Anda di halaman 1dari 2

STA Ruas

NO. LERENG Pengebor Fotogram


NO
RUAS
NAMA RUAS PANJANG (M) KEDALAMAN (M)
ATAS/BAWAH
TITIK BOR KONSEP PENANGANAN DESAIN (ADA/BLM ADA) PERKIRAAN BIAYA (Rp.) DOKUMENTASI DOKUMENTASI DOKUMENTASI DOKUMENTASI Koordinat Topografi
Awal Akhir an etri

PELAKSANAAN JALAN NASIONAL WILAYAH 3, PPK 2.6


PROVINSI SULAWESI TENGAH

2
KONSTRUKSI DINDING PENAHAN TANAH (GRAVITY
1 52056 Tentena - Taripa 3+400 3+428 28.00 30.00 Lereng Bawah WALL) + PONDASI PILE + SALURAN BARU KEARAH Rp1,540,000,000.00 -1.7480422, 120.6766450 ON PROGRESS OK OK
OUTLET/AREA AMAN + BAHU RIGID

1
KONSTRUKSI DINDING PENAHAN TANAH (GRAVITY
2 52056 Tentena - Taripa 5+200 5+220 20.00 20.00 Lereng Bawah WALL) + PONDASI PILE + SALURAN BARU KEARAH Rp1,100,000,000.00 -1.7562303, 120.6857973 OK OK
OUTLET/AREA AMAN + BAHU RIGID

2
KONSTRUKSI DINDING PENAHAN TANAH (GRAVITY
3 52056 Tentena - Taripa 11+800 11+815 15.00 13.00 Lereng Bawah WALL) + PONDASI PILE + SALURAN BARU KEARAH Rp825,000,000.00 -1.7731467, 120.7194473
OUTLET/AREA AMAN + BAHU RIGID

1
KONSTRUKSI DINDING PENAHAN TANAH (GRAVITY
4 52061 Tentena - Taripa 18+500 18+525 25 2.50 Lereng Bawah WALL) + PONDASI PILE + SALURAN BARU KEARAH Rp1,022,500,000.00 -1.7905060,120.7611544
OUTLET/AREA AMAN + BAHU RIGID

1
KONSTRUKSI DINDING PENAHAN TANAH (GRAVITY
5 52056 Tentena - Taripa 18+600 18+630 30.00 25.00 Lereng Bawah WALL) + PONDASI PILE + SALURAN BARU KEARAH Rp1,650,000,000.00 -1.7907333,120.7620165
OUTLET/AREA AMAN + BAHU RIGID

1
KONSTRUKSI DINDING PENAHAN TANAH (GRAVITY
6 52056 Tentena - Taripa 29+500 29+522 22.00 27.00 Lereng Bawah WALL) + PONDASI PILE + SALURAN BARU KEARAH Rp1,210,000,000.00 -1.8653780,120.8062649
OUTLET/AREA AMAN + BAHU RIGID
PELAKSANAAN JALAN NASIONAL WILAYAH 3, PPK 3.5
PROVINSI SULAWESI TENGAH

1
KONSTRUKSI DINDING PENAHAN TANAH (GRAVITY
7 52057 Taripa - Pape 10+500 10+530 30 2.00 Lereng Bawah WALL) + PONDASI PILE + SALURAN BARU KEARAH Rp1,650,000,000.00 -1.9316541,120.7928247 OK OK
OUTLET/AREA AMAN + BAHU RIGID

2
KONSTRUKSI DINDING PENAHAN TANAH (GRAVITY
8 52057 Taripa - Pape 11+625 11+657 32 3.00 Lereng Bawah WALL) + PONDASI PILE + SALURAN BARU KEARAH Rp1,760,000,000.00 -1.9402769,120.7898329 OK OK
OUTLET/AREA AMAN + BAHU RIGID

2
KONSTRUKSI DINDING PENAHAN TANAH (GRAVITY
9 52058 Pape - Tindatana 1+820 1+850 30 2.50 Lereng Bawah WALL) + PONDASI PILE + SALURAN BARU KEARAH Rp1,227,000,000.00 -2.0249899,120.7997870
OUTLET/AREA AMAN + BAHU RIGID

2
KONSTRUKSI DINDING PENAHAN TANAH (GRAVITY
10 52061 Tomata - Beteleme 0+200 0+260 60 2.00 Lereng Bawah WALL) + PONDASI PILE + SALURAN BARU KEARAH Rp3,300,000,000.00 -1.9999620,120.9789016 OK OK OK
OUTLET/AREA AMAN + BAHU RIGID

PERBAIKAN GEOMETRI (BENCHING) +


KONSTRUKSI DINDING PENAHAN TANAH
11 52061 Tomata - Beteleme 25+700 25+725 25 2.00 Lereng Atas Tipikal DAN BUFFER PASANGAN BATU + Rp197,500,000.00 -2.1014939,121.1307263 OK OK
SALURAN BARU KEARAH OUTLET/AREA
AMAN + BAHU RIGID

PERBAIKAN GEOMETRI (BENCHING) +


KONSTRUKSI DINDING PENAHAN TANAH
12 52061 Tomata - Beteleme 28+200 28+260 60 1.50 Lereng Atas Tipikal DAN BUFFER PASANGAN BATU + Rp474,000,000.00 -2.1069772, 121.1410042 OK OK
SALURAN BARU KEARAH OUTLET/AREA
AMAN + BAHU RIGID

PERBAIKAN GEOMETRI (BENCHING) +


KONSTRUKSI DINDING PENAHAN TANAH
13 52061 Tomata - Beteleme 30+200 30+230 30 1.50 Lereng Atas Tipikal DAN BUFFER PASANGAN BATU + Rp237,000,000.00 -2.10254216,121.15038773 OK OK
SALURAN BARU KEARAH OUTLET/AREA
AMAN + BAHU RIGID

PELAKSANAAN JALAN NASIONAL WILAYAH 3, PPK 3.6


PROVINSI SULAWESI TENGAH

PERBAIKAN GEOMETRI (BENCHING) +


KONSTRUKSI DINDING PENAHAN TANAH
14 52481 Tompira - Keuno 3+880 4+000 120 1.00 Lereng Atas Fotogrametri DAN BUFFER PASANGAN BATU + Rp948,000,000.00 -2.0672565,121.4144107
SALURAN BARU KEARAH OUTLET/AREA
AMAN + BAHU RIGID

PERBAIKAN GEOMETRI (BENCHING) +


KONSTRUKSI DINDING PENAHAN TANAH
15 52481 Tompira - Keuno 7+950 8+010 60 1.00 Lereng Atas Fotogrametri DAN BUFFER PASANGAN BATU + Rp474,000,000.00 -2.0738397,121.4403536
SALURAN BARU KEARAH OUTLET/AREA
AMAN + BAHU RIGID