Anda di halaman 1dari 7

PAKUWON MALL SOLO BARU (PMO)

FOTO KEGIATAN SECURE PARKING 1-30 SEPTEMBER 2023

NO Tanggal Keterangan Area Before After Keterangan

PEMASANGAN
1 SEPTEMBER
1. ULANG B1 DONE
2023
CARSTOPER B1

PERBAIKAN STICK
1 S EPTEMBER
2. CONE BESI AREA LG MOTOR DONE
2023
LG MOTOR

PEMB AKARAN
2 SEPTEMBER
3. SAMPAH TIKET P2 DONE
2023
THERMAL

4 SEPTEMBER PENGELASAN
4. B2 DONE
2023 GUTTER B2
4 SEPTEMBER PERUBAHAN
5. PM03 DONE
2023 POSISI PM03

PEMBAKARAN S
5 SEPTEMBER
6. AMPAH TIKET P2 DONE
2023
THERMAL

PEMASANGAN
5 SEPTEMBER STICK CONE
7. GF UTARA DONE
2023 BSEIA AREA GF
UTARA

PENGECATAN
6 SEPTEMBER TANDA SILANG
8. GF UTARA DONE
2023 AREA EXIT ACE
HARDWARE

PENGECATAN
9. 6 SEPTEMBER 2023 B2 DONE
ARROW B2
PROGRES
PEMBERSIHAN
6 SEPTEMBER
10. ASET POS PM & PK DONE
2023
MASUK ATAU
POS KELUAR

PENGECATAN
7 SEPTEMBER
11. LINE MARKA LG LG MOTOR DONE
2023
MOTOR

PEMBAKARAN
7 SEPTEMBER
12. SAMPAH TIKET P2 DONE
2023
THERMAL

PENGECATAN
7 S EPTEMBER ARROW LG
13. LG MOTOR DONE
2023 MOTOR DAN
LINE PARKING
PEMBAKARAN
8 SEPTEMBER P2
14. SAMPAH TIKET DONE
2023
THERMAL

PROGRES
8 SEPTEMBER PENGECATAN LG MOBIL
15. DONE
2023 ARROW PILLAR
LG MOBIL

PEMBAKARAN
9 SEPTEMBER P2
16. SAMPAH TIKET DONE
2023
THERMAL

PERBAIKAN STICK
9 SEPTEMBER LG MOTOR
17. CONE BESI AREA DONE
2023
LG MOTOR
PEMBAKARAN
10 SEPTEMBER P2
18. SAMPAH TIKET DONE
2023
THERMAL

PEMASANGAN
10 SEPTEMBER
19. ULANG LG MOTOR DONE
2023
WHEELSTOPER

20. DONE

21. DONE

22. DONE
23. DONE

24. DONE

25. DONE

26. DONE

27. DONE

28. DONE
29. DONE

30. DONE

31. DONE

32. DONE

Sukoharjo, 1 2023

Dibuat oleh, Mengetahui,

Diyan Nurmayani Krisdiyanto Cahyo Prasetyo


( CPM ) (Carpark SPV) ( Operational Manager )