Anda di halaman 1dari 1

RINCIAN ANGGARAN BIAYA

PROYEK TEKNIK
PENYIRAMAN OTOMATIS KEBUN KELENGKENG PIMPONG
DESA AIR TERBIT - KAMPAR KANAN
JUMLAH
NO URAIAN Satuan Volume Harga Satuan KET
Harga
1 2 3 4 5 6=4x5 7
A. BAHAN / MATERIAL
1 Pompa Air 3/4 hp Unit 2 550.000 1.100.000
2 Micro controler Rosbery Unit 1 435.000 435.000
3 Kabel Mtr 100 5.000 500.000
4 Isolasi Bh 8 16.000 128.000
5 Panel Box 40 cm X 40 CM Bh 1 375.000 375.000
6 MCB 6 A Bh 2 150.000 300.000
7 Kontaktor Magnet 220 VAC Bh 2 200.000 400.000
8 Relay 240 VAC Bh 1 55.000 55.000
9 Rell MCB,KM,REALY 20 cm Bh 1 9.000 9.000
10 Terminal Kabel 12 way Bh 1 25.000 25.000
11 Scun Kabel Type Y Bks 1 80.000 80.000
12 Kabel Ties Bks 1 25.000 25.000
13
14
Org - -
Jumlah A. 3.432.000
B. PERALATAN KERJA
1 Tang Potong Kabel Bh 1 45.000 45.000
2 Obeng (+-) Bh 1 23.000 23.000
3 Tang Clamp Scun Kabel Bh 1 180.000 180.000
4 Sewa Hand Bor Set 1 150.000 150.000
5 Unit - -
6 Unit 1 -
7 Biaya Transportasi Lot 1 300.000 300.000
8 Biaya Tak Terduga Lot 1 250.000 250.000
Jumlah B. 948.000
JUMLAH BIAYA ( A+B ) 4.380.000

GRAND TOTAL 4.380.000


CATATAN :
1 Jika mahasiswa berjumlah 19 orang Maka, Total di bagi jumlah mahasiswa
2 Untuk Hasil biaya /orang Mahasiswa Akan Membayar dengan nilai di samping ini
3 Untuk yang telah membayar tetap harus berpartisifasi dalam project ini 230.526

Pekanbaru, 15 Oktober 2023


KETUA KELOMPOK PROJECT

AJ PANDAPOTAN SILALAHI
2020201029