Anda di halaman 1dari 6

PENGELUARAN DI KERAGILAN

TANGGAL KETERANGAN BIAYA


7/18/2017 TRANSPORT 1 PINDAHAN DARI CIJUJUNG KE KERAGILAN Rp 2,400,000
BIAYA BONGKAR MUAT Rp 500,000
7/19/2017 TRANSPORT 2 PINDAHAN DARI CIJUJUNG KE KERAGILAN Rp 2,400,000
BIAYA BONGKAR MUAT Rp 400,000
7/20/2017 TERPAL Rp 2,655,000
KANOPI Rp 9,396,000
KEBERSIHAN Rp 500,000
JASA INSTALASI LISTRIK Rp 300,000
7/24/2017 TERPAL Rp 3,000,000
TOTAL BIAYA Rp 21,551,000
BAGIAN UMUM

BAGIAN TANGGAL KETERANGAN


UMUM 7/17/2017 GADAI MESIN DAN TIMBANGAN
UMUM 7/17/2017 BIAYA LISTRIK 3 BLN
UMUM 7/17/2017 BIAYA DONGKRAK
UMUM 7/17/2017 BIAYA BRONJONG
UMUM 7/18/2017 LAMPU 2 BH DAN LISTRIK
TRANSPORT 7/20/2017 PAK EMEN (20 S/D 23 JULI 2017)
CABUT 7/21/2017 BON TUKANG CABUT

CABUT 7/21/2017 BON TUKANG CABUT (KAM)


GILING 7/21/2017 BON TUKANG GILING (YONO)
CABUT 7/23/2017 BON TUKANG CABUT
GILING 7/23/2017 BON TUKANG GILING (YONO)
LANGSIRAN 7/23/2017 LANGSIRAN
BIAYA TANGGAL PEMASUKAN PENGELUARAN
Rp 1,025,000 7/17/2017 Rp 500,000 Rp 1,025,000
Rp 66,000 7/17/2017 Rp 50,000 Rp 66,000
Rp 450,000 7/17/2017 Rp 450,000 Rp 450,000
Rp 50,000 7/17/2017 Rp 50,000 Rp 50,000
Rp 100,000 7/18/2017 Rp 100,000 Rp 100,000
Rp 200,000 7/20/2017 Rp 200,000 Rp 200,000
Rp 2,800,000 7/21/2017 Rp 2,800,000 Rp 2,800,000

Rp 300,000 7/21/2017 Rp 300,000 Rp 300,000


Rp 100,000 7/21/2017 Rp 100,000 Rp 100,000
Rp 1,500,000 7/23/2017 Rp 1,500,000 Rp 1,500,000
Rp 200,000 7/23/2017 Rp 200,000 Rp 200,000
Rp 300,000 7/23/2017 Rp 300,000 Rp 300,000
Rp 6,550,000 Rp -
Rp -
Rp -
Rp 6,850,000 Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
SALDO
-Rp 525,000
-Rp 16,000
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp 6,550,000
Rp -
Rp -
Rp 6,850,000
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Anda mungkin juga menyukai