 Jam 0.0720 408,698.87 29,445.98

UMLAH HARGA PERALATAN 114,650.68

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 333,770.68


E. OVERHEAD & PROFIT 10.0 % x D 33,377.07
F. HARGA SATUAN PEKERJAAN ( D + E ) 367,147.74
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 3.2.(1a) PERKIRAAN VOL. PEK. : 347.29
JENIS PEKERJAAN : Timbunan Biasa Dari Sumber Galian TOTAL HARGA (Rp.) : 42,300,049.50
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.11

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.3833 21,428.57 8,214.43


2. Mandor (L02) Jam 0.1278 28,571.43 3,650.86

JUMLAH HARGA TENAGA 11,865.29

B. BAHAN

1. Bahan timbunan biasa (M08) M3 1.4000 20,500.00 28,700.00


(tanah urug)

JUMLAH HARGA BAHAN 28,700.00

C. PERALATAN
1. Excavator (E10) Jam 0.1278 345,037.95 44,088.95
2. Dump Truck (E09) Jam 0.0535 408,698.87 21,857.38
3. Motor Grader (E13) Jam 0.0013 454,708.88 606.52
4 Sheepfoot Roller Jam 0.0023 583,042.05 1,358.28
5. Tandem Roller (E17) Jam 0.0004 583,042.05 221.75
6 Water tank truck (E23) Jam 0.0069 288,433.11 1,979.44
Alat Bantu Ls 1.0000 50.00 50.00

UMLAH HARGA PERALATAN 70,162.32

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 110,727.61


E. OVERHEAD & PROFIT 10.0 % x D 11,072.76
F. HARGA SATUAN PEKERJAAN ( D + E ) 121,800.37
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 3.3.(1) PERKIRAAN VOL. PEK. : 360.00
JENIS PEKERJAAN : Penyiapan Badan Jalan TOTAL HARGA (Rp.) : 942,273.38
SATUAN PEMBAYARAN : M2 0 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0034 21,428.57 73.76


2. Mandor (L02) jam 0.0017 28,571.43 49.18

JUMLAH HARGA TENAGA 122.94

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN
1. Motor Grader (E13) jam 0.0017 454,708.88 782.63
2. Tandem / Vibro Roller (E17) jam 0.0024 583,042.05 1,423.91
3 Alat Bantu Ls 1.0000 50.00 50.00

JUMLAH HARGA PERALATAN 2,256.54

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 2,379.48


E. OVERHEAD & PROFIT 10.0 % x D 237.95
F. HARGA SATUAN PEKERJAAN ( D + E ) 2,617.43
Analisa EI-511

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 5.1.(1) PERKIRAAN VOL. PEK. : 846.00
JENIS PEKERJAAN : Lapis Fondasi Agregat Kelas A TOTAL HARGA : 518,696,072.21
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 1.39

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0285 21,428.57 611.24


2. Mandor (L03) jam 0.0095 28,571.43 271.66

JUMLAH HARGA TENAGA 882.90

B. BAHAN

1. Agregat A M26 M3 1.2310 411,100.00 506,078.28

JUMLAH HARGA BAHAN 506,078.28

C. PERALATAN
1. Wheel Loader (E15) jam 0.0081 345,037.95 2,799.50
2. Dump Truck (E09) jam 0.1051 408,698.87 42,958.71
3. Motor Grader (E13) jam 0.0009 454,708.88 409.65
4. Vibratory Roller (E19a) jam 0.0095 441,631.62 4,199.08
5 Alat Bantu Ls 1.0000 50.00 50.00

JUMLAH HARGA PERALATAN 50,416.94

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 557,378.11


E. OVERHEAD & PROFIT 10.0 % x D 55,737.81
F. HARGA SATUAN PEKERJAAN ( D + E ) 613,115.92
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 5.1.(3) PERKIRAAN VOL. PEK. : 3,087.00
JENIS PEKERJAAN : Lapis Fondasi Agregat Kelas S TOTAL HARGA : 1,217,869,774.31
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 3.27

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0285 21,428.57 611.24


2. Mandor (L03) jam 0.0095 28,571.43 271.66

JUMLAH HARGA TENAGA 882.90

B. BAHAN

1. Aggregat S M3 1.2310 271,700.00 334,472.07

JUMLAH HARGA BAHAN 334,472.07

C. PERALATAN
1. Wheel Loader (E15) jam 0.0081 345,037.95 2,799.50
2. Dump Truck (E09) jam 0.0388 408,698.87 15,837.39
3. Motor Grader (E13) jam 0.0009 454,708.88 409.65
4. Vibratory Roller (E19a) jam 0.0095 441,631.62 4,199.08
5 Alat Bantu Ls 1.0000 50.00 50.00

JUMLAH HARGA PERALATAN 23,295.61

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 358,650.58


E. OVERHEAD & PROFIT 10.0 % x D 35,865.06
F. HARGA SATUAN PEKERJAAN ( D + E ) 394,515.64
Analisa EI-611

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
0
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 6.1 (1) PERKIRAAN VOL. PEK. : 288.00
JENIS PEKERJAAN : Lapis Resap Pengikat - Aspal Cair/Emulsi TOTAL HARGA (Rp.) : 3,082,889.07
SATUAN PEMBAYARAN : Liter % THD. BIAYA PROYEK : 0.01

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0014 21,428.57 30.65


2. Mandor (L03) Jam 0.0007 28,571.43 20.43

JUMLAH HARGA TENAGA 51.08

B. BAHAN

1. Aspal Emulsi CSS-1 (M31a) Liter 0.6592 14,400.00 9,492.48


atau SS-1

JUMLAH HARGA BAHAN 9,492.48

C. PERALATAN

1. Asp. Distributor E41 Jam 0.00020 395,399.57 77.53


2. Compressor E05 Jam 0.00072 154,154.52 110.25

JUMLAH HARGA PERALATAN 187.78

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 9,731.34


E. OVERHEAD & PROFIT 10.0 % x D 973.13
F. HARGA SATUAN PEKERJAAN ( D + E ) 10,704.48
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-612a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
0
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 6.1 (2a) PERKIRAAN VOL. PEK. : 30,174.00
JENIS PEKERJAAN : Lapis Perekat - Aspal Cair/Emulsi TOTAL HARGA (Rp.) : 449,446,419.63
SATUAN PEMBAYARAN : Liter % THD. BIAYA PROYEK : 1.21

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0016 21,428.57 33.95


2. Mandor (L03) Jam 0.0008 28,571.43 22.64

JUMLAH HARGA TENAGA 56.59

B. BAHAN

1. Aspal Emulsi CRS-1 (M31a) Liter 0.8240 16,000.00 13,184.00


atau RS-1

JUMLAH HARGA BAHAN 13,184.00

C. PERALATAN

1. Asp. Distributor E41 Jam 0.0002 395,399.57 77.53


2. Compressor E05 Jam 0.0010 154,154.52 157.02
3. Power Broom E03 Jam 0.0008 83,198.21 65.91

JUMLAH HARGA PERALATAN 300.46

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 13,541.05


E. OVERHEAD & PROFIT 10.0 % x D 1,354.11
F. HARGA SATUAN PEKERJAAN ( D + E ) 14,895.16
Note: 1 0 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
0 berat untuk bahan-bahan.
2 0 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
0 dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
0 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 0 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 0 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
0 yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-651

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 6.5.(1) PERKIRAAN VOL. PEK. : 3,698.40
JENIS PEKERJAAN : Laston Lapis Aus Asbuton (AC-WC Asb) TOTAL HARGA (Rp.) : 5,700,519,095.29
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK : 15.30

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1852 21,428.57 3,968.25

2. Mandor (L03) Jam 0.0185 28,571.43 529.10

JUMLAH HARGA TENAGA 4,497.35

B. BAHAN

1. Agr Pch Mesin 5-10 & 10-15 (M92) M3 0.3234 360,600.00 116,629.51
2. Agr Pch Mesin 0 - 5 (M91) M3 0.4068 372,800.00 151,653.35
3 Semen (M12) Kg 0.0000 1,455.36 0.00
4 Aspal (M10) Kg 58.7100 14,470.90 849,586.30
5 Asbuton B 5/20 (M161) Kg 25.7500 4,000.00 103,000.00

JUMLAH HARGA BAHAN 1,220,869.16

C. PERALATAN
1. Wheel Loader E15 Jam 0.0052 345,037.95 1,808.94
2. AMP E01b Jam 0.0185 7,959,876.97 147,405.13
3. Genset E12 Jam 0.0185 108,635.38 2,011.77
4. Dump Truck E09 Jam 0.0285 408,698.87 11,666.57
5. Asp. Finisher E02 Jam 0.0122 305,923.51 3,742.05
6. Tandem Roller E17a Jam 0.0125 441,862.85 5,503.86
7 P. Tyre Roller E18 Jam 0.0082 450,647.80 3,700.04
8 Alat Bantu Ls 1.0000 20.00 20.00

JUMLAH HARGA PERALATAN 175,858.36

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,401,224.88


E. OVERHEAD & PROFIT 10.0 % x D 140,122.49
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,541,347.37
Note: 1 0 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
0 berat untuk bahan-bahan.
2 0 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
0 dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
0 terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 0 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 0 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
0 yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 6.5.(1) Analisa EI-651
JENIS PEKERJAAN : Laston Lapis Aus Asbuton (AC-WC Asb)
SATUAN PEMBAYARAN : Ton URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 15.73 KM
5 Tebal Lapis (AC-WC) padat t 0.04 M Tabel 6.3.11
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi Agregat (padat) Bip 1.45 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.32 ton/m3
10 Komposisi campuran AC-WC Asb :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15 40.66 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 51.14 % memenuhi -
- Semen FF 0.00 % Spesifikasi
- Aspal Pen. 60/70 As 5.70
- Asbuton Butir 5/20 Asb 2.50 %
- Anti Stripping Agent Asa 0.30 %As
11 Berat isi bahan :
- AC-WC Asb D1 2.29 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2 1.32 ton / M3
- Agr Pch Mesin 0 - 5 mm D3 1.32 ton / M3
12 Jarak Stock pile ke Cold Bin l 0.05 km

II. URUTAN KERJA

1 Wheel Loader memuat Agregat ke dalam Cold Bin AMP.


2 Agregat, aspal, asbuton, dan bahan anti pengelupasan dicampur dan
dipanaskan dengan AMP untuk dimuat langsung ke dalam Dump Truck dan
diangkut ke lokasi pekerjaan.
3 Campuran panas dihampar dengan Finisher dan dipadatkan dengan
Tandem (awal dan akhir) & Pneumatic Tire Roller (antara).
4 Selama pemadatan, sekelompok pekerja akan merapikan tepi hamparan
dengan menggunakan Alat Bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92) 0.3234 M3
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91) 0.4068 M3
1.c. Semen = (FF x Fh2) x 1000 (M12) 0.0000 Kg
1.d. Asbuton Butir 5/20 = (Asb x Fh2) x 1000 (M161) 25.7500 Kg
1.e. Aspal Pen. 60/70 = (As x Fh2) x 1000 (M10) 58.7100 Kg

2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 panduan
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.85 -
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf 15.00 km/jam panduan
- Kecepatan kembali rata rata Vr 20.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.20 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit
- Lain - lain (waktu pasti) T3 0.10 menit
Ts1 0.45 menit

Kap. Prod. / jam = V x Fb x Fa x 60 x Bil Q1 190.74 ton


Ts1

Koefisien Alat/ton = 1 : Q1 (E15) 0.0052 Jam

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. : 6.5.(1) Analisa EI-635a
JENIS PEKERJAAN : Laston Lapis Aus Asbuton (AC-WC Asb)
SATUAN PEMBAYARAN : Ton URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.b. ASPHALT MIXING PLANT (AMP) (E01b)


Kapasitas produksi V 60.00 ton / Jam
Faktor Efisiensi alat Fa 0.90 -

Kap.Prod. / jam = V x Fa Q2 54.00 ton

Koefisien Alat/ton = 1 : Q2 (E01b) 0.0185 Jam

2.c. GENERATORSET ( GENSET ) (E12)


Kap.Prod. / Jam = SAMA DENGAN AMP Q3 54.00 ton
Koefisien Alat/ton = 1 : Q3 (E12) 0.0185 Jam

2.d. DUMP TRUCK (DT) (E09)


Kapasitas bak V 20.00 M3
Faktor Efisiensi alat Fa 0.85 -
Kecepatan rata-rata bermuatan v1 55.00 KM / Jam
Kecepatan rata-rata kosong v2 65.00 KM / Jam
Kapasitas AMP / batch Q2b 1.00 ton Asumsi 60 detik
Waktu menyiapkan 1 batch AC-BC Tb 1.00 menit untuk 1 batch
Waktu Siklus Ts2
- Mengisi Bak = (V : Q2b) x Tb T1 20.00 menit
- Angkut = (L : v1) x 60 menit T2 17.16 menit
- Tunggu + dump + Putar T3 15.00 menit
- Kembali = (L : v2) x 60 menit T4 14.52 menit
Ts2 66.68 menit

Kap.Prod. / jam = V x Fa x 60 x D1 Q4 35.03 ton


Ts2

Koefisien Alat/ton = 1 : Q4 (E09) 0.0285 Jam

2.e. ASPHALT FINISHER (E02)


Kecepatan menghampar V 5.00 m/menit
Faktor efisiensi alat Fa 0.85 -
Lebar hamparan b 3.50 meter
Kap.Prod. / jam = V x b x 60 x Fa x t x D1 Q5 81.75 ton
Koefisien Alat/ton = 1 : Q5 (E02) 0.0122 Jam

2.f. TANDEM ROLLER (E17a)


Kecepatan rata-rata alat v 4.00 Km / Jam
Lebar efektif pemadatan b 1.68 M
Jumlah lintasan n 6.00 lintasan
Lajur lintasan = w / ( b-bo ) N 3.00
Faktor Efisiensi alat Fa 0.85 -
Lebar Overlap bo 0.20 M
Apabila N <= 1
Kap. Prod. / jam = (v x 1000) x b x t x Fa x D1 Q6 0.0000 ton
n
Apabila N > 1
Kap. Prod. / jam = (v x 1000) x (N(b-bo)+bo) x t x Fa x D1 80.28
nxN
Koefisien Alat/ton = 1 : Q6 (E17a) 0.0125 Jam

2.g. PNEUMATIC TIRE ROLLER (E18)


Kecepatan rata-rata v 10.00 KM / jam
Lebar efektif pemadatan b 2.29 M
Jumlah lintasan n 14.00 lintasan
Lajur lintasan N 2.00
Lebar Overlap bo 0.20 M
Faktor Efisiensi alat Fa 0.85 -

Kap.Prod./jam = (v x 1000) x (N(b-bo)+bo) x t x Fa x D1 Q7 121.80 ton


nxN
Koefisien Alat/ton = 1 : Q7 (E18) 0.0082 Jam

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. : 6.5.(1) Analisa EI-635a
JENIS PEKERJAAN : Laston Lapis Aus Asbuton (AC-WC Asb)
SATUAN PEMBAYARAN : Ton URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.h. ALAT BANTU


- Rambu Lump Sum
- Kereta dorong
- Sekop
- Garpu
- Tongkat Kontrol ketebalan hanparan

3. TENAGA
Produksi menentukan : A M P Q2 54.00 ton / Jam
Produksi AC-WC Asb / hari = Tk x Q2 Qt 378.00 ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang

Koefisien Tenaga / ton :


- Pekerja = (Tk x P) / Qt (L01) 0.1852 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0185 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. ### / ton

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 3,698.40 ton
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
0
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 6.3(5a) PERKIRAAN VOL. PEK. : 250.56
JENIS PEKERJAAN : Laston Lapis Aus (AC-WC) TOTAL HARGA (Rp.) : 376,482,718.71
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK : 1.01

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1852 21,428.57 3,968.25


2. Mandor (L03) Jam 0.0185 28,571.43 529.10

JUMLAH HARGA TENAGA 4,497.35

B. BAHAN

1. Agr Pch Mesin 5-10 & 10-15 (M92) M3 0.3206 360,600.00 115,596.89
2. Agr Pch Mesin 0 - 5 (M91) M3 0.4193 372,800.00 156,309.11
3 Semen (M12) Kg 9.6820 1,455.36 14,090.80
4 Aspal (M10) Kg 62.3150 14,470.90 901,753.88

JUMLAH HARGA BAHAN 1,187,750.68

C. PERALATAN
1. Wheel Loader E15 Jam 0.0054 345,037.95 1,852.53
2. AMP E01 Jam 0.0185 7,897,081.39 146,242.25
3. Genset E12 Jam 0.0185 108,635.38 2,011.77
4. Dump Truck E09 Jam 0.0248 408,698.87 10,155.81
5. Asp. Finisher E02 Jam 0.0125 305,923.51 3,832.22
6. Tandem Roller E17a Jam 0.0128 441,862.85 5,636.49
7 P. Tyre Roller E18 Jam 0.0084 450,647.80 3,789.20
8 Alat Bantu Ls 1.0000 200.00 200.00

JUMLAH HARGA PERALATAN 173,720.26

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,365,968.30


E. OVERHEAD & PROFIT 10.0 % x D 136,596.83
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,502,565.13
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
0
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 6.3(6a) PERKIRAAN VOL. PEK. : 375.84
JENIS PEKERJAAN : Laston Lapis Antara (AC-BC) TOTAL HARGA (Rp.) : 545,109,678.07
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK : 1.46

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.2008 21,428.57 4,302.93


2. Mandor (L03) Jam 0.0201 28,571.43 573.72

JUMLAH HARGA TENAGA 4,876.65

B. BAHAN

1. Agr Pch Mesin 5-10 & 10-20 (M92) M3 0.3720 360,600.00 134,126.81
2. Agr Pch Mesin 0 - 5 (M91) M3 0.3719 372,800.00 138,635.00
3 Semen (M12) Kg 9.6820 1,455.36 14,090.80
4 Aspal (M10) Kg 57.1650 14,470.90 827,228.77

JUMLAH HARGA BAHAN 1,114,081.38

C. PERALATAN
1. Wheel Loader E15 Jam 0.0054 345,037.95 1,852.53
2. AMP E01 Jam 0.0201 7,897,081.39 158,575.93
3. Genset E12 Jam 0.0201 108,635.38 2,181.43
4. Dump Truck E09 Jam 0.0683 408,698.87 27,917.98
5. Asphalt Finisher E02 Jam 0.0084 305,923.51 2,554.81
6. Tandem Roller E17a Jam 0.0085 441,862.85 3,757.66
7 P. Tyre Roller E18 Jam 0.0056 450,647.80 2,526.13
8 Alat Bantu Ls 1.0000 200.00 200.00

JUMLAH HARGA PERALATAN 199,566.48

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,318,524.51


E. OVERHEAD & PROFIT 10.0 % x D 131,852.45
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,450,376.96
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 6.3(7a) PERKIRAAN VOL. PEK. : 156.60
JENIS PEKERJAAN : Laston Lapis Fondasi (AC-Base) TOTAL HARGA (Rp.) : 202,773,074.07
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK : 0.54

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.2008 21,428.57 4,302.93


2. Mandor (L03) Jam 0.0201 28,571.43 573.72

JUMLAH HARGA TENAGA 4,876.65

B. BAHAN

1 Agr Pch Mesin 20-30 (M93) M3 0.1417 205,977.42 29,180.92


2 Agr Pch Mesin 5-10 & 10-15 (M92) M3 0.3209 360,600.00 115,711.62
3 Agr Pch Mesin 0 - 5 (M91) M3 0.2876 372,800.00 107,201.18
3 Semen (M12) Kg 9.7850 1,455.36 14,240.71
4 Aspal (M10) Kg 48.9250 14,470.90 707,988.59

JUMLAH HARGA BAHAN 974,323.01

C. PERALATAN
1. Wheel Loader E15 Jam 0.0054 345,037.95 1,852.53
2. AMP E01 Jam 0.0201 7,897,081.39 158,575.93
3. Genset E12 Jam 0.0201 108,635.38 2,181.43
4. Dump Truck E09 Jam 0.0683 408,698.87 27,917.98
5. Asphalt Finisher E02 Jam 0.0067 305,923.51 2,043.85
6. Tandem Roller E17a Jam 0.0071 441,862.85 3,141.54
7 P. Tyre Roller E18 Jam 0.0045 450,647.80 2,020.91
8 Alat Bantu Ls 1.0000 200.00 200.00

JUMLAH HARGA PERALATAN 197,934.17

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,177,133.83


E. OVERHEAD & PROFIT 10.0 % x D 117,713.38
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,294,847.22
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 6.3.(8) PERKIRAAN VOL. PEK. : 149.63
JENIS PEKERJAAN : Bahan Anti Pengelupasan TOTAL HARGA (Rp.) : 10,171,847.40
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK : 0.03

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0000 24,996.34 0.00


2. Mandor (L03) Jam 0.0000 30,066.21 0.00

JUMLAH HARGA TENAGA 0.00

B. BAHAN

1. Bahan anti pengelupasan (M66) Kg 1.0300 60,000.00 61,800.00

JUMLAH HARGA BAHAN 61,800.00

C. PERALATAN

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 61,800.00


E. OVERHEAD & PROFIT 10.0 % x D 6,180.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 67,980.00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 6.5.(2) PERKIRAAN VOL. PEK. : 9,113.63
JENIS PEKERJAAN : Laston Lapis Antara Asbuton (AC-BC Asb) TOTAL HARGA (Rp.) : 13,218,220,319.48
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK : 35.47

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1481 21,428.57 3,174.60

2. Mandor (L03) Jam 0.0185 28,571.43 529.10

JUMLAH HARGA TENAGA 3,703.70

B. BAHAN

1. Agr Pch Mesin 5-10 & 10-15 (M92) M3 0.3751 360,600.00 135,274.17
2. Agr Pch Mesin 0 - 5 (M91) M3 0.3591 372,800.00 133,860.62
3 Semen (M12) Kg - 1,455.36 -
4 Aspal (M10) Kg 53.5600 14,470.90 775,061.19
5 Asbuton B 5/20 (M161) Kg 25.7500 4,000.00 103,000.00

JUMLAH HARGA BAHAN 1,147,195.98

C. PERALATAN
1. Wheel Loader E15 Jam 0.0054 345,037.95 1,852.53
2. AMP E01b Jam 0.0185 7,959,876.97 147,405.13
3. Genset E12 Jam 0.0185 108,635.38 2,011.77
4. Dump Truck E09 Jam 0.0183 408,698.87 7,468.92
5. Asp. Finisher E02 Jam 0.0084 305,923.51 2,554.81
6. Tandem Roller E17a Jam 0.0085 441,862.85 3,757.66
7 P. Tyre Roller E18 Jam 0.0056 450,647.80 2,526.13
8 Alat Bantu Ls 1.0000 50.00 50.00

JUMLAH HARGA PERALATAN 167,626.95

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,318,526.64


E. OVERHEAD & PROFIT 10.0 % x D 131,852.66
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,450,379.30
ITEM PEMBAYARAN NO. : 6.5.(2) Analisa EI-652
JENIS PEKERJAAN : Laston Lapis Antara Asbuton (AC-BC Asb)
SATUAN PEMBAYARAN : Ton URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 15.73 KM
5 Tebal Lapis (WMAC) padat t 0.06 M Tabel 6.3.11
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilangan material : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi Agregat (padat) Bip 1.45 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.32 ton/m3
10 Komposisi campuran WMAC-BC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15 47.16 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 45.14 % memenuhi -
- Semen FF 0.00 % Spesifikasi
- Aspal As 5.20 %
- Asbuton Butir 5/20 Asb 2.50 %As
- Anti Stripping Agent Asa 0.30 %As
11 Berat isi bahan :
- WMAC-BC D1 2.29 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2 1.32 ton / M3
- Agr Pch Mesin 0 - 5 mm D3 1.32 ton / M3
12 Jarak Stock pile ke Cold Bin l 0.05 km

II. URUTAN KERJA

1 Wheel Loader memuat Agregat ke dalam Cold Bin AMP.


2 Agregat, aspal, asbuton, dan bahan anti pengelupasan dicampur dan
dipanaskan dengan AMP untuk dimuat langsung ke dalam Dump Truck dan
diangkut ke lokasi pekerjaan.
3 Campuran panas dihampar dengan Finisher dan dipadatkan dengan
Tandem (awal dan akhir) & Pneumatic Tire Roller (antara).
4 Selama pemadatan, sekelompok pekerja akan merapikan tepi hamparaan
dengan menggunakan Alat Bantu.

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10&10-15" x Fh1) : D2 (M92) 0.3751 M3
1.b. Agr 0-5 = ("0-5" x Fh1) : D3 (M91) 0.3591 M3
1.c. Semen = (FF x Fh2) x 1000 (M12) 0.0000 Kg
1.d. Asbuton Butir 5/20 = (Asb x Fh2) x 1000 (M161) 25.7500 Kg
1.e. Aspal = (As x Fh2) x 1000 (M10) 53.5600 Kg

79.31
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 panduan
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf 15.00 km/jam panduan
- Kecepatan kembali rata rata Vr 20.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.20 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit
- Lain - lain (waktu pasti) T3 0.10 menit
Ts1 0.45 menit

Kap. Prod. / jam = V x Fb x Fa x 60 x Bil Q1 186.25 ton


Ts1

Koefisien Alat/ton = 1 : Q1 (E15) 0.0054 Jam

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. : 6.5.(2) Analisa EI-635a
JENIS PEKERJAAN : Laston Lapis Antara Asbuton (AC-BC Asb)
SATUAN PEMBAYARAN : Ton URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.b. ASPHALT MIXING PLANT (AMP) (E01a)


Kapasitas produksi V 60.00 ton / Jam
Faktor Efisiensi alat Fa 0.90 -

Kap.Prod. / jam = V x Fa Q2 54.00 ton

Koefisien Alat/ton = 1 : Q2 (E01a) 0.0185 Jam

2.c. GENERATORSET ( GENSET ) (E12)


Kap.Prod. / Jam = SAMA DENGAN AMP Q3 54.00 ton
Koefisien Alat/ton = 1 : Q3 (E12) 0.0185 Jam

2.d. DUMP TRUCK (DT) (E08)


Kapasitas bak V 25.00 M3
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 50.00 KM / Jam
Kecepatan rata-rata kosong v2 60.00 KM / Jam
Kapasitas AMP / batch Q2b 1.00 ton Asumsi 60 detik
Waktu menyiapkan 1 batch AC-BC Tb 0.50 menit untuk 1 batch
Waktu Siklus Ts2
- Mengisi Bak = (V : Q2b) x Tb T1 12.50 menit
- Angkut = (L : v1) x 60 menit T2 18.87 menit
- Tunggu + dump + Putar T3 5.00 menit
- Kembali = (L : v2) x 60 menit T4 15.73 menit
Ts2 52.10 menit

Kap.Prod. / jam = V x Fa x 60 x D1 Q4 54.72 ton


Ts2

Koefisien Alat/ton = 1 : Q4 (E08) 0.0183 Jam

2.e. ASPHALT FINISHER (E02)


Kecepatan menghampar V 5.00 m/menit
Faktor efisiensi alat Fa 0.83 -
Lebar hamparan b 3.50 meter
Kap.Prod. / jam = V x b x 60 x Fa x t x D1 Q5 119.74 ton

Koefisien Alat/ton = 1 : Q5 (E02) 0.0084 Jam

2.f. TANDEM ROLLER (E17b)


Kecepatan rata-rata alat v 4.00 Km / Jam
Lebar efektif pemadatan b 1.68 M
Jumlah lintasan n 6.00 lintasan
Lajur lintasan = w / ( b-bo ) N 3.00
Faktor Efisiensi alat Fa 0.83 -
Lebar Overlap bo 0.20 M
Apabila N <= 1
Kap. Prod. / jam = (v x 1000) x b x t x Fa x D1 Q6 0.0000 ton
n
Apabila N > 1
Kap. Prod. / jam = (v x 1000) x (N(b-bo)+bo) x t x Fa x D1 117.59
nxN

Koefisien Alat/ton = 1 : Q6 (E17b) 0.0085 Jam

2.g. PNEUMATIC TIRE ROLLER (E18)


Kecepatan rata-rata v 10.00 KM / jam
Lebar efektif pemadatan b 2.29 M
Jumlah lintasan n 14.00 lintasan
Lajur lintasan N 2.00
Lebar Overlap bo 0.20 M
Faktor Efisiensi alat Fa 0.83 -

Kap.Prod./jam = (v x 1000) x (N(b-bo)+bo) x t x Fa x D1 Q7 178.39 ton


nxN
Koefisien Alat/ton = 1 : Q7 (E18) 0.0056 Jam
Berlanjut ke hal. berikut.
ITEM PEMBAYARAN NO. : 6.5.(2) Analisa EI-635a
JENIS PEKERJAAN : Laston Lapis Antara Asbuton (AC-BC Asb)
SATUAN PEMBAYARAN : Ton URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.h. ALAT BANTU


- Rambu Lump Sum
- Kereta dorong
- Sekop
- Garpu
- Tongkat Kontrol ketebalan hanparan

3. TENAGA
Produksi menentukan : A M P Q2 54.00 ton / Jam
Produksi AC-BC Asb/ hari = Tk x Q2 Qt 378.00 ton
Kebutuhan tenaga :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang

Koefisien Tenaga / ton :


- Pekerja = (Tk x P) / Qt (L01) 0.1481 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0185 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 1,450,379.30 / ton

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 9,113.63 ton
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 6.5.(3) PERKIRAAN VOL. PEK. : 313.20
JENIS PEKERJAAN : Laston Lapis Fondasi Asbuton (AC-Base Asb) TOTAL HARGA (Rp.) : 417,233,895.20
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK : 1.12

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.2008 21,428.57 4,302.93

2. Mandor (L03) Jam 0.0201 28,571.43 573.72

JUMLAH HARGA TENAGA 4,876.65

B. BAHAN
1. Agr Pch Mesin 20-30 (M93) M3 0.1429 205,977.42 29,426.68
2. Agr Pch Mesin 5-10 & 10-15 (M92) M3 0.3238 360,600.00 116,744.25
3 Agr Pch Mesin 0 - 5 (M91) M3 0.2740 372,800.00 102,130.25
4 Semen (M12) Kg 0.0000 1,455.36 0.00
5 Aspal (M10) Kg 45.3200 14,470.90 655,821.01
6 Asbuton B 5/20 (M161) Kg 25.7500 4,000.00 103,000.00

JUMLAH HARGA BAHAN 1,007,122.19

C. PERALATAN
1. Wheel Loader E15 Jam 0.0054 345,037.95 1,852.53
2. AMP E01b Jam 0.0201 7,959,876.97 159,836.89
3. Genset E12 Jam 0.0201 108,635.38 2,181.43
4. Dump Truck E09 Jam 0.0683 408,698.87 27,917.98
5. Asp. Finisher E02 Jam 0.0067 305,923.51 2,043.85
6. Tandem Roller E17a Jam 0.0068 441,862.85 3,006.13
7 P. Tyre Roller E18 Jam 0.0045 450,647.80 2,020.91
8 Alat Bantu Ls 1.0000 200.00 200.00

JUMLAH HARGA PERALATAN 199,059.72

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,211,058.56


E. OVERHEAD & PROFIT 10.0 % x D 121,105.86
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,332,164.42
ITEM PEMBAYARAN NO. : 6.5.(3) Analisa EI-653
JENIS PEKERJAAN : Laston Lapis Fondasi Asbuton (AC-Base Asb)
SATUAN PEMBAYARAN : Ton URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : rusak
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 15.73 KM
5 Tebal Lapis (AC-Base) padat t 0.075 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi Agregat (padat) Bip 1.45 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.32 ton/m3
10 Komposisi campuran AC-Base :
- Agr Pch Mesin 20 - 30 mm 20-30 17.96 %
- Agr Pch Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 40.70 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 34.44 % memenuhi -
- Semen FF 0.00 % Spesifikasi
- Aspal As 4.40 %
- Asbuton Butir 5/20 Asb 2.50
- Anti Stripping Agent Asa 0.30 %As
11 Berat Isi bahan :
- AC-Base D1 2.29 ton / M3
- Agr Pch Mesin 20 - 30 mm D2 1.32 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 20 mm D3 1.32 ton / M3
- Agr Pch Mesin 0 - 5 mm D4 1.32 ton / M3
12 Jarak Stock pile ke Cold Bin l 0.05 km

II. URUTAN KERJA / METODE PELAKSANAAN


1 Wheel Loader memuat Agregat ke dalam Cold Bin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan dengan AMP untuk
dimuat langsung ke dalam Dump Truck dan diangkut ke lokasi pekerjaan
3 Campuran panas AC dihampar dengan Finisher dan dipadatkan dengan
Tandem & Pneumatic Tire Roller
4 Selama pemadatan, sekelompok pekerja akan merapikan tepi hamparan
dengan menggunakan Alat Bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Agr 20-30 = ("20-30" x Fh1) : D2 (M93) 0.1429 M3
1.b. Agr 5-10 & 10-20 = ("5-10&10-20" x Fh1) : D3 (M92) 0.3238 M3
1.c. Agr 0-5 = ("0-5" x Fh1) : D4 (M91) 0.2740 M3
1.d. Semen = (FF x Fh2) x 1000 (M12) 0.0000 Kg
1.e. Aspal = (As x Fh2) x 1000 (M10) 45.3200 Kg
1.f. Asbuton Butir 5/20 = (Asb x Fh2) x 1000 (M161) 25.7500 Kg

2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1
- Kecepatan maju rata rata Vf 15.00 km/jam panduan
- Kecepatan kembali rata rata Vr 20.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.20 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit
- Lain - lain (waktu pasti) T3 0.10 menit
Ts1 0.45 menit

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. : 6.5.(3) Analisa EI-653
JENIS PEKERJAAN : Laston Lapis Fondasi Asbuton (AC-Base Asb)
SATUAN PEMBAYARAN : Ton URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

Kap. Prod./jam = V x Fb x Fa x 60 x Bil Q1 186.25 ton


Ts1

Koefisien Alat / ton = 1 : Q1 (E15) 0.0054 Jam

2.b. ASPHALT MIXING PLANT (AMP) (E01b)


Kapasitas produksi V 60.00 ton / Jam
Faktor Efisiensi alat Fa 0.83 -

Kap.Prod. / jam = V x Fa Q2 49.80 ton

Koefisien Alat / M3 = 1 : Q2 (E01) 0.0201 Jam

2.c. GENERATORSET ( GENSET ) (E12)


Kap.Prod. / Jam = SAMA DENGAN AMP Q3 49.80 ton
Koefisien Alat / ton = 1 : Q3 (E12) 0.0201 Jam

2.d. DUMP TRUCK (DT) (E09)


Kapasitas bak V 8.00 M3
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 40.00 Km / Jam
Kecepatan rata-rata kosong v2 60.00 Km / Jam
Kapasitas AMP / batch Q2b 1.00 ton
Waktu menyiapkan 1 batch AC-BC Tb 1.00 menit
Waktu Siklus Ts2
- Mengisi Bak = (V : Q2b) x Tb T1 8.00 menit
- Angkut = (L : v1) x 60 menit T2 23.59 menit
- Tunggu + dump + Putar T3 15.00 menit
- Kembali = (L : v2) x 60 menit T4 15.73 menit
Ts2 62.32 menit

Kap.Prod. / jam = V x Fa x 60 x D1 Q4 14.64 ton


Ts2

Koefisien Alat / ton = 1 : Q4 (E09) 0.0683 Jam

2.e. ASPHALT FINISHER (E02)


Kecepatan menghampar V 5.00 m/menit
Faktor efisiensi alat Fa 0.83 - Normal
Lebar hamparan b 3.50 meter
Kap.Prod. / jam = V x b x 60 x Fa x t x D1 Q5 149.68 ton

Koefisien Alat / ton = 1 : Q5 (E02) 0.0067 Jam

2.f. TANDEM ROLLER (E17a)


Kecepatan rata-rata alat v 4.00 Km / Jam
Lebar efektif pemadatan b 1.68 M
Jumlah lintasan n 6.00 lintasan 2 awal & 4 Akhir
Jumlah lajur lintasan N 3.00
Lebar overlap bo 0.20 m
Faktor Efisiensi alat Fa 0.83 - Normal

Kap. Prod./jam = (v x 1000) x (N(b-bo)+bo) x t x Fa x D1 Q6 146.99 ton


nxN
Koefisien Alat / ton = 1 : Q6 (E17a) 0.0068 Jam

2.g. PNEUMATIC TIRE ROLLER (E18)


Kecepatan rata-rata v 10.00 KM / Jam
Lebar efektif pemadatan b 2.29 M
Jumlah lintasan n 14.00 lintasan
Lajur lintasan N 2.00
Lebar Overlap bo 0.20 M
Faktor Efisiensi alat Fa 0.83 -

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. : 6.5.(3) Analisa EI-653
JENIS PEKERJAAN : Laston Lapis Fondasi Asbuton (AC-Base Asb)
SATUAN PEMBAYARAN : Ton URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

Kap.Prod. / jam = (v x 1000) x (N(b-bo)+bo) x t x Fa x D1 Q7 222.99 ton


nxN
Koefisien Alat / ton = 1 : Q7 (E18) 0.0045 Jam

2.h. ALAT BANTU


diperlukan : Lump Sum
- Kereta dorong
- Sekop
- Garpu
- Tongkat Kontrol ketebalan hanparan

3. TENAGA
Produksi menentukan : AMP Q2 49.80 ton
Produksi AC-Base Asb / hari = Tk x Q5 Qt 348.60 ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang

Koefisien Tenaga / ton :


- Pekerja = (Tk x P) / Qt (L01) 0.2008 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0201 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 417,233,895.20 / TON

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 313.20 ton
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. :7.1 (6a) PERKIRAAN VOL. PEK. : 60.00
JENIS PEKERJAAN :Beton struktur fc’ 25 Mpa TOTAL HARGA (Rp.) : 121,026,224.43
SATUAN PEMBAYARAN :M3 % THD. BIAYA PROYEK : 0.32

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.4016 21,428.57 8,605.85


2. Tukang (L02) jam 0.6024 25,714.29 15,490.53
3. Mandor (L03) jam 0.0502 28,571.43 1,434.31

JUMLAH HARGA TENAGA 25,530.69

B. BAHAN

1. Semen (M12) Kg 307.9700 1,455.36 448,207.47


2. Agregat Halus Beton (M01a) M3 0.6104 161,800.00 98,770.53
3. Agregat Kasar (M03) M3 0.7944 360,600.00 286,453.18
4. Kayu Perancah (M19) M3 0.3200 1,700,000.00 544,000.00
5. Paku (M18) Kg 3.8400 16,500.00 63,360.00
6. Air (M170) Ltr 190.5500 13.00 2,477.15
7. Plastizier (M182) Kg 0.9239 40,000.00 36,956.40

JUMLAH HARGA BAHAN 1,480,224.73

C. PERALATAN
1. Whell loader (E15) jam 0.0000 345,037.95 0.00
2 Concrete Batching Plant (E80) jam 0.0502 133,542.37 6,703.93
3 Truck Mixer (E49) jam 0.3648 462,774.65 168,825.94
4 Concrete Pump (E30) jam 0.3648 334,193.14 121,917.81
5 Concrete Vibrator (E20) jam 0.3012 64,816.69 19,523.10
6 Water Tank Truck (E23) jam 0.0382 288,433.11 11,004.48
7 Alat Bantu Ls 1.0000 200.00 200.00

JUMLAH HARGA PERALATAN 327,975.25

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,833,730.67


E. OVERHEAD & PROFIT 10.0 % x D 183,373.07
F. HARGA SATUAN PEKERJAAN ( D + E ) 2,017,103.74
Analisa LI-7103a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 7.10.(3a) PERKIRAAN VOL. PEK. : 2,141.61
JENIS PEKERJAAN : Bronjong dengan kawat yang dilapisi galvanis TOTAL HARGA (Rp.) : 2,584,257,229.29
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 6.93

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 10.5000 21,428.57 225,000.00


2. Tukang (L02) jam 4.2000 25,714.29 108,000.00
3. Mandor (L03) jam 0.7000 28,571.43 20,000.00

JUMLAH HARGA TENAGA 353,000.00

B. BAHAN

1. Bronjong dengan kawat dilapisi galvanis (M15a) Kg 15.0000 25,000.00 375,000.00


2. Batu (M02) M3 1.1000 335,400.00 368,940.00

JUMLAH HARGA BAHAN 743,940.00

C. PERALATAN

1. Alat Bantu Ls 1.0000 50.00 50.00

JUMLAH HARGA PERALATAN 50.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,096,990.00


E. OVERHEAD & PROFIT 10.0 % x D 109,699.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,206,689.00
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 7.10.(3a) Analisa LI-7103a
JENIS PEKERJAAN : Bronjong dengan kawat yang dilapisi galvanis
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bronjong dengan kawat dilapisi galvanis diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 15.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Material Fh 1.05 -

II. URUTAN KERJA


1 Keranjang kawat bronjong direntangkana dan dibentuk
sesuai dengan konstruksi yang diinginkan
2 Batu ditempatkan satu demi satu sehingga rongga
sesedikit mungkin
3 Anyaman kawat ditutup dan diikat

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Bronjong dengan kawat dilapisi galvanis (M15a) 15.00 Kg
1.b. Batu (M02) 1.1000 M3

2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Tang = 2 buah
- Pemotong kawat = 2 buah
- Palu pemecah batu = 2 buah

3. TENAGA
Produksi pekerjaan per hari Qt 10.00 M3
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 6.00 orang
- Pekerja P 15.00 orang

Koefisien Tenaga / M3
- Mandor = ( M x Tk ) : Qt (L03) 0.7000 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 4.2000 jam
- Pekerja = ( P x Tk ) : Qt (L01) 10.5000 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 1,206,689.00 / M3

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 2,141.61 M3
Analisa EI-8.3.2a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 8.3.(2a) PERKIRAAN VOL. PEK. : 459.58
JENIS PEKERJAAN : Pengecatan dekoratif pada elemen struktur beton, teba TOTAL HARGA (Rp.) : 35,377,430.04
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.09

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. TENAGA

1. Pekerja (L01) jam 0.2941 21,428.57 6,302.52


2. Mandor (L03) jam 0.0588 28,571.43 1,680.67

JUMLAH HARGA TENAGA 7,983.19

B. BAHAN
1 Cat Dasar (M199) Kg 0.288 45,000.00 12,978.00
2 Cat protektif (M200) Kg 0.258 95,000.00 24,462.50
3 Pengencer (M33) liter 0.041 29,000.00 1,176.75
4 Air (M170) liter 0.000 13.00 0.00

JUMLAH HARGA BAHAN 38,617.25


C. PERALATAN

1 Water Jet Blasting E64 jam 0.0588 68,142.36 4,008.37


2 Generator Set E05 jam 0.0588 325,906.15 19,170.95
3 Alat Bantu Ls 1.0000 200.00 200.00

JUMLAH HARGA PERALATAN 23,379.32


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 69,979.76
E. OVERHEAD & PROFIT 10.0 % x D 6,997.98
F. HARGA SATUAN PEKERJAAN ( D + E ) 76,977.74
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 8.7.(1a) PERKIRAAN VOL. PEK. : 52.48
JENIS PEKERJAAN : Pengecatan struktur baja pada daerah kering tebal 80 mTOTAL HARGA (Rp.) : 5,044,430.65
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.01

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja (L01) jam 0.4634 21,428.57 9,929.83
2. Tukang (L02) jam 0.4634 25,714.29 11,915.80
3. Mandor (L03) jam 0.0927 28,571.43 2,647.95

JUMLAH HARGA TENAGA 24,493.58

B. BAHAN

1 Cat Dasar (M202) Kg 0.288 28,000.00 8,075.20


2 Cat Lapisan Akhir (M203) Kg 0.258 70,000.00 18,025.00
3 Pengencer (M33) liter 0.041 29,000.00 1,176.75
4 Pasir untuk sand blasting (M219) kg 0.000 0.00 0.00

JUMLAH HARGA BAHAN 27,276.95


C. PERALATAN

1 Sand Blaster E77 jam 0.0927 58,133.81 5,387.75


2 Generator Set E12 jam 0.0927 325,906.15 30,204.46
3 Alat Bantu Ls 1.0000 20.00 20.00

JUMLAH HARGA PERALATAN 35,612.21


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 87,382.74
E. OVERHEAD & PROFIT 10.0 % x D 8,738.27
F. HARGA SATUAN PEKERJAAN ( D + E ) 96,121.01
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 8.7.(3a) PERKIRAAN VOL. PEK. : 130.41
JENIS PEKERJAAN : Pengecatan pada elemen sandaran dan/atau pagar peng
TOTAL HARGA (Rp.) : 14,103,733.12
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.04

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1. Pekerja (L01) jam 0.5476 21,428.57 11,735.25
2. Tukang (L02) jam 0.5476 25,714.29 14,082.30
3. Mandor (L03) jam 0.1095 28,571.43 3,129.40

JUMLAH HARGA TENAGA 28,946.96

B. BAHAN

1 Cat Dasar (M202) Kg 0.288 28,000.00 8,075.20


2 Cat Lapisan Akhir (M203) Kg 0.258 70,000.00 18,025.00
3 Pengencer (M33) liter 0.041 29,000.00 1,176.75
4 Pasir untuk sand blasting (M219) 0 0.000 0.00 0.00

JUMLAH HARGA BAHAN 27,276.95


C. PERALATAN

1 Sand Blaster E77 jam 0.1095 58,133.81 6,367.34


2 Generator Set E12 jam 0.1095 325,906.15 35,696.18
3 Alat Bantu Ls 1.0000 30.00 30.00

JUMLAH HARGA PERALATAN 42,093.52


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 98,317.43
E. OVERHEAD & PROFIT 10.0 % x D 9,831.74
F. HARGA SATUAN PEKERJAAN ( D + E ) 108,149.17
ITEM PEMBAYARAN NO. : 8.11.(1) Analisa EI-8111
JENIS PEKERJAAN : Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic Plug
SATUAN PEMBAYARAN :M URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. DATA DAN ASUMSI


1 Menggunakan alat (cara mekanik)
2 Lokasi Pekerjaan : setiap joint jembatan
3 Harus dipastikan perkerasan aspal sudah berumur 14 hari
4 Panjang Siar Muai Ps 7.00 m
5 Bahan / material diterima seluruhnya di Lokasi Pekerjaan
Bridging plate Lebar L.bp 0.150 m
6 Tebal T.bp 0.004 m
Rubber bitumen Lebar L.Rp 0.400 m
Tebal T.Rp 0.075 m
7 Berat jenis Bi.Rp 1.200
Agregat (pengisi) 14 - 20 mm Lebar L.Ag 0.400 m
Tebal T.Ag 0.075 m
8 Berat jenis Bi.Ag 2.200
9 Road Backer/nucel (penahan aspal binder agar tidak turun keb Rb 1.000 m
10 Di bawah permukaan jalan oprit jembatan sudah terpasang beton
11 Jarak rata-rata Base Camp ke Lokasi Pekerjaan L 15.73 KM
12 Jam kerja efektif per-hari Tk 7.00 jam
Faktor kehilangan bahan Fh1 1.02
Fh 2 1.05
13 Perbandingan campuran Rubber bitumen Pr 35.00 %
Agregat Pa 65.00 %
II. URUTAN KERJA

1 Marking aspal yang akan dipotong dengan cat pylox


2 Potong aspal menggunakan Aspalt Cutter dan dicongkel menggunakan Jack hammer
3 Bersihkan permukaan dengan Sikat kawat dan Hot Compressor Air Lance (HCA)
4 Pasang road backer/ nucel disetiap ukuran celah joint dan bersihkan kembali dengan HCA
5 Coating permukaan dengan rubber bitumen
6 Pasang plat baja sesuai ukuran
7 Coating kembali permukaan dengan rubber bitumen
8 Agregat dipanaskan hingga temperatur 180◦ - 200◦ C menggunakan Drum Mixer Khusus
9 Agregat panas dituang kedalam lokasi pekerjaan siar muai
10 Tuang rubber bitumen yang telah dipanaskan dengan Pre Heater/Boiler diatas agregat panas
11 Padatkan lapisan tersebut secara manual
12 Tuang kembali agregat panas diatas lapisan pertama
13 Rubber bitumen panas dituang kembali diatas agregat panas
14 Padatkan lapisan tersebut dengan stamper
15 Tuang rubber bitumen panas sebagai lapisan akhir

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Bridging Plate = Lbp x Tbp x 1 x 7850 x Fh (M133) 4.804 Kg/m1
1.b Road Backer = Rb x Fh (M165) 1.020 m'
1.c Rubber bitumen (25 x 7,5 x 100) cm= L.Ra x T.Ra x 1 x 1000 x Bi.Ra x Pr x Fh (M255) 16.708 Kg/m1
1.d Agregat 14 - 20 mm = L.Ag x T.Ag x 1 x 1000 x Bi.Ag x Pa x Fh (M77) 58.559 Kg/m1

2. ALAT
2.a ASPAL CUTTER (0,5-0,7 m/menit) E76
Kapasitas pemotongan per jam v 6.00 m/Jam
Faktor efisiensi alat Fa 0.83
Kapasitas prod/jam = v x Fa : 2 Q1 2.49 M
Koefisien alat / m = 1 : Q1 E76 0.4016 Jam
2.b JACK HAMMER E26
Kapasitas bongkar bk 7.50 m2/jam Note: 1
Effesiensi kerja Fa 0.83
Kapa. Prod/jam = Fa x L.Rp Q2 3.000 M
Koefisien Alat / m = 1 : Q2 E26 0.3333 Jam
2.c Compressor AHX-10, 10 HP E05
Kap. Prod. / jam = Jack Hammer Q3 3.000 liter

Kap. Produk m / jam 0.100 m/jam


Koefisien Alat / m = 1 : Q3 E05 0.3333 Jam

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. : 8.11.(1) Analisa EI-8111
JENIS PEKERJAAN : Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic Plug
SATUAN PEMBAYARAN :M URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.d. DRUM MIXER KHUSUS E79


Kapasitas Alat V1 200.00 kg
Efektifitas Alat Fa 0.83
Waktu Siklus Ts
- Menuang Bahan T1 2.00 Menit
- Mengaduk agregat T2 30.00 Menit
- Menuangkan agregat T3 6.00 Menit
Ts4 38.00 Menit
Kap. Produk Kg / Jam V x Fa x 60 Q4 262.105 kg/Jam
Ts4
Kap. Produk m / jam 8.74 m/jam
Koefisien Alat / Kg = 1 : Q4 E79 0.1145 Jam
2.d. HOT COMPRESSOR AIR LANCE (HCA) 1000 ◦ C
Kapasitas Alat V2 1,000.00 ◦C
Efektifitas Alat Fa 0.83
Waktu Siklus Ts
- Memanaskan agregat Ts2 90.00 Menit
Kap. Produk Kg / Jam V1 x Fa x 60 Q2 110.667 kg/Jam
Ts2
Kap. Produk m / jam 8.74 m/jam
Koefisien Alat / kg = 1 : Q2 E06 0.0090 Jam
2.c. PRE HEATER / BOILER
Kapasitas Alat V2 500.00 Kg
Efektifitas Alat Fa 0.83
Waktu Siklus Ts
- Memanaskan aspal Ts2 120.00 Menit
Kap. Produk Kg / Jam V1 x Fa x 60 Q2 3.626 kg/Jam
Ts2
Kap. Produk m / jam 0.121 m/jam
Koefisien Alat / kg = 1 : Q2 E06 0.2758 Jam
2.d. TAMPER E25
Kecepatan v 1.00 Km / Jam
Efisiensi alat Fa 0.83 -
Lebar pemadatan Lb 0.40 M
Banyak lintasan n 6 lintasan
Jumlah lapisan N 1
Tebal lapis hamparan tp 0.10 M
Kap. Prod. / Jam = v x 1000 x Fa Q3 138.333 M' / Jam
n
Koefisien Alat / m' = 1 : Q3 x Vp E25 0.0072 jam
2.e GENERATOR SET 2000 Watt E12
Kapasitas genset
Koefisien Alat mengikuti Asphalt Cutter E12 0.40 Jam
3. TENAGA
Produksi pasang Exp. Joint dalam 1 hari Qt 2.49 m
Kebutuhan tenaga : - Mandor M 1.000 orang
- Tukang T 3.000 orang
- Pekerja P 4.000 orang
Koefisien Tenaga / M :
- Mandor = (Tk x M) : Qt (L03) 2.8112 jam
- Tukang = (Tk x Tb) : Qt (L02) 8.4337 jam
- Pekerja = (Tk x P) : Qt (L01) 11.2450 jam
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
5. ANALISA HARGA SATUAN PEKERJAAN
Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKEMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 1,794,874 / M

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan
7. VOLUME PEKERJAAN YANG DIPERLUKAN
Volume pekerjaan : 76.00 M1
Analisa EI-8111

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 8.11.(1) PERKIRAAN VOL. PEK. : 76.00
JENIS PEKERJAAN : Penggantian dan Perbaikan Sambungan Siar Muai TipeTOTAL HARGA (Rp.) : 136,410,395.18
SATUAN PEMBAYARAN :M % THD. BIAYA PROYEK : 0.37

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 11.24 21,428.57 240,963.86


2. Tukang (L02) jam 8.43 25,714.29 216,867.47
3. Mandor (L03) jam 2.81 28,571.43 80,321.29

JUMLAH HARGA TENAGA 538,152.61

B. BAHAN
1. Bridging Plate (M133) Kg/m1 4.804 19,000.00 91,279.80
2. Road Backer (M165) m' 1.020 900.00 918.00
3. Rubber bitumen (25 x 7,5 x 100) (M255) kg 16.708 40,000.00 668,304.00
4. Agregat 14 - 20 mm (M77) Kg 58.559 800.00 46,846.80

JUMLAH HARGA BAHAN 807,348.60

C. PERALATAN

1. Aspal Cutter E76 Jam 0.1145 67,625.79 7,740.30


2. Jack Hammer E26 Jam 0.3333 61,967.04 20,655.68
3. Compressor AHX-10, 10 HP E05 Jam 0.3333 154,154.52 51,384.84
4. Drum Mixer Khusus E79 Jam 0.1145 362,133.71 41,449.04
5. Hot Compressor Air Lance (HCA) 0 Jam 0.0090 180,000.00 1,626.51
6. Pre Heater 0 Jam 0.2758 115,000.00 31,717.23
7. Tamper E25 Jam 0.0072 61,209.77 442.48
8. Generator Set E12 Jam 0.4016 325,906.15 130,886.00
9. Alat Bantu Ls 1.0000 300.00 300.00

JUMLAH HARGA PERALATAN 286,202.08

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,631,703.29


E. OVERHEAD & PROFIT 10.0 % x D 163,170.33
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,794,873.62
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-911

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 9.1.(1) PERKIRAAN VOL. PEK. : 250.00
JENIS PEKERJAAN : Mandor TOTAL HARGA (Rp.) : 8,432,990.67
% THD. BIAYA PROYEK : 0.02
SATUAN PEMBAYARAN : Jam

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Mandor (L03) jam 1.0000 30,665.42 30,665.42


- - -

B. BAHAN

1. - - - - -
2. - - - - -

C. ALAT

1. - - - - -
2. - - - - -

D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 30,665.42


E. OVERHEAD & PROFIT 10.0 % x D 3,066.54
F. HARGA SATUAN PEKERJAAN ( D + E ) 33,731.96
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 9.1.(2) PERKIRAAN VOL. PEK. : 250.00
JENIS PEKERJAAN : Pekerja Biasa TOTAL HARGA (Rp.) : 5,049,479.98
% THD. BIAYA PROYEK : 0.01
SATUAN PEMBAYARAN : Jam

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. BIAYA MANDOR PER BULAN

1. Pekerja Biasa (L01) jam 1.0000 18,361.75 18,361.75


- - -

B. BAHAN

1. - - - - -
2. - - - - -

C. ALAT

1. - - - - -
2. - - - - -

D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 18,361.75


E. OVERHEAD & PROFIT 10.0 % x D 1,836.17
F. HARGA SATUAN PEKERJAAN ( D + E ) 20,197.92
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 9.1.(4a) PERKIRAAN VOL. PEK. : 270.00
JENIS PEKERJAAN : Dump Truck 3 - 4 M3 TOTAL HARGA (Rp.) : 74,802,723.31
% THD. BIAYA PROYEK : 0.20
SATUAN PEMBAYARAN : Jam

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. PEKERJA

1. - - - -
2. - - - -

B. BAHAN

1. - - - -
2. - - - -

C. ALAT

1. DUMP TRUCK 4 TON (E08) jam 1.0000 251,861.02 251,861.02


- - -

D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 251,861.02


E. OVERHEAD & PROFIT 10.0 % x D 25,186.10
F. HARGA SATUAN PEKERJAAN ( D + E ) 277,047.12
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 9.1.(8) PERKIRAAN VOL. PEK. : 270.00
JENIS PEKERJAAN : Motor Grader Min . 100 PK TOTAL HARGA (Rp.) : 114,625,564.00
MOTOR GRADER >100 HP % THD. BIAYA PROYEK : 0.31
SATUAN PEMBAYARAN : JAM (E13)

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. PEKERJA

1. - - - -
2. - - - -

B. BAHAN

1. - - - -
2. - - - -

C. ALAT

1. MOTOR GRADER >100 HP (E13) jam 1.0000 385,944.66 385,944.66

D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 385,944.66


E. OVERHEAD & PROFIT 10.0 % x D 38,594.47
F. HARGA SATUAN PEKERJAAN ( D + E ) 424,539.13
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 9.1.(11) PERKIRAAN VOL. PEK. : 200.00
JENIS PEKERJAAN : Alat Penggali (Excavator) 80-140 PK TOTAL HARGA (Rp.) : 105,171,806.39
EXCAVATOR 80-140 HP % THD. BIAYA PROYEK : 0.28
SATUAN PEMBAYARAN : JAM (E10)

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. PEKERJA

1. - - - -
2. - - - -

B. BAHAN

1. - - - -
2. - - - -

C. ALAT

1. EXCAVATOR 80-140 HP (E10) jam 1.0000 478,053.67 478,053.67

D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 478,053.67


E. OVERHEAD & PROFIT 10.0 % x D 47,805.37
F. HARGA SATUAN PEKERJAAN ( D + E ) 525,859.03
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 9.1.(14) PERKIRAAN VOL. PEK. : 270.00
JENIS PEKERJAAN : Penggilas Bervibrasi 5-8 Ton TOTAL HARGA (Rp.) : 131,164,590.70
VIBRATORY ROLLER 5-8 T. % THD. BIAYA PROYEK : 0.35
SATUAN PEMBAYARAN : JAM (E19)

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. PEKERJA

1. - - - -
2. - - - -

B. BAHAN

1. - - - -
2. - - - -

C. ALAT

1. VIBRATORY ROLLER 5-8 T. (E19) jam 1.0000 441,631.62 441,631.62

D. JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 441,631.62


E. OVERHEAD & PROFIT 10.0 % x D 44,163.16
F. HARGA SATUAN PEKERJAAN ( D + E ) 485,794.78
Analisa EI-921

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 9.2.(1) PERKIRAAN VOL. PEK. : 4,066.65
JENIS PEKERJAAN : Marka Jalan Termoplastik TOTAL HARGA (Rp.) : 529,993,876.29
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 1.42

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 0.1046 24,996.34 2,614.00


2. Tukang (L02) jam 0.0174 25,827.27 450.15
3. Mandor (L03) jam 0.0174 30,066.21 524.03

JUMLAH HARGA TENAGA 3,588.17

B. BAHAN

1. Cat Marka Thermoplastic (M17b) Kg 3.3218 30,000.00 99,652.50


2. Glass Bead (M34) Kg 0.4635 20,000.00 9,270.00

JUMLAH HARGA BAHAN 108,922.50


C. PERALATAN

1. Dump Truck (E08) Jam 0.0174 251,861.02 4,389.73


2. Thermoplastic Road Marking Machine (E85) Jam 0.0174 87,702.76 1,528.59
3. Alat Bantu Ls 1.0000 50.00 50.00

JUMLAH HARGA PERALATAN 5,968.32

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 118,479.00


E. OVERHEAD & PROFIT 10.0 % x D 11,847.90
F. HARGA SATUAN PEKERJAAN ( D + E ) 130,326.90
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 9.2.(1) Analisa EI-921
JENIS PEKERJAAN : Marka Jalan Termoplastik
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 15.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Material Fh 1.03 -
7 Tebal lapisan cat secara manual t 1.50 mm
8 Berat Jenis Bahan Cat BJ.Cat 2.15 Kg/Liter
9 Perbandingan pemakaian bahan : - Cat C 100.00 %
Panjang cat Cat 3.00 m
Panjang kosong Ksg 5.00 m

II. URUTAN KERJA


1 Permukaan jalan dibersihkan dari debu/kotoran
2 Cat dikeluarkan dari alat penghampar dalam kondisi panas
3 Glass Beat ditabur secara mekanis diatas cat yang baru terhampar.

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
1.a. Cat Marka Thermoplastic= 1x1x t/1000 x Fh x 1000 x BJ Cat (M17b) 3.3218 Kg
1.b. Glass Bead = 0,45 x Fh (M34) 0.4635 Kg

2. ALAT
2.a. THERMOPLASTIC ROAD MARKING MACHINE
Kecepatan bergerak bukan didorong v 4.00 km/jam
Lebar penyemprotan b 0.12 m
Faktor efisiensi alat Fa 0.85
Kap. Prod. / jam = (vx1000/(cat+ksg))x(cat/(cat+ksg))xcatxbxFa Q2 57.38 m2

Koefisien Alat / Ltr = 1 : Q2 (E05) 0.01743 Jam

2.b. DUMP TRUCK 4 M3 (E08)


Pada dasarnya alat ini digunakan bersama-sama
dengan Compressor Q2 57.38 M2/Jam

Koef. Alat / M2 = 1 : Q3 (E08) 0.0174 Jam

2.c. ALAT BANTU Ls


Diperlukan :
- Sapu Lidi
- Sikat Ijuk
- Rambu-rambu pengaman
- Maal Tripleks

Berlanjut ke hal. berikut.


ITEM PEMBAYARAN NO. : 9.2.(1) Analisa EI-921
JENIS PEKERJAAN : Marka Jalan Termoplastik
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

3. TENAGA
Produksi pekerjaan per hari = Q1 x Tk Qt 401.63 M2
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Cat Tb 1.00 orang
- Pekerja P 6.00 orang

Koefisien Tenaga / M2 :
- Mandor = ( M x Tk ) : Qt (L03) 0.0174 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0174 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.1046 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 130,326.90 / M2

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ........... bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 4,066.65 M2
Analisa EI-846a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 9.2.(6a) PERKIRAAN VOL. PEK. : 7.00
JENIS PEKERJAAN : Patok Kilometer TOTAL HARGA (Rp.) : 4,475,277.74
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 0.01

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 9.7498 21,428.57 208,923.29


2. Tukang (L02) jam 1.5000 25,714.29 38,570.45
3. Mandor (L03) jam 0.7500 28,571.43 21,428.03

JUMLAH HARGA TENAGA 268,921.77

B. BAHAN

1. Beton Fc 20 Mpa (M186) M3 0.0348 1,901,330.75 66,095.01


2. Baja Tulangan (M57a) Kg 4.3453 13,070.90 56,797.13
3 Cat, dan material lainnya Ls 1.0000 0.00

JUMLAH HARGA BAHAN 122,892.14

C. PERALATAN

1. Dump Truck E08 Jam 0.7500 251,861.02 188,890.99


2. Alat Bantu Ls 1.0000 500.00 500.00

JUMLAH HARGA PERALATAN 189,390.99

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 581,204.90


E. OVERHEAD & PROFIT 10.0 % x D 58,120.49
F. HARGA SATUAN PEKERJAAN ( D + E ) 639,325.39
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 9.2.(3a) PERKIRAAN VOL. PEK. : 22.00
JENIS PEKERJAAN : Rambu Jalan Tunggal dengan Permukaan TOTAL HARGA (Rp.) : 17,642,995.71
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 0.05

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 1.2541 4,532.31 5,684.15


2. Tukang (L02) jam 0.1672 5,963.57 997.22
3. Mandor (L03) jam 0.0836 7,156.29 598.33

JUMLAH HARGA TENAGA 7,279.70

B. BAHAN

1. Pelat Rambu (M35b) Buah 1.0000 418,200.00 418,200.00


2. Pipa Galvanis Dia. 5" (M25a) Batang 1.0000 257,000.00 257,000.00
3. Beton Fc 15 Mpa (M186) M3 0.0160 1,575,738.01 25,211.81

JUMLAH HARGA BAHAN 700,411.81

C. PERALATAN

1. Dump Truck E08 Jam 0.0836 251,861.02 21,057.90


2. Alat Bantu Ls 1.0000 300.00 300.00

JUMLAH HARGA PERALATAN 21,357.90

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 729,049.41


E. OVERHEAD & PROFIT 10.0 % x D 72,904.94
F. HARGA SATUAN PEKERJAAN ( D + E ) 801,954.35
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 9.2.(5) PERKIRAAN VOL. PEK. : 166.00
JENIS PEKERJAAN : Patok Pengarah TOTAL HARGA (Rp.) : 56,511,153.69
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 0.15

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 14.8491 4,532.31 67,300.58


2. Tukang (L02) jam 1.9799 5,963.57 11,807.12
3. Mandor (L03) jam 0.9899 7,156.29 7,084.27

JUMLAH HARGA TENAGA 86,191.98

B. BAHAN

1. Beton fc 20 Mpa (M186) M3 0.0348 1,579,978.68 54,924.01


2. Baja Tulangan (M57a) Kg 2.9201 13,070.90 38,167.67

JUMLAH HARGA BAHAN 93,091.68

C. PERALATAN

1. Dump Truck E08 Jam 0.9899 131,217.37 129,896.92


2. Alat Bantu Ls 1.0000 300.00 300.00

JUMLAH HARGA PERALATAN 130,196.92

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 309,480.58


E. OVERHEAD & PROFIT 10.0 % x D 30,948.06
F. HARGA SATUAN PEKERJAAN ( D + E ) 340,428.64
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 9.2.(7) PERKIRAAN VOL. PEK. : 300.00
JENIS PEKERJAAN : Rel Pengaman TOTAL HARGA (Rp.) : 201,695,961.21
SATUAN PEMBAYARAN : M % THD. BIAYA PROYEK : 0.54

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. PEKERJA

1. Pekerja Biasa (L01) jam 1.9155 4,532.31 8,681.76


2. Tukang (L02) jam 0.4789 5,963.57 2,855.84
3. Mandor (L03) jam 0.2394 7,156.29 1,713.51

JUMLAH HARGA TENAGA 13,251.11

B. BAHAN

1. Rel Pengaman ( Termasuk Tiang Blok (M36) M' 1.0300 550,000.00 566,500.00

JUMLAH HARGA BAHAN 566,500.00

C. PERALATAN

1. Dump Truck E08 Jam 0.2394 131,217.37 31,418.77


2. Alat Bantu Ls 1.0000 30.00 30.00

JUMLAH HARGA PERALATAN 31,448.77

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 611,199.88


E. OVERHEAD & PROFIT 10.0 % x D 61,119.99
F. HARGA SATUAN PEKERJAAN ( D + E ) 672,319.87
ITEM PEMBAYARAN NO. : 9.2.(7) Analisa EI-927
JENIS PEKERJAAN : Rel Pengaman
SATUAN PEMBAYARAN : M URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar rel pengaman diterima di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 15.73 Km ukuran
5 Jam kerja efektif per-hari Tk 7.00 jam sesuai

6 Faktor kehilangan bahan Fh 1.03 - drawing

II. URUTAN KERJA


1 Kesatuam pondasi, pelat dan tiang rambu disiapkan dan
dipasang ditempat yang telah ditentukan

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
1.a. Rel Pengaman ( Termasuk Tiang Blok Baut) (M36) 1.0300 M'

2. ALAT
2.a DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0 M'
Waktu Siklus : Ts
- Memuat T1 50.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 75.50 menit
- Menurunkan T3 60.0 menit
- Lain-lain T4 30.0 menit
Ts 215.5 menit

Kap. Prod. / Jam = Cp Q1 4.2 M'


Ts : 60

Koefisien Alat / M' = 1 : Q1 (E08) 0.2394

2.b. ALAT BANTU


- Linggis / Sekop
- Kunci Baut
- Palu

3. TENAGA
Produksi pasang pagar pengaman / hari = Tk x Q1 Qt 29.23 M'
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / M' :
- Mandor = (Tk x M) : Qt (L03) 0.2394 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.4789 jam
- Pekerja = (Tk x P) : Qt (L01) 1.9155 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 672,319.87 / M'


Berlanjut ke hal. berikut.
ITEM PEMBAYARAN NO. : 9.2.(7) Analisa EI-927
JENIS PEKERJAAN : Rel Pengaman
SATUAN PEMBAYARAN : M URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ........... bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 300.00 M'
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 9.2.(22a) PERKIRAAN VOL. PEK. : 2,250.00
JENIS PEKERJAAN : Stabilisasi Dengan Tanaman TOTAL HARGA (Rp.) : 85,647,097.80
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.23

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 0.2800 4,532.31 1,269.05


2. Tukang (L02) jam 0.1400 5,963.57 834.90
3. Mandor (L03) jam 0.0700 7,156.29 500.94

JUMLAH HARGA TENAGA 2,604.89

B. BAHAN

1. Gebalan Rumput M273 M2 1.0500 30,000.00 31,500.00


2. Pupuk M272 Kg 0.1250 30,000.00

JUMLAH HARGA BAHAN 31,500.00

C. PERALATAN

1. Alat Bantu Ls 1.0000 500.00 500.00

JUMLAH HARGA PERALATAN 500.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 34,604.89


E. OVERHEAD & PROFIT 10.0 % x D 3,460.49
F. HARGA SATUAN PEKERJAAN ( D + E ) 38,065.38
Analisa EI-1011

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 10.1.(1) PERKIRAAN VOL. PEK. : 178.64
JENIS PEKERJAAN : Galian pada Saluran Air atau Lereng untuk TOTAL HARGA (Rp.) : 22,761,437.00
SATUAN PEMBAYARAN : M3 0 % THD. BIAYA PROYEK : 0.06

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.1699 21,428.57 3,641.46


2. Mandor (L03) jam 0.0850 28,571.43 2,427.64

JUMLAH HARGA TENAGA 6,069.09

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Mini Excavator E10a jam 0.1699 239,134.65 40,637.26


2. Dump Truck E08 jam 0.2743 251,861.02 69,075.57
3. Alat Bantu Ls 1.0000 50.00 50.00

JUMLAH HARGA PERALATAN 109,762.83

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 115,831.93


E. OVERHEAD & PROFIT 10.0 % x D 11,583.19
F. HARGA SATUAN PEKERJAAN ( D + E ) 127,415.12
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 10.1.(3) PERKIRAAN VOL. PEK. : 33.64
JENIS PEKERJAAN : Perbaikan Pasangan Batu dengan Mortar TOTAL HARGA (Rp.) : 40,586,937.22
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.11

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 2.4096 21,428.57 51,635.11


2. Tukang Batu (L02) jam 0.8032 25,714.29 20,654.04
3. Mandor (L03) jam 0.4016 28,571.43 11,474.47

JUMLAH HARGA TENAGA 83,763.63

B. BAHAN

1. Batu (M02) M3 1.2000 335,400.00 402,480.00


2. Semen (PC) (M12) Kg 232.0000 1,455.36 337,643.71
3. Pasir (M10b) M3 0.4808 193,800.00 93,184.39

JUMLAH HARGA BAHAN 833,308.09

C. PERALATAN

1 Dump Truck (E08) jam 0.5534 251,861.02 139,385.92


2 Conc. Mixer (E06) jam 0.4016 100,503.95 40,363.03
3 Alat Bantu Ls 1.0000 5.00 5.00

JUMLAH HARGA PERALATAN 179,753.96

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,096,825.67


E. OVERHEAD & PROFIT 10.0 % x D 109,682.57
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,206,508.24
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 10.1.(4) PERKIRAAN VOL. PEK. : 479.66
JENIS PEKERJAAN : Perbaikan Lapis Fondasi Agregat Kelas A TOTAL HARGA : 331,316,918.79
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.89

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.2750 21,428.57 5,892.06


2. Mandor (L03) jam 0.0458 28,571.43 1,309.35

JUMLAH HARGA TENAGA 7,201.40

B. BAHAN

1. Agregat A (M26) M3 1.2890 411,100.00 529,893.72


2 Lapis Resap Pengikat (EI611) liter 0.4841 10,704.48 5,182.04

JUMLAH HARGA BAHAN 535,075.76

C. PERALATAN
1 Jack Hammer (E26) jam 0.3175 61,967.04 19,672.07
2 Mini Generator Set 2000 Watt jam 0.3175 108,635.38 34,487.42
3 Wheel Loader (E15) jam 0.0085 345,037.95 2,931.24
4 Dump Truck (E08) jam 0.0957 251,861.02 24,097.19
5 Baby Vibratory Roller (E19a) jam 0.0458 96,752.08 4,433.87
6 Alat Bantu Ls 1.0000 40.00 40.00

JUMLAH HARGA PERALATAN 85,661.79

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 627,938.95


E. OVERHEAD & PROFIT 10.0 % x D 62,793.90
F. HARGA SATUAN PEKERJAAN ( D + E ) 690,732.85
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 10.1.(6) PERKIRAAN VOL. PEK. : 133.38
JENIS PEKERJAAN : Perbaikan Lapis Fondasi Agregat Kelas S TOTAL HARGA : 66,870,204.14
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.18

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0884 21,428.57 1,894.72


2. Mandor (L03) jam 0.0088 28,571.43 252.63

JUMLAH HARGA TENAGA 2,147.35

B. BAHAN

1. Agregat S M3 1.2890 271,700.00 350,211.93

JUMLAH HARGA BAHAN 350,211.93

C. PERALATAN
1 Jack Hammer (E26) jam 0.3704 61,967.04 22,950.75
2 Air Compressor (E05) jam 0.3704 154,154.52 57,094.27
3 Wheel Loader (E15) jam 0.0085 345,037.95 2,931.24
4 Dump Truck (E08) jam 0.0633 251,861.02 15,951.84
5 Baby Vibratory Roller (E19a) jam 0.0459 96,752.08 4,436.31
6 Alat Bantu Ls 1.0000 50.00 50.00

JUMLAH HARGA PERALATAN 103,414.40

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 455,773.69


E. OVERHEAD & PROFIT 10.0 % x D 45,577.37
F. HARGA SATUAN PEKERJAAN ( D + E ) 501,351.06
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 10.1.(9) PERKIRAAN VOL. PEK. : 834.85
JENIS PEKERJAAN : Perbaikan Campuran Aspal Panas TOTAL HARGA (Rp.) : 2,846,258,515.26
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 7.64

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0980 21,428.57 2,100.84


2. Mandor (L03) Jam 0.0196 28,571.43 560.22

JUMLAH HARGA TENAGA 2,661.06

B. BAHAN

1 Agr Pch Mesin 5-10 & 10-15 (M92) M3 0.7341 360,600.00 264,716.87
2 Agr Pch Mesin 0 - 5 (M91) M3 0.9602 372,800.00 357,947.86
3 Semen (M12) Kg 22.1718 1,455.36 32,267.94
4 Aspal (M10) Kg 142.7014 14,470.90 2,065,016.39
5 Anti Stripping Agent (M66) Kg 0.4281 60,000.00 25,686.24

JUMLAH HARGA BAHAN 2,745,635.31


C. PERALATAN
1 Asphalt Cutter (E67) Jam 0.1307 67,625.79 8,839.97
2 Jack Hammer (E26) Jam 0.4706 61,967.04 29,160.96
3 Wheel Loader (E15) Jam 0.0069 345,037.95 2,387.81
4 AMP (E01) Jam 0.0196 7,897,081.39 154,844.73
5 Genset (E12) Jam 0.0196 325,906.15 6,390.32
6 Dump Truck (E08) Jam 0.3524 251,861.02 88,752.24
7 Baby Vibratory Roller (E19a) jam 0.0985 96,752.08 9,534.64
8 Mini Generator Set 2000 Watt Jam 0.4706 108,635.38 51,122.53
9 Alat Bantu Ls 1.0000 50.00 50.00

JUMLAH HARGA PERALATAN 351,083.20

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 3,099,379.58


E. OVERHEAD & PROFIT 10.0 % x D 309,937.96
F. HARGA SATUAN PEKERJAAN ( D + E ) 3,409,317.53
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 10.1.(11) PERKIRAAN VOL. PEK. : 9.14
JENIS PEKERJAAN : Perbaikan Asbuton Campuran Panas HamparTOTAL HARGA (Rp.) : 47,588,204.14
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.13

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 1.6730 21,428.57 35,849.15


2. Mandor (L03) Jam 0.1673 28,571.43 4,779.89

JUMLAH HARGA TENAGA 40,629.03

B. BAHAN

1. CPHMA M162 M3 2.2145 2,000,000.00 4,429,000.00

JUMLAH HARGA BAHAN 4,429,000.00

C. PERALATAN
1 Asphalt Cutter (E67) Jam 0.1785 67,625.79 12,070.65
2 Jack Hammer (E26) Jam 1.0040 61,967.04 62,215.90
3 Mini Generator Set 2000 Watt Jam 1.0040 108,635.38 109,071.67
4 Dump Truck (E08) Jam 0.2545 251,861.02 64,087.32
5 Baby Vibratory Roller (E19a) jam 0.1673 96,752.08 16,186.24

JUMLAH HARGA PERALATAN 263,631.77

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 4,733,260.81


E. OVERHEAD & PROFIT 10.0 % x D 473,326.08
F. HARGA SATUAN PEKERJAAN ( D + E ) 5,206,586.89
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 10.1.(11) PERKIRAAN VOL. PEK. : 55.00
JENIS PEKERJAAN : Perbaikan Asbuton Campuran Panas HamparTOTAL HARGA (Rp.) : 18,383,490.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.05

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 1.6730 21,428.57 35,849.15


2. Mandor (L03) Jam 0.1673 28,571.43 4,779.89

JUMLAH HARGA TENAGA 40,629.03

B. BAHAN

1. CPHMA M162 M3 0.0000 2,000,000.00 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN
1 Asphalt Cutter (E67) Jam 0.2869 67,625.79 19,399.25
2 Jack Hammer (E26) Jam 1.0040 61,967.04 62,215.90
3 Mini Generator Set 2000 Watt Jam 1.0040 108,635.38 109,071.67
4 Dump Truck (E08) Jam 0.2238 251,861.02 56,357.25
5 Baby Vibratory Roller (E19a) jam 0.1673 96,752.08 16,186.24

JUMLAH HARGA PERALATAN 263,230.31

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 303,859.34


E. OVERHEAD & PROFIT 10.0 % x D 30,385.93
F. HARGA SATUAN PEKERJAAN ( D + E ) 334,245.27
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 10.1.(19) PERKIRAAN VOL. PEK. : 330.00
JENIS PEKERJAAN : Pembersihan Patok TOTAL HARGA (Rp.) : 7,192,327.05
SATUAN PEMBAYARAN : Buah 0 % THD. BIAYA PROYEK : 0.02

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L03) jam 0.7000 21,428.57 15,000.00


2. Mandor (L03) jam 0.1167 28,571.43 3,333.33

JUMLAH HARGA TENAGA 18,333.33

B. BAHAN

1. Air (M170) Ltr 4.0000 13.00 52.00


2. Bahan lainnya Ls 1.0000 200.00 200.00

JUMLAH HARGA BAHAN 252.00

C. PERALATAN

1 Water Tank Truck E23 jam 0.0041 288,433.11 1178.23981339683


2 Alat Bantu Ls 1.0000 50.00 50.00

JUMLAH HARGA PERALATAN 1,228.24

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 19,813.57


E. OVERHEAD & PROFIT 10.0 % x D 1,981.36
F. HARGA SATUAN PEKERJAAN ( D + E ) 21,794.93
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 10.1.(20) PERKIRAAN VOL. PEK. : 23.00
JENIS PEKERJAAN : Pembersihan Rambu TOTAL HARGA (Rp.) : 501,283.40
SATUAN PEMBAYARAN : Buah 0 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.7000 21,428.57 15,000.00


2. Mandor (L03) jam 0.1167 28,571.43 3,333.33

JUMLAH HARGA TENAGA 18,333.33

B. BAHAN

1. Air (M170) Ltr 4.0000 13.00 52.00


2. Bahan lainnya Ls 1.0000 200.00 200.00

JUMLAH HARGA BAHAN 252.00

C. PERALATAN

1 Water Tank Truck E23 jam 0.0041 288,433.11 1178.23981339683


2 Alat Bantu Ls 1.0000 50.00 50.00

JUMLAH HARGA PERALATAN 1,228.24

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 19,813.57


E. OVERHEAD & PROFIT 10.0 % x D 1,981.36
F. HARGA SATUAN PEKERJAAN ( D + E ) 21,794.93
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 10.1.(21) PERKIRAAN VOL. PEK. : 1,200.00
JENIS PEKERJAAN : Pembersihan Drainase TOTAL HARGA (Rp.) : 16,503,234.15
SATUAN PEMBAYARAN :M 0 % THD. BIAYA PROYEK : 0.04

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.1250 21,428.57 2,678.57


2. Mandor (L03) jam 0.0250 28,571.43 714.29

JUMLAH HARGA TENAGA 3,392.86

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Mini Excavator E10a jam 239,134.65 0.00


2. Pick up E08 jam 0.0584 155,000.00 9,059.59
3. Alat Bantu Ls 1.0000 50.00 50.00

JUMLAH HARGA PERALATAN 9,109.59

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 12,502.45


E. OVERHEAD & PROFIT 10.0 % x D 1,250.25
F. HARGA SATUAN PEKERJAAN ( D + E ) 13,752.70
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
0
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 10.1.(22) PERKIRAAN VOL. PEK. : 1,977,360.00
JENIS PEKERJAAN : Pengendalian Tanaman (jalan) TOTAL HARGA (Rp.) : 1,141,925,400.00
SATUAN PEMBAYARAN : M2 0 % THD. BIAYA PROYEK : 3.06

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0140 25,714.29 360.00


2. Mandor (L03) jam 0.0018 28,571.43 50.00

JUMLAH HARGA TENAGA 410.00

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Mesin Pemotong Rumput (E65) Jam 0.0018 20,000.00 35.00


2. Alat Bantu Ls 1.0000 80.00 80.00

JUMLAH HARGA PERALATAN 115.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 525.00


E. OVERHEAD & PROFIT 10.0 % x D 52.50
F. HARGA SATUAN PEKERJAAN ( D + E ) 577.50
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : 10.1.(22) PERKIRAAN VOL. PEK. : 27,200.00
JENIS PEKERJAAN : Pengendalian Tanaman (jembatan) TOTAL HARGA (Rp.) : 26,778,400.00
SATUAN PEMBAYARAN : M2 0 % THD. BIAYA PROYEK : 0.07

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0280 25,714.29 720.00


2. Mandor (L03) jam 0.0035 28,571.43 100.00

JUMLAH HARGA TENAGA 820.00

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Mesin Pemotong Rumput (E65) Jam 0.0035 20,000.00 70.00


2. Alat Bantu Ls 1.0000 5.00 5.00

JUMLAH HARGA PERALATAN 75.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 895.00


E. OVERHEAD & PROFIT 10.0 % x D 89.50
F. HARGA SATUAN PEKERJAAN ( D + E ) 984.50
0

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : SKh-1.9.4.(1) PERKIRAAN VOL. PEK. : 1,548.00
JENIS PEKERJAAN : Galian untuk Selokan Drainase dan Saluran TOTAL HARGA (Rp.) : 128,041,478.08
SATUAN PEMBAYARAN : M3 0 % THD. BIAYA PROYEK : 0.34

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.1699 21,428.57 3,641.46


2. Mandor (L03) jam 0.0850 28,571.43 2,427.64

JUMLAH HARGA TENAGA 6,069.09

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1 Dump Truck E08 jam 0.2743 251,861.02 69,075.57


2 Alat Bantu Ls 1.0000 50.00 50.00

JUMLAH HARGA PERALATAN 69,125.57

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 75,194.67


E. OVERHEAD & PROFIT 10.0 % x D 7,519.47
F. HARGA SATUAN PEKERJAAN ( D + E ) 82,714.13
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK 2.5 B
NAMA PAKET Preservasi Jalan Ma. Lembu – Bts. Prov. Sumbar
………………………………………………………………….
PROP / KAB / KODYA RIAU
ITEM PEMBAYARAN NO. : SKh-1.9.4.(2) PERKIRAAN VOL. PEK. : 1,032.00
JENIS PEKERJAAN : Pasangan Batu dengan Mortar dengan PadatTOTAL HARGA (Rp.) : 1,625,894,139.10
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 4.36

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 4.2353 21,428.57 90,756.30


2. Tukang (L02) jam 2.8235 25,714.29 72,605.04
3. Mandor (L03) jam 0.3529 28,571.43 10,084.03

JUMLAH HARGA TENAGA 173,445.38

B. BAHAN

1. Batu belah (M02) M3 1.2000 335,400.00 402,480.00


2. Semen (PC) (M12) Kg 232.0000 1,455.36 337,643.71
3. Pasir (M10b) M3 0.4808 193,800.00 93,184.39
4 Perancah M3 0.2500 1,700,000.00 425,000.00

JUMLAH HARGA BAHAN 1,258,308.09

C. PERALATAN

1 Conc. Mixer (E06) jam 0.0000 100,503.95 0.00


2 Dump Truck (E08) jam 0.0000 251,861.02 0.00
1 Alat Bantu Ls 1.0000 500.00 500.00

JUMLAH HARGA PERALATAN 500.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,432,253.47


E. OVERHEAD & PROFIT 10.0 % x D 143,225.35
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,575,478.82

Anda mungkin juga menyukai

  • 2 Perhitungan TKDN
    2 Perhitungan TKDN
    Dokumen1 halaman
    2 Perhitungan TKDN
    abas
    Belum ada peringkat
  • Contoh Pengisian TKDN
    Contoh Pengisian TKDN
    Dokumen13 halaman
    Contoh Pengisian TKDN
    Vinsensius Yosmin
    Belum ada peringkat
  • TKDN
    TKDN
    Dokumen13 halaman
    TKDN
    Zaky Fachrur Rozi
    Belum ada peringkat
  • Action Plan KR Binje Kana2000
    Action Plan KR Binje Kana2000
    Dokumen23 halaman
    Action Plan KR Binje Kana2000
    Budi Arba
    100% (4)
  • TKDN
    TKDN
    Dokumen1 halaman
    TKDN
    Apuy Engineer
    Belum ada peringkat
  • TKDN
    TKDN
    Dokumen4 halaman
    TKDN
    Adrial
    Belum ada peringkat
  • Self Essesment TKDN - Priced
    Self Essesment TKDN - Priced
    Dokumen2 halaman
    Self Essesment TKDN - Priced
    Yasin
    Belum ada peringkat
  • TKDN Lanjutan Sampekonan CUM
    TKDN Lanjutan Sampekonan CUM
    Dokumen1 halaman
    TKDN Lanjutan Sampekonan CUM
    arfah bachri
    Belum ada peringkat
  • BoQ TS.
    BoQ TS.
    Dokumen30 halaman
    BoQ TS.
    Putra
    Belum ada peringkat
  • P. TKDN
    P. TKDN
    Dokumen1 halaman
    P. TKDN
    Brel Masiga Mishbahul Hasyir
    Belum ada peringkat
  • TKDN
    TKDN
    Dokumen1 halaman
    TKDN
    reyhan construction
    Belum ada peringkat
  • TKDN
    TKDN
    Dokumen1 halaman
    TKDN
    Muh Rizal
    Belum ada peringkat
  • TKDN
    TKDN
    Dokumen1 halaman
    TKDN
    mossad chord
    Belum ada peringkat
  • TKDN - Cihaur1 - OK PDF
    TKDN - Cihaur1 - OK PDF
    Dokumen2 halaman
    TKDN - Cihaur1 - OK PDF
    Icsan Audah
    Belum ada peringkat
  • TKDN Ruang Oka RSJD Klaten
    TKDN Ruang Oka RSJD Klaten
    Dokumen1 halaman
    TKDN Ruang Oka RSJD Klaten
    Aditya Kamajaya
    Belum ada peringkat
  • Formulir TKDN
    Formulir TKDN
    Dokumen1 halaman
    Formulir TKDN
    asghar trisandy
    Belum ada peringkat
  • TKDN
    TKDN
    Dokumen1 halaman
    TKDN
    Trio hardin Hakim
    Belum ada peringkat
  • TKDN RC Tpa
    TKDN RC Tpa
    Dokumen1 halaman
    TKDN RC Tpa
    arfah bachri
    Belum ada peringkat
  • TKDN
    TKDN
    Dokumen2 halaman
    TKDN
    Andre Khalfi
    Belum ada peringkat
  • TKDN CV. Kawan Konstruksi
    TKDN CV. Kawan Konstruksi
    Dokumen4 halaman
    TKDN CV. Kawan Konstruksi
    Bella Rizqa Karima
    Belum ada peringkat
  • 3.spek Tek Dan TKDN
    3.spek Tek Dan TKDN
    Dokumen4 halaman
    3.spek Tek Dan TKDN
    holmes aulia
    Belum ada peringkat
  • TKDN
    TKDN
    Dokumen1 halaman
    TKDN
    ARGA
    Belum ada peringkat
  • TKDN (Contoh Pagu 100jt)
    TKDN (Contoh Pagu 100jt)
    Dokumen16 halaman
    TKDN (Contoh Pagu 100jt)
    muhammad Afif
    Belum ada peringkat
  • 04 - Perhitungan TKDN
    04 - Perhitungan TKDN
    Dokumen1 halaman
    04 - Perhitungan TKDN
    Muhammad Makhrus
    Belum ada peringkat
  • Formulir TKDN
    Formulir TKDN
    Dokumen1 halaman
    Formulir TKDN
    Wanto
    Belum ada peringkat
  • TKDN
    TKDN
    Dokumen1 halaman
    TKDN
    brian kinayom
    Belum ada peringkat
  • TKDN
    TKDN
    Dokumen2 halaman
    TKDN
    Dadan Hendra Kurniawan
    Belum ada peringkat
  • TKDN
    TKDN
    Dokumen1 halaman
    TKDN
    Joni Alfadira
    Belum ada peringkat
  • Rab Rptra
    Rab Rptra
    Dokumen814 halaman
    Rab Rptra
    indroarifianto_11871
    Belum ada peringkat
  • 02 TKDN
    02 TKDN
    Dokumen1 halaman
    02 TKDN
    MEGA BUANA UATAMA PERKASA
    Belum ada peringkat
  • Formulir TKDN
    Formulir TKDN
    Dokumen1 halaman
    Formulir TKDN
    Rony Maysandri
    Belum ada peringkat
  • TKDN
    TKDN
    Dokumen1 halaman
    TKDN
    boy sipil
    Belum ada peringkat
  • TKDN
    TKDN
    Dokumen1 halaman
    TKDN
    Galih Medan
    Belum ada peringkat
  • TKDN
    TKDN
    Dokumen1 halaman
    TKDN
    Galih Medan
    Belum ada peringkat
  • Formulir TKDN
    Formulir TKDN
    Dokumen1 halaman
    Formulir TKDN
    jaya marabahan
    Belum ada peringkat
  • TKDN
    TKDN
    Dokumen1 halaman
    TKDN
    cvnakacikamandiri mandiri
    Belum ada peringkat
  • TKDN
    TKDN
    Dokumen1 halaman
    TKDN
    Thiago Ladjar
    Belum ada peringkat
  • Tingkat Komponen Dalam Negeri
    Tingkat Komponen Dalam Negeri
    Dokumen2 halaman
    Tingkat Komponen Dalam Negeri
    NaufalRamli
    Belum ada peringkat
  • TKDN Pt. GNC
    TKDN Pt. GNC
    Dokumen1 halaman
    TKDN Pt. GNC
    Bella Rizqa Karima
    Belum ada peringkat
  • TKDN Paving Kota Mjkrto
    TKDN Paving Kota Mjkrto
    Dokumen24 halaman
    TKDN Paving Kota Mjkrto
    Ahmad Jazuli
    Belum ada peringkat
  • BQ Cv. Mafen Tastia Jaya
    BQ Cv. Mafen Tastia Jaya
    Dokumen8 halaman
    BQ Cv. Mafen Tastia Jaya
    gemasharfina12
    Belum ada peringkat
  • Form TKDN Rehab DIR Merauke
    Form TKDN Rehab DIR Merauke
    Dokumen1 halaman
    Form TKDN Rehab DIR Merauke
    idhan power
    Belum ada peringkat
  • TKDN
    TKDN
    Dokumen1 halaman
    TKDN
    saliim firmansyah
    Belum ada peringkat
  • Perhitungan TKDN
    Perhitungan TKDN
    Dokumen1 halaman
    Perhitungan TKDN
    Martinus Gala
    Belum ada peringkat
  • TKDN Padangin Mungkur Palawan Ok 3
    TKDN Padangin Mungkur Palawan Ok 3
    Dokumen7 halaman
    TKDN Padangin Mungkur Palawan Ok 3
    Erik Kurnianto
    Belum ada peringkat
  • Revisi Kecamatan Rancasari
    Revisi Kecamatan Rancasari
    Dokumen17 halaman
    Revisi Kecamatan Rancasari
    Gilang Muhammad Ramadhan
    Belum ada peringkat
  • TKDN
    TKDN
    Dokumen1 halaman
    TKDN
    Yance Leonard
    Belum ada peringkat
  • TKDN
    TKDN
    Dokumen1 halaman
    TKDN
    Enos Liufeto
    Belum ada peringkat
  • Formulir TKDN
    Formulir TKDN
    Dokumen1 halaman
    Formulir TKDN
    ArcapadaArts
    0% (1)
  • 4 TKDN
    4 TKDN
    Dokumen1 halaman
    4 TKDN
    Agus Wahyudin
    Belum ada peringkat
  • TKDN
    TKDN
    Dokumen19 halaman
    TKDN
    bgan29
    Belum ada peringkat
  • TKDN
    TKDN
    Dokumen1 halaman
    TKDN
    rajawali nusatanggara
    Belum ada peringkat
  • TKDN PT - Senata
    TKDN PT - Senata
    Dokumen1 halaman
    TKDN PT - Senata
    Darva Khan
    Belum ada peringkat
  • TKDN
    TKDN
    Dokumen1 halaman
    TKDN
    Jarot Subagyo
    Belum ada peringkat
  • TKDN
    TKDN
    Dokumen1 halaman
    TKDN
    ciptakaryantx
    Belum ada peringkat
  • TKDN Embung CV. Alfi Mandiri
    TKDN Embung CV. Alfi Mandiri
    Dokumen19 halaman
    TKDN Embung CV. Alfi Mandiri
    ArcapadaArts
    Belum ada peringkat
  • Dokumen Penawaran Teknis
    Dokumen Penawaran Teknis
    Dokumen14 halaman
    Dokumen Penawaran Teknis
    Taufik Topan
    Belum ada peringkat