KEGIATAN REHABILITASI BERAT/SEDANG GEDUNG KANTOR

PEKERJAAN REHABILITASI PAGAR INSTALASI FARMASI


TAHUN ANGGARAN 2020
LOKASI KOTA KENDARI
NO. KONTRAK 442/470/DINKES/VII/2020
NILAI KONTRAK Rp. 241.200.000,-
PELAKSANA CV. ANANDONIANO
TANGGAL 30 JULI 2020
:
SELESAI 26 NOVEMBER 2020

LAPORAN HARIAN 30 JULI 2020 1


31 JULI 2020 2
1 AGUSTUS 2020 3
2 AGUSTUS 2020 4
3 AGUSTUS 2020 5
4 AGUSTUS 2020 6
5 AGUSTUS 2020 7
6 AGUSTUS 2020 8
7 AGUSTUS 2020 9
8 AGUSTUS 2020 10
9 AGUSTUS 2020 11
10 AGUSTUS 2020 12
11 AGUSTUS 2020 13
12 AGUSTUS 2020 14
13 AGUSTUS 2020 15
14 AGUSTUS 2020 16
15 AGUSTUS 2020 17
16 AGUSTUS 2020 18
17 AGUSTUS 2020 19
18 AGUSTUS 2020 20
19 AGUSTUS 2020 21
20 AGUSTUS 2020 22
21 AGUSTUS 2020 23
22 AGUSTUS 2020 24
23 AGUSTUS 2020 25
24 AGUSTUS 2020 26
25 AGUSTUS 2020 27
26 AGUSTUS 2020 28
27 AGUSTUS 2020 29
28 AGUSTUS 2020 30
29 AGUSTUS 2020 31
30 AGUSTUS 2020 32
31 AGUSTUS 2020 33
1 SEPTEMBER 2020 34
2 SEPTEMBER 2020 35
3 SEPTEMBER 2020 36
4 SEPTEMBER 2020 37
5 SEPTEMBER 2020 38
6 SEPTEMBER 2020 39
7 SEPTEMBER 2020 40
8 SEPTEMBER 2020 41
9 SEPTEMBER 2020 42
10 SEPTEMBER 2020 43
11 SEPTEMBER 2020 44
12 SEPTEMBER 2020 45
13 SEPTEMBER 2020 46
14 SEPTEMBER 2020 47
15 SEPTEMBER 2020 48
16 SEPTEMBER 2020 49
17 SEPTEMBER 2020 50
18 SEPTEMBER 2020 51
19 SEPTEMBER 2020 52
20 SEPTEMBER 2020 53
21 SEPTEMBER 2020 54
22 SEPTEMBER 2020 55
23 SEPTEMBER 2020 56
24 SEPTEMBER 2020 57
25 SEPTEMBER 2020 58
26 SEPTEMBER 2020 59
27 SEPTEMBER 2020 60
28 SEPTEMBER 2020 61
29 SEPTEMBER 2020 62
30 SEPTEMBER 2020 63
1 OKTOBER 2020 64
2 OKTOBER 2020 65
3 OKTOBER 2020 66
4 OKTOBER 2020 67
5 OKTOBER 2020 68
6 OKTOBER 2020 69
7 OKTOBER 2020 70
8 OKTOBER 2020 71
9 OKTOBER 2020 72
10 OKTOBER 2020 73
11 OKTOBER 2020 74
12 OKTOBER 2020 75
13 OKTOBER 2020 76
14 OKTOBER 2020 77
15 OKTOBER 2020 78
16 OKTOBER 2020 79
17 OKTOBER 2020 80
18 OKTOBER 2020 81
19 OKTOBER 2020 82
20 OKTOBER 2020 83
21 OKTOBER 2020 84
22 OKTOBER 2020 85
23 OKTOBER 2020 86
24 OKTOBER 2020 87
25 OKTOBER 2020 88
26 OKTOBER 2020 89
27 OKTOBER 2020 90
28 OKTOBER 2020 91
29 OKTOBER 2020 92
30 OKTOBER 2020 93
31 OKTOBER 2020 94
1 NOVEMBER 2020 95
2 NOVEMBER 2020 96
3 NOVEMBER 2020 97
4 NOVEMBER 2020 98
5 NOVEMBER 2020 99
6 NOVEMBER 2020 100
7 NOVEMBER 2020 101
8 NOVEMBER 2020 102
9 NOVEMBER 2020 103
10 NOVEMBER 2020 104
11 NOVEMBER 2020 105
12 NOVEMBER 2020 106
13 NOVEMBER 2020 107
14 NOVEMBER 2020 108
15 NOVEMBER 2020 109
16 NOVEMBER 2020 110
17 NOVEMBER 2020 111
18 NOVEMBER 2020 112
19 NOVEMBER 2020 113
20 NOVEMBER 2020 114
21 NOVEMBER 2020 115
22 NOVEMBER 2020 116
23 NOVEMBER 2020 117
24 NOVEMBER 2020 118
25 NOVEMBER 2020 119
26 NOVEMBER 2020 120
JULI - AGUSTUS Kendari, 12 Agustus 2020 30 JULI 2020 S/D 28 AG
AGUSTUS - SEPTEMBER Kendari, 27 September 2020 29 AGUSTUS 2020 S/D 2
SEPTEMBER - OKTOBER Kendari, 27 Oktober 2020 28 SEPTEMBER 2020 S
OKTOBER - NOVEMBER Kendari, 11 November 2020 28 OKTOBER 2020 S/D

1 30 JULI 2020 S/D 5 AGUSTUS 2020


2 6 AGUSTUS 2020 S/D 12 AGUSTUS 2020
JULI - AGUSTUS
3 13 AGUSTUS 2020 S/D 20 Agustus 2020
4 21 AGUSTUS 2020 S/D 28 AGUSTUS 2020
5 29 AGUSTUS 2020 S/D 4 SEPTEMBER 2020
6 5 SEPTEMBER 2020 S/D 11 SEPTEMBER 2020
AGUSTUS - SEPTEMBER
7 12 SEPTEMBER 2020 S/D 19 SEPTEMBER 2020
8 20 SEPTEMBER 2020 S/D 27 SEPTEMBER 2020
9 28 SEPTEMBER 2020 S/D 4 OKTOBER 2020
10 5 SEPTEMBER 2020 S/D 11 OKTOBER 2020
SEPTEMBER - OKTOBER
11 12 OKTOBER 2020 S/D 19 OKTOBER 2020
12 20 OKTOBER 2020 S/D 27 OKTOBER 2020
13 28 OKTOBER 2020 S/D 3 NOVEMBER 2020
14 4 NOVEMBER 2020 S/D 11 NOVEMBER 2020
OKTOBER - NOVEMBER
15 12 NOVEMBER 2020 S/D 18 NOVEMBER 2020
16 19 NOVEMBER 2020 S/D 26 NOVEMBER 2020

Di Buat Oleh Diperiksa Oleh


Kontraktor Pelaksana Konsultan Supervisi
CV. ANANDONIANO CV…………………

……. NO NAME ………. ……. NO NAME ……….


Pelaksana Site Engineer
H. M. YATIM ……. NO NAME ……….
Direktur Inspector
……. NO NAME ……….
Direktur

KEGIATAN REHABILITASI PUSKESMAS/PUSKESMAS PEMBANTU


PEKERJAAN REHABILITASI PUSKESMAS JATI RAYA
NO. KONTRAK ……………………………
NILAI KONTRAK Rp. 161.890.000,-
PELAKSANA CV. RAYHAN RAYA
SUMBER DANA : APBD-P
TAHUN : 2020
BULAN : I (PERTAMA)
PERIODE : 12 NOV - 25 NOV
30 JULI 2020 S/D 28 AGUSTUS 2020 I (PERTAMA)
29 AGUSTUS 2020 S/D 27 SEPTEMBER 2020 II (KE DUA)
28 SEPTEMBER 2020 S/D 27 OKTOBER 2020 III (KE TIGA)
28 OKTOBER 2020 S/D 11 NOVEMBER 2020 IV (KE EMPAT) : 12 NOV - 25 NOV

Kendari, 5 Agustus 2020 I (PERTAMA)


Kendari, 12 Agustus 2020 II (KE DUA)
Kendari, 20 Agustus 2020 III (KE TIGA)
Kendari, 28 Agustus 2020 IV (KE EMPAT)
Kendari, 4 September 2020 V (KE LIMA)
Kendari, 11 September 2020 VI (KE ENAM)
Kendari, 19 September 2020 VII (KE TUJUH)
Kendari, 27 September 2020 VIII (KE DELAPAN)
Kendari, 4 Oktober 2020 IX (KE SEMBILAN)
Kendari, 11 Oktober 2020 X (KE SEPULUH)
Kendari, 19 Oktober 2020 XI (KE SEBELAS)
Kendari, 27 Oktober 2020 XII (KE DUA BELAS)
Kendari, 3 November 2020 XIII (KE TIGA BELAS)
Kendari, 11 November 2020 XIV (KE EMPAT BELAS)
Kendari, 18 November 2020 XV (KE LIMA BELAS)
Kendari, 26 November 2020 XVI (KE ENAM BELAS)

Diperiksa Oleh Disetujui Oleh : Disetujui Oleh


Direksi Teknis Pejabat Pelaksana Teknis Kegiatan (PPTK)
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari

NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. NIP………………….
NAME ……….

NAME ……….

S/PUSKESMAS PEMBANTU
S JATI RAYA
Diketahui Oleh
giatan (PPTK) Pejabat Pembuat Komitmen (PPK)
Dinas Kesehatan Kota Kendari

drg. RAHMININGRUM P., M.Kes


NIP. 19640207 198910 20 001
MONTHLY CERTIFICATE 01

KEGIATAN : REHABILITASI PUSKESMAS/PUSKESMAS PEMBANTU SUMBER DANA : APBD-P


PEKERJAAN : REHABILITASI PUSKESMAS JATI RAYA TAHUN : 2020
NO. KONTRAK : …………………………… BULAN : I (PERTAMA)
NILAI KONTRAK : Rp. 161.890.000,- PERIODE : 12 NOV - 25 NOV
PELAKSANA : CV. RAYHAN RAYA

REKAPITULASI
KONTRAK AWAL KONTRAK TERLAKSANA
NO. URAIAN PEKERJAAN
JUMLAH (Rp.) BOBOT (%) JUMLAH (Rp.) BOBOT (%)

1 2 3 4 5 6
I #REF! #REF! #REF! #REF! #REF!

II #REF! #REF! #REF! #REF! #REF!

III #REF! #REF! #REF! #REF! #REF!


IV #REF! #REF! #REF! #REF! #REF!
V #REF! #REF! #REF! #REF! #REF!

A REAL COST #REF! #REF!


B PPN 10 % #REF! #REF!
#REF! #REF!
C TOTAL COST #REF! #REF!
D DIBULATKAN #REF! #REF!
S/D BULAN LALU 0.00
PROSENTASE PENCAPAIAN FISIK (%) BULAN INI #REF!
S/D BULAN INI #REF!
POTONGAN-POTONGAN S/D BULAN LALU BULAN INI S/D BULAN INI
MONTHLY CERTIFICATE (MC) #REF! #REF!
UANG MUKA (30%) #REF! #REF!
UANG RETENSI (5%) #REF! #REF!
JUMLAH POTONGAN - #REF! #REF!
JUMLAH YANG DIBAYARKAN SAMPAI DENGAN BULAN INI #REF! #REF!
DIBULATKAN #REF! #REF!

TERBILANG : SERATUS LIMA JUTA DUA RATUS DUA PULUH DELAPAN RIBU RUPIAH

Diperiksa Oleh Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. H. M. YATIM


NIP…………………. Direktur Direktur

Diketahui Oleh Disetujui Oleh


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK)
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari

drg. RAHMININGRUM P., M.Kes ……. NO NAME ……….


NIP. 19640207 198910 20 001 NIP………………….
MONTHLY CERTIFICATE 01
KEGIATAN : REHABILITASI PUSKESMAS/PUSKESMAS PEMBANTU SUMBER DANA : APBD-P
PEKERJAAN : REHABILITASI PUSKESMAS JATI RAYA TAHUN : 2020
NO. KONTRAK : …………………………… BULAN : I (PERTAMA)
NILAI KONTRAK : Rp. 161.890.000,- PERIODE : 12 NOV - 25 NOV
PELAKSANA : CV. RAYHAN RAYA

I #REF! Total Rp. #REF!


KONTRAK REALISASI PELAKSANAAN
NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUM. HARGA SATUAN
SATUAN VOLUME
S/D BULAN INI (Rp.) (Rp.)
1 2 3 4 5 6 7

1 #REF! #REF! #REF! #REF! #REF! #REF!


2 #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF! #REF!

JUMLAH TERLAKSANA #REF!


PERSENTASE TERLAKSANA #REF!

Diperiksa Oleh Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. H. M. YATIM


NIP…………………. Direktur Direktur

Diketahui Oleh Disetujui Oleh


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK)
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari

drg. RAHMININGRUM P., M.Kes ……. NO NAME ……….


NIP. 19640207 198910 20 001 NIP………………….
MONTHLY CERTIFICATE 01

KEGIATAN : REHABILITASI PUSKESMAS/PUSKESMAS PEMBANTU SUMBER DANA : APBD-P


PEKERJAAN : REHABILITASI PUSKESMAS JATI RAYA TAHUN : 2020
NO. KONTRAK : …………………………… BULAN : I (PERTAMA)
NILAI KONTRAK : Rp. 161.890.000,- PERIODE : 12 NOV - 25 NOV
PELAKSANA : CV. RAYHAN RAYA

II #REF! Total Rp. #REF!


KONTRAK REALISASI PELAKSANAAN
NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUM. HARGA SATUAN
SATUAN VOLUME
S/D BULAN INI (Rp.) (Rp.)
1 2 3 4 5 6 7

#REF! #REF! #REF! #REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!

JUMLAH TERLAKSANA #REF!


PERSENTASE TERLAKSANA #REF!

Diperiksa Oleh Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. H. M. YATIM


NIP…………………. Direktur Direktur

Diketahui Oleh Disetujui Oleh


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK)
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari

drg. RAHMININGRUM P., M.Kes ……. NO NAME ……….


NIP. 19640207 198910 20 001 NIP………………….
MONTHLY CERTIFICATE 01

KEGIATAN : REHABILITASI PUSKESMAS/PUSKESMAS PEMBANTU SUMBER DANA : APBD-P


PEKERJAAN : REHABILITASI PUSKESMAS JATI RAYA TAHUN : 2020
NO. KONTRAK : …………………………… BULAN : I (PERTAMA)
NILAI KONTRAK : Rp. 161.890.000,- PERIODE : 12 NOV - 25 NOV
PELAKSANA : CV. RAYHAN RAYA

III #REF! Total Rp. #REF!


KONTRAK REALISASI PELAKSANAAN
NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUM. HARGA SATUAN
SATUAN VOLUME
S/D BULAN INI (Rp.) (Rp.)
1 2 3 4 5 6 7

### #REF! #REF! #REF! #REF! #REF! #REF!


### #REF! #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF! #REF!

JUMLAH TERLAKSANA #REF!


PERSENTASE TERLAKSANA #REF!

Diperiksa Oleh Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. H. M. YATIM


NIP…………………. Direktur Direktur

Diketahui Oleh Disetujui Oleh


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK)
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari

drg. RAHMININGRUM P., M.Kes ……. NO NAME ……….


NIP. 19640207 198910 20 001 NIP………………….
MONTHLY CERTIFICATE 01

KEGIATAN : REHABILITASI PUSKESMAS/PUSKESMAS PEMBANTU SUMBER DANA : APBD-P


PEKERJAAN : REHABILITASI PUSKESMAS JATI RAYA TAHUN : 2020
NO. KONTRAK : …………………………… BULAN : I (PERTAMA)
NILAI KONTRAK : Rp. 161.890.000,- PERIODE : 12 NOV - 25 NOV
PELAKSANA : CV. RAYHAN RAYA

IV #REF! Total Rp. #REF!


KONTRAK REALISASI PELAKSANAAN
NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUM. HARGA SATUAN
SATUAN VOLUME
S/D BULAN INI (Rp.) (Rp.)
1 2 3 4 5 6 7

#REF! #REF! #REF! #REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!

JUMLAH TERLAKSANA #REF!


PERSENTASE TERLAKSANA #REF!

Diperiksa Oleh Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. H. M. YATIM


NIP…………………. Direktur Direktur

Diketahui Oleh Disetujui Oleh


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK)
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari

drg. RAHMININGRUM P., M.Kes ……. NO NAME ……….


NIP. 19640207 198910 20 001 NIP………………….
MONTHLY CERTIFICATE 01

KEGIATAN : REHABILITASI PUSKESMAS/PUSKESMAS PEMBANTU SUMBER DANA : APBD-P


PEKERJAAN : REHABILITASI PUSKESMAS JATI RAYA TAHUN : 2020
NO. KONTRAK : …………………………… BULAN : I (PERTAMA)
NILAI KONTRAK : Rp. 161.890.000,- PERIODE : 12 NOV - 25 NOV
PELAKSANA : CV. RAYHAN RAYA

V #REF! Total Rp. #REF!


KONTRAK REALISASI PELAKSANAAN
NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUM. HARGA SATUAN
SATUAN VOLUME
S/D BULAN INI (Rp.) (Rp.)
1 2 3 4 5 6 7

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

JUMLAH TERLAKSANA #REF!


PERSENTASE TERLAKSANA #REF!

Diperiksa Oleh Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. H. M. YATIM


NIP…………………. Direktur Direktur

Diketahui Oleh Disetujui Oleh


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK)
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari

drg. RAHMININGRUM P., M.Kes ……. NO NAME ……….


NIP. 19640207 198910 20 001 NIP………………….
LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN (BULANAN)

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR MINGGU : I (PERTAMA)


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI PERIODE : 30 JULI 2020 S/D 28 AGUSTUS 2020
TAHUN ANGGARAN : 2020 S/D BULAN LALU : - %
LOKASI : KOTA KENDARI BULAN INI : 29.19 %
S/D BULAN INI : 29.19 %

KEMAJUAN PEKERJAAN
KONTRAK
BULAN LALU BULAN INI S/D BULAN INI
VOL
NO URAIAN SAT
TOTAL HARGA SATUAN TOTAL JUMLAH BOBOT BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER
VOL VOL VOL
(Rp) HARGA (Rp) (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. PEKERJAAN PERSIAPAN / PENDAHULUAN


1 Pek. Pembersihan Lokasi/Pembongkaran WC Lama Ls 1.00 2,500,000.00 2,500,000.00 1.14 - - - 0.50 50.00 0.57 0.50 50.00 0.57
2 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 1,000,000.00 1,000,000.00 0.46 - - - 1.00 100.00 0.46 1.00 100.00 0.46
3 Pek. Pembuatan Barak Kerja/Gudang Bahan Ls 1.00 3,500,000.00 3,500,000.00 1.60 - - - 1.00 100.00 1.60 1.00 100.00 1.60
3 Administrasi, Dokumentasi dan Air Kerja Ls 1.00 1,250,000.00 1,250,000.00 0.57 - - - 0.50 50.00 0.28 0.50 50.00 0.28
4 Papan Nama Kegiatan Ls 1.00 150,000.00 150,000.00 0.07 - - - 1.00 100.00 0.07 1.00 100.00 0.07
JUMLAH A 8,400,000.00 3.83 - 2.97 2.97
B. PEK. BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK
- Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir Set 1.00 450,000.00 450,000.00 0.21 - - - 1.00 100.00 0.21 1.00 100.00 0.21
- Pembuatan Kartu Identitas Pekerja (KIP); Lbr 4.00 5,000.00 20,000.00 0.01 - - - 4.00 100.00 0.01 4.00 100.00 0.01
2 Sosialisasi, promosi, dan pelatihan;
Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Safety Talk
- Org 4.00 10,000.00 40,000.00 0.02 - - - 4.00 100.00 0.02 4.00 100.00 0.02
dan/atau Tool Box Meeting);
3 Alat Pelindung Kerja dan Alat Pelindung Diri
- Topi Pelindung (Safety Helmet); Bh 4.00 85,000.00 340,000.00 0.16 - - - 4.00 100.00 0.16 4.00 100.00 0.16
- Pelindung Mata Psg 4.00 65,000.00 260,000.00 0.12 - - - 4.00 100.00 0.12 4.00 100.00 0.12
- Sarung Tangan (Safety Gloves); Psg 4.00 20,000.00 80,000.00 0.04 - - - 4.00 100.00 0.04 4.00 100.00 0.04
- Sepatu Keselamatan (Safety Shoes); Psg 4.00 180,000.00 720,000.00 0.33 - - - 4.00 100.00 0.33 4.00 100.00 0.33
- Rompi Keselamatan (Safety Vest); Bh 4.00 50,000.00 200,000.00 0.09 - - - 4.00 100.00 0.09 4.00 100.00 0.09
4 Asuransi dan perizinan
- BPJS Ketenagakerjaan Dan Kesehatan Kerja; Ls 1.00 500,000.00 500,000.00 0.23 - - - 1.00 100.00 0.23 1.00 100.00 0.23
5 Personel Keselamatan Konstruksi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Petugas K3 Ob 1.00 1,500,000.00 1,500,000.00 0.68 - - - 1.00 100.00 0.68 1.00 100.00 0.68
6 Fasilitas sarana, prasarana, dan alat kesehatan
- Peralatan P3K (Kotak P3K, Tandu,Tabung Oksigen, Obat Luka, Perban, dll) Ls 1.00 1,300,000.00 1,300,000.00 0.59 - - - 1.00 100.00 0.59 1.00 100.00 0.59
7 Rambu-rambu yang diperlukan
- Rambu Informasi dan Peringatan Bh 1.00 50,000.00 50,000.00 0.02 - - - 1.00 100.00 0.02 1.00 100.00 0.02
8 Konsultasi dengan ahli terkait Keselamatan Konstruksi Ls 1.00 500,000.00 500,000.00 0.23 - - - 1.00 100.00 0.23 1.00 100.00 0.23
9 Kegiatan dan peralatan terkait dengan pengendalian Bendera K3 Bh 1.00 50,000.00 50,000.00 0.02 - - - 1.00 100.00 0.02 1.00 100.00 0.02
JUMLAH B 6,010,000.00 2.74 - 2.74 2.74
C. PEKERJAAN PAGAR
I. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi M3 20.51 71,390.00 1,464,454.20 0.67 - - - 20.51 100.00 0.67 20.51 100.00 0.67
2 Pek. Urugan Tanah Kembali M3 5.04 51,480.00 259,459.20 0.12 - - - 5.04 100.00 0.12 5.04 100.00 0.12
3 Pek. Urugan Pasir Alas Pondasi M3 1.68 219,956.00 369,526.08 0.17 - - - 1.68 100.00 0.17 1.68 100.00 0.17
JUMLAH I 2,093,439.48 0.95 - 0.95 0.95
II. PEKERJAAN BATU DAN PLESTERAN
1 Pas. Batu Kosong M3 5.04 452,951.40 2,282,875.06 1.04 - - - 5.04 100.00 1.04 5.04 100.00 1.04
2 Pas. Pondasi Batu Gunung 1 : 5 M3 19.04 822,701.00 15,664,227.04 7.14 - - - 19.04 100.00 7.14 19.04 100.00 7.14
3 Pas. Dinding Batu Bata 1 : 5 M2 41.42 121,558.80 5,034,357.70 2.30 - - - 10.00 24.15 0.55 10.00 24.15 0.55
4 Pas. Plesteran Dinding Batu Bata 1 : 5 M2 82.83 64,381.24 5,332,698.11 2.43 - - - - - - - - -
5 Pas. Plesteran Ciprat/Kamper 1 : 3 M2 32.11 66,976.36 2,150,610.92 0.98 - - - - - - - - -
6 Pas. Plesteran Pondasi + Acian M2 44.80 66,976.36 3,000,540.93 1.37 - - - - - - - - -
7 Pek. List Profil Ls 1.00 2,000,000.00 2,000,000.00 0.91 - - - - - - - - -
JUMLAH II 35,465,309.75 16.17 - 8.74 8.74
III. PEKERJAAN BESI DAN BETON
1 Pek. Beton Pondasi Poer Plat
- Bekisting M2 2.40 170,286.60 408,687.84 0.19 - - - 2.40 100.00 0.19 2.40 100.00 0.19
- Besi Beton Kg 24.72 20,560.54 508,194.87 0.23 - - - 24.72 100.00 0.23 24.72 100.00 0.23
- Beton K175 M3 0.60 1,199,480.49 719,688.29 0.33 - - - 0.60 100.00 0.33 0.60 100.00 0.33
2 Pek. Beton Sloof 15/20
- Bekisting M2 11.20 179,636.60 2,011,929.92 0.92 - - - 11.20 100.00 0.92 11.20 100.00 0.92
- Besi Beton Kg 322.18 20,560.54 6,624,233.02 3.02 - - - 322.18 100.00 3.02 322.18 100.00 3.02
- Beton K175 M3 1.68 1,199,480.49 2,015,127.22 0.92 - - - 1.68 100.00 0.92 1.68 100.00 0.92
3 Pek. Beton Sloof Gerbang 15/30
- Bekisting M2 3.00 179,636.60 538,909.80 0.25 - - - 3.00 100.00 0.25 3.00 100.00 0.25
- Besi Beton Kg 42.01 20,560.54 863,836.71 0.39 - - - 42.01 100.00 0.39 42.01 100.00 0.39
- Beton K175 M3 0.23 1,199,480.49 269,883.11 0.12 - - - 0.23 100.00 0.12 0.23 100.00 0.12
4 Pek. Beton Kolom 20/20
- Roster Beton Kolom Pracetak Motif (Dudukan+Tiang+Topi) Klm 18.00 575,000.00 10,350,000.00 4.72 - - - 18.00 100.00 4.72 18.00 100.00 4.72
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Besi Beton Kg 212.24 20,560.54 4,363,731.43 1.99 - - - 212.24 100.00 1.99 212.24 100.00 1.99
- Beton K175 M3 1.30 1,199,480.49 1,554,526.72 0.71 - - - 1.30 100.00 0.71 1.30 100.00 0.71
5 Pek. Beton Kolom 40/40 (Gerbang)
- Bekisting M2 14.72 249,587.80 3,673,932.42 1.68 - - - - - - - - -
- Besi Beton Kg 163.44 20,560.54 3,360,323.60 1.53 - - - - - - - - -
- Beton K175 M3 1.47 1,199,480.49 1,765,635.28 0.80 - - - - - - - - -
6 Pek. Balok Beton 15/30 dan Topi Beton 10/15
- Bekisting M2 5.48 257,177.80 1,409,334.34 0.64 - - - - - - - - -
- Besi Beton Kg 111.36 20,560.54 2,289,523.28 1.04 - - - - - - - - -
- Beton K175 M3 0.41 1,199,480.49 492,986.48 0.22 - - - - - - - - -
JUMLAH III 43,220,484.33 19.71 - 13.78 13.78
IV PEKERJAAN TERALIS, KERAMIK DAN ACCESSORIES
1 Pek. Teralis Dinding Pagar M1 49.40 552,580.60 27,297,481.64 12.45 - - - - - - - - -
2 Pek. Teralis Pintu Gerbang Tengah dan Samping ( Pintu Sorong ) M1 7.64 1,213,405.60 9,270,418.78 4.23 - - - - - - - - -
3 Pas. Dinding Granit 80 x 80 Cm M2 7.68 428,147.50 3,288,172.80 1.50 - - - - - - - - -
4 Pas. Batu Alam Dinding dan Kolom Gerbang M2 11.52 415,299.50 4,784,250.24 2.18 - - - - - - - - -
5 Pek. Papan Nama Gerbang + Logo Kota + Logo Bakti Husada ( Acrylic ) Ls 1.00 9,500,000.00 9,500,000.00 4.33 - - - - - - - - -
JUMLAH IV 54,140,323.46 24.68 - - -
V PEKERJAAN PENGECATAN
1 Pek. Cat Tembok Dinding/Kolom 2x Cat Anti Lumut M2 95.79 35,827.00 3,431,868.33 1.56 - - - - - - - - -
2 Pek. Cat Besi Teralis 2x Cat M2 57.04 36,462.80 2,079,838.11 0.95 - - - - - - - - -
JUMLAH V 5,511,706.44 2.51 - - -
D. PEKERJAAN PENATAAN LAHAN PARKIR
1 Pek. Galian Tanah Cansteen M3 5.04 71,390.00 359,805.60 0.16 - - - - - - - - -
2 Pek. Urugan Tanah Didatangkan M3 96.00 110,880.00 10,644,480.00 4.85 - - - - - - - - -
3 Pek. Urugan Pasir Alas Cansteen/Rabat M3 12.84 219,956.00 2,824,235.04 1.29 - - - - - - - - -
4 Pek. Cansteen Pas. Batu Gunung 30/60, Camp. 1:4 M3 10.08 857,780.00 8,646,422.40 3.94 - - - - - - - - -
5 Pek. Plesteran Cansteen Camp. 1:3 M2 33.60 66,976.36 2,250,405.70 1.03 - - - - - - - - -
6 Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan Masuk M3 18.24 1,199,480.49 21,878,524.14 9.97 - - - - - - - - -
7 Pek. Pengecatan Cansteen Anti Lumut M2 33.60 35,827.00 1,203,787.20 0.55 - - - - - - - - -
JUMLAH D 47,807,660.07 21.80 - - -
E. PEKERJAAN REHAB/PERBAIKAN
1 Pek. Kramik Lantai 30/30 cm KM/WC M2 2.25 153,684.30 345,789.68 0.16 - - - - - - - - -
2 Pek. Granit Dinding 60/60 cm KM/WC M2 8.28 336,451.50 2,785,818.42 1.27 - - - - - - - - -
3 Pek. Instalasi Air Bersih + Accesories Pipa Ls 1.00 750,000.00 750,000.00 0.34 - - - - - - - - -
4 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 3" AW Ls 1.00 1,500,000.00 1,500,000.00 0.68 - - - - - - - - -
5 Pek. Pasangan Kloset Duduk Bh 1.00 3,382,786.00 3,382,786.00 1.54 - - - - - - - - -
6 Pek. Pasangan Kran Air Bh 1.00 93,104.00 93,104.00 0.04 - - - - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
7 Pek. Floor Drain Bh 1.00 54,736.00 54,736.00 0.02 - - - - - - - - -
8 Pengadaan Ember Air Bh 1.00 75,000.00 75,000.00 0.03 - - - - - - - - -
9 Pek. Pembuatan Septik Tank Unit 1.00 1,800,000.00 1,800,000.00 0.82 - - - - - - - - -
10 Pek. Rehab Atap/Turbin Ls 1.00 5,000,000.00 5,000,000.00 2.28 - - - - - - - - -
JUMLAH E 15,787,234.10 7.20 - - -
F. PEKERJAAN FINISHING DAN PEMBERSIHAN AKHIR
1 Pek. Pembersihan Akhir/Perapihan Ls 1.00 900,000.00 900,000.00 0.41 - - - - - - - - -
JUMLAH F 900,000.00 0.41 - - -
JUMLAH (REAL COST) ( A ) 219,336,157.63
PPN 10 % ( B ) 21,933,615.76
100.00 - 29.19 29.19
TOTAL COST ( A + B ) 241,269,773.40
DIBULATKAN 241,200,000.00

Kendari, 12 Agustus 2020


Disetujui Oleh Diperiksa Oleh Diperiksa Oleh Di Buat Oleh
Pejabat Pelaksana Teknis Kegiatan (PPTK) Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….
NIP…………………. NIP…………………. Site Engineer Pelaksana
LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN (MINGGUAN)

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR MINGGU : I (PERTAMA)


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI PERIODE : 30 JULI 2020 S/D 5 AGUSTUS 2020
TAHUN ANGGARAN : 2020 S/D MINGGU LALU : - %
LOKASI : KOTA KENDARI MINGGU INI : 6.67 %
S/D MINGGU INI : 6.67 %

KEMAJUAN PEKERJAAN
KONTRAK
MINGGU LALU MINGGU INI S/D MINGGU INI
VOL
NO URAIAN SAT
TOTAL HARGA SATUAN TOTAL JUMLAH BOBOT BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER
VOL VOL VOL
(Rp) HARGA (Rp) (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. PEKERJAAN PERSIAPAN / PENDAHULUAN


1 Pek. Pembersihan Lokasi/Pembongkaran WC Lama Ls 1.00 2,500,000.00 2,500,000.00 1.14 - - - 0.50 50.00 0.57 0.50 50.00 0.57
2 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 1,000,000.00 1,000,000.00 0.46 - - - 1.00 100.00 0.46 1.00 100.00 0.46
3 Pek. Pembuatan Barak Kerja/Gudang Bahan Ls 1.00 3,500,000.00 3,500,000.00 1.60 - - - 1.00 100.00 1.60 1.00 100.00 1.60
3 Administrasi, Dokumentasi dan Air Kerja Ls 1.00 1,250,000.00 1,250,000.00 0.57 - - - 0.50 50.00 0.28 0.50 50.00 0.28
4 Papan Nama Kegiatan Ls 1.00 150,000.00 150,000.00 0.07 - - - 1.00 100.00 0.07 1.00 100.00 0.07
JUMLAH A 8,400,000.00 3.83 - 2.97 2.97
B. PEK. BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK
- Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir Set 1.00 450,000.00 450,000.00 0.21 - - - 1.00 100.00 0.21 1.00 100.00 0.21
- Pembuatan Kartu Identitas Pekerja (KIP); Lbr 4.00 5,000.00 20,000.00 0.01 - - - 4.00 100.00 0.01 4.00 100.00 0.01
2 Sosialisasi, promosi, dan pelatihan;
Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Safety Talk
- Org 4.00 10,000.00 40,000.00 0.02 - - - 4.00 100.00 0.02 4.00 100.00 0.02
dan/atau Tool Box Meeting);
3 Alat Pelindung Kerja dan Alat Pelindung Diri
- Topi Pelindung (Safety Helmet); Bh 4.00 85,000.00 340,000.00 0.16 - - - 4.00 100.00 0.16 4.00 100.00 0.16
- Pelindung Mata Psg 4.00 65,000.00 260,000.00 0.12 - - - 4.00 100.00 0.12 4.00 100.00 0.12
- Sarung Tangan (Safety Gloves); Psg 4.00 20,000.00 80,000.00 0.04 - - - 4.00 100.00 0.04 4.00 100.00 0.04
- Sepatu Keselamatan (Safety Shoes); Psg 4.00 180,000.00 720,000.00 0.33 - - - 4.00 100.00 0.33 4.00 100.00 0.33
- Rompi Keselamatan (Safety Vest); Bh 4.00 50,000.00 200,000.00 0.09 - - - 4.00 100.00 0.09 4.00 100.00 0.09
4 Asuransi dan perizinan
- BPJS Ketenagakerjaan Dan Kesehatan Kerja; Ls 1.00 500,000.00 500,000.00 0.23 - - - 1.00 100.00 0.23 1.00 100.00 0.23
5 Personel Keselamatan Konstruksi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Petugas K3 Ob 1.00 1,500,000.00 1,500,000.00 0.68 - - - 1.00 100.00 0.68 1.00 100.00 0.68
6 Fasilitas sarana, prasarana, dan alat kesehatan
- Peralatan P3K (Kotak P3K, Tandu,Tabung Oksigen, Obat Luka, Perban, dll) Ls 1.00 1,300,000.00 1,300,000.00 0.59 - - - 1.00 100.00 0.59 1.00 100.00 0.59
7 Rambu-rambu yang diperlukan
- Rambu Informasi dan Peringatan Bh 1.00 50,000.00 50,000.00 0.02 - - - 1.00 100.00 0.02 1.00 100.00 0.02
8 Konsultasi dengan ahli terkait Keselamatan Konstruksi Ls 1.00 500,000.00 500,000.00 0.23 - - - 1.00 100.00 0.23 1.00 100.00 0.23
9 Kegiatan dan peralatan terkait dengan pengendalian Bendera K3 Bh 1.00 50,000.00 50,000.00 0.02 - - - 1.00 100.00 0.02 1.00 100.00 0.02
JUMLAH B 6,010,000.00 2.74 - 2.74 2.74
C. PEKERJAAN PAGAR
I. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi M3 20.51 71,390.00 1,464,454.20 0.67 - - - 20.51 100.00 0.67 20.51 100.00 0.67
2 Pek. Urugan Tanah Kembali M3 5.04 51,480.00 259,459.20 0.12 - - - 5.04 100.00 0.12 5.04 100.00 0.12
3 Pek. Urugan Pasir Alas Pondasi M3 1.68 219,956.00 369,526.08 0.17 - - - 1.68 100.00 0.17 1.68 100.00 0.17
JUMLAH I 2,093,439.48 0.95 - 0.95 0.95
II. PEKERJAAN BATU DAN PLESTERAN
1 Pas. Batu Kosong M3 5.04 452,951.40 2,282,875.06 1.04 - - - - - - - - -
2 Pas. Pondasi Batu Gunung 1 : 5 M3 19.04 822,701.00 15,664,227.04 7.14 - - - - - - - - -
3 Pas. Dinding Batu Bata 1 : 5 M2 41.42 121,558.80 5,034,357.70 2.30 - - - - - - - - -
4 Pas. Plesteran Dinding Batu Bata 1 : 5 M2 82.83 64,381.24 5,332,698.11 2.43 - - - - - - - - -
5 Pas. Plesteran Ciprat/Kamper 1 : 3 M2 32.11 66,976.36 2,150,610.92 0.98 - - - - - - - - -
6 Pas. Plesteran Pondasi + Acian M2 44.80 66,976.36 3,000,540.93 1.37 - - - - - - - - -
7 Pek. List Profil Ls 1.00 2,000,000.00 2,000,000.00 0.91 - - - - - - - - -
JUMLAH II 35,465,309.75 16.17 - - -
III. PEKERJAAN BESI DAN BETON
1 Pek. Beton Pondasi Poer Plat
- Bekisting M2 2.40 170,286.60 408,687.84 0.19 - - - - - - - - -
- Besi Beton Kg 24.72 20,560.54 508,194.87 0.23 - - - - - - - - -
- Beton K175 M3 0.60 1,199,480.49 719,688.29 0.33 - - - - - - - - -
2 Pek. Beton Sloof 15/20
- Bekisting M2 11.20 179,636.60 2,011,929.92 0.92 - - - - - - - - -
- Besi Beton Kg 322.18 20,560.54 6,624,233.02 3.02 - - - - - - - - -
- Beton K175 M3 1.68 1,199,480.49 2,015,127.22 0.92 - - - - - - - - -
3 Pek. Beton Sloof Gerbang 15/30
- Bekisting M2 3.00 179,636.60 538,909.80 0.25 - - - - - - - - -
- Besi Beton Kg 42.01 20,560.54 863,836.71 0.39 - - - - - - - - -
- Beton K175 M3 0.23 1,199,480.49 269,883.11 0.12 - - - - - - - - -
4 Pek. Beton Kolom 20/20
- Roster Beton Kolom Pracetak Motif (Dudukan+Tiang+Topi) Klm 18.00 575,000.00 10,350,000.00 4.72 - - - - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Besi Beton Kg 212.24 20,560.54 4,363,731.43 1.99 - - - - - - - - -
- Beton K175 M3 1.30 1,199,480.49 1,554,526.72 0.71 - - - - - - - - -
5 Pek. Beton Kolom 40/40 (Gerbang)
- Bekisting M2 14.72 249,587.80 3,673,932.42 1.68 - - - - - - - - -
- Besi Beton Kg 163.44 20,560.54 3,360,323.60 1.53 - - - - - - - - -
- Beton K175 M3 1.47 1,199,480.49 1,765,635.28 0.80 - - - - - - - - -
6 Pek. Balok Beton 15/30 dan Topi Beton 10/15
- Bekisting M2 5.48 257,177.80 1,409,334.34 0.64 - - - - - - - - -
- Besi Beton Kg 111.36 20,560.54 2,289,523.28 1.04 - - - - - - - - -
- Beton K175 M3 0.41 1,199,480.49 492,986.48 0.22 - - - - - - - - -
JUMLAH III 43,220,484.33 19.71 - - -
IV PEKERJAAN TERALIS, KERAMIK DAN ACCESSORIES
1 Pek. Teralis Dinding Pagar M1 49.40 552,580.60 27,297,481.64 12.45 - - - - - - - - -
2 Pek. Teralis Pintu Gerbang Tengah dan Samping ( Pintu Sorong ) M1 7.64 1,213,405.60 9,270,418.78 4.23 - - - - - - - - -
3 Pas. Dinding Granit 80 x 80 Cm M2 7.68 428,147.50 3,288,172.80 1.50 - - - - - - - - -
4 Pas. Batu Alam Dinding dan Kolom Gerbang M2 11.52 415,299.50 4,784,250.24 2.18 - - - - - - - - -
5 Pek. Papan Nama Gerbang + Logo Kota + Logo Bakti Husada ( Acrylic ) Ls 1.00 9,500,000.00 9,500,000.00 4.33 - - - - - - - - -
JUMLAH IV 54,140,323.46 24.68 - - -
V PEKERJAAN PENGECATAN
1 Pek. Cat Tembok Dinding/Kolom 2x Cat Anti Lumut M2 95.79 35,827.00 3,431,868.33 1.56 - - - - - - - - -
2 Pek. Cat Besi Teralis 2x Cat M2 57.04 36,462.80 2,079,838.11 0.95 - - - - - - - - -
JUMLAH V 5,511,706.44 2.51 - - -
D. PEKERJAAN PENATAAN LAHAN PARKIR
1 Pek. Galian Tanah Cansteen M3 5.04 71,390.00 359,805.60 0.16 - - - - - - - - -
2 Pek. Urugan Tanah Didatangkan M3 96.00 110,880.00 10,644,480.00 4.85 - - - - - - - - -
3 Pek. Urugan Pasir Alas Cansteen/Rabat M3 12.84 219,956.00 2,824,235.04 1.29 - - - - - - - - -
4 Pek. Cansteen Pas. Batu Gunung 30/60, Camp. 1:4 M3 10.08 857,780.00 8,646,422.40 3.94 - - - - - - - - -
5 Pek. Plesteran Cansteen Camp. 1:3 M2 33.60 66,976.36 2,250,405.70 1.03 - - - - - - - - -
6 Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan Masuk M3 18.24 1,199,480.49 21,878,524.14 9.97 - - - - - - - - -
7 Pek. Pengecatan Cansteen Anti Lumut M2 33.60 35,827.00 1,203,787.20 0.55 - - - - - - - - -
JUMLAH D 47,807,660.07 21.80 - - -
E. PEKERJAAN REHAB/PERBAIKAN
1 Pek. Kramik Lantai 30/30 cm KM/WC M2 2.25 153,684.30 345,789.68 0.16 - - - - - - - - -
2 Pek. Granit Dinding 60/60 cm KM/WC M2 8.28 336,451.50 2,785,818.42 1.27 - - - - - - - - -
3 Pek. Instalasi Air Bersih + Accesories Pipa Ls 1.00 750,000.00 750,000.00 0.34 - - - - - - - - -
4 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 3" AW Ls 1.00 1,500,000.00 1,500,000.00 0.68 - - - - - - - - -
5 Pek. Pasangan Kloset Duduk Bh 1.00 3,382,786.00 3,382,786.00 1.54 - - - - - - - - -
6 Pek. Pasangan Kran Air Bh 1.00 93,104.00 93,104.00 0.04 - - - - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
7 Pek. Floor Drain Bh 1.00 54,736.00 54,736.00 0.02 - - - - - - - - -
8 Pengadaan Ember Air Bh 1.00 75,000.00 75,000.00 0.03 - - - - - - - - -
9 Pek. Pembuatan Septik Tank Unit 1.00 1,800,000.00 1,800,000.00 0.82 - - - - - - - - -
10 Pek. Rehab Atap/Turbin Ls 1.00 5,000,000.00 5,000,000.00 2.28 - - - - - - - - -
JUMLAH E 15,787,234.10 7.20 - - -
F. PEKERJAAN FINISHING DAN PEMBERSIHAN AKHIR
1 Pek. Pembersihan Akhir/Perapihan Ls 1.00 900,000.00 900,000.00 0.41 - - - - - - - - -
JUMLAH F 900,000.00 0.41 - - -
JUMLAH (REAL COST) ( A ) 219,336,157.63
PPN 10 % ( B ) 21,933,615.76
100.00 - 6.67 6.67
TOTAL COST ( A + B ) 241,269,773.40
DIBULATKAN 241,200,000.00

Kendari, 5 Agustus 2020


Disetujui Oleh Diperiksa Oleh Diperiksa Oleh Di Buat Oleh
Pejabat Pelaksana Teknis Kegiatan (PPTK) Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….
NIP…………………. NIP…………………. Site Engineer Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 30 JULI 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

A. PEKERJAAN PERSIAPAN / PENDAHULUAN 1 Pasir Urug M3 Pasir Urug M3


1 Pek. Pembersihan Lokasi/Pembongkaran WC 0.50 Ls 2 Pasir Pasang M3 Pasir Pasang M3
2 Pek. Pengukuran dan Pemasangan Bouwplank 1.00 Ls 3 Kerikil/Suplit M3 Kerikil/Suplit M3
3 Pek. Pembuatan Barak Kerja/Gudang Bahan 1.00 Ls 4 Batu Bata Merah Bh Batu Bata Merah Bh
4 Administrasi, Dokumentasi dan Air Kerja 0.50 Ls 5 Semen Zak Semen Zak
5 Papan Nama Kegiatan 1.00 Ls 6 Besi Beton Kg Besi Beton Kg
B. PEK. BIAYA PENERAPAN SMKK 7 Tanah Urug M3 Tanah Urug M3
Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja 8 Cat Tembok Kg Cat Tembok Kg
1.00 Set
Dan Formulir 9 Cat Besi Kg Cat Besi Kg
Pembuatan Kartu Identitas Pekerja (KIP); 4.00 Lbr
Pengarahan K3 (safety briefing) : Pertemuan Keselamatan
(Safety Talk dan/atau Tool Box Meeting);
4.00 Org

Topi Pelindung (Safety Helmet); 4.00 Bh


Pelindung Mata 4.00 Psg
Sarung Tangan (Safety Gloves); 4.00 Psg
Sepatu Keselamatan (Safety Shoes); 4.00 Psg
Rompi Keselamatan (Safety Vest); 4.00 Bh
BPJS Ketenagakerjaan Dan Kesehatan Kerja; 1.00 Ls
Petugas K3 1.00 Ob
Peralatan P3K (Kotak P3K, Tandu,Tabung Oksigen,
1.00 Ls
Obat Luka, Perban, dll)
Rambu Informasi dan Peringatan 1.00 Bh
Konsultasi dengan ahli terkait Keselamatan Konstruksi 1.00 Ls
Kegiatan dan peralatan terkait dengan pengendalian
1.00 Bh
Bendera K3

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 31 JULI 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

C. PEKERJAAN PAGAR 1 Pasir Urug M3 Pasir Urug M3


I. PEKERJAAN TANAH DAN PASIR 2 Pasir Pasang M3 Pasir Pasang M3
1 Pek. Galian Tanah Pondasi 5.13 M3 3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 1 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

C. PEKERJAAN PAGAR 1 Pasir Urug M3 Pasir Urug M3


I. PEKERJAAN TANAH DAN PASIR 2 Pasir Pasang M3 Pasir Pasang M3
1 Pek. Galian Tanah Pondasi 5.13 M3 3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 2 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

C. PEKERJAAN PAGAR 1 Pasir Urug M3 Pasir Urug M3


I. PEKERJAAN TANAH DAN PASIR 2 Pasir Pasang M3 Pasir Pasang M3
1 Pek. Galian Tanah Pondasi 5.13 M3 3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 3 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

C. PEKERJAAN PAGAR 1 Pasir Urug M3 Pasir Urug M3


I. PEKERJAAN TANAH DAN PASIR 2 Pasir Pasang M3 Pasir Pasang M3
1 Pek. Galian Tanah Pondasi 5.13 M3 3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 4 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

C. PEKERJAAN PAGAR 1 Pasir Urug M3 Pasir Urug M3


I. PEKERJAAN TANAH DAN PASIR 2 Pasir Pasang M3 Pasir Pasang M3
1 Pek. Urugan Tanah Kembali 5.04 M3 3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug 6.05 M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 5 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

C. PEKERJAAN PAGAR 1 Pasir Urug 2.02 M3 Pasir Urug 2.50 M3


I. PEKERJAAN TANAH DAN PASIR 2 Pasir Pasang M3 Pasir Pasang M3
1 Pek. Urugan Pasir Alas Pondasi 1.68 M3 3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN (MINGGUAN)

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR MINGGU : II (KE DUA)


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI PERIODE : 6 AGUSTUS 2020 S/D 12 AGUSTUS 2020
TAHUN ANGGARAN : 2020 S/D MINGGU LALU : 6.67 %
LOKASI : KOTA KENDARI MINGGU INI : 7.41 %
S/D MINGGU INI : 14.08 %

KEMAJUAN PEKERJAAN
KONTRAK
MINGGU LALU MINGGU INI S/D MINGGU INI
VOL
NO URAIAN SAT
TOTAL HARGA SATUAN TOTAL JUMLAH BOBOT BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER
VOL VOL VOL
(Rp) HARGA (Rp) (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. PEKERJAAN PERSIAPAN / PENDAHULUAN


1 Pek. Pembersihan Lokasi/Pembongkaran WC Lama Ls 1.00 2,500,000.00 2,500,000.00 1.14 0.50 50.00 0.57 - - - 0.50 50.00 0.57
2 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 1,000,000.00 1,000,000.00 0.46 1.00 100.00 0.46 - - - 1.00 100.00 0.46
3 Pek. Pembuatan Barak Kerja/Gudang Bahan Ls 1.00 3,500,000.00 3,500,000.00 1.60 1.00 100.00 1.60 - - - 1.00 100.00 1.60
3 Administrasi, Dokumentasi dan Air Kerja Ls 1.00 1,250,000.00 1,250,000.00 0.57 0.50 50.00 0.28 - - - 0.50 50.00 0.28
4 Papan Nama Kegiatan Ls 1.00 150,000.00 150,000.00 0.07 1.00 100.00 0.07 - - - 1.00 100.00 0.07
JUMLAH A 8,400,000.00 3.83 2.97 - 2.97
B. PEK. BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK
- Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir Set 1.00 450,000.00 450,000.00 0.21 1.00 100.00 0.21 - - - 1.00 100.00 0.21
- Pembuatan Kartu Identitas Pekerja (KIP); Lbr 4.00 5,000.00 20,000.00 0.01 4.00 100.00 0.01 - - - 4.00 100.00 0.01
2 Sosialisasi, promosi, dan pelatihan;
Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Safety Talk
- Org 4.00 10,000.00 40,000.00 0.02 4.00 100.00 0.02 - - - 4.00 100.00 0.02
dan/atau Tool Box Meeting);
3 Alat Pelindung Kerja dan Alat Pelindung Diri
- Topi Pelindung (Safety Helmet); Bh 4.00 85,000.00 340,000.00 0.16 4.00 100.00 0.16 - - - 4.00 100.00 0.16
- Pelindung Mata Psg 4.00 65,000.00 260,000.00 0.12 4.00 100.00 0.12 - - - 4.00 100.00 0.12
- Sarung Tangan (Safety Gloves); Psg 4.00 20,000.00 80,000.00 0.04 4.00 100.00 0.04 - - - 4.00 100.00 0.04
- Sepatu Keselamatan (Safety Shoes); Psg 4.00 180,000.00 720,000.00 0.33 4.00 100.00 0.33 - - - 4.00 100.00 0.33
- Rompi Keselamatan (Safety Vest); Bh 4.00 50,000.00 200,000.00 0.09 4.00 100.00 0.09 - - - 4.00 100.00 0.09
4 Asuransi dan perizinan
- BPJS Ketenagakerjaan Dan Kesehatan Kerja; Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
5 Personel Keselamatan Konstruksi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Petugas K3 Ob 1.00 1,500,000.00 1,500,000.00 0.68 1.00 100.00 0.68 - - - 1.00 100.00 0.68
6 Fasilitas sarana, prasarana, dan alat kesehatan
- Peralatan P3K (Kotak P3K, Tandu,Tabung Oksigen, Obat Luka, Perban, dll) Ls 1.00 1,300,000.00 1,300,000.00 0.59 1.00 100.00 0.59 - - - 1.00 100.00 0.59
7 Rambu-rambu yang diperlukan
- Rambu Informasi dan Peringatan Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
8 Konsultasi dengan ahli terkait Keselamatan Konstruksi Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
9 Kegiatan dan peralatan terkait dengan pengendalian Bendera K3 Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
JUMLAH B 6,010,000.00 2.74 2.74 - 2.74
C. PEKERJAAN PAGAR
I. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi M3 20.51 71,390.00 1,464,454.20 0.67 20.51 100.00 0.67 - - - 20.51 100.00 0.67
2 Pek. Urugan Tanah Kembali M3 5.04 51,480.00 259,459.20 0.12 5.04 100.00 0.12 - - - 5.04 100.00 0.12
3 Pek. Urugan Pasir Alas Pondasi M3 1.68 219,956.00 369,526.08 0.17 1.68 100.00 0.17 - - - 1.68 100.00 0.17
JUMLAH I 2,093,439.48 0.95 0.95 - 0.95
II. PEKERJAAN BATU DAN PLESTERAN
1 Pas. Batu Kosong M3 5.04 452,951.40 2,282,875.06 1.04 - - - 5.04 100.00 1.04 5.04 100.00 1.04
2 Pas. Pondasi Batu Gunung 1 : 5 M3 19.04 822,701.00 15,664,227.04 7.14 - - - 15.00 78.78 5.63 15.00 78.78 5.63
3 Pas. Dinding Batu Bata 1 : 5 M2 41.42 121,558.80 5,034,357.70 2.30 - - - - - - - - -
4 Pas. Plesteran Dinding Batu Bata 1 : 5 M2 82.83 64,381.24 5,332,698.11 2.43 - - - - - - - - -
5 Pas. Plesteran Ciprat/Kamper 1 : 3 M2 32.11 66,976.36 2,150,610.92 0.98 - - - - - - - - -
6 Pas. Plesteran Pondasi + Acian M2 44.80 66,976.36 3,000,540.93 1.37 - - - - - - - - -
7 Pek. List Profil Ls 1.00 2,000,000.00 2,000,000.00 0.91 - - - - - - - - -
JUMLAH II 35,465,309.75 16.17 - 6.67 6.67
III. PEKERJAAN BESI DAN BETON
1 Pek. Beton Pondasi Poer Plat
- Bekisting M2 2.40 170,286.60 408,687.84 0.19 - - - 2.40 100.00 0.19 2.40 100.00 0.19
- Besi Beton Kg 24.72 20,560.54 508,194.87 0.23 - - - 24.72 100.00 0.23 24.72 100.00 0.23
- Beton K175 M3 0.60 1,199,480.49 719,688.29 0.33 - - - 0.60 100.00 0.33 0.60 100.00 0.33
2 Pek. Beton Sloof 15/20
- Bekisting M2 11.20 179,636.60 2,011,929.92 0.92 - - - - - - - - -
- Besi Beton Kg 322.18 20,560.54 6,624,233.02 3.02 - - - - - - - - -
- Beton K175 M3 1.68 1,199,480.49 2,015,127.22 0.92 - - - - - - - - -
3 Pek. Beton Sloof Gerbang 15/30
- Bekisting M2 3.00 179,636.60 538,909.80 0.25 - - - - - - - - -
- Besi Beton Kg 42.01 20,560.54 863,836.71 0.39 - - - - - - - - -
- Beton K175 M3 0.23 1,199,480.49 269,883.11 0.12 - - - - - - - - -
4 Pek. Beton Kolom 20/20
- Roster Beton Kolom Pracetak Motif (Dudukan+Tiang+Topi) Klm 18.00 575,000.00 10,350,000.00 4.72 - - - - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Besi Beton Kg 212.24 20,560.54 4,363,731.43 1.99 - - - - - - - - -
- Beton K175 M3 1.30 1,199,480.49 1,554,526.72 0.71 - - - - - - - - -
5 Pek. Beton Kolom 40/40 (Gerbang)
- Bekisting M2 14.72 249,587.80 3,673,932.42 1.68 - - - - - - - - -
- Besi Beton Kg 163.44 20,560.54 3,360,323.60 1.53 - - - - - - - - -
- Beton K175 M3 1.47 1,199,480.49 1,765,635.28 0.80 - - - - - - - - -
6 Pek. Balok Beton 15/30 dan Topi Beton 10/15
- Bekisting M2 5.48 257,177.80 1,409,334.34 0.64 - - - - - - - - -
- Besi Beton Kg 111.36 20,560.54 2,289,523.28 1.04 - - - - - - - - -
- Beton K175 M3 0.41 1,199,480.49 492,986.48 0.22 - - - - - - - - -
JUMLAH III 43,220,484.33 19.71 - 0.75 0.75
IV PEKERJAAN TERALIS, KERAMIK DAN ACCESSORIES
1 Pek. Teralis Dinding Pagar M1 49.40 552,580.60 27,297,481.64 12.45 - - - - - - - - -
2 Pek. Teralis Pintu Gerbang Tengah dan Samping ( Pintu Sorong ) M1 7.64 1,213,405.60 9,270,418.78 4.23 - - - - - - - - -
3 Pas. Dinding Granit 80 x 80 Cm M2 7.68 428,147.50 3,288,172.80 1.50 - - - - - - - - -
4 Pas. Batu Alam Dinding dan Kolom Gerbang M2 11.52 415,299.50 4,784,250.24 2.18 - - - - - - - - -
5 Pek. Papan Nama Gerbang + Logo Kota + Logo Bakti Husada ( Acrylic ) Ls 1.00 9,500,000.00 9,500,000.00 4.33 - - - - - - - - -
JUMLAH IV 54,140,323.46 24.68 - - -
V PEKERJAAN PENGECATAN
1 Pek. Cat Tembok Dinding/Kolom 2x Cat Anti Lumut M2 95.79 35,827.00 3,431,868.33 1.56 - - - - - - - - -
2 Pek. Cat Besi Teralis 2x Cat M2 57.04 36,462.80 2,079,838.11 0.95 - - - - - - - - -
JUMLAH V 5,511,706.44 2.51 - - -
D. PEKERJAAN PENATAAN LAHAN PARKIR
1 Pek. Galian Tanah Cansteen M3 5.04 71,390.00 359,805.60 0.16 - - - - - - - - -
2 Pek. Urugan Tanah Didatangkan M3 96.00 110,880.00 10,644,480.00 4.85 - - - - - - - - -
3 Pek. Urugan Pasir Alas Cansteen/Rabat M3 12.84 219,956.00 2,824,235.04 1.29 - - - - - - - - -
4 Pek. Cansteen Pas. Batu Gunung 30/60, Camp. 1:4 M3 10.08 857,780.00 8,646,422.40 3.94 - - - - - - - - -
5 Pek. Plesteran Cansteen Camp. 1:3 M2 33.60 66,976.36 2,250,405.70 1.03 - - - - - - - - -
6 Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan Masuk M3 18.24 1,199,480.49 21,878,524.14 9.97 - - - - - - - - -
7 Pek. Pengecatan Cansteen Anti Lumut M2 33.60 35,827.00 1,203,787.20 0.55 - - - - - - - - -
JUMLAH D 47,807,660.07 21.80 - - -
E. PEKERJAAN REHAB/PERBAIKAN
1 Pek. Kramik Lantai 30/30 cm KM/WC M2 2.25 153,684.30 345,789.68 0.16 - - - - - - - - -
2 Pek. Granit Dinding 60/60 cm KM/WC M2 8.28 336,451.50 2,785,818.42 1.27 - - - - - - - - -
3 Pek. Instalasi Air Bersih + Accesories Pipa Ls 1.00 750,000.00 750,000.00 0.34 - - - - - - - - -
4 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 3" AW Ls 1.00 1,500,000.00 1,500,000.00 0.68 - - - - - - - - -
5 Pek. Pasangan Kloset Duduk Bh 1.00 3,382,786.00 3,382,786.00 1.54 - - - - - - - - -
6 Pek. Pasangan Kran Air Bh 1.00 93,104.00 93,104.00 0.04 - - - - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
7 Pek. Floor Drain Bh 1.00 54,736.00 54,736.00 0.02 - - - - - - - - -
8 Pengadaan Ember Air Bh 1.00 75,000.00 75,000.00 0.03 - - - - - - - - -
9 Pek. Pembuatan Septik Tank Unit 1.00 1,800,000.00 1,800,000.00 0.82 - - - - - - - - -
10 Pek. Rehab Atap/Turbin Ls 1.00 5,000,000.00 5,000,000.00 2.28 - - - - - - - - -
JUMLAH E 15,787,234.10 7.20 - - -
F. PEKERJAAN FINISHING DAN PEMBERSIHAN AKHIR
1 Pek. Pembersihan Akhir/Perapihan Ls 1.00 900,000.00 900,000.00 0.41 - - - - - - - - -
JUMLAH F 900,000.00 0.41 - - -
JUMLAH (REAL COST) ( A ) 219,336,157.63
PPN 10 % ( B ) 21,933,615.76
100.00 6.67 7.41 14.08
TOTAL COST ( A + B ) 241,269,773.40
DIBULATKAN 241,200,000.00

Kendari, 12 Agustus 2020


Disetujui Oleh Diperiksa Oleh Diperiksa Oleh Di Buat Oleh
Pejabat Pelaksana Teknis Kegiatan (PPTK) Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….
NIP…………………. NIP…………………. Site Engineer Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 6 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

II. PEKERJAAN BATU DAN PLESTERAN 1 Pasir Urug M3 Pasir Urug M3


1 Pas. Batu Kosong 5.04 M3 2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah 6.00 M3 Batu Belah 25.00 M3

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 7 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pekerjaan Bekisting Pondasi Poer Plat 2.4 M2 1 Pasir Urug M3 Pasir Urug M3
2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting 2.40 M2 Kayu Bekisting 5.00 M3

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 8 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pekerjaan Pembesian Pondasi Poer Plat 24.72 Kg 1 Pasir Urug M3 Pasir Urug M3
2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton 25.96 Kg Besi Beton 1,000 Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kawat Beton 0.37 Kg Kawat Beton 50.00 Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 9 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pekerjaan Pengecoran Pondasi Poer Plat 0.6 M3 1 Pasir Urug M3 Pasir Urug M3
2 Pasir Pasang 0.62 M3 Pasir Pasang 20.00 M3
3 Kerikil/Suplit 0.13 M3 Kerikil/Suplit 10.00 M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 7.00 Zak Semen 100.00 Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 10 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pas. Pondasi Batu Gunung 1 : 5 5 M3 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang 0.003 M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 16.00 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah 6.00 M3 Batu Belah M3

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 11 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pas. Pondasi Batu Gunung 1 : 5 5 M3 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang 0.003 M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 16.00 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah 6.00 M3 Batu Belah M3

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 12 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pas. Pondasi Batu Gunung 1 : 5 5 M3 1 Pasir Urug M3 Pasir Urug 2.50 M3


2 Pasir Pasang 0.003 M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 16.00 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah 6.00 M3 Batu Belah M3

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN (MINGGUAN)

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR MINGGU : III (KE TIGA)


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI PERIODE : 13 AGUSTUS 2020 S/D 20 Agustus 2020
TAHUN ANGGARAN : 2020 S/D MINGGU LALU : 6.67 %
LOKASI : KOTA KENDARI MINGGU INI : 7.13 %
S/D MINGGU INI : 13.80 %

KEMAJUAN PEKERJAAN
KONTRAK
MINGGU LALU MINGGU INI S/D MINGGU INI
VOL
NO URAIAN SAT
TOTAL HARGA SATUAN TOTAL JUMLAH BOBOT BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER
VOL VOL VOL
(Rp) HARGA (Rp) (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. PEKERJAAN PERSIAPAN / PENDAHULUAN


1 Pek. Pembersihan Lokasi/Pembongkaran WC Lama Ls 1.00 2,500,000.00 2,500,000.00 1.14 0.50 50.00 0.57 - - - 0.50 50.00 0.57
2 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 1,000,000.00 1,000,000.00 0.46 1.00 100.00 0.46 - - - 1.00 100.00 0.46
3 Pek. Pembuatan Barak Kerja/Gudang Bahan Ls 1.00 3,500,000.00 3,500,000.00 1.60 1.00 100.00 1.60 - - - 1.00 100.00 1.60
3 Administrasi, Dokumentasi dan Air Kerja Ls 1.00 1,250,000.00 1,250,000.00 0.57 0.50 50.00 0.28 - - - 0.50 50.00 0.28
4 Papan Nama Kegiatan Ls 1.00 150,000.00 150,000.00 0.07 1.00 100.00 0.07 - - - 1.00 100.00 0.07
JUMLAH A 8,400,000.00 3.83 2.97 - 2.97
B. PEK. BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK
- Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir Set 1.00 450,000.00 450,000.00 0.21 1.00 100.00 0.21 - - - 1.00 100.00 0.21
- Pembuatan Kartu Identitas Pekerja (KIP); Lbr 4.00 5,000.00 20,000.00 0.01 4.00 100.00 0.01 - - - 4.00 100.00 0.01
2 Sosialisasi, promosi, dan pelatihan;
Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Safety Talk
- Org 4.00 10,000.00 40,000.00 0.02 4.00 100.00 0.02 - - - 4.00 100.00 0.02
dan/atau Tool Box Meeting);
3 Alat Pelindung Kerja dan Alat Pelindung Diri
- Topi Pelindung (Safety Helmet); Bh 4.00 85,000.00 340,000.00 0.16 4.00 100.00 0.16 - - - 4.00 100.00 0.16
- Pelindung Mata Psg 4.00 65,000.00 260,000.00 0.12 4.00 100.00 0.12 - - - 4.00 100.00 0.12
- Sarung Tangan (Safety Gloves); Psg 4.00 20,000.00 80,000.00 0.04 4.00 100.00 0.04 - - - 4.00 100.00 0.04
- Sepatu Keselamatan (Safety Shoes); Psg 4.00 180,000.00 720,000.00 0.33 4.00 100.00 0.33 - - - 4.00 100.00 0.33
- Rompi Keselamatan (Safety Vest); Bh 4.00 50,000.00 200,000.00 0.09 4.00 100.00 0.09 - - - 4.00 100.00 0.09
4 Asuransi dan perizinan
- BPJS Ketenagakerjaan Dan Kesehatan Kerja; Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
5 Personel Keselamatan Konstruksi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Petugas K3 Ob 1.00 1,500,000.00 1,500,000.00 0.68 1.00 100.00 0.68 - - - 1.00 100.00 0.68
6 Fasilitas sarana, prasarana, dan alat kesehatan
- Peralatan P3K (Kotak P3K, Tandu,Tabung Oksigen, Obat Luka, Perban, dll) Ls 1.00 1,300,000.00 1,300,000.00 0.59 1.00 100.00 0.59 - - - 1.00 100.00 0.59
7 Rambu-rambu yang diperlukan
- Rambu Informasi dan Peringatan Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
8 Konsultasi dengan ahli terkait Keselamatan Konstruksi Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
9 Kegiatan dan peralatan terkait dengan pengendalian Bendera K3 Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
JUMLAH B 6,010,000.00 2.74 2.74 - 2.74
C. PEKERJAAN PAGAR
I. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi M3 20.51 71,390.00 1,464,454.20 0.67 20.51 100.00 0.67 - - - 20.51 100.00 0.67
2 Pek. Urugan Tanah Kembali M3 5.04 51,480.00 259,459.20 0.12 5.04 100.00 0.12 - - - 5.04 100.00 0.12
3 Pek. Urugan Pasir Alas Pondasi M3 1.68 219,956.00 369,526.08 0.17 1.68 100.00 0.17 - - - 1.68 100.00 0.17
JUMLAH I 2,093,439.48 0.95 0.95 - 0.95
II. PEKERJAAN BATU DAN PLESTERAN
1 Pas. Batu Kosong M3 5.04 452,951.40 2,282,875.06 1.04 5.04 100.00 1.04 - - - 5.04 100.00 1.04
2 Pas. Pondasi Batu Gunung 1 : 5 M3 19.04 822,701.00 15,664,227.04 7.14 15.00 78.78 5.63 4.04 21.22 1.52 19.04 100.00 7.14
3 Pas. Dinding Batu Bata 1 : 5 M2 41.42 121,558.80 5,034,357.70 2.30 - - - - - - - - -
4 Pas. Plesteran Dinding Batu Bata 1 : 5 M2 82.83 64,381.24 5,332,698.11 2.43 - - - - - - - - -
5 Pas. Plesteran Ciprat/Kamper 1 : 3 M2 32.11 66,976.36 2,150,610.92 0.98 - - - - - - - - -
6 Pas. Plesteran Pondasi + Acian M2 44.80 66,976.36 3,000,540.93 1.37 - - - - - - - - -
7 Pek. List Profil Ls 1.00 2,000,000.00 2,000,000.00 0.91 - - - - - - - - -
JUMLAH II 35,465,309.75 16.17 6.67 1.52 8.18
III. PEKERJAAN BESI DAN BETON
1 Pek. Beton Pondasi Poer Plat
- Bekisting M2 2.40 170,286.60 408,687.84 0.19 2.40 100.00 0.19 - - - 2.40 100.00 0.19
- Besi Beton Kg 24.72 20,560.54 508,194.87 0.23 24.72 100.00 0.23 - - - 24.72 100.00 0.23
- Beton K175 M3 0.60 1,199,480.49 719,688.29 0.33 0.60 100.00 0.33 - - - 0.60 100.00 0.33
2 Pek. Beton Sloof 15/20
- Bekisting M2 11.20 179,636.60 2,011,929.92 0.92 - - - 11.20 100.00 0.92 11.20 100.00 0.92
- Besi Beton Kg 322.18 20,560.54 6,624,233.02 3.02 - - - 322.18 100.00 3.02 322.18 100.00 3.02
- Beton K175 M3 1.68 1,199,480.49 2,015,127.22 0.92 - - - 1.68 100.00 0.92 1.68 100.00 0.92
3 Pek. Beton Sloof Gerbang 15/30
- Bekisting M2 3.00 179,636.60 538,909.80 0.25 - - - 3.00 100.00 0.25 3.00 100.00 0.25
- Besi Beton Kg 42.01 20,560.54 863,836.71 0.39 - - - 42.01 100.00 0.39 42.01 100.00 0.39
- Beton K175 M3 0.23 1,199,480.49 269,883.11 0.12 - - - 0.23 100.00 0.12 0.23 100.00 0.12
4 Pek. Beton Kolom 20/20
- Roster Beton Kolom Pracetak Motif (Dudukan+Tiang+Topi) Klm 18.00 575,000.00 10,350,000.00 4.72 - - - - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Besi Beton Kg 212.24 20,560.54 4,363,731.43 1.99 - - - - - - - - -
- Beton K175 M3 1.30 1,199,480.49 1,554,526.72 0.71 - - - - - - - - -
5 Pek. Beton Kolom 40/40 (Gerbang)
- Bekisting M2 14.72 249,587.80 3,673,932.42 1.68 - - - - - - - - -
- Besi Beton Kg 163.44 20,560.54 3,360,323.60 1.53 - - - - - - - - -
- Beton K175 M3 1.47 1,199,480.49 1,765,635.28 0.80 - - - - - - - - -
6 Pek. Balok Beton 15/30 dan Topi Beton 10/15
- Bekisting M2 5.48 257,177.80 1,409,334.34 0.64 - - - - - - - - -
- Besi Beton Kg 111.36 20,560.54 2,289,523.28 1.04 - - - - - - - - -
- Beton K175 M3 0.41 1,199,480.49 492,986.48 0.22 - - - - - - - - -
JUMLAH III 43,220,484.33 19.71 0.75 5.62 6.36
IV PEKERJAAN TERALIS, KERAMIK DAN ACCESSORIES
1 Pek. Teralis Dinding Pagar M1 49.40 552,580.60 27,297,481.64 12.45 - - - - - - - - -
2 Pek. Teralis Pintu Gerbang Tengah dan Samping ( Pintu Sorong ) M1 7.64 1,213,405.60 9,270,418.78 4.23 - - - - - - - - -
3 Pas. Dinding Granit 80 x 80 Cm M2 7.68 428,147.50 3,288,172.80 1.50 - - - - - - - - -
4 Pas. Batu Alam Dinding dan Kolom Gerbang M2 11.52 415,299.50 4,784,250.24 2.18 - - - - - - - - -
5 Pek. Papan Nama Gerbang + Logo Kota + Logo Bakti Husada ( Acrylic ) Ls 1.00 9,500,000.00 9,500,000.00 4.33 - - - - - - - - -
JUMLAH IV 54,140,323.46 24.68 - - -
V PEKERJAAN PENGECATAN
1 Pek. Cat Tembok Dinding/Kolom 2x Cat Anti Lumut M2 95.79 35,827.00 3,431,868.33 1.56 - - - - - - - - -
2 Pek. Cat Besi Teralis 2x Cat M2 57.04 36,462.80 2,079,838.11 0.95 - - - - - - - - -
JUMLAH V 5,511,706.44 2.51 - - -
D. PEKERJAAN PENATAAN LAHAN PARKIR
1 Pek. Galian Tanah Cansteen M3 5.04 71,390.00 359,805.60 0.16 - - - - - - - - -
2 Pek. Urugan Tanah Didatangkan M3 96.00 110,880.00 10,644,480.00 4.85 - - - - - - - - -
3 Pek. Urugan Pasir Alas Cansteen/Rabat M3 12.84 219,956.00 2,824,235.04 1.29 - - - - - - - - -
4 Pek. Cansteen Pas. Batu Gunung 30/60, Camp. 1:4 M3 10.08 857,780.00 8,646,422.40 3.94 - - - - - - - - -
5 Pek. Plesteran Cansteen Camp. 1:3 M2 33.60 66,976.36 2,250,405.70 1.03 - - - - - - - - -
6 Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan Masuk M3 18.24 1,199,480.49 21,878,524.14 9.97 - - - - - - - - -
7 Pek. Pengecatan Cansteen Anti Lumut M2 33.60 35,827.00 1,203,787.20 0.55 - - - - - - - - -
JUMLAH D 47,807,660.07 21.80 - - -
E. PEKERJAAN REHAB/PERBAIKAN
1 Pek. Kramik Lantai 30/30 cm KM/WC M2 2.25 153,684.30 345,789.68 0.16 - - - - - - - - -
2 Pek. Granit Dinding 60/60 cm KM/WC M2 8.28 336,451.50 2,785,818.42 1.27 - - - - - - - - -
3 Pek. Instalasi Air Bersih + Accesories Pipa Ls 1.00 750,000.00 750,000.00 0.34 - - - - - - - - -
4 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 3" AW Ls 1.00 1,500,000.00 1,500,000.00 0.68 - - - - - - - - -
5 Pek. Pasangan Kloset Duduk Bh 1.00 3,382,786.00 3,382,786.00 1.54 - - - - - - - - -
6 Pek. Pasangan Kran Air Bh 1.00 93,104.00 93,104.00 0.04 - - - - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
7 Pek. Floor Drain Bh 1.00 54,736.00 54,736.00 0.02 - - - - - - - - -
8 Pengadaan Ember Air Bh 1.00 75,000.00 75,000.00 0.03 - - - - - - - - -
9 Pek. Pembuatan Septik Tank Unit 1.00 1,800,000.00 1,800,000.00 0.82 - - - - - - - - -
10 Pek. Rehab Atap/Turbin Ls 1.00 5,000,000.00 5,000,000.00 2.28 - - - - - - - - -
JUMLAH E 15,787,234.10 7.20 - - -
F. PEKERJAAN FINISHING DAN PEMBERSIHAN AKHIR
1 Pek. Pembersihan Akhir/Perapihan Ls 1.00 900,000.00 900,000.00 0.41 - - - - - - - - -
JUMLAH F 900,000.00 0.41 - - -
JUMLAH (REAL COST) ( A ) 219,336,157.63
PPN 10 % ( B ) 21,933,615.76
100.00 14.08 7.13 21.22
TOTAL COST ( A + B ) 241,269,773.40
DIBULATKAN 241,200,000.00

Kendari, 20 Agustus 2020


Disetujui Oleh Diperiksa Oleh Diperiksa Oleh Di Buat Oleh
Pejabat Pelaksana Teknis Kegiatan (PPTK) Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….
NIP…………………. NIP…………………. Site Engineer Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 13 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pas. Pondasi Batu Gunung 1 : 5 4.04 M3 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang 0.002 M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 13.00 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah 4.85 M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 14 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pek. Bekisting Beton Sloof 15/20 11.2 M2 1 Pasir Urug M3 Pasir Urug M3
2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting 11.20 M2 Kayu Bekisting M3

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 15 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pek. Pembesian Sloof 15/20 162 Kg 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton 170 Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton 2.43 Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 16 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pek. Pembesian Sloof 15/20 162 Kg 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton 170 Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton 2.43 Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 17 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pek. Pengecoran Sloof 15/20 1.68 M3 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang 1.28 M3 Pasir Pasang M3
3 Kerikil/Suplit 1.71 M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 10.95 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 18 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pek. Bekisting Beton Sloof Gerbang 15/30 3 M2 1 Pasir Urug M3 Pasir Urug M3
2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting 3.00 M2 Kayu Bekisting M3

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 19 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pek. Pembesian Sloof Gerbang 15/30 42.01 Kg 1 Pasir Urug M3 Pasir Urug M3
2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton 44 Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton 0.63 Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 20 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pek. Pengecoran Sloof Gerbang 15/30 0.23 M3 1 Pasir Urug M3 Pasir Urug M3
2 Pasir Pasang 0.17 M3 Pasir Pasang M3
3 Kerikil/Suplit 0.23 M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 1.50 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN (MINGGUAN)

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR MINGGU : IV (KE EMPAT)


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI PERIODE : 21 AGUSTUS 2020 S/D 28 AGUSTUS 2020
TAHUN ANGGARAN : 2020 S/D MINGGU LALU : 21.22 %
LOKASI : KOTA KENDARI MINGGU INI : 7.97 %
S/D MINGGU INI : 29.19 %

KEMAJUAN PEKERJAAN
KONTRAK
MINGGU LALU MINGGU INI S/D MINGGU INI
VOL
NO URAIAN SAT
TOTAL HARGA SATUAN TOTAL JUMLAH BOBOT BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER
VOL VOL VOL
(Rp) HARGA (Rp) (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. PEKERJAAN PERSIAPAN / PENDAHULUAN


1 Pek. Pembersihan Lokasi/Pembongkaran WC Lama Ls 1.00 2,500,000.00 2,500,000.00 1.14 0.50 50.00 0.57 - - - 0.50 50.00 0.57
2 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 1,000,000.00 1,000,000.00 0.46 1.00 100.00 0.46 - - - 1.00 100.00 0.46
3 Pek. Pembuatan Barak Kerja/Gudang Bahan Ls 1.00 3,500,000.00 3,500,000.00 1.60 1.00 100.00 1.60 - - - 1.00 100.00 1.60
3 Administrasi, Dokumentasi dan Air Kerja Ls 1.00 1,250,000.00 1,250,000.00 0.57 0.50 50.00 0.28 - - - 0.50 50.00 0.28
4 Papan Nama Kegiatan Ls 1.00 150,000.00 150,000.00 0.07 1.00 100.00 0.07 - - - 1.00 100.00 0.07
JUMLAH A 8,400,000.00 3.83 2.97 - 2.97
B. PEK. BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK
- Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir Set 1.00 450,000.00 450,000.00 0.21 1.00 100.00 0.21 - - - 1.00 100.00 0.21
- Pembuatan Kartu Identitas Pekerja (KIP); Lbr 4.00 5,000.00 20,000.00 0.01 4.00 100.00 0.01 - - - 4.00 100.00 0.01
2 Sosialisasi, promosi, dan pelatihan;
Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Safety Talk
- Org 4.00 10,000.00 40,000.00 0.02 4.00 100.00 0.02 - - - 4.00 100.00 0.02
dan/atau Tool Box Meeting);
3 Alat Pelindung Kerja dan Alat Pelindung Diri
- Topi Pelindung (Safety Helmet); Bh 4.00 85,000.00 340,000.00 0.16 4.00 100.00 0.16 - - - 4.00 100.00 0.16
- Pelindung Mata Psg 4.00 65,000.00 260,000.00 0.12 4.00 100.00 0.12 - - - 4.00 100.00 0.12
- Sarung Tangan (Safety Gloves); Psg 4.00 20,000.00 80,000.00 0.04 4.00 100.00 0.04 - - - 4.00 100.00 0.04
- Sepatu Keselamatan (Safety Shoes); Psg 4.00 180,000.00 720,000.00 0.33 4.00 100.00 0.33 - - - 4.00 100.00 0.33
- Rompi Keselamatan (Safety Vest); Bh 4.00 50,000.00 200,000.00 0.09 4.00 100.00 0.09 - - - 4.00 100.00 0.09
4 Asuransi dan perizinan
- BPJS Ketenagakerjaan Dan Kesehatan Kerja; Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
5 Personel Keselamatan Konstruksi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Petugas K3 Ob 1.00 1,500,000.00 1,500,000.00 0.68 1.00 100.00 0.68 - - - 1.00 100.00 0.68
6 Fasilitas sarana, prasarana, dan alat kesehatan
- Peralatan P3K (Kotak P3K, Tandu,Tabung Oksigen, Obat Luka, Perban, dll) Ls 1.00 1,300,000.00 1,300,000.00 0.59 1.00 100.00 0.59 - - - 1.00 100.00 0.59
7 Rambu-rambu yang diperlukan
- Rambu Informasi dan Peringatan Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
8 Konsultasi dengan ahli terkait Keselamatan Konstruksi Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
9 Kegiatan dan peralatan terkait dengan pengendalian Bendera K3 Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
JUMLAH B 6,010,000.00 2.74 2.74 - 2.74
C. PEKERJAAN PAGAR
I. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi M3 20.51 71,390.00 1,464,454.20 0.67 20.51 100.00 0.67 - - - 20.51 100.00 0.67
2 Pek. Urugan Tanah Kembali M3 5.04 51,480.00 259,459.20 0.12 5.04 100.00 0.12 - - - 5.04 100.00 0.12
3 Pek. Urugan Pasir Alas Pondasi M3 1.68 219,956.00 369,526.08 0.17 1.68 100.00 0.17 - - - 1.68 100.00 0.17
JUMLAH I 2,093,439.48 0.95 0.95 - 0.95
II. PEKERJAAN BATU DAN PLESTERAN
1 Pas. Batu Kosong M3 5.04 452,951.40 2,282,875.06 1.04 5.04 100.00 1.04 - - - 5.04 100.00 1.04
2 Pas. Pondasi Batu Gunung 1 : 5 M3 19.04 822,701.00 15,664,227.04 7.14 19.04 100.00 7.14 - - - 19.04 100.00 7.14
3 Pas. Dinding Batu Bata 1 : 5 M2 41.42 121,558.80 5,034,357.70 2.30 - - - 10.00 24.15 0.55 10.00 24.15 0.55
4 Pas. Plesteran Dinding Batu Bata 1 : 5 M2 82.83 64,381.24 5,332,698.11 2.43 - - - - - - - - -
5 Pas. Plesteran Ciprat/Kamper 1 : 3 M2 32.11 66,976.36 2,150,610.92 0.98 - - - - - - - - -
6 Pas. Plesteran Pondasi + Acian M2 44.80 66,976.36 3,000,540.93 1.37 - - - - - - - - -
7 Pek. List Profil Ls 1.00 2,000,000.00 2,000,000.00 0.91 - - - - - - - - -
JUMLAH II 35,465,309.75 16.17 8.18 0.55 8.74
III. PEKERJAAN BESI DAN BETON
1 Pek. Beton Pondasi Poer Plat
- Bekisting M2 2.40 170,286.60 408,687.84 0.19 2.40 100.00 0.19 - - - 2.40 100.00 0.19
- Besi Beton Kg 24.72 20,560.54 508,194.87 0.23 24.72 100.00 0.23 - - - 24.72 100.00 0.23
- Beton K175 M3 0.60 1,199,480.49 719,688.29 0.33 0.60 100.00 0.33 - - - 0.60 100.00 0.33
2 Pek. Beton Sloof 15/20
- Bekisting M2 11.20 179,636.60 2,011,929.92 0.92 11.20 100.00 0.92 - - - 11.20 100.00 0.92
- Besi Beton Kg 322.18 20,560.54 6,624,233.02 3.02 322.18 100.00 3.02 - - - 322.18 100.00 3.02
- Beton K175 M3 1.68 1,199,480.49 2,015,127.22 0.92 1.68 100.00 0.92 - - - 1.68 100.00 0.92
3 Pek. Beton Sloof Gerbang 15/30
- Bekisting M2 3.00 179,636.60 538,909.80 0.25 3.00 100.00 0.25 - - - 3.00 100.00 0.25
- Besi Beton Kg 42.01 20,560.54 863,836.71 0.39 42.01 100.00 0.39 - - - 42.01 100.00 0.39
- Beton K175 M3 0.23 1,199,480.49 269,883.11 0.12 0.23 100.00 0.12 - - - 0.23 100.00 0.12
4 Pek. Beton Kolom 20/20
- Roster Beton Kolom Pracetak Motif (Dudukan+Tiang+Topi) Klm 18.00 575,000.00 10,350,000.00 4.72 - - - 18.00 100.00 4.72 18.00 100.00 4.72
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Besi Beton Kg 212.24 20,560.54 4,363,731.43 1.99 - - - 212.24 100.00 1.99 212.24 100.00 1.99
- Beton K175 M3 1.30 1,199,480.49 1,554,526.72 0.71 - - - 1.30 100.00 0.71 1.30 100.00 0.71
5 Pek. Beton Kolom 40/40 (Gerbang)
- Bekisting M2 14.72 249,587.80 3,673,932.42 1.68 - - - - - - - - -
- Besi Beton Kg 163.44 20,560.54 3,360,323.60 1.53 - - - - - - - - -
- Beton K175 M3 1.47 1,199,480.49 1,765,635.28 0.80 - - - - - - - - -
6 Pek. Balok Beton 15/30 dan Topi Beton 10/15
- Bekisting M2 5.48 257,177.80 1,409,334.34 0.64 - - - - - - - - -
- Besi Beton Kg 111.36 20,560.54 2,289,523.28 1.04 - - - - - - - - -
- Beton K175 M3 0.41 1,199,480.49 492,986.48 0.22 - - - - - - - - -
JUMLAH III 43,220,484.33 19.71 6.36 7.42 13.78
IV PEKERJAAN TERALIS, KERAMIK DAN ACCESSORIES
1 Pek. Teralis Dinding Pagar M1 49.40 552,580.60 27,297,481.64 12.45 - - - - - - - - -
2 Pek. Teralis Pintu Gerbang Tengah dan Samping ( Pintu Sorong ) M1 7.64 1,213,405.60 9,270,418.78 4.23 - - - - - - - - -
3 Pas. Dinding Granit 80 x 80 Cm M2 7.68 428,147.50 3,288,172.80 1.50 - - - - - - - - -
4 Pas. Batu Alam Dinding dan Kolom Gerbang M2 11.52 415,299.50 4,784,250.24 2.18 - - - - - - - - -
5 Pek. Papan Nama Gerbang + Logo Kota + Logo Bakti Husada ( Acrylic ) Ls 1.00 9,500,000.00 9,500,000.00 4.33 - - - - - - - - -
JUMLAH IV 54,140,323.46 24.68 - - -
V PEKERJAAN PENGECATAN
1 Pek. Cat Tembok Dinding/Kolom 2x Cat Anti Lumut M2 95.79 35,827.00 3,431,868.33 1.56 - - - - - - - - -
2 Pek. Cat Besi Teralis 2x Cat M2 57.04 36,462.80 2,079,838.11 0.95 - - - - - - - - -
JUMLAH V 5,511,706.44 2.51 - - -
D. PEKERJAAN PENATAAN LAHAN PARKIR
1 Pek. Galian Tanah Cansteen M3 5.04 71,390.00 359,805.60 0.16 - - - - - - - - -
2 Pek. Urugan Tanah Didatangkan M3 96.00 110,880.00 10,644,480.00 4.85 - - - - - - - - -
3 Pek. Urugan Pasir Alas Cansteen/Rabat M3 12.84 219,956.00 2,824,235.04 1.29 - - - - - - - - -
4 Pek. Cansteen Pas. Batu Gunung 30/60, Camp. 1:4 M3 10.08 857,780.00 8,646,422.40 3.94 - - - - - - - - -
5 Pek. Plesteran Cansteen Camp. 1:3 M2 33.60 66,976.36 2,250,405.70 1.03 - - - - - - - - -
6 Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan Masuk M3 18.24 1,199,480.49 21,878,524.14 9.97 - - - - - - - - -
7 Pek. Pengecatan Cansteen Anti Lumut M2 33.60 35,827.00 1,203,787.20 0.55 - - - - - - - - -
JUMLAH D 47,807,660.07 21.80 - - -
E. PEKERJAAN REHAB/PERBAIKAN
1 Pek. Kramik Lantai 30/30 cm KM/WC M2 2.25 153,684.30 345,789.68 0.16 - - - - - - - - -
2 Pek. Granit Dinding 60/60 cm KM/WC M2 8.28 336,451.50 2,785,818.42 1.27 - - - - - - - - -
3 Pek. Instalasi Air Bersih + Accesories Pipa Ls 1.00 750,000.00 750,000.00 0.34 - - - - - - - - -
4 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 3" AW Ls 1.00 1,500,000.00 1,500,000.00 0.68 - - - - - - - - -
5 Pek. Pasangan Kloset Duduk Bh 1.00 3,382,786.00 3,382,786.00 1.54 - - - - - - - - -
6 Pek. Pasangan Kran Air Bh 1.00 93,104.00 93,104.00 0.04 - - - - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
7 Pek. Floor Drain Bh 1.00 54,736.00 54,736.00 0.02 - - - - - - - - -
8 Pengadaan Ember Air Bh 1.00 75,000.00 75,000.00 0.03 - - - - - - - - -
9 Pek. Pembuatan Septik Tank Unit 1.00 1,800,000.00 1,800,000.00 0.82 - - - - - - - - -
10 Pek. Rehab Atap/Turbin Ls 1.00 5,000,000.00 5,000,000.00 2.28 - - - - - - - - -
JUMLAH E 15,787,234.10 7.20 - - -
F. PEKERJAAN FINISHING DAN PEMBERSIHAN AKHIR
1 Pek. Pembersihan Akhir/Perapihan Ls 1.00 900,000.00 900,000.00 0.41 - - - - - - - - -
JUMLAH F 900,000.00 0.41 - - -
JUMLAH (REAL COST) ( A ) 219,336,157.63
PPN 10 % ( B ) 21,933,615.76
100.00 21.22 7.97 29.19
TOTAL COST ( A + B ) 241,269,773.40
DIBULATKAN 241,200,000.00

Kendari, 28 Agustus 2020


Disetujui Oleh Diperiksa Oleh Diperiksa Oleh Di Buat Oleh
Pejabat Pelaksana Teknis Kegiatan (PPTK) Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….
NIP…………………. NIP…………………. Site Engineer Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 21 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Roster Beton Kolom Pracetak Motif 3.00 Klm 1 Pasir Urug M3 Pasir Urug M3
2 Besi Beton Kolom 20/20 35.37 Kg 2 Pasir Pasang 0.16 M3 Pasir Pasang M3
3 Beton K175 Kolom 20/20 0.22 M3 3 Kerikil/Suplit 0.22 M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 1.41 Zak Semen Zak
6 Besi Beton 37.14 Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton 0.53 Kg Kawat Beton Kg
13 Roster Kolom 3.00 Klm Roster Kolom 3.00 Klm

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 22 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Roster Beton Kolom Pracetak Motif 3.00 Klm 1 Pasir Urug M3 Pasir Urug M3
2 Besi Beton Kolom 20/20 35.37 Kg 2 Pasir Pasang 0.16 M3 Pasir Pasang M3
3 Beton K175 Kolom 20/20 0.22 M3 3 Kerikil/Suplit 0.22 M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 1.41 Zak Semen Zak
6 Besi Beton 37.14 Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton 0.53 Kg Kawat Beton Kg
13 Roster Kolom 3.00 Klm Roster Kolom 3.00 Klm

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 23 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Roster Beton Kolom Pracetak Motif 3.00 Klm 1 Pasir Urug M3 Pasir Urug M3
2 Besi Beton Kolom 20/20 35.37 Kg 2 Pasir Pasang 0.16 M3 Pasir Pasang M3
3 Beton K175 Kolom 20/20 0.22 M3 3 Kerikil/Suplit 0.22 M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 1.41 Zak Semen Zak
6 Besi Beton 37.14 Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton 0.53 Kg Kawat Beton Kg
13 Roster Kolom 3.00 Klm Roster Kolom 3.00 Klm

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 24 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Roster Beton Kolom Pracetak Motif 3.00 Klm 1 Pasir Urug M3 Pasir Urug M3
2 Besi Beton Kolom 20/20 35.37 Kg 2 Pasir Pasang 0.16 M3 Pasir Pasang M3
3 Beton K175 Kolom 20/20 0.22 M3 3 Kerikil/Suplit 0.22 M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 1.41 Zak Semen Zak
6 Besi Beton 37.14 Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton 0.53 Kg Kawat Beton Kg
13 Roster Kolom 3.00 Klm Roster Kolom 3.00 Klm

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 25 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Roster Beton Kolom Pracetak Motif 3.00 Klm 1 Pasir Urug M3 Pasir Urug M3
2 Besi Beton Kolom 20/20 35.37 Kg 2 Pasir Pasang 0.16 M3 Pasir Pasang M3
3 Beton K175 Kolom 20/20 0.22 M3 3 Kerikil/Suplit 0.22 M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 1.41 Zak Semen Zak
6 Besi Beton 37.14 Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton 0.53 Kg Kawat Beton Kg
13 Roster Kolom 3.00 Klm Roster Kolom 3.00 Klm

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 26 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Roster Beton Kolom Pracetak Motif 3.00 Klm 1 Pasir Urug M3 Pasir Urug M3
2 Besi Beton Kolom 20/20 35.37 Kg 2 Pasir Pasang 0.16 M3 Pasir Pasang M3
3 Beton K175 Kolom 20/20 0.22 M3 3 Kerikil/Suplit 0.22 M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 1.41 Zak Semen Zak
6 Besi Beton 37.14 Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton 0.53 Kg Kawat Beton Kg
13 Roster Kolom 3.00 Klm Roster Kolom 3.00 Klm

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 27 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pas. Dinding Bata 1 : 5 5 M2 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang 0.0023 M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah 350.00 Bh Batu Bata Merah 5,000 Bh
5 Semen 0.95 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 28 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pas. Dinding Bata 1 : 5 5 M2 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang 0.0023 M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah 350.00 Bh Batu Bata Merah Bh
5 Semen 0.95 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN (BULANAN)

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR MINGGU : II (KE DUA)


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI PERIODE : 29 AGUSTUS 2020 S/D 27 SEPTEMBER 2020
TAHUN ANGGARAN : 2020 S/D BULAN LALU : 29.19 %
LOKASI : KOTA KENDARI BULAN INI : 33.71 %
S/D BULAN INI : 62.90 %

KEMAJUAN PEKERJAAN
KONTRAK
BULAN LALU BULAN INI S/D BULAN INI
VOL
NO URAIAN SAT
TOTAL HARGA SATUAN TOTAL JUMLAH BOBOT BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER
VOL VOL VOL
(Rp) HARGA (Rp) (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. PEKERJAAN PERSIAPAN / PENDAHULUAN


1 Pek. Pembersihan Lokasi/Pembongkaran WC Lama Ls 1.00 2,500,000.00 2,500,000.00 1.14 0.50 50.00 0.57 - - - 0.50 50.00 0.57
2 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 1,000,000.00 1,000,000.00 0.46 1.00 100.00 0.46 - - - 1.00 100.00 0.46
3 Pek. Pembuatan Barak Kerja/Gudang Bahan Ls 1.00 3,500,000.00 3,500,000.00 1.60 1.00 100.00 1.60 - - - 1.00 100.00 1.60
3 Administrasi, Dokumentasi dan Air Kerja Ls 1.00 1,250,000.00 1,250,000.00 0.57 0.50 50.00 0.28 - - - 0.50 50.00 0.28
4 Papan Nama Kegiatan Ls 1.00 150,000.00 150,000.00 0.07 1.00 100.00 0.07 - - - 1.00 100.00 0.07
JUMLAH A 8,400,000.00 3.83 2.97 - 2.97
B. PEK. BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK
- Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir Set 1.00 450,000.00 450,000.00 0.21 1.00 100.00 0.21 - - - 1.00 100.00 0.21
- Pembuatan Kartu Identitas Pekerja (KIP); Lbr 4.00 5,000.00 20,000.00 0.01 4.00 100.00 0.01 - - - 4.00 100.00 0.01
2 Sosialisasi, promosi, dan pelatihan;
Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Safety Talk
- Org 4.00 10,000.00 40,000.00 0.02 4.00 100.00 0.02 - - - 4.00 100.00 0.02
dan/atau Tool Box Meeting);
3 Alat Pelindung Kerja dan Alat Pelindung Diri
- Topi Pelindung (Safety Helmet); Bh 4.00 85,000.00 340,000.00 0.16 4.00 100.00 0.16 - - - 4.00 100.00 0.16
- Pelindung Mata Psg 4.00 65,000.00 260,000.00 0.12 4.00 100.00 0.12 - - - 4.00 100.00 0.12
- Sarung Tangan (Safety Gloves); Psg 4.00 20,000.00 80,000.00 0.04 4.00 100.00 0.04 - - - 4.00 100.00 0.04
- Sepatu Keselamatan (Safety Shoes); Psg 4.00 180,000.00 720,000.00 0.33 4.00 100.00 0.33 - - - 4.00 100.00 0.33
- Rompi Keselamatan (Safety Vest); Bh 4.00 50,000.00 200,000.00 0.09 4.00 100.00 0.09 - - - 4.00 100.00 0.09
4 Asuransi dan perizinan
- BPJS Ketenagakerjaan Dan Kesehatan Kerja; Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
5 Personel Keselamatan Konstruksi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Petugas K3 Ob 1.00 1,500,000.00 1,500,000.00 0.68 1.00 100.00 0.68 - - - 1.00 100.00 0.68
6 Fasilitas sarana, prasarana, dan alat kesehatan
- Peralatan P3K (Kotak P3K, Tandu,Tabung Oksigen, Obat Luka, Perban, dll) Ls 1.00 1,300,000.00 1,300,000.00 0.59 1.00 100.00 0.59 - - - 1.00 100.00 0.59
7 Rambu-rambu yang diperlukan
- Rambu Informasi dan Peringatan Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
8 Konsultasi dengan ahli terkait Keselamatan Konstruksi Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
9 Kegiatan dan peralatan terkait dengan pengendalian Bendera K3 Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
JUMLAH B 6,010,000.00 2.74 2.74 - 2.74
C. PEKERJAAN PAGAR
I. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi M3 20.51 71,390.00 1,464,454.20 0.67 20.51 100.00 0.67 - - - 20.51 100.00 0.67
2 Pek. Urugan Tanah Kembali M3 5.04 51,480.00 259,459.20 0.12 5.04 100.00 0.12 - - - 5.04 100.00 0.12
3 Pek. Urugan Pasir Alas Pondasi M3 1.68 219,956.00 369,526.08 0.17 1.68 100.00 0.17 - - - 1.68 100.00 0.17
JUMLAH I 2,093,439.48 0.95 0.95 - 0.95
II. PEKERJAAN BATU DAN PLESTERAN
1 Pas. Batu Kosong M3 5.04 452,951.40 2,282,875.06 1.04 5.04 100.00 1.04 - - - 5.04 100.00 1.04
2 Pas. Pondasi Batu Gunung 1 : 5 M3 19.04 822,701.00 15,664,227.04 7.14 19.04 100.00 7.14 - - - 19.04 100.00 7.14
3 Pas. Dinding Batu Bata 1 : 5 M2 41.42 121,558.80 5,034,357.70 2.30 10.00 24.15 0.55 31.42 75.85 1.74 41.42 100.00 2.30
4 Pas. Plesteran Dinding Batu Bata 1 : 5 M2 82.83 64,381.24 5,332,698.11 2.43 - - - 82.83 100.00 2.43 82.83 100.00 2.43
5 Pas. Plesteran Ciprat/Kamper 1 : 3 M2 32.11 66,976.36 2,150,610.92 0.98 - - - 32.11 100.00 0.98 32.11 100.00 0.98
6 Pas. Plesteran Pondasi + Acian M2 44.80 66,976.36 3,000,540.93 1.37 - - - 44.80 100.00 1.37 44.80 100.00 1.37
7 Pek. List Profil Ls 1.00 2,000,000.00 2,000,000.00 0.91 - - - 1.00 100.00 0.91 1.00 100.00 0.91
JUMLAH II 35,465,309.75 16.17 8.74 7.43 16.17
III. PEKERJAAN BESI DAN BETON
1 Pek. Beton Pondasi Poer Plat
- Bekisting M2 2.40 170,286.60 408,687.84 0.19 2.40 100.00 0.19 - - - 2.40 100.00 0.19
- Besi Beton Kg 24.72 20,560.54 508,194.87 0.23 24.72 100.00 0.23 - - - 24.72 100.00 0.23
- Beton K175 M3 0.60 1,199,480.49 719,688.29 0.33 0.60 100.00 0.33 - - - 0.60 100.00 0.33
2 Pek. Beton Sloof 15/20
- Bekisting M2 11.20 179,636.60 2,011,929.92 0.92 11.20 100.00 0.92 - - - 11.20 100.00 0.92
- Besi Beton Kg 322.18 20,560.54 6,624,233.02 3.02 322.18 100.00 3.02 - - - 322.18 100.00 3.02
- Beton K175 M3 1.68 1,199,480.49 2,015,127.22 0.92 1.68 100.00 0.92 - - - 1.68 100.00 0.92
3 Pek. Beton Sloof Gerbang 15/30
- Bekisting M2 3.00 179,636.60 538,909.80 0.25 3.00 100.00 0.25 - - - 3.00 100.00 0.25
- Besi Beton Kg 42.01 20,560.54 863,836.71 0.39 42.01 100.00 0.39 - - - 42.01 100.00 0.39
- Beton K175 M3 0.23 1,199,480.49 269,883.11 0.12 0.23 100.00 0.12 - - - 0.23 100.00 0.12
4 Pek. Beton Kolom 20/20
- Roster Beton Kolom Pracetak Motif (Dudukan+Tiang+Topi) Klm 18.00 575,000.00 10,350,000.00 4.72 18.00 100.00 4.72 - - - 18.00 100.00 4.72
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Besi Beton Kg 212.24 20,560.54 4,363,731.43 1.99 212.24 100.00 1.99 - - - 212.24 100.00 1.99
- Beton K175 M3 1.30 1,199,480.49 1,554,526.72 0.71 1.30 100.00 0.71 - - - 1.30 100.00 0.71
5 Pek. Beton Kolom 40/40 (Gerbang)
- Bekisting M2 14.72 249,587.80 3,673,932.42 1.68 - - - 14.72 100.00 1.68 14.72 100.00 1.68
- Besi Beton Kg 163.44 20,560.54 3,360,323.60 1.53 - - - 163.44 100.00 1.53 163.44 100.00 1.53
- Beton K175 M3 1.47 1,199,480.49 1,765,635.28 0.80 - - - 1.47 100.00 0.80 1.47 100.00 0.80
6 Pek. Balok Beton 15/30 dan Topi Beton 10/15
- Bekisting M2 5.48 257,177.80 1,409,334.34 0.64 - - - 5.48 100.00 0.64 5.48 100.00 0.64
- Besi Beton Kg 111.36 20,560.54 2,289,523.28 1.04 - - - 111.36 100.00 1.04 111.36 100.00 1.04
- Beton K175 M3 0.41 1,199,480.49 492,986.48 0.22 - - - 0.41 100.00 0.22 0.41 100.00 0.22
JUMLAH III 43,220,484.33 19.71 13.78 5.92 19.71
IV PEKERJAAN TERALIS, KERAMIK DAN ACCESSORIES
1 Pek. Teralis Dinding Pagar M1 49.40 552,580.60 27,297,481.64 12.45 - - - 49.40 100.00 12.45 49.40 100.00 12.45
2 Pek. Teralis Pintu Gerbang Tengah dan Samping ( Pintu Sorong ) M1 7.64 1,213,405.60 9,270,418.78 4.23 - - - 7.64 100.00 4.23 7.64 100.00 4.23
3 Pas. Dinding Granit 80 x 80 Cm M2 7.68 428,147.50 3,288,172.80 1.50 - - - 7.68 100.00 1.50 7.68 100.00 1.50
4 Pas. Batu Alam Dinding dan Kolom Gerbang M2 11.52 415,299.50 4,784,250.24 2.18 - - - 11.52 100.00 2.18 11.52 100.00 2.18
5 Pek. Papan Nama Gerbang + Logo Kota + Logo Bakti Husada ( Acrylic ) Ls 1.00 9,500,000.00 9,500,000.00 4.33 - - - - - - - - -
JUMLAH IV 54,140,323.46 24.68 - 20.35 20.35
V PEKERJAAN PENGECATAN
1 Pek. Cat Tembok Dinding/Kolom 2x Cat Anti Lumut M2 95.79 35,827.00 3,431,868.33 1.56 - - - - - - - - -
2 Pek. Cat Besi Teralis 2x Cat M2 57.04 36,462.80 2,079,838.11 0.95 - - - - - - - - -
JUMLAH V 5,511,706.44 2.51 - - -
D. PEKERJAAN PENATAAN LAHAN PARKIR
1 Pek. Galian Tanah Cansteen M3 5.04 71,390.00 359,805.60 0.16 - - - - - - - - -
2 Pek. Urugan Tanah Didatangkan M3 96.00 110,880.00 10,644,480.00 4.85 - - - - - - - - -
3 Pek. Urugan Pasir Alas Cansteen/Rabat M3 12.84 219,956.00 2,824,235.04 1.29 - - - - - - - - -
4 Pek. Cansteen Pas. Batu Gunung 30/60, Camp. 1:4 M3 10.08 857,780.00 8,646,422.40 3.94 - - - - - - - - -
5 Pek. Plesteran Cansteen Camp. 1:3 M2 33.60 66,976.36 2,250,405.70 1.03 - - - - - - - - -
6 Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan Masuk M3 18.24 1,199,480.49 21,878,524.14 9.97 - - - - - - - - -
7 Pek. Pengecatan Cansteen Anti Lumut M2 33.60 35,827.00 1,203,787.20 0.55 - - - - - - - - -
JUMLAH D 47,807,660.07 21.80 - - -
E. PEKERJAAN REHAB/PERBAIKAN
1 Pek. Kramik Lantai 30/30 cm KM/WC M2 2.25 153,684.30 345,789.68 0.16 - - - - - - - - -
2 Pek. Granit Dinding 60/60 cm KM/WC M2 8.28 336,451.50 2,785,818.42 1.27 - - - - - - - - -
3 Pek. Instalasi Air Bersih + Accesories Pipa Ls 1.00 750,000.00 750,000.00 0.34 - - - - - - - - -
4 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 3" AW Ls 1.00 1,500,000.00 1,500,000.00 0.68 - - - - - - - - -
5 Pek. Pasangan Kloset Duduk Bh 1.00 3,382,786.00 3,382,786.00 1.54 - - - - - - - - -
6 Pek. Pasangan Kran Air Bh 1.00 93,104.00 93,104.00 0.04 - - - - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
7 Pek. Floor Drain Bh 1.00 54,736.00 54,736.00 0.02 - - - - - - - - -
8 Pengadaan Ember Air Bh 1.00 75,000.00 75,000.00 0.03 - - - - - - - - -
9 Pek. Pembuatan Septik Tank Unit 1.00 1,800,000.00 1,800,000.00 0.82 - - - - - - - - -
10 Pek. Rehab Atap/Turbin Ls 1.00 5,000,000.00 5,000,000.00 2.28 - - - - - - - - -
JUMLAH E 15,787,234.10 7.20 - - -
F. PEKERJAAN FINISHING DAN PEMBERSIHAN AKHIR
1 Pek. Pembersihan Akhir/Perapihan Ls 1.00 900,000.00 900,000.00 0.41 - - - - - - - - -
JUMLAH F 900,000.00 0.41 - - -
JUMLAH (REAL COST) ( A ) 219,336,157.63
PPN 10 % ( B ) 21,933,615.76
100.00 29.19 33.71 62.90
TOTAL COST ( A + B ) 241,269,773.40
DIBULATKAN 241,200,000.00

Kendari, 27 September 2020


Disetujui Oleh Diperiksa Oleh Diperiksa Oleh Di Buat Oleh
Pejabat Pelaksana Teknis Kegiatan (PPTK) Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….
NIP…………………. NIP…………………. Site Engineer Pelaksana
LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN (MINGGUAN)

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR MINGGU : V (KE LIMA)


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI PERIODE : 29 AGUSTUS 2020 S/D 4 SEPTEMBER 2020
TAHUN ANGGARAN : 2020 S/D MINGGU LALU : 29.19 %
LOKASI : KOTA KENDARI MINGGU INI : 7.66 %
S/D MINGGU INI : 36.85 %

KEMAJUAN PEKERJAAN
KONTRAK
MINGGU LALU MINGGU INI S/D MINGGU INI
VOL
NO URAIAN SAT
TOTAL HARGA SATUAN TOTAL JUMLAH BOBOT BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER
VOL VOL VOL
(Rp) HARGA (Rp) (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. PEKERJAAN PERSIAPAN / PENDAHULUAN


1 Pek. Pembersihan Lokasi/Pembongkaran WC Lama Ls 1.00 2,500,000.00 2,500,000.00 1.14 0.50 50.00 0.57 - - - 0.50 50.00 0.57
2 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 1,000,000.00 1,000,000.00 0.46 1.00 100.00 0.46 - - - 1.00 100.00 0.46
3 Pek. Pembuatan Barak Kerja/Gudang Bahan Ls 1.00 3,500,000.00 3,500,000.00 1.60 1.00 100.00 1.60 - - - 1.00 100.00 1.60
3 Administrasi, Dokumentasi dan Air Kerja Ls 1.00 1,250,000.00 1,250,000.00 0.57 0.50 50.00 0.28 - - - 0.50 50.00 0.28
4 Papan Nama Kegiatan Ls 1.00 150,000.00 150,000.00 0.07 1.00 100.00 0.07 - - - 1.00 100.00 0.07
JUMLAH A 8,400,000.00 3.83 2.97 - 2.97
B. PEK. BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK
- Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir Set 1.00 450,000.00 450,000.00 0.21 1.00 100.00 0.21 - - - 1.00 100.00 0.21
- Pembuatan Kartu Identitas Pekerja (KIP); Lbr 4.00 5,000.00 20,000.00 0.01 4.00 100.00 0.01 - - - 4.00 100.00 0.01
2 Sosialisasi, promosi, dan pelatihan;
Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Safety Talk
- Org 4.00 10,000.00 40,000.00 0.02 4.00 100.00 0.02 - - - 4.00 100.00 0.02
dan/atau Tool Box Meeting);
3 Alat Pelindung Kerja dan Alat Pelindung Diri
- Topi Pelindung (Safety Helmet); Bh 4.00 85,000.00 340,000.00 0.16 4.00 100.00 0.16 - - - 4.00 100.00 0.16
- Pelindung Mata Psg 4.00 65,000.00 260,000.00 0.12 4.00 100.00 0.12 - - - 4.00 100.00 0.12
- Sarung Tangan (Safety Gloves); Psg 4.00 20,000.00 80,000.00 0.04 4.00 100.00 0.04 - - - 4.00 100.00 0.04
- Sepatu Keselamatan (Safety Shoes); Psg 4.00 180,000.00 720,000.00 0.33 4.00 100.00 0.33 - - - 4.00 100.00 0.33
- Rompi Keselamatan (Safety Vest); Bh 4.00 50,000.00 200,000.00 0.09 4.00 100.00 0.09 - - - 4.00 100.00 0.09
4 Asuransi dan perizinan
- BPJS Ketenagakerjaan Dan Kesehatan Kerja; Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
5 Personel Keselamatan Konstruksi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Petugas K3 Ob 1.00 1,500,000.00 1,500,000.00 0.68 1.00 100.00 0.68 - - - 1.00 100.00 0.68
6 Fasilitas sarana, prasarana, dan alat kesehatan
- Peralatan P3K (Kotak P3K, Tandu,Tabung Oksigen, Obat Luka, Perban, dll) Ls 1.00 1,300,000.00 1,300,000.00 0.59 1.00 100.00 0.59 - - - 1.00 100.00 0.59
7 Rambu-rambu yang diperlukan
- Rambu Informasi dan Peringatan Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
8 Konsultasi dengan ahli terkait Keselamatan Konstruksi Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
9 Kegiatan dan peralatan terkait dengan pengendalian Bendera K3 Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
JUMLAH B 6,010,000.00 2.74 2.74 - 2.74
C. PEKERJAAN PAGAR
I. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi M3 20.51 71,390.00 1,464,454.20 0.67 20.51 100.00 0.67 - - - 20.51 100.00 0.67
2 Pek. Urugan Tanah Kembali M3 5.04 51,480.00 259,459.20 0.12 5.04 100.00 0.12 - - - 5.04 100.00 0.12
3 Pek. Urugan Pasir Alas Pondasi M3 1.68 219,956.00 369,526.08 0.17 1.68 100.00 0.17 - - - 1.68 100.00 0.17
JUMLAH I 2,093,439.48 0.95 0.95 - 0.95
II. PEKERJAAN BATU DAN PLESTERAN
1 Pas. Batu Kosong M3 5.04 452,951.40 2,282,875.06 1.04 5.04 100.00 1.04 - - - 5.04 100.00 1.04
2 Pas. Pondasi Batu Gunung 1 : 5 M3 19.04 822,701.00 15,664,227.04 7.14 19.04 100.00 7.14 - - - 19.04 100.00 7.14
3 Pas. Dinding Batu Bata 1 : 5 M2 41.42 121,558.80 5,034,357.70 2.30 10.00 24.15 0.55 31.42 75.85 1.74 41.42 100.00 2.30
4 Pas. Plesteran Dinding Batu Bata 1 : 5 M2 82.83 64,381.24 5,332,698.11 2.43 - - - - - - - - -
5 Pas. Plesteran Ciprat/Kamper 1 : 3 M2 32.11 66,976.36 2,150,610.92 0.98 - - - - - - - - -
6 Pas. Plesteran Pondasi + Acian M2 44.80 66,976.36 3,000,540.93 1.37 - - - - - - - - -
7 Pek. List Profil Ls 1.00 2,000,000.00 2,000,000.00 0.91 - - - - - - - - -
JUMLAH II 35,465,309.75 16.17 8.74 1.74 10.48
III. PEKERJAAN BESI DAN BETON
1 Pek. Beton Pondasi Poer Plat
- Bekisting M2 2.40 170,286.60 408,687.84 0.19 2.40 100.00 0.19 - - - 2.40 100.00 0.19
- Besi Beton Kg 24.72 20,560.54 508,194.87 0.23 24.72 100.00 0.23 - - - 24.72 100.00 0.23
- Beton K175 M3 0.60 1,199,480.49 719,688.29 0.33 0.60 100.00 0.33 - - - 0.60 100.00 0.33
2 Pek. Beton Sloof 15/20
- Bekisting M2 11.20 179,636.60 2,011,929.92 0.92 11.20 100.00 0.92 - - - 11.20 100.00 0.92
- Besi Beton Kg 322.18 20,560.54 6,624,233.02 3.02 322.18 100.00 3.02 - - - 322.18 100.00 3.02
- Beton K175 M3 1.68 1,199,480.49 2,015,127.22 0.92 1.68 100.00 0.92 - - - 1.68 100.00 0.92
3 Pek. Beton Sloof Gerbang 15/30
- Bekisting M2 3.00 179,636.60 538,909.80 0.25 3.00 100.00 0.25 - - - 3.00 100.00 0.25
- Besi Beton Kg 42.01 20,560.54 863,836.71 0.39 42.01 100.00 0.39 - - - 42.01 100.00 0.39
- Beton K175 M3 0.23 1,199,480.49 269,883.11 0.12 0.23 100.00 0.12 - - - 0.23 100.00 0.12
4 Pek. Beton Kolom 20/20
- Roster Beton Kolom Pracetak Motif (Dudukan+Tiang+Topi) Klm 18.00 575,000.00 10,350,000.00 4.72 18.00 100.00 4.72 - - - 18.00 100.00 4.72
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Besi Beton Kg 212.24 20,560.54 4,363,731.43 1.99 212.24 100.00 1.99 - - - 212.24 100.00 1.99
- Beton K175 M3 1.30 1,199,480.49 1,554,526.72 0.71 1.30 100.00 0.71 - - - 1.30 100.00 0.71
5 Pek. Beton Kolom 40/40 (Gerbang)
- Bekisting M2 14.72 249,587.80 3,673,932.42 1.68 - - - 14.72 100.00 1.68 14.72 100.00 1.68
- Besi Beton Kg 163.44 20,560.54 3,360,323.60 1.53 - - - 163.44 100.00 1.53 163.44 100.00 1.53
- Beton K175 M3 1.47 1,199,480.49 1,765,635.28 0.80 - - - 1.47 100.00 0.80 1.47 100.00 0.80
6 Pek. Balok Beton 15/30 dan Topi Beton 10/15
- Bekisting M2 5.48 257,177.80 1,409,334.34 0.64 - - - 5.48 100.00 0.64 5.48 100.00 0.64
- Besi Beton Kg 111.36 20,560.54 2,289,523.28 1.04 - - - 111.36 100.00 1.04 111.36 100.00 1.04
- Beton K175 M3 0.41 1,199,480.49 492,986.48 0.22 - - - 0.41 100.00 0.22 0.41 100.00 0.22
JUMLAH III 43,220,484.33 19.71 13.78 5.92 19.71
IV PEKERJAAN TERALIS, KERAMIK DAN ACCESSORIES
1 Pek. Teralis Dinding Pagar M1 49.40 552,580.60 27,297,481.64 12.45 - - - - - - - - -
2 Pek. Teralis Pintu Gerbang Tengah dan Samping ( Pintu Sorong ) M1 7.64 1,213,405.60 9,270,418.78 4.23 - - - - - - - - -
3 Pas. Dinding Granit 80 x 80 Cm M2 7.68 428,147.50 3,288,172.80 1.50 - - - - - - - - -
4 Pas. Batu Alam Dinding dan Kolom Gerbang M2 11.52 415,299.50 4,784,250.24 2.18 - - - - - - - - -
5 Pek. Papan Nama Gerbang + Logo Kota + Logo Bakti Husada ( Acrylic ) Ls 1.00 9,500,000.00 9,500,000.00 4.33 - - - - - - - - -
JUMLAH IV 54,140,323.46 24.68 - - -
V PEKERJAAN PENGECATAN
1 Pek. Cat Tembok Dinding/Kolom 2x Cat Anti Lumut M2 95.79 35,827.00 3,431,868.33 1.56 - - - - - - - - -
2 Pek. Cat Besi Teralis 2x Cat M2 57.04 36,462.80 2,079,838.11 0.95 - - - - - - - - -
JUMLAH V 5,511,706.44 2.51 - - -
D. PEKERJAAN PENATAAN LAHAN PARKIR
1 Pek. Galian Tanah Cansteen M3 5.04 71,390.00 359,805.60 0.16 - - - - - - - - -
2 Pek. Urugan Tanah Didatangkan M3 96.00 110,880.00 10,644,480.00 4.85 - - - - - - - - -
3 Pek. Urugan Pasir Alas Cansteen/Rabat M3 12.84 219,956.00 2,824,235.04 1.29 - - - - - - - - -
4 Pek. Cansteen Pas. Batu Gunung 30/60, Camp. 1:4 M3 10.08 857,780.00 8,646,422.40 3.94 - - - - - - - - -
5 Pek. Plesteran Cansteen Camp. 1:3 M2 33.60 66,976.36 2,250,405.70 1.03 - - - - - - - - -
6 Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan Masuk M3 18.24 1,199,480.49 21,878,524.14 9.97 - - - - - - - - -
7 Pek. Pengecatan Cansteen Anti Lumut M2 33.60 35,827.00 1,203,787.20 0.55 - - - - - - - - -
JUMLAH D 47,807,660.07 21.80 - - -
E. PEKERJAAN REHAB/PERBAIKAN
1 Pek. Kramik Lantai 30/30 cm KM/WC M2 2.25 153,684.30 345,789.68 0.16 - - - - - - - - -
2 Pek. Granit Dinding 60/60 cm KM/WC M2 8.28 336,451.50 2,785,818.42 1.27 - - - - - - - - -
3 Pek. Instalasi Air Bersih + Accesories Pipa Ls 1.00 750,000.00 750,000.00 0.34 - - - - - - - - -
4 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 3" AW Ls 1.00 1,500,000.00 1,500,000.00 0.68 - - - - - - - - -
5 Pek. Pasangan Kloset Duduk Bh 1.00 3,382,786.00 3,382,786.00 1.54 - - - - - - - - -
6 Pek. Pasangan Kran Air Bh 1.00 93,104.00 93,104.00 0.04 - - - - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
7 Pek. Floor Drain Bh 1.00 54,736.00 54,736.00 0.02 - - - - - - - - -
8 Pengadaan Ember Air Bh 1.00 75,000.00 75,000.00 0.03 - - - - - - - - -
9 Pek. Pembuatan Septik Tank Unit 1.00 1,800,000.00 1,800,000.00 0.82 - - - - - - - - -
10 Pek. Rehab Atap/Turbin Ls 1.00 5,000,000.00 5,000,000.00 2.28 - - - - - - - - -
JUMLAH E 15,787,234.10 7.20 - - -
F. PEKERJAAN FINISHING DAN PEMBERSIHAN AKHIR
1 Pek. Pembersihan Akhir/Perapihan Ls 1.00 900,000.00 900,000.00 0.41 - - - - - - - - -
JUMLAH F 900,000.00 0.41 - - -
JUMLAH (REAL COST) ( A ) 219,336,157.63
PPN 10 % ( B ) 21,933,615.76
100.00 29.19 7.66 36.85
TOTAL COST ( A + B ) 241,269,773.40
DIBULATKAN 241,200,000.00

Kendari, 4 September 2020


Disetujui Oleh Diperiksa Oleh Diperiksa Oleh Di Buat Oleh
Pejabat Pelaksana Teknis Kegiatan (PPTK) Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….
NIP…………………. NIP…………………. Site Engineer Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 29 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pas. Dinding Bata 1 : 5 31.42 M2 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang 0.01 M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah 2,199 Bh Batu Bata Merah Bh
5 Semen 5.97 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 30 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pek. Bekisting Beton Kolom 40/40 (Gerbang) 14.72 M2 1 Pasir Urug M3 Pasir Urug M3
2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting 16.19 M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 31 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pek. Pembesian Kolom 40/40 Gerbang 163.44 Kg 1 Pasir Urug M3 Pasir Urug M3
2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton 172 Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton 2.45 Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 1 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pek. Pengecoran Kolom 40/40 Gerbang 1.47 M3 1 Pasir Urug M3 Pasir Urug M3
2 Pasir Pasang 1.12 M3 Pasir Pasang M3
3 Kerikil/Suplit 1.50 M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 9.58 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 2 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pek. Bekisting Balok 15/30 dan Topi Beton 10/15 5.48 M2 1 Pasir Urug M3 Pasir Urug M3
2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting 6.03 M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 3 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pek. Pembesian Balok 15/30 dan Topi Beton 10/15 111.36 Kg 1 Pasir Urug M3 Pasir Urug M3
2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton 117 Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton 1.67 Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 4 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pek. Pengecoran Balok 15/30 dan Topi Beton 10/15 0.41 M3 1 Pasir Urug M3 Pasir Urug M3
2 Pasir Pasang 0.31 M3 Pasir Pasang M3
3 Kerikil/Suplit 0.42 M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 2.67 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN (MINGGUAN)

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR MINGGU : VI (KE ENAM)


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI PERIODE : 5 SEPTEMBER 2020 S/D 11 SEPTEMBER 2020
TAHUN ANGGARAN : 2020 S/D MINGGU LALU : 36.85 %
LOKASI : KOTA KENDARI MINGGU INI : 7.56 %
S/D MINGGU INI : 44.41 %

KEMAJUAN PEKERJAAN
KONTRAK
MINGGU LALU MINGGU INI S/D MINGGU INI
VOL
NO URAIAN SAT
TOTAL HARGA SATUAN TOTAL JUMLAH BOBOT BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER
VOL VOL VOL
(Rp) HARGA (Rp) (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. PEKERJAAN PERSIAPAN / PENDAHULUAN


1 Pek. Pembersihan Lokasi/Pembongkaran WC Lama Ls 1.00 2,500,000.00 2,500,000.00 1.14 0.50 50.00 0.57 - - - 0.50 50.00 0.57
2 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 1,000,000.00 1,000,000.00 0.46 1.00 100.00 0.46 - - - 1.00 100.00 0.46
3 Pek. Pembuatan Barak Kerja/Gudang Bahan Ls 1.00 3,500,000.00 3,500,000.00 1.60 1.00 100.00 1.60 - - - 1.00 100.00 1.60
3 Administrasi, Dokumentasi dan Air Kerja Ls 1.00 1,250,000.00 1,250,000.00 0.57 0.50 50.00 0.28 - - - 0.50 50.00 0.28
4 Papan Nama Kegiatan Ls 1.00 150,000.00 150,000.00 0.07 1.00 100.00 0.07 - - - 1.00 100.00 0.07
JUMLAH A 8,400,000.00 3.83 2.97 - 2.97
B. PEK. BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK
- Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir Set 1.00 450,000.00 450,000.00 0.21 1.00 100.00 0.21 - - - 1.00 100.00 0.21
- Pembuatan Kartu Identitas Pekerja (KIP); Lbr 4.00 5,000.00 20,000.00 0.01 4.00 100.00 0.01 - - - 4.00 100.00 0.01
2 Sosialisasi, promosi, dan pelatihan;
Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Safety Talk
- Org 4.00 10,000.00 40,000.00 0.02 4.00 100.00 0.02 - - - 4.00 100.00 0.02
dan/atau Tool Box Meeting);
3 Alat Pelindung Kerja dan Alat Pelindung Diri
- Topi Pelindung (Safety Helmet); Bh 4.00 85,000.00 340,000.00 0.16 4.00 100.00 0.16 - - - 4.00 100.00 0.16
- Pelindung Mata Psg 4.00 65,000.00 260,000.00 0.12 4.00 100.00 0.12 - - - 4.00 100.00 0.12
- Sarung Tangan (Safety Gloves); Psg 4.00 20,000.00 80,000.00 0.04 4.00 100.00 0.04 - - - 4.00 100.00 0.04
- Sepatu Keselamatan (Safety Shoes); Psg 4.00 180,000.00 720,000.00 0.33 4.00 100.00 0.33 - - - 4.00 100.00 0.33
- Rompi Keselamatan (Safety Vest); Bh 4.00 50,000.00 200,000.00 0.09 4.00 100.00 0.09 - - - 4.00 100.00 0.09
4 Asuransi dan perizinan
- BPJS Ketenagakerjaan Dan Kesehatan Kerja; Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
5 Personel Keselamatan Konstruksi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Petugas K3 Ob 1.00 1,500,000.00 1,500,000.00 0.68 1.00 100.00 0.68 - - - 1.00 100.00 0.68
6 Fasilitas sarana, prasarana, dan alat kesehatan
- Peralatan P3K (Kotak P3K, Tandu,Tabung Oksigen, Obat Luka, Perban, dll) Ls 1.00 1,300,000.00 1,300,000.00 0.59 1.00 100.00 0.59 - - - 1.00 100.00 0.59
7 Rambu-rambu yang diperlukan
- Rambu Informasi dan Peringatan Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
8 Konsultasi dengan ahli terkait Keselamatan Konstruksi Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
9 Kegiatan dan peralatan terkait dengan pengendalian Bendera K3 Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
JUMLAH B 6,010,000.00 2.74 2.74 - 2.74
C. PEKERJAAN PAGAR
I. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi M3 20.51 71,390.00 1,464,454.20 0.67 20.51 100.00 0.67 - - - 20.51 100.00 0.67
2 Pek. Urugan Tanah Kembali M3 5.04 51,480.00 259,459.20 0.12 5.04 100.00 0.12 - - - 5.04 100.00 0.12
3 Pek. Urugan Pasir Alas Pondasi M3 1.68 219,956.00 369,526.08 0.17 1.68 100.00 0.17 - - - 1.68 100.00 0.17
JUMLAH I 2,093,439.48 0.95 0.95 - 0.95
II. PEKERJAAN BATU DAN PLESTERAN
1 Pas. Batu Kosong M3 5.04 452,951.40 2,282,875.06 1.04 5.04 100.00 1.04 - - - 5.04 100.00 1.04
2 Pas. Pondasi Batu Gunung 1 : 5 M3 19.04 822,701.00 15,664,227.04 7.14 19.04 100.00 7.14 - - - 19.04 100.00 7.14
3 Pas. Dinding Batu Bata 1 : 5 M2 41.42 121,558.80 5,034,357.70 2.30 41.42 100.00 2.30 - - - 41.42 100.00 2.30
4 Pas. Plesteran Dinding Batu Bata 1 : 5 M2 82.83 64,381.24 5,332,698.11 2.43 - - - - - - - - -
5 Pas. Plesteran Ciprat/Kamper 1 : 3 M2 32.11 66,976.36 2,150,610.92 0.98 - - - - - - - - -
6 Pas. Plesteran Pondasi + Acian M2 44.80 66,976.36 3,000,540.93 1.37 - - - - - - - - -
7 Pek. List Profil Ls 1.00 2,000,000.00 2,000,000.00 0.91 - - - - - - - - -
JUMLAH II 35,465,309.75 16.17 10.48 - 10.48
III. PEKERJAAN BESI DAN BETON
1 Pek. Beton Pondasi Poer Plat
- Bekisting M2 2.40 170,286.60 408,687.84 0.19 2.40 100.00 0.19 - - - 2.40 100.00 0.19
- Besi Beton Kg 24.72 20,560.54 508,194.87 0.23 24.72 100.00 0.23 - - - 24.72 100.00 0.23
- Beton K175 M3 0.60 1,199,480.49 719,688.29 0.33 0.60 100.00 0.33 - - - 0.60 100.00 0.33
2 Pek. Beton Sloof 15/20
- Bekisting M2 11.20 179,636.60 2,011,929.92 0.92 11.20 100.00 0.92 - - - 11.20 100.00 0.92
- Besi Beton Kg 322.18 20,560.54 6,624,233.02 3.02 322.18 100.00 3.02 - - - 322.18 100.00 3.02
- Beton K175 M3 1.68 1,199,480.49 2,015,127.22 0.92 1.68 100.00 0.92 - - - 1.68 100.00 0.92
3 Pek. Beton Sloof Gerbang 15/30
- Bekisting M2 3.00 179,636.60 538,909.80 0.25 3.00 100.00 0.25 - - - 3.00 100.00 0.25
- Besi Beton Kg 42.01 20,560.54 863,836.71 0.39 42.01 100.00 0.39 - - - 42.01 100.00 0.39
- Beton K175 M3 0.23 1,199,480.49 269,883.11 0.12 0.23 100.00 0.12 - - - 0.23 100.00 0.12
4 Pek. Beton Kolom 20/20
- Roster Beton Kolom Pracetak Motif (Dudukan+Tiang+Topi) Klm 18.00 575,000.00 10,350,000.00 4.72 18.00 100.00 4.72 - - - 18.00 100.00 4.72
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Besi Beton Kg 212.24 20,560.54 4,363,731.43 1.99 212.24 100.00 1.99 - - - 212.24 100.00 1.99
- Beton K175 M3 1.30 1,199,480.49 1,554,526.72 0.71 1.30 100.00 0.71 - - - 1.30 100.00 0.71
5 Pek. Beton Kolom 40/40 (Gerbang)
- Bekisting M2 14.72 249,587.80 3,673,932.42 1.68 14.72 100.00 1.68 - - - 14.72 100.00 1.68
- Besi Beton Kg 163.44 20,560.54 3,360,323.60 1.53 163.44 100.00 1.53 - - - 163.44 100.00 1.53
- Beton K175 M3 1.47 1,199,480.49 1,765,635.28 0.80 1.47 100.00 0.80 - - - 1.47 100.00 0.80
6 Pek. Balok Beton 15/30 dan Topi Beton 10/15
- Bekisting M2 5.48 257,177.80 1,409,334.34 0.64 5.48 100.00 0.64 - - - 5.48 100.00 0.64
- Besi Beton Kg 111.36 20,560.54 2,289,523.28 1.04 111.36 100.00 1.04 - - - 111.36 100.00 1.04
- Beton K175 M3 0.41 1,199,480.49 492,986.48 0.22 0.41 100.00 0.22 - - - 0.41 100.00 0.22
JUMLAH III 43,220,484.33 19.71 19.71 - 19.71
IV PEKERJAAN TERALIS, KERAMIK DAN ACCESSORIES
1 Pek. Teralis Dinding Pagar M1 49.40 552,580.60 27,297,481.64 12.45 - - - 30.00 60.73 7.56 30.00 60.73 7.56
2 Pek. Teralis Pintu Gerbang Tengah dan Samping ( Pintu Sorong ) M1 7.64 1,213,405.60 9,270,418.78 4.23 - - - - - - - - -
3 Pas. Dinding Granit 80 x 80 Cm M2 7.68 428,147.50 3,288,172.80 1.50 - - - - - - - - -
4 Pas. Batu Alam Dinding dan Kolom Gerbang M2 11.52 415,299.50 4,784,250.24 2.18 - - - - - - - - -
5 Pek. Papan Nama Gerbang + Logo Kota + Logo Bakti Husada ( Acrylic ) Ls 1.00 9,500,000.00 9,500,000.00 4.33 - - - - - - - - -
JUMLAH IV 54,140,323.46 24.68 - 7.56 7.56
V PEKERJAAN PENGECATAN
1 Pek. Cat Tembok Dinding/Kolom 2x Cat Anti Lumut M2 95.79 35,827.00 3,431,868.33 1.56 - - - - - - - - -
2 Pek. Cat Besi Teralis 2x Cat M2 57.04 36,462.80 2,079,838.11 0.95 - - - - - - - - -
JUMLAH V 5,511,706.44 2.51 - - -
D. PEKERJAAN PENATAAN LAHAN PARKIR
1 Pek. Galian Tanah Cansteen M3 5.04 71,390.00 359,805.60 0.16 - - - - - - - - -
2 Pek. Urugan Tanah Didatangkan M3 96.00 110,880.00 10,644,480.00 4.85 - - - - - - - - -
3 Pek. Urugan Pasir Alas Cansteen/Rabat M3 12.84 219,956.00 2,824,235.04 1.29 - - - - - - - - -
4 Pek. Cansteen Pas. Batu Gunung 30/60, Camp. 1:4 M3 10.08 857,780.00 8,646,422.40 3.94 - - - - - - - - -
5 Pek. Plesteran Cansteen Camp. 1:3 M2 33.60 66,976.36 2,250,405.70 1.03 - - - - - - - - -
6 Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan Masuk M3 18.24 1,199,480.49 21,878,524.14 9.97 - - - - - - - - -
7 Pek. Pengecatan Cansteen Anti Lumut M2 33.60 35,827.00 1,203,787.20 0.55 - - - - - - - - -
JUMLAH D 47,807,660.07 21.80 - - -
E. PEKERJAAN REHAB/PERBAIKAN
1 Pek. Kramik Lantai 30/30 cm KM/WC M2 2.25 153,684.30 345,789.68 0.16 - - - - - - - - -
2 Pek. Granit Dinding 60/60 cm KM/WC M2 8.28 336,451.50 2,785,818.42 1.27 - - - - - - - - -
3 Pek. Instalasi Air Bersih + Accesories Pipa Ls 1.00 750,000.00 750,000.00 0.34 - - - - - - - - -
4 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 3" AW Ls 1.00 1,500,000.00 1,500,000.00 0.68 - - - - - - - - -
5 Pek. Pasangan Kloset Duduk Bh 1.00 3,382,786.00 3,382,786.00 1.54 - - - - - - - - -
6 Pek. Pasangan Kran Air Bh 1.00 93,104.00 93,104.00 0.04 - - - - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
7 Pek. Floor Drain Bh 1.00 54,736.00 54,736.00 0.02 - - - - - - - - -
8 Pengadaan Ember Air Bh 1.00 75,000.00 75,000.00 0.03 - - - - - - - - -
9 Pek. Pembuatan Septik Tank Unit 1.00 1,800,000.00 1,800,000.00 0.82 - - - - - - - - -
10 Pek. Rehab Atap/Turbin Ls 1.00 5,000,000.00 5,000,000.00 2.28 - - - - - - - - -
JUMLAH E 15,787,234.10 7.20 - - -
F. PEKERJAAN FINISHING DAN PEMBERSIHAN AKHIR
1 Pek. Pembersihan Akhir/Perapihan Ls 1.00 900,000.00 900,000.00 0.41 - - - - - - - - -
JUMLAH F 900,000.00 0.41 - - -
JUMLAH (REAL COST) ( A ) 219,336,157.63
PPN 10 % ( B ) 21,933,615.76
100.00 36.85 7.56 44.41
TOTAL COST ( A + B ) 241,269,773.40
DIBULATKAN 241,200,000.00

Kendari, 11 September 2020


Disetujui Oleh Diperiksa Oleh Diperiksa Oleh Di Buat Oleh
Pejabat Pelaksana Teknis Kegiatan (PPTK) Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….
NIP…………………. NIP…………………. Site Engineer Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 5 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pemasangan teralis dinding pagar 4.5 M' 1 Pasir Urug M3 Pasir Urug M3
2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg
13 Teralis Pagar 4.50 M' Teralis Pagar 4.50 M'

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 6 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pemasangan teralis dinding pagar 4.5 M' 1 Pasir Urug M3 Pasir Urug M3
2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg
13 Teralis Pagar 4.50 M' Teralis Pagar 4.50 M'

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 7 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pemasangan teralis dinding pagar 4.5 M' 1 Pasir Urug M3 Pasir Urug M3
2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg
13 Teralis Pagar 4.50 M' Teralis Pagar 4.50 M'

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 8 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pemasangan teralis dinding pagar 4.5 M' 1 Pasir Urug M3 Pasir Urug M3
2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg
13 Teralis Pagar 4.50 M' Teralis Pagar 4.50 M'

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 9 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pemasangan teralis dinding pagar 4.5 M' 1 Pasir Urug M3 Pasir Urug M3
2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg
13 Teralis Pagar 4.50 M' Teralis Pagar 4.50 M'

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 10 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pemasangan teralis dinding pagar 4.5 M' 1 Pasir Urug M3 Pasir Urug M3
2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg
13 Teralis Pagar 4.50 M' Teralis Pagar 4.50 M'

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 11 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pemasangan teralis dinding pagar 3 M' 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg
13 Teralis Pagar 3.00 M' Teralis Pagar 3.00 M'

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN (MINGGUAN)

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR MINGGU : VII (KE TUJUH)


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI PERIODE : 12 SEPTEMBER 2020 S/D 19 SEPTEMBER 2020
TAHUN ANGGARAN : 2020 S/D MINGGU LALU : 44.41 %
LOKASI : KOTA KENDARI MINGGU INI : 8.69 %
S/D MINGGU INI : 53.10 %

KEMAJUAN PEKERJAAN
KONTRAK
MINGGU LALU MINGGU INI S/D MINGGU INI
VOL
NO URAIAN SAT
TOTAL HARGA SATUAN TOTAL JUMLAH BOBOT BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER
VOL VOL VOL
(Rp) HARGA (Rp) (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. PEKERJAAN PERSIAPAN / PENDAHULUAN


1 Pek. Pembersihan Lokasi/Pembongkaran WC Lama Ls 1.00 2,500,000.00 2,500,000.00 1.14 0.50 50.00 0.57 - - - 0.50 50.00 0.57
2 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 1,000,000.00 1,000,000.00 0.46 1.00 100.00 0.46 - - - 1.00 100.00 0.46
3 Pek. Pembuatan Barak Kerja/Gudang Bahan Ls 1.00 3,500,000.00 3,500,000.00 1.60 1.00 100.00 1.60 - - - 1.00 100.00 1.60
3 Administrasi, Dokumentasi dan Air Kerja Ls 1.00 1,250,000.00 1,250,000.00 0.57 0.50 50.00 0.28 - - - 0.50 50.00 0.28
4 Papan Nama Kegiatan Ls 1.00 150,000.00 150,000.00 0.07 1.00 100.00 0.07 - - - 1.00 100.00 0.07
JUMLAH A 8,400,000.00 3.83 2.97 - 2.97
B. PEK. BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK
- Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir Set 1.00 450,000.00 450,000.00 0.21 1.00 100.00 0.21 - - - 1.00 100.00 0.21
- Pembuatan Kartu Identitas Pekerja (KIP); Lbr 4.00 5,000.00 20,000.00 0.01 4.00 100.00 0.01 - - - 4.00 100.00 0.01
2 Sosialisasi, promosi, dan pelatihan;
Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Safety Talk
- Org 4.00 10,000.00 40,000.00 0.02 4.00 100.00 0.02 - - - 4.00 100.00 0.02
dan/atau Tool Box Meeting);
3 Alat Pelindung Kerja dan Alat Pelindung Diri
- Topi Pelindung (Safety Helmet); Bh 4.00 85,000.00 340,000.00 0.16 4.00 100.00 0.16 - - - 4.00 100.00 0.16
- Pelindung Mata Psg 4.00 65,000.00 260,000.00 0.12 4.00 100.00 0.12 - - - 4.00 100.00 0.12
- Sarung Tangan (Safety Gloves); Psg 4.00 20,000.00 80,000.00 0.04 4.00 100.00 0.04 - - - 4.00 100.00 0.04
- Sepatu Keselamatan (Safety Shoes); Psg 4.00 180,000.00 720,000.00 0.33 4.00 100.00 0.33 - - - 4.00 100.00 0.33
- Rompi Keselamatan (Safety Vest); Bh 4.00 50,000.00 200,000.00 0.09 4.00 100.00 0.09 - - - 4.00 100.00 0.09
4 Asuransi dan perizinan
- BPJS Ketenagakerjaan Dan Kesehatan Kerja; Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
5 Personel Keselamatan Konstruksi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Petugas K3 Ob 1.00 1,500,000.00 1,500,000.00 0.68 1.00 100.00 0.68 - - - 1.00 100.00 0.68
6 Fasilitas sarana, prasarana, dan alat kesehatan
- Peralatan P3K (Kotak P3K, Tandu,Tabung Oksigen, Obat Luka, Perban, dll) Ls 1.00 1,300,000.00 1,300,000.00 0.59 1.00 100.00 0.59 - - - 1.00 100.00 0.59
7 Rambu-rambu yang diperlukan
- Rambu Informasi dan Peringatan Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
8 Konsultasi dengan ahli terkait Keselamatan Konstruksi Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
9 Kegiatan dan peralatan terkait dengan pengendalian Bendera K3 Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
JUMLAH B 6,010,000.00 2.74 2.74 - 2.74
C. PEKERJAAN PAGAR
I. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi M3 20.51 71,390.00 1,464,454.20 0.67 20.51 100.00 0.67 - - - 20.51 100.00 0.67
2 Pek. Urugan Tanah Kembali M3 5.04 51,480.00 259,459.20 0.12 5.04 100.00 0.12 - - - 5.04 100.00 0.12
3 Pek. Urugan Pasir Alas Pondasi M3 1.68 219,956.00 369,526.08 0.17 1.68 100.00 0.17 - - - 1.68 100.00 0.17
JUMLAH I 2,093,439.48 0.95 0.95 - 0.95
II. PEKERJAAN BATU DAN PLESTERAN
1 Pas. Batu Kosong M3 5.04 452,951.40 2,282,875.06 1.04 5.04 100.00 1.04 - - - 5.04 100.00 1.04
2 Pas. Pondasi Batu Gunung 1 : 5 M3 19.04 822,701.00 15,664,227.04 7.14 19.04 100.00 7.14 - - - 19.04 100.00 7.14
3 Pas. Dinding Batu Bata 1 : 5 M2 41.42 121,558.80 5,034,357.70 2.30 41.42 100.00 2.30 - - - 41.42 100.00 2.30
4 Pas. Plesteran Dinding Batu Bata 1 : 5 M2 82.83 64,381.24 5,332,698.11 2.43 - - - 82.83 100.00 2.43 82.83 100.00 2.43
5 Pas. Plesteran Ciprat/Kamper 1 : 3 M2 32.11 66,976.36 2,150,610.92 0.98 - - - - - - - - -
6 Pas. Plesteran Pondasi + Acian M2 44.80 66,976.36 3,000,540.93 1.37 - - - 44.80 100.00 1.37 44.80 100.00 1.37
7 Pek. List Profil Ls 1.00 2,000,000.00 2,000,000.00 0.91 - - - - - - - - -
JUMLAH II 35,465,309.75 16.17 10.48 3.80 14.28
III. PEKERJAAN BESI DAN BETON
1 Pek. Beton Pondasi Poer Plat
- Bekisting M2 2.40 170,286.60 408,687.84 0.19 2.40 100.00 0.19 - - - 2.40 100.00 0.19
- Besi Beton Kg 24.72 20,560.54 508,194.87 0.23 24.72 100.00 0.23 - - - 24.72 100.00 0.23
- Beton K175 M3 0.60 1,199,480.49 719,688.29 0.33 0.60 100.00 0.33 - - - 0.60 100.00 0.33
2 Pek. Beton Sloof 15/20
- Bekisting M2 11.20 179,636.60 2,011,929.92 0.92 11.20 100.00 0.92 - - - 11.20 100.00 0.92
- Besi Beton Kg 322.18 20,560.54 6,624,233.02 3.02 322.18 100.00 3.02 - - - 322.18 100.00 3.02
- Beton K175 M3 1.68 1,199,480.49 2,015,127.22 0.92 1.68 100.00 0.92 - - - 1.68 100.00 0.92
3 Pek. Beton Sloof Gerbang 15/30
- Bekisting M2 3.00 179,636.60 538,909.80 0.25 3.00 100.00 0.25 - - - 3.00 100.00 0.25
- Besi Beton Kg 42.01 20,560.54 863,836.71 0.39 42.01 100.00 0.39 - - - 42.01 100.00 0.39
- Beton K175 M3 0.23 1,199,480.49 269,883.11 0.12 0.23 100.00 0.12 - - - 0.23 100.00 0.12
4 Pek. Beton Kolom 20/20
- Roster Beton Kolom Pracetak Motif (Dudukan+Tiang+Topi) Klm 18.00 575,000.00 10,350,000.00 4.72 18.00 100.00 4.72 - - - 18.00 100.00 4.72
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Besi Beton Kg 212.24 20,560.54 4,363,731.43 1.99 212.24 100.00 1.99 - - - 212.24 100.00 1.99
- Beton K175 M3 1.30 1,199,480.49 1,554,526.72 0.71 1.30 100.00 0.71 - - - 1.30 100.00 0.71
5 Pek. Beton Kolom 40/40 (Gerbang)
- Bekisting M2 14.72 249,587.80 3,673,932.42 1.68 14.72 100.00 1.68 - - - 14.72 100.00 1.68
- Besi Beton Kg 163.44 20,560.54 3,360,323.60 1.53 163.44 100.00 1.53 - - - 163.44 100.00 1.53
- Beton K175 M3 1.47 1,199,480.49 1,765,635.28 0.80 1.47 100.00 0.80 - - - 1.47 100.00 0.80
6 Pek. Balok Beton 15/30 dan Topi Beton 10/15
- Bekisting M2 5.48 257,177.80 1,409,334.34 0.64 5.48 100.00 0.64 - - - 5.48 100.00 0.64
- Besi Beton Kg 111.36 20,560.54 2,289,523.28 1.04 111.36 100.00 1.04 - - - 111.36 100.00 1.04
- Beton K175 M3 0.41 1,199,480.49 492,986.48 0.22 0.41 100.00 0.22 - - - 0.41 100.00 0.22
JUMLAH III 43,220,484.33 19.71 19.71 - 19.71
IV PEKERJAAN TERALIS, KERAMIK DAN ACCESSORIES
1 Pek. Teralis Dinding Pagar M1 49.40 552,580.60 27,297,481.64 12.45 30.00 60.73 7.56 19.40 39.27 4.89 49.40 100.00 12.45
2 Pek. Teralis Pintu Gerbang Tengah dan Samping ( Pintu Sorong ) M1 7.64 1,213,405.60 9,270,418.78 4.23 - - - - - - - - -
3 Pas. Dinding Granit 80 x 80 Cm M2 7.68 428,147.50 3,288,172.80 1.50 - - - - - - - - -
4 Pas. Batu Alam Dinding dan Kolom Gerbang M2 11.52 415,299.50 4,784,250.24 2.18 - - - - - - - - -
5 Pek. Papan Nama Gerbang + Logo Kota + Logo Bakti Husada ( Acrylic ) Ls 1.00 9,500,000.00 9,500,000.00 4.33 - - - - - - - - -
JUMLAH IV 54,140,323.46 24.68 7.56 4.89 12.45
V PEKERJAAN PENGECATAN
1 Pek. Cat Tembok Dinding/Kolom 2x Cat Anti Lumut M2 95.79 35,827.00 3,431,868.33 1.56 - - - - - - - - -
2 Pek. Cat Besi Teralis 2x Cat M2 57.04 36,462.80 2,079,838.11 0.95 - - - - - - - - -
JUMLAH V 5,511,706.44 2.51 - - -
D. PEKERJAAN PENATAAN LAHAN PARKIR
1 Pek. Galian Tanah Cansteen M3 5.04 71,390.00 359,805.60 0.16 - - - - - - - - -
2 Pek. Urugan Tanah Didatangkan M3 96.00 110,880.00 10,644,480.00 4.85 - - - - - - - - -
3 Pek. Urugan Pasir Alas Cansteen/Rabat M3 12.84 219,956.00 2,824,235.04 1.29 - - - - - - - - -
4 Pek. Cansteen Pas. Batu Gunung 30/60, Camp. 1:4 M3 10.08 857,780.00 8,646,422.40 3.94 - - - - - - - - -
5 Pek. Plesteran Cansteen Camp. 1:3 M2 33.60 66,976.36 2,250,405.70 1.03 - - - - - - - - -
6 Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan Masuk M3 18.24 1,199,480.49 21,878,524.14 9.97 - - - - - - - - -
7 Pek. Pengecatan Cansteen Anti Lumut M2 33.60 35,827.00 1,203,787.20 0.55 - - - - - - - - -
JUMLAH D 47,807,660.07 21.80 - - -
E. PEKERJAAN REHAB/PERBAIKAN
1 Pek. Kramik Lantai 30/30 cm KM/WC M2 2.25 153,684.30 345,789.68 0.16 - - - - - - - - -
2 Pek. Granit Dinding 60/60 cm KM/WC M2 8.28 336,451.50 2,785,818.42 1.27 - - - - - - - - -
3 Pek. Instalasi Air Bersih + Accesories Pipa Ls 1.00 750,000.00 750,000.00 0.34 - - - - - - - - -
4 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 3" AW Ls 1.00 1,500,000.00 1,500,000.00 0.68 - - - - - - - - -
5 Pek. Pasangan Kloset Duduk Bh 1.00 3,382,786.00 3,382,786.00 1.54 - - - - - - - - -
6 Pek. Pasangan Kran Air Bh 1.00 93,104.00 93,104.00 0.04 - - - - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
7 Pek. Floor Drain Bh 1.00 54,736.00 54,736.00 0.02 - - - - - - - - -
8 Pengadaan Ember Air Bh 1.00 75,000.00 75,000.00 0.03 - - - - - - - - -
9 Pek. Pembuatan Septik Tank Unit 1.00 1,800,000.00 1,800,000.00 0.82 - - - - - - - - -
10 Pek. Rehab Atap/Turbin Ls 1.00 5,000,000.00 5,000,000.00 2.28 - - - - - - - - -
JUMLAH E 15,787,234.10 7.20 - - -
F. PEKERJAAN FINISHING DAN PEMBERSIHAN AKHIR
1 Pek. Pembersihan Akhir/Perapihan Ls 1.00 900,000.00 900,000.00 0.41 - - - - - - - - -
JUMLAH F 900,000.00 0.41 - - -
JUMLAH (REAL COST) ( A ) 219,336,157.63
PPN 10 % ( B ) 21,933,615.76
100.00 44.41 8.69 53.10
TOTAL COST ( A + B ) 241,269,773.40
DIBULATKAN 241,200,000.00

Kendari, 19 September 2020


Disetujui Oleh Diperiksa Oleh Diperiksa Oleh Di Buat Oleh
Pejabat Pelaksana Teknis Kegiatan (PPTK) Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….
NIP…………………. NIP…………………. Site Engineer Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 12 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pemasangan teralis dinding pagar 5 M' 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang 10.00 M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen 100.00 Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg
13 Teralis Pagar 5.00 M' Teralis Pagar 5.00 M'

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 13 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pemasangan teralis dinding pagar 5 M' 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg
13 Teralis Pagar 5.00 M' Teralis Pagar 5.00 M'

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 14 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pemasangan teralis dinding pagar 5 M' 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg
13 Teralis Pagar 5.00 M' Teralis Pagar 5.00 M'

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 15 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pemasangan teralis dinding pagar 4.4 M' 1 Pasir Urug M3 Pasir Urug M3
2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg
13 Teralis Pagar 4.40 M' Teralis Pagar 4.40 M'

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 16 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Plesteran Dinding Bata 30 M2 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang 0.0006 M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 4.50 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 17 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Plesteran Dinding Bata 30 M2 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang 0.0006 M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 4.50 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 18 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Plesteran Dinding Bata 22.83 M2 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang 0.0005 M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 3.42 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 19 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Plesteran Pondasi + Acian 44.8 M2 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang 0.0009 M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 6.72 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN (MINGGUAN)

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR MINGGU : VIII (KE DELAPAN)


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI PERIODE : 20 SEPTEMBER 2020 S/D 27 SEPTEMBER 2020
TAHUN ANGGARAN : 2020 S/D MINGGU LALU : 53.10 %
LOKASI : KOTA KENDARI MINGGU INI : 9.80 %
S/D MINGGU INI : 62.90 %

KEMAJUAN PEKERJAAN
KONTRAK
MINGGU LALU MINGGU INI S/D MINGGU INI
VOL
NO URAIAN SAT
TOTAL HARGA SATUAN TOTAL JUMLAH BOBOT BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER
VOL VOL VOL
(Rp) HARGA (Rp) (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. PEKERJAAN PERSIAPAN / PENDAHULUAN


1 Pek. Pembersihan Lokasi/Pembongkaran WC Lama Ls 1.00 2,500,000.00 2,500,000.00 1.14 0.50 50.00 0.57 - - - 0.50 50.00 0.57
2 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 1,000,000.00 1,000,000.00 0.46 1.00 100.00 0.46 - - - 1.00 100.00 0.46
3 Pek. Pembuatan Barak Kerja/Gudang Bahan Ls 1.00 3,500,000.00 3,500,000.00 1.60 1.00 100.00 1.60 - - - 1.00 100.00 1.60
3 Administrasi, Dokumentasi dan Air Kerja Ls 1.00 1,250,000.00 1,250,000.00 0.57 0.50 50.00 0.28 - - - 0.50 50.00 0.28
4 Papan Nama Kegiatan Ls 1.00 150,000.00 150,000.00 0.07 1.00 100.00 0.07 - - - 1.00 100.00 0.07
JUMLAH A 8,400,000.00 3.83 2.97 - 2.97
B. PEK. BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK
- Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir Set 1.00 450,000.00 450,000.00 0.21 1.00 100.00 0.21 - - - 1.00 100.00 0.21
- Pembuatan Kartu Identitas Pekerja (KIP); Lbr 4.00 5,000.00 20,000.00 0.01 4.00 100.00 0.01 - - - 4.00 100.00 0.01
2 Sosialisasi, promosi, dan pelatihan;
Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Safety Talk
- Org 4.00 10,000.00 40,000.00 0.02 4.00 100.00 0.02 - - - 4.00 100.00 0.02
dan/atau Tool Box Meeting);
3 Alat Pelindung Kerja dan Alat Pelindung Diri
- Topi Pelindung (Safety Helmet); Bh 4.00 85,000.00 340,000.00 0.16 4.00 100.00 0.16 - - - 4.00 100.00 0.16
- Pelindung Mata Psg 4.00 65,000.00 260,000.00 0.12 4.00 100.00 0.12 - - - 4.00 100.00 0.12
- Sarung Tangan (Safety Gloves); Psg 4.00 20,000.00 80,000.00 0.04 4.00 100.00 0.04 - - - 4.00 100.00 0.04
- Sepatu Keselamatan (Safety Shoes); Psg 4.00 180,000.00 720,000.00 0.33 4.00 100.00 0.33 - - - 4.00 100.00 0.33
- Rompi Keselamatan (Safety Vest); Bh 4.00 50,000.00 200,000.00 0.09 4.00 100.00 0.09 - - - 4.00 100.00 0.09
4 Asuransi dan perizinan
- BPJS Ketenagakerjaan Dan Kesehatan Kerja; Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
5 Personel Keselamatan Konstruksi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Petugas K3 Ob 1.00 1,500,000.00 1,500,000.00 0.68 1.00 100.00 0.68 - - - 1.00 100.00 0.68
6 Fasilitas sarana, prasarana, dan alat kesehatan
- Peralatan P3K (Kotak P3K, Tandu,Tabung Oksigen, Obat Luka, Perban, dll) Ls 1.00 1,300,000.00 1,300,000.00 0.59 1.00 100.00 0.59 - - - 1.00 100.00 0.59
7 Rambu-rambu yang diperlukan
- Rambu Informasi dan Peringatan Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
8 Konsultasi dengan ahli terkait Keselamatan Konstruksi Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
9 Kegiatan dan peralatan terkait dengan pengendalian Bendera K3 Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
JUMLAH B 6,010,000.00 2.74 2.74 - 2.74
C. PEKERJAAN PAGAR
I. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi M3 20.51 71,390.00 1,464,454.20 0.67 20.51 100.00 0.67 - - - 20.51 100.00 0.67
2 Pek. Urugan Tanah Kembali M3 5.04 51,480.00 259,459.20 0.12 5.04 100.00 0.12 - - - 5.04 100.00 0.12
3 Pek. Urugan Pasir Alas Pondasi M3 1.68 219,956.00 369,526.08 0.17 1.68 100.00 0.17 - - - 1.68 100.00 0.17
JUMLAH I 2,093,439.48 0.95 0.95 - 0.95
II. PEKERJAAN BATU DAN PLESTERAN
1 Pas. Batu Kosong M3 5.04 452,951.40 2,282,875.06 1.04 5.04 100.00 1.04 - - - 5.04 100.00 1.04
2 Pas. Pondasi Batu Gunung 1 : 5 M3 19.04 822,701.00 15,664,227.04 7.14 19.04 100.00 7.14 - - - 19.04 100.00 7.14
3 Pas. Dinding Batu Bata 1 : 5 M2 41.42 121,558.80 5,034,357.70 2.30 41.42 100.00 2.30 - - - 41.42 100.00 2.30
4 Pas. Plesteran Dinding Batu Bata 1 : 5 M2 82.83 64,381.24 5,332,698.11 2.43 82.83 100.00 2.43 - - - 82.83 100.00 2.43
5 Pas. Plesteran Ciprat/Kamper 1 : 3 M2 32.11 66,976.36 2,150,610.92 0.98 - - - 32.11 100.00 0.98 32.11 100.00 0.98
6 Pas. Plesteran Pondasi + Acian M2 44.80 66,976.36 3,000,540.93 1.37 44.80 100.00 1.37 - - - 44.80 100.00 1.37
7 Pek. List Profil Ls 1.00 2,000,000.00 2,000,000.00 0.91 - - - 1.00 100.00 0.91 1.00 100.00 0.91
JUMLAH II 35,465,309.75 16.17 14.28 1.89 16.17
III. PEKERJAAN BESI DAN BETON
1 Pek. Beton Pondasi Poer Plat
- Bekisting M2 2.40 170,286.60 408,687.84 0.19 2.40 100.00 0.19 - - - 2.40 100.00 0.19
- Besi Beton Kg 24.72 20,560.54 508,194.87 0.23 24.72 100.00 0.23 - - - 24.72 100.00 0.23
- Beton K175 M3 0.60 1,199,480.49 719,688.29 0.33 0.60 100.00 0.33 - - - 0.60 100.00 0.33
2 Pek. Beton Sloof 15/20
- Bekisting M2 11.20 179,636.60 2,011,929.92 0.92 11.20 100.00 0.92 - - - 11.20 100.00 0.92
- Besi Beton Kg 322.18 20,560.54 6,624,233.02 3.02 322.18 100.00 3.02 - - - 322.18 100.00 3.02
- Beton K175 M3 1.68 1,199,480.49 2,015,127.22 0.92 1.68 100.00 0.92 - - - 1.68 100.00 0.92
3 Pek. Beton Sloof Gerbang 15/30
- Bekisting M2 3.00 179,636.60 538,909.80 0.25 3.00 100.00 0.25 - - - 3.00 100.00 0.25
- Besi Beton Kg 42.01 20,560.54 863,836.71 0.39 42.01 100.00 0.39 - - - 42.01 100.00 0.39
- Beton K175 M3 0.23 1,199,480.49 269,883.11 0.12 0.23 100.00 0.12 - - - 0.23 100.00 0.12
4 Pek. Beton Kolom 20/20
- Roster Beton Kolom Pracetak Motif (Dudukan+Tiang+Topi) Klm 18.00 575,000.00 10,350,000.00 4.72 18.00 100.00 4.72 - - - 18.00 100.00 4.72
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Besi Beton Kg 212.24 20,560.54 4,363,731.43 1.99 212.24 100.00 1.99 - - - 212.24 100.00 1.99
- Beton K175 M3 1.30 1,199,480.49 1,554,526.72 0.71 1.30 100.00 0.71 - - - 1.30 100.00 0.71
5 Pek. Beton Kolom 40/40 (Gerbang)
- Bekisting M2 14.72 249,587.80 3,673,932.42 1.68 14.72 100.00 1.68 - - - 14.72 100.00 1.68
- Besi Beton Kg 163.44 20,560.54 3,360,323.60 1.53 163.44 100.00 1.53 - - - 163.44 100.00 1.53
- Beton K175 M3 1.47 1,199,480.49 1,765,635.28 0.80 1.47 100.00 0.80 - - - 1.47 100.00 0.80
6 Pek. Balok Beton 15/30 dan Topi Beton 10/15
- Bekisting M2 5.48 257,177.80 1,409,334.34 0.64 5.48 100.00 0.64 - - - 5.48 100.00 0.64
- Besi Beton Kg 111.36 20,560.54 2,289,523.28 1.04 111.36 100.00 1.04 - - - 111.36 100.00 1.04
- Beton K175 M3 0.41 1,199,480.49 492,986.48 0.22 0.41 100.00 0.22 - - - 0.41 100.00 0.22
JUMLAH III 43,220,484.33 19.71 19.71 - 19.71
IV PEKERJAAN TERALIS, KERAMIK DAN ACCESSORIES
1 Pek. Teralis Dinding Pagar M1 49.40 552,580.60 27,297,481.64 12.45 49.40 100.00 12.45 - - - 49.40 100.00 12.45
2 Pek. Teralis Pintu Gerbang Tengah dan Samping ( Pintu Sorong ) M1 7.64 1,213,405.60 9,270,418.78 4.23 - - - 7.64 100.00 4.23 7.64 100.00 4.23
3 Pas. Dinding Granit 80 x 80 Cm M2 7.68 428,147.50 3,288,172.80 1.50 - - - 7.68 100.00 1.50 7.68 100.00 1.50
4 Pas. Batu Alam Dinding dan Kolom Gerbang M2 11.52 415,299.50 4,784,250.24 2.18 - - - 11.52 100.00 2.18 11.52 100.00 2.18
5 Pek. Papan Nama Gerbang + Logo Kota + Logo Bakti Husada ( Acrylic ) Ls 1.00 9,500,000.00 9,500,000.00 4.33 - - - - - - - - -
JUMLAH IV 54,140,323.46 24.68 12.45 7.91 20.35
V PEKERJAAN PENGECATAN
1 Pek. Cat Tembok Dinding/Kolom 2x Cat Anti Lumut M2 95.79 35,827.00 3,431,868.33 1.56 - - - - - - - - -
2 Pek. Cat Besi Teralis 2x Cat M2 57.04 36,462.80 2,079,838.11 0.95 - - - - - - - - -
JUMLAH V 5,511,706.44 2.51 - - -
D. PEKERJAAN PENATAAN LAHAN PARKIR
1 Pek. Galian Tanah Cansteen M3 5.04 71,390.00 359,805.60 0.16 - - - - - - - - -
2 Pek. Urugan Tanah Didatangkan M3 96.00 110,880.00 10,644,480.00 4.85 - - - - - - - - -
3 Pek. Urugan Pasir Alas Cansteen/Rabat M3 12.84 219,956.00 2,824,235.04 1.29 - - - - - - - - -
4 Pek. Cansteen Pas. Batu Gunung 30/60, Camp. 1:4 M3 10.08 857,780.00 8,646,422.40 3.94 - - - - - - - - -
5 Pek. Plesteran Cansteen Camp. 1:3 M2 33.60 66,976.36 2,250,405.70 1.03 - - - - - - - - -
6 Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan Masuk M3 18.24 1,199,480.49 21,878,524.14 9.97 - - - - - - - - -
7 Pek. Pengecatan Cansteen Anti Lumut M2 33.60 35,827.00 1,203,787.20 0.55 - - - - - - - - -
JUMLAH D 47,807,660.07 21.80 - - -
E. PEKERJAAN REHAB/PERBAIKAN
1 Pek. Kramik Lantai 30/30 cm KM/WC M2 2.25 153,684.30 345,789.68 0.16 - - - - - - - - -
2 Pek. Granit Dinding 60/60 cm KM/WC M2 8.28 336,451.50 2,785,818.42 1.27 - - - - - - - - -
3 Pek. Instalasi Air Bersih + Accesories Pipa Ls 1.00 750,000.00 750,000.00 0.34 - - - - - - - - -
4 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 3" AW Ls 1.00 1,500,000.00 1,500,000.00 0.68 - - - - - - - - -
5 Pek. Pasangan Kloset Duduk Bh 1.00 3,382,786.00 3,382,786.00 1.54 - - - - - - - - -
6 Pek. Pasangan Kran Air Bh 1.00 93,104.00 93,104.00 0.04 - - - - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
7 Pek. Floor Drain Bh 1.00 54,736.00 54,736.00 0.02 - - - - - - - - -
8 Pengadaan Ember Air Bh 1.00 75,000.00 75,000.00 0.03 - - - - - - - - -
9 Pek. Pembuatan Septik Tank Unit 1.00 1,800,000.00 1,800,000.00 0.82 - - - - - - - - -
10 Pek. Rehab Atap/Turbin Ls 1.00 5,000,000.00 5,000,000.00 2.28 - - - - - - - - -
JUMLAH E 15,787,234.10 7.20 - - -
F. PEKERJAAN FINISHING DAN PEMBERSIHAN AKHIR
1 Pek. Pembersihan Akhir/Perapihan Ls 1.00 900,000.00 900,000.00 0.41 - - - - - - - - -
JUMLAH F 900,000.00 0.41 - - -
JUMLAH (REAL COST) ( A ) 219,336,157.63
PPN 10 % ( B ) 21,933,615.76
100.00 53.10 9.80 62.90
TOTAL COST ( A + B ) 241,269,773.40
DIBULATKAN 241,200,000.00

Kendari, 27 September 2020


Disetujui Oleh Diperiksa Oleh Diperiksa Oleh Di Buat Oleh
Pejabat Pelaksana Teknis Kegiatan (PPTK) Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….
NIP…………………. NIP…………………. Site Engineer Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 20 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pek. Plesteran Ciprat/Kamper 1 : 3 32.11 M2 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang 0.0006 M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 4.82 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 21 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

Pek. Teralis Pintu Gerbang Tengah dan Samping (Pintu 1 Pasir Urug M3 Pasir Urug M3
1 7.64 M'
Sorong ) 2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg
13 Teralis Pintu 7.64 M' Teralis Pintu 7.64 M'

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 22 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pas. Dinding Granit 60x60 7.68 M2 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang 0.0002 M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 1.43 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg
13 Granit 60 x 60 21.35 Bh Granit 60 x 60 6.00 Doz

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 23 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pas. Batu Alam Dinding 5.76 M2 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang 0.0001 M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 1.07 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 24 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pas. Batu Alam Dinding 5.76 M2 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang 0.0001 M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 1.07 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 25 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pekerjaan List Profil 1 Ls 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 1.00 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 26 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pekerjaan List Profil 1 Ls 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 1.00 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 27 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pekerjaan List Profil 1 Ls 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 1.00 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 30 JULI 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 31 JULI 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 1 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 2 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 3 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 4 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 5 AGUSTUS 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 16 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN (BULANAN)

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR MINGGU : III (KE TIGA)


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI PERIODE : 28 SEPTEMBER 2020 S/D 27 OKTOBER 2020
TAHUN ANGGARAN : 2020 S/D BULAN LALU : 62.90 %
LOKASI : KOTA KENDARI BULAN INI : 32.31 %
S/D BULAN INI : 95.21 %

KEMAJUAN PEKERJAAN
KONTRAK
BULAN LALU BULAN INI S/D BULAN INI
VOL
NO URAIAN SAT
TOTAL HARGA SATUAN TOTAL JUMLAH BOBOT BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER
VOL VOL VOL
(Rp) HARGA (Rp) (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. PEKERJAAN PERSIAPAN / PENDAHULUAN


1 Pek. Pembersihan Lokasi/Pembongkaran WC Lama Ls 1.00 2,500,000.00 2,500,000.00 1.14 0.50 50.00 0.57 0.50 50.00 0.57 1.00 100.00 1.14
2 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 1,000,000.00 1,000,000.00 0.46 1.00 100.00 0.46 - - - 1.00 100.00 0.46
3 Pek. Pembuatan Barak Kerja/Gudang Bahan Ls 1.00 3,500,000.00 3,500,000.00 1.60 1.00 100.00 1.60 - - - 1.00 100.00 1.60
3 Administrasi, Dokumentasi dan Air Kerja Ls 1.00 1,250,000.00 1,250,000.00 0.57 0.50 50.00 0.28 - - - 0.50 50.00 0.28
4 Papan Nama Kegiatan Ls 1.00 150,000.00 150,000.00 0.07 1.00 100.00 0.07 - - - 1.00 100.00 0.07
JUMLAH A 8,400,000.00 3.83 2.97 0.57 3.54
B. PEK. BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK
- Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir Set 1.00 450,000.00 450,000.00 0.21 1.00 100.00 0.21 - - - 1.00 100.00 0.21
- Pembuatan Kartu Identitas Pekerja (KIP); Lbr 4.00 5,000.00 20,000.00 0.01 4.00 100.00 0.01 - - - 4.00 100.00 0.01
2 Sosialisasi, promosi, dan pelatihan;
Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Safety Talk
- Org 4.00 10,000.00 40,000.00 0.02 4.00 100.00 0.02 - - - 4.00 100.00 0.02
dan/atau Tool Box Meeting);
3 Alat Pelindung Kerja dan Alat Pelindung Diri
- Topi Pelindung (Safety Helmet); Bh 4.00 85,000.00 340,000.00 0.16 4.00 100.00 0.16 - - - 4.00 100.00 0.16
- Pelindung Mata Psg 4.00 65,000.00 260,000.00 0.12 4.00 100.00 0.12 - - - 4.00 100.00 0.12
- Sarung Tangan (Safety Gloves); Psg 4.00 20,000.00 80,000.00 0.04 4.00 100.00 0.04 - - - 4.00 100.00 0.04
- Sepatu Keselamatan (Safety Shoes); Psg 4.00 180,000.00 720,000.00 0.33 4.00 100.00 0.33 - - - 4.00 100.00 0.33
- Rompi Keselamatan (Safety Vest); Bh 4.00 50,000.00 200,000.00 0.09 4.00 100.00 0.09 - - - 4.00 100.00 0.09
4 Asuransi dan perizinan
- BPJS Ketenagakerjaan Dan Kesehatan Kerja; Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
5 Personel Keselamatan Konstruksi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Petugas K3 Ob 1.00 1,500,000.00 1,500,000.00 0.68 1.00 100.00 0.68 - - - 1.00 100.00 0.68
6 Fasilitas sarana, prasarana, dan alat kesehatan
- Peralatan P3K (Kotak P3K, Tandu,Tabung Oksigen, Obat Luka, Perban, dll) Ls 1.00 1,300,000.00 1,300,000.00 0.59 1.00 100.00 0.59 - - - 1.00 100.00 0.59
7 Rambu-rambu yang diperlukan
- Rambu Informasi dan Peringatan Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
8 Konsultasi dengan ahli terkait Keselamatan Konstruksi Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
9 Kegiatan dan peralatan terkait dengan pengendalian Bendera K3 Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
JUMLAH B 6,010,000.00 2.74 2.74 - 2.74
C. PEKERJAAN PAGAR
I. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi M3 20.51 71,390.00 1,464,454.20 0.67 20.51 100.00 0.67 - - - 20.51 100.00 0.67
2 Pek. Urugan Tanah Kembali M3 5.04 51,480.00 259,459.20 0.12 5.04 100.00 0.12 - - - 5.04 100.00 0.12
3 Pek. Urugan Pasir Alas Pondasi M3 1.68 219,956.00 369,526.08 0.17 1.68 100.00 0.17 - - - 1.68 100.00 0.17
JUMLAH I 2,093,439.48 0.95 0.95 - 0.95
II. PEKERJAAN BATU DAN PLESTERAN
1 Pas. Batu Kosong M3 5.04 452,951.40 2,282,875.06 1.04 5.04 100.00 1.04 - - - 5.04 100.00 1.04
2 Pas. Pondasi Batu Gunung 1 : 5 M3 19.04 822,701.00 15,664,227.04 7.14 19.04 100.00 7.14 - - - 19.04 100.00 7.14
3 Pas. Dinding Batu Bata 1 : 5 M2 41.42 121,558.80 5,034,357.70 2.30 41.42 100.00 2.30 - - - 41.42 100.00 2.30
4 Pas. Plesteran Dinding Batu Bata 1 : 5 M2 82.83 64,381.24 5,332,698.11 2.43 82.83 100.00 2.43 - - - 82.83 100.00 2.43
5 Pas. Plesteran Ciprat/Kamper 1 : 3 M2 32.11 66,976.36 2,150,610.92 0.98 32.11 100.00 0.98 - - - 32.11 100.00 0.98
6 Pas. Plesteran Pondasi + Acian M2 44.80 66,976.36 3,000,540.93 1.37 44.80 100.00 1.37 - - - 44.80 100.00 1.37
7 Pek. List Profil Ls 1.00 2,000,000.00 2,000,000.00 0.91 1.00 100.00 0.91 - - - 1.00 100.00 0.91
JUMLAH II 35,465,309.75 16.17 16.17 - 16.17
III. PEKERJAAN BESI DAN BETON
1 Pek. Beton Pondasi Poer Plat
- Bekisting M2 2.40 170,286.60 408,687.84 0.19 2.40 100.00 0.19 - - - 2.40 100.00 0.19
- Besi Beton Kg 24.72 20,560.54 508,194.87 0.23 24.72 100.00 0.23 - - - 24.72 100.00 0.23
- Beton K175 M3 0.60 1,199,480.49 719,688.29 0.33 0.60 100.00 0.33 - - - 0.60 100.00 0.33
2 Pek. Beton Sloof 15/20
- Bekisting M2 11.20 179,636.60 2,011,929.92 0.92 11.20 100.00 0.92 - - - 11.20 100.00 0.92
- Besi Beton Kg 322.18 20,560.54 6,624,233.02 3.02 322.18 100.00 3.02 - - - 322.18 100.00 3.02
- Beton K175 M3 1.68 1,199,480.49 2,015,127.22 0.92 1.68 100.00 0.92 - - - 1.68 100.00 0.92
3 Pek. Beton Sloof Gerbang 15/30
- Bekisting M2 3.00 179,636.60 538,909.80 0.25 3.00 100.00 0.25 - - - 3.00 100.00 0.25
- Besi Beton Kg 42.01 20,560.54 863,836.71 0.39 42.01 100.00 0.39 - - - 42.01 100.00 0.39
- Beton K175 M3 0.23 1,199,480.49 269,883.11 0.12 0.23 100.00 0.12 - - - 0.23 100.00 0.12
4 Pek. Beton Kolom 20/20
- Roster Beton Kolom Pracetak Motif (Dudukan+Tiang+Topi) Klm 18.00 575,000.00 10,350,000.00 4.72 18.00 100.00 4.72 - - - 18.00 100.00 4.72
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Besi Beton Kg 212.24 20,560.54 4,363,731.43 1.99 212.24 100.00 1.99 - - - 212.24 100.00 1.99
- Beton K175 M3 1.30 1,199,480.49 1,554,526.72 0.71 1.30 100.00 0.71 - - - 1.30 100.00 0.71
5 Pek. Beton Kolom 40/40 (Gerbang)
- Bekisting M2 14.72 249,587.80 3,673,932.42 1.68 14.72 100.00 1.68 - - - 14.72 100.00 1.68
- Besi Beton Kg 163.44 20,560.54 3,360,323.60 1.53 163.44 100.00 1.53 - - - 163.44 100.00 1.53
- Beton K175 M3 1.47 1,199,480.49 1,765,635.28 0.80 1.47 100.00 0.80 - - - 1.47 100.00 0.80
6 Pek. Balok Beton 15/30 dan Topi Beton 10/15
- Bekisting M2 5.48 257,177.80 1,409,334.34 0.64 5.48 100.00 0.64 - - - 5.48 100.00 0.64
- Besi Beton Kg 111.36 20,560.54 2,289,523.28 1.04 111.36 100.00 1.04 - - - 111.36 100.00 1.04
- Beton K175 M3 0.41 1,199,480.49 492,986.48 0.22 0.41 100.00 0.22 - - - 0.41 100.00 0.22
JUMLAH III 43,220,484.33 19.71 19.71 - 19.71
IV PEKERJAAN TERALIS, KERAMIK DAN ACCESSORIES
1 Pek. Teralis Dinding Pagar M1 49.40 552,580.60 27,297,481.64 12.45 49.40 100.00 12.45 - - - 49.40 100.00 12.45
2 Pek. Teralis Pintu Gerbang Tengah dan Samping ( Pintu Sorong ) M1 7.64 1,213,405.60 9,270,418.78 4.23 7.64 100.00 4.23 - - - 7.64 100.00 4.23
3 Pas. Dinding Granit 80 x 80 Cm M2 7.68 428,147.50 3,288,172.80 1.50 7.68 100.00 1.50 - - - 7.68 100.00 1.50
4 Pas. Batu Alam Dinding dan Kolom Gerbang M2 11.52 415,299.50 4,784,250.24 2.18 11.52 100.00 2.18 - - - 11.52 100.00 2.18
5 Pek. Papan Nama Gerbang + Logo Kota + Logo Bakti Husada ( Acrylic ) Ls 1.00 9,500,000.00 9,500,000.00 4.33 - - - 1.00 100.00 4.33 1.00 100.00 4.33
JUMLAH IV 54,140,323.46 24.68 20.35 4.33 24.68
V PEKERJAAN PENGECATAN
1 Pek. Cat Tembok Dinding/Kolom 2x Cat Anti Lumut M2 95.79 35,827.00 3,431,868.33 1.56 - - - 95.79 100.00 1.56 95.79 100.00 1.56
2 Pek. Cat Besi Teralis 2x Cat M2 57.04 36,462.80 2,079,838.11 0.95 - - - 57.04 100.00 0.95 57.04 100.00 0.95
JUMLAH V 5,511,706.44 2.51 - 2.51 2.51
D. PEKERJAAN PENATAAN LAHAN PARKIR
1 Pek. Galian Tanah Cansteen M3 5.04 71,390.00 359,805.60 0.16 - - - 5.04 100.00 0.16 5.04 100.00 0.16
2 Pek. Urugan Tanah Didatangkan M3 96.00 110,880.00 10,644,480.00 4.85 - - - 96.00 100.00 4.85 96.00 100.00 4.85
3 Pek. Urugan Pasir Alas Cansteen/Rabat M3 12.84 219,956.00 2,824,235.04 1.29 - - - 12.84 100.00 1.29 12.84 100.00 1.29
4 Pek. Cansteen Pas. Batu Gunung 30/60, Camp. 1:4 M3 10.08 857,780.00 8,646,422.40 3.94 - - - 10.08 100.00 3.94 10.08 100.00 3.94
5 Pek. Plesteran Cansteen Camp. 1:3 M2 33.60 66,976.36 2,250,405.70 1.03 - - - 33.60 100.00 1.03 33.60 100.00 1.03
6 Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan Masuk M3 18.24 1,199,480.49 21,878,524.14 9.97 - - - 18.24 100.00 9.97 18.24 100.00 9.97
7 Pek. Pengecatan Cansteen Anti Lumut M2 33.60 35,827.00 1,203,787.20 0.55 - - - 33.60 100.00 0.55 33.60 100.00 0.55
JUMLAH D 47,807,660.07 21.80 - 21.80 21.80
E. PEKERJAAN REHAB/PERBAIKAN
1 Pek. Kramik Lantai 30/30 cm KM/WC M2 2.25 153,684.30 345,789.68 0.16 - - - - - - - - -
2 Pek. Granit Dinding 60/60 cm KM/WC M2 8.28 336,451.50 2,785,818.42 1.27 - - - - - - - - -
3 Pek. Instalasi Air Bersih + Accesories Pipa Ls 1.00 750,000.00 750,000.00 0.34 - - - - - - - - -
4 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 3" AW Ls 1.00 1,500,000.00 1,500,000.00 0.68 - - - - - - - - -
5 Pek. Pasangan Kloset Duduk Bh 1.00 3,382,786.00 3,382,786.00 1.54 - - - - - - - - -
6 Pek. Pasangan Kran Air Bh 1.00 93,104.00 93,104.00 0.04 - - - - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
7 Pek. Floor Drain Bh 1.00 54,736.00 54,736.00 0.02 - - - - - - - - -
8 Pengadaan Ember Air Bh 1.00 75,000.00 75,000.00 0.03 - - - - - - - - -
9 Pek. Pembuatan Septik Tank Unit 1.00 1,800,000.00 1,800,000.00 0.82 - - - 1.00 100.00 0.82 1.00 100.00 0.82
10 Pek. Rehab Atap/Turbin Ls 1.00 5,000,000.00 5,000,000.00 2.28 - - - 1.00 100.00 2.28 1.00 100.00 2.28
JUMLAH E 15,787,234.10 7.20 - 3.10 3.10
F. PEKERJAAN FINISHING DAN PEMBERSIHAN AKHIR
1 Pek. Pembersihan Akhir/Perapihan Ls 1.00 900,000.00 900,000.00 0.41 - - - - - - - - -
JUMLAH F 900,000.00 0.41 - - -
JUMLAH (REAL COST) ( A ) 219,336,157.63
PPN 10 % ( B ) 21,933,615.76
100.00 62.90 32.31 95.21
TOTAL COST ( A + B ) 241,269,773.40
DIBULATKAN 241,200,000.00

Kendari, 27 Oktober 2020


Disetujui Oleh Diperiksa Oleh Diperiksa Oleh Di Buat Oleh
Pejabat Pelaksana Teknis Kegiatan (PPTK) Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….
NIP…………………. NIP…………………. Site Engineer Pelaksana
LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN (MINGGUAN)

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR MINGGU : IX (KE SEMBILAN)


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI PERIODE : 28 SEPTEMBER 2020 S/D 4 OKTOBER 2020
TAHUN ANGGARAN : 2020 S/D MINGGU LALU : 62.90 %
LOKASI : KOTA KENDARI MINGGU INI : 8.02 %
S/D MINGGU INI : 70.92 %

KEMAJUAN PEKERJAAN
KONTRAK
MINGGU LALU MINGGU INI S/D MINGGU INI
VOL
NO URAIAN SAT
TOTAL HARGA SATUAN TOTAL JUMLAH BOBOT BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER
VOL VOL VOL
(Rp) HARGA (Rp) (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. PEKERJAAN PERSIAPAN / PENDAHULUAN


1 Pek. Pembersihan Lokasi/Pembongkaran WC Lama Ls 1.00 2,500,000.00 2,500,000.00 1.14 0.50 50.00 0.57 - - - 0.50 50.00 0.57
2 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 1,000,000.00 1,000,000.00 0.46 1.00 100.00 0.46 - - - 1.00 100.00 0.46
3 Pek. Pembuatan Barak Kerja/Gudang Bahan Ls 1.00 3,500,000.00 3,500,000.00 1.60 1.00 100.00 1.60 - - - 1.00 100.00 1.60
3 Administrasi, Dokumentasi dan Air Kerja Ls 1.00 1,250,000.00 1,250,000.00 0.57 0.50 50.00 0.28 - - - 0.50 50.00 0.28
4 Papan Nama Kegiatan Ls 1.00 150,000.00 150,000.00 0.07 1.00 100.00 0.07 - - - 1.00 100.00 0.07
JUMLAH A 8,400,000.00 3.83 2.97 - 2.97
B. PEK. BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK
- Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir Set 1.00 450,000.00 450,000.00 0.21 1.00 100.00 0.21 - - - 1.00 100.00 0.21
- Pembuatan Kartu Identitas Pekerja (KIP); Lbr 4.00 5,000.00 20,000.00 0.01 4.00 100.00 0.01 - - - 4.00 100.00 0.01
2 Sosialisasi, promosi, dan pelatihan;
Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Safety Talk
- Org 4.00 10,000.00 40,000.00 0.02 4.00 100.00 0.02 - - - 4.00 100.00 0.02
dan/atau Tool Box Meeting);
3 Alat Pelindung Kerja dan Alat Pelindung Diri
- Topi Pelindung (Safety Helmet); Bh 4.00 85,000.00 340,000.00 0.16 4.00 100.00 0.16 - - - 4.00 100.00 0.16
- Pelindung Mata Psg 4.00 65,000.00 260,000.00 0.12 4.00 100.00 0.12 - - - 4.00 100.00 0.12
- Sarung Tangan (Safety Gloves); Psg 4.00 20,000.00 80,000.00 0.04 4.00 100.00 0.04 - - - 4.00 100.00 0.04
- Sepatu Keselamatan (Safety Shoes); Psg 4.00 180,000.00 720,000.00 0.33 4.00 100.00 0.33 - - - 4.00 100.00 0.33
- Rompi Keselamatan (Safety Vest); Bh 4.00 50,000.00 200,000.00 0.09 4.00 100.00 0.09 - - - 4.00 100.00 0.09
4 Asuransi dan perizinan
- BPJS Ketenagakerjaan Dan Kesehatan Kerja; Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
5 Personel Keselamatan Konstruksi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Petugas K3 Ob 1.00 1,500,000.00 1,500,000.00 0.68 1.00 100.00 0.68 - - - 1.00 100.00 0.68
6 Fasilitas sarana, prasarana, dan alat kesehatan
- Peralatan P3K (Kotak P3K, Tandu,Tabung Oksigen, Obat Luka, Perban, dll) Ls 1.00 1,300,000.00 1,300,000.00 0.59 1.00 100.00 0.59 - - - 1.00 100.00 0.59
7 Rambu-rambu yang diperlukan
- Rambu Informasi dan Peringatan Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
8 Konsultasi dengan ahli terkait Keselamatan Konstruksi Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
9 Kegiatan dan peralatan terkait dengan pengendalian Bendera K3 Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
JUMLAH B 6,010,000.00 2.74 2.74 - 2.74
C. PEKERJAAN PAGAR
I. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi M3 20.51 71,390.00 1,464,454.20 0.67 20.51 100.00 0.67 - - - 20.51 100.00 0.67
2 Pek. Urugan Tanah Kembali M3 5.04 51,480.00 259,459.20 0.12 5.04 100.00 0.12 - - - 5.04 100.00 0.12
3 Pek. Urugan Pasir Alas Pondasi M3 1.68 219,956.00 369,526.08 0.17 1.68 100.00 0.17 - - - 1.68 100.00 0.17
JUMLAH I 2,093,439.48 0.95 0.95 - 0.95
II. PEKERJAAN BATU DAN PLESTERAN
1 Pas. Batu Kosong M3 5.04 452,951.40 2,282,875.06 1.04 5.04 100.00 1.04 - - - 5.04 100.00 1.04
2 Pas. Pondasi Batu Gunung 1 : 5 M3 19.04 822,701.00 15,664,227.04 7.14 19.04 100.00 7.14 - - - 19.04 100.00 7.14
3 Pas. Dinding Batu Bata 1 : 5 M2 41.42 121,558.80 5,034,357.70 2.30 41.42 100.00 2.30 - - - 41.42 100.00 2.30
4 Pas. Plesteran Dinding Batu Bata 1 : 5 M2 82.83 64,381.24 5,332,698.11 2.43 82.83 100.00 2.43 - - - 82.83 100.00 2.43
5 Pas. Plesteran Ciprat/Kamper 1 : 3 M2 32.11 66,976.36 2,150,610.92 0.98 32.11 100.00 0.98 - - - 32.11 100.00 0.98
6 Pas. Plesteran Pondasi + Acian M2 44.80 66,976.36 3,000,540.93 1.37 44.80 100.00 1.37 - - - 44.80 100.00 1.37
7 Pek. List Profil Ls 1.00 2,000,000.00 2,000,000.00 0.91 1.00 100.00 0.91 - - - 1.00 100.00 0.91
JUMLAH II 35,465,309.75 16.17 16.17 - 16.17
III. PEKERJAAN BESI DAN BETON
1 Pek. Beton Pondasi Poer Plat
- Bekisting M2 2.40 170,286.60 408,687.84 0.19 2.40 100.00 0.19 - - - 2.40 100.00 0.19
- Besi Beton Kg 24.72 20,560.54 508,194.87 0.23 24.72 100.00 0.23 - - - 24.72 100.00 0.23
- Beton K175 M3 0.60 1,199,480.49 719,688.29 0.33 0.60 100.00 0.33 - - - 0.60 100.00 0.33
2 Pek. Beton Sloof 15/20
- Bekisting M2 11.20 179,636.60 2,011,929.92 0.92 11.20 100.00 0.92 - - - 11.20 100.00 0.92
- Besi Beton Kg 322.18 20,560.54 6,624,233.02 3.02 322.18 100.00 3.02 - - - 322.18 100.00 3.02
- Beton K175 M3 1.68 1,199,480.49 2,015,127.22 0.92 1.68 100.00 0.92 - - - 1.68 100.00 0.92
3 Pek. Beton Sloof Gerbang 15/30
- Bekisting M2 3.00 179,636.60 538,909.80 0.25 3.00 100.00 0.25 - - - 3.00 100.00 0.25
- Besi Beton Kg 42.01 20,560.54 863,836.71 0.39 42.01 100.00 0.39 - - - 42.01 100.00 0.39
- Beton K175 M3 0.23 1,199,480.49 269,883.11 0.12 0.23 100.00 0.12 - - - 0.23 100.00 0.12
4 Pek. Beton Kolom 20/20
- Roster Beton Kolom Pracetak Motif (Dudukan+Tiang+Topi) Klm 18.00 575,000.00 10,350,000.00 4.72 18.00 100.00 4.72 - - - 18.00 100.00 4.72
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Besi Beton Kg 212.24 20,560.54 4,363,731.43 1.99 212.24 100.00 1.99 - - - 212.24 100.00 1.99
- Beton K175 M3 1.30 1,199,480.49 1,554,526.72 0.71 1.30 100.00 0.71 - - - 1.30 100.00 0.71
5 Pek. Beton Kolom 40/40 (Gerbang)
- Bekisting M2 14.72 249,587.80 3,673,932.42 1.68 14.72 100.00 1.68 - - - 14.72 100.00 1.68
- Besi Beton Kg 163.44 20,560.54 3,360,323.60 1.53 163.44 100.00 1.53 - - - 163.44 100.00 1.53
- Beton K175 M3 1.47 1,199,480.49 1,765,635.28 0.80 1.47 100.00 0.80 - - - 1.47 100.00 0.80
6 Pek. Balok Beton 15/30 dan Topi Beton 10/15
- Bekisting M2 5.48 257,177.80 1,409,334.34 0.64 5.48 100.00 0.64 - - - 5.48 100.00 0.64
- Besi Beton Kg 111.36 20,560.54 2,289,523.28 1.04 111.36 100.00 1.04 - - - 111.36 100.00 1.04
- Beton K175 M3 0.41 1,199,480.49 492,986.48 0.22 0.41 100.00 0.22 - - - 0.41 100.00 0.22
JUMLAH III 43,220,484.33 19.71 19.71 - 19.71
IV PEKERJAAN TERALIS, KERAMIK DAN ACCESSORIES
1 Pek. Teralis Dinding Pagar M1 49.40 552,580.60 27,297,481.64 12.45 49.40 100.00 12.45 - - - 49.40 100.00 12.45
2 Pek. Teralis Pintu Gerbang Tengah dan Samping ( Pintu Sorong ) M1 7.64 1,213,405.60 9,270,418.78 4.23 7.64 100.00 4.23 - - - 7.64 100.00 4.23
3 Pas. Dinding Granit 80 x 80 Cm M2 7.68 428,147.50 3,288,172.80 1.50 7.68 100.00 1.50 - - - 7.68 100.00 1.50
4 Pas. Batu Alam Dinding dan Kolom Gerbang M2 11.52 415,299.50 4,784,250.24 2.18 11.52 100.00 2.18 - - - 11.52 100.00 2.18
5 Pek. Papan Nama Gerbang + Logo Kota + Logo Bakti Husada ( Acrylic ) Ls 1.00 9,500,000.00 9,500,000.00 4.33 - - - 1.00 100.00 4.33 1.00 100.00 4.33
JUMLAH IV 54,140,323.46 24.68 20.35 4.33 24.68
V PEKERJAAN PENGECATAN
1 Pek. Cat Tembok Dinding/Kolom 2x Cat Anti Lumut M2 95.79 35,827.00 3,431,868.33 1.56 - - - 95.79 100.00 1.56 95.79 100.00 1.56
2 Pek. Cat Besi Teralis 2x Cat M2 57.04 36,462.80 2,079,838.11 0.95 - - - 57.04 100.00 0.95 57.04 100.00 0.95
JUMLAH V 5,511,706.44 2.51 - 2.51 2.51
D. PEKERJAAN PENATAAN LAHAN PARKIR
1 Pek. Galian Tanah Cansteen M3 5.04 71,390.00 359,805.60 0.16 - - - 5.04 100.00 0.16 5.04 100.00 0.16
2 Pek. Urugan Tanah Didatangkan M3 96.00 110,880.00 10,644,480.00 4.85 - - - 20.00 20.83 1.01 20.00 20.83 1.01
3 Pek. Urugan Pasir Alas Cansteen/Rabat M3 12.84 219,956.00 2,824,235.04 1.29 - - - - - - - - -
4 Pek. Cansteen Pas. Batu Gunung 30/60, Camp. 1:4 M3 10.08 857,780.00 8,646,422.40 3.94 - - - - - - - - -
5 Pek. Plesteran Cansteen Camp. 1:3 M2 33.60 66,976.36 2,250,405.70 1.03 - - - - - - - - -
6 Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan Masuk M3 18.24 1,199,480.49 21,878,524.14 9.97 - - - - - - - - -
7 Pek. Pengecatan Cansteen Anti Lumut M2 33.60 35,827.00 1,203,787.20 0.55 - - - - - - - - -
JUMLAH D 47,807,660.07 21.80 - 1.18 1.18
E. PEKERJAAN REHAB/PERBAIKAN
1 Pek. Kramik Lantai 30/30 cm KM/WC M2 2.25 153,684.30 345,789.68 0.16 - - - - - - - - -
2 Pek. Granit Dinding 60/60 cm KM/WC M2 8.28 336,451.50 2,785,818.42 1.27 - - - - - - - - -
3 Pek. Instalasi Air Bersih + Accesories Pipa Ls 1.00 750,000.00 750,000.00 0.34 - - - - - - - - -
4 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 3" AW Ls 1.00 1,500,000.00 1,500,000.00 0.68 - - - - - - - - -
5 Pek. Pasangan Kloset Duduk Bh 1.00 3,382,786.00 3,382,786.00 1.54 - - - - - - - - -
6 Pek. Pasangan Kran Air Bh 1.00 93,104.00 93,104.00 0.04 - - - - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
7 Pek. Floor Drain Bh 1.00 54,736.00 54,736.00 0.02 - - - - - - - - -
8 Pengadaan Ember Air Bh 1.00 75,000.00 75,000.00 0.03 - - - - - - - - -
9 Pek. Pembuatan Septik Tank Unit 1.00 1,800,000.00 1,800,000.00 0.82 - - - - - - - - -
10 Pek. Rehab Atap/Turbin Ls 1.00 5,000,000.00 5,000,000.00 2.28 - - - - - - - - -
JUMLAH E 15,787,234.10 7.20 - - -
F. PEKERJAAN FINISHING DAN PEMBERSIHAN AKHIR
1 Pek. Pembersihan Akhir/Perapihan Ls 1.00 900,000.00 900,000.00 0.41 - - - - - - - - -
JUMLAH F 900,000.00 0.41 - - -
JUMLAH (REAL COST) ( A ) 219,336,157.63
PPN 10 % ( B ) 21,933,615.76
100.00 62.90 8.02 70.92
TOTAL COST ( A + B ) 241,269,773.40
DIBULATKAN 241,200,000.00

Kendari, 4 Oktober 2020


Disetujui Oleh Diperiksa Oleh Diperiksa Oleh Di Buat Oleh
Pejabat Pelaksana Teknis Kegiatan (PPTK) Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….
NIP…………………. NIP…………………. Site Engineer Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 28 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pek. Papan Nama Kantor dan Logo 1 Ls 1 Pasir Urug M3 Pasir Urug M3
2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 29 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pengecatan Tembok/Dinding Dengan Anti Lumut 47.9 M2 1 Pasir Urug M3 Pasir Urug M3
2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok 17.24 Kg Cat Tembok 50.00 Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 30 SEPTEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pengecatan Tembok/Dinding Dengan Anti Lumut 47.9 M2 1 Pasir Urug M3 Pasir Urug M3
2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok 17.24 Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 1 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pengecatan Besi teralis 28.52 M2 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi 8.56 Kg Cat Besi 20.00 Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 2 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pengecatan Besi teralis 28.52 M2 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi 8.56 Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 3 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pekerjaan Galian Tanah Cansteen 5.04 M3 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 4 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pekerjaan Urugan Tanah didatangkan 20 M3 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug 24.00 M3 Tanah Urug 24.00 M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN (MINGGUAN)

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR MINGGU : X (KE SEPULUH)


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI PERIODE : 5 SEPTEMBER 2020 S/D 11 OKTOBER 2020
TAHUN ANGGARAN : 2020 S/D MINGGU LALU : 70.92 %
LOKASI : KOTA KENDARI MINGGU INI : 9.07 %
S/D MINGGU INI : 79.99 %

KEMAJUAN PEKERJAAN
KONTRAK
MINGGU LALU MINGGU INI S/D MINGGU INI
VOL
NO URAIAN SAT
TOTAL HARGA SATUAN TOTAL JUMLAH BOBOT BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER
VOL VOL VOL
(Rp) HARGA (Rp) (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. PEKERJAAN PERSIAPAN / PENDAHULUAN


1 Pek. Pembersihan Lokasi/Pembongkaran WC Lama Ls 1.00 2,500,000.00 2,500,000.00 1.14 0.50 50.00 0.57 - - - 0.50 50.00 0.57
2 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 1,000,000.00 1,000,000.00 0.46 1.00 100.00 0.46 - - - 1.00 100.00 0.46
3 Pek. Pembuatan Barak Kerja/Gudang Bahan Ls 1.00 3,500,000.00 3,500,000.00 1.60 1.00 100.00 1.60 - - - 1.00 100.00 1.60
3 Administrasi, Dokumentasi dan Air Kerja Ls 1.00 1,250,000.00 1,250,000.00 0.57 0.50 50.00 0.28 - - - 0.50 50.00 0.28
4 Papan Nama Kegiatan Ls 1.00 150,000.00 150,000.00 0.07 1.00 100.00 0.07 - - - 1.00 100.00 0.07
JUMLAH A 8,400,000.00 3.83 2.97 - 2.97
B. PEK. BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK
- Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir Set 1.00 450,000.00 450,000.00 0.21 1.00 100.00 0.21 - - - 1.00 100.00 0.21
- Pembuatan Kartu Identitas Pekerja (KIP); Lbr 4.00 5,000.00 20,000.00 0.01 4.00 100.00 0.01 - - - 4.00 100.00 0.01
2 Sosialisasi, promosi, dan pelatihan;
Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Safety Talk
- Org 4.00 10,000.00 40,000.00 0.02 4.00 100.00 0.02 - - - 4.00 100.00 0.02
dan/atau Tool Box Meeting);
3 Alat Pelindung Kerja dan Alat Pelindung Diri
- Topi Pelindung (Safety Helmet); Bh 4.00 85,000.00 340,000.00 0.16 4.00 100.00 0.16 - - - 4.00 100.00 0.16
- Pelindung Mata Psg 4.00 65,000.00 260,000.00 0.12 4.00 100.00 0.12 - - - 4.00 100.00 0.12
- Sarung Tangan (Safety Gloves); Psg 4.00 20,000.00 80,000.00 0.04 4.00 100.00 0.04 - - - 4.00 100.00 0.04
- Sepatu Keselamatan (Safety Shoes); Psg 4.00 180,000.00 720,000.00 0.33 4.00 100.00 0.33 - - - 4.00 100.00 0.33
- Rompi Keselamatan (Safety Vest); Bh 4.00 50,000.00 200,000.00 0.09 4.00 100.00 0.09 - - - 4.00 100.00 0.09
4 Asuransi dan perizinan
- BPJS Ketenagakerjaan Dan Kesehatan Kerja; Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
5 Personel Keselamatan Konstruksi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Petugas K3 Ob 1.00 1,500,000.00 1,500,000.00 0.68 1.00 100.00 0.68 - - - 1.00 100.00 0.68
6 Fasilitas sarana, prasarana, dan alat kesehatan
- Peralatan P3K (Kotak P3K, Tandu,Tabung Oksigen, Obat Luka, Perban, dll) Ls 1.00 1,300,000.00 1,300,000.00 0.59 1.00 100.00 0.59 - - - 1.00 100.00 0.59
7 Rambu-rambu yang diperlukan
- Rambu Informasi dan Peringatan Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
8 Konsultasi dengan ahli terkait Keselamatan Konstruksi Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
9 Kegiatan dan peralatan terkait dengan pengendalian Bendera K3 Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
JUMLAH B 6,010,000.00 2.74 2.74 - 2.74
C. PEKERJAAN PAGAR
I. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi M3 20.51 71,390.00 1,464,454.20 0.67 20.51 100.00 0.67 - - - 20.51 100.00 0.67
2 Pek. Urugan Tanah Kembali M3 5.04 51,480.00 259,459.20 0.12 5.04 100.00 0.12 - - - 5.04 100.00 0.12
3 Pek. Urugan Pasir Alas Pondasi M3 1.68 219,956.00 369,526.08 0.17 1.68 100.00 0.17 - - - 1.68 100.00 0.17
JUMLAH I 2,093,439.48 0.95 0.95 - 0.95
II. PEKERJAAN BATU DAN PLESTERAN
1 Pas. Batu Kosong M3 5.04 452,951.40 2,282,875.06 1.04 5.04 100.00 1.04 - - - 5.04 100.00 1.04
2 Pas. Pondasi Batu Gunung 1 : 5 M3 19.04 822,701.00 15,664,227.04 7.14 19.04 100.00 7.14 - - - 19.04 100.00 7.14
3 Pas. Dinding Batu Bata 1 : 5 M2 41.42 121,558.80 5,034,357.70 2.30 41.42 100.00 2.30 - - - 41.42 100.00 2.30
4 Pas. Plesteran Dinding Batu Bata 1 : 5 M2 82.83 64,381.24 5,332,698.11 2.43 82.83 100.00 2.43 - - - 82.83 100.00 2.43
5 Pas. Plesteran Ciprat/Kamper 1 : 3 M2 32.11 66,976.36 2,150,610.92 0.98 32.11 100.00 0.98 - - - 32.11 100.00 0.98
6 Pas. Plesteran Pondasi + Acian M2 44.80 66,976.36 3,000,540.93 1.37 44.80 100.00 1.37 - - - 44.80 100.00 1.37
7 Pek. List Profil Ls 1.00 2,000,000.00 2,000,000.00 0.91 1.00 100.00 0.91 - - - 1.00 100.00 0.91
JUMLAH II 35,465,309.75 16.17 16.17 - 16.17
III. PEKERJAAN BESI DAN BETON
1 Pek. Beton Pondasi Poer Plat
- Bekisting M2 2.40 170,286.60 408,687.84 0.19 2.40 100.00 0.19 - - - 2.40 100.00 0.19
- Besi Beton Kg 24.72 20,560.54 508,194.87 0.23 24.72 100.00 0.23 - - - 24.72 100.00 0.23
- Beton K175 M3 0.60 1,199,480.49 719,688.29 0.33 0.60 100.00 0.33 - - - 0.60 100.00 0.33
2 Pek. Beton Sloof 15/20
- Bekisting M2 11.20 179,636.60 2,011,929.92 0.92 11.20 100.00 0.92 - - - 11.20 100.00 0.92
- Besi Beton Kg 322.18 20,560.54 6,624,233.02 3.02 322.18 100.00 3.02 - - - 322.18 100.00 3.02
- Beton K175 M3 1.68 1,199,480.49 2,015,127.22 0.92 1.68 100.00 0.92 - - - 1.68 100.00 0.92
3 Pek. Beton Sloof Gerbang 15/30
- Bekisting M2 3.00 179,636.60 538,909.80 0.25 3.00 100.00 0.25 - - - 3.00 100.00 0.25
- Besi Beton Kg 42.01 20,560.54 863,836.71 0.39 42.01 100.00 0.39 - - - 42.01 100.00 0.39
- Beton K175 M3 0.23 1,199,480.49 269,883.11 0.12 0.23 100.00 0.12 - - - 0.23 100.00 0.12
4 Pek. Beton Kolom 20/20
- Roster Beton Kolom Pracetak Motif (Dudukan+Tiang+Topi) Klm 18.00 575,000.00 10,350,000.00 4.72 18.00 100.00 4.72 - - - 18.00 100.00 4.72
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Besi Beton Kg 212.24 20,560.54 4,363,731.43 1.99 212.24 100.00 1.99 - - - 212.24 100.00 1.99
- Beton K175 M3 1.30 1,199,480.49 1,554,526.72 0.71 1.30 100.00 0.71 - - - 1.30 100.00 0.71
5 Pek. Beton Kolom 40/40 (Gerbang)
- Bekisting M2 14.72 249,587.80 3,673,932.42 1.68 14.72 100.00 1.68 - - - 14.72 100.00 1.68
- Besi Beton Kg 163.44 20,560.54 3,360,323.60 1.53 163.44 100.00 1.53 - - - 163.44 100.00 1.53
- Beton K175 M3 1.47 1,199,480.49 1,765,635.28 0.80 1.47 100.00 0.80 - - - 1.47 100.00 0.80
6 Pek. Balok Beton 15/30 dan Topi Beton 10/15
- Bekisting M2 5.48 257,177.80 1,409,334.34 0.64 5.48 100.00 0.64 - - - 5.48 100.00 0.64
- Besi Beton Kg 111.36 20,560.54 2,289,523.28 1.04 111.36 100.00 1.04 - - - 111.36 100.00 1.04
- Beton K175 M3 0.41 1,199,480.49 492,986.48 0.22 0.41 100.00 0.22 - - - 0.41 100.00 0.22
JUMLAH III 43,220,484.33 19.71 19.71 - 19.71
IV PEKERJAAN TERALIS, KERAMIK DAN ACCESSORIES
1 Pek. Teralis Dinding Pagar M1 49.40 552,580.60 27,297,481.64 12.45 49.40 100.00 12.45 - - - 49.40 100.00 12.45
2 Pek. Teralis Pintu Gerbang Tengah dan Samping ( Pintu Sorong ) M1 7.64 1,213,405.60 9,270,418.78 4.23 7.64 100.00 4.23 - - - 7.64 100.00 4.23
3 Pas. Dinding Granit 80 x 80 Cm M2 7.68 428,147.50 3,288,172.80 1.50 7.68 100.00 1.50 - - - 7.68 100.00 1.50
4 Pas. Batu Alam Dinding dan Kolom Gerbang M2 11.52 415,299.50 4,784,250.24 2.18 11.52 100.00 2.18 - - - 11.52 100.00 2.18
5 Pek. Papan Nama Gerbang + Logo Kota + Logo Bakti Husada ( Acrylic ) Ls 1.00 9,500,000.00 9,500,000.00 4.33 1.00 100.00 4.33 - - - 1.00 100.00 4.33
JUMLAH IV 54,140,323.46 24.68 24.68 - 24.68
V PEKERJAAN PENGECATAN
1 Pek. Cat Tembok Dinding/Kolom 2x Cat Anti Lumut M2 95.79 35,827.00 3,431,868.33 1.56 95.79 100.00 1.56 - - - 95.79 100.00 1.56
2 Pek. Cat Besi Teralis 2x Cat M2 57.04 36,462.80 2,079,838.11 0.95 57.04 100.00 0.95 - - - 57.04 100.00 0.95
JUMLAH V 5,511,706.44 2.51 2.51 - 2.51
D. PEKERJAAN PENATAAN LAHAN PARKIR
1 Pek. Galian Tanah Cansteen M3 5.04 71,390.00 359,805.60 0.16 5.04 100.00 0.16 - - - 5.04 100.00 0.16
2 Pek. Urugan Tanah Didatangkan M3 96.00 110,880.00 10,644,480.00 4.85 20.00 20.83 1.01 76.00 79.17 3.84 96.00 100.00 4.85
3 Pek. Urugan Pasir Alas Cansteen/Rabat M3 12.84 219,956.00 2,824,235.04 1.29 - - - 12.84 100.00 1.29 12.84 100.00 1.29
4 Pek. Cansteen Pas. Batu Gunung 30/60, Camp. 1:4 M3 10.08 857,780.00 8,646,422.40 3.94 - - - 10.08 100.00 3.94 10.08 100.00 3.94
5 Pek. Plesteran Cansteen Camp. 1:3 M2 33.60 66,976.36 2,250,405.70 1.03 - - - - - - - - -
6 Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan Masuk M3 18.24 1,199,480.49 21,878,524.14 9.97 - - - - - - - - -
7 Pek. Pengecatan Cansteen Anti Lumut M2 33.60 35,827.00 1,203,787.20 0.55 - - - - - - - - -
JUMLAH D 47,807,660.07 21.80 1.18 9.07 10.25
E. PEKERJAAN REHAB/PERBAIKAN
1 Pek. Kramik Lantai 30/30 cm KM/WC M2 2.25 153,684.30 345,789.68 0.16 - - - - - - - - -
2 Pek. Granit Dinding 60/60 cm KM/WC M2 8.28 336,451.50 2,785,818.42 1.27 - - - - - - - - -
3 Pek. Instalasi Air Bersih + Accesories Pipa Ls 1.00 750,000.00 750,000.00 0.34 - - - - - - - - -
4 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 3" AW Ls 1.00 1,500,000.00 1,500,000.00 0.68 - - - - - - - - -
5 Pek. Pasangan Kloset Duduk Bh 1.00 3,382,786.00 3,382,786.00 1.54 - - - - - - - - -
6 Pek. Pasangan Kran Air Bh 1.00 93,104.00 93,104.00 0.04 - - - - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
7 Pek. Floor Drain Bh 1.00 54,736.00 54,736.00 0.02 - - - - - - - - -
8 Pengadaan Ember Air Bh 1.00 75,000.00 75,000.00 0.03 - - - - - - - - -
9 Pek. Pembuatan Septik Tank Unit 1.00 1,800,000.00 1,800,000.00 0.82 - - - - - - - - -
10 Pek. Rehab Atap/Turbin Ls 1.00 5,000,000.00 5,000,000.00 2.28 - - - - - - - - -
JUMLAH E 15,787,234.10 7.20 - - -
F. PEKERJAAN FINISHING DAN PEMBERSIHAN AKHIR
1 Pek. Pembersihan Akhir/Perapihan Ls 1.00 900,000.00 900,000.00 0.41 - - - - - - - - -
JUMLAH F 900,000.00 0.41 - - -
JUMLAH (REAL COST) ( A ) 219,336,157.63
PPN 10 % ( B ) 21,933,615.76
100.00 70.92 9.07 79.99
TOTAL COST ( A + B ) 241,269,773.40
DIBULATKAN 241,200,000.00

Kendari, 11 Oktober 2020


Disetujui Oleh Diperiksa Oleh Diperiksa Oleh Di Buat Oleh
Pejabat Pelaksana Teknis Kegiatan (PPTK) Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….
NIP…………………. NIP…………………. Site Engineer Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 5 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pekerjaan Urugan Tanah didatangkan 19 M3 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug 22.80 M3 Tanah Urug 22.80 M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 6 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pekerjaan Urugan Tanah didatangkan 19 M3 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug 22.80 M3 Tanah Urug 22.80 M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 7 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pekerjaan Urugan Tanah didatangkan 19 M3 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug 22.80 M3 Tanah Urug 22.80 M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 8 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pekerjaan Urugan Tanah didatangkan 19 M3 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug 22.80 M3 Tanah Urug 22.80 M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 9 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pekerjaan Urugan Pasir Alas Lantai 12.84 M3 1 Pasir Urug 15.41 M3 Pasir Urug 16.00 M3
2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 10 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pek. Pas. Batu Gunung Cansteen 1 : 4 5.04 M3 1 Pasir Urug M3 Pasir Urug M3
2 Pasir Pasang 2.62 M3 Pasir Pasang 10.00 M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 16.43 Zak Semen 50.00 Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah 6.05 M3 Batu Belah 20.00 M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 11 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pek. Pas. Batu Gunung Cansteen 1 : 4 5.04 M3 1 Pasir Urug M3 Pasir Urug M3
2 Pasir Pasang 2.62 M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 16.43 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah 6.05 M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN (MINGGUAN)

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR MINGGU : XI (KE SEBELAS)


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI PERIODE : 12 OKTOBER 2020 S/D 19 OKTOBER 2020
TAHUN ANGGARAN : 2020 S/D MINGGU LALU : 79.99 %
LOKASI : KOTA KENDARI MINGGU INI : 9.97 %
S/D MINGGU INI : 89.96 %

KEMAJUAN PEKERJAAN
KONTRAK
MINGGU LALU MINGGU INI S/D MINGGU INI
VOL
NO URAIAN SAT
TOTAL HARGA SATUAN TOTAL JUMLAH BOBOT BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER
VOL VOL VOL
(Rp) HARGA (Rp) (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. PEKERJAAN PERSIAPAN / PENDAHULUAN


1 Pek. Pembersihan Lokasi/Pembongkaran WC Lama Ls 1.00 2,500,000.00 2,500,000.00 1.14 0.50 50.00 0.57 - - - 0.50 50.00 0.57
2 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 1,000,000.00 1,000,000.00 0.46 1.00 100.00 0.46 - - - 1.00 100.00 0.46
3 Pek. Pembuatan Barak Kerja/Gudang Bahan Ls 1.00 3,500,000.00 3,500,000.00 1.60 1.00 100.00 1.60 - - - 1.00 100.00 1.60
3 Administrasi, Dokumentasi dan Air Kerja Ls 1.00 1,250,000.00 1,250,000.00 0.57 0.50 50.00 0.28 - - - 0.50 50.00 0.28
4 Papan Nama Kegiatan Ls 1.00 150,000.00 150,000.00 0.07 1.00 100.00 0.07 - - - 1.00 100.00 0.07
JUMLAH A 8,400,000.00 3.83 2.97 - 2.97
B. PEK. BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK
- Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir Set 1.00 450,000.00 450,000.00 0.21 1.00 100.00 0.21 - - - 1.00 100.00 0.21
- Pembuatan Kartu Identitas Pekerja (KIP); Lbr 4.00 5,000.00 20,000.00 0.01 4.00 100.00 0.01 - - - 4.00 100.00 0.01
2 Sosialisasi, promosi, dan pelatihan;
Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Safety Talk
- Org 4.00 10,000.00 40,000.00 0.02 4.00 100.00 0.02 - - - 4.00 100.00 0.02
dan/atau Tool Box Meeting);
3 Alat Pelindung Kerja dan Alat Pelindung Diri
- Topi Pelindung (Safety Helmet); Bh 4.00 85,000.00 340,000.00 0.16 4.00 100.00 0.16 - - - 4.00 100.00 0.16
- Pelindung Mata Psg 4.00 65,000.00 260,000.00 0.12 4.00 100.00 0.12 - - - 4.00 100.00 0.12
- Sarung Tangan (Safety Gloves); Psg 4.00 20,000.00 80,000.00 0.04 4.00 100.00 0.04 - - - 4.00 100.00 0.04
- Sepatu Keselamatan (Safety Shoes); Psg 4.00 180,000.00 720,000.00 0.33 4.00 100.00 0.33 - - - 4.00 100.00 0.33
- Rompi Keselamatan (Safety Vest); Bh 4.00 50,000.00 200,000.00 0.09 4.00 100.00 0.09 - - - 4.00 100.00 0.09
4 Asuransi dan perizinan
- BPJS Ketenagakerjaan Dan Kesehatan Kerja; Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
5 Personel Keselamatan Konstruksi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Petugas K3 Ob 1.00 1,500,000.00 1,500,000.00 0.68 1.00 100.00 0.68 - - - 1.00 100.00 0.68
6 Fasilitas sarana, prasarana, dan alat kesehatan
- Peralatan P3K (Kotak P3K, Tandu,Tabung Oksigen, Obat Luka, Perban, dll) Ls 1.00 1,300,000.00 1,300,000.00 0.59 1.00 100.00 0.59 - - - 1.00 100.00 0.59
7 Rambu-rambu yang diperlukan
- Rambu Informasi dan Peringatan Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
8 Konsultasi dengan ahli terkait Keselamatan Konstruksi Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
9 Kegiatan dan peralatan terkait dengan pengendalian Bendera K3 Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
JUMLAH B 6,010,000.00 2.74 2.74 - 2.74
C. PEKERJAAN PAGAR
I. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi M3 20.51 71,390.00 1,464,454.20 0.67 20.51 100.00 0.67 - - - 20.51 100.00 0.67
2 Pek. Urugan Tanah Kembali M3 5.04 51,480.00 259,459.20 0.12 5.04 100.00 0.12 - - - 5.04 100.00 0.12
3 Pek. Urugan Pasir Alas Pondasi M3 1.68 219,956.00 369,526.08 0.17 1.68 100.00 0.17 - - - 1.68 100.00 0.17
JUMLAH I 2,093,439.48 0.95 0.95 - 0.95
II. PEKERJAAN BATU DAN PLESTERAN
1 Pas. Batu Kosong M3 5.04 452,951.40 2,282,875.06 1.04 5.04 100.00 1.04 - - - 5.04 100.00 1.04
2 Pas. Pondasi Batu Gunung 1 : 5 M3 19.04 822,701.00 15,664,227.04 7.14 19.04 100.00 7.14 - - - 19.04 100.00 7.14
3 Pas. Dinding Batu Bata 1 : 5 M2 41.42 121,558.80 5,034,357.70 2.30 41.42 100.00 2.30 - - - 41.42 100.00 2.30
4 Pas. Plesteran Dinding Batu Bata 1 : 5 M2 82.83 64,381.24 5,332,698.11 2.43 82.83 100.00 2.43 - - - 82.83 100.00 2.43
5 Pas. Plesteran Ciprat/Kamper 1 : 3 M2 32.11 66,976.36 2,150,610.92 0.98 32.11 100.00 0.98 - - - 32.11 100.00 0.98
6 Pas. Plesteran Pondasi + Acian M2 44.80 66,976.36 3,000,540.93 1.37 44.80 100.00 1.37 - - - 44.80 100.00 1.37
7 Pek. List Profil Ls 1.00 2,000,000.00 2,000,000.00 0.91 1.00 100.00 0.91 - - - 1.00 100.00 0.91
JUMLAH II 35,465,309.75 16.17 16.17 - 16.17
III. PEKERJAAN BESI DAN BETON
1 Pek. Beton Pondasi Poer Plat
- Bekisting M2 2.40 170,286.60 408,687.84 0.19 2.40 100.00 0.19 - - - 2.40 100.00 0.19
- Besi Beton Kg 24.72 20,560.54 508,194.87 0.23 24.72 100.00 0.23 - - - 24.72 100.00 0.23
- Beton K175 M3 0.60 1,199,480.49 719,688.29 0.33 0.60 100.00 0.33 - - - 0.60 100.00 0.33
2 Pek. Beton Sloof 15/20
- Bekisting M2 11.20 179,636.60 2,011,929.92 0.92 11.20 100.00 0.92 - - - 11.20 100.00 0.92
- Besi Beton Kg 322.18 20,560.54 6,624,233.02 3.02 322.18 100.00 3.02 - - - 322.18 100.00 3.02
- Beton K175 M3 1.68 1,199,480.49 2,015,127.22 0.92 1.68 100.00 0.92 - - - 1.68 100.00 0.92
3 Pek. Beton Sloof Gerbang 15/30
- Bekisting M2 3.00 179,636.60 538,909.80 0.25 3.00 100.00 0.25 - - - 3.00 100.00 0.25
- Besi Beton Kg 42.01 20,560.54 863,836.71 0.39 42.01 100.00 0.39 - - - 42.01 100.00 0.39
- Beton K175 M3 0.23 1,199,480.49 269,883.11 0.12 0.23 100.00 0.12 - - - 0.23 100.00 0.12
4 Pek. Beton Kolom 20/20
- Roster Beton Kolom Pracetak Motif (Dudukan+Tiang+Topi) Klm 18.00 575,000.00 10,350,000.00 4.72 18.00 100.00 4.72 - - - 18.00 100.00 4.72
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Besi Beton Kg 212.24 20,560.54 4,363,731.43 1.99 212.24 100.00 1.99 - - - 212.24 100.00 1.99
- Beton K175 M3 1.30 1,199,480.49 1,554,526.72 0.71 1.30 100.00 0.71 - - - 1.30 100.00 0.71
5 Pek. Beton Kolom 40/40 (Gerbang)
- Bekisting M2 14.72 249,587.80 3,673,932.42 1.68 14.72 100.00 1.68 - - - 14.72 100.00 1.68
- Besi Beton Kg 163.44 20,560.54 3,360,323.60 1.53 163.44 100.00 1.53 - - - 163.44 100.00 1.53
- Beton K175 M3 1.47 1,199,480.49 1,765,635.28 0.80 1.47 100.00 0.80 - - - 1.47 100.00 0.80
6 Pek. Balok Beton 15/30 dan Topi Beton 10/15
- Bekisting M2 5.48 257,177.80 1,409,334.34 0.64 5.48 100.00 0.64 - - - 5.48 100.00 0.64
- Besi Beton Kg 111.36 20,560.54 2,289,523.28 1.04 111.36 100.00 1.04 - - - 111.36 100.00 1.04
- Beton K175 M3 0.41 1,199,480.49 492,986.48 0.22 0.41 100.00 0.22 - - - 0.41 100.00 0.22
JUMLAH III 43,220,484.33 19.71 19.71 - 19.71
IV PEKERJAAN TERALIS, KERAMIK DAN ACCESSORIES
1 Pek. Teralis Dinding Pagar M1 49.40 552,580.60 27,297,481.64 12.45 49.40 100.00 12.45 - - - 49.40 100.00 12.45
2 Pek. Teralis Pintu Gerbang Tengah dan Samping ( Pintu Sorong ) M1 7.64 1,213,405.60 9,270,418.78 4.23 7.64 100.00 4.23 - - - 7.64 100.00 4.23
3 Pas. Dinding Granit 80 x 80 Cm M2 7.68 428,147.50 3,288,172.80 1.50 7.68 100.00 1.50 - - - 7.68 100.00 1.50
4 Pas. Batu Alam Dinding dan Kolom Gerbang M2 11.52 415,299.50 4,784,250.24 2.18 11.52 100.00 2.18 - - - 11.52 100.00 2.18
5 Pek. Papan Nama Gerbang + Logo Kota + Logo Bakti Husada ( Acrylic ) Ls 1.00 9,500,000.00 9,500,000.00 4.33 1.00 100.00 4.33 - - - 1.00 100.00 4.33
JUMLAH IV 54,140,323.46 24.68 24.68 - 24.68
V PEKERJAAN PENGECATAN
1 Pek. Cat Tembok Dinding/Kolom 2x Cat Anti Lumut M2 95.79 35,827.00 3,431,868.33 1.56 95.79 100.00 1.56 - - - 95.79 100.00 1.56
2 Pek. Cat Besi Teralis 2x Cat M2 57.04 36,462.80 2,079,838.11 0.95 57.04 100.00 0.95 - - - 57.04 100.00 0.95
JUMLAH V 5,511,706.44 2.51 2.51 - 2.51
D. PEKERJAAN PENATAAN LAHAN PARKIR
1 Pek. Galian Tanah Cansteen M3 5.04 71,390.00 359,805.60 0.16 5.04 100.00 0.16 - - - 5.04 100.00 0.16
2 Pek. Urugan Tanah Didatangkan M3 96.00 110,880.00 10,644,480.00 4.85 96.00 100.00 4.85 - - - 96.00 100.00 4.85
3 Pek. Urugan Pasir Alas Cansteen/Rabat M3 12.84 219,956.00 2,824,235.04 1.29 12.84 100.00 1.29 - - - 12.84 100.00 1.29
4 Pek. Cansteen Pas. Batu Gunung 30/60, Camp. 1:4 M3 10.08 857,780.00 8,646,422.40 3.94 10.08 100.00 3.94 - - - 10.08 100.00 3.94
5 Pek. Plesteran Cansteen Camp. 1:3 M2 33.60 66,976.36 2,250,405.70 1.03 - - - - - - - - -
6 Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan Masuk M3 18.24 1,199,480.49 21,878,524.14 9.97 - - - 18.24 100.00 9.97 18.24 100.00 9.97
7 Pek. Pengecatan Cansteen Anti Lumut M2 33.60 35,827.00 1,203,787.20 0.55 - - - - - - - - -
JUMLAH D 47,807,660.07 21.80 10.25 9.97 20.22
E. PEKERJAAN REHAB/PERBAIKAN
1 Pek. Kramik Lantai 30/30 cm KM/WC M2 2.25 153,684.30 345,789.68 0.16 - - - - - - - - -
2 Pek. Granit Dinding 60/60 cm KM/WC M2 8.28 336,451.50 2,785,818.42 1.27 - - - - - - - - -
3 Pek. Instalasi Air Bersih + Accesories Pipa Ls 1.00 750,000.00 750,000.00 0.34 - - - - - - - - -
4 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 3" AW Ls 1.00 1,500,000.00 1,500,000.00 0.68 - - - - - - - - -
5 Pek. Pasangan Kloset Duduk Bh 1.00 3,382,786.00 3,382,786.00 1.54 - - - - - - - - -
6 Pek. Pasangan Kran Air Bh 1.00 93,104.00 93,104.00 0.04 - - - - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
7 Pek. Floor Drain Bh 1.00 54,736.00 54,736.00 0.02 - - - - - - - - -
8 Pengadaan Ember Air Bh 1.00 75,000.00 75,000.00 0.03 - - - - - - - - -
9 Pek. Pembuatan Septik Tank Unit 1.00 1,800,000.00 1,800,000.00 0.82 - - - - - - - - -
10 Pek. Rehab Atap/Turbin Ls 1.00 5,000,000.00 5,000,000.00 2.28 - - - - - - - - -
JUMLAH E 15,787,234.10 7.20 - - -
F. PEKERJAAN FINISHING DAN PEMBERSIHAN AKHIR
1 Pek. Pembersihan Akhir/Perapihan Ls 1.00 900,000.00 900,000.00 0.41 - - - - - - - - -
JUMLAH F 900,000.00 0.41 - - -
JUMLAH (REAL COST) ( A ) 219,336,157.63
PPN 10 % ( B ) 21,933,615.76
100.00 79.99 9.97 89.96
TOTAL COST ( A + B ) 241,269,773.40
DIBULATKAN 241,200,000.00

Kendari, 19 Oktober 2020


Disetujui Oleh Diperiksa Oleh Diperiksa Oleh Di Buat Oleh
Pejabat Pelaksana Teknis Kegiatan (PPTK) Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….
NIP…………………. NIP…………………. Site Engineer Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 12 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan 1 Pasir Urug M3 Pasir Urug M3
1 2.28 M3
Masuk 2 Pasir Pasang 1.73 M3 Pasir Pasang 10.00 M3
3 Kerikil/Suplit 2.35 M3 Kerikil/Suplit 10.00 M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 14.87 Zak Semen 50.00 Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 13 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan 1 Pasir Urug M3 Pasir Urug M3
1 2.28 M3
Masuk 2 Pasir Pasang 1.73 M3 Pasir Pasang M3
3 Kerikil/Suplit 2.35 M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 14.87 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 14 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan 1 Pasir Urug M3 Pasir Urug M3
1 2.28 M3
Masuk 2 Pasir Pasang 1.73 M3 Pasir Pasang M3
3 Kerikil/Suplit 2.35 M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 14.87 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 15 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan 1 Pasir Urug M3 Pasir Urug M3
1 2.28 M3
Masuk 2 Pasir Pasang 1.73 M3 Pasir Pasang M3
3 Kerikil/Suplit 2.35 M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 14.87 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 16 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan 1 Pasir Urug M3 Pasir Urug M3
1 2.28 M3
Masuk 2 Pasir Pasang 1.73 M3 Pasir Pasang M3
3 Kerikil/Suplit 2.35 M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 14.87 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 17 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan 1 Pasir Urug M3 Pasir Urug M3
1 2.28 M3
Masuk 2 Pasir Pasang 1.73 M3 Pasir Pasang M3
3 Kerikil/Suplit 2.35 M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 14.87 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 18 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan 1 Pasir Urug M3 Pasir Urug M3
1 2.28 M3
Masuk 2 Pasir Pasang 1.73 M3 Pasir Pasang M3
3 Kerikil/Suplit 2.35 M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 14.87 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 19 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan 1 Pasir Urug M3 Pasir Urug M3
1 2.28 M3
Masuk 2 Pasir Pasang 1.73 M3 Pasir Pasang M3
3 Kerikil/Suplit 2.35 M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 14.87 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN (MINGGUAN)

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR MINGGU : XII (KE DUA BELAS)
PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI PERIODE : 20 OKTOBER 2020 S/D 27 OKTOBER 2020
TAHUN ANGGARAN : 2020 S/D MINGGU LALU : 89.96 %
LOKASI : KOTA KENDARI MINGGU INI : 5.25 %
S/D MINGGU INI : 95.21 %

KEMAJUAN PEKERJAAN
KONTRAK
MINGGU LALU MINGGU INI S/D MINGGU INI
VOL
NO URAIAN SAT
TOTAL HARGA SATUAN TOTAL JUMLAH BOBOT BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER
VOL VOL VOL
(Rp) HARGA (Rp) (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. PEKERJAAN PERSIAPAN / PENDAHULUAN


1 Pek. Pembersihan Lokasi/Pembongkaran WC Lama Ls 1.00 2,500,000.00 2,500,000.00 1.14 0.50 50.00 0.57 0.50 50.00 0.57 1.00 100.00 1.14
2 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 1,000,000.00 1,000,000.00 0.46 1.00 100.00 0.46 - - - 1.00 100.00 0.46
3 Pek. Pembuatan Barak Kerja/Gudang Bahan Ls 1.00 3,500,000.00 3,500,000.00 1.60 1.00 100.00 1.60 - - - 1.00 100.00 1.60
3 Administrasi, Dokumentasi dan Air Kerja Ls 1.00 1,250,000.00 1,250,000.00 0.57 0.50 50.00 0.28 - - - 0.50 50.00 0.28
4 Papan Nama Kegiatan Ls 1.00 150,000.00 150,000.00 0.07 1.00 100.00 0.07 - - - 1.00 100.00 0.07
JUMLAH A 8,400,000.00 3.83 2.97 0.57 3.54
B. PEK. BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK
- Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir Set 1.00 450,000.00 450,000.00 0.21 1.00 100.00 0.21 - - - 1.00 100.00 0.21
- Pembuatan Kartu Identitas Pekerja (KIP); Lbr 4.00 5,000.00 20,000.00 0.01 4.00 100.00 0.01 - - - 4.00 100.00 0.01
2 Sosialisasi, promosi, dan pelatihan;
Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Safety Talk
- Org 4.00 10,000.00 40,000.00 0.02 4.00 100.00 0.02 - - - 4.00 100.00 0.02
dan/atau Tool Box Meeting);
3 Alat Pelindung Kerja dan Alat Pelindung Diri
- Topi Pelindung (Safety Helmet); Bh 4.00 85,000.00 340,000.00 0.16 4.00 100.00 0.16 - - - 4.00 100.00 0.16
- Pelindung Mata Psg 4.00 65,000.00 260,000.00 0.12 4.00 100.00 0.12 - - - 4.00 100.00 0.12
- Sarung Tangan (Safety Gloves); Psg 4.00 20,000.00 80,000.00 0.04 4.00 100.00 0.04 - - - 4.00 100.00 0.04
- Sepatu Keselamatan (Safety Shoes); Psg 4.00 180,000.00 720,000.00 0.33 4.00 100.00 0.33 - - - 4.00 100.00 0.33
- Rompi Keselamatan (Safety Vest); Bh 4.00 50,000.00 200,000.00 0.09 4.00 100.00 0.09 - - - 4.00 100.00 0.09
4 Asuransi dan perizinan
- BPJS Ketenagakerjaan Dan Kesehatan Kerja; Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
5 Personel Keselamatan Konstruksi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Petugas K3 Ob 1.00 1,500,000.00 1,500,000.00 0.68 1.00 100.00 0.68 - - - 1.00 100.00 0.68
6 Fasilitas sarana, prasarana, dan alat kesehatan
- Peralatan P3K (Kotak P3K, Tandu,Tabung Oksigen, Obat Luka, Perban, dll) Ls 1.00 1,300,000.00 1,300,000.00 0.59 1.00 100.00 0.59 - - - 1.00 100.00 0.59
7 Rambu-rambu yang diperlukan
- Rambu Informasi dan Peringatan Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
8 Konsultasi dengan ahli terkait Keselamatan Konstruksi Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
9 Kegiatan dan peralatan terkait dengan pengendalian Bendera K3 Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
JUMLAH B 6,010,000.00 2.74 2.74 - 2.74
C. PEKERJAAN PAGAR
I. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi M3 20.51 71,390.00 1,464,454.20 0.67 20.51 100.00 0.67 - - - 20.51 100.00 0.67
2 Pek. Urugan Tanah Kembali M3 5.04 51,480.00 259,459.20 0.12 5.04 100.00 0.12 - - - 5.04 100.00 0.12
3 Pek. Urugan Pasir Alas Pondasi M3 1.68 219,956.00 369,526.08 0.17 1.68 100.00 0.17 - - - 1.68 100.00 0.17
JUMLAH I 2,093,439.48 0.95 0.95 - 0.95
II. PEKERJAAN BATU DAN PLESTERAN
1 Pas. Batu Kosong M3 5.04 452,951.40 2,282,875.06 1.04 5.04 100.00 1.04 - - - 5.04 100.00 1.04
2 Pas. Pondasi Batu Gunung 1 : 5 M3 19.04 822,701.00 15,664,227.04 7.14 19.04 100.00 7.14 - - - 19.04 100.00 7.14
3 Pas. Dinding Batu Bata 1 : 5 M2 41.42 121,558.80 5,034,357.70 2.30 41.42 100.00 2.30 - - - 41.42 100.00 2.30
4 Pas. Plesteran Dinding Batu Bata 1 : 5 M2 82.83 64,381.24 5,332,698.11 2.43 82.83 100.00 2.43 - - - 82.83 100.00 2.43
5 Pas. Plesteran Ciprat/Kamper 1 : 3 M2 32.11 66,976.36 2,150,610.92 0.98 32.11 100.00 0.98 - - - 32.11 100.00 0.98
6 Pas. Plesteran Pondasi + Acian M2 44.80 66,976.36 3,000,540.93 1.37 44.80 100.00 1.37 - - - 44.80 100.00 1.37
7 Pek. List Profil Ls 1.00 2,000,000.00 2,000,000.00 0.91 1.00 100.00 0.91 - - - 1.00 100.00 0.91
JUMLAH II 35,465,309.75 16.17 16.17 - 16.17
III. PEKERJAAN BESI DAN BETON
1 Pek. Beton Pondasi Poer Plat
- Bekisting M2 2.40 170,286.60 408,687.84 0.19 2.40 100.00 0.19 - - - 2.40 100.00 0.19
- Besi Beton Kg 24.72 20,560.54 508,194.87 0.23 24.72 100.00 0.23 - - - 24.72 100.00 0.23
- Beton K175 M3 0.60 1,199,480.49 719,688.29 0.33 0.60 100.00 0.33 - - - 0.60 100.00 0.33
2 Pek. Beton Sloof 15/20
- Bekisting M2 11.20 179,636.60 2,011,929.92 0.92 11.20 100.00 0.92 - - - 11.20 100.00 0.92
- Besi Beton Kg 322.18 20,560.54 6,624,233.02 3.02 322.18 100.00 3.02 - - - 322.18 100.00 3.02
- Beton K175 M3 1.68 1,199,480.49 2,015,127.22 0.92 1.68 100.00 0.92 - - - 1.68 100.00 0.92
3 Pek. Beton Sloof Gerbang 15/30
- Bekisting M2 3.00 179,636.60 538,909.80 0.25 3.00 100.00 0.25 - - - 3.00 100.00 0.25
- Besi Beton Kg 42.01 20,560.54 863,836.71 0.39 42.01 100.00 0.39 - - - 42.01 100.00 0.39
- Beton K175 M3 0.23 1,199,480.49 269,883.11 0.12 0.23 100.00 0.12 - - - 0.23 100.00 0.12
4 Pek. Beton Kolom 20/20
- Roster Beton Kolom Pracetak Motif (Dudukan+Tiang+Topi) Klm 18.00 575,000.00 10,350,000.00 4.72 18.00 100.00 4.72 - - - 18.00 100.00 4.72
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Besi Beton Kg 212.24 20,560.54 4,363,731.43 1.99 212.24 100.00 1.99 - - - 212.24 100.00 1.99
- Beton K175 M3 1.30 1,199,480.49 1,554,526.72 0.71 1.30 100.00 0.71 - - - 1.30 100.00 0.71
5 Pek. Beton Kolom 40/40 (Gerbang)
- Bekisting M2 14.72 249,587.80 3,673,932.42 1.68 14.72 100.00 1.68 - - - 14.72 100.00 1.68
- Besi Beton Kg 163.44 20,560.54 3,360,323.60 1.53 163.44 100.00 1.53 - - - 163.44 100.00 1.53
- Beton K175 M3 1.47 1,199,480.49 1,765,635.28 0.80 1.47 100.00 0.80 - - - 1.47 100.00 0.80
6 Pek. Balok Beton 15/30 dan Topi Beton 10/15
- Bekisting M2 5.48 257,177.80 1,409,334.34 0.64 5.48 100.00 0.64 - - - 5.48 100.00 0.64
- Besi Beton Kg 111.36 20,560.54 2,289,523.28 1.04 111.36 100.00 1.04 - - - 111.36 100.00 1.04
- Beton K175 M3 0.41 1,199,480.49 492,986.48 0.22 0.41 100.00 0.22 - - - 0.41 100.00 0.22
JUMLAH III 43,220,484.33 19.71 19.71 - 19.71
IV PEKERJAAN TERALIS, KERAMIK DAN ACCESSORIES
1 Pek. Teralis Dinding Pagar M1 49.40 552,580.60 27,297,481.64 12.45 49.40 100.00 12.45 - - - 49.40 100.00 12.45
2 Pek. Teralis Pintu Gerbang Tengah dan Samping ( Pintu Sorong ) M1 7.64 1,213,405.60 9,270,418.78 4.23 7.64 100.00 4.23 - - - 7.64 100.00 4.23
3 Pas. Dinding Granit 80 x 80 Cm M2 7.68 428,147.50 3,288,172.80 1.50 7.68 100.00 1.50 - - - 7.68 100.00 1.50
4 Pas. Batu Alam Dinding dan Kolom Gerbang M2 11.52 415,299.50 4,784,250.24 2.18 11.52 100.00 2.18 - - - 11.52 100.00 2.18
5 Pek. Papan Nama Gerbang + Logo Kota + Logo Bakti Husada ( Acrylic ) Ls 1.00 9,500,000.00 9,500,000.00 4.33 1.00 100.00 4.33 - - - 1.00 100.00 4.33
JUMLAH IV 54,140,323.46 24.68 24.68 - 24.68
V PEKERJAAN PENGECATAN
1 Pek. Cat Tembok Dinding/Kolom 2x Cat Anti Lumut M2 95.79 35,827.00 3,431,868.33 1.56 95.79 100.00 1.56 - - - 95.79 100.00 1.56
2 Pek. Cat Besi Teralis 2x Cat M2 57.04 36,462.80 2,079,838.11 0.95 57.04 100.00 0.95 - - - 57.04 100.00 0.95
JUMLAH V 5,511,706.44 2.51 2.51 - 2.51
D. PEKERJAAN PENATAAN LAHAN PARKIR
1 Pek. Galian Tanah Cansteen M3 5.04 71,390.00 359,805.60 0.16 5.04 100.00 0.16 - - - 5.04 100.00 0.16
2 Pek. Urugan Tanah Didatangkan M3 96.00 110,880.00 10,644,480.00 4.85 96.00 100.00 4.85 - - - 96.00 100.00 4.85
3 Pek. Urugan Pasir Alas Cansteen/Rabat M3 12.84 219,956.00 2,824,235.04 1.29 12.84 100.00 1.29 - - - 12.84 100.00 1.29
4 Pek. Cansteen Pas. Batu Gunung 30/60, Camp. 1:4 M3 10.08 857,780.00 8,646,422.40 3.94 10.08 100.00 3.94 - - - 10.08 100.00 3.94
5 Pek. Plesteran Cansteen Camp. 1:3 M2 33.60 66,976.36 2,250,405.70 1.03 - - - 33.60 100.00 1.03 33.60 100.00 1.03
6 Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan Masuk M3 18.24 1,199,480.49 21,878,524.14 9.97 18.24 100.00 9.97 - - - 18.24 100.00 9.97
7 Pek. Pengecatan Cansteen Anti Lumut M2 33.60 35,827.00 1,203,787.20 0.55 - - - 33.60 100.00 0.55 33.60 100.00 0.55
JUMLAH D 47,807,660.07 21.80 20.22 1.57 21.80
E. PEKERJAAN REHAB/PERBAIKAN
1 Pek. Kramik Lantai 30/30 cm KM/WC M2 2.25 153,684.30 345,789.68 0.16 - - - - - - - - -
2 Pek. Granit Dinding 60/60 cm KM/WC M2 8.28 336,451.50 2,785,818.42 1.27 - - - - - - - - -
3 Pek. Instalasi Air Bersih + Accesories Pipa Ls 1.00 750,000.00 750,000.00 0.34 - - - - - - - - -
4 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 3" AW Ls 1.00 1,500,000.00 1,500,000.00 0.68 - - - - - - - - -
5 Pek. Pasangan Kloset Duduk Bh 1.00 3,382,786.00 3,382,786.00 1.54 - - - - - - - - -
6 Pek. Pasangan Kran Air Bh 1.00 93,104.00 93,104.00 0.04 - - - - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
7 Pek. Floor Drain Bh 1.00 54,736.00 54,736.00 0.02 - - - - - - - - -
8 Pengadaan Ember Air Bh 1.00 75,000.00 75,000.00 0.03 - - - - - - - - -
9 Pek. Pembuatan Septik Tank Unit 1.00 1,800,000.00 1,800,000.00 0.82 - - - 1.00 100.00 0.82 1.00 100.00 0.82
10 Pek. Rehab Atap/Turbin Ls 1.00 5,000,000.00 5,000,000.00 2.28 - - - 1.00 100.00 2.28 1.00 100.00 2.28
JUMLAH E 15,787,234.10 7.20 - 3.10 3.10
F. PEKERJAAN FINISHING DAN PEMBERSIHAN AKHIR
1 Pek. Pembersihan Akhir/Perapihan Ls 1.00 900,000.00 900,000.00 0.41 - - - - - - - - -
JUMLAH F 900,000.00 0.41 - - -
JUMLAH (REAL COST) ( A ) 219,336,157.63
PPN 10 % ( B ) 21,933,615.76
100.00 89.96 5.25 95.21
TOTAL COST ( A + B ) 241,269,773.40
DIBULATKAN 241,200,000.00

Kendari, 27 Oktober 2020


Disetujui Oleh Diperiksa Oleh Diperiksa Oleh Di Buat Oleh
Pejabat Pelaksana Teknis Kegiatan (PPTK) Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….
NIP…………………. NIP…………………. Site Engineer Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 20 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Plesteran Cansteen 1 : 3 16.8 M2 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang 0.34 M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 2.52 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 21 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Plesteran Cansteen 1 : 3 16.8 M2 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang 0.34 M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 2.52 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 22 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pengecatan Cansteen Anti Lumut 16.8 M2 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok 6.05 Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 23 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pengecatan Cansteen Anti Lumut 16.8 M2 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok 6.05 Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 24 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pek. Pembuatan Septictank 0.5 Ls 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 25 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pek. Pembuatan Septictank 0.5 Ls 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 26 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pek. Rehab Atap/Turbin 0.5 Ls 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 27 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pek. Rehab Atap/Turbin 0.5 Ls 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN (BULANAN)

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR MINGGU : IV (KE EMPAT)


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI PERIODE : 28 OKTOBER 2020 S/D 11 NOVEMBER 2020
TAHUN ANGGARAN : 2020 S/D BULAN LALU : 95.21 %
LOKASI : KOTA KENDARI BULAN INI : 4.79 %
S/D BULAN INI : 100.00 %

KEMAJUAN PEKERJAAN
KONTRAK
BULAN LALU BULAN INI S/D BULAN INI
VOL
NO URAIAN SAT
TOTAL HARGA SATUAN TOTAL JUMLAH BOBOT BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER
VOL VOL VOL
(Rp) HARGA (Rp) (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. PEKERJAAN PERSIAPAN / PENDAHULUAN


1 Pek. Pembersihan Lokasi/Pembongkaran WC Lama Ls 1.00 2,500,000.00 2,500,000.00 1.14 0.50 50.00 0.57 - - - 0.50 50.00 0.57
2 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 1,000,000.00 1,000,000.00 0.46 1.00 100.00 0.46 - - - 1.00 100.00 0.46
3 Pek. Pembuatan Barak Kerja/Gudang Bahan Ls 1.00 3,500,000.00 3,500,000.00 1.60 1.00 100.00 1.60 - - - 1.00 100.00 1.60
3 Administrasi, Dokumentasi dan Air Kerja Ls 1.00 1,250,000.00 1,250,000.00 0.57 0.50 50.00 0.28 0.50 50.00 0.28 1.00 100.00 0.57
4 Papan Nama Kegiatan Ls 1.00 150,000.00 150,000.00 0.07 1.00 100.00 0.07 - - - 1.00 100.00 0.07
JUMLAH A 8,400,000.00 3.83 2.97 0.28 3.26
B. PEK. BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK
- Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir Set 1.00 450,000.00 450,000.00 0.21 1.00 100.00 0.21 - - - 1.00 100.00 0.21
- Pembuatan Kartu Identitas Pekerja (KIP); Lbr 4.00 5,000.00 20,000.00 0.01 4.00 100.00 0.01 - - - 4.00 100.00 0.01
2 Sosialisasi, promosi, dan pelatihan;
Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Safety Talk
- Org 4.00 10,000.00 40,000.00 0.02 4.00 100.00 0.02 - - - 4.00 100.00 0.02
dan/atau Tool Box Meeting);
3 Alat Pelindung Kerja dan Alat Pelindung Diri
- Topi Pelindung (Safety Helmet); Bh 4.00 85,000.00 340,000.00 0.16 4.00 100.00 0.16 - - - 4.00 100.00 0.16
- Pelindung Mata Psg 4.00 65,000.00 260,000.00 0.12 4.00 100.00 0.12 - - - 4.00 100.00 0.12
- Sarung Tangan (Safety Gloves); Psg 4.00 20,000.00 80,000.00 0.04 4.00 100.00 0.04 - - - 4.00 100.00 0.04
- Sepatu Keselamatan (Safety Shoes); Psg 4.00 180,000.00 720,000.00 0.33 4.00 100.00 0.33 - - - 4.00 100.00 0.33
- Rompi Keselamatan (Safety Vest); Bh 4.00 50,000.00 200,000.00 0.09 4.00 100.00 0.09 - - - 4.00 100.00 0.09
4 Asuransi dan perizinan
- BPJS Ketenagakerjaan Dan Kesehatan Kerja; Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
5 Personel Keselamatan Konstruksi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Petugas K3 Ob 1.00 1,500,000.00 1,500,000.00 0.68 1.00 100.00 0.68 - - - 1.00 100.00 0.68
6 Fasilitas sarana, prasarana, dan alat kesehatan
- Peralatan P3K (Kotak P3K, Tandu,Tabung Oksigen, Obat Luka, Perban, dll) Ls 1.00 1,300,000.00 1,300,000.00 0.59 1.00 100.00 0.59 - - - 1.00 100.00 0.59
7 Rambu-rambu yang diperlukan
- Rambu Informasi dan Peringatan Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
8 Konsultasi dengan ahli terkait Keselamatan Konstruksi Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
9 Kegiatan dan peralatan terkait dengan pengendalian Bendera K3 Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
JUMLAH B 6,010,000.00 2.74 2.74 - 2.74
C. PEKERJAAN PAGAR
I. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi M3 20.51 71,390.00 1,464,454.20 0.67 20.51 100.00 0.67 - - - 20.51 100.00 0.67
2 Pek. Urugan Tanah Kembali M3 5.04 51,480.00 259,459.20 0.12 5.04 100.00 0.12 - - - 5.04 100.00 0.12
3 Pek. Urugan Pasir Alas Pondasi M3 1.68 219,956.00 369,526.08 0.17 1.68 100.00 0.17 - - - 1.68 100.00 0.17
JUMLAH I 2,093,439.48 0.95 0.95 - 0.95
II. PEKERJAAN BATU DAN PLESTERAN
1 Pas. Batu Kosong M3 5.04 452,951.40 2,282,875.06 1.04 5.04 100.00 1.04 - - - 5.04 100.00 1.04
2 Pas. Pondasi Batu Gunung 1 : 5 M3 19.04 822,701.00 15,664,227.04 7.14 19.04 100.00 7.14 - - - 19.04 100.00 7.14
3 Pas. Dinding Batu Bata 1 : 5 M2 41.42 121,558.80 5,034,357.70 2.30 41.42 100.00 2.30 - - - 41.42 100.00 2.30
4 Pas. Plesteran Dinding Batu Bata 1 : 5 M2 82.83 64,381.24 5,332,698.11 2.43 82.83 100.00 2.43 - - - 82.83 100.00 2.43
5 Pas. Plesteran Ciprat/Kamper 1 : 3 M2 32.11 66,976.36 2,150,610.92 0.98 32.11 100.00 0.98 - - - 32.11 100.00 0.98
6 Pas. Plesteran Pondasi + Acian M2 44.80 66,976.36 3,000,540.93 1.37 44.80 100.00 1.37 - - - 44.80 100.00 1.37
7 Pek. List Profil Ls 1.00 2,000,000.00 2,000,000.00 0.91 1.00 100.00 0.91 - - - 1.00 100.00 0.91
JUMLAH II 35,465,309.75 16.17 16.17 - 16.17
III. PEKERJAAN BESI DAN BETON
1 Pek. Beton Pondasi Poer Plat
- Bekisting M2 2.40 170,286.60 408,687.84 0.19 2.40 100.00 0.19 - - - 2.40 100.00 0.19
- Besi Beton Kg 24.72 20,560.54 508,194.87 0.23 24.72 100.00 0.23 - - - 24.72 100.00 0.23
- Beton K175 M3 0.60 1,199,480.49 719,688.29 0.33 0.60 100.00 0.33 - - - 0.60 100.00 0.33
2 Pek. Beton Sloof 15/20
- Bekisting M2 11.20 179,636.60 2,011,929.92 0.92 11.20 100.00 0.92 - - - 11.20 100.00 0.92
- Besi Beton Kg 322.18 20,560.54 6,624,233.02 3.02 322.18 100.00 3.02 - - - 322.18 100.00 3.02
- Beton K175 M3 1.68 1,199,480.49 2,015,127.22 0.92 1.68 100.00 0.92 - - - 1.68 100.00 0.92
3 Pek. Beton Sloof Gerbang 15/30
- Bekisting M2 3.00 179,636.60 538,909.80 0.25 3.00 100.00 0.25 - - - 3.00 100.00 0.25
- Besi Beton Kg 42.01 20,560.54 863,836.71 0.39 42.01 100.00 0.39 - - - 42.01 100.00 0.39
- Beton K175 M3 0.23 1,199,480.49 269,883.11 0.12 0.23 100.00 0.12 - - - 0.23 100.00 0.12
4 Pek. Beton Kolom 20/20
- Roster Beton Kolom Pracetak Motif (Dudukan+Tiang+Topi) Klm 18.00 575,000.00 10,350,000.00 4.72 18.00 100.00 4.72 - - - 18.00 100.00 4.72
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Besi Beton Kg 212.24 20,560.54 4,363,731.43 1.99 212.24 100.00 1.99 - - - 212.24 100.00 1.99
- Beton K175 M3 1.30 1,199,480.49 1,554,526.72 0.71 1.30 100.00 0.71 - - - 1.30 100.00 0.71
5 Pek. Beton Kolom 40/40 (Gerbang)
- Bekisting M2 14.72 249,587.80 3,673,932.42 1.68 14.72 100.00 1.68 - - - 14.72 100.00 1.68
- Besi Beton Kg 163.44 20,560.54 3,360,323.60 1.53 163.44 100.00 1.53 - - - 163.44 100.00 1.53
- Beton K175 M3 1.47 1,199,480.49 1,765,635.28 0.80 1.47 100.00 0.80 - - - 1.47 100.00 0.80
6 Pek. Balok Beton 15/30 dan Topi Beton 10/15
- Bekisting M2 5.48 257,177.80 1,409,334.34 0.64 5.48 100.00 0.64 - - - 5.48 100.00 0.64
- Besi Beton Kg 111.36 20,560.54 2,289,523.28 1.04 111.36 100.00 1.04 - - - 111.36 100.00 1.04
- Beton K175 M3 0.41 1,199,480.49 492,986.48 0.22 0.41 100.00 0.22 - - - 0.41 100.00 0.22
JUMLAH III 43,220,484.33 19.71 19.71 - 19.71
IV PEKERJAAN TERALIS, KERAMIK DAN ACCESSORIES
1 Pek. Teralis Dinding Pagar M1 49.40 552,580.60 27,297,481.64 12.45 49.40 100.00 12.45 - - - 49.40 100.00 12.45
2 Pek. Teralis Pintu Gerbang Tengah dan Samping ( Pintu Sorong ) M1 7.64 1,213,405.60 9,270,418.78 4.23 7.64 100.00 4.23 - - - 7.64 100.00 4.23
3 Pas. Dinding Granit 80 x 80 Cm M2 7.68 428,147.50 3,288,172.80 1.50 7.68 100.00 1.50 - - - 7.68 100.00 1.50
4 Pas. Batu Alam Dinding dan Kolom Gerbang M2 11.52 415,299.50 4,784,250.24 2.18 11.52 100.00 2.18 - - - 11.52 100.00 2.18
5 Pek. Papan Nama Gerbang + Logo Kota + Logo Bakti Husada ( Acrylic ) Ls 1.00 9,500,000.00 9,500,000.00 4.33 - - - - - - - - -
JUMLAH IV 54,140,323.46 24.68 20.35 - 20.35
V PEKERJAAN PENGECATAN
1 Pek. Cat Tembok Dinding/Kolom 2x Cat Anti Lumut M2 95.79 35,827.00 3,431,868.33 1.56 - - - - - - - - -
2 Pek. Cat Besi Teralis 2x Cat M2 57.04 36,462.80 2,079,838.11 0.95 - - - - - - - - -
JUMLAH V 5,511,706.44 2.51 - - -
D. PEKERJAAN PENATAAN LAHAN PARKIR
1 Pek. Galian Tanah Cansteen M3 5.04 71,390.00 359,805.60 0.16 - - - - - - - - -
2 Pek. Urugan Tanah Didatangkan M3 96.00 110,880.00 10,644,480.00 4.85 - - - - - - - - -
3 Pek. Urugan Pasir Alas Cansteen/Rabat M3 12.84 219,956.00 2,824,235.04 1.29 - - - - - - - - -
4 Pek. Cansteen Pas. Batu Gunung 30/60, Camp. 1:4 M3 10.08 857,780.00 8,646,422.40 3.94 - - - - - - - - -
5 Pek. Plesteran Cansteen Camp. 1:3 M2 33.60 66,976.36 2,250,405.70 1.03 - - - - - - - - -
6 Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan Masuk M3 18.24 1,199,480.49 21,878,524.14 9.97 - - - - - - - - -
7 Pek. Pengecatan Cansteen Anti Lumut M2 33.60 35,827.00 1,203,787.20 0.55 - - - - - - - - -
JUMLAH D 47,807,660.07 21.80 - - -
E. PEKERJAAN REHAB/PERBAIKAN
1 Pek. Kramik Lantai 30/30 cm KM/WC M2 2.25 153,684.30 345,789.68 0.16 - - - 2.25 100.00 0.16 2.25 100.00 0.16
2 Pek. Granit Dinding 60/60 cm KM/WC M2 8.28 336,451.50 2,785,818.42 1.27 - - - 8.28 100.00 1.27 8.28 100.00 1.27
3 Pek. Instalasi Air Bersih + Accesories Pipa Ls 1.00 750,000.00 750,000.00 0.34 - - - 1.00 100.00 0.34 1.00 100.00 0.34
4 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 3" AW Ls 1.00 1,500,000.00 1,500,000.00 0.68 - - - 1.00 100.00 0.68 1.00 100.00 0.68
5 Pek. Pasangan Kloset Duduk Bh 1.00 3,382,786.00 3,382,786.00 1.54 - - - 1.00 100.00 1.54 1.00 100.00 1.54
6 Pek. Pasangan Kran Air Bh 1.00 93,104.00 93,104.00 0.04 - - - 1.00 100.00 0.04 1.00 100.00 0.04
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
7 Pek. Floor Drain Bh 1.00 54,736.00 54,736.00 0.02 - - - 1.00 100.00 0.02 1.00 100.00 0.02
8 Pengadaan Ember Air Bh 1.00 75,000.00 75,000.00 0.03 - - - 1.00 100.00 0.03 1.00 100.00 0.03
9 Pek. Pembuatan Septik Tank Unit 1.00 1,800,000.00 1,800,000.00 0.82 - - - - - - - - -
10 Pek. Rehab Atap/Turbin Ls 1.00 5,000,000.00 5,000,000.00 2.28 - - - - - - - - -
JUMLAH E 15,787,234.10 7.20 - 4.10 4.10
F. PEKERJAAN FINISHING DAN PEMBERSIHAN AKHIR
1 Pek. Pembersihan Akhir/Perapihan Ls 1.00 900,000.00 900,000.00 0.41 - - - 1.00 100.00 0.41 1.00 100.00 0.41
JUMLAH F 900,000.00 0.41 - 0.41 0.41
JUMLAH (REAL COST) ( A ) 219,336,157.63
PPN 10 % ( B ) 21,933,615.76
100.00 62.90 4.79 67.69
TOTAL COST ( A + B ) 241,269,773.40
DIBULATKAN 241,200,000.00

Kendari, 11 November 2020


Disetujui Oleh Diperiksa Oleh Diperiksa Oleh Di Buat Oleh
Pejabat Pelaksana Teknis Kegiatan (PPTK) Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….
NIP…………………. NIP…………………. Site Engineer Pelaksana
LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN (MINGGUAN)

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR MINGGU : XIII (KE TIGA BELAS)
PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI PERIODE : 28 OKTOBER 2020 S/D 3 NOVEMBER 2020
TAHUN ANGGARAN : 2020 S/D MINGGU LALU : 95.21 %
LOKASI : KOTA KENDARI MINGGU INI : 4.00 %
S/D MINGGU INI : 99.20 %

KEMAJUAN PEKERJAAN
KONTRAK
MINGGU LALU MINGGU INI S/D MINGGU INI
VOL
NO URAIAN SAT
TOTAL HARGA SATUAN TOTAL JUMLAH BOBOT BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER
VOL VOL VOL
(Rp) HARGA (Rp) (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. PEKERJAAN PERSIAPAN / PENDAHULUAN


1 Pek. Pembersihan Lokasi/Pembongkaran WC Lama Ls 1.00 2,500,000.00 2,500,000.00 1.14 1.00 100.00 1.14 - - - 1.00 100.00 1.14
2 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 1,000,000.00 1,000,000.00 0.46 1.00 100.00 0.46 - - - 1.00 100.00 0.46
3 Pek. Pembuatan Barak Kerja/Gudang Bahan Ls 1.00 3,500,000.00 3,500,000.00 1.60 1.00 100.00 1.60 - - - 1.00 100.00 1.60
3 Administrasi, Dokumentasi dan Air Kerja Ls 1.00 1,250,000.00 1,250,000.00 0.57 0.50 50.00 0.28 - - - 0.50 50.00 0.28
4 Papan Nama Kegiatan Ls 1.00 150,000.00 150,000.00 0.07 1.00 100.00 0.07 - - - 1.00 100.00 0.07
JUMLAH A 8,400,000.00 3.83 3.54 - 3.54
B. PEK. BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK
- Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir Set 1.00 450,000.00 450,000.00 0.21 1.00 100.00 0.21 - - - 1.00 100.00 0.21
- Pembuatan Kartu Identitas Pekerja (KIP); Lbr 4.00 5,000.00 20,000.00 0.01 4.00 100.00 0.01 - - - 4.00 100.00 0.01
2 Sosialisasi, promosi, dan pelatihan;
Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Safety Talk
- Org 4.00 10,000.00 40,000.00 0.02 4.00 100.00 0.02 - - - 4.00 100.00 0.02
dan/atau Tool Box Meeting);
3 Alat Pelindung Kerja dan Alat Pelindung Diri
- Topi Pelindung (Safety Helmet); Bh 4.00 85,000.00 340,000.00 0.16 4.00 100.00 0.16 - - - 4.00 100.00 0.16
- Pelindung Mata Psg 4.00 65,000.00 260,000.00 0.12 4.00 100.00 0.12 - - - 4.00 100.00 0.12
- Sarung Tangan (Safety Gloves); Psg 4.00 20,000.00 80,000.00 0.04 4.00 100.00 0.04 - - - 4.00 100.00 0.04
- Sepatu Keselamatan (Safety Shoes); Psg 4.00 180,000.00 720,000.00 0.33 4.00 100.00 0.33 - - - 4.00 100.00 0.33
- Rompi Keselamatan (Safety Vest); Bh 4.00 50,000.00 200,000.00 0.09 4.00 100.00 0.09 - - - 4.00 100.00 0.09
4 Asuransi dan perizinan
- BPJS Ketenagakerjaan Dan Kesehatan Kerja; Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
5 Personel Keselamatan Konstruksi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Petugas K3 Ob 1.00 1,500,000.00 1,500,000.00 0.68 1.00 100.00 0.68 - - - 1.00 100.00 0.68
6 Fasilitas sarana, prasarana, dan alat kesehatan
- Peralatan P3K (Kotak P3K, Tandu,Tabung Oksigen, Obat Luka, Perban, dll) Ls 1.00 1,300,000.00 1,300,000.00 0.59 1.00 100.00 0.59 - - - 1.00 100.00 0.59
7 Rambu-rambu yang diperlukan
- Rambu Informasi dan Peringatan Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
8 Konsultasi dengan ahli terkait Keselamatan Konstruksi Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
9 Kegiatan dan peralatan terkait dengan pengendalian Bendera K3 Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
JUMLAH B 6,010,000.00 2.74 2.74 - 2.74
C. PEKERJAAN PAGAR
I. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi M3 20.51 71,390.00 1,464,454.20 0.67 20.51 100.00 0.67 - - - 20.51 100.00 0.67
2 Pek. Urugan Tanah Kembali M3 5.04 51,480.00 259,459.20 0.12 5.04 100.00 0.12 - - - 5.04 100.00 0.12
3 Pek. Urugan Pasir Alas Pondasi M3 1.68 219,956.00 369,526.08 0.17 1.68 100.00 0.17 - - - 1.68 100.00 0.17
JUMLAH I 2,093,439.48 0.95 0.95 - 0.95
II. PEKERJAAN BATU DAN PLESTERAN
1 Pas. Batu Kosong M3 5.04 452,951.40 2,282,875.06 1.04 5.04 100.00 1.04 - - - 5.04 100.00 1.04
2 Pas. Pondasi Batu Gunung 1 : 5 M3 19.04 822,701.00 15,664,227.04 7.14 19.04 100.00 7.14 - - - 19.04 100.00 7.14
3 Pas. Dinding Batu Bata 1 : 5 M2 41.42 121,558.80 5,034,357.70 2.30 41.42 100.00 2.30 - - - 41.42 100.00 2.30
4 Pas. Plesteran Dinding Batu Bata 1 : 5 M2 82.83 64,381.24 5,332,698.11 2.43 82.83 100.00 2.43 - - - 82.83 100.00 2.43
5 Pas. Plesteran Ciprat/Kamper 1 : 3 M2 32.11 66,976.36 2,150,610.92 0.98 32.11 100.00 0.98 - - - 32.11 100.00 0.98
6 Pas. Plesteran Pondasi + Acian M2 44.80 66,976.36 3,000,540.93 1.37 44.80 100.00 1.37 - - - 44.80 100.00 1.37
7 Pek. List Profil Ls 1.00 2,000,000.00 2,000,000.00 0.91 1.00 100.00 0.91 - - - 1.00 100.00 0.91
JUMLAH II 35,465,309.75 16.17 16.17 - 16.17
III. PEKERJAAN BESI DAN BETON
1 Pek. Beton Pondasi Poer Plat
- Bekisting M2 2.40 170,286.60 408,687.84 0.19 2.40 100.00 0.19 - - - 2.40 100.00 0.19
- Besi Beton Kg 24.72 20,560.54 508,194.87 0.23 24.72 100.00 0.23 - - - 24.72 100.00 0.23
- Beton K175 M3 0.60 1,199,480.49 719,688.29 0.33 0.60 100.00 0.33 - - - 0.60 100.00 0.33
2 Pek. Beton Sloof 15/20
- Bekisting M2 11.20 179,636.60 2,011,929.92 0.92 11.20 100.00 0.92 - - - 11.20 100.00 0.92
- Besi Beton Kg 322.18 20,560.54 6,624,233.02 3.02 322.18 100.00 3.02 - - - 322.18 100.00 3.02
- Beton K175 M3 1.68 1,199,480.49 2,015,127.22 0.92 1.68 100.00 0.92 - - - 1.68 100.00 0.92
3 Pek. Beton Sloof Gerbang 15/30
- Bekisting M2 3.00 179,636.60 538,909.80 0.25 3.00 100.00 0.25 - - - 3.00 100.00 0.25
- Besi Beton Kg 42.01 20,560.54 863,836.71 0.39 42.01 100.00 0.39 - - - 42.01 100.00 0.39
- Beton K175 M3 0.23 1,199,480.49 269,883.11 0.12 0.23 100.00 0.12 - - - 0.23 100.00 0.12
4 Pek. Beton Kolom 20/20
- Roster Beton Kolom Pracetak Motif (Dudukan+Tiang+Topi) Klm 18.00 575,000.00 10,350,000.00 4.72 18.00 100.00 4.72 - - - 18.00 100.00 4.72
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Besi Beton Kg 212.24 20,560.54 4,363,731.43 1.99 212.24 100.00 1.99 - - - 212.24 100.00 1.99
- Beton K175 M3 1.30 1,199,480.49 1,554,526.72 0.71 1.30 100.00 0.71 - - - 1.30 100.00 0.71
5 Pek. Beton Kolom 40/40 (Gerbang)
- Bekisting M2 14.72 249,587.80 3,673,932.42 1.68 14.72 100.00 1.68 - - - 14.72 100.00 1.68
- Besi Beton Kg 163.44 20,560.54 3,360,323.60 1.53 163.44 100.00 1.53 - - - 163.44 100.00 1.53
- Beton K175 M3 1.47 1,199,480.49 1,765,635.28 0.80 1.47 100.00 0.80 - - - 1.47 100.00 0.80
6 Pek. Balok Beton 15/30 dan Topi Beton 10/15
- Bekisting M2 5.48 257,177.80 1,409,334.34 0.64 5.48 100.00 0.64 - - - 5.48 100.00 0.64
- Besi Beton Kg 111.36 20,560.54 2,289,523.28 1.04 111.36 100.00 1.04 - - - 111.36 100.00 1.04
- Beton K175 M3 0.41 1,199,480.49 492,986.48 0.22 0.41 100.00 0.22 - - - 0.41 100.00 0.22
JUMLAH III 43,220,484.33 19.71 19.71 - 19.71
IV PEKERJAAN TERALIS, KERAMIK DAN ACCESSORIES
1 Pek. Teralis Dinding Pagar M1 49.40 552,580.60 27,297,481.64 12.45 49.40 100.00 12.45 - - - 49.40 100.00 12.45
2 Pek. Teralis Pintu Gerbang Tengah dan Samping ( Pintu Sorong ) M1 7.64 1,213,405.60 9,270,418.78 4.23 7.64 100.00 4.23 - - - 7.64 100.00 4.23
3 Pas. Dinding Granit 80 x 80 Cm M2 7.68 428,147.50 3,288,172.80 1.50 7.68 100.00 1.50 - - - 7.68 100.00 1.50
4 Pas. Batu Alam Dinding dan Kolom Gerbang M2 11.52 415,299.50 4,784,250.24 2.18 11.52 100.00 2.18 - - - 11.52 100.00 2.18
5 Pek. Papan Nama Gerbang + Logo Kota + Logo Bakti Husada ( Acrylic ) Ls 1.00 9,500,000.00 9,500,000.00 4.33 1.00 100.00 4.33 - - - 1.00 100.00 4.33
JUMLAH IV 54,140,323.46 24.68 24.68 - 24.68
V PEKERJAAN PENGECATAN
1 Pek. Cat Tembok Dinding/Kolom 2x Cat Anti Lumut M2 95.79 35,827.00 3,431,868.33 1.56 95.79 100.00 1.56 - - - 95.79 100.00 1.56
2 Pek. Cat Besi Teralis 2x Cat M2 57.04 36,462.80 2,079,838.11 0.95 57.04 100.00 0.95 - - - 57.04 100.00 0.95
JUMLAH V 5,511,706.44 2.51 2.51 - 2.51
D. PEKERJAAN PENATAAN LAHAN PARKIR
1 Pek. Galian Tanah Cansteen M3 5.04 71,390.00 359,805.60 0.16 5.04 100.00 0.16 - - - 5.04 100.00 0.16
2 Pek. Urugan Tanah Didatangkan M3 96.00 110,880.00 10,644,480.00 4.85 96.00 100.00 4.85 - - - 96.00 100.00 4.85
3 Pek. Urugan Pasir Alas Cansteen/Rabat M3 12.84 219,956.00 2,824,235.04 1.29 12.84 100.00 1.29 - - - 12.84 100.00 1.29
4 Pek. Cansteen Pas. Batu Gunung 30/60, Camp. 1:4 M3 10.08 857,780.00 8,646,422.40 3.94 10.08 100.00 3.94 - - - 10.08 100.00 3.94
5 Pek. Plesteran Cansteen Camp. 1:3 M2 33.60 66,976.36 2,250,405.70 1.03 33.60 100.00 1.03 - - - 33.60 100.00 1.03
6 Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan Masuk M3 18.24 1,199,480.49 21,878,524.14 9.97 18.24 100.00 9.97 - - - 18.24 100.00 9.97
7 Pek. Pengecatan Cansteen Anti Lumut M2 33.60 35,827.00 1,203,787.20 0.55 33.60 100.00 0.55 - - - 33.60 100.00 0.55
JUMLAH D 47,807,660.07 21.80 21.80 - 21.80
E. PEKERJAAN REHAB/PERBAIKAN
1 Pek. Kramik Lantai 30/30 cm KM/WC M2 2.25 153,684.30 345,789.68 0.16 - - - 2.25 100.00 0.16 2.25 100.00 0.16
2 Pek. Granit Dinding 60/60 cm KM/WC M2 8.28 336,451.50 2,785,818.42 1.27 - - - 8.28 100.00 1.27 8.28 100.00 1.27
3 Pek. Instalasi Air Bersih + Accesories Pipa Ls 1.00 750,000.00 750,000.00 0.34 - - - 1.00 100.00 0.34 1.00 100.00 0.34
4 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 3" AW Ls 1.00 1,500,000.00 1,500,000.00 0.68 - - - 1.00 100.00 0.68 1.00 100.00 0.68
5 Pek. Pasangan Kloset Duduk Bh 1.00 3,382,786.00 3,382,786.00 1.54 - - - 1.00 100.00 1.54 1.00 100.00 1.54
6 Pek. Pasangan Kran Air Bh 1.00 93,104.00 93,104.00 0.04 - - - - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
7 Pek. Floor Drain Bh 1.00 54,736.00 54,736.00 0.02 - - - - - - - - -
8 Pengadaan Ember Air Bh 1.00 75,000.00 75,000.00 0.03 - - - - - - - - -
9 Pek. Pembuatan Septik Tank Unit 1.00 1,800,000.00 1,800,000.00 0.82 1.00 100.00 0.82 - - - 1.00 100.00 0.82
10 Pek. Rehab Atap/Turbin Ls 1.00 5,000,000.00 5,000,000.00 2.28 1.00 100.00 2.28 - - - 1.00 100.00 2.28
JUMLAH E 15,787,234.10 7.20 3.10 4.00 7.10
F. PEKERJAAN FINISHING DAN PEMBERSIHAN AKHIR
1 Pek. Pembersihan Akhir/Perapihan Ls 1.00 900,000.00 900,000.00 0.41 - - - - - - - - -
JUMLAH F 900,000.00 0.41 - - -
JUMLAH (REAL COST) ( A ) 219,336,157.63
PPN 10 % ( B ) 21,933,615.76
100.00 95.21 4.00 99.20
TOTAL COST ( A + B ) 241,269,773.40
DIBULATKAN 241,200,000.00

Kendari, 3 November 2020


Disetujui Oleh Diperiksa Oleh Diperiksa Oleh Di Buat Oleh
Pejabat Pelaksana Teknis Kegiatan (PPTK) Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….
NIP…………………. NIP…………………. Site Engineer Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 28 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pas. Keramik Lantai 30x30 2.25 M2 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang 0.1013 M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 0.45 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg
13 Keramik 30 x 30 26.71 Bh Keramik 30 x 30 3.00 Doz

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 29 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pas. Keramik Dinding 60 x 60 2.76 M2 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang 0.0497 M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 0.51 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg
13 Keramik 30 x 30 7.67 Bh Keramik 30 x 30 3.00 Doz

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 30 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pas. Keramik Dinding 60 x 60 2.76 M2 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang 0.0497 M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 0.51 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg
13 Keramik 30 x 30 7.67 Bh Keramik 30 x 30 3.00 Doz

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 31 OKTOBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pas. Keramik Dinding 60 x 60 2.76 M2 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang 0.0497 M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen 0.51 Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg
13 Keramik 30 x 30 7.67 Bh Keramik 30 x 30 3.00 Doz

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 1 NOVEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pas. Instalasi Air Bersih 1 Ls 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg
13 Pipa Instalasi 1.00 Set Pipa Instalasi 1.00 Set

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 2 NOVEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pas. Instalasi Air Kotor 3" 1 Ls 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg
13 Pipa Instalasi 1.00 Set Pipa Instalasi 1.00 Set

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 3 NOVEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pemasangan Klosed Duduk 1 Bh 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg
13 Kloset Duduk 1.00 Bh Kloset Duduk 1.00 Bh

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN (MINGGUAN)

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR MINGGU : XIV (KE EMPAT BELAS)
PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI PERIODE : 4 NOVEMBER 2020 S/D 11 NOVEMBER 2020
TAHUN ANGGARAN : 2020 S/D MINGGU LALU : 99.20 %
LOKASI : KOTA KENDARI MINGGU INI : 0.80 %
S/D MINGGU INI : 100.00 %

KEMAJUAN PEKERJAAN
KONTRAK
MINGGU LALU MINGGU INI S/D MINGGU INI
VOL
NO URAIAN SAT
TOTAL HARGA SATUAN TOTAL JUMLAH BOBOT BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER BOBOT TER
VOL VOL VOL
(Rp) HARGA (Rp) (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%) CAPAI (%) TIMB. (%)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. PEKERJAAN PERSIAPAN / PENDAHULUAN


1 Pek. Pembersihan Lokasi/Pembongkaran WC Lama Ls 1.00 2,500,000.00 2,500,000.00 1.14 1.00 100.00 1.14 - - - 1.00 100.00 1.14
2 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 1,000,000.00 1,000,000.00 0.46 1.00 100.00 0.46 - - - 1.00 100.00 0.46
3 Pek. Pembuatan Barak Kerja/Gudang Bahan Ls 1.00 3,500,000.00 3,500,000.00 1.60 1.00 100.00 1.60 - - - 1.00 100.00 1.60
3 Administrasi, Dokumentasi dan Air Kerja Ls 1.00 1,250,000.00 1,250,000.00 0.57 0.50 50.00 0.28 0.50 50.00 0.28 1.00 100.00 0.57
4 Papan Nama Kegiatan Ls 1.00 150,000.00 150,000.00 0.07 1.00 100.00 0.07 - - - 1.00 100.00 0.07
JUMLAH A 8,400,000.00 3.83 3.54 0.28 3.83
B. PEK. BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK
- Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir Set 1.00 450,000.00 450,000.00 0.21 1.00 100.00 0.21 - - - 1.00 100.00 0.21
- Pembuatan Kartu Identitas Pekerja (KIP); Lbr 4.00 5,000.00 20,000.00 0.01 4.00 100.00 0.01 - - - 4.00 100.00 0.01
2 Sosialisasi, promosi, dan pelatihan;
Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Safety Talk
- Org 4.00 10,000.00 40,000.00 0.02 4.00 100.00 0.02 - - - 4.00 100.00 0.02
dan/atau Tool Box Meeting);
3 Alat Pelindung Kerja dan Alat Pelindung Diri
- Topi Pelindung (Safety Helmet); Bh 4.00 85,000.00 340,000.00 0.16 4.00 100.00 0.16 - - - 4.00 100.00 0.16
- Pelindung Mata Psg 4.00 65,000.00 260,000.00 0.12 4.00 100.00 0.12 - - - 4.00 100.00 0.12
- Sarung Tangan (Safety Gloves); Psg 4.00 20,000.00 80,000.00 0.04 4.00 100.00 0.04 - - - 4.00 100.00 0.04
- Sepatu Keselamatan (Safety Shoes); Psg 4.00 180,000.00 720,000.00 0.33 4.00 100.00 0.33 - - - 4.00 100.00 0.33
- Rompi Keselamatan (Safety Vest); Bh 4.00 50,000.00 200,000.00 0.09 4.00 100.00 0.09 - - - 4.00 100.00 0.09
4 Asuransi dan perizinan
- BPJS Ketenagakerjaan Dan Kesehatan Kerja; Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
5 Personel Keselamatan Konstruksi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Petugas K3 Ob 1.00 1,500,000.00 1,500,000.00 0.68 1.00 100.00 0.68 - - - 1.00 100.00 0.68
6 Fasilitas sarana, prasarana, dan alat kesehatan
- Peralatan P3K (Kotak P3K, Tandu,Tabung Oksigen, Obat Luka, Perban, dll) Ls 1.00 1,300,000.00 1,300,000.00 0.59 1.00 100.00 0.59 - - - 1.00 100.00 0.59
7 Rambu-rambu yang diperlukan
- Rambu Informasi dan Peringatan Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
8 Konsultasi dengan ahli terkait Keselamatan Konstruksi Ls 1.00 500,000.00 500,000.00 0.23 1.00 100.00 0.23 - - - 1.00 100.00 0.23
9 Kegiatan dan peralatan terkait dengan pengendalian Bendera K3 Bh 1.00 50,000.00 50,000.00 0.02 1.00 100.00 0.02 - - - 1.00 100.00 0.02
JUMLAH B 6,010,000.00 2.74 2.74 - 2.74
C. PEKERJAAN PAGAR
I. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi M3 20.51 71,390.00 1,464,454.20 0.67 20.51 100.00 0.67 - - - 20.51 100.00 0.67
2 Pek. Urugan Tanah Kembali M3 5.04 51,480.00 259,459.20 0.12 5.04 100.00 0.12 - - - 5.04 100.00 0.12
3 Pek. Urugan Pasir Alas Pondasi M3 1.68 219,956.00 369,526.08 0.17 1.68 100.00 0.17 - - - 1.68 100.00 0.17
JUMLAH I 2,093,439.48 0.95 0.95 - 0.95
II. PEKERJAAN BATU DAN PLESTERAN
1 Pas. Batu Kosong M3 5.04 452,951.40 2,282,875.06 1.04 5.04 100.00 1.04 - - - 5.04 100.00 1.04
2 Pas. Pondasi Batu Gunung 1 : 5 M3 19.04 822,701.00 15,664,227.04 7.14 19.04 100.00 7.14 - - - 19.04 100.00 7.14
3 Pas. Dinding Batu Bata 1 : 5 M2 41.42 121,558.80 5,034,357.70 2.30 41.42 100.00 2.30 - - - 41.42 100.00 2.30
4 Pas. Plesteran Dinding Batu Bata 1 : 5 M2 82.83 64,381.24 5,332,698.11 2.43 82.83 100.00 2.43 - - - 82.83 100.00 2.43
5 Pas. Plesteran Ciprat/Kamper 1 : 3 M2 32.11 66,976.36 2,150,610.92 0.98 32.11 100.00 0.98 - - - 32.11 100.00 0.98
6 Pas. Plesteran Pondasi + Acian M2 44.80 66,976.36 3,000,540.93 1.37 44.80 100.00 1.37 - - - 44.80 100.00 1.37
7 Pek. List Profil Ls 1.00 2,000,000.00 2,000,000.00 0.91 1.00 100.00 0.91 - - - 1.00 100.00 0.91
JUMLAH II 35,465,309.75 16.17 16.17 - 16.17
III. PEKERJAAN BESI DAN BETON
1 Pek. Beton Pondasi Poer Plat
- Bekisting M2 2.40 170,286.60 408,687.84 0.19 2.40 100.00 0.19 - - - 2.40 100.00 0.19
- Besi Beton Kg 24.72 20,560.54 508,194.87 0.23 24.72 100.00 0.23 - - - 24.72 100.00 0.23
- Beton K175 M3 0.60 1,199,480.49 719,688.29 0.33 0.60 100.00 0.33 - - - 0.60 100.00 0.33
2 Pek. Beton Sloof 15/20
- Bekisting M2 11.20 179,636.60 2,011,929.92 0.92 11.20 100.00 0.92 - - - 11.20 100.00 0.92
- Besi Beton Kg 322.18 20,560.54 6,624,233.02 3.02 322.18 100.00 3.02 - - - 322.18 100.00 3.02
- Beton K175 M3 1.68 1,199,480.49 2,015,127.22 0.92 1.68 100.00 0.92 - - - 1.68 100.00 0.92
3 Pek. Beton Sloof Gerbang 15/30
- Bekisting M2 3.00 179,636.60 538,909.80 0.25 3.00 100.00 0.25 - - - 3.00 100.00 0.25
- Besi Beton Kg 42.01 20,560.54 863,836.71 0.39 42.01 100.00 0.39 - - - 42.01 100.00 0.39
- Beton K175 M3 0.23 1,199,480.49 269,883.11 0.12 0.23 100.00 0.12 - - - 0.23 100.00 0.12
4 Pek. Beton Kolom 20/20
- Roster Beton Kolom Pracetak Motif (Dudukan+Tiang+Topi) Klm 18.00 575,000.00 10,350,000.00 4.72 18.00 100.00 4.72 - - - 18.00 100.00 4.72
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
- Besi Beton Kg 212.24 20,560.54 4,363,731.43 1.99 212.24 100.00 1.99 - - - 212.24 100.00 1.99
- Beton K175 M3 1.30 1,199,480.49 1,554,526.72 0.71 1.30 100.00 0.71 - - - 1.30 100.00 0.71
5 Pek. Beton Kolom 40/40 (Gerbang)
- Bekisting M2 14.72 249,587.80 3,673,932.42 1.68 14.72 100.00 1.68 - - - 14.72 100.00 1.68
- Besi Beton Kg 163.44 20,560.54 3,360,323.60 1.53 163.44 100.00 1.53 - - - 163.44 100.00 1.53
- Beton K175 M3 1.47 1,199,480.49 1,765,635.28 0.80 1.47 100.00 0.80 - - - 1.47 100.00 0.80
6 Pek. Balok Beton 15/30 dan Topi Beton 10/15
- Bekisting M2 5.48 257,177.80 1,409,334.34 0.64 5.48 100.00 0.64 - - - 5.48 100.00 0.64
- Besi Beton Kg 111.36 20,560.54 2,289,523.28 1.04 111.36 100.00 1.04 - - - 111.36 100.00 1.04
- Beton K175 M3 0.41 1,199,480.49 492,986.48 0.22 0.41 100.00 0.22 - - - 0.41 100.00 0.22
JUMLAH III 43,220,484.33 19.71 19.71 - 19.71
IV PEKERJAAN TERALIS, KERAMIK DAN ACCESSORIES
1 Pek. Teralis Dinding Pagar M1 49.40 552,580.60 27,297,481.64 12.45 49.40 100.00 12.45 - - - 49.40 100.00 12.45
2 Pek. Teralis Pintu Gerbang Tengah dan Samping ( Pintu Sorong ) M1 7.64 1,213,405.60 9,270,418.78 4.23 7.64 100.00 4.23 - - - 7.64 100.00 4.23
3 Pas. Dinding Granit 80 x 80 Cm M2 7.68 428,147.50 3,288,172.80 1.50 7.68 100.00 1.50 - - - 7.68 100.00 1.50
4 Pas. Batu Alam Dinding dan Kolom Gerbang M2 11.52 415,299.50 4,784,250.24 2.18 11.52 100.00 2.18 - - - 11.52 100.00 2.18
5 Pek. Papan Nama Gerbang + Logo Kota + Logo Bakti Husada ( Acrylic ) Ls 1.00 9,500,000.00 9,500,000.00 4.33 1.00 100.00 4.33 - - - 1.00 100.00 4.33
JUMLAH IV 54,140,323.46 24.68 24.68 - 24.68
V PEKERJAAN PENGECATAN
1 Pek. Cat Tembok Dinding/Kolom 2x Cat Anti Lumut M2 95.79 35,827.00 3,431,868.33 1.56 95.79 100.00 1.56 - - - 95.79 100.00 1.56
2 Pek. Cat Besi Teralis 2x Cat M2 57.04 36,462.80 2,079,838.11 0.95 57.04 100.00 0.95 - - - 57.04 100.00 0.95
JUMLAH V 5,511,706.44 2.51 2.51 - 2.51
D. PEKERJAAN PENATAAN LAHAN PARKIR
1 Pek. Galian Tanah Cansteen M3 5.04 71,390.00 359,805.60 0.16 5.04 100.00 0.16 - - - 5.04 100.00 0.16
2 Pek. Urugan Tanah Didatangkan M3 96.00 110,880.00 10,644,480.00 4.85 96.00 100.00 4.85 - - - 96.00 100.00 4.85
3 Pek. Urugan Pasir Alas Cansteen/Rabat M3 12.84 219,956.00 2,824,235.04 1.29 12.84 100.00 1.29 - - - 12.84 100.00 1.29
4 Pek. Cansteen Pas. Batu Gunung 30/60, Camp. 1:4 M3 10.08 857,780.00 8,646,422.40 3.94 10.08 100.00 3.94 - - - 10.08 100.00 3.94
5 Pek. Plesteran Cansteen Camp. 1:3 M2 33.60 66,976.36 2,250,405.70 1.03 33.60 100.00 1.03 - - - 33.60 100.00 1.03
6 Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan Masuk M3 18.24 1,199,480.49 21,878,524.14 9.97 18.24 100.00 9.97 - - - 18.24 100.00 9.97
7 Pek. Pengecatan Cansteen Anti Lumut M2 33.60 35,827.00 1,203,787.20 0.55 33.60 100.00 0.55 - - - 33.60 100.00 0.55
JUMLAH D 47,807,660.07 21.80 21.80 - 21.80
E. PEKERJAAN REHAB/PERBAIKAN
1 Pek. Kramik Lantai 30/30 cm KM/WC M2 2.25 153,684.30 345,789.68 0.16 2.25 100.00 0.16 - - - 2.25 100.00 0.16
2 Pek. Granit Dinding 60/60 cm KM/WC M2 8.28 336,451.50 2,785,818.42 1.27 8.28 100.00 1.27 - - - 8.28 100.00 1.27
3 Pek. Instalasi Air Bersih + Accesories Pipa Ls 1.00 750,000.00 750,000.00 0.34 1.00 100.00 0.34 - - - 1.00 100.00 0.34
4 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 3" AW Ls 1.00 1,500,000.00 1,500,000.00 0.68 1.00 100.00 0.68 - - - 1.00 100.00 0.68
5 Pek. Pasangan Kloset Duduk Bh 1.00 3,382,786.00 3,382,786.00 1.54 1.00 100.00 1.54 - - - 1.00 100.00 1.54
6 Pek. Pasangan Kran Air Bh 1.00 93,104.00 93,104.00 0.04 - - - 1.00 100.00 0.04 1.00 100.00 0.04
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
7 Pek. Floor Drain Bh 1.00 54,736.00 54,736.00 0.02 - - - 1.00 100.00 0.02 1.00 100.00 0.02
8 Pengadaan Ember Air Bh 1.00 75,000.00 75,000.00 0.03 - - - 1.00 100.00 0.03 1.00 100.00 0.03
9 Pek. Pembuatan Septik Tank Unit 1.00 1,800,000.00 1,800,000.00 0.82 1.00 100.00 0.82 - - - 1.00 100.00 0.82
10 Pek. Rehab Atap/Turbin Ls 1.00 5,000,000.00 5,000,000.00 2.28 1.00 100.00 2.28 - - - 1.00 100.00 2.28
JUMLAH E 15,787,234.10 7.20 7.10 0.10 7.20
F. PEKERJAAN FINISHING DAN PEMBERSIHAN AKHIR
1 Pek. Pembersihan Akhir/Perapihan Ls 1.00 900,000.00 900,000.00 0.41 - - - 1.00 100.00 0.41 1.00 100.00 0.41
JUMLAH F 900,000.00 0.41 - 0.41 0.41
JUMLAH (REAL COST) ( A ) 219,336,157.63
PPN 10 % ( B ) 21,933,615.76
100.00 99.20 0.80 100.00
TOTAL COST ( A + B ) 241,269,773.40
DIBULATKAN 241,200,000.00

Kendari, 11 November 2020


Disetujui Oleh Diperiksa Oleh Diperiksa Oleh Di Buat Oleh
Pejabat Pelaksana Teknis Kegiatan (PPTK) Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….
NIP…………………. NIP…………………. Site Engineer Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 4 NOVEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pemasangan Kran Air 1 Bh 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg
13 Kran Air 1.00 Bh Kran Air 1.00 Bh

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 5 NOVEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pemasangan Floor Drain 1 Bh 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg
13 Floor Drain 1.00 Bh Floor Drain 1.00 Bh

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 6 NOVEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi 2 Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil 5 Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 2 Set
4 Adm. Teknik 1 Org
5 Logistik 1 Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang 3 Org
10 Tukang 3 Org
11 Pekerja 6 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pengadaan Ember Air 1 Bh 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg
13 Ember Air 1.00 Bh Ember Air 1.00 Bh

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 7 NOVEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi - Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil - Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 1 Set
4 Adm. Teknik - Org
5 Logistik - Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang - Org
10 Tukang - Org
11 Pekerja 2 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pembersihan Akhir/Sisa Material Ls 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 8 NOVEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi - Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil - Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 1 Set
4 Adm. Teknik - Org
5 Logistik - Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang - Org
10 Tukang - Org
11 Pekerja 2 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pembersihan Akhir/Sisa Material Ls 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 9 NOVEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi - Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil - Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 1 Set
4 Adm. Teknik - Org
5 Logistik - Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang - Org
10 Tukang - Org
11 Pekerja 2 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pembersihan Akhir/Sisa Material Ls 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 10 NOVEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi - Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil - Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 1 Set
4 Adm. Teknik - Org
5 Logistik - Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang - Org
10 Tukang - Org
11 Pekerja 2 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pembersihan Akhir/Sisa Material Ls 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN HARIAN

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR NO. KONTRAK : 442/470/DINKES/VII/2020


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI NILAI KONTRAK : Rp. 241.200.000,-
TAHUN ANGGARAN : 2020 PELAKSANA : CV. ANANDONIANO
LOKASI : KOTA KENDARI TGL. LAPORAN : 11 NOVEMBER 2020

NO TENAGA KERJA ORANG NO JENIS PERALATAN JUMLAH KAPASITAS

1 Kepala Proyek 1 Org 1 Alat Tukang Gali/Besi - Set


2 Pelaksana 1 Org 2 Alat Tukang Batu/Profil - Set
3 Ass. Pelaksana - Org 3 Alat Bantu Lainnya 1 Set
4 Adm. Teknik - Org
5 Logistik - Org
6 Operator - Org
7 Mekanik - Org
8 Driver - Org
9 Kepala Tukang - Org
10 Tukang - Org
11 Pekerja 2 Org
12 Mandor 1 Org

BAHAN
NO JENIS PEKERJAAN VOLUME NO PEMAKAIAN BAHAN VOLUME VOLUME
PENGADAAN

1 Pembersihan Akhir/Sisa Material Ls 1 Pasir Urug M3 Pasir Urug M3


2 Pasir Pasang M3 Pasir Pasang M3
3 Kerikil/Suplit M3 Kerikil/Suplit M3
4 Batu Bata Merah Bh Batu Bata Merah Bh
5 Semen Zak Semen Zak
6 Besi Beton Kg Besi Beton Kg
7 Tanah Urug M3 Tanah Urug M3
8 Cat Tembok Kg Cat Tembok Kg
9 Cat Besi Kg Cat Besi Kg
10 Batu Belah M3 Batu Belah M3
11 Kayu Bekisting M2 Kayu Bekisting M3
12 Kawat Beton Kg Kawat Beton Kg

Keadaan Cuaca Jam

H catatan : H Hujan
M M Mendung
C C Cerah

Disetujui Oleh : Diperiksa Oleh Di Buat Oleh


Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
Dinas Kesehatan Kota Kendari CV………………… CV. ANANDONIANO

……. NO NAME ………. ……. NO NAME ………. ……. NO NAME ……….


NIP…………………. Inspector Pelaksana
LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN (MINGGUAN)

KEGIATAN : REHABILITASI BERAT/SEDANG GEDUNG KANTOR


PEKERJAAN : REHABILITASI PAGAR INSTALASI FARMASI
TAHUN ANGGARAN : 2020
LOKASI : KOTA KENDARI

KONTRAK MINGGU KE

VOL
NO URAIAN SAT
TOTAL HARGA SATUAN TOTAL JUMLAH BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14
(Rp) HARGA (Rp) (%)

1 2 3 4 5 6 7

A. PEKERJAAN PERSIAPAN / PENDAHULUAN


1 Pek. Pembersihan Lokasi/Pembongkaran WC Lama Ls 1.00 2,500,000.00 2,500,000.00 1.14 0.57 0.57
2 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.00 1,000,000.00 1,000,000.00 0.46 0.46
3 Pek. Pembuatan Barak Kerja/Gudang Bahan Ls 1.00 3,500,000.00 3,500,000.00 1.60 1.60
3 Administrasi, Dokumentasi dan Air Kerja Ls 1.00 1,250,000.00 1,250,000.00 0.57 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
4 Papan Nama Kegiatan Ls 1.00 150,000.00 150,000.00 0.07 0.07
JUMLAH A 8,400,000.00
B. PEK. BIAYA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
1 Penyiapan RKK
- Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir Set 1.00 450,000.00 450,000.00 0.21 0.21
- Pembuatan Kartu Identitas Pekerja (KIP); Lbr 4.00 5,000.00 20,000.00 0.01 0.01
2 Sosialisasi, promosi, dan pelatihan;
Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Safety Talk
- Org 4.00 10,000.00 40,000.00 0.02 0.02
dan/atau Tool Box Meeting);
3 Alat Pelindung Kerja dan Alat Pelindung Diri
- Topi Pelindung (Safety Helmet); Bh 4.00 85,000.00 340,000.00 0.16 0.16
- Pelindung Mata Psg 4.00 65,000.00 260,000.00 0.12 0.12
- Sarung Tangan (Safety Gloves); Psg 4.00 20,000.00 80,000.00 0.04 0.04
- Sepatu Keselamatan (Safety Shoes); Psg 4.00 180,000.00 720,000.00 0.33 0.33
- Rompi Keselamatan (Safety Vest); Bh 4.00 50,000.00 200,000.00 0.09 0.09
4 Asuransi dan perizinan
- BPJS Ketenagakerjaan Dan Kesehatan Kerja; Ls 1.00 500,000.00 500,000.00 0.23 0.23
5 Personel Keselamatan Konstruksi
- Petugas K3 Ob 1.00 1,500,000.00 1,500,000.00 0.68 0.68
6 Fasilitas sarana, prasarana, dan alat kesehatan
- Peralatan P3K (Kotak P3K, Tandu,Tabung Oksigen, Obat Luka, Perban, dll) Ls 1.00 1,300,000.00 1,300,000.00 0.59 0.59
7 Rambu-rambu yang diperlukan
- Rambu Informasi dan Peringatan Bh 1.00 50,000.00 50,000.00 0.02 0.02
8 Konsultasi dengan ahli terkait Keselamatan Konstruksi Ls 1.00 500,000.00 500,000.00 0.23 0.23
9 Kegiatan dan peralatan terkait dengan pengendalian Bendera K3 Bh 1.00 50,000.00 50,000.00 0.02 0.02
JUMLAH B 6,010,000.00
1 2 3 4 5 6 7
C. PEKERJAAN PAGAR
I. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi M3 20.51 71,390.00 1,464,454.20 0.67 0.67
2 Pek. Urugan Tanah Kembali M3 5.04 51,480.00 259,459.20 0.12 0.12
3 Pek. Urugan Pasir Alas Pondasi M3 1.68 219,956.00 369,526.08 0.17 0.17
JUMLAH I 2,093,439.48
II. PEKERJAAN BATU DAN PLESTERAN
1 Pas. Batu Kosong M3 5.04 452,951.40 2,282,875.06 1.04 1.04
2 Pas. Pondasi Batu Gunung 1 : 5 M3 19.04 822,701.00 15,664,227.04 7.14 5.00 2.14
3 Pas. Dinding Batu Bata 1 : 5 M2 41.42 121,558.80 5,034,357.70 2.30 2.30
4 Pas. Plesteran Dinding Batu Bata 1 : 5 M2 82.83 64,381.24 5,332,698.11 2.43 2.43
5 Pas. Plesteran Ciprat/Kamper 1 : 3 M2 32.11 66,976.36 2,150,610.92 0.98 0.98
6 Pas. Plesteran Pondasi + Acian M2 44.80 66,976.36 3,000,540.93 1.37 1.37
7 Pek. List Profil Ls 1.00 2,000,000.00 2,000,000.00 0.91 0.91
JUMLAH II 35,465,309.75
III. PEKERJAAN BESI DAN BETON
1 Pek. Beton Pondasi Poer Plat
- Bekisting M2 2.40 170,286.60 408,687.84 0.19 0.19
- Besi Beton Kg 24.72 20,560.54 508,194.87 0.23 0.23
- Beton K175 M3 0.60 1,199,480.49 719,688.29 0.33 0.33
2 Pek. Beton Sloof 15/20
- Bekisting M2 11.20 179,636.60 2,011,929.92 0.92 0.92
- Besi Beton Kg 322.18 20,560.54 6,624,233.02 3.02 3.02
- Beton K175 M3 1.68 1,199,480.49 2,015,127.22 0.92 0.92
3 Pek. Beton Sloof Gerbang 15/30
- Bekisting M2 3.00 179,636.60 538,909.80 0.25 0.25
- Besi Beton Kg 42.01 20,560.54 863,836.71 0.39 0.39
- Beton K175 M3 0.23 1,199,480.49 269,883.11 0.12 0.12
4 Pek. Beton Kolom 20/20
- Roster Beton Kolom Pracetak Motif (Dudukan+Tiang+Topi) Klm 18.00 575,000.00 10,350,000.00 4.72 4.72
- Besi Beton Kg 212.24 20,560.54 4,363,731.43 1.99 1.99
- Beton K175 M3 1.30 1,199,480.49 1,554,526.72 0.71 0.71
5 Pek. Beton Kolom 40/40 (Gerbang)
- Bekisting M2 14.72 249,587.80 3,673,932.42 1.68 1.68
- Besi Beton Kg 163.44 20,560.54 3,360,323.60 1.53 1.53
- Beton K175 M3 1.47 1,199,480.49 1,765,635.28 0.80 0.80
6 Pek. Balok Beton 15/30 dan Topi Beton 10/15
- Bekisting M2 5.48 257,177.80 1,409,334.34 0.64 0.64
- Besi Beton Kg 111.36 20,560.54 2,289,523.28 1.04 1.04
- Beton K175 M3 0.41 1,199,480.49 492,986.48 0.22 0.22
JUMLAH III 43,220,484.33
IV PEKERJAAN TERALIS, KERAMIK DAN ACCESSORIES
1 Pek. Teralis Dinding Pagar M1 49.40 552,580.60 27,297,481.64 12.45 6.22 6.22
2 Pek. Teralis Pintu Gerbang Tengah dan Samping ( Pintu Sorong ) M1 7.64 1,213,405.60 9,270,418.78 4.23 4.23
3 Pas. Dinding Granit 80 x 80 Cm M2 7.68 428,147.50 3,288,172.80 1.50
4 Pas. Batu Alam Dinding dan Kolom Gerbang M2 11.52 415,299.50 4,784,250.24 2.18
1 2 3 4 5 6 7
5 Pek. Papan Nama Gerbang + Logo Kota + Logo Bakti Husada ( Acrylic ) Ls 1.00 9,500,000.00 9,500,000.00 4.33
JUMLAH IV 54,140,323.46
V PEKERJAAN PENGECATAN
1 Pek. Cat Tembok Dinding/Kolom 2x Cat Anti Lumut M2 95.79 35,827.00 3,431,868.33 1.56
2 Pek. Cat Besi Teralis 2x Cat M2 57.04 36,462.80 2,079,838.11 0.95
JUMLAH V 5,511,706.44
D. PEKERJAAN PENATAAN LAHAN PARKIR
1 Pek. Galian Tanah Cansteen M3 5.04 71,390.00 359,805.60 0.16
2 Pek. Urugan Tanah Didatangkan M3 96.00 110,880.00 10,644,480.00 4.85
3 Pek. Urugan Pasir Alas Cansteen/Rabat M3 12.84 219,956.00 2,824,235.04 1.29
4 Pek. Cansteen Pas. Batu Gunung 30/60, Camp. 1:4 M3 10.08 857,780.00 8,646,422.40 3.94
5 Pek. Plesteran Cansteen Camp. 1:3 M2 33.60 66,976.36 2,250,405.70 1.03
6 Pek. Rabat Beton Halaman, T=8 Cm + Rabat Jalan Masuk M3 18.24 1,199,480.49 21,878,524.14 9.97
7 Pek. Pengecatan Cansteen Anti Lumut M2 33.60 35,827.00 1,203,787.20 0.55
JUMLAH D 47,807,660.07
E. PEKERJAAN REHAB/PERBAIKAN
1 Pek. Kramik Lantai 30/30 cm KM/WC M2 2.25 153,684.30 345,789.68 0.16
2 Pek. Granit Dinding 60/60 cm KM/WC M2 8.28 336,451.50 2,785,818.42 1.27
3 Pek. Instalasi Air Bersih + Accesories Pipa Ls 1.00 750,000.00 750,000.00 0.34
4 Pek. Pasangan Instalasi Air Kotor/Limbah Pipa 3" AW Ls 1.00 1,500,000.00 1,500,000.00 0.68
5 Pek. Pasangan Kloset Duduk Bh 1.00 3,382,786.00 3,382,786.00 1.54
6 Pek. Pasangan Kran Air Bh 1.00 93,104.00 93,104.00 0.04
7 Pek. Floor Drain Bh 1.00 54,736.00 54,736.00 0.02
8 Pengadaan Ember Air Bh 1.00 75,000.00 75,000.00 0.03
9 Pek. Pembuatan Septik Tank Unit 1.00 1,800,000.00 1,800,000.00 0.82
10 Pek. Rehab Atap/Turbin Ls 1.00 5,000,000.00 5,000,000.00 2.28
JUMLAH E 15,787,234.10
F. PEKERJAAN FINISHING DAN PEMBERSIHAN AKHIR
1 Pek. Pembersihan Akhir/Perapihan Ls 1.00 900,000.00 900,000.00 0.41
JUMLAH F 900,000.00
JUMLAH (REAL COST) ( A ) 219,336,157.63
PPN 10 % ( B ) 21,933,615.76
100.00 6.26 7.00 7.05 8.23 6.35 10.61 7.25 7.12 0.05 0.05 0.05 0.05 0.05 0.05
TOTAL COST ( A + B ) 241,269,773.40
DIBULATKAN 241,200,000.00

Disetujui Oleh Diperiksa Oleh


Pejabat Pelaksana Teknis Kegiatan (PPTK) Direksi Teknis
Dinas Kesehatan Kota Kendari Dinas Kesehatan Kota Kendari

……. NO NAME ………. ……. NO NAME ……….


NIP…………………. NIP………………….