PERMIT TO WORK REGISTER

Tgl Terbit Tgl Ditutup Jml Hari PTW Tambahan


No No PTW Pekerjaan /Jobs Supervisor Catatan Khusus / Spesific Remarks
Date Isued Date Close No of days Additional PTW
1 CWP 0101 Bor dalam/soil Priyono 10 Juni 2022 16 Juni 2022 7
2 LFW 0501 Bor dalam/soil Priyono 10 Juni 2022 16 Juni 2022 7
3 WAH 0301 Bor dalam/soil Priyono 10 Juni 2022 16 Juni 2022 7
4 WAH 0302 Bor dalam/soil Priyono 17 Juni 2022 23 Juni 2022 7
5 CWP 0102 Bor dalam/soil Priyono 17 Juni 2022 23 Juni 2022 7
6 LFW 0502 Bor dalam/soil Priyono 17 Juni 2022 23 Juni 2022 7
7 EXCA 0401 Bor log Priyono 24 Juni 2022 30 Juni 2022 7
8 CWP 0103 Bor log Priyono 24 Juni 2022 30 Juni 2022 7
9 WAH 0303 Bor log Priyono 24 Juni 2022 30 Juni 2022 7
10 CWP 0104 Bor log Priyono 01 JUli 2022 07 Juli 2022 7
11 LFW 0503 Bor log Priyono 01 JUli 2022 07 Juli 2022 7
12 WAH 0304 Bor log Priyono 01 JUli 2022 07 Juli 2022 7
06 Agustus 13 Agustus
13 ELW 0601 Pemasangan Siswanto 7
2022 2022
06 Agustus 13 Agustus
14 CWP 0105 Pembangunan direksi keet Siswanto 7
2022 2022
06 Agustus 13 Agustus
15 CWP 0106 Pembesian Siswanto 7
2022 2022
06 Agustus 13 Agustus
16 HPW 0201 Pengelasan Siswanto 7
2022 2022
Pemasangan H-beam jembatan akses 06 Agustus 13 Agustus
17 LFW 0503 Siswanto 7
sementara 2022 2022
22 Agustus 26 Agustus
18 CWP 0107 Pembesian Siswanto 5
2022 2022
02
29 Agustus
19 CWP 0108 Pembesian Siswanto September 5
2022
2022
05 08
20 HWP 0202 Pengelasan dan Pembuatan gorong-gorong Siswanto September September 4
2022 2022
05 09
21 CWP 0109 Pembesian dan Pembuatan gorong-gorong Siswanto September September 5
2022 2022
PERMIT TO WORK REGISTER
05 09
22 LFW 0504 Pembuatan gorong-gorong Siswanto September September 5
2022 2022
12 16
23 CWP 0110 Pembesian dan Pengecoran Siswanto September September 5
2022 2022
12 16
24 LFW 0504 Pemasangan gorong-gorong Siswanto September September 5
2022 2022
12 15
25 WAH 0305 Pengecoran dan Pemasangan bekisting RW Siswanto September September 3
2022 2022
12 16
Pengelasan, Pemotongan, dan
26 HWP 0203 Siswanto September September 3
Penggerindaan
2022 2022
19 23
Pengelasan, Pemotongan, dan
27 HWP 0204 Siswanto September September 5
Penggerindaan
2022 2022
19 23
28 LFW 0505 Pemasangan alat dan Mobilisasi material Siswanto September September 5
2022 2022
19 23
Bekisting, Pembesian, Pengecoran, dan
29 CWP 0111 Siswanto September September 5
Pemasangan pagar
2022 2022
19 23
30 WAH 0306 Bekisting, Pembesian, dan Pengecoran Siswanto September September 5
2022 2022
26 30
31 LFW 0506 Pemasangan alat dan Mobilisasi material Siswanto September September 5
2022 2022
26 30
Bekisting, Pembesian, Pengecoran, dan
32 CWP 0112 Siswanto September September 5
Pemasangan pagar
2022 2022
26 30
Pengelasan, Pemotongan, dan
33 HWP 0205 Siswanto September September 5
Penggerindaan
2022 2022
26 30
34 WAH 0307 Bekisting, Pembesian, dan Pengecoran Siswanto September September 5
2022 2022
03 Oktober 07 Oktober
35 WAH 0308 Bekisting dan Pengecoran Siswanto 5
2022 2022
36 CWP 0113 Bekisting, Pembesian, dan Pengurugan Siwanto 03 Oktober 07 Oktober 5
PERMIT TO WORK REGISTER
2022 2022
03 Oktober 07 Oktober
37 LFW 0507 Mobilisasi material Siswanto 5
2022 2022
Pengelasan, Pemotongan, dan 03 Oktober 07 Oktober
38 HWP 0206 Siswanto 5
Penggerindaan 2022 2022
07 Oktober 07 Oktober
39 WAH 0309 Setting alat bore pile Haryanto 1
2022 2022
10 Oktober 14 Oktober
40 WAH 0310 Bekisting, Pembesian, dan Pengecoran Siswanto 5
2022 2022
10 Oktober 14 Oktober
41 HWP 0207 Pengelasan dan Pemotongan Siswanto 5
2022 2022
10 Oktober 14 Oktober
42 LFW 0508 Mobilisasi material Siswanto 5
2022 2022
Bekisting, Pembesian, Pengecoran, dan 10 Oktober 14 Oktober
43 CWP 0114 Siswanto 5
Pengurugan 2022 2022
17 Oktober 23 Oktober
44 HWP 0208 Drilling Bore PIle Siswanto 7
2022 2022
17 Oktober 23 Oktober
45 CWP 0115 Drilling Bore PIle Haryanto 7
2022 2022
17 Oktober 23 Oktober
46 LFW 0509 Drilling Bore PIle Haryanto 7
2022 2022
Pengelasan, Pemotongan, dan 24 Oktober 28 Oktober
47 HWP 0209 Siswanto 5
Penggerindaan 2022 2022
24 Oktober 30 Oktober
48 CWP 0116 Bekisting, Pembesian, dan Pengecoran Siswanto 7
2022 2022
24 Oktober 30 Oktober
49 LFW 0510 Mobilisasi material Siswanto 7
2022 2022
24 Oktober 30 Oktober
50 WAH 0311 Bekisting, Pembesian, dan Pengecoran Siswanto 7
2022 2022
24 Oktober 30 Oktober
51 HWP 0210 Drilling Bore PIle Haryanto 7
2022 2022
24 Oktober 30 Oktober
52 LFW 0511 Drilling Bore PIle Haryanto 7
2022 2022
24 Oktober 30 Oktober
53 CWP 0117 Drilling Bore PIle Haryanto 7
2022 2022
31 Oktober 06 November
54 CWP 0118 Drilling Bore PIle Erzal 7
2022 2022
31 Oktober 06 November
55 HWP 0211 Drilling Bore PIle Erzal 7
2022 2022
31 Oktober 06 November
56 LFW 0512 Drilling Bore PIle Erzal 7
572022 2022
PERMIT TO WORK REGISTER
07 November 13 November
57 CWP 0119 Drilling Bore PIle Erzal 7
2022 2022
07 November 13 November
58 HWP 0212 Drilling Bore PIle Haryanto 7
2022 2022
07 November 13 November
59 LFW 0513 Drilling Bore PIle Haryanto 7
2022 2022
31 Oktober 06 November
60 CWP 0120 Pembesian Siswanto 7
2022 2022
31 Oktober 06 November
61 HWP 0213 Pengealsan Siswanto 7
2022 2022
31 Oktober 06 November
62 WAH 0312 Pembesian Siswanto 7
2022 2022
07 November 13 November
63 LFW 0514 Mobilisasi material Siswanto 7
2022 2022
07 November 13 November
64 CWP 0121 Pembesian Siswanto 7
2022 2022
07 November 13 November
65 HWP 0214 Pengealsan Siswanto 7
2022 2022
07 November 13 November
66 WAH 0313 Pembesian Siswanto 7
2022 2022
07 November 13 November
67 LFW 0515 Mobilisasi material Siswanto 7
2022 2022
13 November 19 November
68 CWP 0122 Pembesian Siswanto 7
2022 2022
13 November 19 November
69 HWP 0215 Pengealsan Siswanto 7
2022 2022
13 November 19 November
70 WAH 0314 Pembesian Siswanto 7
2022 2022
13 November 19 November
71 LFW 0516 Mobilisasi material Siswanto 7
2022 2022
14 November 20 November
72 CWP 0123 Drilling Bore PIle Haryanto 7
2022 2022
14 November 20 November
73 LFW 0517 Drilling Bore PIle Haryanto 7
2022 2022
14 November 20 November
74 HWP 0216 Drilling Bore PIle Haryanto 7
2022 2022
21 November 27 November
75 CWP 0124 Bekisting, Pembesian, dan Pengecoran Siswanto 7
2022 2022
21 November 27 November
76 HWP 0217 Pengealsan dan Pemotongan Siswanto 7
2022 2022
77 WAH 0315 Pengecoran dan Pembesian Siwanto 21 November 27 November 7
PERMIT TO WORK REGISTER
2022 2022
21 November 27 November
78 CWP 0125 Pengecoran Erzal 7
2022 2022
21 November 27 November
79 HWP 0218 Pengelasan Erzal 7
2022 2022
21 November 27 November
80 LFW 0518 Mobilisasi material Siswanto 7
2022 2022
21 November 27 November
81 LFW 0519 Bore Pile Erzal 7
2022 2022
28 November 03 Desember
82 CWP 0126 Drilling Bore Pile Erzal 7
2022 2022
28 November 03 Desember
83 LFW 0519 Drilling Bore Pile Erzal 7
2022 2022
28 November 03 Desember
84 WAH 0316 Drilling Bore Pile Erzal 7
2022 2022
28 November 03 Desember
85 HWP 0219 Drilling Bore Pile Erzal 7
2022 2022
28 November 03 Desember
86 CWP 0127 Relokasi Sungai SIswanto 7
2022 2022
28 November 03 Desember
87 LFW 0520 Relokasi Sungai SIswanto 7
2022 2022
28 November 03 Desember
88 WAH 0317 Relokasi Sungai SIswanto 7
2022 2022
28 November 03 Desember
89 HWP 0220 Relokasi Sungai SIswanto 7
2022 2022
04 Desember 10 Desember
90 CWP 0128 Relokasi Sungai SIswanto 7
2022 2022
04 Desember 10 Desember
91 LFW 0521 Relokasi Sungai SIswanto 7
2022 2022
04 Desember 10 Desember
92 WAH 0318 Relokasi Sungai SIswanto 7
2022 2022
04 Desember 10 Desember
93 HWP 0221 Relokasi Sungai SIswanto 7
2022 2022
04 Desember 10 Desember
94 CWP 0129 Drilling Bore Pile Erzal 7
2022 2022
04 Desember 10 Desember
95 LFW 0522 Drilling Bore Pile Erzal 7
2022 2022
04 Desember 10 Desember
96 WAH 0319 Drilling Bore Pile Erzal 7
2022 2022
04 Desember 10 Desember
97 HWP 0222 Drilling Bore Pile Erzal 7
2022 2022
PERMIT TO WORK REGISTER
11 Desember 17 Desember
98 CWP 0130 Relokasi Sungai SIswanto 7
2022 2022
11 Desember 17 Desember
99 LFW 0523 Relokasi Sungai SIswanto 7
2022 2022
11 Desember 17 Desember
100 WAH 0320 Relokasi Sungai SIswanto 7
2022 2022
11 Desember 17 Desember
101 HWP 0223 Relokasi Sungai SIswanto 7
2022 2022
11 Desember 17 Desember
102 CWP 0131 Bore Pile Erzal 7
2022 2022
11 Desember 17 Desember
103 LFW 0524 Bore Pile Erzal 7
2022 2022
11 Desember 17 Desember
104 WAH 0321 Bore Pile Erzal 7
2022 2022
11 Desember 17 Desember
105 HWP 0224 Bore Pile Erzal 7
2022 2022
12 Desember 18 Desember
106 CWP 0132 Pemancangan SSP Dayat 7
2022 2022
12 Desember 18 Desember
107 WAH 0322 Pemancangan SSP Dayat 7
2022 2022
12 Desember 18 Desember
108 HWP 0225 Pemancangan SSP Dayat 7
2022 2022
12 Desember 18 Desember
109 LFW 0525 Pemancangan SSP Dayat 7
2022 2022
Bekisting,, Pembesian, Pengecoran, dan 18 Desember 24 Desember
110 CWP 0133 Siswanto 7
Pengurugan 2022 2022
18 Desember 24 Desember
111 WAH 0323 Bekisting,, Pembesian, dan Pengecoran Siswanto 7
2022 2022
Pengelasan, Pemotongan, dan 18 Desember 24 Desember
112 HWP 0226 Siswanto 7
Penggerindaan 2022 2022
18 Desember 24 Desember
113 LFW 0526 Pemsangan alat dan Mobilisasi material Siswanto 7
2022 2022
18 Desember 24 Desember
114 CWP 0134 Relokasi Sungai Siswanto 7
2022 2022
18 Desember 24 Desember
115 CWP 0135 Bore Pile Erzak 7
2022 2022
18 Desember 24 Desember
116 LFW 0527 Bore Pile Erzak 7
2022 2022
18 Desember 24 Desember
117 HWP 0227 Bore Pile Erzak 7
2022 2022
118 WAH 0324 Bore Pile Erzak 18 Desember 24 Desember 7
PERMIT TO WORK REGISTER
2022 2022
19 Desember 25 Desember
119 CWP 0136 Pemancangan SSP Dayat 7
2022 2022
19 Desember 25 Desember
120 WAH 0325 Pemancangan SSP Dayat 7
2022 2022
19 Desember 25 Desember
121 HWP 0228 Pemancangan SSP Dayat 7
2022 2022
19 Desember 25 Desember
122 LFW 0528 Pemancangan SSP Dayat 7
2022 2022
Bekisting,, Pembesian, Pengecoran, dan 25 Desember 31 Desember
123 CWP 0137 Siswanto 7
Pengurugan 2022 2022
25 Desember 31 Desember
124 WAH 0326 Bekisting,, Pembesian, dan Pengecoran Siswanto 7
2022 2022
Pengelasan, Pemotongan, dan 25 Desember 31 Desember
125 HWP 0229 Siswanto 7
Penggerindaan 2022 2022
25 Desember 31 Desember
126 LFW 0529 Pemsangan alat dan Mobilisasi material Siswanto 7
2022 2022
09 Januari 15 Januari
127 LFW 0530 Pemsangan alat dan Mobilisasi material Erzal 7
2023 2023
Pengelasan, Penggerindaan, dan 09 Januari 15 Januari
128 HWP 0230 Erzal 7
Pemotogan 2023 2023
09 Januari 15 Januari
129 CWP 0138 Pembesian dan Pengecoran Erzal 7
2023 2023
09 Januari 15 Januari
130 WAH 0327 Pembesian dan Pengecoran Erzal 7
2023 2023
09 Januari 15 Januari
131 LFW 0531 Pemasangan alat dan Pemasangan Crawler Dayat 7
2023 2023
Pengelasan, Penggerindaan, dan 09 Januari 15 Januari
132 HWP 0231 Dayat 7
Pemotogan 2023 2023
09 Januari 15 Januari
133 CWP 0139 Pemancangan SSP Dayat 7
2023 2023
09 Januari 15 Januari
134 WAH 0328 Pemancangan SSP Dayat 7